Anda di halaman 1dari 133

PRECIPITACION TOTAL M

JULI

ESTACION
MICROCUENCA
RIO
TIPO

MOLINO
MOLINO

AO

ENE

FEB

MAR

ABR

1966.00

64.80

1967.00

68.00

95.50

52.70

27.50

172.10

191.70

66.40

1968.00

134.30

212.00

193.80

27.00

1969.00

172.10

1970.00

148.50

164.00

87.40

31.80

196.70

166.30

44.50

1971.00

166.80

345.90

71.00

74.90

1972.00

288.90

221.00

169.20

17.80

1973.00

271.40

189.90

145.40

109.20

1974.00

269.00

357.00

60.00

193.00

1975.00

184.00

266.00

156.00

16.00

1976.00

331.00

201.00

136.00

21.00

1977.00

91.00

275.00

222.00

5.40

1978.00

250.00

99.00

117.00

19.00

1979.00

197.00

117.00

229.00

80.00

1980.00

190.00

91.40

253.00

3.40

1981.00

126.00

112.00

106.00

55.00

1982.00

166.00

239.00

137.00

60.00

1983.00

202.00

245.00

128.00

55.00

1984.00

219.00

242.00

119.00

61.00

1985.00

128.00

304.00

162.00

110.00

1986.00

131.00

260.00

171.00

107.00

1987.00

296.00

70.00

82.00

37.00

1988.00

300.00

70.00

249.00

124.00

1989.00

160.00

176.00

195.00

11.30

1990.00

192.00

50.00

51.00

47.00

1991.00

147.00

101.00

152.00

70.00

1992.00

159.00

130.00

40.00

32.00

1993.00

219.00

88.00

185.00

30.00

1994.00

186.00

149.00

109.00

55.00

1995.00

128.00

105.00

134.00

19.00

1996.00

195.00

127.00

137.00

32.00

1997.00

264.00

220.00

162.00

61.00

1998.00

132.00

77.00

150.00

62.00

1999.00

158.00

278.00

309.00

61.00

2000.00

275.00

236.00

138.00

16.00

2001.00

324.00

251.00

239.00

57.00

2002.00

145.00

216.00

239.00

134.00

2003.00

229.00

142.00

304.00

39.00

2004.00

322.00

115.00

68.00

54.00

2005.00

139.00

189.00

78.00

29.00

2006.00

320.00

210.00

120.00

32.00

N DATOS
MEDIA
DESV.STD.

40.00

40.00

40.00

40.00

197.29

180.62

151.57

53.35

72.52

78.78

66.90

39.08

MIN

64.80

50.00

40.00

3.40

MAX

331.00

357.00

309.00

193.00

PRO.5 ULT.AO.

250.57

194.14

169.43

51.57

MEDIANA

186.00

189.00

145.40

47.00

Fuente: SENAMHI-PUNO.

Anexo 1
PRECIPITACION TOTAL MENSUAL SERIE DE 1996-2006 (mm) EN LA LOCALIDAD DE JULI
JULI
LATITUD
LONGITUD
ALTITUD

1612'13.6" S
6927'35.7" W
3812 MSNM

CODIGO

REGION
PROV
DIST

MAY

JUN

JUL

AGO

SET

OCT

12.20

0.00

0.00

0.00

13.00

58.60

45.10

0.00

0.00

0.00

44.90

30.30

0.00

30.70

10.00

20.00

30.90

3.50

8.30

7.00

1.80

9.10

22.40

23.10

3.80

0.20

3.50

0.00

30.70

34.00

0.00

23.00

0.00

11.50

0.00

29.50

12.90

2.70

3.80

1.60

26.90

13.40

3.00

0.00

8.10

17.10

44.60

45.40

55.00

4.20

0.20

101.00

22.00

32.00

44.00

9.70

0.00

12.00

36.00

95.00

44.00

1.00

2.40

43.00

63.40

9.50

0.00

0.00

14.50

1.00

57.60

66.40

0.00

0.00

4.00

8.00

22.00

0.90

2.20

0.00

14.10

2.20

4.10

47.10

2.40

1.40

11.00

33.00

101.00

40.20

18.00

7.80

1.30

4.20

18.80

29.00

18.00

8.40

0.50

9.90

26.00

23.00

10.00

9.20

2.00

15.00

24.00

25.00

15.00

1.90

3.10

19.20

26.40

34.80

34.00

26.00

0.00

22.00

89.00

13.00

4.30

0.00

3.60

37.00

15.00

29.00

5.50

8.70

19.20

1.30

18.60

64.20

9.00

0.20

1.00

0.00

22.00

58.00

16.00

3.80

6.30

17.30

18.10

3.70

13.00

48.00

0.00

18.00

19.00

69.00

10.00

31.00

3.80

0.60

11.80

49.80

0.00

0.70

3.70

40.90

0.00

24.00

7.60

2.90

0.00

35.10

21.00

73.00

11.00

1.00

1.60

0.80

7.10

14.30

6.10

0.00

0.60

7.20

17.80

26.00

18.00

0.00

9.10

38.00

4.50

26.60

11.00

0.00

0.00

64.00

79.00

36.00

0.00

13.60

0.00

0.00

12.30

75.00

28.00

2.20

3.10

1.90

58.00

130.00

10.00

14.00

0.60

17.00

1.20

62.00

7.90

1.90

12.00

30.90

18.80

67.00

8.60

16.50

42.40

10.90

3.70

39.40

23.00
11.00

0.00

5.90

12.60

42.00

24.00

2.00

34.00

49.00

25.00

11.10

1.50

0.00

0.00

1.00

24.00

61.00

5.00

3.00

2.00

6.00

5.40

15.00

40.00

40.00

40.00

40.00

40.00

40.00

13.03

6.90

5.59

17.54

27.51

39.31

13.72

10.76

8.89

20.79

23.52

26.92

0.00

0.00

0.00

0.00

0.00

0.90

55.00

48.00

42.40

101.00

101.00

130.00

9.57

5.34

13.84

18.20

17.16

39.93

10.00

2.00

2.40

11.50

22.00

32.00

110880

CODIGO

ION
V

PUNO
CHUCUITO
JULI
NOV

DIC

TOTAL

66.90

98.60

489.80

5.70

177.10

801.30

85.50

41.10

788.80

17.30

98.40

642.70

24.40

177.50

830.10

98.90

134.90

956.40

50.00

148.50

956.70

30.90

68.60

933.60

29.00

38.00

1160.40

35.00

280.00

1133.70

5.90

51.00

909.20

62.80

114.90

910.60

88.20

147.00

755.10

115.50

133.10

941.30

106.40

25.00

858.20

40.00

113.00

631.10

36.00

120.00

843.80

49.00

107.00

871.20

39.70

129.60

910.70

164.00

163.00

1215.00

23.00

139.00

919.90

155.00

43.00

800.50

27.00

96.00

956.20

45.00

58.40

710.90

64.00

173.00

744.00

30.90

74.00

681.90

72.60

60.70

563.60

122.00

69.00

852.60

69.00

165.00

768.80

71.00

117.00

631.70

77.20

101.60

766.00

79.00

86.50

1062.50

66.00

51.00

638.90

18.50

94.00

1141.70

1.90

119.00

890.70

13.80

116.00

1139.30

37.40

107.00

999.90

25.00

89.00

25.70

85.00

801.80

54.00

98.00

674.50

13.50

78.00

809.90

107.10

935.50

40.00

40.00

54.70

106.99

854.40

38.96

48.71

449.55

1.90

25.00

186.00

164.00

280.00

2111.40

24.47

98.86

45.00

101.60

893.09
793.90

VELOCIDAD DEL VIEN


JULI

ESTACION
MICROCUENCA
RIO
TIPO

MOLINO
MOLINO

AO

ENE

FEB

MAR

ABR

1985

3.10

3.00

3.20

2.40

1986

1.80

1.80

2.30

2.30

1987

2.40

2.90

2.90

2.90

1988

2.90

3.00

2.70

2.60

1989

2.10

2.30

2.30

2.30

1990

2.40

2.90

2.70

2.30

1991

3.00

2.80

2.60

2.30

1992

3.00

2.70

2.00

2.80

1993

2.40

2.20

2.30

2.00

1994

2.40

2.10

2.10

2.10

1995

2.40

2.40

2.30

2.20

1996

2.30

2.20

2.10

2.10

1997

1.90

1.90

2.10

1.80

1998

2.30

1.90

2.20

1.70

1999

2.60

2.30

2.10

2.30

2000

2.30

2.30

1.90

2.20

2001

2.20

2.40

2.10

2.50

2002

2.70

2.40

2.30

2.30

2003

2.40

2.50

1.90

2.50

2004

1.90

2.30

1.90

2.30

2005

2.00

2.00

1.90

2.20

N DATOS

21.00

21.00

21.00

21.00

MEDIA

2.40

2.40

2.28

2.29

DESV.STD.

0.37

0.37

0.35

0.28

MIN

1.80

1.80

1.90

1.70

MAX

3.10

3.00

3.20

2.90

PROM. 5 AOS

2.25

2.32

2.00

2.33

MEDIANA

2.40

2.30

2.20

2.30

Fuente: SENAMHI - PUNO

Nexo 2
VELOCIDAD DEL VIENTO (m/s) SEREIE DE 1985-2005 EL LA LOCALIDAD DE JULI.
JULI
LATITUD
LONGITUD
ALTITUD

1612'13.6" S
6927'35.7" W
3812 MSNM

CODIGO
REGION
PROV
DIST

MAY

JUN

JUL

AGO

SET

OCT

3.00

3.10

3.40

2.80

2.60

3.20

2.60

2.60

2.80

3.00

2.80

3.20

2.80

2.70

2.80

2.60

2.90

2.80

3.10

2.30

2.30

2.00

2.60

2.30

2.10

2.20

2.40

2.80

2.60

2.80

2.30

2.30

2.60

2.60

3.70

3.00

2.40

2.40

2.50

2.70

2.90

2.70

2.50

2.70

2.80

2.80

2.70

3.10

2.50

2.30

2.40

2.50

2.60

2.40

2.30

2.50

2.40

2.20

2.80

2.80

2.40

2.30

2.20

2.00

2.40

2.30

2.50

2.10

2.00

2.50

2.70

2.40

2.20

2.00

2.10

2.20

2.20

2.40

2.00

2.00

2.10

2.10

2.80

2.50

2.20

2.20

2.30

2.50

2.80

2.80

2.40

2.30

2.80

2.80

3.00

2.90

2.40

2.60

2.40

2.10

2.60

2.80

2.20

2.70

3.00

2.90

3.10

3.30

2.50

2.30

3.20

3.10

2.80

2.60

2.40

2.20

2.70

2.50

2.70

3.10

2.20

2.20

2.20

2.40

3.30

3.00

21.00

21.00

21.00

21.00

21.00

21.00

2.43

2.38

2.54

2.53

2.79

2.78

0.27

0.27

0.37

0.33

0.31

0.31

2.00

2.00

2.00

2.00

2.20

2.30

3.10

3.10

3.40

3.10

3.70

3.30

2.35

2.38

2.72

2.63

2.92

2.95

2.40

2.30

2.40

2.50

2.80

2.80

110880

CODIGO

ION
V

PUNO
CHUCUITO
JULI
NOV

DIC

PROM.

3.10

2.40

2.94

3.20

3.00

2.62

2.60

2.80

2.76

2.70

2.90

2.62

3.00

3.00

2.49

3.20

2.60

2.72

2.80

3.20

2.69

2.00

2.90

2.67

3.00

2.30

2.41

2.80

2.40

2.41

2.60

2.60

2.34

2.60

2.30

2.32

2.30

2.30

2.12

2.50

2.70

2.23

2.80

2.80

2.48

3.60

3.40

2.66

3.20

2.90

2.52

3.20

2.70

2.73

3.10

2.80

2.64

2.60

2.80

2.45

2.70

2.70

2.40

21.00

21.00

40.00

2.84

2.74

2.53

0.37

0.29

0.20

2.00

2.30

2.12

3.60

3.40

2.94

3.07

2.88

2.80

2.80

#DIV/0!

2.57
2.52

TEMPERATURA MEDIA
JULI

ESTACION
MICROCUENCA
RIO
TIPO

MOLINO
MOLINO

AO

ENE

FEB

MAR

ABR

1985

10.10

9.50

10.00

9.40

1986

9.60

9.00

9.20

8.70

1987

9.40

9.20

9.00

9.20

1988

10.00

10.10

9.80

9.20

1989

9.50

9.00

9.00

8.50

1990

9.30

8.70

9.00

8.70

1991

8.40

10.10

9.80

9.10

1992

8.40

8.30

8.80

8.30

1993

8.70

8.40

8.00

8.50

1994

9.30

9.30

8.80

8.90

1995

9.90

10.00

9.60

9.00

1996

9.30

9.40

9.40

9.20

1997

9.50

9.30

9.00

8.10

1998

11.20

11.50

11.40

10.50

1999

9.40

8.90

8.50

8.00

2000

8.70

8.60

8.60

8.20

2001

8.60

9.20

8.80

8.30

2002

9.50

9.70

9.80

8.80

2003

10.00

10.00

9.70

8.80

2004

9.50

9.70

10.00

9.30

2005

10.00

9.50

10.10

9.50

N DATOS

40.00

40.00

40.00

40.00

MEDIA

9.38

9.45

9.50

8.82

DESV.STD.

0.66

0.72

0.74

0.58

MIN

8.60

8.60

8.60

8.20

MAX

10.00

11.50

11.40

10.50

PROM. 5 AOS

9.38

9.45

9.50

8.82

MEDIANA

9.50

9.30

9.20

8.80

Fuente: SENAMHI - PUNO

Anexo 3
TEMPERATURA MEDIA MENSUAL (C) SERIE 1985-2005 EN LA LOCALIDAD DE JULI
JULI
LATITUD
LONGITUD
ALTITUD

1612'13.6" S
6927'35.7" W
3812 MSNM

CODIGO

REGION
PROV
DIST

MAY

JUN

JUL

AGO

SET

OCT

8.00

6.40

5.10

6.90

8.00

8.60

6.00

5.60

4.30

6.10

7.50

8.40

7.50

6.00

5.80

7.00

8.40

9.30

7.80

6.10

6.20

7.90

8.90

9.30

7.60

6.90

5.70

6.70

8.20

9.60

7.70

5.60

5.10

6.40

7.60

9.60

8.00

5.20

5.60

6.60

7.50

9.00

7.70

6.60

5.50

5.30

7.10

8.60

7.20

5.20

5.60

5.90

7.70

8.70

7.20

5.50

5.80

6.60

7.70

8.90

7.50

5.90

6.40

7.70

8.50

9.60

7.60

6.20

5.50

7.40

8.10

9.60

7.00

5.50

6.70

6.70

8.70

9.50

8.30

7.40

6.80

7.70

8.30

9.30

6.50

5.20

5.70

6.40

7.20

7.80

7.10

4.90

4.60

6.20

7.40

8.70

6.90

6.20

5.30

6.20

7.90

9.20

7.50

6.80

5.40

6.60

8.10

9.50

6.00

5.90

5.80

6.20

6.90

8.90

6.00

5.60

6.10

6.50

8.00

9.50

7.60

5.60

6.40

6.20

7.90

9.30

40.00

40.00

40.00

40.00

40.00

40.00

6.85

5.83

5.60

6.32

7.70

9.18

0.67

0.64

0.63

0.64

0.52

0.49

6.00

4.90

4.60

6.20

6.90

8.70

8.30

7.40

6.80

7.90

8.90

9.60

6.85

5.83

5.60

6.32

7.70

9.18

7.50

5.90

5.70

6.60

7.90

9.30

110880

CODIGO

ION
V

PUNO
CHUCUITO
JULI
NOV

DIC

PROM.

8.50

9.10

8.30

9.60

9.60

7.80

10.40

10.90

8.51

10.00

10.30

8.80

10.10

10.30

8.43

10.20

9.60

8.13

9.00

9.00

8.11

8.60

9.70

7.74

9.60

9.80

7.78

9.80

9.40

8.10

8.40

7.90

8.37

9.50

10.00

8.43

10.30

11.20

8.46

9.60

10.40

9.37

8.70

9.70

7.67

9.80

9.50

7.69

10.40

9.50

8.04

10.10

10.30

8.51

9.80

10.60

8.22

10.20

10.70

8.43

9.70

9.60

8.45

40.00

40.00

40.00

10.00

10.03

8.25

0.64

0.74

0.41

9.70

9.50

7.67

10.40

11.20

9.37

10.00

10.03

9.80

9.70

#DIV/0!

8.22
8.30

HUMEDAD RELA
JULI

ESTACION
MICROCUENCA
RIO
TIPO

MOLINO
MOLINO

AO

ENE

FEB

MAR

ABR

1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005

69.00
59.00
75.00
72.00
65.00
85.00
78.00
75.00
71.00
71.00
90.00
71.00
79.00
86.00
72.00

65.00
57.00
65.00
78.00
63.00
74.00
77.00
68.00
78.00
75.00
88.00
82.00
81.00
83.00
82.00

72.00
66.00
74.00
72.00
71.00
70.00
77.00
62.00
79.00
70.00
75.00
82.00
82.00
83.00
77.00

68.00
53.00
66.00
62.00
57.00
64.00
77.00
69.00
74.00
60.00
68.00
74.00
75.00
81.00
59.00

N DATOS
40.00
MEDIA
74.53
DESV.STD.
8.13
MIN
59.00
MAX
90.00
PROM. 5 AO
78.17
MEDIANA
72.00
Fuente: SENAMHI - PUNO

40.00
74.40
8.87
57.00
88.00
81.83
77.00

40.00
74.13
6.03
62.00
83.00
78.17
74.00

40.00
67.13
8.05
53.00
81.00
69.50
68.00

Anexo 4
HUMEDAD RELATIVA (%) SERIE 1991-2005 EN LA LOCALIDAD DE JULI
JULI
LATITUD
LONGITUD
ALTITUD

1612'13.6" S
6927'35.7" W
3812 MSNM

CODIGO
REGION
PROV
DIST

MAY

JUN

JUL

AGO

SET

OCT

49.00
50.00
51.00
72.00
47.00
53.00
69.00
42.00
62.00
45.00
62.00
64.00
70.00
66.00
53.00

50.00
47.00
43.00
59.00
44.00
51.00
56.00
53.00
34.00
45.00
57.00
73.00
62.00
60.00
48.00

53.00
41.00
44.00
49.00
54.00
59.00
57.00
48.00
40.00
35.00
57.00
73.00
66.00
71.00
53.00

54.00
47.00
46.00
60.00
45.00
63.00
64.00
52.00
42.00
52.00
68.00
72.00
58.00
74.00
48.00

52.00
35.00
48.00
65.00
56.00
64.00
63.00
48.00
44.00
66.00
58.00
72.00
63.00
73.00
56.00

55.00
47.00
60.00
63.00
51.00
62.00
56.00
53.00
57.00
80.00
63.00
80.00
60.00
68.00
68.00

40.00
57.00
9.89
42.00
72.00
60.00
53.00

40.00
52.13
9.49
34.00
73.00
57.50
51.00

40.00
53.33
11.08
35.00
73.00
59.17
53.00

40.00
56.33
10.19
42.00
74.00
62.00
54.00

40.00
57.53
10.64
35.00
73.00
64.67
58.00

40.00
61.53
9.50
47.00
80.00
69.83
60.00

110880

CODIGO

ION
V

PUNO
CHUCUITO
JULI
NOV

DIC

PROM.

43.00
46.00
62.00
67.00
54.00
70.00
62.00
58.00
44.00
71.00
67.00
74.00
75.00
76.00
77.00

42.00
54.00
68.00
62.00
58.00
71.00
66.00
62.00
54.00
79.00
68.00
70.00
70.00
71.00
89.00

56.00
50.17
58.50
65.08
55.42
65.50
66.83
57.50
56.58
62.42
68.42
73.92
70.08
74.33
65.17

40.00
63.07
11.75
43.00
77.00
73.33
67.00

40.00
65.60
11.17
42.00
89.00
74.50
68.00

#DIV/0!

40.00
63.06
7.17
50.17
74.33
69.06
65.08

CUADRO DE INFROMACION METEORO

FUENTE: SERVICIO NACIONAL DE METEREOLOGIA E HIDROLOGIA - PUNO


INFORMACION GEOGRAFICA :
LATITUD :

16

13 '

47 ''

LONGITUD :

69

24 '

52 ''

ALTITUD :

3830

hasta

3840

INFORMACION METEREOLOGICA : SERIE AO 2000 - 2005


ENE

FEB

MAR

10.00
8.60
9.38

11.50
8.60
9.45

11.40
8.60
9.50

250.6
78.17
2.25
6.70

194.1
81.83
2.32
6.80

169.4
78.17
2.00
7.20

Temperatura
Maxima C
Minima C
Media C
Precipitacion (mm)
Humedad Relativa %
Veloc. Viento (m/s)
Horas de Sol (horas)

CALCULO DE LA EVAPOTRANSPIRACION
METODO DE PENNMAN-MONTEITH (SOFTWARE CROPWAT) version para Windows

16.0 Para usar la tabla de Factor de Latitud

LATITUD ABSOLUTA :
ALTITUD PROMEDIO :

Numero del Mes :


N de dias del mes
ETP

(mm/mes)

3835

Para la Correccion por Altitud

ENE
1

FEB
2

MAR
3

31.0

28.0

31.0

97.0

86.2

93.6

ETP

(mm/dia)

3.13

ETP maxima =

3.48

3.08
mm/dia

3.02

Anexo 5

RO DE INFROMACION METEOROLOGICA PROMEDIO DE 5 AOS 2000-2005 ESTACION JULI

SUR
OESTE
m.s.n.m.

ABR

MAY

JUN

JUL

AGO

SEP

10.50
8.20
8.82

8.30
6.00
6.85

7.40
4.90
5.83

6.80
4.60
5.60

7.90
6.20
6.32

8.90
6.90
7.70

51.57
69.50
2.33
8.70

9.57
60.00
2.35
9.40

5.34
57.50
2.38
9.20

13.84
59.17
2.72
9.50

18.20
62.00
2.63
9.50

17.16
64.67
2.92
8.50

E LA EVAPOTRANSPIRACION POTENCIAL ETP

sion para Windows

e Factor de Latitud

ABR
4

MAY
5

JUN
6

JUL
7

AGO
8

SEP
9

30.0

31.0

30.0

31.0

31.0

30.0

87.6

79.1

68.7

73.2

85.6

92.7

2.92

2.55

2.29

2.36

2.76

3.09

OCT

NOV

DIC

9.60
8.70
9.18

10.40
9.70
10.00

11.20
9.50
10.03

39.93
69.83
2.95
9.20

24.47
73.33
3.07
8.00

98.86
74.50
2.88
7.40

OCT
10

NOV
11

DIC
12

31.0

30.0

31.0

107.9

103.5

105.7

3.48

3.45

3.41

REQUERIMIENTO HIDRICO Y PROGRAMA


TIEMPO DE RIEGO PROMEDIO = 2 HORAS
INTERVALO ENTRE RIEGOS = 04 DIAS
EFICIENCIA DE RIEGO = 70 %
TRATAMIENTO = FRECUENCIA (F1) PRIMER CORTE
FECHA
9/1/2009
9/5/2009
9/9/2009
9/13/2009
9/17/2009
9/21/2009
9/25/2009
9/29/2009
10/3/2009
10/7/2009
10/11/2009
10/15/2009
10/19/2009
10/23/2009
10/27/2009
10/31/2009
11/4/2009
11/8/2009
11/12/2009
MINIMO
MAXIMO
PROMEDIO
TOTAL

Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
11.71
0.90
10.54
4.20
11.87
0.90
10.68
4.64
12.03
0.90
10.83
4.92
12.20
0.90
10.98
5.04
12.35
0.94
11.61
5.01
12.51
0.97
12.13
4.83
12.67
1.01
12.80
4.54
12.82
1.06
13.59
4.16
12.96
1.09
14.13
3.72
13.10
1.10
14.41
3.26
13.23
1.10
14.55
2.80
13.35
1.10
14.69
2.39
13.46
1.10
14.81
2.05
13.57
1.10
14.93
1.82
13.66
1.10
15.03
1.73
13.74
1.10
15.11
1.79
13.81
1.10
15.19
2.04
13.87
1.10
15.26
2.48
10.43
1.10
11.47
2.27
10.43
0.90
10.54
1.73
13.87
1.10
15.26
5.04
12.81
1.04
13.30
3.35
243.34
252.73
63.69

Fuente: elaboracion propia

REQUERIMIENTO HIDRICO Y PROGRAMA


TIEMPO DE RIEGO PROMEDIO = 3 HORAS
INTERVALO ENTRE RIEGOS = 06 DIAS
EFICIENCIA DE RIEGO = 70 %
TRATAMIENTO = FRECUENCIA (F2) PRIMER CORTE
FECHA
Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
9/1/2009
17.63
0.90
15.87
6.48
9/7/2009
17.99
0.90
16.19
7.29
9/13/2009
18.35
0.91
16.70
7.56
9/19/2009
18.71
0.96
17.96
7.32
9/25/2009
19.06
1.02
19.44
6.67
10/1/2009
19.39
1.08
20.94
5.75

10/7/2009
10/13/2009
10/19/2009
10/25/2009
10/31/2009
11/6/2009
11/12/2009
MINIMO
MAXIMO
PROMEDIO
TOTAL

19.70
19.98
20.23
20.46
20.64
20.78
10.43
10.43
20.78
18.72
243.35

1.10
1.10
1.10
1.10
1.10
1.10
1.10
0.90
1.10
1.04

21.67
21.98
22.25
22.51
22.70
22.86
11.47
11.47
22.86
19.43
252.54

4.71
3.74
2.99
2.62
2.77
3.54
2.27
2.27
7.56
4.90
63.71

Fuente: elaboracion propia

REQUERIMIENTO HIDRICO Y PROGRAMA


TIEMPO DE RIEGO = 4 HORAS
INTERVALO ENTRE RIEGOS = 08 DIAS
EFICIENCIA DE RIEGO = 70 %
TRATAMIENTO = FRECUENCIA (F3) PRIMER CORTE
FECHA
9/1/2009
9/9/2009
9/17/2009
9/25/2009
10/3/2009
10/11/2009
10/19/2009
10/27/2009
11/4/2009
11/12/2009
MINIMO
MAXIMO
PROMEDIO

Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
23.58
0.90
21.22
8.84
24.23
0.90
21.81
9.96
24.87
0.95
23.63
9.84
25.48
1.03
26.24
8.70
26.06
1.10
28.67
6.98
26.58
1.10
29.24
5.19
27.03
1.10
29.73
3.88
27.40
1.10
30.14
3.52
27.68
1.10
30.45
4.52
10.43
1.10
11.47
2.27
10.43
0.90
11.47
2.27
27.68
1.10
30.45
9.96
24.33
1.04
25.26
6.37

TOTAL
243.34
Fuente: elaboracion propia

252.60

63.70

REQUERIMIENTO HIDRICO Y PROGRAMA


TIEMPO DE RIEGO PROMEDIO = 2 HORAS
INTERVALO ENTRE RIEGOS = 04 DIAS
EFICIENCIA DE RIEGO = 70 %
TRATAMIENTO = FRECUENCIA (F1) SEGUNDO CORTE
FECHA
Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
11/16/2009
13.94
0.90
12.55
3.98
11/20/2009
13.96
0.90
12.56
5.05

11/24/2009
11/28/2009
12/2/2009
12/6/2009
12/10/2009
12/14/2009
12/18/2009
12/22/2009
12/26/2009
12/30/2009
1/3/2010
1/7/2010
1/11/2010
MINIMO
MAXIMO
PROMEDIO
TOTAL

13.97
13.95
13.93
13.89
13.84
13.77
13.70
13.61
13.51
13.40
13.36
13.34
13.31
13.31
13.97
13.70
205.48

0.91
0.96
1.01
1.07
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
0.90
1.10
1.04

12.71
13.39
14.07
14.86
15.22
15.15
15.07
14.97
14.86
14.74
14.70
14.67
14.64
12.55
15.22
14.28
214.17

6.33
7.80
9.45
11.26
13.19
15.23
17.33
19.46
21.58
22.93
24.22
26.15
27.92
3.98
27.92
15.46
231.88

Fuente: elaboracion propia

REQUERIMIENTO HIDRICO Y PROGRAMA


TIEMPO DE RIEGO = 3 HORAS
INTERVALO ENTRE RIEGOS = 06 DIAS
EFICIENCIA DE RIEGO = 70 %
TRATAMIENTO = FRECUENCIA (F1) SEGUNDO CORTE
FECHA
Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
11/16/2009
20.92
0.90
18.83
6.36
11/22/2009
20.95
0.91
19.06
9.00
11/28/2009
20.92
0.97
20.29
12.31
12/4/2009
20.85
1.05
21.89
16.20
12/10/2009
20.74
1.10
22.81
20.55
12/16/2009
20.58
1.10
22.64
25.21
12/22/2009
20.37
1.10
22.41
29.99
12/28/2009
20.14
1.10
22.15
33.98
1/3/2010
20.03
1.10
22.03
37.06
1/9/2010
19.98
1.10
21.98
41.22
MINIMO
19.98
0.90
18.83
6.36
MAXIMO
20.95
1.10
22.81
41.22
PROMEDIO
20.55
1.04
21.41
23.19
TOTAL
205.48
214.10
231.88
Fuente: elaboracion propia

REQUERIMIENTO HIDRICO Y PROGRAMA


TIEMPO DE RIEGO = 10 HORAS
INTERVALO ENTRE RIEGOS = 08 DIAS
EFICIENCIA DE RIEGO = 70 %

TRATAMIENTO = FRECUENCIA (F1)


FECHA
11/16/2009
11/24/2009
12/2/2009
12/10/2009
12/18/2009
12/26/2009
1/3/2010
1/11/2010
MINIMO
MAXIMO
PROMEDIO
TOTAL

Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
27.91
0.90
25.12
9.04
27.92
0.94
26.24
14.13
27.82
1.04
28.93
20.70
27.61
1.10
30.37
28.42
27.30
1.10
30.03
36.79
26.91
1.10
29.60
44.51
26.70
1.10
29.37
50.37
13.31
1.10
14.64
27.92
13.31
0.90
14.64
9.04
27.82
1.10
30.37
50.37
25.69
1.05
26.79
28.99
205.48
1.10
214.31
231.88

Fuente: elaboracion propia

Anexo 6:
NTO HIDRICO Y PROGRAMACION DE RIEGO POR ASPERSION (SOFTWARE-CROPWAT)

Precip. Efect. Req.net.riego Req.net.riego Eficiencias


Req. Total
Req.Total
mm/period
mm/period
m3/Ha.
de Aplicac.
mm/period.
m3/Ha.
3.34
10.54
105.39
0.70
15.06
150.56
3.59
10.68
106.83
0.70
15.26
152.61
3.76
10.83
108.27
0.70
15.47
154.67
3.84
10.98
109.80
0.70
15.69
156.86
3.85
11.61
116.09
0.70
16.58
165.84
3.80
12.13
121.35
0.70
17.34
173.35
3.69
12.80
127.97
0.70
18.28
182.81
3.54
13.59
135.89
0.70
19.41
194.13
3.36
14.13
141.26
0.70
20.18
201.81
3.17
14.41
144.10
0.70
20.59
205.86
2.80
14.55
145.53
0.70
20.79
207.90
2.39
14.69
146.85
0.70
20.98
209.79
2.05
14.81
148.06
0.70
21.15
211.51
1.82
14.93
149.27
0.70
21.32
213.24
1.73
15.03
150.26
0.70
21.47
214.66
1.79
15.11
151.14
0.70
21.59
215.91
2.04
15.19
151.91
0.70
21.70
217.01
2.48
15.26
152.57
0.70
21.80
217.96
2.27
11.47
114.73
0.70
16.39
163.90
1.73
10.54
105.39
0.70
15.06
150.56
3.85
15.26
152.57
0.70
21.80
217.96
2.91
13.30
133.01
0.70
19.00
190.02
55.31
252.73
2527.27
13.30
361.04
3610.39
Anexo 7:

NTO HIDRICO Y PROGRAMACION DE RIEGO POR ASPERSION (SOFTWARE-CROPWAT)

Precip. Efect. Req.net.riego Req.net.riego Eficiencias


Req. Total
Req.net.riego
mm/period
mm/period
m3/Ha.
de Aplicac.
mm/period.
m3/Ha.
5.11
15.87
158.67
0.70
22.67
226.67
5.58
16.19
161.91
0.70
23.13
231.30
5.77
16.70
166.99
0.70
23.86
238.55
5.72
17.96
179.62
0.70
25.66
256.59
5.48
19.44
194.41
0.70
27.77
277.73
5.11
20.94
209.41
0.70
29.92
299.16

4.63
3.74
2.99
2.62
2.77
3.54
2.27
2.27
5.77
4.26
55.33

21.67
21.98
22.25
22.51
22.70
22.86
11.47
11.47
22.86
19.43
252.54

216.70
219.78
222.53
225.06
227.04
228.58
114.73
114.73
228.58
194.26
2525.43

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70

30.96
31.40
31.79
32.15
32.43
32.65
16.39
16.39
32.65
27.75
360.78

309.57
313.97
317.90
321.51
324.34
326.54
163.90
163.90
326.54
277.52
3607.75

Anexo 8:

NTO HIDRICO Y PROGRAMACION DE RIEGO POR ASPERSION (SOFTWARE-CROPWAT)

Precip. Efect. Req.net.riego Req.net.riego Eficiencias


Req. Total
Req.net.riego
mm/period
mm/period
m3/Ha.
de Aplicac.
mm/period.
m3/Ha.
6.93
21.22
212.22
0.70
30.32
303.17
7.60
21.81
218.07
0.70
31.15
311.53
7.65
23.63
236.27
0.70
33.75
337.52
7.22
26.24
262.44
0.70
37.49
374.92
6.54
28.67
286.66
0.70
40.95
409.51
5.19
29.24
292.38
0.70
41.77
417.69
3.88
29.73
297.33
0.70
42.48
424.76
3.52
30.14
301.40
0.70
43.06
430.57
4.52
30.45
304.48
0.70
43.50
434.97
2.27
11.47
114.73
0.70
16.39
163.90
2.27
11.47
114.73
0.70
16.39
163.90
7.65
30.45
304.48
0.70
43.50
434.97
5.53
25.26
252.60
0.70
36.09
360.85
55.32

252.60

2525.98

7.00

360.85

3608.54

Anexo 9:

NTO HIDRICO Y PROGRAMACION DE RIEGO POR ASPERSION (SOFTWARE-CROPWAT)

Precip. Efect. Req.net.riego Req.net.riego Eficiencias


Req. Total
Req.net.riego
mm/period
mm/period
m3/Ha.
de Aplicac.
mm/period.
m3/Ha.
3.98
12.55
125.46
0.70
17.92
179.23
5.05
12.56
125.64
0.70
17.95
179.49

5.98
6.85
7.81
8.84
9.93
11.06
12.21
13.36
14.48
15.19
15.79
16.73
17.62
3.98
17.62
10.99
164.88

12.71
13.39
14.07
14.86
15.22
15.15
15.07
14.97
14.86
14.74
14.70
14.67
14.64
12.55
15.22
14.28
214.17

127.13
133.92
140.69
148.62
152.24
151.47
150.70
149.71
148.61
147.40
146.96
146.74
146.41
125.46
152.24
142.78
2141.70

0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
0.70
10.50

18.16
19.13
20.10
21.23
21.75
21.64
21.53
21.39
21.23
21.06
20.99
20.96
20.92
17.92
21.75
20.40
305.96

181.61
191.31
200.99
212.32
217.49
216.39
215.29
213.87
212.30
210.57
209.94
209.63
209.16
179.23
217.49
203.97
3059.58

Anexo 10:

NTO HIDRICO Y PROGRAMACION DE RIEGO POR ASPERSION (SOFTWARE-CROPWAT)

Precip. Efect. Req.net.riego Req.net.riego Eficiencias


Req. Total
Req.net.riego
mm/period
mm/period
m3/Ha.
de Aplicac.
mm/period.
m3/Ha.
6.36
18.83
188.28
0.70
26.90
268.97
8.65
19.06
190.65
0.70
27.24
272.35
10.63
20.29
202.92
0.70
28.99
289.89
12.87
21.89
218.93
0.70
31.28
312.75
15.31
22.81
228.14
0.70
32.59
325.91
17.88
22.64
226.38
0.70
32.34
323.40
20.46
22.41
224.07
0.70
32.01
320.10
22.57
22.15
221.54
0.70
31.65
316.49
24.04
22.03
220.33
0.70
31.48
314.76
26.10
21.98
219.78
0.70
31.40
313.97
6.36
18.83
188.28
0.70
26.90
268.97
26.10
22.81
228.14
0.70
32.59
325.91
16.49
21.41
214.10
0.70
30.59
305.86
164.87
214.10
2141.01
7.00
305.86
3058.59
Anexo 11:

NTO HIDRICO Y PROGRAMACION DE RIEGO POR ASPERSION (SOFTWARE-CROPWAT)

Precip. Efect. Req.net.riego Req.net.riego Eficiencias


Req. Total
Req.net.riego
mm/period
mm/period
m3/Ha.
de Aplicac.
mm/period.
m3/Ha.
9.03
25.12
251.19
0.70
35.88
358.84
12.83
26.24
262.45
0.70
37.49
374.93
16.65
28.93
289.33
0.70
41.33
413.33
20.98
30.37
303.71
0.70
43.39
433.87
25.56
30.03
300.30
0.70
42.90
429.00
29.67
29.60
296.01
0.70
42.29
422.87
32.53
29.37
293.70
0.70
41.96
419.57
17.62
14.64
146.41
0.70
20.92
209.16
9.03
14.64
146.41
0.70
20.92
209.16
32.53
30.37
303.71
0.70
43.39
433.87
20.61
26.79
267.89
0.70
38.27
382.70
164.87
214.31
2143.10
5.60
306.16
3061.57

PWAT)

Infiltracion
Precip.med. Tiempo
Basica mm/h Asper.mm/h de Riego (h)
24.00
11.6
1
24.00
11.6
1
24.00
11.6
1
24.00
11.6
1
24.00
11.6
1
24.00
11.6
1
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
1
24.00
11.60
1.30
24.00
11.60
1.88
24.00
11.60
1.64
220.40
31.12

PWAT)

Infiltracion
Precip.med. Tiempo
Basica mm/h Asper.mm/h de Riego (h)
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
3

24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00

11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.60
11.60
11.60
150.80

3
3
3
3
3
3
1
1.41
2.82
2.39
31.10

PWAT)

Infiltracion
Precip.med. Tiempo
Basica mm/h Asper.mm/h de Riego (h)
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.6
4
24.00
11.6
4
24.00
11.6
4
24.00
11.6
4
24.00
11.6
4
24.00
11.6
1
24.00
11.60
1.41
24.00
11.60
3.75
24.00
11.60
3.11
3.54

31.11

PWAT)

Infiltracion
Precip.med. Tiempo
Basica mm/h Asper.mm/h de Riego (h)
24.00
11.6
2
24.00
11.6
2

24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00

11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.60
11.60
11.60
174.00

2
2
2
2
2
2
2
2
2
2
2
2
2
1.55
1.87
1.76
26.38

PWAT)

PWAT)

Infiltracion
Precip.med. Tiempo
Basica mm/h Asper.mm/h de Riego (h)
24.00
11.6
2
24.00
11.6
2
24.00
11.6
2
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.6
3
24.00
11.60
2.32
24.00
11.60
2.81
24.00
11.60
2.64
116.00
26.37

Infiltracion
Precip.med. Tiempo
Basica mm/h Asper.mm/h de Riego (h)
24.00
3.54
10
24.00
3.54
11
24.00
3.54
12
24.00
3.54
12
24.00
3.54
12
24.00
3.54
12
24.00
3.54
12
24.00
3.54
6
24.00
3.54
5.91
24.00
3.54
12.26
24.00
3.54
10.81
28.32
86.48

Anexo 12:

DISEO DE SISTEMA DE RIEGO POR ASPERS

Informacin Requerida:

Diseo Agronmico
1.-

2.-

3.-

4.-

5.-

6.-

7.-

8.-

9.-

1.-

2.-

3.-

4.-

5.-

1.-

2.-

3.-

4.-

5.-

Anexo 12:

DISEO DE SISTEMA DE RIEGO POR ASPERSION


REGION

PUNO

PROVINCIA:

CHUCUITO

DISTRITO:

JULI

CENTRO POBLADO:

MOLINO

LOCALIDAD:

VILCALLAME

MICROCUENCA:

MOLINO

rmacin Requerida:
Evapotranspiracin potencial
Coeficiente del cultivo
Evapotranspiracin real
rea ha irrigar
Velocidad del viento
Velocidad de infiltracin bsica
Cultivo proyectado
Eficiencia de riego
Caudal disponible manantial

o Agronmico
Determinacin de la dosis en mm

Ln= HFU

( CC PM )
Da PR
100

Profundidad de races
Capacidad de campo % del peso seco del suelo
Punto de marchitamiento % del peso seco del suelo
Fraccin de agotamiento de agua disponible
Densidad aparente del suelo

Determinacin de dosis total

Dt =

Nn
Ea

Necesidades netas de agua


Eficiencia de aplicacin
Determinacin del intervalo entre riegos

Ir =

Dn
ET ( cultivo )

Necesidades netas de agua de riego


Evapotranspiracin real o de cultivo
Tiempo de riego

t =

Dt
Pma

Necesidades totales de agua de riego


Pluviometra de los aspersores
Cuadal necesario

Q = 10

S Dt
ir T

Superficie regada en Ha
Dosis total en mm de altura de agua
Nmero de dias empleados en regar
Tiempo de riego en Horas/dia
Disposicin de tuberias en el campo
Nmero de tuberas laterales
Longitud de las tuberias laterales
Nmero de aspersores por lateral
Seleccin del aspersor
Caractersticas hidrulicas de los aspersores
Especificaciones de diseo de los aspersores marca : NAAN
Dimetro de boquillas del aspersor
Espaciamiento de aspersores Ea
Espaciamiento de laterales El
Pluviometra del aspersor Pp
Presin de trabajo de los aspersores
Caudal del aspersor qa
Diametro de alcance de chorro
Obtencin de la Pluviometra Real:

Caudal del aspersor qa


Espaciamiento de aspersores Ea
Espaciamiento de laterales El
Comprobacin de la pluviometra:
Pluviometra del aspersor Pp

Traslape del dametro mojado de los aspersores


Radio del diametro mojado de aspersores
Traslape debe estar comprendido entre el 15 - 30 %

Diseo Hidrulico
Clculo de tuberas laterales
Caudal en el origen del lateral portaaspersores (Q).

Q = ns q
Nmero de salidas
Caudal de cada salida

Longitud ficticia del lateral (Lf):


Lf = Lr1 . 10

Longitud real:
Longitud equivalente o multiplicar por 1.10:

Prdida de carga en el lateral (h):

h=JFLf

prdida de carga unitaria mca/ml:


Factor de Christiansen (F):
Longitud ficticia del lateral (Lf) m:
Tubera PE de 3/4"

Para el clculo de J se utiliz el Abaco 1 del del libro Tcnicas de riego FUENTES (2003), Departamento de suelos
Para un caudal de 2.21 m3/h, para tubera de 20.4 mm tiene una prdida de carga de 25.1 mca / 100 m
Prdida de carga admisible en el lateral (ha)

Porcentaje de presin nominal del aspersor


Presin de trabajo de los aspersores
Presin en el origen del lateral (Po)

Po= Pm + 0 . 75 h + Ha
si el lateral es horizontal

Po= Pm + 0 . 75 h Hg /2 + Ha

si el lateral tiene pendiente

Presin en el origen del lateral


Presin de trabajo del aspersor
Perdida de carga en el lateral
Desnivel geomtrico del lateral
Altura del tubo portaaspersor
Hg/2 = (+) si el lateral es ascendente
Hg/2 = (-) si el lateral es descendente
Clculo de tuberas secundarias o porta laterales
Caudal en el origen de la secundaria (Q).

Q = NlQl
Nmero de laterales
Caudal de cada lateral

Longitud ficticia de tubera secundaria (LF).

Lf = Lr1 .10
Longitud real
Longitud equivalente o multiplicado po 1.10
Dimetro preliminar de tubera porta lateral

Prdida de carga en tubera secundaria porta lateral (h')

h
h=JFLf
' =JFLf
Perdida de carga unitaria mca/ml:
Factor de Christiansen (F):
Longitud ficticia de la terciaria (Lf) m:
Tubo. PE

Para el clculo de J se utiliz el abaco 1 del del libro Tcnicas de riego FUENTES (2003), Departamento de suelos
Para un caudal de 8.10 m3/h, para tubera de 1 " tiene una prdida de carga de 40 mca / 100 m

Prdida de carga admisible en la tubera secundaria (h'a):

Presin en el origen de la secundaria (P'o):

P ' o= Po + 0 . 75 h '
Presin en el origen del lateral
Prdida de carga en la tubera secundaria
Desnivel geomtrico (+)
Altura de tubo porta aspersor

Hg
+ Ha
2

ON

ETP =

3.48

mm/da

Kc =

1.10

Mximo

ETR =

3.83

mm/da

A=

0.05

Has

Vv =

2.54

m/s

Ib =

24.0

mm/h

ALFALFA
Er =

70

Qd =

5.4

lt / seg

Dn =
Dn =

13.28
132.78

mm
m3/Ha

H=
Cc =
Pm =
f=
Da =

0.80
24.42
13.73
0.55
1.40

m
%
%
Tn/m3

Dt =
Dt =

18.97
189.68

mm
m3/Ha

Nn =
Ea =

13.28
70.00

mm
%

IR =

Das

Nn =
ETc =
t=

Nt =
Pma =

13.28
3.83
2

mm/da
mm/da
horas

18.97
11.57

mm/da
mm/hora

Q=

1.9

m3/hora

S=
Dt =
Ir =
T=

0.05
18.97
1.00
4.92

Ha
mm
dia
horas

Nl =
Ll =
Na =

3.00
19.00
3.00

Und
m
Und

NAAN

427

f=
Ea =
El =
Pp =
Po =
qa =
D=

3.0
7.2
7.2
11.6
18.00
0.6
10.0

Pp =

qa * 1000
Ea * El

mm
m
m
mm / h
mca
m3 /h
m

qa =
Ea =
El =

0.6
7.2
7.2

m3 /h
m
m

Pp
11.6
mm / h

<
<
OK!

Ib
24.0
mm / h

r=
Traslp =

4.75
2.48

m
m

Q=

1.80

m3/hora

ns =
q=

3.00
0.6

m3/hora

Lf =

20.10

m.

Lr =
Le =

19.00
1.10

m
m

Qc =

1.88

mca.

J=
F=
Lf =
Di =

0.25
0.37
20.10
19.00

mca/ml

Pp < Ib

m
mm

03), Departamento de suelos y riegos (CRIDA)-11 INIA


25.1 mca / 100 m
ha =

3.60

mca

Pn =
Po =

0.2
18.0

mca

Po =

19.91

mca

Po =
Pm =
h=
Hg =
Ha =

19.91
18.00
1.88
0.60
0.80

mca
mca
mca
m
m

Q=

5.40

m3/hora

Nl =
Ql =

3.00
1.80

Und
Lts/h

Lf =

23.10

Lr =
Le =
D=

22.00
1.1
25.0

m
m
mm

h' =

3.44

mca

J=
F=
Lf =
D=

0.40
0.372
23.1
1

mca
m
Pulg.

03), Departamento de suelos y riegos (CRIDA)-11 INIA


ca / 100 m

h'a =

3.60

mca

h' =

23.79

mca

Po =
h' =
Hg =
Ha =

19.91
3.44
1.0
0.8

mca
mca
m
m

7.28291317

Anexo 13

REQUERIMIENTO HIDRICO Y PROGRAMACION DE R


TIEMPO DE RIEGO = 03 HORAS
INTERVALO ENTRE RIEGOS = 04 DIAS
EFICIENCIA DE RIEGO = 90 %
TRATAMIENTO = FRECUENCIA (F1) PRIMER CORTE
FECHA
Eto
Kc/period
Req. Neto
mm/perd
9/1/2009

9/5/2009
9/9/2009

9/13/2009
9/17/2009

9/21/2009
9/25/2009

9/29/2009
10/3/2009

10/7/2009
10/11/2009

10/15/2009
10/19/2009

10/23/2009
10/27/2009

10/31/2009
11/4/2009

11/8/2009
11/12/2009
MINIMO
MAXIMO
PROMEDIO
TOTAL

11.71
11.87
12.03
12.20
12.35
12.51
12.67
12.82
12.96
13.10
13.23
13.35
13.46
13.57
13.66
13.74
13.81
13.87
10.43
10.43
13.87
12.80
243.34

0.90
0.90
0.90
0.90
0.94
0.97
1.01
1.06
1.09
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
0.90
1.10
1.04

mm/Period

Precipitacion
mm/period

10.54
10.68
10.83
10.98
11.61
12.13
12.80
13.59
14.13
14.41
14.55
14.69
14.81
14.93
15.03
15.11
15.19
15.26
11.47

4.20
4.64
4.92
5.04
5.01
4.83
4.54
4.16
3.72
3.26
2.80
2.39
2.05
1.82
1.73
1.79
2.04
2.48
2.27

10.54
15.26
13.40
252.73

1.73
5.04
3.31
63.69

Anexo 14

REQUERIMIENTO HIDRICO Y PROGRAMACION DE R


TIEMPO DE RIEGO = 03 HORAS
INTERVALO ENTRE RIEGOS = 02 DIAS
EFICIENCIA DE RIEGO = 90 %
TRATAMIENTO = FRECUENCIA (F2)
FECHA

Eto
mm/perd

Kc/period

Req. Neto
mm/Period

Precipitacion
mm/period

9/1/2009

5.83
5.87
5.92
5.96

0.90
0.90
0.90
0.90

5.25
5.28
5.33
5.36

2.04
2.17
2.28
2.37

9/3/2009
9/5/2009

9/7/2009

9/9/2009

9/11/2009
9/13/2009

9/15/2009
9/17/2009

9/19/2009
9/21/2009

9/23/2009
9/25/2009

9/27/2009
9/29/2009

10/1/2009
10/3/2009

10/5/2009
10/7/2009

10/9/2009
10/11/2009

10/13/2009
10/15/2009

10/17/2009
10/19/2009

10/21/2009
10/23/2009

10/25/2009
10/27/2009

10/29/2009
10/31/2009

11/2/2009
11/4/2009

11/6/2009
11/8/2009

11/10/2009
11/12/2009

11/14/2009
MINIMO
MAXIMO
PROMEDIO
TOTAL

6.00
6.04
6.08
6.12
6.16
6.20
6.24
6.28
6.31
6.35
6.39
6.43
6.46
6.50
6.53
6.57
6.60
6.63
6.66
6.69
6.72
6.75
6.77
6.80
6.82
6.84
6.86
6.88
6.90
6.91
6.93
6.94
6.95
3.48

0.90
0.90
0.90
0.90
0.92
0.94
0.96
0.99
1.00
1.02
1.04
1.07
1.09
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

5.40
5.44
5.47
5.51
5.67
5.83
5.99
6.22
6.31
6.48
6.65
6.88
7.04
7.15
7.18
7.23
7.26
7.29
7.33
7.36
7.39
7.43
7.45
7.48
7.50
7.52
7.55
7.57
7.59
7.60
7.62
7.63
7.65
3.83

2.44
2.49
2.52
2.53
2.52
2.49
2.45
2.39
2.31
2.23
2.13
2.03
1.92
1.80
1.69
1.57
1.46
1.35
1.24
1.15
1.06
0.99
0.93
0.89
0.87
0.86
0.88
0.92
0.98
1.06
1.17
1.31
1.47
0.80

3.48
6.95
6.35
243.37

0.90
1.10
1.03

3.83
7.65
6.60
252.70

0.80
2.53
1.68
63.76

Anexo 15

REQUERIMIENTO HIDRICO Y PROGRAMACION DE R


TIEMPO DE RIE = 03 HORAS
INTERVALO ENTRE RIEGOS = 03 DIAS
EFICIENCIA DE RIEGO = 90 %
TRATAMIENTO = FRECUENCIA (F3)

FECHA

Eto
mm/perd

Kc/period

Req. Neto
mm/Period

Precipitacion
mm/period

9/1/2009

8.77
8.86
8.95
9.04
9.13
9.22
9.31
9.40
9.49
9.57
9.65
9.73
9.81
9.88
9.96
10.02
10.09
10.15
10.20
10.25
10.30
10.34
10.38
10.41
10.43

0.90
0.90
0.90
0.90
0.90
0.92
0.95
0.98
1.01
1.04
1.07
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

7.89
7.97
8.06
8.14
8.22
8.48
8.84
9.21
9.58
9.95
10.33
10.70
10.79
10.87
10.96
11.02
11.10
11.17
11.22
11.28
11.33
11.37
11.42
11.45
11.47

3.11
3.37
3.58
3.71
3.78
3.78
3.72
3.60
3.44
3.23
3.00
2.75
2.49
2.23
1.98
1.76
1.57
1.42
1.33
1.29
1.33
1.44
1.63
1.91
2.27

8.77
10.43
9.72
243.34

0.90
1.10
1.03

7.89
11.47
10.08
252.82

1.29
3.78
2.55
63.72

9/4/2009
9/7/2009

9/10/2009
9/13/2009

9/16/2009
9/19/2009

9/22/2009
9/25/2009

9/28/2009
10/1/2009

10/4/2009
10/7/2009

10/10/2009
10/13/2009

10/16/2009
10/19/2009

10/22/2009
10/25/2009

10/28/2009
10/31/2009

11/3/2009
11/6/2009

11/9/2009
11/12/2009
MINIMO
MAXIMO
PROMEDIO
TOTAL

Anexo 13

ICO Y PROGRAMACION DE RIEGO POR GOTEO (SOFTWARE CROPWAT)

Precip. Efect.
mm/period

Req.net.riego
mm/period

Eficiencias
de Aplicac.

Req. Total
mm/period.

Req. Total
m3/Ha.

Descarga
Got. M3/ha

3.34
3.59
3.76
3.84
3.85
3.80
3.69
3.54
3.36
3.17
2.80
2.39
2.05
1.82
1.73
1.79
2.04
2.48
2.27

10.54
10.68
10.83
10.98
11.61
12.13
12.80
13.59
14.13
14.41
14.55
14.69
14.81
14.93
15.03
15.11
15.19
15.26
11.47

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

11.71
11.87
12.03
12.20
12.90
13.48
14.22
15.10
15.70
16.01
16.17
16.32
16.45
16.59
16.70
16.79
16.88
16.95
12.75

117.10
118.70
120.30
122.00
128.99
134.83
142.19
150.99
156.96
160.11
161.70
163.17
164.51
165.86
166.96
167.93
168.79
169.52
127.48

58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58

1.73
3.85
2.88
55.31

10.54
15.26
13.40
252.73

0.90
0.90
0.90
17.10

11.71
16.95
14.89
280.81

117.10
169.52
148.88
2808.08

58.00
58.00
58.00
1102.00

Anexo 14

ICO Y PROGRAMACION DE RIEGO POR GOTEO (SOFTWARE CROPWAT)

Precip. Efect.
mm/period

Req.net.riego
mm/period

Eficiencias
de Aplicac.

Req. Total
mm/period.

Req. Total
m3/Ha.

Descarga
Got. M3/ha

1.63
1.71
1.77
1.82

5.25
5.28
5.33
5.36

0.90
0.90
0.90
0.90

5.83
5.87
5.92
5.96

58.30
58.70
59.20
59.60

58
58
58
58

1.86
1.89
1.92
1.93
1.93
1.92
1.91
1.89
1.86
1.83
1.79
1.75
1.70
1.66
1.61
1.56
1.46
1.35
1.24
1.15
1.06
0.99
0.93
0.89
0.87
0.86
0.88
0.92
0.98
1.06
1.17
1.31
1.47
0.80

5.40
5.44
5.47
5.51
5.67
5.83
5.99
6.22
6.31
6.48
6.65
6.88
7.04
7.15
7.18
7.23
7.26
7.29
7.33
7.36
7.39
7.43
7.45
7.48
7.50
7.52
7.55
7.57
7.59
7.60
7.62
7.63
7.65
3.83

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

6.00
6.04
6.08
6.12
6.30
6.48
6.66
6.91
7.01
7.20
7.38
7.64
7.82
7.94
7.98
8.03
8.07
8.10
8.14
8.18
8.21
8.25
8.27
8.31
8.34
8.36
8.38
8.41
8.43
8.45
8.47
8.48
8.49
4.25

60.00
60.40
60.80
61.20
62.97
64.76
66.56
69.08
70.11
71.97
73.84
76.45
78.24
79.44
79.81
80.30
80.67
81.03
81.40
81.77
82.13
82.50
82.74
83.11
83.36
83.60
83.84
84.09
84.33
84.46
84.70
84.82
84.94
42.53

58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58

0.80
1.93
1.45
55.33

3.83
7.65
6.60
252.70

0.90
0.90
0.90

4.25
8.49
7.34
280.78

42.53
84.94
73.38
2807.75

58.00
58.00
58.00
2204.00

Anexo 15

ICO Y PROGRAMACION DE RIEGO POR GOTEO (SOFTWARE CROPWAT)

Precip. Efect.
mm/period

Req.net.riego
mm/period

Eficiencias
de Aplicac.

Req. Total
mm/period.

Req. Total
m3/Ha.

Descarga
Got. M3/ha

2.48
2.63
2.75
2.83
2.88
2.90
2.88
2.84
2.78
2.70
2.60
2.50
2.40
2.23
1.98
1.76
1.57
1.42
1.33
1.29
1.33
1.44
1.63
1.91
2.27

7.89
7.97
8.06
8.14
8.22
8.48
8.84
9.21
9.58
9.95
10.33
10.70
10.79
10.87
10.96
11.02
11.10
11.17
11.22
11.28
11.33
11.37
11.42
11.45
11.47

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

8.77
8.86
8.95
9.04
9.13
9.42
9.83
10.24
10.65
11.06
11.47
11.89
11.99
12.08
12.17
12.25
12.33
12.41
12.47
12.53
12.59
12.64
12.69
12.72
12.75

87.70
88.60
89.50
90.40
91.30
94.25
98.27
102.36
106.50
110.59
114.73
118.92
119.90
120.76
121.73
122.47
123.32
124.06
124.67
125.28
125.89
126.38
126.87
127.23
127.48

58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58

1.29
2.90
2.20
55.33

7.89
11.47
10.08
252.82

0.90
0.90
0.90
22.50

8.77
12.75
11.20
280.91

87.70
127.48
112.01
2809.13

58.00
58.00
58.00
3.54

Tiempo
de Riego (h)

2.5
2.5
2.6
2.6
2.7
2.8
3.0
3.1
3.2
3.3
3.3
3.3
3.3
3.4
3.4
3.4
3.4
3.4
2.7
2.52
3.42
3.07
57.92

Tiempo
de Riego (h)

1.0
1.0
1.0
1.0

1.0
1.0
1.0
1.1
1.1
1.1
1.1
1.2
1.2
1.2
1.3
1.3
1.3
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.5
1.5
1.5
1.5
1.5
0.7
0.73
1.46
1.27
48.41

Tiempo
de Riego (h)

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
1.51
2.20
1.93
48.43

Anexo 16:
REQUERIMIENTO HIDRICO Y PROGRAMACION DE R
TIEMPO DE RIEGO PROMEDIO = 1 HORA
INTERVALO ENTRE RIEGOS = 04 DIA
EFICIENCIA DE RIEGO = 90 %
TRATAMIENTO = FRECUENCIA (F1) SEGUNDO CORTE
FECHA
11/16/2009
11/20/2009
11/24/2009
11/28/2009
12/2/2009
12/6/2009
12/10/2009
12/14/2009
12/18/2009
12/22/2009
12/26/2009
12/30/2009
1/3/2010
1/7/2010
1/11/2010
MINIMO
MAXIMO
PROMEDIO
TOTAL

Eto
mm/perd
13.94
13.96
13.97
13.95
13.93
13.89
13.84
13.77
13.70
13.61
13.51
13.40
13.36
13.34
13.31
13.31
13.97
13.70
205.48

Kc/period
0.90
0.90
0.91
0.96
1.01
1.07
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
0.90
1.10
1.04

Req. Neto
mm/Period
12.55
12.56
12.71
13.39
14.07
14.86
15.22
15.15
15.07
14.97
14.86
14.74
14.70
14.67
14.64
12.55
15.22
14.28
214.17

Precipitacion
mm/period
3.98
5.05
6.33
7.80
9.45
11.26
13.19
15.23
17.33
19.46
21.58
22.93
24.22
26.15
27.92
3.98
27.92
15.46
231.88

Fuente. Elaboracion propia

Anexo 17
REQUERIMIENTO HIDRICO Y PROGRAMACION DE R
TIEMPO DE RIEGO PROMEDIO = 1.2 HORAS
INTERVALO ENTRE RIEGOS = 02 DIAS
EFICIENCIA DE RIEGO = 90 %
TRATAMIENTO = FRECUENCIA (F2) SEGUNDO CORTE
FECHA
Eto
Kc/period
Req. Neto
Precipitacion
mm/perd
mm/Period
mm/period
11/16/2009
6.97
0.90
6.27
1.87
11/18/2009
6.98
0.90
6.28
2.11
11/20/2009
6.98
0.90
6.28
2.38
11/22/2009
6.98
0.90
6.28
2.67
11/24/2009
6.98
0.90
6.28
2.99
11/26/2009
6.98
0.92
6.42
3.34
11/28/2009
6.98
0.95
6.63
3.70
11/30/2009
6.98
0.97
6.77
4.10
12/2/2009
6.97
1.00
6.97
4.51

12/4/2009
12/6/2009
12/8/2009
12/10/2009
12/12/2009
12/14/2009
12/16/2009
12/18/2009
12/20/2009
12/22/2009
12/24/2009
12/26/2009
12/28/2009
12/30/2009
1/1/2010
1/3/2010
1/5/2010
1/7/2010
1/9/2010
1/11/2010
1/13/2010
TOTAL

6.96
6.95
6.94
6.93
6.91
6.90
6.88
6.86
6.84
6.82
6.79
6.77
6.74
6.71
6.69
6.68
6.68
6.67
6.67
6.66
6.65
205.50

1.03
1.05
1.08
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10
1.10

7.17
7.30
7.50
7.62
7.60
7.59
7.57
7.55
7.52
7.50
7.47
7.45
7.41
7.38
7.36
7.35
7.35
7.34
7.34
7.33
7.32
214.19

4.94
5.39
5.86
6.35
6.85
7.35
7.87
8.40
8.93
9.46
10.00
10.53
11.05
11.57
11.36
11.86
12.36
12.84
13.31
13.75
14.17
231.87

Fuente. Elaboracion propia

Anexo 18
REQUERIMIENTO HIDRICO Y PROGRAMACION DE R
TIEMPO DE RIE = 10 HORAS
INTERVALO ENTRE RIEGOS = 08 DIAS
EFICIENCIA DE RIEGO = 70 %
TRATAMIENTO = FRECUENCIA (F3)
FECHA
11/16/2009
11/19/2009
11/22/2009
11/25/2009
11/28/2009
12/1/2009
12/4/2009
12/7/2009
12/10/2009
12/13/2009
12/16/2009
12/19/2009
12/22/2009

Eto
mm/perd
10.46
10.47
10.47
10.47
10.47
10.46
10.44
10.41
10.39
10.35
10.31
10.27
10.21

Kc/period
0.90
0.90
0.90
0.91
0.95
0.99
1.03
1.07
1.10
1.10
1.10
1.10
1.10

Req. Neto
mm/Period
9.41
9.42
9.42
9.53
9.95
10.36
10.75
11.14
11.43
11.39
11.34
11.30
11.23

Precipitacion
mm/period
2.90
3.47
4.13
4.87
5.70
6.61
7.58
8.62
9.71
10.84
12.01
13.20
14.40

12/25/2009
12/28/2009
12/31/2009
1/3/2010
1/6/2010
1/9/2010
1/12/2010

10.16
10.10
10.04
10.02
10.01
10.00
9.98
205.49

TOTAL
Fuente. Elaboracion propia

1.10
1.10
1.10
1.10
1.10
1.10
1.10

11.18
11.11
11.04
11.02
11.01
11.00
10.98
214.01

15.59
16.77
17.21
17.98
19.08
20.13
21.10
231.90

Anexo 16:
ICO Y PROGRAMACION DE RIEGO POR GOTEO (SOFTWARE CROPWAT)

Precip. Efect. Req.net.riego


mm/period
mm/period
3.98
12.55
5.05
12.56
5.98
12.71
6.85
13.39
7.81
14.07
8.84
14.86
9.93
15.22
11.06
15.15
12.21
15.07
13.36
14.97
14.48
14.86
15.19
14.74
15.79
14.70
16.73
14.67
17.62
14.64
3.98
12.55
17.62
15.22
10.99
14.28
164.88
214.17

Eficiencias
de Aplicac.
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
13.50

Req. Total
mm/period.
13.94
13.96
14.13
14.88
15.63
16.51
16.92
16.83
16.74
16.63
16.51
16.38
16.33
16.30
16.27
13.94
16.92
15.86
237.97

Req.Total
m3/Ha.
139.40
139.60
141.25
148.80
156.33
165.14
169.16
168.30
167.44
166.34
165.12
163.78
163.29
163.04
162.68
139.40
169.16
158.64
2379.67

Descarga
got m3/Ha
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58.33
58.33
58.33
874.95

Anexo 17
ICO Y PROGRAMACION DE RIEGO POR GOTEO (SOFTWARE CROPWAT)

Precip. Efect. Req.net.riego


mm/period
mm/period
1.87
6.27
2.11
6.28
2.38
6.28
2.67
6.28
2.89
6.28
3.09
6.42
3.31
6.63
3.54
6.77
3.78
6.97

Eficiencias
de Aplicac.
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

Req. Total
mm/period.
6.97
6.98
6.98
6.98
6.98
7.14
7.37
7.52
7.74

Req.net.riego
m3/Ha.
69.70
69.80
69.80
69.80
69.80
71.35
73.68
75.23
77.44

Descarga
got m3/Ha
58
58
58
58
58
58
58
58
58

4.03
4.29
4.55
4.82
5.10
5.39
5.67
5.96
6.25
6.54
6.82
7.10
7.38
7.65
7.54
7.78
8.02
8.25
8.48
8.70
8.92
164.88

7.17
7.30
7.50
7.62
7.60
7.59
7.57
7.55
7.52
7.50
7.47
7.45
7.41
7.38
7.36
7.35
7.35
7.34
7.34
7.33
7.32
214.19

0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

7.97
8.11
8.33
8.47
8.45
8.43
8.41
8.38
8.36
8.34
8.30
8.27
8.24
8.20
8.18
8.16
8.16
8.15
8.15
8.14
8.13
237.99

79.65
81.08
83.28
84.70
84.46
84.33
84.09
83.84
83.60
83.36
82.99
82.74
82.38
82.01
81.77
81.64
81.64
81.52
81.52
81.40
81.28
2379.90

58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58
58

Anexo 18
ICO Y PROGRAMACION DE RIEGO POR GOTEO (SOFTWARE CROPWAT)

Precip. Efect. Req.net.riego


mm/period
mm/period
2.90
9.41
3.47
9.42
4.09
9.42
4.56
9.53
5.05
9.95
5.58
10.36
6.14
10.75
6.73
11.14
7.34
11.43
7.97
11.39
8.61
11.34
9.26
11.30
9.91
11.23

Eficiencias
de Aplicac.
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90

Req. Total
mm/period.
10.46
10.47
10.47
10.59
11.05
11.51
11.95
12.38
12.70
12.65
12.60
12.55
12.48

Req.net.riego
m3/Ha.
104.60
104.70
104.70
105.86
110.52
115.06
119.48
123.76
126.99
126.50
126.01
125.52
124.79

Descarga
got m3/Ha
58
58
58
58
58
58
58
58
58
58
58
58
58

10.55
11.17
11.40
11.76
12.29
12.81
13.30
164.89

11.18
11.11
11.04
11.02
11.01
11.00
10.98
214.01

0.90
0.90
0.90
0.90
0.90
0.90
0.90
18.00

12.42
12.34
12.27
12.25
12.23
12.22
12.20
237.78

124.18
123.44
122.71
122.47
122.34
122.22
121.98
2377.84

58
58
58
58
58
58
58

Tiempo
de Riego (h)
2
2
2
3
3
3
3
3
3
3
3
3
3
3
3
2.39
2.90
2.72
40.80

Tiempo
de Riego (h)
1.2
1.2
1.2
1.2
1.2
1.2
1.3
1.3
1.3

1.4
1.4
1.4
1.5
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
1.4
40.80

Tiempo
de Riego (h)
2
2
2
2
2
2
2
2
2
2
2
2
2

2
2
2
2
2
2
2
40.77

Anexo 19:
DISEO DE SISTEMA DE RIEGO POR GOT

REGION

PUNO

PROVINCIA:

CHUCUITO

DISTRITO:

JULI

CENTRO POBLADO:

MOLINO

LOCALIDAD:

VILCALLAME

MICROCUENCA:

MOLINO

Informacion Requerida:
Evapotranspiracion potencial
Coeficiente del cultivo
Evapotranspiracion real
Area ha Irrigar
Velocidad de infiltracin bsica
Cultivo proyectado
Jornal, horas de trabajo
Eficiencia de riego
Caudal disponible manantial

Clculos de Demanda Hdrica


1.-

Lmina neta ( Ln ):
CULTIVO
ALFALFA
LAMINA NETA MAX.

2.-

Lmina real o bruta ( Lr ):

Area de parcela por tratamiento = 49 m2


Lmina neta ( Ln ):
Eficiencia de riego

Ln =

LAMINA REQUERIDA
Ln =
Ln =
Lr = ( Ln/Er )

Prueba de descarga en campo de las cintas goteros


Tiempo
Horas
1
2
3
4
5
6

Caudal
Litros
1.4
2.8
4.2
5.6
7
8.4

Caractersticas hidrulicas de las cintas goteros


Especificaciones de diseo de las cintas goteros
Dimetro interior
Clase
Espesor
Espaciamento de salidas
Longitud del rollo
Peso del rollo
Tasa de flujo (LPH/100m@.55 bar)
Presin de trabajo en
Caudal de cada gotero

Diseo Agronomico
1.-

Superficie mojada por emisor


profundidad de raices de alfalfa
Profundidad del bulbo a 90%
Profundidad del bulbo a 120%

la superficie mojada por emisor se determino en campo, en este caso tericamente


y 120 % de la profundidad de la raz, en las pruebas de campo se observa que a un
un caudal 3.9 litros en 3 horas

S = r 2
2.-

Porcentaje de superficie mojada

P=10 x

Sup . Moj . planta


Sup . Ocup . planta

3.-

Numero de emisores por planta, como se moja el 100% del suelo, en este caso el n
parcela experimental que tiene un ara de 49 m2 y que pertenece a una frecuencia d

Numero de emisores por planta, como se moja el 100% del suelo, en este caso el n
parcela experimental que tiene un ara de 49 m2 y que pertenece a una frecuencia d

Ne=

Sup . Ocup . plantaP


100Sup . Moj . emisor

Nmero de emisores por parcela teoricamente (Ne)


Dimetro del crculo mojado del emisor
rea de la parcela experimental
4.-

Profundidad del bulbo

5.-

Dosis, intervalo de riego y tiempo de riego

Dt=eqat
Dt=Ntl
Dosis total en litros/ parcela
Nmero real de emisores/parcela
Caudal de cada emisor, en Litros / hora
Tiempo de riego en horas
Necesidades de riego litros por da
Intrvalo de riego

En el clculo de la dosis total de riego se aclara que tericamente el nmero de emi


utilizar cintas goteros que vienen definidas el distanciamiento entre goteros a 0.30 m
de 207 unidades ya que la longitud del lateral es de 7 m, en el cual hay 23 emisores
experimental.
F

Diseo Hidrulico:
Calculo del lateral
1.-

Calculo de la variacin mxima de la presin


dH =

0.1
H
x

Presin de trabajo del emisor


Exponente de descarga del emisor

1.-

Clculo de Caudal en el origen del lateral (Q)

Q= eqa
Caudal del emisor:
Nmero de goteros por lateral:

2.-

Longitud ficticia del lateral (Lf):


Lf = Lr + Le

Longitud real:
Longitud equivalente:
Le = Lr0 . 2

3.-

Perdida de carga en el lateral (h):

h=JFLf

Prdida de carga unitaria mca/ml:


Factor de Christiansen (F):
Longitud ficticia del lateral (Lf) m:
Cinta gotero de dimetro interior

Para el clculo de J se utiliz el Abaco 1 del del libro Tcnicas de riego FUENTES (
(CRIDA)-11 INIA Para un caudal de 0.03 m3/h, para tubera de 16 mm tiene una pe

4.-

Prdida de carga admisible en el lateral (ha):


ha =

0 . 055
H
x

Exponente de descarga (x)


Presin de trabajo de los goteros (H)
5.-

Presin en el origen del lateral (Po)


Po= Pm + 0 . 73 h

si el lateral es horizontal

Po= Pm+0 . 73 h Hg /2

si el lateral tiene pendiente

Presin en el origen del lateral


Presin de trabajo del gotero
Prdida de carga en el lateral
Desnivel geomtrico del lateral
Hg/2 = (+) si el lateral es ascendente
Hg/2 = (-) si el lateral es descendente
Clculo de tuberas terciarias o porta laterales
1.Caudal en el origen de la terciaria (Q)

Q = NlQl
Nmero de laterales

Caudal de cada lateral


4.-

Caudal del Sistema:

Qs = Qc * Nc

Caudal por conductor:


Nmero de Tuberas de Conduccin

2.-

longitud ficticia de tubera terciaria (Lf)


Lf = Lr + Le
Le = Lr0 . 2

Longitud real
Longitud equivalente
Dimetro preliminar de Tubera terciaria

3.-

Prdida de Carga en terciaria (h')

h
h=JFLf
' =JFLf
Prdida de carga unitaria mca/ml:
Factor de Christiansen (F):
Longitud ficticia de la terciaria (Lf) m:
Tubo. PE

Para el clculo de J se utiliz el abaco 1 del del libro Tcnicas de riego FUENTES (2
(CRIDA)-11 INIA Para un caudal de 0.81 m3/h, para tubera de 3/4 " tiene una perd
4.-

Prdida de carga admisible en la terciaria (h'a):

h ' a=

0. 1
H h
x

Presin de trabajo del emisor


Exponente de descarga de gotero
Prdida de carga real en lateral

5.-

Presin en el origen de la terciaria (P'o):

P ' o= Po + 0 . 73 h '
Presin en el origen del lateral
Prdida de carga en la terciaria
Desnivel geomtrico (+)

Hg
2

Clculo de tuberas secundarias:


1.-

Caudal en el origen de la secundaria (Q)

Q = Nt Qt
Nmero de terciarias
Caudal de cada terciaria
2.-

Longitud ficticia de tubera secundaria Lf)


Lf = Lr + Le
Le = Lr0 . 2

Longitud real
Longitud equivalente
Dimetro preliminar de tubera terciaria
1.-

Prdida de carga en tubera secundaria (h')

h
h=JFLf
' =JFLf
Prdida de carga unitaria mca/ml:
Factor de Christiansen (F):
Longitud ficticia del lateral (Lf) m:
Longitud real m:
Tubo. PE de alta densidad 1"

4.-

Para el clculo de J se utiliz el abaco 1 del del libro Tcnicas de riego FUENTES (2
(CRIDA)-11 INIA Para un caudal de 2.42 m3/h, para tubera de 1 " tiene una perdid

Anexo 19:
ISTEMA DE RIEGO POR GOTEO

ETP =

3.13

mm/dia

Kc =

1.10

Maximo

ETR =

3.44

mm/dia

A=

500.00

Ib =

24.0

m2
mm/h

ALFALFA
J=

12

horas/dia

Er =

90

Qd =

5.4

lt / seg

15.26

mm

LAMINA REQUERIDA
15.26
mm
15.26
mm
Lr =
Vol=
Vol=
Vol=

16.95
169.50
169500.0
867.50

Ln =
Er =

15.26
90

mm/dia
m3/dia/Ha
Lit/dia/Ha
Lit/dia/Parc
mm
%

Caudal
Litros

Radio de bulbo
cm
21
35
55
63
69
76

Profundidad de Bulbo
cm
30
52
72
91
98
104

RODRIP
Di =
Clase=
Esp.=
Eg =
Lr=
Pr=
Tf=
Pt =
qa =

16.0
5000.0
0.127
0.3
3810.0
33.0
185 o 300
7.03
1.4

mm
mm
m
m
Kg.
mca
lit /h

S=
pr =
Pb 90% =
Pb 120% =

0.95
0.80
0.72
0.96

m2
m
m
m

, en este caso tericamente la profundidad del bulbo debe estar comprendido entre el 90
campo se observa que a una profundidad de 72 cm le corresponde un radio de 55 cm y

P=

100%

planta
planta

% del suelo, en este caso el numero de emisores se calcul para una


pertenece a una frecuencia de riego.

aP
misor

Ne >

Ne =
Dh =
a=
Pb =

Dt =
ne =
qa =
t=
Nt =
I=

SpSr P
100Dh

51.56
0.95
49.00

Und
m2
m2

72.00 cm

869.400
207
1.4
3.0
867.5
1

Lit.
Und
lit/h
h
lit/da
das

ricamente el nmero de emisores por parcela es de 52 unidades, pero al


miento entre goteros a 0.30 m, el nmero total de emisores ser entonces
m, en el cual hay 23 emisores, se tiene 9 laterales en una parcela

dH =

H=
x=

2.00

mca

10.00 mca
0.5

Q=
Q=

32.20
0.03

qa =
e=

1.4
23.0

lit/hora
m3/hora
lit /h
Und

Lf =

8.40

m.

Lr =
Le =

7.00
1.40

m
m

0.07

mca.

0.02
0.44
8.40
16.00

mca/ml

Qc =
J=
F=
Lf =
Di =

m
mm

cnicas de riego FUENTES (2003), Departamento de suelos y riegos


era de 16 mm tiene una perdida de carga de 1.9 mca / 100 m

ha =

0.77

mca

x=
H=

0.5
7.0

mca

Po =

6.78

mca

Po =
Pm =
h=
Hg =

6.78
7.03
0.07
0.60

mca
mca
mca
m

869.40
0.87

Lts/h
m3/h

27.00

Und

Q=
Q=
Nl =

Ql =

Qc =

Qs =

32.20

Lts/h

26.40

22.00
4.4
19.1

m
m
mm

0.36

mca

0.04
0.387
26.4
3/4

mca

lts/seg.
Nc = Conduct.
lts/seg.
Lf =

Lr =
Le =
D=

h' =
J=
F=
Lf =
D=

m
Pulg.

cnicas de riego FUENTES (2003), Departamento de suelos y riegos


era de 3/4 " tiene una perdida de carga de 3.5 mca / 100 m
h'a =

H=
x=
h=

h' =

Po =
h' =
Hg =

1.34

mca

7.03
0.5
0.07

mca

7.54

mca

6.78
0.36
1.0

mca
mca
m

mca

Q=
Q=

2.61

Lts/h
m3/h

3.00
869.40

Und
Lts/h

16.80

14.00
2.8
1.0

m
m
"

0.31

mca

0.05
0.4
16.8
14.0
1

mca

2608.20

Nl =
Ql =
Lf =

Lr =
Le =
D=
h' =

J=
F=
Lf =
Lr =
D=

m
m
Pulg.

cnicas de riego FUENTES (2003), Departamento de suelos y riegos


era de 1 " tiene una perdida de carga de 4.8 mca / 100 m

m3/hora
pulg.

h ' a=

0. 1
H h
x

57

0.86948695

0.75
0.16

1.100232

0.3285714286

0.019

Anexo 20:
PLANILLA DE METRADOS RIEGO POR ASPERSION

ITEM

DESCRIPCION

01

SISTEMA DE RIEGO POR ASPERSION

01.01

HIDRANTES

01.01.01

TRABAJOS PRELIMINARES

01.01.01.01

LIMPIEZA DE TERR

01.01.01.02

TRAZO Y REPLANT

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

EXCAVACION MANU

01.01.03

OBRAS DE CONCRETO SIMPLE

01.01.03.01

CONCRETO F'C=17

01.01.03.02

ENCOFRADO Y DE

01.01.04

TARRAJEOS

01.01.04.01

TARRAJEO EN EXTE

01.01.05

ACCESORIOS

01.01.05.01

SUMINISTRO Y COLOCACION DE TAPA METALICA

01.01.05.02

SUMINISTRO Y CO

01.02

MODULO DE RIEGO POR ASPERSION

01.02.01

INSTALACION DE M

VECES

LARGO

ANCHO

0.40

0.40

0.40

0.40

0.40

0.40

1.20

0.10

1.20

1.20

Anexo 21:
PLANILLA DE METRADOS RIEGO POR GOTEO

ITEM

DESCRIPCION

01

SISTEMA DE RIEGO POR GOTEO

01.01

HIDRANTES

01.01.01

TRABAJOS PRELIMINARES

01.01.01.01

LIMPIEZA DE TERR

01.01.01.02

TRAZO Y REPLANT

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

EXCAVACION MANU

01.01.03

OBRAS DE CONCRETO SIMPLE

01.01.03.01

CONCRETO F'C=17

01.01.03.02

ENCOFRADO Y DE

01.01.04

TARRAJEOS

01.01.04.01

TARRAJEO EN EXTE

01.01.05

ACCESORIOS

01.01.05.01

SUMINISTRO Y COL

01.01.05.02

SUMINISTRO Y CO

VECES

LARGO

ANCHO

0.40

0.40

0.40

0.40

0.40

0.40

1.20

0.10

1.20

1.20

01.02

MODULO DE RIEGO POR GOTEO

01.02.01

INSTALACION DE T

01.02.02

INSTALACION DE

01.02.04

INSTALACION DE C

100.00

exo 20:

DOS RIEGO POR ASPERSION

ALTURA

PARCIAL

TOTAL

UND

0.16

0.16

m2

0.16

0.16

m2

0.50

0.08

0.08

m3

0.50

0.06

0.06

m3

0.50

1.20

1.20

m2

0.50

0.60

0.60

m2

1.00

1.00

und

1.00

1.00

und

2.00

2.00

und

PARCIAL

TOTAL

0.16

0.16

m2

0.16

0.16

m2

0.50

0.08

0.08

m3

0.50

0.06

0.06

m3

0.50

1.20

1.20

m2

0.50

0.60

0.60

m2

1.00

1.00

und

1.00

1.00

und

exo 21:

ADOS RIEGO POR GOTEO


ALTURA

UND

100.00

100.00

1.00

1.00

und

1.00

1.00

HA

1.23443983

12344.3983

3.07777778

30777.7778

Anexo 22:

COSTO DIRECTO PARA LA INSTALACION DEL SISTEMA DE RIEGO POR ASPERSION


Cliente

UNIVERSIDAD NACIONAL DEL ALTIPLANO, FACULTAD DE CIENCIAS AGRARIAS.

Lugar

PUNO - CHUCUITO - JULI

Item

Descripcin

01

SISTEMA DE RIEGO POR ASPERSION

01.01

HIDRANTES

01.01.01

TRABAJOS PRELIMINARES

01.01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

EXCAVACION MANUAL

01.01.03

OBRAS DE CONCRETO SIMPLE

01.01.03.01

CONCRETO F'C=175 KG/CM2 EN MUROS DE HIDRANTES

01.01.03.02

ENCOFRADO Y DESENCOFRADO

01.01.04

TARRAJEOS

01.01.04.01

TARRAJEO EN EXTERIORES (MORTERO1:5)

01.01.05

ACCESORIOS

01.01.05.01

SUMINISTRO Y COLOCACION DE TAPA METALICA

01.01.05.02

SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTES

01.02

MODULO DE RIEGO POR ASPERSION

01.02.01

INSTALACION DE MODULO DE ASPERSORES (EQUIPO MOVIL)


COSTO DIRECTO
COSTO DIRECTO

Anexo 23:
COSTO DIRECTO PARA LA INSTALACION DE RIEGO POR GOTEO
Cliente

UNIVERSIDAD NACIONAL DEL ALTIPLANO, FACULTAD DE CIENCIAS AGRARIAS.

Lugar

PUNO - CHUCUITO - JULI

Item

Descripcin

01

SISTEMA DE RIEGO POR GOTEO

01.01

HIDRANTES

01.01.01

TRABAJOS PRELIMINARES

01.01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.01.02

TRAZO Y REPLANTEO PRELIMINAR

01.01.02

MOVIMIENTO DE TIERRAS

01.01.02.01

EXCAVACION MANUAL

01.01.03

OBRAS DE CONCRETO SIMPLE

01.01.03.01

CONCRETO F'C=175 KG/CM2 EN MUROS DE HIDRANTES

01.01.03.02

ENCOFRADO Y DESENCOFRADO

01.01.04

TARRAJEOS

01.01.04.01

TARRAJEO EN EXTERIORES (MORTERO1:5)

01.01.05

ACCESORIOS

01.01.05.01

SUMINISTRO Y COLOCACION DE TAPA METALICA

01.01.05.02

SUMINISTRO Y COLOCACION DE ACCESORIOS EN HIDRANTES

01.02

MODULO DE RIEGO POR GOTEO

01.02.01

INSTALACION DE TUBERIAS PORTA LATERALES

01.02.02

INSTALACION DE CONECTOTES DE CINTAS GOTEROS

01.02.04

INSTALACION DE CINTAS GOTEROS


COSTO DIRECTO
COSTO DIRECTO

2:

SISTEMA DE RIEGO POR ASPERSION

Und.

Metrado

Cost Unit S/.

Parcial S/.
2,536.27
84.94
0.15

m2

0.25

0.21

0.05

m2

0.25

0.41

0.10
0.54

m3

0.13

4.12

0.54

m3

0.09

219.97

19.80

m2

0.50

4.62

2.31

22.11

2.78
m2

0.50

5.55

2.78
59.36

und

1.00

18.02

18.02

und

1.00

41.34

41.34

und

3.00

817.11

2,451.33

2451.33

2,536.27

2,536.27

3:

ION DE RIEGO POR GOTEO

Und.

Metrado

Cost Unit S/.

Parcial S/.
3,204.19
84.94
0.15

m2

0.25

0.21

0.05

m2

0.25

0.41

0.10
0.54

m3

0.13

4.12

0.54
22.11

m3

0.09

219.97

19.80

m2

0.5

4.62

2.31

m2

0.5

5.55

2.78

2.78

59.36
und

18.02

18.02

und

41.34

41.34
3,119.25

100

3.03

303.00

und

313.74

313.74

HA

2502.51

2,502.51
3,204.19

3,204.19

CAMPO: COMUNIDAD VILC ALLAME


FECHA: 25 DE AGOSTO DEL 2009
METODO DE CILINDRO INFILTOMETRO
TEXTURA: FRANCO AECILLOSO

TIEMPO (min)

LAMINA INFILTRADA (cm)

ACUMULADO (To)
PARCIAL

LECTURA (cm)

0
1
1
1
1
1
1
1
1
1
1
3
3
3
3
3
5
5
5
5
5
10
10
10
10
15
15

0
1
2
3
4
5
6
7
8
9
8
13
16
19
22
25
30
35
40
45
50
60
70
80
90
105
120

28
26.9
26.4
26
25.8
25.5
25.3
25.1
24.9
24.7
24.6
24.1
23.6
23.2
22.8
22.5
21.9
21.3
20.8
20.3
19.8
18.8
18
17.1
16.8
15.6
14.4

PARCIAL (cm)

PARCIAL

0
1.1
0.5
0.4
0.2
0.3
0.2
0.2
0.2
0.2
0.1
0.5
0.5
0.4
0.4
0.3
0.6
0.6
0.5
0.5
0.5
1
0.8
0.9
0.3
2.4
1.2

0
1.1
0.5
0.4
0.2
0.3
0.2
0.2
0.2
0.2
0.1
0.5
0.5
0.4
0.4
0.3
0.6
0.6
0.5
0.5
0.5
1
0.8
0.9
0.3
1.2
1.2

26

Fuente: Elaboracion Propia


Ao =

0.0326

ao

1.55244075

ao

PARAMETROS DETERMINADOS PARA LAS ECUACIONES DE INFILTRACION


Inf. Acumulada

Velocidad de Infiltracion

Velcid. De Infiltracion Prom.

0.5190 b

-0.4888 b

1.078 a

35.7 a

r2

0.9978 r 2

-1.0881 r 2

CONCLUCION DE INFILTRACION PARA FINES DE RIEGO

Parametros Inf. Basica


a=
b=

T base
(min)

Infil. Basica
cm/hora

35.7

-0.4888

245

2.4

Anexo 24
PRUEBA DE INFILTRACION
OBSERVADOR: JUSTO MAQUERA VELASQUEZ
N DE PRUEBA: 01
OBSRVACIONES: CAMPO CON CULTIVO DE ALFALFA

NFILTRADA (cm)

VEL. DE INFILTRACION (cm/h)

ACUMULADO

(Icum)

0
1.1
1.6
2
2.2
2.5
2.7
2.9
3.1
3.3
3.4
3.9
4.4
4.8
5.2
5.5
6.1
6.7
7.2
7.7
8.2
9.2
10
10.9
11.2
12.4

INSTANTAN

0
66.00
30.00
24.00
12.00
18.00
12.00
12.00
12.00
12.00
6.00
10.00
10.00
8.00
8.00
6.00
7.20
7.20
6.00
6.00
6.00
6.00
4.80
5.40
1.80
4.80
13.6

(i)

PROMEDIO

0
66.00
48.00
40.00
33.00
30.00
23.14
24.86
20.67
19.80
18.55
17.83
17.23
17.85
16.00
15.38
14.89
14.47
14.02
13.62
13.26
12.93
12.57
12.81
11.86
11.58
4.80
11.33
SUMATORIA TOTAL

CALCULO DE LA FUNCION DE LA LAMINA INFILTRADA ACUMULADA


(Log Ti)=X Tiempo min
Acumulado

0.30
0.48
0.60
0.70
0.78
0.85
0.90
0.95
0.90
1.11
1.20
1.28
1.34
1.40
1.48
1.54
1.60
1.65
1.70
1.78
1.85
1.90
1.95
2.02
2.08
32.36

Log (Icum)=Yi Lamina


(cm) Acumulada

Ti x Yi

0
0.04
0.20
0.30
0.34
0.40
0.43
0.46
0.49
0.52
0.53
0.59
0.64
0.68
0.72
0.74
0.79
0.83
0.86
0.89
0.91
0.96
1.00
1.04
1.05
1.09
1.13
17.64

1.69724293

NFILTRACION

lcid. De Infiltracion Prom.


-0.34
50

Ecuacion de la lamina de infiltracion acumulada


0.52
1.0779 To
Icum =

0.94

NES DE RIEGO

Infil. Basica
mm/h

Ecuacion de la velocidad de infiltracion basica


-0.5
Ib
35.7 tb

0.06
0.14
0.21
0.28
0.34
0.39
0.44
0.49
0.48
0.66
0.77
0.87
0.96
1.03
1.16
1.28
1.37
1.47
1.55
1.71
1.85
1.97
2.05
2.21
2.36
26.1

24.25

Anexo 24
PRUEBA DE INFILTRACION

LA LAMINA INFILTRADA ACUMULADA

Ti 2

CALCULO DE LA FUNCION DE LA VELOCIDAD DE INFILTRACION INSTANTANEA

Yi 2

0
0.00
0.09
0.23
0.36
0.49
0.61
0.71
0.82
0.91
0.82
1.24
1.45
1.64
1.80
1.95
2.18
2.38
2.57
2.73
2.89
3.16
3.40
3.62
3.82
4.09
4.32

X = Log To

0
0.00
0.04
0.09
0.12
0.16
0.19
0.21
0.24
0.27
0.28
0.35
0.41
0.46
0.51
0.55
0.62
0.68
0.74
0.79
0.84
0.93
1.00
1.08
1.10
1.20
1.28
48.3

Y = Log (i)

0
0.00
0.30
0.48
0.60
0.70
0.78
0.85
0.90
0.95
0.90
1.11
1.20
1.28
1.34
1.40
1.48
1.54
1.60
1.65
1.70
1.78
1.85
1.90
1.95
2.02
2.08
14.1

32.4

0
1.82
1.48
1.38
1.08
1.26
1.08
1.08
1.08
1.08
0.78
1.00
1.00
0.90
0.90
0.78
0.86
0.86
0.78
0.78
0.78
0.78
0.68
0.73
0.26
0.68
0.68
24.55

X*i

X2

0
0.00
0.44
0.66
0.65
0.88
0.84
0.91
0.97
1.03
0.70
1.11
1.20
1.15
1.21
1.09
1.27
1.32
1.25
1.29
1.32
1.38
1.26
1.39
0.50
1.38
1.42

0
0.00
0.09
0.23
0.36
0.49
0.61
0.71
0.82
0.91
0.82
1.24
1.45
1.64
1.80
1.95
2.18
2.38
2.57
2.73
2.89
3.16
3.40
3.62
3.82
4.09
4.32
26.6

48.3

Ecuacion de la velocidad de infiltracion instantanea


-0.5
Ii
35.7 to

Ecuacion de la velocidad de infiltracion promedio


-0.3
Ip
50 t

RACION INSTANTANEA

Y2

CALCULO DE LA FUNCION DE VELOCIDAD DE INFILTRACION PROMEDIO

X = Log To

0.00
3.31
2.18
1.90
1.16
1.58
1.16
1.16
1.16
1.16
0.61
1.00
1.00
0.82
0.82
0.61
0.74
0.74
0.61
0.61
0.61
0.61
0.46
0.54
0.07
0.46
0.46
25.52

Y = Log i

0
0.00
0.30
0.48
0.60
0.70
0.78
0.85
0.90
0.95
0.90
1.11
1.20
1.28
1.34
1.40
1.48
1.54
1.60
1.65
1.70
1.78
1.85
1.90
1.95
2.02
2.08

X*Y

1.82
1.68
1.60
1.52
1.48
1.36
1.40
1.32
1.30
1.27
1.25
1.24
1.25
1.20
1.19
1.17
1.16
1.15
1.13
1.12
1.11
1.10
1.11
1.07
1.06
1.05
32.4

X2

0.00
0.51
0.76
0.91
1.03
1.06
1.18
1.19
1.24
1.15
1.39
1.49
1.60
1.62
1.66
1.73
1.79
1.84
1.88
1.91
1.98
2.03
2.11
2.10
2.15
2.19
33.1

Y2

0.00
0.09
0.23
0.36
0.49
0.61
0.71
0.82
0.91
0.82
1.24
1.45
1.64
1.80
1.95
2.18
2.38
2.57
2.73
2.89
3.16
3.40
3.62
3.82
4.09
4.32
38.5

3.31
2.83
2.57
2.31
2.18
1.86
1.95
1.73
1.68
1.61
1.57
1.53
1.57
1.45
1.41
1.38
1.35
1.32
1.29
1.26
1.24
1.21
1.23
1.15
1.13
1.11
48.3

43.2

Anexo 25:
COSTO DE PRODUCCION DEL CULTIVO DE ALFALFA ETAPA INSTALACION
DEPARTAMENTO: Puno
PROVINCIA: Chucuito
MBITO: Comunidad Vilcallame-Juli
CULTIVO: ALFALFA (Medicago sativa L.)
FECHA DE SIEMBRA: 31 de diciembre 2009
FECHA DE COSECHA:
VARIEDAD: Ranger

N
I.
1.0

RUBROS
COSTOS DIRECTOS
Preparacin del Terreno
Riego de machaco

Aradura
Rastra
Desterronado
Limpieza del terreno
Nivelado y melgado
2.0

Jornal

Cosecha

Siega manual
Recojo de forraje
Traslado del forraje
5.0

Kg.
Bolsa
Bolsa
Kg.
Kg.
Jornal
Jornal
Jornal
Jornal
Jornal

Labores Culturales

Deshierbo manual
4.0

Jornal
H/M
H/M
H/M
Jornal
H/M

Siembra

Semilla de alfalfa
Inoculante
Roca fosfrica (50 Kg.)
Fosfato diamonico
Cloruro de potasio
Inoculacin
Traslado de insumos
Fertilizacin
Siembra manual
Retapado manual
3.0

UNIDAD DE
MEDIDA

Jornal
Jornal
Jornal

Almacenado

Almacenado del forraje


SUB TOTAL DE COSTOS DIRECTOS/ (H)

Jornal

6.0

Imprevistos

5% de costos directos
II.
7.0

TOTAL COSTOS DIRECTOS O VARIABLES


COSTOS INDIRECTOS
Gastos Administrativos
8% de costos directos
COSTO TOTAL DE PRODUCCION (I+II)

ANALISIS DE RENTABILIDAD
Costo total de la produccion
Rendimiento comercial estimado (Kg/Ha)
Costo / Kg. (S/.)
Precio Estimado S/. X Kg.
Ingreso Total (S/.)
Ingreso Neto (S/.)
Rentabilidad

E ALFALFA ETAPA INSTALACION


PERIODO VEGETATIVO: Perenne
RENDIMIENTO (Kg./ha) M.V. 35-40 mil
NIVEL TECNOLGICO: Madio-alto
RIEGO: Goteo
FECHA DE ELABORACIN: junio 2010

CANTIDAD
POR (Ha)

PRECIO
UNITARIO

COSTO
PARCIAL
565.00

1.00
4.00
2.50
3.00
2.00
3.00

15.00
45.00
40.00
30.00
15.00
45.00

15.00
180.00
100.00
90.00
45.00
135.00
1,722.00

30.00
1.00
4.00
260.00
150.00
0.60
1.00
1.00
1.00
5.00

30.00
18.00
15.00
1.50
1.50
15.00
15.00
15.00
15.00
15.00

900.00
18.00
60.00
390.00
225.00
9.00
15.00
15.00
15.00
75.00
150.00

10.00

15.00

150.00

10.00
2.00
2.00

15.00
15.00
15.00

150.00
30.00
30.00

210.00

30.00

2.00

15.00

30.00
2,677.00

133.85
2,810.85

224.87
3,035.72

3,035.72
25,100.00
0.12
0.15
3,765.00
729.28
0.24

Anexo 26:
COSTO DE PRODUCCION DEL CULTIVO DE ALFALFA
PRIMER CORTE

DEPARTAMENTO: Puno

PERIODO VEGETATIVO: Perenne

PROVINCIA: Chucuito

RENDIMIENTO (Kg./ha) M.V. 35-40 mil

MBITO: Comunidad Vilcallame-Juli

NIVEL TECNOLGICO: Madio-alto

CULTIVO: ALFALFA (Medicago sativa L.)

RIEGO: Aspersion

FECHA DE SIEMBRA: 31 de diciembre 2009

FECHA DE ELABORACIN: junio 2010

FECHA DE COSECHA:
VARIEDAD: Ranger

RUBROS

I.

COSTOS DIRECTOS

1.0

UNIDAD DE
MEDIDA

Fertilizacin

Instalacion de sistema de riego


Traslado de insumos
Fosfato diamonico
Cloruro de potasio
3.0

1.00
1.00
260.00
150.00

Jornal
Jornal

10.00
20.00

Jornal
Jornal
Jornal

10.00
2.00
2.00

Jornal

2.00

Labores Culturales

Cosecha

Siega manual
Recojo de forraje
Traslado del forraje
5.0

Jornal
Kg.
Kg.

Global

Deshierbo manual
Riego complementario
4.0

CANTIDAD
POR (Ha)

Almacenado

Almacenado del forraje


SUB TOTAL DE COSTOS DIRECTOS/ (H)
6.0

Imprevistos

5% de costos directos
II.
7.0

TOTAL COSTOS DIRECTOS O VARIABLES


COSTOS INDIRECTOS
Gastos Administrativos
8% de costos directos
COSTO TOTAL DE PRODUCCION (I+II)

ANALISIS DE RENTABILIDAD
Costo total de la produccion
Rendimiento comercial estimado (Kg/Ha)
Costo / Kg. (S/.)
Precio Estimado S/. X Kg.
Ingreso Total (S/.)
Ingreso Neto (S/.)
Rentabilidad

Anexo 27
COSTO DE PRODUCCION DEL

ALFALFA

PRIMER COR

DO VEGETATIVO: Perenne

MIENTO (Kg./ha) M.V. 35-40 mil

TECNOLGICO: Madio-alto

DE ELABORACIN: junio 2010

PRECIO
UNITARIO

COSTO
PARCIAL

N
I.

1,052.71

422.71
15.00
1.50
1.50

422.71
15.00
390.00
225.00

15.00
15.00

150.00
300.00

15.00
15.00
15.00

150.00
30.00
30.00

450.00

210.00

30.00

15.00

1.0

3.0

4.0

5.0

30.00
1,742.71
6.0

87.14
1,829.85
II.
7.0

146.39
1,976.24

1,976.24
24,100.00
0.08
0.15
3,615.00
1,638.76
0.83

Anexo 27:
COSTO DE PRODUCCION DEL CULTIVO DE ALFALFA
PRIMER CORTE

DEPARTAMENTO: Puno

PERIODO VEGETATIVO: Perenne

PROVINCIA: Chucuito

RENDIMIENTO (Kg./ha) M.V. 35-40 mil

MBITO: Comunidad Vilcallame-Juli

NIVEL TECNOLGICO: Madio-alto

CULTIVO: ALFALFA (Medicago sativa L.)

RIEGO: Goteo

FECHA DE SIEMBRA: 31 de diciembre 2009

FECHA DE ELABORACIN: junio 2010

FECHA DE COSECHA:
VARIEDAD: Ranger

RUBROS

UNIDAD DE
MEDIDA

CANTIDAD
POR (Ha)

PRECIO
UNITARIO

COSTOS DIRECTOS
Fertilizacin

Instalacion de sistema de riego


Traslado de insumos
Fosfato diamonico
Cloruro de potasio

Jornal
Kg.
Kg.

1.00
1.00
260.00
150.00

534.03
15.00
1.50
1.50

Jornal
Jornal

10.00
36.00

15.00
5.00

Jornal
Jornal
Jornal
Jornal

10.00
2.00
2.00
2.00

15.00
15.00
15.00
15.00

Jornal

2.00

15.00

Global

Labores Culturales

Deshierbo manual
Riego complementario
Cosecha

Siega manual
Recojo de forraje
Traslado del forraje
Recojo de cintas goteros
Almacenado

Almacenado del forraje


SUB TOTAL DE COSTOS DIRECTOS/ (H)
Imprevistos

5% de costos directos
TOTAL COSTOS DIRECTOS O VARIABLES
COSTOS INDIRECTOS
Gastos Administrativos
8% de costos directos
COSTO TOTAL DE PRODUCCION (I+II)

ANALISIS DE RENTABILIDAD
Costo total de la produccion
Rendimiento comercial estimado (Kg/Ha)
Costo / Kg. (S/.)
Precio Estimado S/. X Kg.
Ingreso Total (S/.)
Ingreso Neto (S/.)
Rentabilidad

COSTO
PARCIAL

1,164.03

534.03
15.00
390.00
225.00
330.00

150.00
180.00
240.00

150.00
30.00
30.00
30.00
30.00

30.00
1,764.03

88.20
1,852.23

148.18
2,000.41

2,000.41
25,100.00
0.08
0.15
3,765.00
1,764.59
0.88

Anexo 28:
COSTO DE PRODUCCION DEL CULTIVO DE ALFALFA
SEGUNDO CORTE

DEPARTAMENTO: Puno

PERIODO VEGETATIVO: Perenne

PROVINCIA: Chucuito

RENDIMIENTO (Kg./ha) M.V. 35-40 mil

MBITO: Comunidad Vilcallame-Juli

NIVEL TECNOLGICO: Madio-alto

CULTIVO: ALFALFA (Medicago sativa L.)

RIEGO: Aspersion

FECHA DE SIEMBRA: 31 de diciembre 2009

FECHA DE ELABORACIN: junio 2010

FECHA DE COSECHA:
VARIEDAD: Ranger

RUBROS

I.

COSTOS DIRECTOS

1.0

3.0

UNIDAD DE
MEDIDA

Fertilizacin
Instalacion de sistema de riego

Global

1.00

Traslado de insumos
Fosfato diamonico
Cloruro de potasio

Jornal
Kg.
Kg.

1.00
260.00
150.00

Jornal
Jornal

10.00
15.00

Jornal
Jornal
Jornal

10.00
2.00
2.00

Jornal

2.00

Labores Culturales

Deshierbo manual
Riego complementario
4.0

Cosecha

Siega manual
Recojo de forraje
Traslado del forraje
5.0

CANTIDAD
POR (Ha)

Almacenado

Almacenado del forraje


SUB TOTAL DE COSTOS DIRECTOS/ (H)
6.0

Imprevistos

5% de costos directos
II.
7.0

TOTAL COSTOS DIRECTOS O VARIABLES


COSTOS INDIRECTOS
Gastos Administrativos
8% de costos directos
COSTO TOTAL DE PRODUCCION (I+II)

ANALISIS DE RENTABILIDAD
Costo total de la produccion
Rendimiento comercial estimado (Kg/Ha)
Costo / Kg. (S/.)
Precio Estimado S/. X Kg.
Ingreso Total (S/.)
Ingreso Neto (S/.)
Rentabilidad

Anexo 29:
COSTO DE PRODUCCION DEL CU

ALFALFA

SEGUNDO CORTE

DO VEGETATIVO: Perenne

MIENTO (Kg./ha) M.V. 35-40 mil

TECNOLGICO: Madio-alto

DE ELABORACIN: junio 2010

PRECIO
UNITARIO

COSTO
PARCIAL

N
I.

422.71

1,052.71
422.71

15.00
1.50
1.50

15.00
390.00
225.00

15.00
15.00

150.00
225.00

15.00
15.00
15.00

150.00
30.00
30.00

375.00

210.00

30.00

15.00

1.0

3.0

4.0

5.0

30.00
1,667.71
6.0

83.39
1,751.10
II.
7.0

140.09
1,891.19

1,891.19
34,900.00
0.05
0.15
5,235.00
3,343.81
1.77

Anexo 29:
COSTO DE PRODUCCION DEL CULTIVO DE ALFALFA
SEGUNDO CORTE

DEPARTAMENTO: Puno

PERIODO VEGETATIVO: Perenne

PROVINCIA: Chucuito

RENDIMIENTO (Kg./ha) M.V. 35-40 mil

MBITO: Comunidad Vilcallame-Juli

NIVEL TECNOLGICO: Madio-alto

CULTIVO: ALFALFA (Medicago sativa L.)

RIEGO: Goteo

FECHA DE SIEMBRA: 31 de diciembre 2009

FECHA DE ELABORACIN: junio 2010

FECHA DE COSECHA:
VARIEDAD: Ranger

RUBROS

UNIDAD DE
MEDIDA

CANTIDAD
POR (Ha)

PRECIO
UNITARIO

COSTOS DIRECTOS
Fertilizacin
Instalacion de sistema de riego

Global

1.00

534.03

Traslado de insumos
Fosfato diamonico
Cloruro de potasio

Jornal
Kg.
Kg.

1.00
260.00
150.00

15.00
1.50
1.50

Jornal
Jornal

10.00
30.00

15.00
5.00

Jornal
Jornal
Jornal
Jornal

10.00
2.00
2.00
2.00

15.00
15.00
15.00
15.00

Jornal

2.00

15.00

Labores Culturales

Deshierbo manual
Riego complementario
Cosecha

Siega manual
Recojo de forraje
Traslado del forraje
Recojo de cintas goteros
Almacenado

Almacenado del forraje


SUB TOTAL DE COSTOS DIRECTOS/ (H)
Imprevistos

5% de costos directos

TOTAL COSTOS DIRECTOS O VARIABLES


COSTOS INDIRECTOS
Gastos Administrativos
8% de costos directos
%
COSTO TOTAL DE PRODUCCION (I+II)

ANALISIS DE RENTABILIDAD
Costo total de la produccion
Rendimiento comercial estimado (Kg/Ha)
Costo / Kg. (S/.)
Precio Estimado S/. X Kg.
Ingreso Total (S/.)
Ingreso Neto (S/.)
Rentabilidad

COSTO
PARCIAL

1,164.03
534.03

15.00
390.00
225.00
300.00

150.00
150.00
240.00

150.00
30.00
30.00
30.00
30.00

30.00
1,734.03

86.70
1,820.73

145.66
1,966.39

1,966.39
36,100.00
0.05
0.15
5,415.00
3,448.61
1.75

Horizonte del proyecto


1 Flujo de costos de operacin y mantenimiento riego por aspersion

1.1 Operacin y mantenimiento del sistema de riego por aspersion


Insumos y materiales de origen nacional
Remuneraciones
Tarifa de agua (Gasto=3610 m3), costo por 1m3 = S/. 0.04

1.2 Gastos por imprevistos


1.3 Gastos administrativos
2 Flujo de costos de operacin y mantenimiento riego por goteo

2.1 Operacin y mantenimiento del sistema de riego por goteo


Insumos y materiales de origen nacional
Remuneraciones
Tarifa de agua (Gasto=2807 m3), costo por 1m3 = S/. 0.04

2.2 Gastos por imprevistos


2.3 Gastos administrativos
3 Flujo de costos de produccion con riego por aspersion

3.1 costo de produccion con riego por aspersion


3.2 Gastos por imprevistos
3.3 Gastos administrativos
4 Flujo de costos de produccion con riego por goteo

4.1 costo de produccion con riego por goteo


4.2 Gastos por imprevistos
4.3 Gastos administrativos
5 total flujo de costos con aspersion (1+3)
6 total flujo de costos con goteo (2+4)
7 Flujo de ingresos del proyecto con riego por aspersion
7.1 Flujo de ingresos con riego por aspersion
8 Flujo de ingresos del proyecto con riego por goteo
8.1 Flujo de ingresos con riego por goteo
Fuente. Elaboracion propia.

Anexo 30:
FLUJO DE COSTOS E INGRESOS DEL PROYECTO

1
riego por aspersion

a de riego por aspersion


ales de origen nacional

=3610 m3), costo por 1m3 = S/. 0.04

riego por goteo

a de riego por goteo


ales de origen nacional

=2807 m3), costo por 1m3 = S/. 0.04

7,800.55
6,903.14
345.16
552.25
7,912.85
7,002.52
350.13
560.20
7,800.55
7,912.85

360.92
319.40
100.00
75.00
144.40
15.97
25.55
262.48
232.28
100.00
20.00
112.28
11.61
18.58
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
6,928.54

360.92
319.40
100.00
75.00
144.40
15.97
25.55
3,177.88
2,812.28
2,500.00
200.00
112.28
140.61
224.98
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
9,843.94

360.92
319.40
100.00
75.00
144.40
15.97
25.55
262.48
232.28
100.00
20.00
112.28
11.61
18.58
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
6,928.54

5,711.86
5,711.86
5,942.48
5,942.48

10,031.44
10,031.44
10,345.82
10,345.82

10,031.44
10,031.44
10,345.82
10,345.82

10

360.92
319.40
100.00
75.00
144.40
15.97
25.55
262.48
232.28
100.00
20.00
112.28
11.61
18.58
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
6,928.54

1,553.07
1,374.40
1,080.00
150.00
144.40
68.72
109.95
3,177.88
2,812.28
2,500.00
200.00
112.28
140.61
224.98
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
7,964.19
9,843.94

360.92
319.40
100.00
75.00
144.40
15.97
25.55
262.48
232.28
100.00
20.00
112.28
11.61
18.58
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
6,928.54

360.92
319.40
100.00
75.00
144.40
15.97
25.55
262.48
232.28
100.00
20.00
112.28
11.61
18.58
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
6,928.54

360.92
319.40
100.00
75.00
144.40
15.97
25.55
3,177.88
2,812.28
2,500.00
200.00
112.28
140.61
224.98
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
9,843.94

360.92
319.40
100.00
75.00
144.40
15.97
25.55
262.48
232.28
100.00
20.00
112.28
11.61
18.58
6,411.12
5,673.56
283.68
453.88
6,666.07
5,899.18
294.96
471.93
6,772.04
6,928.54

10,031.44
10,031.44
10,345.82
10,345.82

10,031.44
10,031.44
10,345.82
10,345.82

10,031.44
10,031.44
10,345.82
10,345.82

10,031.44
10,031.44
10,345.82
10,345.82

10,031.44
10,031.44
10,345.82
10,345.82

10,031.44
10,031.44
10,345.82
10,345.82

Anex

RESULTADOS DE LA EVALUACION ECONOMIC

Flujo de Fondos Netos a precios privados


Flujo de ingresos con riego por aspersion
Flujo de costos totales con riego por aspers
FFN
Tasa descuento
Valor actual neto (VAN)
Tasa interna de retorno (TIR)
Coeficiente beneficio costo (B/C)

1
7,800.55
(7,800.55)
14%
3,913
24%
1.23

2
5,711.86
6,772.04
(1,060.18)

Ane

RESULTADOS DE LA EVALUACION ECONOM


Flujo de Fondos Netos a precios privados
Flujo de ingresos con riego por goteo
Flujo de costos totales con riego por goteo
FFN
Tasa descuento
Valor actual neto (VAN)
Tasa interna de retorno (TIR)
Coeficiente beneficio costo (B/C)

1
7,912.85
(7,912.85)
14%
348
15%
1.12

2
5,942.48
6,928.54
(986.07)

Anexo 31:

OS DE LA EVALUACION ECONOMICA DEL PROYECTO CON RIEGO POR ASPERSION

3
10,031.44
6,772.04
3,259.41

4
10,031.44
6,772.04
3,259.41

5
10,031.44
6,772.04
3,259.41

6
10,031.44
7,964.19
2,067.26

7
10,031.44
6,772.04
3,259.41

8
10,031.44
6,772.04
3,259.41

Anexo 32

OS DE LA EVALUACION ECONOMICA DEL PROYECTO CON RIEGO POR GOTEO


3
10,345.82
9,843.94
501.88

4
10,345.82
6,928.54
3,417.28

5
10,345.82
6,928.54
3,417.28

6
10,345.82
9,843.94
501.88

7
10,345.82
6,928.54
3,417.28

8
10,345.82
6,928.54
3,417.28

9
10,031.44
6,772.04
3,259.41

10
10,031.44
6,772.04
3,259.41

85,963.42
69,941.05

9
10,345.82
9,843.94
501.88

10
10,345.82
6,928.54
3,417.28

88,709.07
79,015.95

Anda mungkin juga menyukai