Anda di halaman 1dari 1

NO

Item (big category)

Regarding HP rotor,
balancing and over-speed test will be
executed in sequence in a day, don't
need to split it
in above regard "O"
AES request
POSCO proposal Remarks

Item (small category)

Activity description

HP Turbine assembly

Assembly clearance check (theoretical)

2
3
4
5

HP Turbine Rotor
HP Turbine Rotor
HP Turbine Rotor
Blades

Runout check
Assembled rotor, balancing
Assembled rotor, over speed test
Examination of rotor blades (NDT)

O
O
X
X

O
O
O
X

HP turbine casing

Hydrostatic test

Turbine valve block (ESV, CV)

Hydrostatic test

HP Turbine system MAA

HP turbine casing is made as one part and the rotor will be inserted from the
okay As
rear, it is not possible to control clearance with feeler gauge.
reasonable approach

hydrospecified
test can be requirement
reviewed by photo.
necessary,
we can
Okay,The
is result
thereofany
forIfthe
witness
of provide
AES to
video
of testwitness
as well. of this hydrostatic test is not necessary
this test
? file
if not,
result of
hydro test them
can be reviewed
by photo.
necessary,hydrostatic
we can provide
but if The
it does,
convince
to witness
of IPIf casing
test
video file of test as well. Especially, the valve casing can be verified again during
instead
the hydro test of main steam pipe.
The result of test will be submitted by document.
The result of test will be submitted by document.

8
9
10
11
12

Gear System MAK

Gear unit
IP turbine assembly
IP turbine rotor
IP turbine rotor
IP turbine rotor

Running test
Assembly clearance check
Runout check
Assembled rotor, balancing
Assembled rotor, over speed test

O
O
O
O
X

X
X
O
O
O

13

IP Turbine system MAC

IP turbine inlet casing

Hydrostatic test

14

IP inlet steam ESV

Manufacturing, test & inspection of casing (NDT)

15

IP inlet steam control valve

Hydrostatic test

Common oil skid


Servomotor
Generator and Line & Neutral side cubicle
Generator and Line & Neutral side cubicle
Generator and Line & Neutral side cubicle

Running test (lube oil pump DC motor driven)


Functional testing
Generator armature and field winding resistance test
Generator armature and field winding insulation resistance test
Generator high voltage tests of armature and field windings

O
O
O
O
O

X
X
O
O
O

Generator and Line & Neutral side cubicle

Generator temperature rise test

This would be part of no-load running test at Mulheim plant test facility with huge
commercial effect and negative effect on delivery time. Normally, it is site test.

Generator and Line & Neutral side cubicle

Generator noise level test

This would be part of no-load running test at Mulheim plant test facility with huge
commercial effect and negative effect on delivery time. Normally, it is site test.

23
24
25
26

Generator and Line & Neutral side cubicle


Generator and Line & Neutral side cubicle
Generator and Line & Neutral side cubicle
Generator and Line & Neutral side cubicle

Generator dynamic balance test


Rotor runout check
Balancing and overspeed test
Standstill test

O
O
X
O

O
O
O
O

27

Generator and Line & Neutral side cubicle

Manufacturing, test & inspection of cooler (Hydro test)

Control equipment and cubicles

Factory acceptance test

O
24 POINTS

XO
13 POINTS

16
17
18
19
20

Common lube & control oil skid


Servomotors/Valves

21

22

28

Generator MK

Control Equipment CJJ

Okay. only functional testing


The
result
hydro test
can beand
reviewed
by photo. If necessary, we can provide
such
asofOpen/
close
its duvideo
file of
as well. therefore, it is
ration
is test
available
The
resultto
of test
will its
be submitted
by document.
better
verify
test result
The
resultwith
of hydro
can beupon
reviewed
along
testtest
report
ar-by photo. If necessary, we can provide
video file of test as well. Especially, the valve casing can be verified again during
rival of material on site
the hydro test of main steam pipe.
The result of test will be submitted by document.
The result of test will be submitted by document.

The result of hydro test can be reviewed by photo. If necessary, we can provide
video file of test as well.
The result of test will be submitted by document.

Above testing FAT for control cubicle would be better to change


its status to "O"