EMPLOYMENT RECORD:
PERIOD
COMPANY

:
:

POSITION

October 19, 2007 May 29, 2011


International Plant Services
1602 Old Underwood Road
La Porte TX 77571 USA
Pipe Fitter

Work Description:
Pipe Fitters prepare Isometric drawings in the field to install all 2 72, steel, stainless,
alloys and exotic metal pipe spools according to specifications.
Requires Hydro-testing pipe system for all types of petrochemical, industrial,
commercial, power, nuclear and pulp and paper chemical process.
Establish criteria hydro testing pipe system.
Interfaces with pipe foreman to identify, expedite and install all pre-fabricated pipe
spools.

EMPLOYMENT HISTORY
PERIOD

POSITION

April 28, 2005 November 20, 2006


Formosa Petrochemical Corporation
No. 1 Formosa Industrial Complex,
Mailiao Village, Yunlin County
Taiwan, R.O.C.
Pipe Fitter

Work Description:
Responsible for fabrication and erection installation of all mechanical piping works in
accordance with IFC issued for construction drawing.
Fit up align heavy and thin wall pipe work lines as per isometric drawing on the pipe rack
at highest and lowest fabrication.
Maintain good quality of piping works and daily production report and submitted to
piping foreman on daily basis.
Perform other related tasks maybe assigned.
PERIOD
COMPANY

:
:

POSITION

August 14, 2002 October 29, 2003


TCC/IMI
Tchad Cameron Constructors TCHAD
DEVELOPMENT PROJECT N Djamena
Republique DU Tchad Africa
Pipe Fitter (Resin)

Work Description:
Fabrication and installation of under ground pipelines such as open drain line using RTRP
(RESIN) piping material, fresh water pipelines using CPCV, storm water pipelines using
PVC pipes and fire water using ductile pipes inside the central treating facility area.
I was assigned and worked both on fabrication and installation of underground open drain
pipelines, I was one of those who did the epoxy welding of fiberglass fittings working
and also assigned on hydro testing of the installed underground open drain pipelines
(gravity). I was also assigned of the installation of fire hydrant risers post indicator
valves, fire hose reels and fire monitors.
PERIOD
COMPANY

:
:

POSITION

November 02, 1999 September 21, 2000


Energy Overseas International Inc.
Ampco Methanol Project Malabo Equatorial
Guinea, West Africa
Pipe Fitter

Work Description:
Responsible for fabrication and erection installation of all mechanical piping. Works in
accordance with IFC issued for construction drawings.
Fabrication and installation of fiber glass spool mostly acid line and water sea line and
other related task that maybe assigned.
Prepare duly production reports and submit to piping foreman on daily basis.

EMPLOYMENT HISTORY
PERIOD
COMPANY

:
:

POSITION

March 06, 1997 November 10, 1998


Sukwon Idche Engineering (M) Sdn Bhd
Petronas Gas Processing Plant GPP 5 & 6
Project Looked Bag #7, Kerteh 24300
Kemaman Terengganu Malaysia
Pipe Fitter

Work Description:
Responsible for fabrication and erection installation of all mechanical piping works in
accordance with IFC issued for construction drawings.
Fit up align heavy and thin wall pipe work lines as per isometric drawing on the pipe rack
at highest and lowest elevation.
Maintain good quality of piping works and daily production report and submitted to
piping foreman on daily basis.
Perform other related tasks maybe assigned.

Company Name
Name of Project
Address
Date
Position

:
:
:
:
:

Al Yusr Townsend and Bottum Company Ltd.


SADAF PROJECT
P. O. Box 10025 Madinat Al Sinaiyah K. S. A.
February 23, 1992 December 15, 1996
Pipe Fitter

Duties and Responsibilities:


Responsible for fabrication and erection installation of all mechanical piping works in
accordance with IFC issued for construction drawings.
Fit up align heavy and thin wall pipe work lines as per isometric drawing on the pipe rack
at highest and lowest elevation.
Perform maintenance repairs of all mechanical equipment such as heat exchangers task,
vessels, column, furnaces boilers and assist millwright in dismantling mechanical preinstalling pumps, marine loading arms, compressor and turbines generator, during each
routine maintenance minor and major shutdown in SADAF plant.
Maintain good quality of piping works and mechanical equipment shutdown, also daily
production report submitted to formal on daily basis.