FAKULTAS TEKNOLOGI KEBUMIAN DAN ENERGI UNIVERSITAS TRISAKTI JAKARTA 2016 RESERVE EVALUATION, DRIVE MECHANISM, AND PRODUCTION FORECASTING USING METHOD OF MATERIAL BALANCE
ON RESERVOIR R FIELD A FINAL ASSIGNMENT
Submitted by MUHAMMAD ARIEF RAMADHAN
PETROLEUM ENGINEERING STUDY PROGRAM
FACULTY EARTH TECHNOLOGY AND ENERGY TRISAKTI UNIVESITY JAKARTA 2016 EVALUASI CADANGAN, DRIVE MECHANISM, DAN PERAMALAN PRODUKSI MENGGUNAKAN METODE MATERIAL BALANCE PADA RESERVOIR R LAPANGAN A
TUGAS AKHIR
Dibuat Untuk Memenuhi Salah Satu Syarat Mendapatkan Gelar Sarjana
Teknik Pada Program Studi Teknik Perminyakan Fakultas Teknologi Kebumian dan Energi Universitas Trisakti Oleh MUHAMMAD ARIEF RAMADHAN 071 10 192
PROGRAM STUDI TEKNIK PERMINYAKAN
FAKULTAS TEKNOLOGI KEBUMIAN DAN ENERGI UNIVERSITAS TRISAKTI JAKARTA 2016 RESERVE EVALUATION, DRIVE MECHANISM, AND PRODUCTION FORECASTING USING METHOD OF MATERIAL BALANCE ON RESERVOIR R FIELD A
FINAL ASSIGNMENT
To Fill The Requirement To Achieve Bachelor Degree
At Petroleum Engineering Study Program Faculty of Technology Earth And Energy Trisakti University Submitted by MUHAMMAD ARIEF RAMADHAN 071 10 192
PETROLEUM ENGINEERING STUDY PROGRAM
FACULTY OF EARTH TECHNOLOGY AND ENERGY TRISAKTI UNIVERSITY JAKARTA 2016