Traceability_PDU
Training Document
for
YAZAKI Users
PDU_TRACEABILITY
Rev.Nr
Name
Date
Zied Hammouda
29.11.2016
saved: 05.01.2017
Page 1 of 12
Training document
Traceability_PDU
Content
1
YSDINV....................................................................................................................................... 4
HUMO......................................................................................................................................... 5
2.1 Pallet with different HU......................................................................................................... 5
2.2 Handling unit of Material.......................................................................................................6
YPP_BATCH_TRACE................................................................................................................. 7
saved: 05.01.2017
Page 2 of 12
Training document
Traceability_PDU
Traceability
The traceability from the invoice to the component can be done with combination of three
transactions:
YSDINV: related to SD, it makes the link between invoice and outbound delivery.
HUMO: related to LO, it makes the link between outbound delivery and Handling units of finished
goods.
YPP_BATCH_TRACE: related to PP, it makes the link between produced Materials, component
batches. It also provides the production line.
saved: 05.01.2017
Page 3 of 12
Training document
Traceability_PDU
1 YSDINV
Run transaction YSDINV
saved: 05.01.2017
Page 4 of 12
Training document
Traceability_PDU
(3) Sales document.
(4) Quantity and unit of measure
(5) Outbound delivery Number
To have the HU related to invoice
(1) Select and copy the outbound delivery number.
(2) Run transaction HUMO.
2 HUMO
HU for Materials
2.1
saved: 05.01.2017
Page 5 of 12
Training document
Traceability_PDU
(1) Pallet ID
(2) List of Material packed in the pallet
To display all materials HU, select the pallet HU and click on
(1) Pallet ID
(2) HU of Material
(3) Material code, Quantity and unit of measure.
2.2
saved: 05.01.2017
Page 6 of 12
Training document
Traceability_PDU
(2) Copy the creation date of handling unit.
saved: 05.01.2017
Page 7 of 12
Training document
Traceability_PDU
3 YPP_BATCH_TRACE
Run transaction YPP_BATCH_TRACE:
saved: 05.01.2017
Page 8 of 12
Training document
Traceability_PDU
saved: 05.01.2017
Page 9 of 12
Training document
Traceability_PDU
101
261
GI goods issue
131
301
302
311
561
601
GD goods issue:delvy
saved: 05.01.2017
Page 10 of 12
Training document
Traceability_PDU
Page 11 of 12
Training document
Traceability_PDU
(4) Date and Time of each historic detail.
To display an object key, double click Goods receipt for example.
saved: 05.01.2017
Page 12 of 12