TYPICAL CROSS SECTION

NEW FLEXIBLE PAVEMENT (As per IR


Road Name- Baghima To Tilaidih

Slope

21

7.500
4.5%

3.5%

1.875

3.75

0.170
Slope

2:1
0.175

4.05
0.300
Approved Soil
8.88
10.08

Sub Engineer

S.D.O.

Note: All Dimensions in metre


Not to scale

YPICAL CROSS SECTION FOR CONSTRUCTION


E PAVEMENT (As per IRC:SP:72)

PMC
G-3 Layer
G-2 Layer
GSB
Subgrade

FORMAT - 4

0.020
0.075
0.075
0.175
0.300

7.500
3.5%

4.5%

3.75

1.875

4.05

Hard Shoulder
2.215
2.065
2.415

Slope

2:1

proved Soil
8.88
10.08

Executive Engineer
0

DESIGN OF RURAL ROAD


under PMGSY
Road Name- Baghima To Tilaidih
STATE: JHARKHAND
DISTRICT: GUMLA
BLOCK :PALKOT

SUBMITTED BY GROUP NO 2 ( AP16190-199)

EARTHWORK CAC
VOLUME REPORT (Based on auto
NAME OF ROAD :
LENGTH OF ROAD :

Baghima To Tilaidih
1000.00

EARTHWORK SUM

Description
FOR UNLINED DRAIN
TWO SIDE :
w=(0.9+0.45)/2
d=0.45
A
TOTAL QUANTITY OF CUTTTING FROM DRAINS
B
TOTAL QUANTITY OF EMB FILLING FROM EARTHWORK SHEET
C
TOTAL QUANTITY OF EMB CUTTING FROM EARTHWORK SHEET
D
TOTAL QUANTITY OF EXCAVATION IN ROAD
E
QUANTITY OF EMB FILL FROM TOTAL EXCAVATED MATERIAL
F =(B-E)
QUANTITY OF FILL FOR EMB CONSTRUCTION (BORROW SOIL)

Chainage

Distance

Cut Area

Fill Area

0
25
50
75
100
125
150
170
175
200
225
250
275
300
325
340
350
375
400
425
450
475
500
525
550
575
600
620
625

0
25
25
25
25
25
25
20
5
25
25
25
25
25
25
15
10
25
25
25
25
25
25
25
25
25
25
20
5

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.34
3.19
2.15
0.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.03
5.00
7.06
11.39
17.35
10.17
5.75
5.06
2.34
0.60
0.00
0.00
0.00
0.00
0.29
0.43
1.54
3.10
4.81
6.20
6.79
7.30
5.90
4.03
2.41
1.03
0.47
0.57
1.28

650
675
700
725
750
775
800
825
850
875
900
925
950
975
1000

25
25
25
25
25
25
25
25
25
25
25
25
25
25
25

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.42
1.64
2.14
2.65
3.20
3.75
4.32
4.92
3.96
3.07
2.24
1.49
0.79
0.22
0.00

EARTHWORK CACULATIONS
OLUME REPORT (Based on autocad profile taken from DPR)
DISTRICT
BLOCK
EARTHWORK SUMMARY

NO

2.000

1000.000

0.675

Cut
Volume

Fill
Volume

Cum. Cut
Volume

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
16.713
56.563
66.775
28.575
0.990
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

75.42
150.79
230.59
359.16
343.94
199.02
108.13
18.50
36.72
7.48
0.00
0.00
0.03
3.59
5.40
9.90
58.05
98.86
137.66
162.48
176.14
164.90
124.09
80.55
42.98
18.71
10.38
4.62

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.71
73.28
140.05
168.63
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62

SHEET
K SHEET

ERIAL
W SOIL)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

33.80
38.32
47.26
59.83
73.10
86.85
100.92
115.58
111.09
87.89
66.38
46.71
28.59
12.64
2.71

169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62

GUMLA
PALKOT

QTY (CUM)

0.450

607.500
607.500
3539.76
169.62
777.12
388.56
3151.20

Cum. Fill
Volume

Remarks

75.42
226.20
456.79
815.96
1159.89
1358.91
1467.05
1485.55
1522.27
1529.75
1529.75
1529.75
1529.78
1533.37
1538.77
1548.66
1606.71
1705.58
1843.24
2005.71
2181.85
2346.76
2470.84
2551.39
2594.37
2613.08
2623.46
2628.08

2661.88
2700.21
2747.47
2807.30
2880.40
2967.25
3068.17
3183.74
3294.84
3382.73
3449.11
3495.82
3524.41
3537.05
3539.76

(50% of excavated earthworked used for fill)

Ref no
1.1

1.2

2
2.1

2.2

2.3

2.4

2.5

2.6

4.1

4.2

4.3

5.1

4.2

4.3

4.4

5.1

DESCRIPTION

Clearing grass and removal of the rubbish upto a distance of 50 m outside the peripher
Description
Details of cost for 100 sqm.
Labour:
Beldars
Coolies
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 100 sqm.
Say

Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees
and saplings of girth upto 30 cm measured at a height of 1 m above ground level
and removal of rubbish upto a distance of 50 m outside the periphery of the area
cleared.
Description
Details of cost for 100 sqm.
Labour:
Beldars
Coolies
TOTAL
Add 1 % for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 100 sqm.
Say

EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means
over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) includin
disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.
Description
Details of cost for 10 cum.
Average output of Hydraulic Excavator per
hour = 30cum.
MACHINERY
Hydraulic Excavator (3D) with driver and fuel.
Hire and running charges of loader.

LabourMate
Beldar/Coolies
TOTAL
Add 1 % for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 10 cum.
Cost of 1 cum.
Say

Filling available excavated earth (excluding rock) in trenches, plinth, sides of


foundations etc. in layers not exceeding 20cm in depth, consolidating each depo
layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Description
Details of cost for 10 cum.
LabourMate
Coolies
Bhishti
TOTAL
Add for water charge @ 1 %
TOTAL
Add for contractors profit and over-heads @
1,500.%
Cost of 10 cum.
Cost of 1 cum.

Say

Earth work in rough excavation, banking excavated earth in layers not exceedin
cm in depth, breaking clods watering, rolling each layer with tonne roller or w
or steel rammers, and rolling every 3rd and top-most layer with power roller of m
8 tonnes and dressing up in embankments for roads, flood banks, marginal bank
guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m
All kinds of soil
Description
Details of cost for 10 cum.
LabourBeldars
Coolies
Bhishti
Chokidar
Roller charges (one roller does 1850 sqm. of
consolidation per day)
Hire Charges
Diesel
Carriage of diesel
Sundries

TOTAL
Add 1 % for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 10 cum.
Cost of 1 cum.
Say

Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual m


in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including ge
out the excavated soil and disposal of surplus excavated soil as directed, within
of 50 m.
All kinds of soil.
Description
Details of cost for 10 cum.
MACHINERY
Hydraulic Excavator (3D) with driver and fuel.
Hire and running charges of loader.
LabourMate
Beldars/Coolies
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 10 cum.
Cost of 1 cum.
Say

Construction of Embankment with Material obtained from Borrowpits


Construction of embankment with approved material obtained from borrow pits
Unit = cum
Taking output = 100 cum
a)
Labour
Mate
Mazdoor
b)
Machinery
Hydraulic Excavator1 cum bucket capacity @ 60 cum per hour
Tipper 10 tonne capacity
Add 10 per cent of cost of carriage to cover cost of loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader for grading @ 100 cum per hour
Water tanker6 KL capacity
Vibratory roller 8 -10 tonnes @ 100 cum per hour
c)
Material
Cost of water
d) Compensation for earth taken from private land

TOTAL
Overhead chages/contractor profit @15%(a+b+c)
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d+)/100

Construction of Subgrade and Earthen Shoulders

Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading
compacted to meet requirement of table No. 300-2
Unit = cum
Taking output = 100 cum
a) Labour
Mate
Mazdoor
b) Machinery
Hydraulic excavator1 cum bucket capacity @ 60 cum per hour
Tipper 10 tonne capacity
Add 10 per cent of cost of carriage to cover cost of loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader for grading @ 50 cum per hour
Water tanker with 6 km lead
Vibratory roller 8-10 tonnes @ 80 cum per hour
c) Material
Cost of water
Compensation for earth taken from private land
Total
d) Overhead Charges and Contractor Profit @ 15 % ( a+b+c)
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100

Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne
capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber
and consolidating with road roller including making good the undulations etc. and
re-rolling the sub grade and disposal of surplus earth lead upto 50 metres.
Description
Details of cost for 22.5 cum.
(A) preparation of subgrade.
Earth work in excavation including dressing
etc. 100sqm.x22.5cm (average depth) =
22.5cum.
Labour
Mate
Coolie
Beldar
Hire charges of road roller
Chowkidar
Diesel for road roller @ 18 litres
Carriage of diesel
Sundries

(B) Conslidation of subgrade


Roller charges (one roller does 1860 sqm. of
conosolidation of sub - grade with road roller
of 8 to 12 tonne capacity including making
good the undulations etc. with earth or quarry
spoils etc. and rerolling the subgrade
Hire charges of Diesel Road Roller - 8 to 10
tonne
Chowkidar
Diesel oil
Carriage of diesel.
Sundries
Total (22.5 cum)

Material used:
Moorum.
Details of cost for 22.5 cum.
Material
Cost of moorum at quarry
Carriage
Sub TOTAL
Total
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Total (22.5 cum)
Cost for 1 Cum

Laying , spreading and compacting stone aggregate of specified sizes to WBM (G


specifications including spreading in uniform thickness, hand picking , rolling wi
3 wheeled road / vibratory roller 8-10 tonne in stages to proper grade and cambe
applying and brooming requisite type of screening / binding material to fillup
interstices of coarse aggregate watering and compacting to the required density
Description
Details of cost for 1.00 cum.
Labour
Beldar
Coolie
Roller charges (one roller does 30 cum
consolidation per day of 8 hours and uses 18
litres of diesel oil).
Hire charges of Road Roller
Chowkidar
Diesel for road roller @ 18 litres
0.033x18 = 0.59
Diesel oil
Carriage of diesel

Sundries
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost for 1 cum
Say

63 mm to 45 mm size stone aggregate.(g ii)


Description
Details of cost for 1.00 cum.
Materials :
Stone Aggregate 90 mm (one size).
Stone Aggregate 63 mm (one size)
Stone Aggregate 53 mm (one size)
Carriage of aggregate
Total
Add 1% for water charges.
Total
Add 15% for contractors profit and overheads
Cost for 1 cum
Say

Laying , spreading and compacting stone aggregate of specified sizes to WBM (G


specifications including spreading in uniform thickness, hand picking , rolling wi
3 wheeled road / vibratory roller 8-10 tonne in stages to proper grade and cambe
applying and brooming requisite type of screening / binding material to fillup
interstices of coarse aggregate watering and compacting to the required density
Description
Details of cost for 1.00 cum.
Labour
Beldar
Coolie
Roller charges (one roller does 30 cum
consolidation per day of 8 hours and uses 18
litres of diesel oil).
Hire charges of Road Roller
Chowkidar
Diesel for road roller @ 18 litres
0.033x18 = 0.59
Diesel oil
Carriage of diesel
Sundries
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost for 1 cum
Say

Materials :
Description
Details of cost for 1.00 cum.
Materials :
Stone Aggregate 63mm (one size)
Stone Aggregate 53 mm (one size)
Stone Aggregate 45mm (one size)
Carriage
Description
Total
Add 1% for water charges.
Total
Add 15 % for contractors profit and overheads
Cost for 1 cum
Say

Providing and applying prime coat using hot straight run bitumen of grade 80/ 1
including heating the bitumen, spraying the bitumen with mechanically operated
spray unit fitted on bitumen boiler, cleaning and preparing the existing road
surface as per specifications :
On W.B.M. @ 0.75 Kg / sqm.
Description
Details of cost for 100.00sqm
Bitumen 80/100
Carriage of bitumen
Steam coal
Carriage of steam coal
Materials for cleaning the road surface :
Wire brush (with thick wire)
Soft brush
Gunny bags
Spray unit
Sundries
Labour:
(a) For cleaning:
Mate
Beldar
(b) For heating bitumen:
Beldar
(c) For applying tack coat:
Beldar
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads

Cost for 100 sqm.


Cost per Sqm.
Say

Providing and applying tack coat using bitumen emulsion (Rapid Setting)
complying with IS 8887-1995, spraying the bitumen emulsion with mechanically
operated spray unit, cleaning and preparing the existing road surface as per
specifications:
On bituminous surface @ 0,25kg/sqm.
Description
Details of cost for 100 sqm.
bitumen emulsion (R.S.)
Carriage of bitumen
Materials for cleaning the road surface :
Wire brush (with thick wire)
Soft brush
Gunny bags
Spray unit
Sundries
Labour:
(a) For cleaning:
Mate
Beldar
(c) For applying tack coat:
Beldar (0.47/0.050)x0.025=0.235
TOTAL
Add 1% for water charges
TOTAL,
Add 15% for contractors profit and overheads
Cost for 100 sqm.
Cost per Sqm.
Say

2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of
13.2 mm size and 11.2 mm size respectively per 100 sqm. and 52 kg. and 56 kg.
hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respective
including a tack coat with hot straight run bitumen including consolidation with
road roller of 6 to 9 tonne capacity etc. complete: (tack coat to be paid for
separately).
With paving Asphalt 80/100 heated and then mixed with solvent at the rate of 70
grams per kg of asphalt.
Description
Details of cost for 100 sqm.
Asphalt 80/100
(i) Hot bitumen @52kg.per cum. of stone
chippings 1.8cum. of 13.2mm nominal size
chippings.

(ii) Hot bitumen @56kg. per cum. of stone


chippings 0.90cum. of 11.2mm nominal size
chippings.
Bitumen :52xl.8+56x0.9=144kg. or 0.144
tonne.
Carriage of bitumen
Solvent 70gms/kg. for 0.144 t = 10.08kg.
Carriage of solvent
Stone chippings 13.2mm nominal size
@1.80cum. per 100 sqm.
Stone chippings 11.2mm nominal size
@0.90cum. per 100 sqm.
Carriage of aggregate
Steam coal for heating bitumen @ 2 qunitals
per tonne of bitumen = 2x0.144=0.288q
Carriage of steam coal
Labour for cleaning the road surface, heating
and spraying bitumen and aggregate :
(a) For cleaning:
Mate
Beldar
Coolie
(b) For heating bitumen:
Beldar
(c) For screening and spreading premixed
aggregate :
Mistry
Beldar
(d) Consolidation Charges
Chowkidar(at barrier for night watch and for
road roller)
Hire charges of road roller
Diesel for road roller @ 18 litres per day
Carriage of diesel
Hire charges of boiler
Hire charges for mixer
(e) Misc:
Brushes etc. for cleaning, Wire bursh (with
thick wire)
Soft brush
Brooms and gunny bags
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost for 100 sqm.
Cost per Sqm
Say

Providing and laying seal coat over prepared surface of road with bitumen heate
in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of gra
80/100 and blinding surface with 0.90cum of stone aggregate of 6.7 mm size (Pa
11.2mm sieve and retained on 2.36mm sieve) per 100 sqm of road surface includ
rolling and finishing with power road roller all complete.
Description
Details of cost for 100.00 sqm.
Bitumen 80/100
Carriage of bitumen
Stone aggregate
Carriage of stone aggregate
Steam coal for heating bitumen @ 2 qunitals
per tonne of bitumen =2x0.0.98=1.96 qtl.
Carriage of steam coal
Labour for cleaning road surface, heating
bitumen mixing and spreading aggregate :
(a) For heating and spraying bitumen :
Mistry
Sprayman
Beldar
(b) For cleaning:
Mate
Beldar
Coolie
(c) For screening and spraying aggregate :
Mate
Beldar
(d) Misc :
Chowkidar (at barrier for night watch and for
road roller)
Bhishti
Hire charges for road roller
Hire charges for tar sprayer unit
Diesel for road roller @ 18 litres per day
Hire charges of boiler
(e) Misc :
Wire brush (with thick wire)
Soft brush
Sundries
Brooms and gunny bags
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost for 100 sqm.
Cost per sqm.
Say

Providing Retro-reflective regulatory sign board of size 900mm dia meter made out
of 2mm thick aluminium sheet, face to be fully covered with high intensity

encapsulated lens type retro -reflective sheeting as approved by Engineer-in-charge.


Letter , symbols, borders etc. will be as per IRC - 67 with required colour scheme on
the boards and with the high intensity grade A. The aluminium sheet to be riveted
to M.S. frame of angle iron of stze 40x40x4mm The boards will be fixed to 1 No.
50x50mm square post made of M.S. angle 50x50x4m, 4m long welded to the frame
with adequate anti-theft arrangement .Sheet work to be painted with two or more
coats of synthetic enamel paint over an under coat (primer) and back side of
aluminium sheet to be painted with two or more coats of epoxy paint including
appropriate priming coat complete in all respects as per direction of Engineer-incharge.
Description
Details cost for one board of 0.635 sqm
Aluminium sheet 2mm thick = 0.635 sqm.
Add 10% wastage = 0.06 sqm, total = 0.635 +
0.06 = 0 695 sqn
Say 0.70 sqm @ 5.60 kg/sqm =3.98 kg
Cost of Alummiurfi sheet 2mm thick (X).
High intensity retro reflective sheet = 0.70
sqm
high intensity sheet for lettering/ sing and
border etc.
Taking 40% Area=0.28 sqm, total = 0.70 +
0.28 = 0.98 sqm.
High intensity retro - reflective sheet (Y).
Angle iron 40x40x4mm = 4x0.60=2.40@
2.4kg/ mtr = 5.76 kg
50x50x5 mm = 2x4m =8m @ 3kg/ mtr =24.00
kg
Total = 5.76 + 24.00 = 29.76 kg
(A) Rate as per item no 10.2
Labour.
Mate
Beldar
Cost of material for drilling holes, nut bolts &
rivets, facrication etc. @ 2% on (X+Y+A)

Description
Painting with synthetic enamel paint
1x2.40x0.12=0.29 sqm
1x4.00x0.12=0.80 sqm, total = 0.29 + 0.80 =
1.09 sqm
Rate as per item no 13.61.1
Painting with epoxy paint on back side of
aluminium sheet, Rate as per Item no.13.52.1
Sundries & hole fast etc,
Total
Add 1% for water charges except on (A).

Total
Add 15% for contractors profit and overheads
Cost for 1 board
Say

RATE ANALYSIS

ea cleared.
Unit

Quantity

Day
Day

Unit

Rate

.6
.25

280
280

Quantity

Day
Day

Rate

1.08
.6

280
280

Unit

Quantity Rate

Day
Day

.04125
.04125

9,800
1,200

Day
Day

Unit

Day
Day
Day

Quantity

Rate

.2
2.5
.2

0.4
4

400
280

Amount

138.45
135.25
138.45

Unit

Quantity

Day
Day
Day
Day

Day
litre
quintal
L.S.

5.9
3.6
.4
.008

0.008

Rate

135.25
135.25
138.45
135.25

1000.00
.144
30.25
.0014
5.32
2.73
1

Unit

Day
Day

Quantity

Rate

.04125 6 000.00
.04125
800

Day
Day

.4
4.1

138.45
135.25

fts and leads, transporting to site, spreading, grading to required slope and compacting
Unit

Quantity

Rate

day
day

0.04
1

400
280

hour
tonne.km

1.67

6000
1700

hour
hour
day
hour

0.5
1
1
1

1750
2450
1500
1300

KL
cum

24
100

160
25

160 x L

say

Unit

Quantity

Rate

day
day

0.040
1.000

400.00
280.00

hour
tonne.km

1.670
175xL

6000.00
1700.00

hour
hour
hour
hour

0.500
2.000
4.000
1.250

1750.00
1225.00
1500.00
1300.00

KL
cum

24.000
100.000

160.00
25.00

say

Unit

Day
Day
Day
Day
Day
litre
L.S.

Quantity Rate

1.8
18
.27
.054
.054
.972
1.43

400
280
280
1,550
280
45
3

45 L.S.

6.76

Day

.054 1550`

Day
litre
L.S.
L.S.

.054
.972
1.43
6.76

cum
cum

Unit

280
45
3
3

22.5
22.5

Quantity

460
65

Rate

Day
Day

.26
.263

280
280

Day
Day

.033
.033

1,550
280

litre
L.S.

.59
1.43

45
3

L.S.

2.73

Unit

Quantity

cum
cum
cum
cum

Unit

Rate

.1
.65
.25
1

Quantity

1,000
1,100
1,100
68

Rate

Day
Day

.26
.263

280
280

Day
Day

.033
.033

1,550
280

litre
L.S.
L.S.

.59
1.43
2.73

45
3
3

45 liter

cum
cum
cum
cum
Unit

Unit

tonne
tonne
quintal
tonne

.05
.3
.65
1
Quantity

1,100
1,100
1,200
68
Rate

Quantity

Rate

.075
.075
.15
.015

32,000
58
350
60.81

each
each
L.S.
Day
L.S.

.05
.12
7.8
.03
9.1

15
12
1
250
1

Day
Day

.06
1.46

280
280

Day

.19

280

Day

.47

280

Unit

Quantity

Rate

tonne
tonne

.025
.025

32,000
58

each
each
L.S.
Day
L.S

.05
.12
7.8
.03
7.8

15
12
1
250
1

Day
Day

.061
1.46

280
280

Day

.235

280

Unit

Quantity

Rate

tonne

.144

25,000

.144
10.08
.1
1.8

58
18
6.2
750

.9

750

cum
quintal

2.7
.288

58
300

tonne

.0288

60.81

Day
Day
Day

.08
1.4
1.4

400
280
280

Day

.57

280

Day
Day

.19
5

280
280

Day

.27

280

Day
litre
L.S
Day
Day

.11
2
2.73
.13
.04

1,550
45
3
650
250

each

.11

15

each
L.S.

.32
6.76

12
1

tonne
kilogram
quintal
cum
cum

Unit

45 / liter

Quantity

Rate

tonne
tonne
cum
cum
quintal

.098
.098
.9
.9
1.9

25,000
58
750
58
300

tonne

.196

60.81

Day
Day
Day

.04
.06
.69

280
280
280

Day
Day
Day

.11
1.4
1.41

400
280
280

Day
Day

.05
.51

400
280

Day

.15

280

Day
Day
Day
litre
Day

.06
.06
.06
1.08
.06

280
1,550
250
45
595

each
each
L.S.
L.S.

.05
.12
18.2
2.73

15
12
1
1

Unit

kilogram

Quantity Rate

3.98

240

.98

1,800

kg

29.76

63

Day
Day
L.S.

.01
.25
70.23

280
280
3

sqm
sqm

1.09
.635

43.3
92

L.S.

31.2

sqm

Amount

168
70
238
23.8
261.8
39.27
301.01
301

Amount

302.4
168
470.4
4.7
475.1
71.26
546.36
546.35

Amount

404.25
49.5

160
1,120
1,733.75
17.34
1,751.09
262.66
2,013.75
201.37
201.4

27.69
338.12
27.69
393.5
3.94
397.44
59.62
457.06
45.71

45.7

Amount

797.98
486.9
55.38
1.08

8
4.36
.01
2.73

1 356.44
13.56
1 370.00
205.5
1 575.50
157.55
157.55

Amount

247.5
33
55.38
554.52
890.4
8.9
899.3
134.9
1,034.2
103.42
103.4

ired slope and compacting to meet requirement


Amount

16
280
10020
1700
170
875
245
1500
1300
3840
2500

22446
3366.9
25812.9
258.129
258

Amount

16.00
280.00
10020.00
1700.00
170.00
875.00
2450.00
6000.00
1625.00
3840.00
2500.00
29476.00
4421.40
33897.40
338.97
338.97

Amount

720
5,040
75.6
83.7
15.12
43.74
4.29

20.28

83.7
15.12
43.74
4.29
20.28
6,169.86

10,350.0
1,462.5
11,812.5
17,982.4
179.8
18,162.2
2,724.3
20,886.5
928.3

Amount

72.8
73.64

51.15
9.24

26.55
4.29

8.19
245.86
2.45
248.31
37.25
285.55
285.55

Amount

100
715
275
68
1,158
11.58
1,169.58
175.437
1,345.017
1,345.1

Amount

72.8
73.64

51.15
9.24

26.55
4.29
8.19
246.02
2.46
248.48
37.272
285.752
285.8

55
330
780
68
Amount
1,233
12.33
1,245.33
186.8
1,432.13
1,432.1

Amount

2,400
4.35
52.5
.91
.75
1.44
7.8
7.5
9.1

16.8
408.8
53.2
131.6
2,059.03
20.59
3,094.75
464.21

3,558.96
35.58
35.6

Amount
800
1.45
.75
1.44
7.8
7.5
7.8

17.08
408.8
65.8
1,318.42
13.18
1,331.6
199.74
1,531.34
15.31
15.3

Amount

3,600
8.352
181.44
.62
1,350
675
156.6
86.4
1.75

32
392
392
159.6

53.2
1,400
75.6
170.5
90
8.19
84.5
10
1.65
3.84
6.76
8,940.22
89.4
7,125.97
1,354.41
8,480.3803
84.8
84.8

Amount
2,450
5.684
675
52.2
588
11.92

11.2
16.8
193.2
44
392
394.8
20
142.8
42
16.8
93
15
48.6
35.7
.75
1.44
18.2
2.73
4,879.82
48.79
4,928.61
739.29
5,667.9
56.67
56.7

Amount

955.2

1,764

1874.88
2.8
70
210.69

47.197
58.42
93.6
5,076.787
50.76

5,127.547
769.13
5,896.68
5,896.68

QUANTITY ESTIMATION
Road Name :-

Baghima To Tilaidih

Length of Road (M) :-

1000.00

S.No.

REF.NO

DESCRIPTION OF ITEMS

Nos

A. CLEARING & GRUBBING


1
1.1
Clearing Grass and Removal of Rubbish
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery
of the area cleared.

Clearing and Grubbing Road Land

2.2

Clearing jungle including uprooting of rank vegetation, grass, brush wood, treesand
saplings of girth upto 30 cm measured at a height of 1 m above ground leveland removal
(a)

of rubbish upto a distance of 50 m outside the periphery of the areacleared.


In area of non-thorny jungle

C. EARTHWORK
1

2.3

Compacting Original Ground / Existing Embankment.


Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm
in depth, breaking clods watering, rolling each layer with tonne roller or wooden or
steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8
tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide
banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m
1

2.4

Surface Drains in Soil


Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including
dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2

2.1

Excavation in Soil with lead upto 50 m


Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means
over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.
-

2.2

Construction of Embankment with Material Obtained from Roadway Cutting


Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift upto 1.5 m

Construction of Embankment with Material Obtained from Borrow Pits

2.5

Construction of Embankment with Material obtained from Borrowpits Construction of


embankment with approved material obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope and compacting to meet
requirement

(C)

Lead from 250m to 500m

2.50

Construction of Subgrade and Earthen Shoulders


Construction of subgrade and earthen shoulders with approved material obtained from
borrow pits with all lifts and leads, transporting to site, spreading, grading to required
slope and compacted to meet requirement as per Technical Specification. Lead from
500m to 750m

Earthen Shoulder Besides GSB In BT Road

D. GSB & WBM


1

4.1

Granular Sub-base with Well Graded Material


Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne
capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and
consolidating with road roller including making good the undulations etc. and re-rolling
the sub grade and disposal of surplus earth lead upto 50 metres.
(a) GSB for BT Road

4.2

WBM Grading 2 (By Manual Means)

Laying , spreading and compacting stone aggregate of specified sizes to WBM (G


II)specifications including spreading in uniform thickness, hand picking , rolling with 3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.

For BT Road
3

4.30

WBM Grading 3 (By Manual Means )

Laying , spreading and compacting stone aggregate of specified sizes to WBM (GIII)specifications including spreading in uniform thickness, hand picking , rolling with3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.
For BT Road

E. HARD SHOULDER
1

4.1

Construction of Shoulder with moorum material

For BT Road

F. BITUMEN WORK
5.1
Prime Coat

Providing and applying prime coat using hot straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the existing roadsurface as per
specifications :

5.20

Tack Coat
Providing and applying tack coat using bitumen emulsion (Rapid Setting)complying with
IS 8887-1995, spraying the bitumen emulsion with mechanicallyoperated spray unit,
cleaning and preparing the existing road surface as per specifications:

5.3

20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modifie


2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of13.2 mm
size and 11.2 mm size respectively per 100 sqm. and 52 kg. and 56 kg. ofhot bitumen per
cum of stone chippings of 13.2 mm and 11.2 mm size respectivelyincluding a tack coat
with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne
capacity etc. complete: (tack coat to be paid for separately). With paving Asphalt 80/100
heated and then mixed with solvent at the rate of 70 grams per kg of asphalt.

5.4

Providing and laying seal coat over prepared surface of road with bitumen heated in bit
98 kg of bitumen of grade 80/100 and blinding surface with 0.90cum of stone aggregate
on 2.36mm sieve) per 100 sqm of road surface including rolling and finishing with powe

H. Sign Boards & KM Stones

6.1
A
(I)

Cautionary, mandatory, informatory, direction and place indentification signs


Retro-reflectrorised Traffic Signs.
Providing Retro-reflective regulatory sign board of size 900mm dia meter made out of
2mm thick aluminium sheet, face to be fully covered with high intensity encapsulated
lens type retro -reflective sheeting as approved by Engineer-in-charge. Letter , symbols,
borders etc. will be as per IRC - 67 with required colour scheme on the boards and with
the high intensity grade A. The aluminium sheet to be riveted to M.S. frame of angle
iron of stze 40x40x4mm The boards will be fixed to 1 No. 50x50mm square post made
of M.S. angle 50x50x4m, 4m long welded to the frame with adequate anti-theft
arrangement .Sheet work to be painted with two or more coats of synthetic enamel paint
over an under coat (primer) and back side of aluminium sheet to be painted with two or
more coats of epoxy paint including appropriate priming coat complete in all respects as
per direction of Engineer-in-charge.

MATION

L(m)

B(m)

1000.00

1000.00

D(m)

UNIT

QUANTITY

4.00

sqm

4000.00

6.000

sqm
Total

6000.00
6000.00

SubTotal Setting Out, Clearing & Grubbing:-

1000.00

1000.00

3.000

0.150

Cum.

450.00

0.675

0.450

cum

607.50

777.12

Cum.

777.12

388.56

Cum.

388.56

dway Cutting

row Pits

3151.20

1000

2.145

0.325

Cum

3151.20

Cum.

1394.25

Sub Total Earthwork:-

1000.000

1000.000

4.05

3.750

0.075

Cum

303.75

TOTAL

Cum.

303.75

Grand Total

Cum.

303.75

0.075
TOTAL

Cum.
Cum.

281.25
281.25

1000.000

3.750

0.075
TOTAL

1000.000

1.670

0.170

Cum.
281.25
Cum.
281.25
Sub Total GSB & WBM & Brick Soling:-

Cum.

567.80

Sub Total Hard Shoulder: -

1000.000

1000.000

3.750
TOTAL

Sqm

3750.00
3750.00

TOTAL

Sqm

3750.00
3750.00

3.750

netration grade/modified bitumen) Binder Case - II By Mechanical Means

1000.000

3.750
TOTAL

Sqm

3750.00
3750.00

h bitumen heated in bitumen boiler fitted with the spray set spraying using
cum of stone aggregate of 6.7 mm size (Passing 11.2mm sieve and retained
and finishing with power road roller all complete.

1000.000

3.750
TOTAL

Sqm

3750.00
3750.00
Sub Total Bitumen Work:-

ification signs

Each
3.00
Sub Total Sign Boards & KM Stones:-

GRAND TOTAL

SAY

COST ESTIMATE FOR ROAD C


Road Name :-

Baghima To Tilaidih

Length of Road (M) :-

1000.00

S.No.

REF.NO

BLOCK :DESCRIPTION OF ITEMS

Nos

A. CLEARING & GRUBBING


1.1
Clearing Grass and Removal of Rubbish

Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery
of the area cleared.

Clearing and Grubbing Road Land

2.2

Clearing jungle including uprooting of rank vegetation, grass, brush wood, treesand
saplings of girth upto 30 cm measured at a height of 1 m above ground leveland removal
(a)

of rubbish upto a distance of 50 m outside the periphery of the areacleared.


In area of non-thorny jungle

C. EARTHWORK
1

2.3

Compacting Original Ground / Existing Embankment.


Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm
in depth, breaking clods watering, rolling each layer with tonne roller or wooden or
steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8
tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide
banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m
1

2.4

Surface Drains in Soil


Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including
dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2

2.1

Excavation in Soil with lead upto 50 m


Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means
over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.
-

2.2

Construction of Embankment with Material Obtained from Roadway Cutting

Filling available excavated earth (excluding rock) in trenches, plinth, sides of


foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift upto 1.5 m
5

Construction of Embankment with Material Obtained from Borrow Pits

2.5

Construction of Embankment with Material obtained from Borrowpits Construction of


embankment with approved material obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope and compacting to meet
requirement

(C)

Lead from 250m to 500m

2.6

Construction of Subgrade and Earthen Shoulders


Construction of subgrade and earthen shoulders with approved material obtained from
borrow pits with all lifts and leads, transporting to site, spreading, grading to required
slope and compacted to meet requirement as per Technical Specification. Lead from
500m to 750m

Earthen Shoulder Besides GSB In BT Road

D. GSB & WBM


1

4.1

Granular Sub-base with Well Graded Material


Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne
capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and
consolidating with road roller including making good the undulations etc. and re-rolling
the sub grade and disposal of surplus earth lead upto 50 metres.
(a) GSB for BT Road

4.2

WBM Grading 2 (By Manual Means)

Laying , spreading and compacting stone aggregate of specified sizes to WBM (G


II)specifications including spreading in uniform thickness, hand picking , rolling with 3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.

For BT Road

4.30

WBM Grading 3 (By Manual Means )


Laying , spreading and compacting stone aggregate of specified sizes to WBM (GIII)specifications including spreading in uniform thickness, hand picking , rolling with3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.
For BT Road

E. HARD SHOULDER
1

4.1

Construction of Shoulder with moorum material

For BT Road

F. BITUMEN WORK
1
5.1
Prime Coat
Providing and applying prime coat using hot straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the existing roadsurface as per
specifications :

5.20

Tack Coat
Providing and applying tack coat using bitumen emulsion (Rapid Setting)complying with
IS 8887-1995, spraying the bitumen emulsion with mechanicallyoperated spray unit,
cleaning and preparing the existing road surface as per specifications:

5.3

20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modifie


2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of13.2 mm
size and 11.2 mm size respectively per 100 sqm. and 52 kg. and 56 kg. ofhot bitumen per
cum of stone chippings of 13.2 mm and 11.2 mm size respectivelyincluding a tack coat
with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne
capacity etc. complete: (tack coat to be paid for separately). With paving Asphalt 80/100
heated and then mixed with solvent at the rate of 70 grams per kg of asphalt.

5.4

Providing and laying seal coat over prepared surface of road with bitumen heated in bit
blinding surface with 0.90cum of stone aggregate of 6.7 mm size (Passing 11.2mm sieve
with power road roller all complete.

H. Sign Boards & KM Stones

6.1
A
(I)

Cautionary, mandatory, informatory, direction and place indentification signs


Retro-reflectrorised Traffic Signs.
Providing Retro-reflective regulatory sign board of size 900mm dia meter made out of
2mm thick aluminium sheet, face to be fully covered with high intensity encapsulated
lens type retro -reflective sheeting as approved by Engineer-in-charge. Letter , symbols,
borders etc. will be as per IRC - 67 with required colour scheme on the boards and with
the high intensity grade A. The aluminium sheet to be riveted to M.S. frame of angle
iron of stze 40x40x4mm The boards will be fixed to 1 No. 50x50mm square post made
of M.S. angle 50x50x4m, 4m long welded to the frame with adequate anti-theft
arrangement .Sheet work to be painted with two or more coats of synthetic enamel paint
over an under coat (primer) and back side of aluminium sheet to be painted with two or
more coats of epoxy paint including appropriate priming coat complete in all respects as
per direction of Engineer-in-charge.

ATE FOR ROAD CONSTRUCTION


BLOCK :-

PALKOT

L(m)

B(m)

1000.00

1000.00

D(m)

Package No

JH10IRC037

DISTRICT :-

GUMLA

UNIT

QUANTITY

RATE (Rs.)

4.00

sqm

4000.00

3.01

6.000

sqm
Total

6000.00
6000.00

5.46

SubTotal Setting Out, Clearing & Grubbing:-

1000.00

dway Cutting

1000.00

3.000

0.150

Cum.

450.00

157.55

0.675

0.450

cum

607.50

103.4

Cum.

777.12

201.40

777.12

388.56

Cum.

388.56

45.70

3151.20

Cum

3151.20

258.18

Cum.

1394.25

338.97

row Pits

1000

2.145

0.325

Sub Total Earthwork:-

1000.000

1000.000

4.05

3.750

0.075

Cum

303.75

TOTAL

Cum.

303.75

Grand Total

Cum.

303.75

Cum.

281.25

0.075

928.30

TOTAL

Cum.

1000.000

3.750

0.075
TOTAL

Cum.
Cum.

1000.000

1.670

0.170

Cum.

281.25

1345.10

281.25
281.25
1432.10
Sub Total GSB & WBM & Brick Soling:-

567.80

928.30

Sub Total Hard Shoulder: -

1000.000

3.750
TOTAL

1000.000

Sqm

3750.00
3750.00

35.60

Sqm

3750.00
3750.00

15.30

3.750
TOTAL

netration grade/modified bitumen) Binder Case - II By Mechanical Means

1000.000

3.750
TOTAL

Sqm

3750.00
3750.00

84.80

h bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade 80/100 and
(Passing 11.2mm sieve and retained on 2.36mm sieve) per 100 sqm of road surface including rolling and finishing
1000.000

3.750
TOTAL

Sqm

3750.00
3750.00

56.70
Sub Total Bitumen Work:-

ification signs

Each

3.00
5896.68
Sub Total Sign Boards & KM Stones:-

GRAND TOTAL

SAY

42.50

RC037

LA
AMOUNT (Rs.)

12040.00

32781.00

44821.00

70897.50

62815.50

156511.97

17757.19

813576.82

472608.92

1594167.90

281971.00

378309.00

402778.00
1063058.00

527089.00
527089.00

133500.00

57375.00

318000.00

bitumen of grade 80/100 and


cluding rolling and finishing

212625.00
721500.00

17690.00
17690.00

4250296.90

LACS.

COST ESTIMATE FOR ROAD CONSTRUCTION


Road Name :-

Baghima To Tilaidih

Length of Road (M) :-

1000.00

S.No.

REF.NO

DESCRIPTION OF ITEMS

A. CLEARING & GRUBBING


1.1
Clearing Grass and Removal of Rubbish

Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery
of the area cleared.

Clearing and Grubbing Road Land

2.2

Clearing jungle including uprooting of rank vegetation, grass, brush wood, treesand
saplings of girth upto 30 cm measured at a height of 1 m above ground leveland removal
(a)

of rubbish upto a distance of 50 m outside the periphery of the areacleared.


In area of non-thorny jungle

SubTotal Sett

C. EARTHWORK
1

2.3

Compacting Original Ground / Existing Embankment.


Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm
in depth, breaking clods watering, rolling each layer with tonne roller or wooden or
steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8
tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide
banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m

2.4

Surface Drains in Soil


Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including
dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the
excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

2.1

Excavation in Soil with lead upto 50 m


Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means
over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including
disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.

2.2

Construction of Embankment with Material Obtained from Roadway Cutting

Filling available excavated earth (excluding rock) in trenches, plinth, sides of


foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift upto 1.5 m
5

Construction of Embankment with Material Obtained from Borrow Pits

2.5

Construction of embankment with approved material obtained from borrow pits with a
lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting
to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause
301.5

(C)

Lead from 250m to 500m

3.14

Construction of Subgrade and Earthen Shoulders


Construction of subgrade and earthen shoulders with approved material obtained from
borrow pits with all lifts and leads, transporting to site, spreading, grading to required
slope and compacted to meet requirement as per Technical Specification. Lead from
500m to 750m

Earthen Shoulder Besides GSB In BT Road

D. GSB & WBM


1

4.1

Granular Sub-base with Well Graded Material


Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne
capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and
consolidating with road roller including making good the undulations etc. and re-rolling
the sub grade and disposal of surplus earth lead upto 50 metres.
(a) GSB for BT Road
TOTAL
Grand Total

4.2

WBM Grading 2 (By Manual Means)

Laying , spreading and compacting stone aggregate of specified sizes to WBM (G


II)specifications including spreading in uniform thickness, hand picking , rolling with 3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.

For BT Road

TOTAL
3

4.30

WBM Grading 3 (By Manual Means )


Laying , spreading and compacting stone aggregate of specified sizes to WBM (GIII)specifications including spreading in uniform thickness, hand picking , rolling with3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.
For BT Road
TOTAL

E. HARD SHOULDER
1

4.1

Construction of Shoulder with moorum material

For BT Road

F. BITUMEN WORK
1
5.1
Prime Coat
Providing and applying prime coat using hot straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the existing roadsurface as per
specifications :

5.20

Tack Coat
Providing and applying tack coat using bitumen emulsion (Rapid Setting)complying with
IS 8887-1995, spraying the bitumen emulsion with mechanicallyoperated spray unit,
cleaning and preparing the existing road surface as per specifications:

5.3

20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modifie


2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of13.2 mm
size and 11.2 mm size respectively per 100 sqm. and 52 kg. and 56 kg. ofhot bitumen per
cum of stone chippings of 13.2 mm and 11.2 mm size respectivelyincluding a tack coat
with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne
capacity etc. complete: (tack coat to be paid for separately). With paving Asphalt 80/100
heated and then mixed with solvent at the rate of 70 grams per kg of asphalt.

TOTAL

5.4

Providing and laying seal coat over prepared surface of road with bitumen heated in bit
using 98 kg of bitumen of grade 80/100 and blinding surface with 0.90cum of stone agg
retained on 2.36mm sieve) per 100 sqm of road surface including rolling and finishing w
TOTAL

H. Sign Boards & KM Stones

6.1
A
(I)

Cautionary, mandatory, informatory, direction and place indentification signs


Retro-reflectrorised Traffic Signs.
Providing Retro-reflective regulatory sign board of size 900mm dia meter made out of
2mm thick aluminium sheet, face to be fully covered with high intensity encapsulated
lens type retro -reflective sheeting as approved by Engineer-in-charge. Letter , symbols,
borders etc. will be as per IRC - 67 with required colour scheme on the boards and with
the high intensity grade A. The aluminium sheet to be riveted to M.S. frame of angle
iron of stze 40x40x4mm The boards will be fixed to 1 No. 50x50mm square post made
of M.S. angle 50x50x4m, 4m long welded to the frame with adequate anti-theft
arrangement .Sheet work to be painted with two or more coats of synthetic enamel paint
over an under coat (primer) and back side of aluminium sheet to be painted with two or
more coats of epoxy paint including appropriate priming coat complete in all respects as
per direction of Engineer-in-charge.

ROAD CONSTRUCTION
Package No

JH10IRC037

DISTRICT :-

GUMLA

UNIT

QUANTITY

sqm

4000.00

sqm
Total

6000.00
6000.00

RATE (Rs.)

SubTotal Setting Out, Clearing & Grubbing:-

AMOUNT (Rs.)

0.00

0.00

0.00

Cum.

450.00

0.00

cum

607.50

0.00

Cum.

777.12

0.00

rom Roadway Cutting

Cum.

388.56

0.00

Cum

3151.20

0.00

Cum.

1394.25

0.00

rom Borrow Pits

Sub Total Earthwork:-

Cum

303.75

Cum.

303.75

Cum.

303.75

Cum.

281.25

0.00

0.00

Cum.

Cum.
Cum.

Cum.

281.25

281.25
281.25
Sub Total GSB & WBM & Brick Soling:-

567.80

Sub Total Hard Shoulder: -

0.00

0.00
0.00

0.00
0.00

Sqm

3750.00
3750.00

0.00

Sqm

3750.00
3750.00

0.00

ous (penetration grade/modified bitumen) Binder Case - II By Mechanical Means

Sqm

3750.00
3750.00

0.00

road with bitumen heated in bitumen boiler fitted with the spray set spraying
face with 0.90cum of stone aggregate of 6.7 mm size (Passing 11.2mm sieve and
ncluding rolling and finishing with power road roller all complete.
Sqm

3750.00
3750.00
Sub Total Bitumen Work:-

0.00
0.00

3.00
Sub Total Sign Boards & KM Stones:-

0.00
0.00

GRAND TOTAL

0.00

e indentification signs

Each

SAY

0.00

LACS.

S.No.

Description

Unit Quantity

1 Aluminium Sheet (2mm thick)sqm


2 Paints
2.1 Enamel Paint
sqm
2.2 Epoxy Paint
sqm
3 Morum
cum
4 Aggregate
4.1 Stone Aggregate (90 mm thick) sqm
4.2 Stone Aggregate (63 mm thick) sqm
4.3 Stone Aggregate (53 mm thick) sqm
5 Aggregate
5.1 Stone Aggregate (90 mm thick) sqm
5.2 Stone Aggregate (63 mm thick) sqm
5.3 Stone Aggregate (53 mm thick) sqm
6 Aggregate
6.1 Stone Aggregate (90 mm thick) sqm
6.2 Stone Aggregate (63 mm thick) sqm
6.3 Stone Aggregate (53 mm thick) sqm
7 Bitumen
7.1 Bitumen
sqm
7.2 Steam Coal
sqm
7.3 Bitumen
sqm
8 Bitumen
8.1 Bitumen
sqm
8.2 Stone Chipping
sqm
8.3 Steam Coal
sqm
9 Bitumen
9.1 Bitumen
sqm
9.2 Stone Aggregate
sqm
9.3 Steam Coal
sqm

0.98
1.09
0.635

1.1
0.65
0.25
1.1
0.65
0.25
0.05
0.3
0.65
0.075
0.15
0.025
0.144
1.8
0.288
0.098
0.9
1.9

Length (m) Total


1000

980

1000
1000

1090
635
22.5

303
303
303

333.3
196.95
75.75

281.25
281.25
281.25

309.375
182.8125
70.3125

281.25
281.25
281.25

14.0625
84.375
182.8125

3750
3750
3750

281.25
562.5
93.75

3750
3750
3750

540
6750
1080

3750
3750
3750

367.5
3375
7125

TIME SCHEDULE OF ACTIVITIES


ACTIVI
TY NO

Activities

Setting out work

Volume unit
1

Clearing grass and Grubbing 10000

Time(da Labour/
ys)
Machine

km

sq.m

2 Dozers

Excavation in soil with lead


upto 50 m.

777.12

cum

1
Hydraulic
Excavator

Construction of embankment
with material obtained from
road way cutting

388.56

cum

2 mates

Construction of embankment
with material obtained from
borrow pit

3151.2

cum

10 mates

Subgrade and earthen


shoulder

1394.25

cum

4 mates

Granular sub base with well


graded material

303.75

cum

2 mates

WBM grading 2

281.25

cum

2 mates

WBM grading 3

281.25

cum

2 mates

Bitumen work
a) Prime coat

3750

Sq.m.

b)Tack coat

3750

sq.m.

c)20mm thick premix carpet


using bitumenous binder by
mechanical means

3750

sq.m.

10

DAY 1
activity1

DAY 2

DAY 3

DAY 4

DAY 5

DAY 6

DAY 7

DAY 8

acitivity 2
activity 3

ac

DAY 9

DAY 10

DAY 11

DAY 12

DAY 13

DAY 14

DAY 15

activity 4 & 5
activity 6

DAY 16

DAY 17

DAY 18

DAY 19

DAY 20

DAY 21

DAY 22

DAY 23

activity 7
activity 8
activity 9

DAY 24

DAY 25

DAY 26

DAY 27

DAY 28

DAY 29

DAY 30

activity 10(a)
activity 10(b)
activity 10 c

TOTAL TIME FOR THE PROJECT IS ONE MONTH

ROJECT IS ONE MONTH

LABOUR REQUIREMENT
SR NO. PARTICULARS
1 BELDAR
2 COLLIE
3 SAUNDRIES
4 MATE
5 CHOWKIDAR
6 DRIVER
7 BHISHTI
8 MAZDOOR
9 SPRAYMAN

TOTAL AMOUNT

NO. OF DAYS
30
30
30
30
30
30
30
30
30

30

RATE/DAY
280
280
250
400
280
280
280
280
280

QUANTITY
29.03
28.286
47.29
3.211
0.548
0.825
1.32
1
0.06

TOTAL QUANTITY
870.9
848.58
1418.7
96.33
16.44
24.75
39.6
30
1.8

AMOUNT
243852
237602.4
1418.7
38532
4603.2
6930
11088
8400
504

552930.3

Equipment
Sr no. Description
Quantity
1

3
a

Unit

Quantity

Excavation
Hydraulic Excavator
0.04125 day/10 cum 777.12
GSB
Road Roller

0.054 day/22.5 cum 303.75

WBM
WBM Grade II
vibratory roller 0.033
WBM Grade II
vibratory roller 0.033

Unit
cum

cum

day/cum

281.5

cum

day/cum

281.5

cum

4Premix Carpet Surface


3 Wheel Road Roller
0.11 day/100 sq.m 3750

sq.m

uipment
Days
4

Remarks

7 hours working

Rate

per

8000 day

4000 day

10 8 hours working

4000 day

10 8 hours working

4000 day

4000 day

Total cost
32000
0
0
4000
0
0
0
40000
0
40000
0
0
16000