EXPRESSION OF INTEREST
Detailed Engineering Design and Study Report of Co-financing Water Supply &
Sanitation Projects in Urban/Semi Urban area.
SIDeF-BEAM Association
Lead Consultant (in case of JV)
EOI FORMS
Consultant Name: Sustainable Infrastructure
Development Foundation
Acronym: SIDeF
Acronym: BEAM
Consultant
Acronym
Address
EOI
Submission
Authorized
By
Position
Sustainable
Infrastructure
Development
Foundation
E-mail:
sidef@mail.com.np
JV (Lead)
Hare
Ram
Shresth
a
Executi
ve
Director
JV
Ram
Kumar
Raman
Yadav
Managi
ng
Director
Address:Sanepa,Lalitpur,Nepal
P.O.Box: 366, Lalitpur, Nepal
Phone: +977-1-5542783
BEAM
Consultant pvt.
Ltd.
BEAM
e-mail :
beamconsultant@gmail.co
m
Website:
www.beamconsultant.com
Present the rationale for and benefits of working in association (JV or Sub-consultant) with others
rather than undertaking the assignment independently (as appropriate). Describe the proposed
management and coordination approach of the association and the role of each firm.
Benefits of working in association or JV
Provide companies with the opportunity to gain new capacity and expertise.
Allow companies to enter related businesses or new geographic markets or gain new technological
knowledge access to greater resources, including specialized staff and technology sharing of risks
with a venture partner.
Joint ventures can be flexible. For example, a joint venture can have a limited life span and only
cover part of what we do, thus limiting both our commitment and the business' exposure.
In the era of divestiture and consolidation, JVs offer a creative way for companies to exit from
non-core businesses.
Companies can gradually separate a business from the rest of the organization, and eventually, sell
it to the other parent company.
The firm has the strong quality management network. The board of directors has handled various sections
such as Engineering, Management, Quality control, and Administrative. In selecting the member of staff to
undertake this assignment the JV has taken into consideration the high level of expertise that is required in
each discipline, and the environment in which the team members will have to work. The JV strongly
believes in strong management and administrative guidance in support of the Project. In order to effectively
address the requirements of the project and successful performance therefore, the JV has identified four
major elements and guarantees to honor these elements during the course of the Project:
a) Project Management Element: This element is responsible for the overall project, oversight of the
contract, financial monitoring, and technical quality,
b) Strong Project Team: The Project Team will possess strong professionalism and will be capable of
working in a coordinated manner,
c) Linkage and Coordination: They are required not only to be well maintained with the various offices
and personnel of client and the local bodies of the Project area, but also with the beneficiaries and their
organizations &
d) Logistic and Administrative Support Element : The Project management will be able to provide an
adequate backstopping to the Project Team, which is responsive to the Project requirement and appreciate
the time and quality honored delivery of the Project outputs.
As a Lead firm SIDeF will be responsible for Overall Coordination of the project enters into
correspondence with the Client and overall technical, Financial, administrative and logistics management of
the consulting services,
Whereas BEAM will be Responsible for Administrative works as well as technical works mainly Road,
water supply & Contract Management sector & technical Sector mainly in urban Development, Planning,
Water Supply, Preparation for different plan, Guideline Preparation etc.
I confirm that:
Documentation regarding our corporate structure including beneficial ownership has been attached.
Documentation regarding our Board of Directors has been attached.
A written agreement to associate for the purpose of this Expression of Interest has been signed
between the consortium partners and has been attached.
I. Assignment Specific Qualifications and Experience
A.
Technical Competence
1. Cross-referencing from your profile projects in Section E. Project References, highlight the technical
qualifications/experiences of your entity/consortium's in survey, design estimate of urban water supply
projects along with design of water treatment system, preparation of environmental and social safeguard
documents, structural design work of urban/semi urban water supply components and preparation of bid
documents with technical specification (as per assignments described in objective of work).
related to water supply and sanitation services proposed for each town project. Consultants were also involved in the
preparation of IEE reports of both sub projects. Services also include construction supervision of town projects on
town project basis as and when a small town that demonstrates its commitment to the project. Consultants will
accomplish task in coordination with NGO engaged in conducting software activities, including community
awareness and public education assignments, safeguarding assignments, environmental safeguarding assignments,
Training and Capacity building assignment for WUSCs/Local bodies.
Elaboration of various alternative scenario, preparation and also comparison of the alternatives for appraising the
town projects covering the technical, economical, financial, environmental, social as well as institutional aspects of
project appraisal. Prepare detail feasibility studies and preliminary design for the town projects in close coordination
with NGO, PMO/Town Project Office (TPO), WUSC and local authorities.
(IV)Detailed survey design, IEE, tender document preparation etc. of Main Town Water supply Scheme UEIP
project in Hetauda municipality
Nature of Service Provided:
Design and Construction supervision of Urban Water Supply Schemes.
Design and Construction supervision to enhance Functionality work of urban water Supply Schemes Water
supply and Sewerage management Plan
capacity building of WUSC in urban water supply schemes
Design and Construction supervision of Waste Water Management and Sanitation schemes
Perform community awareness and public education assignments
Perform social safeguarding assignments
Perform environmental safeguarding assignments
Perform Training and Capacity building assignment for WUSCs/Local bodies
Description of actual services provided by expert within the assignment:
Consulting services include feasibility study, detailed engineering survey and design, preparation of detailed
working drawings, cost estimates, economic and financial analysis, level of water tariff and contract documents
related to water supply and sanitation services proposed for each town project. Consultants were also involved in the
preparation of IEE reports of both sub projects. Services also include construction supervision of town projects on
town project basis as and when a small town that demonstrates its commitment to the project. Consultants will
accomplish task in coordination with NGO engaged in conducting software activities, including community
awareness and public education assignments, safeguarding assignments, environmental safeguarding assignments,
Training and Capacity building assignment for WUSCs/Local bodies.
(V) Survey, design, IEE & Construction supervision of Tulsipur Nagar Town Water Supply and Sanitation
Project under Small town water supply and sanitation sector project at Tulsipur, Ghorahi Municipality
,Dang District
Nature of Service Provided:
Design and Construction supervision of Urban Water Supply Schemes.
Design and Construction supervision to enhance Functionality work of urban water Supply Schemes Water
supply and Sewerage management Plan
capacity building of WUSC in urban water supply schemes
Design and Construction supervision of Waste Water Management and Sanitation schemes
Perform community awareness and public education assignments
Perform social safeguarding assignments
Perform environmental safeguarding assignments
Perform Training and Capacity building assignment for WUSCs/Local bodies
Description of actual services provided by expert within the assignment:
Consulting services include feasibility study, detailed engineering survey and design, preparation of detailed
working drawings, cost estimates, economic and financial analysis, level of water tariff and contract documents
related to water supply and sanitation services proposed for each town project. Consultants were also involved in the
preparation of IEE reports of both sub projects. Services also include construction supervision of town projects on
town project basis as and when a small town that demonstrates its commitment to the project. Consultants will
accomplish task in coordination with NGO engaged in conducting software activities, including community
awareness and public education assignments, safeguarding assignments, environmental safeguarding assignments,
Training and Capacity building assignment for WUSCs/Local bodies.
(VI)Survey, design, IEE & Construction supervision of Tribhuwan Nagar Town Water Supply and Sanitation
Project under Small town water supply and sanitation sector project at Tribhuwan Nagar Municipality
,Dang District
Nature of Service Provided:
Design and Construction supervision of Urban Water Supply Schemes.
Design and Construction supervision to enhance Functionality work of urban water Supply Schemes Water
supply and Sewerage management Plan
capacity building of WUSC in urban water supply schemes
Design and Construction supervision of Waste Water Management and Sanitation schemes
Perform community awareness and public education assignments
Perform social safeguarding assignments
Perform environmental safeguarding assignments
Perform Training and Capacity building assignment for WUSCs/Local bodies
Description of actual services provided by expert within the assignment:
Consulting services include feasibility study, detailed engineering survey and design, preparation of detailed
working drawings, cost estimates, economic and financial analysis, level of water tariff and contract documents
related to water supply and sanitation services proposed for each town project. Consultants were also involved in the
preparation of IEE reports of both sub projects. Services also include construction supervision of town projects on
town project basis as and when a small town that demonstrates its commitment to the project. Consultants will
accomplish task in coordination with NGO engaged in conducting software activities, including community
awareness and public education assignments, safeguarding assignments, environmental safeguarding assignments,
Training and Capacity building assignment for WUSCs/Local bodies.
Sustainable Infrastructure Development Foundation (Lead Firm) has following experiences under
(Ministry of Physical Planning and works now Ministry of Urban Development)
Detailed survey design, IEE, tender document preparation etc. of Kmanane Water supply Scheme
UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender document preparation etc. of Choughada Water supply Scheme
UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender document preparation etc. of Lamsuredanda Water supply
Scheme UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender document preparation etc. of Main Town Water supply Scheme
UEIP project in Hetauda municipality
Survey, design, IEE & Construction supervision of Tulsipur Nagar Town Water Supply and
Sanitation Project under Small town water supply and sanitation sector project at Tulsipur, Ghorahi
Municipality ,Dang District
Survey, design, IEE & Construction supervision of Tribhuwan Nagar Town Water Supply and
Sanitation Project under Small town water supply and sanitation sector project at Tribhuwan Nagar
Municipality ,Dang District
B.
Geographical Experience
Cross-referencing from your profile projects in Section E. Project References, present experiences in similar
geographic areas.
Detailed survey design, IEE, tender document preparation etc. of Kmanane Water supply Scheme
UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender document preparation etc. of Choughada Water supply Scheme
UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender document preparation etc. of Lamsuredanda Water supply
Scheme UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender document preparation etc. of Main Town Water supply Scheme
UEIP project in Hetauda municipality
Survey, design, IEE & Construction supervision of Tulsipur Nagar Town Water Supply and
Sanitation Project under Small town water supply and sanitation sector project at Tulsipur, Ghorahi
Municipality ,Dang District
Survey, design, IEE & Construction supervision of Tribhuwan Nagar Town Water Supply and
Sanitation Project under Small town water supply and sanitation sector project at Tribhuwan Nagar
consortium firms strive to provide best possible mechanism to ensure the continuity of professional service
once contracted. We understand that the satisfaction of professional will depicts the success of projects. The
professionals will be provided with good remuneration as per contract with allowances, per diem facilities,
transport and communication facilities, and fringe benefits, accidental and medical insurances. Apart from
these facilities the consortium will legally make contract with the professional with commitment to not
leaving the project till it is accomplished. In fact, in order to discourage the professionals from leaving
before their time period, in one of the project we handled as the local lead firm, we arranged for the
retention amount of 5% of the remaining amount which the professional will have to forfeit if he or she
leaves before the agreed time period. As per the agreement we carry out with the professionals they are
bound to inform us at least one month beforehand if they are to discontinue with us, and in this one month
we have up to now managed to find an equivalent or better replacement candidate.
5. Describe what social protection practices you have in place to safeguard the well-being of your
proposed experts? Specifically describe arrangements you have in place for medical, accident, and
life insurance coverage during the assignment.
After the identification and finalization of stakeholders with the Client, the Consultant will organize
stakeholders' consultation at local level. The issues to be discussed during this consultation will include:
Beneficiary participation issues including participation of disadvantaged and vulnerable
groups in decision making, planning and management
Potential social and environmental {positive and adverse) impacts of the project activities
on the livelihoods and quality of life and possible enhancement and mitigate measures
Management capacities and delivery mechanisms of local institutions
Governance issues- role of community leaders and elected people's representatives
Cultural property protection
Rehabilitation issues including safeguards & enhancement options and conflict resolution
mechanism
Training and institutional capacity building
Inputs into the enhancement of participation mechanisms.
The above mentioned mechanisms will definitely make friendly and cooperative environment to our team
and stakeholders, which will ease in effective implementation of the approach and methodology team has
proposed. The consortium will make special arrangements for insurance coverage for 10 years for the
personnel assigned for the project. This will cover the project period which will be an added incentive
during the assignment. This will ensure quality outputs for the assigned staff which has been standard
policy for every project undertaken by the consortium. For this purpose, the proposed personnel will be
provided Rs, 5,00,000 as personnel insurance during the assignment. We also make provision for the
medical expenses of Rs. 4,000 on annual basis for each and every professional to be involved in our
projects.
6. Describe capacity of key manpower of the firm in Survey, Design & Estimation of large
infrastructure projects.
The team will be selected for the smooth and effective completion of the project with due consideration to
the requirement of ToR. The tasks envisaged in the proposed job as stated in this is called for inputs from
multidisciplinary team of experts with each and every member contributing to his area of expertise
systematically and meticulously.
The key expert of the consulting team for the service will be selected among the list shown in (VI).
The team for this job will be composed to carry out the tasks in a coherent, comprehensive, and integrated
manner to obtain the best output. The team listed below in (VI) has been selected because:
All of them have excellent qualifications in the work required and are full abreast with the technical
advances in their particular field of interest
All of them have matching experience and have successfully completed similar assignments as well
as has experience of handling large projects of other and similar field.
All of them are able to relate and communicate quickly and easily to the clients need and with each
other
Most of them have similar geographical experience
All of them have high level of inter-personal qualities to listen to the views of others impartially
Remarks
Lead Firm
JV Firm
Fiscal Year
Turnover
Remarks
2069/070
1,55,41,914.00
2068/069
2,12,30,326.00
2067/068
2,29,31,636.00
Total
59,703,876.00
1,99,01,292.00
BEAM:
FY
Adjustment
factor as per
NRB
Gross Annual
Turnover
069/070
2,86,26,505.92
1.199
1,65,18,049.00
070/071
071/072
2,43,07,285.25
1,64,42,165.81
1.311
1.383
2,01,70,067.00
2,78,80,279.00
Total
6,45,68,395.00
Feasibility Study, Detailed Eng. Survey, Soil Investigation, Hydrological Study and Detailed
Design of Bridges 1. Jalladi Bridge, Dhanusha 2. Aurahi Bridge, Dhanusha, 3. Shivpur Bridge,
Dhanusha, 4. Gwang Bridge, Sindhuli, 5. Jangha Bridge, Mahottari 6. Uttimpur-Laliya Bridge,
Dhanusha.
Feasibility Study of Midhill Highway (Package: MH2-PMEU-069/70, Pokhara-Baglung -Musikot
Border- Rukumkot-Rukumkot-Musikot -Chourjahari -Dailekh -Lainchour -Saijula BelkhetMangalsen-Silgadhi -Satbanjh -Jhulaghat Section) (700 KM).
IEE study of Agaiya-Narinpur Road, Nepalgunj district.
Geotechnical Investigation of Slope for Road Slope Disaster Management of Koshi Highway and
Hile Bhojpur Feeder Road.
Preparation/Upgrading of DTMP of 20 District such as (Nuwakot, Rasuwa, Bara, Parsa, Rauthat,
Sarlahi, Dhanusha, Mahottari, Udaypur, Tanhu, Gorkha, Baglung, Gulmi, Salyan, Dang, Banke,
Kanchanpur, Pyuthan, Arghakhanchi, Rupandehi)Detailed Engineering Survey, Design, Cost
Estimate and Report Preparation of Bhangeri Dandagaun Majhuwa, Fulkharka-Besari-Mannu Road
in Dhading District.
Detailed Topographic Survey, Architectural, Structure and Land Scape Design including Electrical
and Sanitary Design with BOQ and specification of Convention Centre at Doti, Dipayal.
Detailed Feasibility Study of Pilchaur - Majhkula Irrigation Project at Kailali.
Baseline Survey of daulatpur, Haripur, Kusaha, Madhupatti VDCs of Saptari District.
Detail Engineering Survey, Design, and Cost Estimate of Khandbari Municipality Water Supply
Project under Maintenance and Rehabilitation Programme.
Special Inspection, Assessment, Design and Supervision of Maintenance and Repair Works of
Maikhola Bridge on Mechi Highway, (Contract No.: BP/337158-4/BMDS/2068/69-01).
Professionals qualification and experience in related field:
The firms possess number of individuals in-house as well as ready on call professionals for different
disciplines. For this particular job as well we have specially qualified Water supply and sanitation Sector
engineers. Provided in Annex II
E. Project References
Please select most relevant projects to demonstrate the firms technical qualifications and geographical
experience (maximum 10 projects including JV) with projects of this nature and scale.
SN
1
Project
Detailed survey design, IEE, tender
document preparation etc. of Kmanane
Water supply Scheme UEIP project in
Hetauda municipality.
Detailed survey design, IEE, tender
document preparation etc. of Choughada
Water supply Scheme UEIP project in
Hetauda municipality.
Detailed survey design, IEE, tender
document preparation etc. of
Lamsuredanda Water supply Scheme
UEIP project in Hetauda municipality.
Detailed survey design, IEE, tender
document preparation etc. of Main Town
Water supply Scheme UEIP project in
Hetauda municipality
Period
Client
Country
Firm
9.0 Months
UEIP Hetauda
Municipality-ADB
Funded.
Nepal
SIDeF
9.0 Months
UEIP Hetauda
Municipality-ADB
Funded
Nepal
SIDeF
5.0 Months
UEIP Hetauda
Municipality-ADB
Funded
Nepal
SIDeF
5.0 Months
UEIP Hetauda
Municipality-ADB
Funded
Nepal
SIDeF
10
11
2.5 years
Nepal
SIDeF
2.5 years
Nepal
SIDeF
4.0 Months
DUDBC
Nepal
DIGICON
Nepal
DIGICON
Nepal
DIGICON
Nepal
DIGICON
Nepal
DIGICON
4.0 Months
4.0 Months
DUDBC
DUDBC
3.5 Months
DUDBC
3.5 Months
DUDBC
Project Summary
SIDeF
SN 1
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Detailed survey design, IEE, tender document preparation etc. of Kmanane Water
supply Scheme UEIP project in Hetauda municipality.
Nepal/Central
May 2006
March-2007
Continuous
UEIP Hetauda Municipality
ADB Funded
Description
SN 2
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Description
SN 3
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Detailed survey design, IEE, tender document preparation etc. of Choughada Water
supply Scheme UEIP project in Hetauda municipality
Nepal/Central
October 2006
March 2007
Continuous
UEIP Hetauda Municipality
ADB Funded
Detailed Engineering Design, Tender documentation
Preparation of IEE Report
Presentation and workshop
Water tariff calculation
Assessment of land acquisition, compensation,
Resettlement and relocation issues and socio-economic survey, preparation of
socio technical profile,
benefit monitoring evaluation, co-ordination with tole lane organizations and
WUC, water quality test,
Technical specification,
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
operation & maintenance requirements
Total Man Month:
Description
SN 4
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Description
SN 5
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Detailed survey design, IEE, tender document preparation etc. of Main Town Water
supply Scheme UEIP project in Hetauda municipality
Nepal/Central
October 2006
March 2007
Continuous
UEIP Hetauda Municipality
ADB Funded
Detailed Engineering Design, Tender documentation
Preparation of IEE Report
Presentation and workshop
Water tariff calculation
Assessment of land acquisition, compensation,
Resettlement and relocation issues and socio-economic survey, preparation of
socio technical profile,
benefit monitoring evaluation, co-ordination with tole lane organizations and
WUC, water quality test,
Technical specification,
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
operation & maintenance requirements
Total Man Month:
Survey, design, IEE & Construction supervision of Tulsipur Nagar Town Water
Supply and Sanitation Project under Small town water supply and sanitation sector
project at Tulsipur, Ghorahi Municipality ,Dang District
Nepal/Central
Continuous
Department of Water supply and Sewerage, Small Town Project
Funding Source
Description
SN 6
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Description
ADB Funded
Detailed Engineering Design, Tender documentation
Preparation of IEE Report
Presentation and workshop
Water tariff calculation
Assessment of land acquisition, compensation,
Resettlement and relocation issues and socio-economic survey, preparation of
socio technical profile,
benefit monitoring evaluation, co-ordination with tole lane organizations and
WUC, water quality test,
Technical specification,
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
operation & maintenance requirements
Total Man Month:
Survey, design, IEE & Construction supervision of Tribhuwan Nagar Town Water
Supply and Sanitation Project under Small town water supply and sanitation sector
project at Tribhuwan Nagar Municipality ,Dang District
Nepal/Central
Continuous
Department of Water supply and Sewerage, Small Town Project
ADB Funded
Detailed Engineering Design, Tender documentation
Preparation of IEE Report
Presentation and workshop
Water tariff calculation
Assessment of land acquisition, compensation,
Resettlement and relocation issues and socio-economic survey, preparation of
socio technical profile,
benefit monitoring evaluation, co-ordination with tole lane organizations and
WUC, water quality test,
Technical specification,
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
operation & maintenance requirements
Total Man Month:
DIGICON
SN 7
Project Title
Country / Region
Start Date
Completion Date
Feasibility study of Water supply sources DPR Preparation of one feasible water
supply and Sanitation project of Khurkot market centre of Sindhuli District.
Nepal/Central
2068-11-12
2069-03-12
Continuous /
Intermittent
Client
Funding Source
Description
SN 8
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Description
SN 9
Project Title
Country / Region
Start Date
Completion Date
Continuous
Department of Urban Development and Building construction-DUDBC
Government of Nepal
(Conduct Stake Holders Meeting in the Siraha Municipality,Siraha
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
Carry out field Survey of existing infrastructures like roads, drainage,
educational institutions, water supply pipe line and other infrastructures in the
Municipality.
Preparation of Detailed Project Report of Water supply, road and sewerage
drainage network system of Plan Siraha Municipality, Siraha.
Detailed Drawing, Design and cost estimate of the Projects.
Preparation of Tender document and Bill of Quantity (BOQ) of the projects.
Preparation of final Report of the project.
Formulation of Plan for operation & maintenance requirements
Total Man Month:
Feasibility study of Water supply sources DPR Preparation of one feasible water
supply and sanitation project of Baireni market centre of Dhading District.
Nepal/Central
2068-11-23
2069-03-25
Continuous
Department of Urban Development and Building construction-DUDBC
Government of Nepal
(Conduct Stake Holders Meeting in the Siraha Municipality,Siraha
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
Carry out field Survey of existing infrastructures like roads, drainage,
educational institutions, water supply pipe line and other infrastructures in the
Municipality.
Preparation of Detailed Project Report of Water supply, road and sewerage
drainage network system of Plan Siraha Municipality, Siraha.
Detailed Drawing, Design and cost estimate of the Projects.
Preparation of Tender document and Bill of Quantity (BOQ) of the projects.
Preparation of final Report of the project.
Formulation of Plan for operation & maintenance requirements
Total Man Month:
Feasibility study of Water supply sources and DPR Preparation of one feasible
water supply and sanitation project of Burtibang Market centre of Baglung
District
Nepal/Western
2068-11-23
2069-03-25
Continuous /
Intermittent
Client
Funding Source
Description
SN 10
Project Title
Country / Region
Start Date
Completion Date
Continuous /
Intermittent
Client
Funding Source
Description
Continuous
Department of Urban Development and Building construction-DUDBC
Government of Nepal
(Conduct Stake Holders Meeting in the Siraha Municipality,Siraha
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
Carry out field Survey of existing infrastructures like roads, drainage,
educational institutions, water supply pipe line and other infrastructures in the
Municipality.
Preparation of Detailed Project Report of Water supply, road and sewerage
drainage network system of Plan Siraha Municipality, Siraha.
Detailed Drawing, Design and cost estimate of the Projects.
Preparation of Tender document and Bill of Quantity (BOQ) of the projects.
Preparation of final Report of the project.
Formulation of Plan for operation & maintenance requirements
Total Man Month:
Preparation of Detailed Project Report (DPR) of Storm Water Drainage and
Sewerage System Proposed for Saudi Fund Development for Rajbiraj Municipality.
Nepal/Eastern
2067-12-15
2069-03-20
Continuous
Department of Urban Development and Building construction-DUDBC
Government of Nepal
(Conduct Stake Holders Meeting in the Siraha Municipality,Siraha
Ascertain population and coverage area, project cost, community contribution,
detailed construction works,
Carry out field Survey of existing infrastructures like roads, drainage,
educational institutions, water supply pipe line and other infrastructures in the
Municipality.
Preparation of Detailed Project Report of Water supply, road and sewerage
drainage network system of Plan Siraha Municipality, Siraha.
Detailed Drawing, Design and cost estimate of the Projects.
Preparation of Tender document and Bill of Quantity (BOQ) of the projects.
Preparation of final Report of the project.
Formulation of Plan for operation & maintenance requirements
Total Man Month:
N 11
Preparation of Detailed Project Report (DPR) of Storm Water Drainage and
Sewerage System Proposed for Saudi Fund Development for Siraha Municipality.
Country / Region
Nepal/Eastern
Start Date
2067-12-15
Completion Date
2068-03-25
Continuous
/ Continuous
Project Title
Intermittent
Client
Funding Source
Description
II. Key Considerations in approaching this assignment (no more than 3,000 characters
requirements ,especially those of the project affected people; gauging stakeholders level of understanding;
identifying their interest and level of influence both positive and negative, communication of these
interests; identifying strategic approaches and materials for engaging stakeholders through various
communication and media channels that will be critical to sharing information, building consensus and
supporting project objectives. We would suggest also to analyze the media and communication channels
that will be critical to sharing information, build consensus and support the project objectives; and evaluate
the communication capacity of the relevant institutions both Client and non-government that are
involved in the implementation and/or managing the implementation of the communication program.
FORMULATION OF APPROACH AND METHODOLOGY:
The Technical approach and methodology have been formulated following a logical sequence and is shown
in the figure below.
Methodology
Approach
Understan
ding of the
Objectives
Identified
Problems /
Resolution
s
Define
Major
Activities
Breakdow
n of
Activities
into Tasks
and
Analyse
Tasks of
inputs /
outputs /
time
frame
Organise
Activity /
Tasks / Sub
Tasks in
Sequencer
sub-tasks
Work
Plan
Organiza
tion
In the technical approach to services, Activities have been identified based on the requirements of the
TOR. The scope of work detailed in the TOR are detailed enough to meet the requirements.
DETAILED METHODOLOGY:
Based on our understanding of the objectives and the detail given in TOR for the services, our technical,
management, participatory, general, innovativeness and technology transfer approaches, an appropriate
methodology has been developed by the Consultant. Since the scope of services covers some independent
and interdependent activities, it is proposed to follow "ACTIVITY /TASK APPROACH" to carry out the
entire work comprehensively and accurately to the complete satisfaction of the Client. The whole foreseen
scope of work has thus been organized into different Task Groups, which will allow better monitoring,
compliance and QA/QC during the entire duration of Consultancy services. Depending on the nature of
each task and their relationship as well as the project completion time including immediate targets, a
suitable Work Plan/Schedule will be prepared separately for each to ensure satisfactory completion of
services. However, these may require modifications or adjustments, inter alias, for addressing additional
issues or conditions encountered during the provision of services. Should such modifications become
necessary, these will be suitably reviewed and discussed with the Client and appropriate approval obtained.
Several tasks may be started simultaneously and thus their serial numbers do not necessarily reflect any
sequential order. The text in italics of each task denotes the corresponding activities as referred to in the
TOR. Methodology is developed by dividing the works contained in TOR into different tasks and sub-tasks.
Major components of consultants services are defined in terms of Task Series.
Each task will be broken down in to various relevant sub task and activities within them and is detailed
below in chart.
Diagram of the Service Methodology
III.
Key Experts
List of experts is only required for Consultants Qualifications Selection (CQS).
SN
Name
Nationalit
y
Position/Title
Qualification/Experienc
e
1
2
3
4
5
(Please insert
IV.
EOI Attachments
SN
Description
1
Certificate of Incorporation of the lead member (Attached in ANNEX)
2
Certificate of Incorporation of the JV member (for each member) (Attached in ANNEX)
3
Certificate of Incorporation of the Sub-Consultant (for each sub-consultant) (Attached in ANNEX)
4
Letter of Association (Attached )
5
Registration with VAT and Income Tax Offices (Provided in Annex)
(Please insert more rows as necessary)
V.
Eligibility Declaration
We, the undersigned, certify to the best of our knowledge and belief:
We confirm that the project references submitted as part of this EOI accurately reflect the
experience of the specified firm/consortium.
The lead entity and JV member or sub-consultant are NOT currently sanctioned by any government
agency. Neither the consulting firm nor the JV member or sub-consultant has ever been convicted
of an integrity-related offense or crime related to theft, corruption, fraud, collusion or coercion.
We understand that it is our obligation to notify any member of the consortium become ineligible to
work or be convicted of an integrity-related offense or crime as described above.
JV member or sub-consultant, including all proposed experts named in this EOI, confirmed their
interest in this activity in writing.
JV member or sub-consultant, including all proposed experts named in this EOI, authorized us in
writing to represent them in expressing interest in this activity.
None of the proposed consortiums are subsidiaries of and/or dependent on the Executing Agency or
the Implementing Agency or individuals related to them.
We understand that any misrepresentations that knowingly or recklessly mislead, or attempt to
mislead may lead to the automatic rejection of the proposal or cancellation of the contract, if
awarded, and may result in further remedial action.