NOPEMBER
Asset Register
Report
SHIP MAINTENANCE ME 141329
Edo Legowo
Project
List of Equipment
NRP
SHIP
MAINTENANCE
4213 100 075
Rev. No.
Page
Page 2 of 15
LIST OF CONTENT
1.
INTRODUCTION..................................................................................3
2.
OBJECTIVE......................................................................................... 3
3.
REFFERENCE...................................................................................... 3
4.
LIST OF ABBREVATION.......................................................................3
4.1 Location Code................................................................................. 3
4.2 System Code.................................................................................. 3
4.3 Equipment Code............................................................................. 4
5.
DESIGN REQUIREMENTS....................................................................6
6.
SUMMARY.......................................................................................... 6
a.
Main Engine.................................................................................... 6
b.
c.
Sterntube Seal................................................................................7
d.
e.
f.
g.
h.
i.
j.
k.
I.
INTRODUCTION
Project
List of Equipment
NRP
SHIP
MAINTENANCE
4213 100 075
Rev. No.
Page
Page 3 of 15
Project
List of Equipment
NRP
SHIP
MAINTENANCE
4213 100 075
Rev. No.
Page
Page 4 of 15
3.
Penyusunan (Staffing)
The function of staffing also called the personnel functions include the
tasks of obtaining employee, shows an employee, and take advantage
of employees. The function of every manager associated with the
employee leadership environment for employees compelled to carry out
the task as well as possible to realize the company's objectives or goals
that they accompany the activity.
4.
Directing
When the work plan has been arranged, the organizational structure has
been set and the position or positions in the organizational structure has
been filled, then the activity that should do next is to coordinating the
subordinate, so that what the objectives are realized.
5.
Controlling
Control can be defined as a process to implement what work has been
carried out, vote, and if necessary, corrected with the intention that the
implementation in accordance with the original plan.
Maintenance management includes engineering which includes
technical work to enhance the maintenance process. Maintenance
management is one part of the maintenance work, and is a factor /
elemet very important in the overall arrangements of work involving the
utilization of existing resources, such as labor, machinery, material /
spare-parts, money and maintenance methods.
Maintenance engineering consist of :
Maintenance administrative engineering
Management data & proses (EDP).
Maintenance planning & control.
Material management.
Investment control & work management.
II.
OBJECTIVE
III.
REFFERENCE
Project
List of Equipment
NRP
Rev. No.
Page
IV.
SHIP
MAINTENANCE
4213 100 075
Page 5 of 15
LIST OF ABBREVATION
4.1 Location Code
No Cod
.
e
1 001
2 002
3 003
4.2 System Code
No Cod
.
e
1 MEN
2 CPP
3 STS
4 ROC
5
ADS
6
7
8
EDS
DFS
LUB
SW
C
FWC
CWP
9
10
11
Description
Engine Room
After Peak
Navigation Deck
Description
Main Engine
Controllable Pitch Propeller
Sterntube Seal
Reduction Gears with Oil Coolers
Auxiliary Diesel Sets and Emergency
Diesel Set
Emergency Diesel Set
Diesel Fuel Filling and Transfer System
Lubricating Oil Filling & Transfer System
Sea Water Pumps and Coolers
Fresh Water Pumps and Coolers
Chilled Water Plant
Description
Main Engine
Turbocharger
Fuel Injection Pump
Fuel Injector
Controlable Pitch Propeller
Hub
Pitch Servo Unit
Hydraulic Main Pump
Hydraulic Standby Pump
Sterntube Seal (Aft)
Sterntube Seal (Forward)
Reduction Gear With Oil Cooler
Project
List of Equipment
NRP
Rev. No.
Page
13
14
15
16
17
18
19
CEG
LOA
LOS
LOM
PRV
OCO
DOF
20
DPO
21
22
23
24
25
26
27
28
29
30
31
32
33
TMR
TMT
TTT
PRG
PRS
PRT
NRV
ADS
ACG
EDS
EAC
TFP
MEP
34
DBR
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
FSR
FSS
FSH
TRP
DOP
SMP
SGP
LSM
LSP
HSP
SPP
STP
FRP
CMP
LCM
HC
M
50
SHIP
MAINTENANCE
4213 100 075
Page 6 of 15
Project
List of Equipment
NRP
Rev. No.
Page
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
V.
VI.
CAP
LCA
SHP
FGP
BBP
BLP
ACP
PRP
LTM
HTM
LCM
FW
H
HW
C
UCF
EAC
ACC
CWP
SCC
ELM
CDR
EVP
CW
C
DFS
TAS
SHIP
MAINTENANCE
4213 100 075
Page 7 of 15
DESIGN REQUIREMENTS
Components code :
XXX-YYY-ZZZ-00, where :
1. XXX = Location
2. YYY = System
3. ZZZ = Equipment
4. 00
= Number or Location of Equipment (if more than 1
equipment)
SUMMARY
a. Main Engine
Assets
001-MEN-MEN-
Description
Main Engine Portside
Project
NRP
List of Equipment
Rev. No.
Page
01
001-MEN-MEN02
001-MEN-TBC01
001-MEN-TBC02
001-MEN-FIP-01
001-MEN-FIP-02
001-MAN-FIR-01
001-MAN-FIR-02
SHIP
MAINTENANCE
4213 100 075
Page 8 of 15
Sterntube
Sterntube
Sterntube
Sterntube
Seal
Seal
Seal
Seal
Description
(Aft) Portside
(aft) Starboard
(Forward) Portside
(Forward) Starboard
Project
List of Equipment
NRP
Rev. No.
Page
02
001-ROC-LOA01
001-ROC-LOA02
001-ROC-LOS01
001-ROC-LOS02
001-ROC-LOM01
001-ROC-LOM02
001-ROC-PRV01
001-ROC-PRV02
001-ROC-OCO01
001-ROC-OCO02
001-ROC-DOF01
001-ROC-DOF02
001-ROC-DPO01
001-ROC-DPO02
001-ROC-TMR01
001-ROC-TMR02
001-ROC-TMT01
001-ROC-TMT02
001-ROC-TTT01
001-ROC-TTT02
SHIP
MAINTENANCE
4213 100 075
Page 9 of 15
Starboard
Lube Oil Attached Pump Portside
Lube Oil Attached Pump Starboard
Lube Oil Standby Pump Portside
Lube Oil Standby Pump Starboard
Lube Oil Motor Portside
Lube Oil Motor Starboard
Pressure Relief Valve Portside
Pressure Relief Valve Starboard
Oil Cooler Portside
Oil Cooler Starboard
Double Oil Filter Portside
Double Oil Filter Starboard
Differential Pressure Indicator for Oil Filter
Portside
Differential Pressure Oil Indicator for Oil
Filter Starboard
Thermometer Portside
Thermometer Starboard
Thermostat Portside
Thermostat Starboard
Temperature Transmitter Portside 1
Temperature Transmitter
Project
List of Equipment
NRP
Rev. No.
Page
001-ROC-TTT03
001-ROC-TTT04
001-ROC-PRG01
001-ROC-PRG02
001-ROC-PRS01
001-ROC-PRS02
001-ROC-PRT01
001-ROC-PRT02
001-ROC-NRV01
001-ROC-NRV02
SHIP
MAINTENANCE
4213 100 075
Page 10 of 15
Project
List of Equipment
NRP
Rev. No.
Page
f.
SHIP
MAINTENANCE
4213 100 075
Page 11 of 15
Project
List of Equipment
NRP
Rev. No.
Page
i.
j.
SHIP
MAINTENANCE
4213 100 075
Page 12 of 15
and Coolers
Description
Sprinkler Pump
Topping up Pump Sprinkler Plant
Fire Pump
Fire Pump
Fire Pump
Sea Cooling Water pump Man Engine
Sea Cooling Water pump Man Engine
Sea Cooling Water pump Man Engine
Sea Cooling Water pump Man Engine
L.T. Coolers Main Engine
L.T. Coolers Main Engine
H.T. Coolers Main Engine
H.T. Coolers Main Engine
Sea Cooling Water pump AUX. Engine
Sea Cooling Water pump AUX. Engine
L.T. Coolers AUX. Eng.
L.T. Coolers AUX. Eng.
L.T. Coolers AUX. Eng.
L.T. Coolers AUX. Eng.
Sea Water Hydrofor Pumps
Sea Water Hydrofor Pumps
FW Gen Sea Water Pump
FW Gen Sea Water Pump
Bilge and Ballast Pump
Bilge and Ballast Pump
Bilge Pump
Bilge Pump
Sea Cool. Water Pump A.C. Plant
Sea Cool. Water Pump A.C. Plant
Sea Cool. Water Pump A.C. Plant
Sea Cool. Water. Pp. Prov. Refr. Plant
Sea Cool. Water. Pp. Prov. Refr. Plant
Description
Project
List of Equipment
NRP
Rev. No.
Page
ME LT FW Cooling
Pump
ME LT FW Cooling
Pump
ME LT FW Cooling
Pump
ME LT FW Cooling
Pump
ME HT FW Cooling
Pump
ME HT FW Cooling
Pump
ME HT FW Cooling
Pump
ME HT FW Cooling
Pump
ME FW Preheating
Pump
ME FW Preheating
Pump
AE LT FW Cooling
Pump
AE LT FW Cooling
Pump
ME FW Cooled LO
Coolers
ME FW Cooled LO
Coolers
FW Hydrofor
Pumps
FW Hydrofor
Pumps
FW Hydrofor
Pumps
Hot Water Circ.
Pump
Hot Water Circ.
Pump
UV Filter
UV. Filter
Emergency AC
001-FWC-LTM-01
001-FWC-LTM-02
001-FWC-LTM-03
001-FWC-LTM-04
001-FWC-HTM-01
001-FWC-HTM-02
001-FWC-HTM-03
001-FWC-HTM-04
001-FWC-PHM-01
001-FWC-PHM-02
001-FWC-LTA-01
001-FWC-LTA-02
001-FWC-LCM-01
001-FWC-LCM-02
001-FWC-FWH-01
001-FWC-FWH-02
001-FWC-FWH-03
001-FWC-HWC-01
001-FWC-HWC-02
001-FWC-UVF-01
001-FWC-UVF-02
001-FWC-EAC-01
SHIP
MAINTENANCE
4213 100 075
Page 13 of 15
Project
List of Equipment
NRP
Rev. No.
Page
Comp. FW Cooling
Pump
AC Plant Chilled
Water Circulating
Pump
AC Plant Chilled
Water Circulating
Pump
SHIP
MAINTENANCE
4213 100 075
001-FWC-ACC-01
001-FWC-ACC-02
Page 14 of 15
Project
List of Equipment
NRP
SHIP
MAINTENANCE
4213 100 075
Rev. No.
Page
Page 15 of 15