Spreadsheets to EC2
Client
Advisory Group
Location
Date
Rod
Summary 1
1
A
Revision
chg
2003-2017 TCC
239
6-Jan-17
Checked
Page
Job No
FB625
Rotate 90 for frames centred on NS gridlines.
4
Rebar
Layering
B1 & T1
B2 & T2
D
TO SCALE PLAN
VALIDITY
Grid
Grid
Grid
Grid
PUNCHING
Deflection
%age As
End bar
1
2
3
4
Grid A
Grid B
Grid C
Grid D
Deflection
%age As
End bar
Heads with a 525 projection should give few or no links at internal columns.
Alternatively, increases in top steel over columns will reduce link requirements.
REINFORCEMENT
Quantities allow for laps, but not for wastage, rationalisation or steel increases for shear.
Total weight, Tonnes 17.55
Rebar density, kg/m 84.1