TANIMULYA HIGH SCHOOL

A. BACKGROUND
Nowadays, the challenge in education development goes tightly and it also
followed by the darting progress of science and technology. It makes youth people have
to be more competitive. They must have a good knowledge in science. The reason of
estabilishing this international school is to support the advancement of science in
international standart, especially for rural are. Because education in rural area should
increase as the same with education in urban area. Hopefully, every children can have a
same degree for their education.
B. GENERAL PURPOSE
To send their children to school quality, and quality for children useful for the
country and nation. In addition the school is one of the main objectives is needed to study
life. Every child is also entitled to a proper education and to create a young generation of
quality and competitiveness.

The school is also able to create a positive school culture to encourage the pupils
to develop the mind in order to create a young generation of the plume. School is the
main form in the application in science, quality school provides a special attraction.
The whole school community is also to appreciate a difference in the position of
teachers as a teacher and giver of knowledge for role models for students, provides a
record of behavior that gives awards to students so do not look at the background of
religion, culture, or ethnicity.
C. SPECIAL PURPOSE
1. Able to raise behavior and specific character
2. Rear student to be real human
3. Able to presenting the good balance between thought and action so that can make
schools character increasing rapidly and will be known by wide community.
4. Student also must be able think creative, selfsufficent and skillful appropriate with
rules of school that has been agreed before.

D. DAY/DATE/TIME
At the beginning of school construction was started on 20 August 14 until 09 December
2017. This process in accordance with the planning and development process is running
about 3 years , and school building maintenance period runs of 1 year. And after the
maintenance period , the school will start operating. And the time hours of teaching and
learning in this school only runs in the morning at 07:15 until 13:30. after the learning
process is resumed with laboratory practices of 14.30 until 16:45 . and after school
laboratories ended the school 's teaching and learning process , and is prescribed for the
students and the students should immediately return home each.

E. CONDITION
At the beginning of the construction of this school built on land that was once
made into fields by the people here , and now this school has been built in stages and
construction of this school will be developed if the people around this area more
dominant entrust their children's education in this school . this school is located in place

away from the crowds. So that every student can learn more focused and consentrate on
the lesson learned. This school was established international standard and the number of
classrooms in schools across the room numbered 18 room and the room was only for the
classroom and on the laboratory room school building 5 laboratories which there are 2
laboratories of Computer , 1 chemistry laboratory, 1 physics laboratory, and the last
laboratory of biology. And the whole room lab. This school is one of the lab Complete,
functions that male and female students is facilitated to study in this school . This school
was built in order to study this area develop better than usual, and the school was built
with adequate facilities so that - students and students more enthusiastic about learning.
F. METHODS OF CONSTRUCTION
The sewage of the premises

sometimes

needs

diverting

as

well.

Each stage is crucial to get right, if not the project could result in failures or in creating an
unattractive space, which is not fully utilised.
Stage 1 Preliminary Work
It is crucial to get the design right to suite your needs. Once a design is established it will
be submitted to planning as most basements need planning consent (unless it can be
achieved

under

permitted

development,

rarely

the

case

in

basements).

We will prepare calculations and drawings for Building Control and Party Wall
surveyors. We can offer a full design service depending on your needs from a simple shell
to a modern high standard finish. Some services such as gas and electric meters might
need moving prior of works.
Stage 2 Front excavation
If you currently have some type of basement or cellar we might be able to dig from the
front garden so all the works go from the front garden as appose to through the house.
This will enable you to be less disturbed during the majority of the construction stage. We
might be able to work under some slabs depending on the slab construction. The holding
is placed for security and storage. The front area might be filled in on a later stage or
constructed to accommodate a front light well. If no basement exists we will still build a

front holding, however we will need access to the front room in the initial stage as we
might not be able to work under the concrete or the wood floor.
Stage 3 Insertion of Beams
This will depend on the design but usually in older houses it will take the load of the floor
of the ground floor and entail moving the sleepers. This will enable a clear open space
hence making the basement potentially one of the biggest rooms of the home if not the
largest.

Stage 4 Underpinning, excavation and slab construction.


This stage will take time as the underpinning has to be done in sequence according to the
engineers specification and inspected by the building control. Once the underpinning is
completed the remaining soil will be removed. Once the earth is removed the slab can be
constructed, the slab will be 200 to 300mm thick with reinforced steel normally tied into
the toes of the pins.

Stage 5 - Water proofing and floor construction


The new room is water proofed by a membrane on the floor and walls and sealed
together. The floor will be constructed of 18mm tongue and grove boards or screed on top
of the membrane. This will depend on the type of flooring required to finish the room.
As the waterproofing is crucial more information is dedicated to this subject.
Stage 6 Staircase
We might have done all the works without interfering with the main house however once
the new staircase is to be fitted, access will be needed. This stage might be delayed while
the internal fit out is taking place.
Stage 7 - Internal fit out

This stage is where your basement area comes alive to suite your needs. The electrics,
plumbing, portioning and all the internal work will depend on your needs which were
implemented in the design.

G. SPECIFICATION
Tanimulya International School is a school with international standart.
Tanimulya international school pants school built on 10 acres of land, and located at the
foot of mountain Lubuk Raya. This school can be reached from the city center field with
a time of 2 hours, and has a field distance from the city center 85 km. This school
consist of a kindergarten, elementry school, junior high school. Tanimulya internation
school also has support facilities and learning activities, the facility is in the form of
classroom size 5x5 meter equipped with air conditionin that makes students comfortable
and at ease learning in the classroom, chemistry lab, physics lab, biology lab, dan
computer lab which each lab is equipped with apploances which is fairly complete and
size of each lab was made 10x10 meters in which students can comfortably learn.
Tanimulya International School also equipped

with other supporting facilities, the

sports field, along teachers room, headmaster room places of worship in the form of
mushalla, school cafetaria, and parking field that is wide enough to accommodate
vehicless of teachers or students.
1. Room of Head Master
Room of headmaster has designed simply and only for himself. And in the outside of
headmaster room has a place for secretary of headmaster. The special in this room is a
cupboard to save all of appreciation that students has been achieved on behalf of the
school.
2. Teachers Room
It is the teachers' room . Every teacher in this classroom has a private table as a place.
This room can accommodate up to 45 teacher's desk . Inside this room special toilet
teacher . That teachers do not need to leave the room when going to the toilet .
3. Physics Laboratory
This laboratory is located beside the chemistry laboratory . This school has only one
physics lab . although this is only one laboratory , but this room is the most complete

laboratory among schools that once existed in this area .This room is equipped with
CCTV to safeguard them. This room is also equipped with ac to provide comfort to the
students who use this laboratory . This room can accommodate 50 students who are
doing the practice .
4.

Laboratory of Biologi

Lab is a room that needed a school as the completeness of the learning process . For
example , biology laboratory . The room is designed as comfortable as possible for
students when considered from the room layout and the completeness of the equipment .
Availability of air conditioning is also necessary to maintain the freshness of the room .
This room is a favorite room for students because students' interest in biology that is
supported by the convenience and completeness of equipment .

5. Computer Laboratory
We built this room specifically for computer labs which can accommodate up to 30
units of computers. This room is also equipped with air conditioning so the room stays
fresh all the time even though the room was filled by students who are learning .
The school has three computer labs where capacity and the same room specifications as
described previously .
6. Parking Lot
This field deliberately kept simple with emphasis on comfort for the owner of the
motorcycle. A spacious parking lot should also be calculated by comparing the number
of students who bring personal vehicles to school. Parking lot be closed so that vehicles
are not exposed to the hot sun and rain . The parking lot was also made of concrete so
that the parking lot was not muddy when it rains .
7. Living Healt
Health space is very important for schools . The availability of this room to watch if there
are students who are injured or ill at the time at school . Therefore the health should be
maintained clean room . The room must have a window that is sufficient as air vents .
Closet drugs and medical equipment are required to be maintained. For room lay

students, was made more closed so other students who are outside , do not enter if not
interested. Do not forget giving sufficient window for good air cycle .
8. Canteen
Canteens were clean and orderly is very important for high school students . a spacious
cafeteria with a comparison to note that there are many students .
there are a lot of fans are made in the cafeteria to make students as comfortable as
possible while in the cafeteria.
9. School Library .
The school library is the largest room in the school, the library size three times larger than
the teacher office space . This library has computer technology if you want to find a book
in this room . This room is also equipped with facilities such as tables, chairs and ac ,
bookcases , computers and others. and do not forget , this room is also equipped with
CCTV to maintain the security of the library in order to create a more conducive
atmosphere .
H. CONCLUSION
Each area requires the development of science is uneven. Because, every child is
entitled to receive the same education in every area. Education will help them to live a
brighter future, with technology that also supports. And this school, Tanimulya
International School, is a school that has facilities to support every child to get an
education that is more feasible with the advancement of the technology provided.