Revision
Belt Conveyors
701882-1100-45ED-4001
00
Client:
ETI BAKIR A.S. - TURKEY
Project:
BALANCE OF PLANT - MAZIDAGI FERTILIZER COMPLEX
Applicable to:
Quotation
Equipment Name
Equipment Tag No.
Specification No.
Project No.:
Package No.:
Purchase
P5117
Package Title:
701882
Raw Phosphate Handling Package
As built
GENERAL INFORMATION
Vendor
Vendor Quotation No.
Quantity
(X)
(X)
1
INSTRUCTIONS TO VENDOR
VENDOR IS ASKED TO COMPLETE THE CROSSED (X) CELLS
Belt conveyor to be supplied with feed hopper 110-Y-30 and chute 110-Y-31. For equipment layout information refer to 701882-1100-45D2-0004 drawing.
Local control unit to regulate the conveyor speed to reach the assigned mass flow, with an accuracy of 1% in the range of [10% t/h ; Design point t/h]
Giving in local and remote : flow, weighing, totalization, faults, - mass assignment local or remote; control unit with calibration and adjustment of weighing system.
Vendor to supply 110-S-31 Magnetic Separator for conveyor 110-T-31 for remove the metallic parts from the beneficiated phosphate.
PROCESS DESCRIPTION
Conveyor 110-T-31 receives the raw phosphate via 110-Y-30 hopper from a payloader (capacity 5 tons) and transports it to the Phosphate Preparation Tank via 110-Y-31 chute.
Refer to EQUIPMENT SPECIFICATION - BELT CONVEYORS - 701882-1100-45ES-0001
Location
Mazidagi Fertilizer Complex, Turkey-> Refer to Design Basis and Battery Limit Conditions - 701882-0000-49EC-0001
DESIGN CRITERIA
Characteristics
Units
Operating Conditions / Process Requirements
Ambient Temperature
C
-17 to +45
Local average temperature
C
25,6
Barometric Pressure
mbar
901
Ambient Relative Humidity
Maximum
Wet bulb design temperature = 22 C
Normal
%
60,2
Minimum
Site Altitude (M.A.S.L.)
m
877
Location
Turkey
Duty
Basic Wind Velocity
m/s
avg = 1,9 / design = 15,5 / max = 42
Seismic Zone
Zone 3 but A0 will be taken =0,30
Materials
Refer to 701882-0000-49EC-0001 - Design Basis
3.1 Phosphate rock
Ground Phosphate Rock (30% P2O5, 50% CaO, 5%
SiO2 on dry basis); moisture = 18% max humidity
Material Temperature
Bulk density
Material
Angle of Repose
Angle of Surcharge
Particle Size
C
kg/m
Vendor Deviations
Rev.
Rev.
1410
degree
degree
100% 2000 m
in which 96% < 500 m (minimum)
70% > 75 m (minimum)
%
kg/h
kg/h
124.500
250.000
mm
m/s
(X)
1 (max.1,2)
(X)
REFER TO LAYOUT 701882-1100-45D2-0004
Max 14
degree
(X)
(X)
DESIGN DATA / TECHNICAL REQUIREMENT
Characteristics
Units
Requirements
Mechanical
Magnet Style
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
Weighing System
At least 10 feet from the load zone of the conveyor
Position
Accuracy (min +0.5%/-0.5%) for [25%;125%] of the design rated load
Reading repeatability of
Weigh Sensor Protect.
0.1% or better
min IP65 - 100% (minimum) overload protection and
mechanical stops
Totalizer
Recoder
Printer
Controller
AI
AO
Input Power
Voltage
Phases
Frequency
Push-Button Starter Enclosure
V
Hz
Refer to 701882-1500-47ED-0005
(X)
(X)
(X)
(X)
Page 1 of 2
Belt Conveyor
Conveyor
Pulley Size
Pulley's Number
Belt Type
Belt Speed
Cleats Type
Cleat Spacing
Drive Assembly
Reducer
Type
Model
Rated
Safety Factor
Motor Speed
Coupling
Type
Model
Belt
Type
Model
Connected Horsepower
Design Power Input
Overall Dimensions
kW
Guards included
Inlet Chute
Inlet Skirting
Head Pulley pre-cleaner
Head Pulley secondary-cleaner
Tail pulleys belt plow
Paint Specification
Yes
Yes
Yes
Yes
Yes
Yes
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
Miscellaneous
Yes
Yes
Yes
Yes
Yes
Yes
Acc. To Vendor Spec - at least 701882-0000-45EG0002 & 701882-0000-45EG-0003
Refer to Scope of Work 701882-1100-45EW-4001
Safety Switches
Yes
(X)
(X)
Yes
(X)
(X)
Yes
(X)
(X)
Yes
(X)
(X)
Materials
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
(X)
Units
kg
kg
m
mm
kg
Units
(X)
(X)
(X)
(X)
(X)
(X)
SHIPPING / INSTALLATION DATA
Requirements
Shipping Weights
(X)
(X)
(X)
(X)
(X)
SPARE PARTS
Requirements
(X)
(X)
Rev.
Rev.
VENDOR COMMENTS:
Revision
PA
00
Preparedy By
CDA
CDA
Checked By
JKA
JKA
REVISION HISTORY
Approved By
Date
JJA
30/09/2015
JJA
1/10/2015
Page 2 of 2
Revision Details
First Issue for Client approval
Issued for RFI