Subject: Rail Shim Plate Verification

Prepared by:

Date:
Job No:

Title: Shim Plate Verification on BOP Overhead Crane STBD Rail


Ref:

Design Considerations:

The maximum force applied on the rail was based on Reaction Forces Report "G1435-N-RD-001"
from NOV, Load Case 205 on support F4. The Rail between the shims plates was considered as
beam fixed at both ends with uniform load over entire span.

Design Data:
Maximum Reaction Force on the Rail:
Roller Support Length:
Span of the Shim:
Load Distribution:

Fz =
s=
l=
w=

1053
600
350
1755

kN
mm
mm
Nmm

fy =
120
75

355

N/mm
Width of the Top Rail:
Height of the Top Rail:

Rail Information:
Specified Min. Yield of the Rail:
Width of the Rail:
b=
Height of the Rail:
h=

ID
Rail
Top Rail
Total

b
cm
12,00
10,00

h
cm
7,50
1,50
9,00

mm
mm
y

Ay

cm
90,00
15,00
105,00

cm
3,75
8,25
4,39

cm.cm
337,50
123,75
461,25

Section Modulus Top:


Section Modulus Bot:

SMtop =
SMbot =

155,95
148,69

cm
cm

Section Modulus Min:

SMmin =

148,69

cm

d
cm
0,64
-3,86

bt =
ht =

100
15
Io
4

cm
421,88
2,81

mm
mm
Ixx = Io + Ad
4
cm
459,07
225,98
685,04

Bending Verification:
Maximum Bending Moment:
Required Rail Section Modulus:
Current Rail Section Modulus:

Mmax =
SMreq =
SM =

1,79E+07
84,11
148,69

Nmm
cm
cm

Mmax = w.l / 12
SMreq = Mmax / (0,6.fy)

Vmax =
AshearReq =
Ashear =

307125
21,63
105,00

N
cm
cm

Vmax = w.l / 2
AshearReq = Vmax / (0,4.fy)

fcombined =
fadm =

130,71
142,00

N/mm
N/mm

fcomb = ((Mmax/SMreq)^2+3.(Vmax/Ashear)^2)
Ok
fadm = 0,4.fy

Ok

Shear Verification:
Maximum Shear Force:
Required Rail Shear Area:
Current Rail Shear Area:

Ok

Combined Load Verification


Combined Load:
Maximum Allowed Combined Load: