Anda di halaman 1dari 1

Project

Spreadsheets to EC2

Client

Advisory Group

Location

Third floor slab

The Concrete Centre


Made by

Date

Rod

Originated from TCC33X.xlsm v 4.8 on CD

Summary 1
1
A

Revision

chg

2003-2017 TCC

239

6-Jan-17

Checked

FLAT SLAB ANALYSIS & DESIGN to EN 1992-1 : 2004

Page

Job No

FB625
Rotate 90 for frames centred on NS gridlines.

4
Rebar
Layering
B1 & T1

B2 & T2

D
TO SCALE PLAN
VALIDITY
Grid
Grid
Grid
Grid

PUNCHING

Legend for frames on EW gridlines

Deflection

%age As

End bar

1
2
3
4

Grid A
Grid B
Grid C
Grid D

Deflection

%age As

End bar

MANY STUDS/LINKS REQUIRED

Heads with a 525 projection should give few or no links at internal columns.

See page Summary 8

Alternatively, increases in top steel over columns will reduce link requirements.

REINFORCEMENT

Estimated quantities (excluding any shear links)

Quantities allow for laps, but not for wastage, rationalisation or steel increases for shear.
Total weight, Tonnes 17.55
Rebar density, kg/m 84.1

Concrete volume, m 208.8


Rebar density, kg/m 26.1