Phone
Fax
:
:
021021-
:
:
:
Commodity
2.
3.
Quantity
Quality
:
:
Description
Gross Calorific Value (ARB)
Total Moisture(ARB)
Inherent Moisture(ADB)
Total Sulphur (ADB)
Ash Content (ADB)
Volatile Matters(ADB)
Fixed Carbon (ADB)
HGI
Size 0-50mm (crushed)
Above 50mm
4.
Guarantee
4600 Kcal/kg
28%
15% approx.
1% max
6%
42% approx.
By different
45 approx.
90% min
10%
Rejection
Below 4400 Kcal/kg
Above 30%
Above 9%
-
Price/Terms of Delivery:
IDR.390.000 /MT (IDR three hundred ninety thousand ) FOB barge at loading jetty based on 4600
Kcal/kg (ARB), TM (ARB) 28%.
Export documents fee (PEB), clearance of tug/barge, tax and royalty fee are included by IUP holder,
but excluding barges freight and loading costs from barge to the mother vessel.
Page 1 of 5
5.
Delivery/Laycan Period:
1) coal to be delivered and lifted within 14th 20thNovember, 2016
(Any urgent lifting is subject to final availability of jettys slot)
2) For each lifting, Buyer shall give Seller Shipping Instruction (SI) with complete details immediately
soon after Signing of Contract or upon acceptance of laycan with confirmation of fixed MVs laycan
for Sellerto secure jettys slot.
3) SELLER will start barging only upon receipt of full payment from BUYER.
6.
Loading Jetty
7.
Surveyor
PT. GEOSERVICES
8.
8.1
8.2
ASH Content
In the event that the actual ASH content (ADB) at the loading jetty is above 6%, Seller will pay Buyer
Penalty of USD0.10/MT (US$ Tencents) per 1% ASH above 6% up to 9%, fractions pro-rata
basis. If actualASH content above 6%, then the adjustment formula is:
Penalty ASH
Adjusted Invoice FOB Price
9.
10.
Terms of Payment
BUYER to make payment to SELLER as follow:
10.1
BUYER will arrange TT according to quantity to be lifted, i.e. (IDR 390.000 X MT) to theSELLER
upon
receiving Sellers Proforma Invoice.
Copy of bank swift TT to be faxed/emailed to Seller for tracking.
10.2
As Down Payment 10 % at sign Contract and the rest Seller must receive/sight the full payment at
least 2 working days prior to barging.
10.3
In the event the TT payment is not received in accordance with clause 10.1 and 10.2 , the contract
shall be considered null and void. In which case, SELLER shall not be liable to any claims and
damages.
10.4
Upon receipt of Seller following documents. Buyer will settle within 5 working days amount due to
Seller, if any, after stating the calculation of price adjustment in accordance with Clause 8.
a.
b.
c.
d.
e.
Sellers signed Commercial Invoice (with price adjustment if any) in 1 original & 1 copy
Composite Certificate of Analysis issued by surveyor (article 7) in 1 original & 2 copies
Composite Certificate of Weight issued by surveyor (article 7) in 1 original & 2 copies
Draft Survey Report issued by surveyor (article 7) in 1 original & 2 copies
Full sets (3/3) clean on board barge Bills of Lading marked freight payable as per charter
party consignee and notify party to be advised at time of shipment.
f. Surat Keterangan Asal Barang (SKAB) issued by CV KKE in 1 original & 2 copies.
g. Surat Keterangan Pengiriman Barang (SKPB) issued by CV KKE in 1 original & 2 copies
xx/WUS-xxx/X/2014 1ST ORIGINAL
Page 2 of 5
:
:
:
:
Bank BCA
Wira Usaha Sejahtera
11.
12.
Weight Determination
Weight determination shall be as per barges Draft Survey to be performed at loadingjetty by surveyor
(article 7),whose results will be final and binding for both parties and basis for invoicing.
Cost shall be atSellers account.
13.
MARITIME CONDITIONS
13.1
Nomination of Barge
Buyer shall nominate suitable performing tug/barge to Seller by fax or email for Sellers acceptance
at least 3 days prior to fixture or eta at loading jetty within the agreed LAYCAN (Article 5).
Seller to reply within 24 hours by fax or email notifying acceptance of the nominated tug/barge which
Accept ance shall not beunduly withheld.
13.2
13.3
13.4
Loadrate
The Seller guarantees each barge loading to complete within 1 day (PWWD SHINC), excluding
5 major Indonesian holidays, i.e. 2 Days of IdulFitri, 1 day of Good Friday, 1 day of IdulAdha, 1 day
of New Years Day and 1 day of National Day.
13.5
14.
14.1
Risk with respect to the coal delivered shall pass on from the SELLER to the BUYER when the
Said coal progressively passes the barges railing at loading jetty.
14,2
Title and ownership of the coal delivered shall pass on from the SELLER totheBUYER once full
paymenthas been received by theSELLER.
15.
CONFIDENTIALITY
Both Parties take this agreement as strict confidential and will not disclose to any entity the contents of
this Agreement without prior written consent of the other Party, partially or wholly, during the contract
duration and 1 year after the completion of the Agreement (including but not limited to Price, Quality
Page 3 of 5
FORCE MAJEUR
If at any time during the existence of this contract neither part is unable to perform in whole or in part
any obligation under this contract including, without limitation of war, warlike condition, riots, hostility,
military operation, acts of enemies, revolution, civil commotion, sabotage, quarantine restriction,
explosions, fires, flood, windstorm, earthquake, river side and other natural catastrophes or acts of
GOD, national or provincial emergency, labor or citizens disturbances of any kind, order, acts or
Omissions of any Governmental agency/authority (prohibition of export or import), epidemics, strikes,
or any labour dispute, blockade, embargoes. Within 7 (seven) days of force majeure conditions, the
affected party shall inform the other party giving details of:
a.
b.
c.
d.
Either party may write to the other party to notify the cessation of the force majeur condition.
Supporting governmental or internationally recognized publications must be exhibited to evidence the
cessation.
Should above condition last more than 30 (Thirty) days, either party will have the right to refuse further
performance of the contract in which case neither party shall have the right to claim eventual
damages.
17.
DISPUTE SETTLEMENT
In case of dispute, both Parties shall put as much as possible effort to resolve it amicably. Should
amicable settlement is not achieved within 30 (thirty) days, the Parties shall proceed to mediation.
Either party may propose the Mediator, but both Parties shall agree on the appointment. If no
agreement can be reached, then the Parties will accept a Mediator proposed by BANI in Jakarta.
The conduct of mediation shall be undertaken in accordance with the Rules of the ICC.
Mediation proceedings shall take place in Singapore, or any other venue agreed by the Parties. The
Mediators decision shall be final and binding on the Parties, and neither Party shall institute any further
claims in any court related to the Mediators decision.
The cost of mediator shall be borne equally by both Parties.
18.
GOVERNING LAW
This agreement and the rights, privileges, duties and obligations of the parties herein under shall be
governed by and construed in accordance with the Laws of Singapore and jurisdiction of the courts of
Singapore.
19.
20.
CORRESPONDENCES
All notices, consent, request including correspondences and invoices, relating to this agreement shall
be sent to theParties address as set forth below:
TO BUYER :
Address
:
Phone
Fax
Email
+62-542 421981
+62-542 421981
:
:
:
heri.mdc@gmail.com
Page 4 of 5
TO SELLER:
Address
Phone
Facsimile
Email
Both parties, executed by their duly authorized signatory hereby finalize this Sales Contract by affixing their
signatures and companys stamp.
SELLER:
BUYER:
HERI JULIANTO
director
Page 5 of 5