PT PLN (Persero)

..
..

<PEMBANGUNAN
JARINGAN TRANSMISI 500 KV
SUMATRA BAGIAN SELATAN>
= PROJECT DEFINITION =

Penulis

: juli

Tanggal

: 11 juli 2016

Revisi Terakhir

: 11 oktober 2016

Referensi Dokumen :
Versi

PMO-PMM TI PLN

: 1.0

01 PMM - INI

PT PLN (Persero)
..
..

= TABLE OF CONTENT =

= TABLE OF CONTENT =

= DOCUMENT CONTROL =

= GENERAL INFO =
A. Business Problem and Business Challenges
B. Product or Services Description
C. Strategic and Background
D. Critical Success Factor
E. Expected Benefit and Key Performance Indicator
F. Area Impacted
G. Technology
H. Project Description
I. General Subsequent Planning Activities
J. Risk
K. Constraints
L. Assumptions
M. Other Related Information

4
5
5
5
5
5
6
7
7
7
8
8
8
8

PMO-PMM TI PLN

01 PMM - INI

PT. PLN (Persero)


..
..

Terpercaya Membangun Usaha

= DOCUMENT CONTROL =

Revision History
Date

Author

Version

Reference

Reviewers
Name

Title

Signature

Distribution
No Copy

Name

Location

Catatan:
Jika menerima soft copy dari document ini dan mencetaknya,
harap menuliskan nama anda pada tabel distribusi di halaman
depan, untuk keperluan pengontrolan dokumen.
Jika menerima soft copy dari document ini dan mencetaknya,
harap menuliskan nama anda pada halaman depan, untuk
keperluan pengontrolan dokumen.

PMO-PMM TI PLN

3 dari 8

01 PMM - INI

PT. PLN (Persero)


..
..

Terpercaya Membangun Usaha

= GENERAL INFO =

Project ID

001 / PPJT 500 KV / SBS / 2016

Project Name

PEMBANGUNAN JARINGAN TRANSMISI 500 kV


SUMATRA BAGIAN SELATAN

Project Owner

Muhammad Dandy

Project Manager

Axel Azariat, S.T.

Project Dependency

Main

Sub

Predecessor

Successor

Brief Description
on Dependency

Dependency Map

PMO-PMM TI PLN

4 dari 8

01 PMM - INI

PT. PLN (Persero)


..
..

Terpercaya Membangun Usaha

A. Business Problem
PT.PLN (Persero) adalah sebuah perusahaan BUMN yang mengurusi semua aspek kelistrikan yang ada di Indonesia. Dalam
proses bisnis PT. PLN (Persero) meliputi proses pembangkit, transmisi, dan distribusi. Akan tetapi penyebaran tenaga listrik di
indonesia ini belum merata seperti yang terjadi di wilayah sumatra bagian selatan sehingga masih diperlukan upaya untuk
dapat memenuhi kebutuhan masyarakat, melalui perluasan jaringan transmisi pada daerah daerah yang kurang jaringan
transmisinya.
Sementra itu UIP sumatra bagian selatan saat ini belum dapat menyediakan jaringan transmisi untuk wilayah sumatra bagian
selatan khususnya wilayah palembang sampai lampung dikarenakan keterbatasan pendanaan . Sehingga menimbulkan
masalah berikut dalam operasi sehari- hari:

Adanya devisit daya untuk wilayah lampung.

Sering terjadinya pemadam bergilir.

Wilayah geografinya sulit terjangkau.

Tantangan tambahan lainnya bagi UIP sumatra bagian Selatan datang dari direksi PT. PLN yaitu dapat membangun jaringan
transmisi untuk wilayah palembang sampai lampung.

B. Product or Services Description


Produk-produk dan servis yang akan diimplementasikan akan dijabarkan seperti bagian berikut.

C. Strategic and Background


Please answer the following questions by marking Yes or No.

Yes

No

Is the project consistent with the state organization Business Plan.? If not, why
not?
Is the project identified in the state organization IT strategic plan? If not, why
not?

D. Critical Success Factor


PLEASE DESCRIBE PRE-REQUISITE CONDITION

FOR PROJECT SUCCESS

E. Expected Benefit and Key Performance Indicator


Please list factors that will be used to determine the success of the project, which should answer the
question, How do we know if the project was successful? It is essential that the criteria be
quantifiable and measurable. Short-term success factors are used to determine if a project is
complete.

Short Term

Long Term

PMO-PMM TI PLN

5 dari 8

01 PMM - INI

PT. PLN (Persero)


..
..

Terpercaya Membangun Usaha

CATEGORY

SAVINGS PLAN
ONE TIME

RECURRIN
G

A. EMPLOYEE RELATED SAVINGS


1

Labor Cost Reduction / Avoidance

Reduces Turnover
Subtotal
B. EQUIPMENT RELATED SAVINGS
1
Elimination of Obsolete Equipment
2

Elimination of Maintenance Cost for Obsolete Equipment


(including labor and parts)
3
Reduced Cost for Existing Equipment Based on Higher
Utilization
Subtotal
C. SPACE RELATED SAVINGS
1
New Space Construction Avoidance
Subtotal
D. INVENTORY RELATED SAVINGS
1
Reduced Inventory Carrying Cost
2
Reduced Loss / Shrinkage
Subtotal
E. INFORMATION RELATED SAVINGS
1
Reduced IT Administration Support for Legacy Application
2
Resale of Existing Computer
3
Resale of Existing Computer
Subtotal
F. CUSTOMER SERVICES RELATED
1
Increase Sales
2
Improve Customer Satisfaction
3
Reduced Penalties
Subtotal
TOTAL SAVINGS

F. Area Impacted
Check all appropriate functions:
- Business Operation
Holding
Distribution
- Business Process
Material Management
Controlling and
Assurance
Performance and Process
Management
Partner Management
Energy Fulfillment
Management

PMO-PMM TI PLN

Generation
MSO

Transmission

Finance & Accounting


Management
Human Resources
Management
Risk Management

Regulatory Accounting

Scheduling Management
Energy Operation,
Administration and

Energy Trading
Asset, Facilities,
Equipment

6 dari 8

Regulatory and
External Affairs
Central Procurement

01 PMM - INI

PT. PLN (Persero)


..
..

Terpercaya Membangun Usaha

Automation
Billing and Collection

Engineering, Procurement
and Construction

Location Management
AM/FM/GIS
Sales

Customer Management

Maintenance
Load Balancing
Management and
Automation
Marketing

Other Business Functions:

G. Technology
Identify technology areas that might apply to this project. Check all appropriate categories:
- Application Architecture Category
Corporate Mgt
Automation
Engineering, Design &
Customer Service
Construction

Operations
Trading

Other Technology Areas:

H. Project Description
Provide high-level project description such as goal, objectives, deliverables & milestones,
estimate schedule, cost, resources requirement.

Project Goal and Objective

Deliverables

Schedule and Milestones

Cost Estimate

Resources Requirement Estimate

I. General Subsequent Planning Activities


A high-level planning information should be provided with this project statement if any
sizable effort of business analysis needs to be completed. If not, this section may be
omitted.

PMO-PMM TI PLN

7 dari 8

01 PMM - INI

PT. PLN (Persero)


..
..

Terpercaya Membangun Usaha

Please provide a list of activities to complete the Initiation and Planning phases. There
should be approximately 2 to 10 tasks.
Activity
No.

Activity Description

No. of
Days

Estimate
d Cost

Milestone

TOTAL

J. Risk

K. Constraints

L. Assumptions

M. Other Related Information

PMO-PMM TI PLN

8 dari 8