CONTRACT DATA
Part two - Data provided by the Contractor
Completion of the data in full is essential to create a complete contract.
General statements
The Contractor is
Name .......................................................
Address ....................................................
..................................................................
..................................................................
..................................................................
The working areas are the Site and any additional area as proposed by
the Contractor and accepted by the Project Manager under NEC clause
15.1. [Subject to review by Project Office]
The key people are [Optional Clause for Marking Scheme Approach]
(1) Name ..................................................................
Job ..................................................................
Responsibilities .................................................................
..................................................................
Qualifications..................................................................
Experience..................................................................
..................................................................
Job ..................................................................
Responsibilities .................................................................
..................................................................
Qualifications..................................................................
Experience..................................................................
..................................................................
-1-
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
..................................................................
Prices
A and C]
Prices
B and D]
-2-
X1 Price adjustment
for inflation
(as amended by the
Articles of Agreement)
[Applicable to building
contracts]
Factors are:
Table A for Schedule of Proportions for the works other than Building
(Column No.)
Percentage of
tendered prices
subject to adjustment
(%)
TENDER
LIMITS
(whole number)
(*)
Max. Min.
(1)
(2)
XX
XX
Aggregates
XX
XX
Portland cement
(ordinary)
XX
XX
Concrete blocks
XX
XX
Sand
XX
XX
Steel reinforcement
XX
XX
XX
XX
Timber formwork
XX
XX
Hardwood
XX
XX
Teak
XX
XX
XX
XX
Copper pipes
XX
XX
uPVC pipes
XX
XX
Glass
XX
XX
Paint
XX
XX
TOTAL
Calculated
Proportions
Index
Proportion (+)
(0.0085x(3))
(3)
(4)
0.1500
100
1.0000
-3-
Percentage of
tendered prices
subject to adjustment
LIMITS
Max. Min.
Calculated
Proportions
TENDER
(whole number)
(*)
Index
Proportion (+)
(0.0062x(3))
(3)
(4)
(Column No.)
(1)
(2)
General Workers
XX
XX
Refrigeration/ AC/
Ventilation Mechanic
XX
XX
XX
XX
XX
XX
XX
XX
XX
XX
GMS pipes
XX
XX
B.S. Equipment
0.2300
0.1500
TOTAL
100
1.0000
Notes:
(*)
(+)
The tenderer shall complete the following table by filling in the weighting
for each of the selected trades for computing the index figure of the
composite selected labour trades.
Table for Composite Selected Labour Trades
Labour Trades #
Weighting (%) **
100
Notes:
(#) The Census and Statistics Department publishes Average Daily
Wages of Workers Engaged in Public Sector Construction Projects as
Reported by Main Contractors for the occupations listed in this
column.
(**) To be filled in by the tenderer in whole numbers between 0 and 100.
The total shall equal to 100.
An index figure shall mean:
-5-
The base date for the index figures is the date 42 days prior to the date
for the return of tenders.
-6-
X1 Price adjustment The Schedule of Proportions used to calculate the Price Adjustment
for inflation
Factor are:
(as amended by the
Articles of Table for Schedule of Proportions
Agreement)
[Applicable to civil
Percentage of
Calculated
engineering
tendered
prices
Item of Labour and
Proportions
contracts]
subject to adjustment
Selected Materials
TENDER
Index
applicable to this
LIMITS
(whole number)
Proportion (+)
contract
(*)
(0.0085x(3))
Max. Min.
(Column No.)
(1)
(2)
XX
XX
Aggregates
XX
XX
Bitumen
XX
XX
Diesel fuel
XX
XX
Steel reinforcement
XX
XX
XX
XX
Portland cement
(ordinary)
XX
XX
Timber formwork
XX
XX
TOTAL
(3)
(4)
0.1500
100
1.0000
Notes:
(*)
-7-
Weighting (%) **
100
Notes:
(#) The Census and Statistics Department publishes Average Daily
Wages of Workers Engaged in Public Sector Construction Projects
as Reported by Main Contractors for the occupations listed in this
column.
(**) To be filled in by the tenderer in whole numbers between 0 and 100.
The total shall equal to 100.
An index figure shall mean:
The base date for the index figures is the date 42 days prior to the date
for the return of tenders.
Name
Signature
in the capacity of
duly authorized to sign tenders for and on behalf of
Date
Name of Witness
Signature of Witness
Occupation
Address of Witness