9
1.
2.
3.
4.
5.
6.
7.
8.
PERANCANGAN ALAT
PENGARANGAN SEKAM PADI
DENGAN MENGGUNAKAN SCREW
CONVEYOR
9.
2.
3.
4.
5.
6.
7.
PENGARUH PERLAKUAN
QUENCHING TERHADAP
KEKERASAN DAN STRUKTUR
MIKRO PADA PENGELASAN BAJA
STAINLESS STEEL
8.
9.
2.
PERENCANAAN PEMBUATAN
POROS RODA DEPAN SEPEDA
MOTOR JENIS VESPA DENGAN
MESIN CNC TU-2A
3.
4.
5.
6.
7.
8.
PENGARUH TEPERATUR
PEMANASAN DAN MEDIA
QUENCHING TERHADAP SIFAT
MEKANIKPADA BAJA AMUNITIT SK
9.
2.
3.
4.
5.
6.
7.
8.
9.
2.
3.
4.
5.
6.
PENGGUNAAN
MIKROKONTROLLER ATMega 8535
UNTUK SISTEM KONTROL PADA
PROTOTYPE ELEVATOR
7.
8.
9.
2.
3.
4.
5.
6.
7.
8.
9.
9.
1.
2.
3.
4.
PERENCANAAN ECONOMISER
UNTUK KETEL UAP PIPA AIR
KAPASITAS 30 TON/JAM DI PG.
KEBON AGUNG MALANG
5.
PERANCANGAN ELEMEN
TRANSMISI PADA MOBIL LISTRIK
ARUS DC
6.
7.
8.
4.
5.
PERANCANGAN RUANG
PENYIMPAN DINGIN (COLD
STORAGE) SUSU KAPASITAS 20.000
LITER
6.
7.
8.
48. PENGARUH VARIASI BESAR ARUS
LISTRIK DAN DISCHARGE TIME
TERHADAP KEKASARAN
PERMUKAAN PADA PROSES DIE
SINKING EDM
9.
1.
PERANCANGAN HYDROCYCLONE
PEMISAH LUMPUR
2.
3.
PERANCANGAN PROSES
PENGECORAN KRAN AIR ? 4 3
TYPE BALL VALVE DENGAN
MENGGUNAKAN CETAKAN PASIR
KONSTRUKSI ( TEBAL = 13 mm )
TERHADAP KEKUATAN TARIK
DENGAN PERLAKUAN PANAS
PASCA LAS
29. PENGARUH KOMPOSISI AIR
TERHADAP LAJU KOROSI PIPA
PDAM KABUPATEN NGANJUK
(Kajian Teori)
30. PENGARUH TEMPERATUR
ANNEALING TERHADAP SIFAT
MEKANIK DAN STRUKTUR MIKRO
BESI TUANG KELABU FC 25
31. PERANCANGAN MESIN GERGAJI
KAYU KOMBINASI MESIN GRAFIR
KAYU
32. ANALISA PERPINDAHAN PANAS
PADA TUNGKU PEMBAKARAN
KERAMIK JENIS API BALIK
33. ANALISA TEGANGAN PADA PROFIL
SIKU DENGAN MENGGUNAKAN
SOFTWARE ANSYS 6.0
34. ANALISA PERBANDINGAN
BRACKING LIMIT PADA MOBIL KIA
RIO DAN SUZUKI BALENO
35. PERANCANGAN INSTALASI PIPA AIR
BERSIH DI DESA MARGOMULYO
KEC. KEREK KAB. TUBAN
36. PERANCANGAN MESIN PENGADUK,
PENGEPRES DAN PENCETAK MIE
KAPASITAS 20 KG / JAM
37. ANALISA TEGANGAN PADA PEGAS
TEKAN ATAU KOMPRESI PADA
LOKOMOTIF TYPE CC.201 0120172
38. PERENCANAAN ALAT PEMASANG
DAN PELEPAS KARET IDLER
DENGAN MENGGUNAKAN SISTEM
HIDROLIK
39. ANALISA TEGANGAN YANG
TERJADI PADA LENGAN
PENGANGKAT ( BOOM ) DUMP
TRUCK HINO FM 226 KAPASITAS
ANGKUT 33.000 Kg
40. PERBANDINGAN LAJU KOROSI
PADA BAJA KARBON UNTUK
KONSTRUKSI MESIN DENGAN
2.
3.
4.
5.
6.
7.
8.
PERENCANAAN MESIN
PENGHANCUR KERTAS DAUR
ULANG KAPASITAS 150 KG/JAM
9.
KX 30 MENGGUNAKAN SOFTWARE
ANSYS 5.4
28. ANALISA BLIND DRILL ROLL ( BDR )
TERHADAP GAYA GESEK FELT PADA
PAPER MACHINE 4 (PM4) Di PT.
KERTAS LECES PROBOLINGGO
29. PERENCANAAN PROSES PRODUKSI
VELG RACING MOBIL DENGAN DIE
CASTING
30. STUDI KARAKTERISTIK PENGARUH
KELENGKUNGAN GELAGAR
31. ANALISA ENERGI PADA PRODUKSI
WAX/MALAM DENGAN BAHAN
DASAR PH SOLAR DI PUSDIKLAT
MIGAS CEPU
32. PERANCANGAN MESIN PENGUPAS
KULIT BUAH KOPI BASAH
33. PENGARUH PENAMBAHAN SERAT
KELAPA DAN VARIASI KOMPOSISI
SEMEN TERHADAP KEKUATAN
BENDING
34. PERENCANAAN ALAT TROMOL
STATIK UNTUK SEPEDA
35. PERENCANAAN MESIN PEMOTONG
PLAT STAINLESS STEEL DENGAN
KEDALAMAN POTONG 0,5 mm
36. PENGARUH PENGAPIAN
ELEKTRONIK CDI DIBANDING
PENGAPIAN KONVENSIONAL
SISTEM PLATINA TERHADAP DAYA
DAN EFISIENSI BAHAN BAKAR
37. KONSEP DESAIN PELEMPAR PAKAN
IKAN
38. PERANCANGAN MESIN PENGERING
GABAH TIPE ALIRAN CAMPUR
(MIXED-FLOW DRYER) KAPASITAS
10 TON / PROSES
39. ?Analisis Statis Poros Molen Jenis 3 Hp
Kapasitas Maks. 250 Kg?
40. PERANCANGAN PENDINGIN
KONTAINER UNTUK
PENGANGKUTAN UDANG DENGAN
KAPASITAS 16 TON
3.
PERHITUNGAN KEBUTUHAN
MINYAK BAKAR AKIBAT
KEKURANGAN SUPPLY AMPAS
TEBU (Bagasse) PADA KETEL UAP
YOSHIMINE DI PG KEBON AGUNG
MALANG
4.
5.
PERENCANAAN KOPLING
HIDROLIK PADA SEPEDA MOTOR
6.
PERENCANAAN KOPLING
HIDROLIK PADA SEPEDA MOTOR
7.
8.
9.
PERANCANGAN MESIN
PENGHANCUR SAMPAH ORGANIK
KAPASITAS 350 KG/JAM
2.
4.
5.
PERENCANAAN TURBOCHARGER
PADA MOTOR DIESEL EMPAT
LANGKAH DENGAN DAYA 300 HP
6.
7.
8.
9.
PERANCANGAN MESIN
PENGHANCUR COMPACT DISK
(POLYCARBONATE) SISTEM
PENGHANCUR RODA GIGI
KAPASITAS 250 KG/JAM
2.
PERANCANGAN PEMBUATAN
CETAKAN VELG RACING SEPEDA
MOTOR DENGAN MENGGUNAKAN
CETAKAN PASIR
2.
3.
4.
5.
6.
45. Pengaruh Tempering Pada Baja Api 5LX52 Terhadap Mikro Struktur dan
Kekerasan
7.
8.
9.