Anda di halaman 1dari 17

DAFTAR HARGA BAHAN DAN UPAH KERJA

KEGIATAN
LOKASI
TAHUN ANGGARAN
NO
1

NAMA BAHAN
2
A. BAHAN PENGADAAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Modul Surya
Modul Support
Tiang Lampu Galvanasir
Box Baterai
Batteray VRLA Gal.
Lampu LED Ultra Bright + Rumah Lampu
BCU/BCR
Kabel Modul Surya ke BCU
Kabel BCU ke Lampu
Kabel Batteray ke BCU
Stang Ornamen
Klem
Duri Pengaman LPJU
Angker
Connector Material Instalasi
Kerikil
Semen PC (50 Kg/zak)
Pasir Beton
Mandor
Kepala Tukang
Tukang
Pekerja

: PENGADAAN LAMPU JALAN LED-PJU PANE


: Kab.Polewali mandar
: 2016
SAT
3

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
M3
M3
M3
OH
OH
OH
OH

DAN UPAH KERJA

NGADAAN LAMPU JALAN LED-PJU PANEL SOLAR


b.Polewali mandar

HARGA BAHAN
4

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,269,048
500,000
3,900,000
400,000
1,500,000
3,500,000
120,000
33,000
23,000
18,500
68,000
10,000
25,000
15,000
40,000
140,000
58,000
150,000
120,000
100,000
80,000
80,000

30

58000

1740000

DAFTAR ANALISA HARGA SATUAN


NO
I

URAIAN
Galian tanah dan urug kembali
1 Galian Tanah
- Pekerja
- Mandor

SATUAN
M3
oh
oh

KOEFISIEN

0.625
0.062

Ju
2 Urugan Tanah Kembali
- Pekerja
- Mandor

oh
oh

0.156
0.016

Ju
Jumla
II

Pekerjaan Beton Cor


- Kerikil
- Semen PC (50 Kg/zak)
- Pasir Beton
- Tukang
- Kepala Tukang
- Pekerja
- Mandor

M3
M3
M3
M3
oh
oh
oh
oh

0.8200
7.3920
0.5400
1.0000
0.1000
6.0000
0.3000

UAN
HARGA SATUAN

Rp
Rp

Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah

80,000 Rp
120,000 Rp
Jumlah 1 Rp
80,000
120,000
Jumlah 2
Jumlah 1+2

140,000
58,000
150,000
80,000
100,000
80,000
120,000

Jumlah

50,000
7,440
57,440
12,480
1,920
14,400
71,840

114,800
428,736
81,000
80,000
10,000
480,000
36,000
1,230,536

0.125

8,980.00

0.125

153,817.00

REKAPITULASI
PROGRAM

: PENNGKATAN SARANA DAN PRASARANA


FASILITAS UMUM
: PENGADAAN LAMPU JALAN PAKET III
: KECAMATAN BALANIPA DAN TINAMBUNG
: 2015
45 TITIK
: APBD

KEGIATAN
LOKASI
TAHUN ANGGARAN
VOLUME
SUMBER DANA
NO
A.
B.

URAIAN PEKERJAAN
PEKERJAAN PENGADAAN DAN PEMASANGAN
BIAYA PEMASANGAN

SAT.
UNIT
UNIT

HARGA SATUAN
Rp.
1.00
17,798,048.00
1.00
2,238,640.94
Jumlah Per Titik
Jumlah 45 Titik
Pajak 10%
Grand Total
Dibulatkan

VOL.

JUMLAH HARGA
Rp.
17,798,048.00
2,238,640.94
20,036,688.94
901,651,002.30
90,165,100.23
991,816,102.53
991,816,200.00

RENCANA ANGGARAN BIAYA


PROGRAM
KEGIATAN
LOKASI
TAHUN ANGGARAN
SUMBER DANA
NO
A.

URAIAN PEKERJAAN

SAT.

PEKERJAAN PENGADAAN DAN PEMASANGAN


I. SATU MATA LAMPU
a. Pengadaan Barang
1
Modul Surya
2
Modul Support
3
Tiang Lampu Galvanasir
4
Box Baterai
5
Batteray VRLA Gal.
6
Lampu LED Ultra Bright + Rumah Lampu
7
BCU/BCR
8
Kabel Modul Surya ke BCU
9
Kabel BCU ke Lampu
10 Kabel Batteray ke BCU
11 Stang Ornamen
12 Klem
13 Duri Pengaman LPJU
14 Angker
15 Connector Material Instalasi

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit

BIAYA
1
2
3
4

M3
M3
Ls
Ls

PEMASANGAN
Pek. Galian Tanah (0.5 x0.5x0.5 m)
Pek. Beton Bertulang untuk Pondasi (0.5x0.5x0.5 m)
Pek. Jaringan Besi Pengaman Batteray
Pek. Pemasangan Tiang Lampu dan Instalasi dan
Dudukan Batteray

: PENNGKATAN SARANA DAN PRASARANA


FASILITAS UMUM
: PENGADAAN LAMPU JALAN PAKET III
: KECAMATAN BALANIPA DAN TINAMBUNG
: 2015
: APBD
VOL.

HARGA SATUAN
Rp.

JUMLAH HARGA
Rp.

1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
7.00
2.00
1.00
2.00
1.00
4.00
1.00

7,269,048
500,000
3,900,000
400,000
1,500,000
3,500,000
120,000
33,000
23,000
18,500
68,000
10,000
25,000
15,000
40,000

7,269,048
500,000
3,900,000
400,000
1,500,000
3,500,000
120,000
198,000
161,000
37,000
68,000
20,000
25,000
60,000
40,000
17,798,048

0.125
0.125
1.00
1.00

71,840
838,808
223,244.94
1,167,608.00

8,980.00
838,808.00
223,244.94
1,167,608.00
2,238,640.94
20,036,688.94

1167608

89
4,825,588.90
20,090,909.04

54,220.10

RENCANA ANGGARAN BIAYA


KEGIATAN
LOKASI
TAHUN ANGGARAN
NO

URAIAN PEKERJAAN

PEKERJAAN PENGADAAN DAN PEMASANGAN


Lampu LED 40 Watt COB
Solar Panel
Controller
Battery Khusus Solar Cell
Tiang
Kabel & MC Konektor
Pembuatan angkur, Beton & Transportasi

: PENGADAAN LAMPU JALAN TENAGA SURYA


: Kab. Polewai Mandar
: 2016
SAT.
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Jumlah
Jumlah 302 Titik
PPN 10%
TOTAL

HARGA SATUAN
Rp.

VOL.
1.00
1.00
1.00
2.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,600,000
6,000,000
1,550,000
2,700,000
4,250,000
1,100,000
1,350,000

GA SURYA

JUMLAH HARGA
Rp.
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,600,000
6,000,000
1,550,000
5,400,000
4,250,000
1,100,000
1,350,000
21,250,000
6,417,500,000
641,750,000
7,059,250,000

7,097,000,000
Rp

(37,750,000)

TIME SCHEDUL
:
:
:
:

KEGIATAN
LOKASI
TAHUN ANGGARAN

NO
A.

URAIAN PEKERJAAN
PEKERJAAN PENGADAAN DAN PEMASANGAN

Jumlah

JUMLAH HARGA
6,417,500,000

6,417,500,000
Kumulatif Bulanan
Kumulatif Kemajuan

2016
PENGADAAN LAMPU JALAN TENAGA SURYA
Kab. Polewai Mandar
2016
BOBOT
%

JADWAL WAKTU PELAKSANAAN


BULAN I
1
2
3
100.00% 25.00% 25.00% 25.00%

100.00%
%
25.00% 25.00% 25.00%
%
25.00% 50.00% 75.00%

TENAGA SURYA

KETERANGAN
5

PHO

WAKTU PELAKSANAAN
LAN I
4
25.00%

25.00%
100.00%

#REF!

TIME SCHEDUL
: 2016
: PENGADAAN LAMPU JALAN TENAGA SURYA
: Kab. Polewai Mandar
: 2016

KEGIATAN
LOKASI
TAHUN ANGGARAN

NO

URAIAN PEKERJAAN

A.

PEKERJAAN PENGADAAN DAN PEMASANGAN

B.

BIAYA PEMASANGAN

JUMLAH HARGA
20,650,000

1,350,000

Jumlah

22,000,000
Kumulatif Bulanan
Kumulatif Kemajuan

BOBOT
%

JADWAL WAKTU PELAKSAN


BULAN I
1
2
3
93.86% 18.77% 18.77% 18.77%

6.14%

1.53%

1.53%

1.53%

100.00%
%
18.77% 20.31% 20.31%
%
18.77% 39.08% 59.39%

TENAGA SURYA

1.53%

1.53%

PHO

WAL WAKTU PELAKSANAAN


LAN I
BULAN II
4
5
6
18.77% 18.77%

20.31% 20.31%
79.69% 100.00% 100.00%

KETERANGAN

JADWAL PENGIRIMAN/PENYERAHAN BARANG

NO
1
2
3
4
5
6
7

Uraian Barang
Lampu LED 40 Watt COB
Solar Panel
Controller
Battery Khusus Solar Cell
Tiang
Kabel & MC Konektor
Pembuatan angkur, Beton & Transportasi

Satuan
Ukuran

: 2016

Tempat
Tujuan
Akhir

Unit
Unit
Unit
Unit
Unit
Unit
Unit

1
1
1
1
1
1
1

Polewali
Polewali
Polewali
Polewali
Polewali
Polewali
Polewali

Tanggal Tiba Kiriman


Tanggal Tiba
Kiriman Paling
Cepat

Tanggal Tiba
Kiriman Paling
Lambat

10/12/2016
10/12/2016
10/12/2016
10/12/2016
10/12/2016
10/12/2016
28/11/2016

12/11/2016
12/11/2016
12/11/2016
12/11/2016
12/11/2016
12/11/2016
12/11/2016

gal Tiba Kiriman


Usulan Tanggal Tiba Kiriman
oleh Peserta Pengadaan
11/12/2016 ( 11 Hari )
11/12/2016 ( 11 Hari )
11/12/2016 ( 11 Hari )
11/12/2016 ( 11 Hari )
11/12/2016 ( 11 Hari )
11/12/2016 ( 11 Hari )
11/12/2016 ( 8 Hari )

Anda mungkin juga menyukai