Anda di halaman 1dari 2

ENGINEERING & PROJECT MANAGEMENT

SITE PROJECTS DEPARTMENT

REQUEST FOR INSPECTION


Project Title :

Methanol Recovery WHA side cut Project

Project No. :

AF1314035

Project Type :

Contractor Contact Person

Sajjad Ahmed

Inspection Date

26-12-16

Time:

SSRS No.:

Discipline:

CIVIL

Const.

Affiliate :

Tel:

09:00AM

AR-RAZI

0546654977
4

Place of Inspection

Rev. :

00

RFI No

P-828

AR-RAZI

Network No:
MECH.

ELECT.

INSTR.

S No.
6.1.5

Item to be Inspected
Visual welding Inspection of joints
as per ITP# SEN-ITP-005 Rev.00

Quantity
80

Drawings No. / Remarks


As per attached report#
W-105

Satisfactory
Results
Unsatisfactory
Comments

QA/QC Engineer /
Inspector Name

Signature

Date

Construction Supervisor /
Project Engineer

Signature

Date

Contractor

Sajjad Ahmed

Signature

Date

25-12-16

EPM-SPD-PC-F-008 Rev. No.: 00


Ref Doc.: EPM-SPD-PC-P-004

Page 1 of 2