Anda di halaman 1dari 118

A N A L I S A

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

B E T O N

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.B )


1

Pek.Pondasi Type.P1. 1200x1200x200 ( 130 Kg ) K.250


3.472
0.288
Bekisting/m3 Besi Atas
12.00
3.333
Besi Bawah
24.00

#REF!

12.48
24.96

13 mm
13 mm

TOTA L

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

#REF!

1.040
1.040

37.44
130.00

NO.

#REF!

Berat
kg

#REF!

#REF!

#REF!

#REF!
Profit & Over

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.B )


2

Pek.Kolom.K1.200x200 ( 217,49 Kg ) K.250


25.000
0.040
Bekisting/m3 Sengkang
7.11
20.000
Besi Pokok
4.00
Stek 40 D
1.66

2.81
4.16
1.73

2.81
70.22
TOTA L

5.89
147.26
217.49

8 mm
13 mm
13 mm

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.395
1.040
1.040

NO.

URAIAN PEKERJAAN

Total

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.B )


3

Pek.Tie Biem TB1.150x300 ( 309,39 Kg ) K.250


22.222
0.045
Bekisting/m3 Sengkang
7.20
4.44
13.333
Besi Pokok
6.00

4.44
98.72
TOTA L

NO.

URAIAN PEKERJAAN

Total

9.48

10 mm
16 mm

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.617
1.580

9.48
210.67
309.39

Ttl.Bs.Polos

#REF!

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.B )


4

Pek.Plat Lantai t = 10 cm ( 82,27 Kg ) K.250


10.000
0.100
Bekisting/m3 Besi Pokok &
13.33
1.018
Besi Bagi

8.23

8.23
82.27
TOTA L

10 mm

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.617

NO.

URAIAN PEKERJAAN

Total

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

BANGUNAN POS JAGA ( 19.B )


ELEVASI + 2.550
Pek.Plat Lantai t = 10 cm ( 82,27 Kg ) K.250
10.000
0.100
Bekisting/m3 Besi Pokok &
13.33
10.000
Besi Bagi

8.23

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

10 mm

8.23
82.27

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

BANGUNAN POS JAGA ( 19.B )


ELEVASI + 2.750.
Pek.Balok B1.150x200 ( 212,40 Kg ) K.250
33.333
0.030
Bekisting/m3 Sengkang
5.60
18.333
Besi Pokok
4.00

2.21
4.16

2.21
73.73
TOTA L

4.16
138.67
212.40

Besi Beton
diameter

8 mm
13 mm

Beton.K.250
( Rp )/m3

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.617

TOTA L

NO.

Beton.K.250
( Rp )/m3

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.395
1.040

NO.

URAIAN PEKERJAAN

Total

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

BANGUNAN POS JAGA ( 19.B )


ELEVASI + 2.750.
Pek.Balok G1.150x300 ( 202,87 Kg ) K.250.
22.222
0.045
Bekisting/m3 Sengkang
7.20
16.667
Besi Pokok
6.00

2.84
6.24

2.84
63.20

URAIAN PEKERJAAN

Total

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

8 mm
13 mm

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

Beton.K.250
( Rp )/m3

Beton.K.250
( Rp )/m3

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.395
1.040

6.24
138.67
201.87

TOTA L

NO.

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.A )


1

Pek.Pondasi Type.P1. 1400x1400x200 ( 126,29 Kg ) K.250


2.551
0.392
Bekisting/m3 Besi Atas
15.87
2.857
Besi Bawah
31.73

#REF!

16.50
33.00

13 mm
13 mm

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

1.040
1.040

49.50
126.29
TOTA L

#REF!

NO.

URAIAN PEKERJAAN

Total

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.A )


2

Pek.Kolom.K1.200x200 ( 217,49 Kg ) K.250


25.000
0.040
Bekisting/m3 Sengkang
7.11
20.000
Besi Pokok
4.00
Stek 40 D
1.66

2.81
4.16
1.73

2.81
70.22
TOTA L

NO.

URAIAN PEKERJAAN

Total

8 mm
13 mm
13 mm

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Profit & Over

0.395
1.040
1.040

5.89
147.26
217.49

Ttl.Bs.Polos

#REF!

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.A )


3

Pek.Tie Biem TB1.150x300 ( 309,39 Kg ) K.250


22.222
0.045
Bekisting/m3 Sengkang
7.20
4.44
13.333
Besi Pokok
6.00

4.44
98.72
TOTA L

9.48

9.48
210.67
309.39

10 mm
16 mm

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

0.617
1.580

NO.

URAIAN PEKERJAAN

Total

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

Beton.K.250
( Rp )/m3
Profit & Over

Beton.K.250
( Rp )/m3

BANGUNAN POS JAGA ( 19.A )


4

Pek.Plat Lantai t = 10 cm ( 82,27 Kg ) K.250.


10.000
0.100
Bekisting/m3 Besi Pokok &
13.33
1.018
Besi Bagi

#REF!

8.23

10 mm

8.23
82.27

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

BANGUNAN POS JAGA ( 19.B )


ELEVASI + 2.550
Pek.Plat Lantai t = 10 cm ( 82,27 Kg ) K.250
10.000
0.100
Bekisting/m3 Besi Pokok &
13.33
10.000
Besi Bagi

Besi Beton
diameter

Berat
kg

#REF!

#REF!

#REF!

#REF!
Profit & Over

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

#REF!

8.23

10 mm

#REF!

0.617

TOTA L

NO.

#REF!

0.617

#REF!

Beton.K.250
( Rp )/m3

#REF!

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

8.23
82.27

Besi Beton
diameter

Berat
kg

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

BANGUNAN POS JAGA ( 19.A )


ELEVASI + 2.750.
Pek.Balok B1.150x200 ( 212,40 Kg ) K.250
33.333
0.030
Bekisting/m3 Sengkang
5.60
18.333
Besi Pokok
4.00

( Rp )/m3

Total

2.21
4.16

Berat
kg

8 mm
13 mm

Ttl.Bs.Ulir

Kg/m3

Kg/m3

Besi Beton
diameter

6.24

8 mm
13 mm

#REF!
Profit & Over

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

#REF!

Beton.K.250
( Rp )/m3

#REF!

Berat
kg

#REF!

#REF!

#REF!

#REF!
Profit & Over

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

#REF!

2.84

Beton.K.250
( Rp )/m3
#REF!

0.395
1.040

4.16
138.67
212.40

Ttl.Bs.Polos

BANGUNAN POS JAGA ( 19.A )


ELEVASI + 2.750.
Pek.Balok G1.150x300 ( 201,87 Kg ) K.250.
22.222
0.045
Bekisting/m3 Sengkang
7.20
16.667
Besi Pokok
6.00

Besi Beton
diameter

#REF!

TOTA L

URAIAN PEKERJAAN

( Rp )/m3

#REF!

2.21
73.73

NO.

Besi Ulir

#REF!

TOTA L

NO.

Besi Polos

0.395
1.040

#REF!

Beton.K.250
( Rp )/m3

#REF!

NO.

URAIAN PEKERJAAN

Total

Ttl.Bs.Polos

Ttl.Bs.Ulir

Kg/m3

Kg/m3

2.84
63.20
TOTA L

6.24
138.67
201.87

Besi Beton
diameter

Berat
kg

Besi Polos

Besi Ulir

( Rp )/m3

( Rp )/m3

#REF!
#REF!

Beton.K.250
( Rp )/m3
#REF!

#REF!
Profit & Over

I S A

B E T O N
0
Bekisting
( Rp )/m3

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Bekisting
( Rp )/m3

TOTAL
( Rp )

Bekisting
( Rp )/m3

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Bekisting
( Rp )/m3

TOTAL
( Rp )

Bekisting
( Rp )/m3

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Bekisting
( Rp )/m3

TOTAL
( Rp )

Bekisting
( Rp )/m3

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :

#REF!
#REF!

Bekisting
( Rp )/m3
Total :
PPN 10 % :
Total :
Dibulatkan :

TOTAL
( Rp )
#REF!
#REF!
#REF!
#REF!

Bekisting
( Rp )/m3

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!

#REF!

Bekisting
( Rp )/m3
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

TOTAL
( Rp )
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

Bekisting
( Rp )/m3
#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

TOTAL
( Rp )

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

#REF!

#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

Bekisting
( Rp )/m3

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TOTAL
( Rp )

Bekisting
( Rp )/m3
#REF!
#REF!
Profit & Over Head 10 % :
Total :
PPN 10 % :
Total :
Dibulatkan :

TOTAL
( Rp )

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

TYPE - 45 / 112
pekerjaan tapak 50/50/15
jumlah tapak
=
lebar
=
panjang
=
tinggi
=
volume
=

balok slof 15/20


16
0.50
0.50
0.15
0.60

buah
m
m
m
m3

panjang
lebar
tinggi
volume

=
=
=
=

74
0.15
0.2
2.22

m
m
m
m3

Pekerjaan Kusen Pintu dan Jedela


pintu panel type -1
pintu panel type -2
pintu PVC
jendela alumunium J1
jendela alumunium J2

=
=
=
=
=

1
4
1
1
3

unit
unit
unit
unit
unit

urugan tanah bawah lantai. T = 17 cm


pekerjaan stump
jumlah stump
lebar
panjang
tinggi
volume

=
=
=
=
=

pekerjaan galian Pondasi


jumlah galian
=
lebar
=
panjang
=
tinggi
=
volume
=

16
0.15
0.15
0.35
0.13

buah
m
m
m
m3

16
0.60
0.60
0.60
3.46

buah
m
m
m
m3

pekerjaan urugan pasir, bawah tapak


jumlah tapak
=
16 buah
lebar
panjang
tinggi
volume

=
=
=
=

pekerjaan lantai kerja bawah


jumlah tapak
=
lebar
=
panjang
=
tinggi
=
volume
=

0.60
0.60
0.05
0.29

luas
tebal
volume

=
=
=

49.64 m2
0.17 m
8.44 m3

urugan pasir bawah lantai. T =5 cm


luas
tebal
volume

=
=
=

49.64 m2
0.05 m
2.48 m3

=
=
=
=
=

26
3.15
0.12
0.12
1.18

buah
m
m
m
m3

=
=
=
=
=

1
3.10
0.15
0.15
0.07

buah
m
m
m
m3

=
=
=
=
=

1
3.10
0.15
0.25
0.12

buah
m
m
m
m3

Kolom 15/15

m
m
m
m3

tapak
16 buah
0.60 m
0.60 m
0.05 m
0.29 m3

pekerjaan timbunan kembali bekas galian


Vol galian total
=
3.46 m3
vol urugan pasir
=
0.29 m3
vol lantai kerja'
=
0.29 m3
vol tapak
=
0.60 m3
vol stump
=
0.13 m3
volume Bersih
=
2.15 m3

Jumlah Kolom
Tinggi
Lebar 1
Lebar 2
Volume

Pekerjaan Atap + Rangka + asesoris atap


Luasan Kiri Bangunan
=
Luasan Tengah Bangunan
=
Luas Total Atap Supersteel
=

40.21 m2
39.17 m2
79.38 m2

Perabung Supersteel
Lesplank GRC

=
=

19.36 m'
37.04 m'

Acesoris Pelengkap + Profil


Batu Alam Untuk Profil Tiang Depan
Kaca Dinding Depan Atas
Cor Plat dak
Profil Kaca Dinding Atas

=
=
=
=

3.41
1.94
5.08
9.94

Profil Tiang

2.51 m2

Kolom 15/25
Jumlah Kolom
Tinggi
Lebar 1
Lebar 2
Volume

4.00

3.00

Ring Balok 12/15


=
=
=
=

Te r as

66.50
0.12
0.15
1.20

m
m
m
m3

Pasangan Bata 1/2 batu ( bagian bawah )


125.55
24

7.00
3.00

3.00

panjang
lebar
tinggi
volume

panjang
tinggi
volume

=
=
=

40.5 m
3.1 m
125.55 m2

1.935
7.74
1.935
1.935
5.805
19.35

Kolom 12/12
Jumlah Kolom
Tinggi
Lebar 1
Lebar 2
Volume

=
=
=
=
=

K. Tidur

3.00

1.00

Da pu r

3.00
R. Keluarga
Km/Wc

1.50

16.00

A
3.50

R. Tamu

3.00

K. Tidur

Te r as

1.00

m2
m2
m2
m'

57.4
206.95

Pasangan Bata 1/2 batu ( bagian atas )


panjang
tinggi
volume
pagar

=
=
=
=

20
2.87
57.4
24

m
m
m2
m2

5.00

5.00

B
3.00

total kotor
total bersih

=
=

206.95 m2
187.6 m2

3.00

7.00

1.00

m2
m2
m2
m2
m2

Pekerjaan Plafoond + Rangka


Plafond Gypsum
=
Ranga Plafond
=
Lest Plafoond
=

39.03 m2
39.03 m2
49.00 m'

Pekerjaan Keramik
keramik 40x40
plint keramik 10/40

=
=

44.23 m2
48.18 m'

Keramik 20/20 Lantai WC


Plint Keramik 10/20 wc
Keramik 20/25 dinding WC

=
=
=

1.42 m2
5.22 m'
9.66 M2

Pekerjaan Elektrik
Stop Kontak
Saklar Mata Satu
Saklar Mata Dua
Saklar Mata Tiga
Saklar Mata Empat
lampu philips 20 watt

=
=
=
=
=
=

meteran
MCB

=
=

m2

5.00
2.00
2.00
1.00
1.00
12.00

unit
unit
uniu
unit
unit
unit

1 unit
1.00 unit

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Divisi

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 36 M2 (RsS), 36 M2 (RS), 45 M2 DAN 88 M2
: JALAN RAJA SEI KECIL - TANJUNGPINANG
Jumlah Harga
Pekerjaan
(Rupiah)

Uraian

PEMBANGUNAN RUMAH TYPE 36 M2 (RSS)

18.00 UNIT

Rp

49,500,000.00

Rp

891,000,000.00

PEMBANGUNAN RUMAH TYPE 36 M2 (RS)

9.00 UNIT

Rp

56,250,000.00

Rp

506,250,000.00

PEMBANGUNAN RUMAH TYPE 45 M2

20.00 UNIT

Rp

67,500,000.00

Rp 1,350,000,000.00

PEMBANGUNAN RUMAH TYPE 88 M2

13.00 UNIT

Rp 154,000,000.00

Rp 2,002,000,000.00

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )


(B) P E M B U L A T A N

Terbilang :

Rp 4,749,250,000.00
Rp 4,749,250,000.00

EMPAT BELAS MILYAR TUJUH RATUS LIMA PULUH DUA JUTA DELAPAN RATUS
LIMA PULUH RIBU RUPIAH,Tanjungpinang, maret 2010

Dibuat oleh,
PT. SINAR METEOR BENTAN

TANDDY WINERLY
DIREKTUR

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Divisi

1
2
3
4
5
6
7
8
9
10
11
12
13

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 88 M2 (RS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG

Jumlah Harga
Pekerjaan
(Rupiah)

Uraian

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH
PEKERJAAN STRUKTUR
PEKERJAAN PASANGAN
PEKERJAAN ATAP
PEKERJAAN KERAMIK
PEKERJAAN PLAFOND
PEKERJAAN ELEKTRIK
PEKERJAAN KUSEN, PINTU DAN JENDELA
PEKERJAAN GANTUNGAN
PEKERJAAN SANITASI
PEKERJAAN PENGECATAN
PEKERJAAN AKHIR

200,000.00
2,448,754.09
29,721,818.86
36,823,553.39
19,479,808.79
10,643,383.84
9,515,479.12
4,250,000.00
25,050,000.00
1,010,000.00
5,120,000.00
9,451,068.86
287,000.00

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )


(B) P E M B U L A T A N
(C ) HARGA SATUAN BANGUNAN PER M2

Terbilang :

154,000,866.96
154,000,000.00
1,750,000.00

SERATUS LIMA PULUH EMPAT JUTA RUPIAH,-

Tanjungpinang,
Disetujui oleh,
PENANGGUNG JAWAB OPERASIONAL KEGIATAN
(PJOK)

Desember 2010
Dibuat oleh,
KONSULTAN PERENCANA
PT. BENTAN SONDONG KONSULTAN

AGUS WIDYASMIKO
Penata Tk.I NIP. 19680815 198903 1 008
Diketahui oleh,
PEJABAT PEMBUAT KOMITMEN
(PPK)

HENDRA KAMALUDIN
NIP. 19610105 1981011 1 004

YULIZAR, ST
DIREKTUR

DAFTAR KUANTITAS DAN HARGA


DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Mata
Pemb.

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 88 M2 (RS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG

Uraian

Sat

Perkiraan
Kuantitas

Harga
Satuan
(Rupiah)
e

Jumlah
Harga-Harga
(Rupiah)
f = (d x e)

1. PEKERJAAN PENDAHULUAN
1.1
1.2

Perataaan dan Pembersihan Lokasi


Pengukuran + Pemasangan Bouwplank

LS
LS

1.00
1.00

50,000.00
150,000.00

Jumlah Harga Pekerjaan BAB 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

50,000.00
150,000.00

200,000.00

2. PEKERJAAN TANAH
2.1
2.2
2.3
2.4

Galian Tanah Pondasi


Urugan Tanah Kembali
Urugan Tanah Biasa
Urugan Pasir

M3
M3
M3
M3

9.59
6.05
78.78
7.66

12,740.00
6,107.50
17,185.00
122,185.00

Jumlah Harga Pekerjaan BAB 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

122,112.90
36,948.24
1,353,800.14
935,892.81

2,448,754.09

3. PEKERJAAN STRUKTUR
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9

Pek. Beton K125 (Lantai Kerja)


Pek. Beton Tumbuk K175 (Lantai Rabat)
Beton Bertulang K175 (Pondasi Tapak)
Beton Bertulang K175 (Balok Sloof 15/30 cm)
Beton Bertulang K175 (Balok Lantai 15/30 cm)
Beton Bertulang K175 (Kolom 12/12 cm)
Beton Bertulang K175 (Kolom 12/35 cm)
Beton Bertulang K175 (Ring Balok 12/15)
Beton Bertulang K175 ( tangga )

M3
M3
M3
M3
M3
M3
M3
M3
M3

0.62
7.16
1.88
4.03
2.35
0.94
3.98
1.98
2.24

428,253.00
437,717.00
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75

Jumlah Harga Pekerjaan BAB 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

266,587.49
3,134,770.48
2,839,173.28
6,095,137.20
3,551,805.77
1,425,219.56
6,025,861.37
2,992,488.64
3,390,775.06

29,721,818.86

4. PEKERJAAN PASANGAN
4.1
4.2
4.3
4.3

Pasangan bata merah 1 ; 4


Plesteran dinding 1;4 tebal 15 mm
Less Profil beton
Relling Tangga Stainless

M2
M2
M2
M'

347.60
695.20
5.22
7.40

50,832.50
18,566.80
700,000.00
350,000.00

Jumlah Harga Pekerjaan BAB 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

17,669,326.17
12,907,602.23
3,656,625.00
2,590,000.00

36,823,553.39

5. PEKERJAAN ATAP
5.1
5.2
5.3
5.4

Pekerjaan Kuda-Kuda kayu Klass 2


Pekerjaan Atap Spandeck
Pekerjaan Perabung Spandeck
Lisplank GRC ukuran 1/30 cm

M3
M2
M1
M1

4.13
96.09
8.60
39.16

3,500,000.00
30,000.00
68,330.50
40,141.50

Jumlah Harga Pekerjaan BAB 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

14,437,500.00
2,882,625.00
587,642.30
1,572,041.49

19,479,808.79

6. PEK. KERAMIK
6.1
6.2
6.3
6.4
6.5

Keramik 40/40 cm (Ruang dalam) anti Slip


Keramik 20/20 cm (Km/Wc) Anti Slip
Keramik 20/25 cm (Dinding Km/Wc) Anti Slip
Plint Keramik 10/40 cm
Plint Keramik bermotif 7/20 cm

M2
M2
M2
M1
M1

80.46
2.06
12.68
117.49
13.19

87,148.60
83,541.92
69,626.20
19,015.85
26,015.85

Jumlah Harga Pekerjaan BAB 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7,011,758.48
171,762.19
882,566.48
2,234,231.64
343,065.04

10,643,383.84

7. PEKERJAAN PLAFOND
7.1
7.2

Pasangan Plafond Gypsun t = 10mm + rangka


Pekerjaan List Plafond Gypsun T=12 cm

M2
M1

89.42
127.46

78,135.75
19,835.20

Jumlah Harga Pekerjaan BAB 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

6,987,222.54
2,528,256.58

9,515,479.12

8. PEKERJAAN ELEKTRIK
8.1
8.2
8.3
8.4
8.5
8.6
8.7

Pekerjaan Penyambungan Listrik


Papan MCB
Pemasangan Instalasi titik lampu
Pemasangan Lampu Philips 15 Watt
Pemasangan Stop Kontak
Pemasangan Saklar Mata 1
Pemasangan Saklar Mata 2

Unit
Unit
TTK
Bh
Bh
Bh
Bh

1.00
1.00
16.00
11.00
5.00
6.00
4.00

2,000,000.00
100,000.00
80,000.00
45,000.00
25,000.00
25,000.00
25,000.00

Jumlah Harga Pekerjaan BAB 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

2,000,000.00
100,000.00
1,280,000.00
495,000.00
125,000.00
150,000.00
100,000.00

4,250,000.00

9. PEK. KUSEN, PINTU DAN JENDELA


9.1
9.2
9.3
9.4
9.5
9.6
9.7
9.8
9.9
9.10
9.11

Pek. Kusen dan Pintu Panel P1


Pek. Daun Pintu Fiberglass P2
Pek. Daun Jendela Alumunium (J1)
Pek. Daun Jendela Alumunium (J2)
Pek. Daun Jendela Alumunium (J3)
Pek. Daun Jendela Alumunium (J4)
Pek. Daun Jendela Alumunium (J5)
Pek. Daun Jendela Alumunium (J6)
Pek. Daun Jendela Alumunium (J7)
Pek. Daun Jendela Alumunium (J8)
Pek. Screen Alumunium

SET
SET
SET
SET
SET
SET
SET
SET
SET
SET
SET

6.00
2.00
3.00
1.00
4.00
1.00
1.00
2.00
2.00
3.00
1.00

1,200,000.00
1,200,000.00
1,000,000.00
1,000,000.00
1,000,000.00
800,000.00
800,000.00
800,000.00
800,000.00
800,000.00
250,000.00

Jumlah Harga Pekerjaan BAB 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7,200,000.00
2,400,000.00
3,000,000.00
1,000,000.00
4,000,000.00
800,000.00
800,000.00
1,600,000.00
1,600,000.00
2,400,000.00
250,000.00

25,050,000.00

10. PEKERJAAN GANTUNGAN


10.1
10.2
10.3

Pek. Engsel Pintu 4 " Stainless


Pek. Kunci Tanam 2 Slaag
Pek. Magnet Penahan Pintu

BH
BH
BH

24.00
8.00
6.00

10,000.00
70,000.00
35,000.00

Jumlah Harga Pekerjaan BAB 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

240,000.00
560,000.00
210,000.00

1,010,000.00

11. PEKERJAAN SANITASI


11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9

Pek. Kloset Jongkok Keramik


Pek. Kloset Duduk Keramik
Pek. Bak Air lapis Fiber
Pek. Kran air plastik
Pek. Floor Drained
Pek. Bathtub
Pek. Shower
Perpipaan Air bersih dan kotor
Pek. Septitank +peresapan

BH
BH
BH
BH
BH
BH
BH
LS
BH

1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00

100,000.00
1,000,000.00
250,000.00
10,000.00
15,000.00
2,150,000.00
70,000.00
500,000.00
1,000,000.00

Jumlah Harga Pekerjaan BAB 11 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

100,000.00
1,000,000.00
250,000.00
20,000.00
30,000.00
2,150,000.00
70,000.00
500,000.00
1,000,000.00

5,120,000.00

12. PEKERJAAN PENGECATAN


12.1
12.2
12.3

Pengecatan dinding 3x sapu Wheather Sield


Pengecatan plafond 3x sapu
Pengecatan cat Minyak kayu 3x sapu

M2
M2
M2

695.20
89.42
5.87

12,586.35
6,566.35
19,384.75

Jumlah Harga Pekerjaan BAB 12 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

8,750,005.35
587,190.23
113,873.29

9,451,068.86

13. PEKERJAAN AKHIR


13.2

Pembersihan akhir

LS

1.00

287,000.00

Jumlah Harga Pekerjaan BAB 13 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

287,000.00

287,000.00

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Divisi

1
2
3
4
5
6
7
8
9
10
11
12
13

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 45 M2 (RS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG
Jumlah Harga
Pekerjaan
(Rupiah)

Uraian

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH
PEKERJAAN STRUKTUR
PEKERJAAN PASANGAN
PEKERJAAN ATAP
PEKERJAAN KERAMIK
PEKERJAAN PLAFOND
PEKERJAAN ELEKTRIK
PEKERJAAN KUSEN, PINTU DAN JENDELA
PEKERJAAN GANTUNGAN
PEKERJAAN SANITASI
PEKERJAAN PENGECATAN
PEKERJAAN AKHIR

200,000.00
540,658.22
9,359,858.57
17,492,586.78
17,086,909.99
4,021,758.46
4,275,000.00
6,350,000.00
775,000.00
1,662,000.00
5,512,223.07
225,000.00

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )


(D) P E M B U L A T A N
(C ) HARGA SATUAN BANGUNAN PER M2

Terbilang :

67,500,995.09
67,500,000.00
1,500,000.00

ENAM PULUH TUJUH JUTA LIMA RATUS RIBU RUPIAH,-

Tanjungpinang,
Disetujui oleh,
PENANGGUNG JAWAB OPERASIONAL KEGIATAN
(PJOK)

Desember 2010
Dibuat oleh,
KONSULTAN PERENCANA
PT. BENTAN SONDONG KONSULTAN

AGUS WIDYASMIKO
Penata Tk.I NIP. 19680815 198903 1 008
Diketahui oleh,
PEJABAT PEMBUAT KOMITMEN
(PPK)

HENDRA KAMALUDIN
NIP. 19610105 1981011 1 004

YULIZAR, ST
DIREKTUR

DAFTAR KUANTITAS DAN HARGA


DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Mata
Pemb.

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 45 M2 (RS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG

Uraian

Sat

Perkiraan
Kuantitas

Harga
Satuan
(Rupiah)
e

Jumlah
Harga-Harga
(Rupiah)
f = (d x e)

1. PEKERJAAN PENDAHULUAN
1.1
1.2

Perataaan dan Pembersihan Lokasi


Pengukuran + Pemasangan Bouwplank

LS
LS

1.00
1.00

50,000.00
150,000.00

Jumlah Harga Pekerjaan BAB 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

50,000.00
150,000.00

200,000.00

2. PEKERJAAN TANAH
2.1
2.2
2.3
2.4

Galian Tanah Pondasi


Urugan Tanah Kembali
Urugan Tanah Biasa
Urugan Pasir

M3
M3
M3
M3

3.46
2.15
8.44
2.77

12,740.00
6,107.50
17,185.00
122,185.00

Jumlah Harga Pekerjaan BAB 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

44,029.44
13,155.56
145,020.78
338,452.45

540,658.22

3. PEKERJAAN STRUKTUR
3.1
3.2
3.3
3.4
3.5
3.6
3.6
3.7

Pek. Beton K125 (Lantai Kerja)


Pek. Beton Tumbuk K175 (Lantai Rabat)
Beton Bertulang K175 (Pondasi Tapak)
Beton Bertulang K175 (Balok Sloof 15/20 cm)
Beton Bertulang K175 (Kolom 12/12 cm)
Beton Bertulang K175 (Kolom 12/15 cm)
Beton Bertulang K175 (Kolom 15/25 cm)
Beton Bertulang K175 (Ring Balok 12/15)

M3
M3
M3
M3
M3
M3
M3
M3

0.29
2.48
0.60
2.22
1.18
0.07
0.12
1.20

428,253.00
437,717.00
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75

Jumlah Harga Pekerjaan BAB 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

123,336.86
1,086,413.59
908,535.45
3,361,581.17
1,785,817.28
105,617.25
176,028.74
1,812,528.22

9,359,858.57

4. PEKERJAAN PASANGAN
4.1
4.2

Pasangan bataKO 1 ; 4
Plesteran dinding 1;4 tebal 15 mm

M2
M2

198.86
397.71

50,832.50
18,566.80

Jumlah Harga Pekerjaan BAB 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

10,108,347.62
7,384,239.16

17,492,586.78

5. PEKERJAAN ATAP
5.1
5.2
5.3
5.4

Pekerjaan Kuda-Kuda Baja Ringan Galvanis


Pekerjaan Atap Super Steel
Pekerjaan Perabung Super Steel
Lisplank GRC ukuran 1/30 cm

M2
M2
M1
M1

79.38
79.38
19.36
37.04

100,000.00
79,870.00
68,330.50
40,141.50

Jumlah Harga Pekerjaan BAB 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7,937,505.06
6,339,685.29
1,322,878.48
1,486,841.16

17,086,909.99

6. PEK. KERAMIK
6.1
6.2
6.3
6.4
6.5

Keramik 40/40 cm (Ruang dalam) anti Slip


Keramik 20/20 cm (Km/Wc) Anti Slip
Keramik 20/25 cm (Dinding Km/Wc) Anti Slip
Plint Keramik 10/40 cm
Plint Keramik 7/20 cm

M2
M2
M2
M1
M1

44.23
1.42
9.66
48.18
5.22

87,148.60
83,541.92
69,626.20
19,015.85
26,015.85

Jumlah Harga Pekerjaan BAB 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3,854,608.72
118,462.44
672,380.21
916,183.65
135,802.74

5,697,437.77

7. PEKERJAAN PLAFOND
7.1
7.2

Pasangan Plafond Gypsun t = 10mm + rangka


Pekerjaan List Plafond Gypsun T=12 cm

M2
M1

39.03
49.00

78,135.75
19,835.20

Jumlah Harga Pekerjaan BAB 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3,049,833.66
971,924.80

4,021,758.46

8. PEKERJAAN ELEKTRIK
8.1
8.2
8.3
8.4

Pekerjaan Penyambungan Listrik


Papan MCB
Pemasangan Instalasi titik lampu
Pemasangan Lampu Philips 17 Watt

Unit
Unit
TTK
Bh

1.00
1.00
17.00
12.00

2,000,000.00
100,000.00
80,000.00
45,000.00

2,000,000.00
100,000.00
1,360,000.00
540,000.00

8.5
8.6
8.7
8.8
8.9

Pemasangan Stop Kontak


Pemasangan Saklar Mata 1
Pemasangan Saklar Mata 2
Pemasangan Saklar Mata 3
Pemasangan Saklar Mata 4

Bh
Bh
Bh
Bh
Bh

5.00
2.00
2.00
1.00
1.00

25,000.00
25,000.00
25,000.00
25,000.00
25,000.00

Jumlah Harga Pekerjaan BAB 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

125,000.00
50,000.00
50,000.00
25,000.00
25,000.00

4,275,000.00

9. PEK. KUSEN, PINTU DAN JENDELA


9.1
9.2
9.3
9.4
9.5

Pek. Kusen dan Pintu Panel Type 1


Pek. Kusen dan Pintu Panel Type 2
Pek. Daun Pintu Fiberglass (P3)
Pek. Daun Jendela Alumunium (J1)
Pek. Daun Jendela Alumunium (J2)

SET
SET
SET
SET
SET

1.00
4.00
1.00
1.00
3.00

700,000.00
700,000.00
250,000.00
650,000.00
650,000.00

Jumlah Harga Pekerjaan BAB 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

700,000.00
2,800,000.00
250,000.00
650,000.00
1,950,000.00

6,350,000.00

10. PEKERJAAN GANTUNGAN


10.1
10.2
10.3

Pek. Engsel Pintu 4 " Stainless


Pek. Kunci Tanam 2 Slaag
Pek. Magnet Penahan Pintu

BH
BH
BH

18.00
6.00
5.00

10,000.00
70,000.00
35,000.00

Jumlah Harga Pekerjaan BAB 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

180,000.00
420,000.00
175,000.00

775,000.00

11. PEKERJAAN SANITASI


11.1
11.2
11.3
11.4
11.6
11.7

Pek. Kloset Jongkok Keramik


Pek. Bak Air lapis Fiber
Pek. Kran air plastik
Pek. Floor Drained
Perpipaan Air bersih dan kotor
Pek. Septitank +peresapan

BH
BH
BH
BH
LS
BH

1.00
1.00
1.00
1.00
1.00
1.00

100,000.00
250,000.00
10,000.00
15,000.00
187,000.00
1,100,000.00

Jumlah Harga Pekerjaan BAB 11 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

100,000.00
250,000.00
10,000.00
15,000.00
187,000.00
1,100,000.00

1,662,000.00

12. PEKERJAAN PENGECATAN


12.1
12.2
12.3

Pengecatan dinding 3x sapu Wheather Sield


Pengecatan plafond 3x sapu
Pengecatan cat Minyak kayu 3x sapu

M2
M2
M2

397.71
39.03
12.91

12,586.35
6,566.35
19,384.75

Jumlah Harga Pekerjaan BAB 12 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

5,005,742.43
256,301.06
250,179.58

5,512,223.07

13. PEKERJAAN AKHIR


13.2

Pembersihan akhir

LS

1.00

225,000.00

Jumlah Harga Pekerjaan BAB 13 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

225,000.00

225,000.00

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Divisi

1
2
3
4
5
6
7
8
9
10
11
12
13

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 36 M2 (RSS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG
Jumlah Harga
Pekerjaan
(Rupiah)

Uraian

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH
PEKERJAAN STRUKTUR
PEKERJAAN PASANGAN
PEKERJAAN ATAP
PEKERJAAN KERAMIK
PEKERJAAN PLAFOND
PEKERJAAN ELEKTRIK
PEKERJAAN KUSEN, PINTU DAN JENDELA
PEKERJAAN GANTUNGAN
PEKERJAAN SANITASI
PEKERJAAN PENGECATAN
PEKERJAAN AKHIR

200,000.00
540,658.22
9,359,858.57
14,760,874.52
7,815,971.16
4,275,000.00
6,350,000.00
775,000.00
1,575,000.00
3,649,500.56
199,000.00

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )


(D) P E M B U L A T A N
(C ) HARGA SATUAN BANGUNAN PER M2

Terbilang :

49,500,863.03
49,500,000.00
1,100,000.00

EMPAT PULUH SEMBILAN JUTA LIMA RATUS RIBU RUPIAH,-

Tanjungpinang,
Disetujui oleh,
PENANGGUNG JAWAB OPERASIONAL KEGIATAN
(PJOK)

Desember 2010
Dibuat oleh,
KONSULTAN PERENCANA
PT. BENTAN SONDONG KONSULTAN

AGUS WIDYASMIKO
Penata Tk.I NIP. 19680815 198903 1 008
Diketahui oleh,
PEJABAT PEMBUAT KOMITMEN
(PPK)

HENDRA KAMALUDIN
NIP. 19610105 1981011 1 004

YULIZAR, ST
DIREKTUR

DAFTAR KUANTITAS DAN HARGA


DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Mata
Pemb.

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 36 M2 (RSS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG

Uraian

Sat

Perkiraan
Kuantitas

Harga
Satuan
(Rupiah)
e

Jumlah
Harga-Harga
(Rupiah)
f = (d x e)

1. PEKERJAAN PENDAHULUAN
1.1
1.2

Perataaan dan Pembersihan Lokasi


Pengukuran + Pemasangan Bouwplank

LS
LS

1.00
1.00

75,000.00
125,000.00

Jumlah Harga Pekerjaan BAB 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

75,000.00
125,000.00

200,000.00

2. PEKERJAAN TANAH
2.1
2.2
2.3
2.4

Galian Tanah Pondasi


Urugan Tanah Kembali
Urugan Tanah Biasa
Urugan Pasir

M3
M3
M3
M3

3.46
2.15
8.44
2.77

12,740.00
6,107.50
17,185.00
122,185.00

Jumlah Harga Pekerjaan BAB 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

44,029.44
13,155.56
145,020.78
338,452.45

540,658.22

3. PEKERJAAN STRUKTUR
3.1
3.2
3.3
3.4
3.5
3.6
3.6
3.7

Pek. Beton K125 (Lantai Kerja)


Pek. Beton Tumbuk K175 (Lantai Rabat)
Beton Bertulang K175 (Pondasi Tapak)
Beton Bertulang K175 (Balok Sloof 15/20 cm)
Beton Bertulang K175 (Kolom 12/12 cm)
Beton Bertulang K175 (Kolom 12/15 cm)
Beton Bertulang K175 (Kolom 15/25 cm)
Beton Bertulang K175 (Ring Balok 12/15)

M3
M3
M3
M3
M3
M3
M3
M3

0.29
2.48
0.60
2.22
1.18
0.07
0.12
1.20

428,253.00
437,717.00
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75

Jumlah Harga Pekerjaan BAB 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

123,336.86
1,086,413.59
908,535.45
3,361,581.17
1,785,817.28
105,617.25
176,028.74
1,812,528.22

9,359,858.57

4. PEKERJAAN PASANGAN
4.1
4.2

Pasangan batako 1 ; 4
Plesteran dinding 1;4 tebal 15 mm

M2
M2

187.60
281.40

50,832.50
18,566.80

Jumlah Harga Pekerjaan BAB 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

9,536,177.00
5,224,697.52

14,760,874.52

5. PEKERJAAN ATAP
5.1
5.2
5.3
5.4

Pekerjaan Kuda-Kuda Kayu Klass 2


Pekerjaan Atap asbes gelombnag
Pekerjaan Perabung semen
Lisplank GRC ukuran 1/30 cm

M2
M2
M1
M1

0.75
79.38
19.36
37.04

3,500,000.00
30,000.00
68,330.50
40,141.50

Jumlah Harga Pekerjaan BAB 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

2,625,000.00
2,381,251.52
1,322,878.48
1,486,841.16

7,815,971.16

6. PEK. KERAMIK
6.1
6.2
6.3
6.4
6.5

Keramik 40/40 cm (Ruang dalam) anti Slip


Keramik 20/20 cm (Km/Wc) Anti Slip
Keramik 20/25 cm (Dinding Km/Wc) Anti Slip
Plint Keramik 10/40 cm
Plint Keramik 7/20 cm

M2
M2
M2
M1
M1

87,148.60
83,541.92
69,626.20
19,015.85
26,015.85

Jumlah Harga Pekerjaan BAB 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7. PEKERJAAN PLAFOND
7.1
7.2

Pasangan Plafond Gypsun t = 10mm + rangka


Pekerjaan List Plafond Gypsun T=12 cm

M2
M1

78,135.75
19,835.20

Jumlah Harga Pekerjaan BAB 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

8. PEKERJAAN ELEKTRIK
8.1
8.2
8.3
8.4

Pekerjaan Penyambungan Listrik


Papan MCB
Pemasangan Instalasi titik lampu
Pemasangan Lampu Philips 17 Watt

Unit
Unit
TTK
Bh

1.00
1.00
17.00
12.00

2,000,000.00
100,000.00
80,000.00
45,000.00

2,000,000.00
100,000.00
1,360,000.00
540,000.00

8.5
8.6
8.7
8.8
8.9

Pemasangan Stop Kontak


Pemasangan Saklar Mata 1
Pemasangan Saklar Mata 2
Pemasangan Saklar Mata 3
Pemasangan Saklar Mata 4

Bh
Bh
Bh
Bh
Bh

5.00
2.00
2.00
1.00
1.00

25,000.00
25,000.00
25,000.00
25,000.00
25,000.00

Jumlah Harga Pekerjaan BAB 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

125,000.00
50,000.00
50,000.00
25,000.00
25,000.00

4,275,000.00

9. PEK. KUSEN, PINTU DAN JENDELA


9.1
9.2
9.3
9.4
9.5

Pek. Kusen dan Pintu Panel Type 1


Pek. Kusen dan Pintu Panel Type 2
Pek. Daun Pintu Fiberglass (P3)
Pek. Daun Jendela Alumunium (J1)
Pek. Daun Jendela Alumunium (J2)

SET
SET
SET
SET
SET

1.00
4.00
1.00
1.00
3.00

700,000.00
700,000.00
250,000.00
650,000.00
650,000.00

Jumlah Harga Pekerjaan BAB 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

700,000.00
2,800,000.00
250,000.00
650,000.00
1,950,000.00

6,350,000.00

10. PEKERJAAN GANTUNGAN


10.1
10.2
10.3

Pek. Engsel Pintu 4 " Stainless


Pek. Kunci Tanam 2 Slaag
Pek. Magnet Penahan Pintu

BH
BH
BH

18.00
6.00
5.00

10,000.00
70,000.00
35,000.00

Jumlah Harga Pekerjaan BAB 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

180,000.00
420,000.00
175,000.00

775,000.00

11. PEKERJAAN SANITASI


11.1
11.2
11.3
11.4
11.6
11.7

Pek. Kloset Jongkok Keramik


Pek. Bak Air lapis Fiber
Pek. Kran air plastik
Pek. Floor Drained
Perpipaan Air bersih dan kotor
Pek. Septitank +peresapan

BH
BH
BH
BH
LS
BH

1.00
1.00
1.00
1.00
1.00
1.00

100,000.00
200,000.00
10,000.00
15,000.00
150,000.00
1,100,000.00

Jumlah Harga Pekerjaan BAB 11 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

100,000.00
200,000.00
10,000.00
15,000.00
150,000.00
1,100,000.00

1,575,000.00

12. PEKERJAAN PENGECATAN


12.1
12.2
12.3

Pengecatan dinding 3x sapu


Pengecatan plafond 3x sapu
Pengecatan cat Minyak kayu 3x sapu

M2
M2
M2

281.40
5.56

12,586.35
6,566.35
19,384.75

Jumlah Harga Pekerjaan BAB 12 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3,541,798.89
107,701.67

3,649,500.56

13. PEKERJAAN AKHIR


13.2

Pembersihan akhir

LS

1.00

199,000.00

Jumlah Harga Pekerjaan BAB 13 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

199,000.00

199,000.00

REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Divisi

1
2
3
4
5
6
7
8
9
10
11
12
13

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 36 M2 (RS)
: JALAN RAJA SEI KECIL - TANJUNGPINANG
Jumlah Harga
Pekerjaan
(Rupiah)

Uraian

PEKERJAAN PENDAHULUAN
PEKERJAAN TANAH
PEKERJAAN STRUKTUR
PEKERJAAN PASANGAN
PEKERJAAN ATAP
PEKERJAAN KERAMIK
PEKERJAAN PLAFOND
PEKERJAAN ELEKTRIK
PEKERJAAN KUSEN, PINTU DAN JENDELA
PEKERJAAN GANTUNGAN
PEKERJAAN SANITASI
PEKERJAAN PENGECATAN
PEKERJAAN AKHIR

125,000.00
540,658.22
9,359,858.57
16,502,440.36
7,815,971.16
4,021,758.46
4,275,000.00
6,350,000.00
775,000.00
1,175,000.00
5,228,879.16
81,000.00

(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )


(D) P E M B U L A T A N
(C ) HARGA SATUAN BANGUNAN PER M2

Terbilang :

56,250,565.93
56,250,000.00
1,250,000.00

LIMA PULUH ENAM JUTA ENAM RATUS LIMA PULUH RIBU RUPIAH,-

Tanjungpinang,
Disetujui oleh,
PENANGGUNG JAWAB OPERASIONAL KEGIATAN
(PJOK)

Desember 2010
Dibuat oleh,
KONSULTAN PERENCANA
PT. BENTAN SONDONG KONSULTAN

AGUS WIDYASMIKO
Penata Tk.I NIP. 19680815 198903 1 008
Diketahui oleh,
PEJABAT PEMBUAT KOMITMEN
(PPK)

HENDRA KAMALUDIN
NIP. 19610105 1981011 1 004

YULIZAR, ST
DIREKTUR

DAFTAR KUANTITAS DAN HARGA


DEVELOPER
PROGRAM
PEKERJAAN
LOKASI

No. Mata
Pemb.

: PT. SINAR METEOR BENTAN


: RENCANA PEMBANGUNAN PERUMAHAN SEBONG GARDEN VIEW
: PEMBANGUNAN RUMAH TYPE 36 M2 (RS)
: JALAN RAJA HAJI FISABILILLAH KM. 8 - TANJUNGPINANG

Uraian

Sat

Perkiraan
Kuantitas

Harga
Satuan
(Rupiah)
e

Jumlah
Harga-Harga
(Rupiah)
f = (d x e)

1. PEKERJAAN PENDAHULUAN
1.1
1.2

Perataaan dan Pembersihan Lokasi


Pengukuran + Pemasangan Bouwplank

LS
LS

1.00
1.00

50,000.00
75,000.00

Jumlah Harga Pekerjaan BAB 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

50,000.00
75,000.00

125,000.00

2. PEKERJAAN TANAH
2.1
2.2
2.3
2.4

Galian Tanah Pondasi


Urugan Tanah Kembali
Urugan Tanah Biasa
Urugan Pasir

M3
M3
M3
M3

3.46
2.15
8.44
2.77

12,740.00
6,107.50
17,185.00
122,185.00

Jumlah Harga Pekerjaan BAB 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

44,029.44
13,155.56
145,020.78
338,452.45

540,658.22

3. PEKERJAAN STRUKTUR
3.1
3.2
3.3
3.4
3.5
3.6
3.6
3.7

Pek. Beton K125 (Lantai Kerja)


Pek. Beton Tumbuk K175 (Lantai Rabat)
Beton Bertulang K175 (Pondasi Tapak)
Beton Bertulang K175 (Balok Sloof 15/20 cm)
Beton Bertulang K175 (Kolom 12/12 cm)
Beton Bertulang K175 (Kolom 12/15 cm)
Beton Bertulang K175 (Kolom 15/25 cm)
Beton Bertulang K175 (Ring Balok 12/15)

M3
M3
M3
M3
M3
M3
M3
M3

0.29
2.48
0.60
2.22
1.18
0.07
0.12
1.20

428,253.00
437,717.00
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75
1,514,225.75

Jumlah Harga Pekerjaan BAB 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

123,336.86
1,086,413.59
908,535.45
3,361,581.17
1,785,817.28
105,617.25
176,028.74
1,812,528.22

9,359,858.57

4. PEKERJAAN PASANGAN
4.1
4.2

Pasangan bataoko 1 ; 4
Plesteran dinding 1;4 tebal 15 mm

M2
M2

187.60
375.20

50,832.50
18,566.80

Jumlah Harga Pekerjaan BAB 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

9,536,177.00
6,966,263.36

16,502,440.36

5. PEKERJAAN ATAP
5.1
5.2
5.3
5.4

Pekerjaan Kuda-Kuda Kayu Klass 2


Pekerjaan Atap asbes gelombnag
Pekerjaan Perabung semen
Lisplank GRC ukuran 1/30 cm

M2
M2
M1
M1

0.75
79.38
19.36
37.04

3,500,000.00
30,000.00
68,330.50
40,141.50

Jumlah Harga Pekerjaan BAB 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

2,625,000.00
2,381,251.52
1,322,878.48
1,486,841.16

7,815,971.16

6. PEK. KERAMIK
6.1
6.2
6.3
6.4
6.5

Keramik 40/40 cm (Ruang dalam) anti Slip


Keramik 20/20 cm (Km/Wc) Anti Slip
Keramik 20/25 cm (Dinding Km/Wc) Anti Slip
Plint Keramik 10/40 cm
Plint Keramik 7/20 cm

M2
M2
M2
M1
M1

87,148.60
83,541.92
69,626.20
19,015.85
26,015.85

Jumlah Harga Pekerjaan BAB 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

7. PEKERJAAN PLAFOND
7.1
7.2

Pasangan Plafond Gypsun t = 10mm + rangka


Pekerjaan List Plafond Gypsun T=12 cm

M2
M1

39.03
49.00

78,135.75
19,835.20

Jumlah Harga Pekerjaan BAB 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

3,049,833.66
971,924.80

4,021,758.46

8. PEKERJAAN ELEKTRIK
8.1
8.2
8.3
8.4

Pekerjaan Penyambungan Listrik


Papan MCB
Pemasangan Instalasi titik lampu
Pemasangan Lampu Philips 17 Watt

Unit
Unit
TTK
Bh

1.00
1.00
17.00
12.00

2,000,000.00
100,000.00
80,000.00
45,000.00

2,000,000.00
100,000.00
1,360,000.00
540,000.00

8.5
8.6
8.7
8.8
8.9

Pemasangan Stop Kontak


Pemasangan Saklar Mata 1
Pemasangan Saklar Mata 2
Pemasangan Saklar Mata 3
Pemasangan Saklar Mata 4

Bh
Bh
Bh
Bh
Bh

5.00
2.00
2.00
1.00
1.00

25,000.00
25,000.00
25,000.00
25,000.00
25,000.00

Jumlah Harga Pekerjaan BAB 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

125,000.00
50,000.00
50,000.00
25,000.00
25,000.00

4,275,000.00

9. PEK. KUSEN, PINTU DAN JENDELA


9.1
9.2
9.3
9.4
9.5

Pek. Kusen dan Pintu Panel Type 1


Pek. Kusen dan Pintu Panel Type 2
Pek. Daun Pintu Fiberglass (P3)
Pek. Daun Jendela Alumunium (J1)
Pek. Daun Jendela Alumunium (J2)

SET
SET
SET
SET
SET

1.00
4.00
1.00
1.00
3.00

700,000.00
700,000.00
250,000.00
650,000.00
650,000.00

Jumlah Harga Pekerjaan BAB 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

700,000.00
2,800,000.00
250,000.00
650,000.00
1,950,000.00

6,350,000.00

10. PEKERJAAN GANTUNGAN


10.1
10.2
10.3

Pek. Engsel Pintu 4 " Stainless


Pek. Kunci Tanam 2 Slaag
Pek. Magnet Penahan Pintu

BH
BH
BH

18.00
6.00
5.00

10,000.00
70,000.00
35,000.00

Jumlah Harga Pekerjaan BAB 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

180,000.00
420,000.00
175,000.00

775,000.00

11. PEKERJAAN SANITASI


11.1
11.2
11.3
11.4
11.6
11.7

Pek. Kloset Jongkok Keramik


Pek. Bak Air lapis Fiber
Pek. Kran air plastik
Pek. Floor Drained
Perpipaan Air bersih dan kotor
Pek. Septitank +peresapan

BH
BH
BH
BH
LS
BH

1.00
1.00
1.00
1.00
1.00
1.00

100,000.00
200,000.00
10,000.00
15,000.00
150,000.00
700,000.00

Jumlah Harga Pekerjaan BAB 11 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

100,000.00
200,000.00
10,000.00
15,000.00
150,000.00
700,000.00

1,175,000.00

12. PEKERJAAN PENGECATAN


12.1
12.2
12.3

Pengecatan dinding 3x sapu


Pengecatan plafond 3x sapu
Pengecatan cat Minyak kayu 3x sapu

M2
M2
M2

375.20
39.03
12.91

12,586.35
6,566.35
19,384.75

Jumlah Harga Pekerjaan BAB 12 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

4,722,398.52
256,301.06
250,179.58

5,228,879.16

13. PEKERJAAN AKHIR


13.2

Pembersihan akhir

LS

1.00

81,000.00

Jumlah Harga Pekerjaan BAB 13 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

81,000.00

81,000.00

TABEL PERHITUNGAN BETON


INSTANSI
PROGRAM
KEGIATAN
PEKERJAAN
LOKASI

: DINAS PERTANIAN DAN KEHUTANAN KABUPATEN BINTAN


: PEMBERDAYAAN SOSIAL EKONOMI PASCA BENCANA
: REHABILITASI DAN KONSTRUKSI PASCA BENCANA
: PEMBANGUNAN SAUNG TANI
: DESA LOME - KECAMATAN TUAPAYA

BETON STRUKTUR K-175


NO

1
2
3
4
5
6

PEK. BESI ULIR

PEKERJAAN BEKISTING

TYPE BETON

Pondasi Tapak
Balok Sloof 15/20 cm
Kolom 25/25 cm
Kolom 12/12
Ring Balok 15/20
Ring Balok 12/25, 10/15, 15/15

TOTAL HARGA
1.00 kg/m3 Rp

437,717.00

1 KG

1.00
1.00
1.00
1.00
1.00
1.00

437,717.00
437,717.00
437,717.00
437,717.00
437,717.00
437,717.00

100.00
100.00
100.00
100.00
100.00
100.00

kg/m3
kg/m3
kg/m3
kg/m3
kg/m3
kg/m3

Rp
Rp
Rp
Rp
Rp
Rp

10,503.50

1,050,350.00
1,050,350.00
1,050,350.00
1,050,350.00
1,050,350.00
1,050,350.00

Koef.

1.0000
1.0000
1.000
1.000
1.000
1.000

26,158.750
28,408.750
52,990.000
52,990.000
54,540.000
54,540.000

Jumlah

26,158.75
28,408.75
52,990.00
52,990.00
54,540.00
54,540.00

Rp
Rp
Rp
Rp
Rp
Rp

1,514,225.75
1,516,475.75
1,541,057.00
1,541,057.00
1,542,607.00
1,542,607.00

ANALISA B IAYA
KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
KODE

ANALISA

Pembersihan Lokasi
1.0000 LS Pembersihan Lokasi

SAT

LS

Pengukuran dan pemasangan bouwplank


M1
Tenaga :
0.1000 oh Pekerja
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang Kayu
0.0050 oh Mandor
Material :
3
0.0120 m Kayu meranti 5/7 (Kayu Klass III)
0.0200 kg Paku Segala ukuran ( Rata - Rata )
0.0070 m3 Papan meranti 3/20 (Kayu Klass III)

Penggalian Tanah Biasa


Tenaga :
0.4000 oh Pekerja
0.0400 oh Mandor

M3

Urugan Tanah Kembali


Tenaga :
0.1920 oh Pekerja
0.0190 oh Mandor

M3

Urugan Tanah Biasa


Tenaga :
0.3000 oh Pekerja
0.0100 oh Mandor
Material :
3
1.2000 m Urugan Tanah Biasa

M3

Urugan Pasir

M3

Tenaga :
0.3000 oh Pekerja
0.0100 oh Mandor
Material :
1.2000 m3 Pasir urug

HARGA
( Rp. )
3

UPAH
4

JUMLAH HARGA (Rp.)


BAHAN
JUMLAH
5
6

500,000.00

500,000.00

500,000.00
500,000.00

40,000.00
55,000.00
60,000.00
55,000.00

4,000.00
5,500.00
600.00
275.00

4,000.00
5,500.00
600.00
275.00

1,800,000.00
15,000.00
1,800,000.00

10,375.00

21,600.00
300.00
12,600.00
34,500.00

21,600.00
300.00
12,600.00
44,875.00
31,412.50

40,000.00
55,000.00

16,000.00
2,200.00
18,200.00

16,000.00
2,200.00
18,200.00
12,740.00

40,000.00
55,000.00

7,680.00
1,045.00
8,725.00

7,680.00
1,045.00
8,725.00
6,107.50

40,000.00
55,000.00

12,000.00
550.00

12,000.00
550.00

10,000.00

12,550.00

12,000.00
12,000.00

12,000.00
24,550.00
17,185.00

40,000.00
55,000.00

12,000.00
550.00

12,000.00
550.00

135,000.00

12,550.00

162,000.00
162,000.00

162,000.00
174,550.00
122,185.00

Pek. Beton K125 lantai Kerja


Tenaga :
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang Batu
1.6500 oh Pekerja
0.0800 oh Mandor
Material :
3
0.4700 m Pasir beton
0.9400 m3 Batu Pecah Granit 3/4"
197.0000 kg Semen Portland / 50 Kg

M3
55,000.00
60,000.00
40,000.00
55,000.00

13,750.00
1,500.00
66,000.00
4,400.00

13,750.00
1,500.00
66,000.00
4,400.00

150,000.00
250,000.00
1,120.00

85,650.00

70,500.00
235,000.00
220,640.00
526,140.00

70,500.00
235,000.00
220,640.00
611,790.00
428,253.00

Pek. Beton Tumbuk K175 lantai Rabat


Tenaga :
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang Batu
1.6500 oh Pekerja
0.0800 oh Mandor
Material :
3
0.5200 m Pasir beton
0.8700 m3 Batu Pecah Granit 3/4"
218.0000 kg Semen Portland / 50 Kg

M3

Pek. Beton Cor K225


Tenaga :
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang Batu
2.0000 oh Pekerja
1.0000 oh Mandor
Material :
0.5400 m3 Pasir beton
0.8100 m3 Batu Pecah Granit 3/4"
393.0000 kg Semen Portland / 50 Kg

M3

Pek. Pembesian dengan besi polos


Tenaga :
0.0070 oh Tukang Besi
0.0007 oh Kepala Tukang Besi
0.0070 oh Pekerja
0.0003 oh Mandor

KG

Material :
1.0500 kg Besi beton polos
0.0150 kg Kawat beton

Pek. Pasangan bekisting untuk pondasi


Tenaga :
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang Kayu
0.3000 oh Pekerja
0.0050 oh Mandor
Material :
3
0.0400 m Papan Kayu Meranti
0.3000 kg Paku segala ukuran

m2

Pek. Pasangan bekisting untuk sloof


Tenaga :
0.2600 oh Tukang Kayu

m2

55,000.00
60,000.00
40,000.00
55,000.00

13,750.00
1,500.00
66,000.00
4,400.00

13,750.00
1,500.00
66,000.00
4,400.00

150,000.00
250,000.00
1,120.00

85,650.00

78,000.00
217,500.00
244,160.00
539,660.00

78,000.00
217,500.00
244,160.00
625,310.00
437,717.00

55,000.00
60,000.00
40,000.00
55,000.00

19,250.00
2,100.00
80,000.00
55,000.00

19,250.00
2,100.00
80,000.00
55,000.00

150,000.00
250,000.00
1,120.00

156,350.00

81,000.00
202,500.00
440,160.00
723,660.00

81,000.00
202,500.00
440,160.00
880,010.00
616,007.00

55,000.00
60,000.00
40,000.00
55,000.00

385.00
42.00
280.00
16.50

385.00
42.00
280.00
16.50

9,000.00
22,000.00

723.50

9,450.00
330.00
9,780.00

9,450.00
330.00
10,503.50
7,352.45

55,000.00
60,000.00
40,000.00
55,000.00

14,300.00
1,560.00
12,000.00
275.00

14,300.00
1,560.00
12,000.00
275.00

1,800,000.00
15,000.00

28,135.00

72,000.00
4,500.00
76,500.00
4 x pakai :

72,000.00
4,500.00
104,635.00
26,158.75

55,000.00

14,300.00

14,300.00

0.0260 oh Kepala Tukang Kayu


0.3000 oh Pekerja
0.0050 oh Mandor
Material :
3
0.0450 m Kayu Meranti
0.3000 kg Paku segala ukuran

10

11

12

Pek. Pasangan bekisting untuk kolom


Tenaga :
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang Kayu
0.3000 oh Pekerja
0.0060 oh Mandor
Material :
0.0400 m3 Kayu Meranti
0.4000 kg Paku segala ukuran
0.0150 m3 Kayu Meranti
0.3500 lbr Plywood tebal 9 mm
2.0000 btg Dolken kayu galam dia. 8 - 4 m

m2

Pek. Pasangan bekisting untuk balok


Tenaga :
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang Kayu
0.3200 oh Pekerja
0.0060 oh Mandor
Material :
3
0.0400 m Kayu Meranti
0.4000 kg Paku segala ukuran
0.0180 m3 Kayu Meranti
0.3500 lbr Plywood tebal 9 mm
2.0000 btg Dolken kayu galam dia. 8 - 4 m

m2

Pek. Pasangan bekisting untuk lantai


Tenaga :
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang Kayu
0.3200 oh Pekerja
0.0060 oh Mandor
Material :
3
0.0400 m Kayu Meranti
0.4000 kg Paku segala ukuran
0.0150 m3 Kayu Meranti
0.3500 lbr Plywood tebal 9 mm
6.0000 btg Dolken kayu galam dia. 8 - 4 m

m2

60,000.00
40,000.00
55,000.00

1,560.00
12,000.00
275.00

1,560.00
12,000.00
275.00

1,800,000.00
15,000.00

28,135.00

81,000.00
4,500.00
85,500.00
4 x pakai :

81,000.00
4,500.00
113,635.00
28,408.75

55,000.00
60,000.00
40,000.00
55,000.00

18,150.00
1,980.00
12,000.00
330.00

18,150.00
1,980.00
12,000.00
330.00

1,800,000.00
15,000.00
1,800,000.00
70,000.00
25,000.00

32,460.00

72,000.00
6,000.00
27,000.00
24,500.00
50,000.00
179,500.00
4 x pakai :

72,000.00
6,000.00
27,000.00
24,500.00
50,000.00
211,960.00
52,990.00

55,000.00
60,000.00
40,000.00
55,000.00

18,150.00
1,980.00
12,800.00
330.00

18,150.00
1,980.00
12,800.00
330.00

1,800,000.00
15,000.00
1,800,000.00
70,000.00
25,000.00

33,260.00

72,000.00
6,000.00
32,400.00
24,500.00
50,000.00
184,900.00
4 x pakai :

72,000.00
6,000.00
32,400.00
24,500.00
50,000.00
218,160.00
54,540.00

55,000.00
60,000.00
40,000.00
55,000.00

18,150.00
1,980.00
12,800.00
330.00

18,150.00
1,980.00
12,800.00
330.00

1,800,000.00
15,000.00
1,800,000.00
70,000.00
25,000.00

33,260.00

72,000.00
6,000.00
27,000.00
24,500.00
150,000.00
279,500.00

72,000.00
6,000.00
27,000.00
24,500.00
150,000.00
312,760.00

2 x pakai :

156,380.00

ANALISA B IAYA
KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
KODE
1
12

12

13

14

15

URAIAN

PE K E R JAAN
2

SAT.
3

Pas. Bata merah 1/2 batu camp. 1 pc : 4 ps


Tenaga :
0.1000 oh Tukang batu
0.0100 oh Kepala Tukang Batu
0.3200 oh Pekerja
0.0150 oh Mandor
Material :
44.0000 bh Batu Bata Merah
11.5000 kg Semen Portland / 50 Kg
0.0430 m3 Pasir pasang

m2

Pas. Batako 1/2 batu camp. 1 pc : 4 ps


Tenaga :
0.0500 oh Tukang batu
0.0050 oh Kepala Tukang Batu
0.1600 oh Pekerja
0.0075 oh Mandor
Material :
12.5000 bh Batako
8.5000 kg Semen Portland / 50 Kg
0.0430 m3 Pasir pasang

m2

Plesteran 1 pc : 4 ps, tebal 15 mm


Tenaga :
0.1500 oh Tukang batu
0.0150 oh Kepala Tukang Batu
0.2000 oh Pekerja
0.0100 oh Mandor
Material :
5.2000 kg Semen Portland / 50 Kg
0.0200 m3 Pasir pasang

m2

Pek. Pasangan Atap Bitumen


Tenaga :
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang Kayu
0.2000 oh Pekerja
0.0100 oh Mandor
Material :
1.1000 M2 Atap Bitumen
0.0300 kg Paku segala Ukuran (rata-rata)

m2

Pek. Pasangan Perabung Atap Bitumen

m1

HARGA
( Rp. )
4

UPAH
5

JUMLAH HARGA (Rp.)


BAHAN
6

55,000.00
60,000.00
40,000.00
55,000.00

5,500.00
600.00
12,800.00
825.00

1,000.00
1,120.00
150,000.00

19,725.00

44,000.00
12,880.00
6,450.00
63,330.00

55,000.00
60,000.00
40,000.00
55,000.00

2,750.00
300.00
6,400.00
412.50

2,000.00
1,120.00
150,000.00

9,862.50

25,000.00
9,520.00
6,450.00
40,970.00

55,000.00
60,000.00
40,000.00
55,000.00

8,250.00
900.00
8,000.00
550.00

1,120.00
150,000.00

17,700.00

5,824.00
3,000.00
8,824.00

55,000.00
60,000.00
40,000.00
55,000.00

5,500.00
600.00
8,000.00
550.00

90,000.00
15,000.00

14,650.00

99,000.00
450.00
99,450.00

Tenaga :
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Material :
1.1000 M1 Perabung Bitumen
0.0500 kg Paku segala Ukuran (rata-rata)
0.1500
0.0150
0.2500
0.0130

16

17

18

19

oh
oh
oh
oh

Pas. Listplank GRC ukuran (1 x 30) cm


Tenaga :
0.2200 oh Tukang Kayu
0.0220 oh Kepala Tukang Kayu
0.1100 oh Pekerja
0.0050 oh Mandor
Material :
1.1000 m1 Papan Lisplank GRC
0.0500 kg Paku segala Ukuran (rata-rata)

m1

Pek. Pas. Talang Air Spandek


Tenaga :
0.1500 oh Tukang Kayu
0.0150 oh Kepala Tukang Kayu
0.2500 oh Pekerja
0.0130 oh Mandor
Material :
1.1000 M1 Talang Spandek
0.0500 kg Paku segala Ukuran (rata-rata)

m1

Pas. Lantai keramik 40 x 40 cm


Tenaga :
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang Batu
0.6200 oh Pekerja
0.0300 oh Mandor
Material :
1.0000 m2 Keramik 40 x 40 cm
14.1500 kg Semen Portland / 50 Kg
2.0000 kg Semen warna
0.0390 m3 Pasir pasang

m2

Pas. Lantai keramik 30 x 30 cm


Tenaga :
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang Batu
0.6200 oh Pekerja
0.0300 oh Mandor
Material :
1.0000 m2 Keramik 30 x 30 cm Ex Roman
14.1500 kg Semen Portland / 50 Kg
2.0000 kg Semen warna
0.0390 m3 Pasir pasang

m2

55,000.00
60,000.00
40,000.00
55,000.00

8,250.00
900.00
10,000.00
715.00

70,000.00
15,000.00

19,865.00

77,000.00
750.00
77,750.00

55,000.00
60,000.00
40,000.00
55,000.00

12,100.00
1,320.00
4,400.00
275.00

35,000.00
15,000.00

18,095.00

38,500.00
750.00
39,250.00

55,000.00
60,000.00
40,000.00
55,000.00

8,250.00
900.00
10,000.00
715.00

70,000.00
15,000.00

19,865.00

77,000.00
750.00
77,750.00

55,000.00
60,000.00
40,000.00
55,000.00

19,250.00
2,100.00
24,800.00
1,650.00

45,000.00
1,120.00
5,000.00
150,000.00

47,800.00

45,000.00
15,848.00
10,000.00
5,850.00
76,698.00

55,000.00
60,000.00
40,000.00
55,000.00

19,250.00
2,100.00
24,800.00
1,650.00

40,000.00
1,120.00
5,000.00
150,000.00

40,000.00
15,848.00
10,000.00
5,850.00

20

21

22

23

24

Pas. Lantai keramik 20 x 20 cm


Tenaga :
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang Batu
0.6200 oh Pekerja
0.0300 oh Mandor
Material :
1.0000 M2 Keramik 20 x 20 cm Ex.Roman
11.3800 kg Semen Portland / 50 Kg
1.5000 kg Semen warna
0.0420 m3 Pasir pasang

m2

Pas. Dinding keramik 20 x 25 cm


Tenaga :
0.1000 oh Tukang Batu
0.0450 oh Kepala Tukang Batu
0.6000 oh Pekerja
0.0300 oh Mandor
1.0000 m2 Keramik 20 x 25 cm Ex.Roman
9.3000 kg Semen Portland / 50 Kg
1.5000 kg Semen warna
0.0180 m3 Pasir pasang

m2

Pas. Plint keramik 10 x 40 cm


Tenaga :
0.0900 oh Tukang Batu
0.0090 oh Kepala Tukang Batu
0.0900 oh Pekerja
0.0045 oh Mandor
Material :
1.0000 m1 Keramik 10 x 40 cm
1.6500 kg Semen Portland / 50 Kg
0.1000 kg Semen warna
0.0032 m3 Pasir pasang

Pas. Lantai keramik 10 x 30 cm ( Anti Slip )


Tenaga :
0.0900 oh Tukang Batu
0.0090 oh Kepala Tukang Batu
0.0900 oh Pekerja
0.0045 oh Mandor
Material :
1.0000 m1 Keramik 10 x 30 cm ( Anti Slip )
1.6500 kg Semen Portland / 50 Kg
0.1000 kg Semen warna
0.0032 m3 Pasir pasang

Pas. Plint keramik 7 x 20 cm (Bermotif)


Tenaga :
0.0900 oh Tukang Batu

47,800.00

71,698.00

55,000.00
60,000.00
40,000.00
55,000.00

19,250.00
2,100.00
24,800.00
1,650.00

45,000.00
1,120.00
5,000.00
150,000.00

47,800.00

45,000.00
12,745.60
7,500.00
6,300.00
71,545.60

55,000.00
60,000.00
40,000.00
55,000.00
45,000.00
1,120.00
5,000.00
150,000.00

5,500.00
2,700.00
24,000.00
1,650.00
33,850.00

45,000.00
10,416.00
7,500.00
2,700.00
65,616.00

55,000.00
60,000.00
40,000.00
55,000.00

4,950.00
540.00
3,600.00
247.50

15,000.00
1,120.00
5,000.00
150,000.00

9,337.50

15,000.00
1,848.00
500.00
480.00
17,828.00

55,000.00
60,000.00
40,000.00
55,000.00

4,950.00
540.00
3,600.00
247.50

15,000.00
1,120.00
5,000.00
150,000.00

9,337.50

15,000.00
1,848.00
500.00
480.00
17,828.00

55,000.00

4,950.00

0.0090
0.0900
0.0045
1.0000
1.6500
0.1000
0.0032

oh Kepala Tukang Batu


oh Pekerja
oh Mandor
Material :
m1 Keramik 10 x 25 cm (bermotif)
kg Semen Portland / 50 Kg
kg Semen warna
m3 Pasir pasang

60,000.00
40,000.00
55,000.00

540.00
3,600.00
247.50

25,000.00
1,120.00
5,000.00
150,000.00

9,337.50

25,000.00
1,848.00
500.00
480.00
27,828.00

25

26

27

28

29

Pas. Batu Alam dinding 10/20 cm


Tenaga :
0.1500 oh Tukang Batu
0.0455 oh Kepala Tukang Batu
0.6500 oh Pekerja
0.0350 oh Mandor
Material :
1.0000 M2 Batu Alam 10/20 cm
5.7000 kg Semen Portland / 50 Kg
0.1000 kg Semen warna
0.0032 m3 Pasir pasang

Pas. Langit Gypsun t = 10 mm + rangka hollow


Tenaga :
0.4700 oh Tukang Kayu
0.0470 oh Kepala Tukang
0.3100 oh Pekerja
0.0155 oh Mandor
Material :
2
1.0000 m Gypsun Board 10 mm
1.0000 m2 Rangka Hollow + penggantung
0.1100 kg Paku Skrup

Pas. List Flapond Gypsun T = 12 cm


Tenaga :
0.0210 oh Tukang Kayu
0.0021 oh Kepala Tukang Kayu
0.0210 oh Pekerja
0.0010 oh Mandor
Material :
1.0000 m1 List Profil + Bending Gypsun
0.0580 kg Paku Skrup

Pek. kloset Jongkok Keramik


buah
Tenaga :
1.5000 oh Pekerja
0.1400 oh Mandor
1.0500 oh Tukang batu
0.1400 oh Kepala tukang Batu
Material :
1.0000 bh Kloset Jongkok Keramik
1.0000 ls Perlengkapan (6% harga kloset)
Pek. Kran air Plastik
Tenaga :
0.0100 oh Pekerja
0.0050 oh Mandor
0.1000 oh Tukang
0.0100 oh Kepala tukang Batu
Material :
1.0000 bh Kran air Plastik
0.0250 set Seal tape

55,000.00
60,000.00
40,000.00
55,000.00

8,250.00
2,730.00
26,000.00
1,925.00

100,000.00
1,120.00
5,000.00
150,000.00

38,905.00

100,000.00
6,384.00
500.00
480.00
107,364.00

55,000.00
60,000.00
40,000.00
55,000.00

25,850.00
2,820.00
12,400.00
852.50

20,000.00
47,500.00
20,000.00

41,922.50

20,000.00
47,500.00
2,200.00
69,700.00

55,000.00
60,000.00
40,000.00
55,000.00

1,155.00
126.00
840.00
55.00

25,000.00
20,000.00

2,176.00

25,000.00
1,160.00
26,160.00

40,000.00
55,000.00
55,000.00
60,000.00

60,000.00
7,700.00
57,750.00
8,400.00

100,000.00
6,000.00

133,850.00

100,000.00
6,000.00
106,000.00

40,000.00
55,000.00
55,000.00
60,000.00

400.00
275.00
5,500.00
600.00

10,000.00
5,000.00

6,775.00

10,000.00
125.00
10,125.00

buah

30

31

32

Memasang bak mandi batu bata volume 0.30 m3


Tenaga :
6.0000 oh Pekerja
0.3000 oh Mandor
3.0000 oh Tukang batu
0.3000 oh Kepala tukang Batu
Material :
200.0000 bh Batu bata merah
120.0000 kg Semen Portland / 50 Kg
0.3000 m3 Pasir pasang
4.5000 m2 Keramik ( 25 x 25 ) cm
6.0000 kg Semen putih

buah

Pek. floor drain Stainless


Tenaga :
0.0100 oh Pekerja
0.0050 oh Mandor
0.1000 oh Tukang
0.0100 oh Kepala tukang Batu
Material :
1.0000 bh Floor drain

buah

Pengecatan tembok baru (1 lapis Sealer, 1 lapis ca m2


dasar, 2 lapis cat penutup) Weathershield
Tenaga :
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala tukang Cat
0.0025 oh Mandor

0.1000
0.1000
0.2600
33

Pengecatan Flapond baru (1 lapis cat


dasar, 2 lapis cat penutup)
Tenaga :
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala tukang Cat
0.0025 oh Mandor

0.2000
0.2600

34

Material :
kg Sealer
kg Cat dasar setara ICI
kg Cat penutup 2 x setara ICI

240,000.00
16,500.00
165,000.00
18,000.00

1,000.00
1,120.00
150,000.00
45,000.00
15,000.00

439,500.00

200,000.00
134,400.00
45,000.00
202,500.00
90,000.00
671,900.00

40,000.00
55,000.00
55,000.00
60,000.00

400.00
275.00
5,500.00
600.00

15,000.00

6,775.00

15,000.00
15,000.00

40,000.00
55,000.00
60,000.00
55,000.00

800.00
3,465.00
378.00
137.50

60,000.00
20,000.00
20,000.00

4,780.50

6,000.00
2,000.00
5,200.00
13,200.00

40,000.00
55,000.00
60,000.00
55,000.00

800.00
3,465.00
378.00
137.50

10,000.00
10,000.00

4,780.50

2,000.00
2,600.00
4,600.00

40,000.00
55,000.00

2,800.00
495.00

m2

Material :
kg Cat dasar setara nipon
kg Cat penutup 2 x setara nipon

Pengecatan bidang kayu baru (1 lapis plamir), 1 l


cat dasar, 2 lapis cat penutup
Tenaga :
0.0700 oh Pekerja
0.0090 oh Tukang cat

40,000.00
55,000.00
55,000.00
60,000.00

m2

0.0060
0.0025
0.2000
0.1500
0.1700
0.2600

35

36

37

oh Kepala tukang Cat


oh Mandor
Material :
kg Cat meni Kayu
kg Plamir Kayu
kg Cat Minyak dasar
kg Cat Minyak penutup

Pek.Urinoir Toto Type U.57 M.


buah
Tenaga :
1.0000 oh Pekerja
0.1000 oh Mandor
1.0000 oh Tukang batu
0.1000 oh Kepala tukang Batu
Material :
1.0000 bh Urinoir Toto Type U.57.M
6.0000 kg Semen Portland / 50 Kg
0.0100 m3 Pasir pasang
1.0000 ls Perlengkapan (30% harga urionir)

Memasang bak cuci piring stainles steel


Tenaga :
0.0300 oh Pekerja
0.0015 oh Mandor
0.3000 oh Tukang batu
0.0300 oh Kepala tukang
Material :
1.0000 bh Bak cuci stainless steel
1.0000 set Water drain + accessories

60,000.00
55,000.00

360.00
137.50

40,000.00
20,000.00
30,000.00
30,000.00

3,792.50

8,000.00
3,000.00
5,100.00
7,800.00
23,900.00

40,000.00
55,000.00
55,000.00
60,000.00

40,000.00
5,500.00
55,000.00
6,000.00

1,250,000.00
1,120.00
150,000.00
375,000.00

106,500.00

1,250,000.00
6,720.00
1,500.00
375,000.00
1,633,220.00

40,000.00
55,000.00
55,000.00
60,000.00

1,200.00
82.50
16,500.00
1,800.00

500,000.00
125,000.00

19,582.50

500,000.00
125,000.00
625,000.00

40,000.00
55,000.00
55,000.00
60,000.00

400.00
275.00
5,500.00
600.00

750,000.00
1,120.00
150,000.00
90,000.00

6,775.00

750,000.00
6,720.00
1,500.00
10,800.00
769,020.00

buah

Pek. Wastafel Toto Type L.521 V1A


buah
Tenaga :
0.0100 oh Pekerja
0.0050 oh Mandor
0.1000 oh Tukang Pipa
0.0100 oh Kepala tukang Batu
Material :
1.0000 bh Wastafel
6.0000 kg Semen Portland / 50 Kg
0.0100 m3 Pasir pasang
0.1200 Ls Perlengkapan (12% harga Wastafel)

ANALISA B IAYA
UKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
JUMLAH HARGA (Rp.)
JUMLAH
7

5,500.00
600.00
12,800.00
825.00
44,000.00
12,880.00
6,450.00
83,055.00
58,138.50

2,750.00
300.00
6,400.00
412.50
25,000.00
9,520.00
6,450.00
50,832.50
35,582.75

8,250.00
900.00
8,000.00
550.00
5,824.00
3,000.00
26,524.00
18,566.80

5,500.00
600.00
8,000.00
550.00
99,000.00
450.00
114,100.00
79,870.00

8,250.00
900.00
10,000.00
715.00
77,000.00
750.00
97,615.00
68,330.50

12,100.00
1,320.00
4,400.00
275.00
38,500.00
750.00
57,345.00
40,141.50

8,250.00
900.00
10,000.00
715.00
77,000.00
750.00
97,615.00
68,330.50

19,250.00
2,100.00
24,800.00
1,650.00
45,000.00
15,848.00
10,000.00
5,850.00
124,498.00
87,148.60

19,250.00
2,100.00
24,800.00
1,650.00
40,000.00
15,848.00
10,000.00
5,850.00

119,498.00
83,648.60

19,250.00
2,100.00
24,800.00
1,650.00
45,000.00
12,745.60
7,500.00
6,300.00
119,345.60
83,541.92

5,500.00
2,700.00
24,000.00
1,650.00
45,000.00
10,416.00
7,500.00
2,700.00
99,466.00
69,626.20

4,950.00
540.00
3,600.00
247.50
15,000.00
1,848.00
500.00
480.00
27,165.50
19,015.85

4,950.00
540.00
3,600.00
247.50
15,000.00
1,848.00
500.00
480.00
27,165.50
19,015.85

4,950.00

540.00
3,600.00
247.50
25,000.00
1,848.00
500.00
480.00
37,165.50
26,015.85

8,250.00
2,730.00
26,000.00
1,925.00
100,000.00
6,384.00
500.00
480.00
146,269.00

25,850.00
2,820.00
12,400.00
852.50
20,000.00
47,500.00
2,200.00
111,622.50
78,135.75

1,155.00
126.00
840.00
55.00
25,000.00
1,160.00
28,336.00
19,835.20

60,000.00
7,700.00
57,750.00
8,400.00
100,000.00
6,000.00
239,850.00
167,895.00
400.00
275.00
5,500.00
600.00
10,000.00
125.00
16,900.00

11,830.00

240,000.00
16,500.00
165,000.00
18,000.00
200,000.00
134,400.00
45,000.00
202,500.00
90,000.00
1,111,400.00
777,980.00

400.00
275.00
5,500.00
600.00
15,000.00
21,775.00
15,242.50

800.00
3,465.00
378.00
137.50

6,000.00
2,000.00
5,200.00
17,980.50
12,586.35

800.00
3,465.00
378.00
137.50

2,000.00
2,600.00
9,380.50
6,566.35

2,800.00
495.00

360.00
137.50
8,000.00
3,000.00
5,100.00
7,800.00
27,692.50
19,384.75

40,000.00
5,500.00
55,000.00
6,000.00
1,250,000.00
6,720.00
1,500.00
375,000.00
1,739,720.00

1,200.00
82.50
16,500.00
1,800.00
500,000.00
125,000.00
644,582.50

400.00
275.00
5,500.00
600.00
750,000.00
6,720.00
1,500.00
10,800.00
775,795.00

DAFTAR HARGA SATUAN UPAH DAN MATERIAL


KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)

NO

URAIAN PEKERJAAN

VOL

SATUAN

HARGA

KETERANGAN

Pekerja

1.00

OR/HR

40,000.00

Lokasi Pekerjaan

Tukang Gali

1.00

OR/HR

55,000.00

Lokasi Pekerjaan

Kepala Tukang Batu

1.00

OR/HR

60,000.00

Lokasi Pekerjaan

Tukang Batu

1.00

OR/HR

55,000.00

Lokasi Pekerjaan

Kepala Tukang Kayu

1.00

OR/HR

60,000.00

Lokasi Pekerjaan

Tukang Kayu

1.00

OR/HR

55,000.00

Lokasi Pekerjaan

Kepala Tukang Besi

1.00

OR/HR

60,000.00

Lokasi Pekerjaan

Tukang Besi

1.00

OR/HR

55,000.00

Lokasi Pekerjaan

Kepala Tukang Cat

1.00

OR/HR

60,000.00

Lokasi Pekerjaan

10

Tukang Cat

1.00

OR/HR

55,000.00

Lokasi Pekerjaan

11

Tukang aspal

1.00

OR/HR

55,000.00

Lokasi Pekerjaan

12
13

Mandor
Tukang Las

1.00 OR/HR
1.00 OR/HR

55,000.00
55,000.00

Lokasi Pekerjaan
Lokasi Pekerjaan

MATERIAL
BATU :
1

Batu Bata merah

1.00

BH

1,000.00

Lokasi Pekerjaan

Batu Pecah Setempat 3/4"

1.00

M3

250,000.00

Lokasi Pekerjaan

Batu Belah setempat 5-9"

1.00

M3

250,000.00

Lokasi Pekerjaan

PASIR :
1

Pasir Urug

1.00

M3

135,000.00

Lokasi Pekerjaan

Pair Beton

1.00

M3

150,000.00

Lokasi Pekerjaan

Pasir Pasang

1.00

M3

150,000.00

Lokasi Pekerjaan

Tanah Timbunan Biasa

1.00

M3

10,000.00

Lokasi Pekerjaan

PLAFOND :
1

Triplek GRC T = 3 mm

1.00

M2

20,000.00

Lokasi Pekerjaan

Triplek Gypsun T = 10 mm

1.00

M2

20,000.00

Lokasi Pekerjaan

Less Gypsun + Bending Gypsun

1.00

M1

25,000.00

Lokasi Pekerjaan

Papan Lispank GRC 3/30

1.00

M1

30,000.00

Lokasi Pekerjaan

Papan Plywood T = 9 mm

1.00

M2

70,000.00

Lokasi Pekerjaan

CAT
1

Cat Minyak dasar / Setara paton

1.00

KG

30,000.00

Lokasi Pekerjaan

Cat Kalkarium Wheather Shlied / Setara

1.00

KG

20,000.00

Lokasi Pekerjaan

DAFTAR HARGA SATUAN UPAH DAN MATERIAL


KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
3

Cat Kalkarium Nippont / Setara

1.00

KG

10,000.00

Lokasi Pekerjaan

Kertas gosok / ampelas

1.00

LBR

4,500.00

Lokasi Pekerjaan

Minyak cat / Thinnner

1.00

KG

35,000.00

Lokasi Pekerjaan

Meni besi

1.00

KG

50,000.00

Lokasi Pekerjaan

Cat Meni Kayu

1.00

KG

40,000.00

Lokasi Pekerjaan

Plamir Kayu

1.00

KG

20,000.00

Lokasi Pekerjaan

Sealer

1.00

KG

60,000.00

Lokasi Pekerjaan

KERAMIK
1

Keramik Lantai 40 x 40 cm

1.00

M2

45,000.00

Lokasi Pekerjaan

Keramik Lantai 30 x 30 cm

1.00

M2

40,000.00

Lokasi Pekerjaan

Keramik Lantai 25 x 25 cm

1.00

M2

45,000.00

Lokasi Pekerjaan

Keramik Dinding 20 x 25 cm

1.00

M2

45,000.00

Lokasi Pekerjaan

Plint Keramik 10/40 cm

1.00

M1

15,000.00

Lokasi Pekerjaan

Plint Keramik 10/30 cm

1.00

M1

15,000.00

Lokasi Pekerjaan

Plint Keramik 10/25 cm

1.00

M1

25,000.00

Lokasi Pekerjaan

Batu Alam 10/20 cm

1.00

M2

100,000.00

Lokasi Pekerjaan

SEMEN :
1

Semen Portland / 50 Kg

1.00

ZAK

56,000.00

Lokasi Pekerjaan

Semen Portland / 50 Kg

1.00

KG

1,120.00

Lokasi Pekerjaan

Semen Warna

1.00

KG

5,000.00

Lokasi Pekerjaan

Semen Putih

1.00

KG

15,000.00

Lokasi Pekerjaan

BESI DAN KAWAT.


1

Tulangan Besi Beton Ulir

1.00

KG

9,000.00

Lokasi Pekerjaan

Tulangan Besi Beton Polos

1.00

KG

9,000.00

Lokasi Pekerjaan

Kawat Beton

1.00

KG

22,000.00

Lokasi Pekerjaan

Paku Segala ukuran ( Rata - Rata )

1.00

KG

15,000.00

Lokasi Pekerjaan

Paku SkruB

1.00

KG

20,000.00

Lokasi Pekerjaan

Besi Rangka Hollow

1.00

M2

47,500.00

Lokasi Pekerjaan

KAYU.
1

Kayu Klass III

1.00

M3

1,800,000.00

Lokasi Pekerjaan

Kayu Klass II

1.00

M3

2,300,000.00

Lokasi Pekerjaan

Kayu Klass I

1.00

M3

2,500,000.00

Lokasi Pekerjaan

Kayu Andang / Dolken

1.00

BTG

25,000.00

Lokasi Pekerjaan

1.00

M2

90,000.00

Lokasi Pekerjaan

ATAP.
1

AtapSpandek Motif Genteng

DAFTAR HARGA SATUAN UPAH DAN MATERIAL


KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
2

Spandek Motif Lurus T= 0,024

1.00

M2

85,000.00

Lokasi Pekerjaan

Perabung Spandek

1.00

M1

70,000.00

Lokasi Pekerjaan

SANITASI
1

Kloset Jongkok

1.00

BH

100,000.00

Lokasi Pekerjaan

Kran air Plastik

1.00

BH

10,000.00

Lokasi Pekerjaan

Floor Drained

1.00

BH

15,000.00

Lokasi Pekerjaan

Kitchen Set

1.00

BH

500,000.00

Lokasi Pekerjaan

Septitank + Peresapan

1.00

BH

1,100,000.00

Lokasi Pekerjaan

LAIN - LAIN.
1

Papan Nama Proyek

1.00

BH

500,000.00

Lokasi Pekerjaan

Perataaan dan Pembersihan Lokasi

1.00

LS

760,000.00

Lokasi Pekerjaan

Pengukuran + Pemasangan Bouwplank

1.00

LS

750,000.00

Lokasi Pekerjaan

Pembuatan Direksikeet

1.00

LS

3,000,000.00

Lokasi Pekerjaan

Pembuatan gudang barang dan buruh

1.00

LS

3,000,000.00

Lokasi Pekerjaan

Less Profil beton

1.00

LS

4,473,500.00

Lokasi Pekerjaan

Kuda-Kuda Baja Ringan Galvanis

1.00

M2

100,000.00

Lokasi Pekerjaan

Ventilasi kayu Ukir Type 1

1.00

BH

300,000.00

Lokasi Pekerjaan

Tunjuk Langit Kayu Type 1

1.00

BH

200,000.00

Lokasi Pekerjaan

10

Lisplank Parang

1.00

LS

750,000.00

Lokasi Pekerjaan

11

Papan MCB

1.00

BH

100,000.00

Lokasi Pekerjaan

12

Pemasangan Instalasi titik lampu

1.00

TTK

80,000.00

Lokasi Pekerjaan

13

Pemasangan Lampu Down Ligth 20 Watt

1.00

BH

45,000.00

Lokasi Pekerjaan

14

Pemasangan Stop Kontak

1.00

BH

25,000.00

Lokasi Pekerjaan

15

Pemasangan Saklar lampu

1.00

BH

25,000.00

Lokasi Pekerjaan

16

Pengadaan Kipas Angin Gantung

1.00

BH

450,000.00

Lokasi Pekerjaan

17

Kusen dan Pintu Utama Dabel (P1)

1.00

BH

700,000.00

Lokasi Pekerjaan

18

Pek. Pintu folding Gate

1.00

SET

4,500,000.00

Lokasi Pekerjaan

19

Pek. Kusen dan Pintu Utama Dabel (P1)

1.00

BH

700,000.00

Lokasi Pekerjaan

20

Pek. Daun Jendela Rangkap 3 (J1)

1.00

BH

1,650,000.00

Lokasi Pekerjaan

21

Pek. Daun Jendela Tunggal (J2)

1.00

BH

650,000.00

Lokasi Pekerjaan

22

Pek. Daun Jendela Tunggal (J3)

1.00

BH

750,000.00

Lokasi Pekerjaan

23

Pek. Ventilasi KM/WC (V1)

1.00

BH

500,000.00

Lokasi Pekerjaan

24

Pek. Angin-angin Profil

1.00

BH

10,000.00

Lokasi Pekerjaan

25

Daun Pintu Fiberglass (P3)

1.00

UNIT

250,000.00

Lokasi Pekerjaan

26

Ventilasi KM/WC (V1)

1.00

BH

250,000.00

Lokasi Pekerjaan

27

Angin-angin Profil Type 1

1.00

BH

15,000.00

Lokasi Pekerjaan

28

Angin-angin Profil Type 2

1.00

BH

20,000.00

Lokasi Pekerjaan

29

Engsel Pintu 4 " Stainless

1.00

BH

10,000.00

Lokasi Pekerjaan

DAFTAR HARGA SATUAN UPAH DAN MATERIAL


KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
(SNI)
30

Kunci Tanam 2 Slaag

1.00

BH

70,000.00

Lokasi Pekerjaan

31

Magnet Penahan Pintu

1.00

BH

35,000.00

Lokasi Pekerjaan

32

Handle Pintu Stainless

1.00

BH

100,000.00

Lokasi Pekerjaan

33

Septitank + Peresapan

1.00

LS

1,000,000.00

Lokasi Pekerjaan

34

Parit pasangan batu bata

1.00

M1

125,000.00

Lokasi Pekerjaan

35

Pembersihan Akhir

1.00

M1

896,000.00

Lokasi Pekerjaan

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

BANG.DEKANAT.
LANTAI. 1.

Kolom K1.250X250 ( 416 kg )

Total
Besi
Kg

16.000
Besi Pokok dia. 19 mm

8.00

2.230

17.840

Skg. Dia. 12 - 12,5 cm

9.00

0.888
Total :

7.992
30.000
480.000

Kolom K2.350X350 ( 310 kg )


8.163
Besi Pokok dia. 19 mm

12.00

2.230

26.760

Skg. Dia. 12 - 12,5 cm

12.60

0.888
Total :

11.189
40.000
330.000

Kolom K3.350X350 ( 384 kg )


8.163
Besi Pokok dia. 19 mm

16.00

2.230

35.680

Skg. Dia. 12 - 12,5 cm

12.60

0.888
Total :

11.189
50.000
410.000

9.00

2.230

20.070

15.57

0.888
Total :

13.826
34.000
140.000

8.00

2.230

17.840

14.40

0.617

8.885
30.000
200.000

Kolom K.4 dia.550 ( 143 kg )


4.210
Besi Pokok dia. 19 mm
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Tie Beam TB1. 300x500 ( 180 kg )


6.667
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

Total :

01/16/2017 - 04:23:19

342684622.xls

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

545,375.00

K.225
384,900.00

6,402,275.00

545,375.00

K.225
384,900.00

4,692,275.00

11,400.00

545,375.00

K.225
384,900.00

5,604,275.00

11,400.00

545,375.00

K.225
384,900.00

2,526,275.00

545,375.00

K.225
384,900.00

3,210,275.00

11,400.00

11,400.00

11,400.00

Page : 65 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

Balok B1. 200x500 ( 210 kg )


10.000
Besi Pokok dia. 19 mm

6.00

2.230

13.380

Skg. Dia. 10 - 12,5 cm

12.60

0.617

7.774
20.000
200.000

Total :
7

Total :

14.808
14.808
100.000

22.000
16.000

1.040
0.617

22.880
9.872

6.000

0.395
Total :

2.370
22.880
180.000

Balok Ornamen BG1.200x200 ( 350 kg )


Lantai 1 , 2 & Lantai 3
25.000
Besi Pokok dia. 16 mm
6.00

1.580

9.480

Skg. Dia. 10 - 12,5 cm

0.617
Total :

4.442
10.000
250.000

Pek.Tangga t = 13 cm ( 176 kg )
0.130
Besi dia.13 - 100 cm
Besi dia.10 - 150 cm
Besi dia.8 - 200 cm
( Double )

545,375.00

3,210,275.00

545,375.00

K.225
384,900.00

2,070,275.00

545,375.00

K.225
384,900.00

2,982,275.00

545,375.00

K.225
384,900.00

3,780,275.00

545,375.00

K.225
384,900.00

3,780,275.00

Plat Lantai t = 15 cm ( 99 kg )
0.150
Besi dia.10 - 20 cm
( Double )

11,400.00

K.225
384,900.00

24.000

7.20

0.617

Balok KG1. 200x200 ( 275 kg )


Lantai 1 , 2 & Lantai 3
25.000
Besi Pokok dia. 16 mm

4.00

1.580

6.320

Skg. Dia. 10 - 11 cm

8.07

0.617

4.981
10.000
250.000

Total :

01/16/2017 - 04:23:19

342684622.xls

11,400.00

11,400.00

11,400.00

11,400.00

Page : 66 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

LANTAI. 2.
1

Kolom K1.250X250 ( 416 kg )


16.000
Besi Pokok dia. 19 mm

8.00

2.230

17.840

Skg. Dia. 12 - 12,5 cm

9.00

0.888
Total :

7.992
30.000
480.000

Kolom K2.350X350 ( 310 kg )


8.163
Besi Pokok dia. 19 mm

12.00

2.230

26.760

Skg. Dia. 12 - 12,5 cm

12.60

0.888
Total :

11.189
40.000
330.000

Kolom K3.350X350 ( 384 kg )


8.163
Besi Pokok dia. 19 mm

16.00

2.230

35.680

Skg. Dia. 12 - 12,5 cm

12.60

0.888
Total :

11.189
50.000
410.000

9.00

2.230

20.070

15.57

0.888
Total :

13.826
30.000
130.000

6.00

2.230

13.380

12.60

0.617

7.774
20.000
200.000

Kolom K.4 dia.550 ( 143 kg )


4.210
Besi Pokok dia. 19 mm
Skg. Dia. 12 - 12,5 cm

Balok G1. 200x500 ( 210 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

Total :

01/16/2017 - 04:23:19

342684622.xls

545,375.00

K.225
384,900.00

6,402,275.00

545,375.00

K.225
384,900.00

4,692,275.00

11,400.00

545,375.00

K.225
384,900.00

5,604,275.00

11,400.00

545,375.00

K.225
384,900.00

2,412,275.00

545,375.00

K.225
384,900.00

3,210,275.00

11,400.00

11,400.00

11,400.00

Page : 67 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Balok G2. 300x500 ( 187 kg )


6.667
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

Balok G3. 200x350 ( 300 kg )


14.286
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

Balok G4. 250x400 ( 230 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

Balok B1. 200x350 ( 286 kg )


14.286
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg

8.50

2.230

18.955

14.40

0.617
Total :

8.885
30.000
200.000

6.50

2.230

14.495

10.27

0.617
Total :

6.335
20.000
290.000

7.00

2.230

15.610

11.70

0.617
Total :

7.219
20.000
200.000

6.00

2.230

13.380

10.27

0.617

6.335
20.000
290.000

Total :
10

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

4,236,275.00

545,375.00

K.225
384,900.00

3,210,275.00

11,400.00

545,375.00

K.225
384,900.00

4,236,275.00

11,400.00

K.225
545,375.00
384,900.00

2,640,275.00

11,400.00

11,400.00

11,400.00

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
( Double )

Total
Besi
Kg

LANTAI. 3.
Kolom K1.250X250 ( 416 kg )
16.000
Besi Pokok dia. 19 mm

01/16/2017 - 04:23:19

32.000

8.00

0.617
Total :

19.744
19.744
150.000

2.230

17.840

342684622.xls

Page : 68 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
9.00

0.888

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Kolom K2.350X350 ( 237 kg )


8.163
Besi Pokok dia. 19 mm
Skg. Dia. 12 - 12,5 cm

8.00
12.60

Total :

480.000

2.230
0.888

17.840
11.189
30.000
240.000

Total :
3

Kolom K3.350X350 ( 384 kg )


8.163
Besi Pokok dia. 19 mm
Skg. Dia. 12 - 12,5 cm

16.00
12.60

2.230
0.888
Total :

Kolom K.4 dia.550 ( 143 kg )


4.210
Besi Pokok dia. 19 mm
Skg. Dia. 12 - 12,5 cm

9.00
15.57

2.230
0.888
Total :

Balok G1. 200x500 ( 210 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

6.00
12.60

2.230
0.617
Total :

Balok G2. 300x500 ( 187 kg )


6.667
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

8.50
14.40

2.230
0.617
Total :

Total Harga
(Rp.)

7.992
30.000

Harga
Beton
Rp/m3
K.225

11,400.00

11,400.00

545,375.00

384,900.00

6,402,275.00

545,375.00

K.225
384,900.00

3,666,275.00

5,604,275.00

35.680
11.189
50.000
410.000

11,400.00

545,375.00

K.225
384,900.00

20.070
13.826
30.000
130.000

11,400.00

545,375.00

K.225
384,900.00

2,412,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

3,210,275.00

13.380
7.774
20.000
200.000

18.955
8.885
30.000
200.000

11,400.00

11,400.00

Balok G3. 200x350 ( 300 kg )


14.286

01/16/2017 - 04:23:19

342684622.xls

Page : 69 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

Balok G4. 250x400 ( 230 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
6.50

2.230

14.495

10.27

0.617

6.335

Total :

20.000
290.000

7.00
11.70

2.230
0.617
Total :

Balok B1. 200x350 ( 286 kg )


14.286
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

6.00
10.27

2.230
0.617
Total :

10

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
( Double )

32.000

0.617
Total :

B
1

15.610
7.219
20.000
200.000

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

11,400.00

545,375.00

K.225
384,900.00

4,236,275.00

545,375.00

K.225
384,900.00

3,210,275.00

4,236,275.00

11,400.00

Harga
Beton
Rp/m3

Total Harga
(Rp.)

13.380
6.335
20.000
290.000

11,400.00

545,375.00

K.225
384,900.00

19.744
19.744
150.000

11,400.00

545,375.00

K.225
384,900.00

2,640,275.00

17.840
11.189
30.000
240.000

11,400.00

545,375.00

K.225
384,900.00

3,666,275.00

545,375.00

K.225
384,900.00

5,604,275.00

PENTHOUSE
Kolom K2.350X350 ( 237 kg )
8.163
Besi Pokok dia. 19 mm
Skg. Dia. 12- 12,5 cm

8.00
12.60

2.230
0.888
Total :

Total
Besi
Kg

Kolom K3.350X350 ( 384 kg )


8.163
Besi Pokok dia. 19 mm
Skg. Dia. 812- 12,5 cm

16.00
12.60

2.230
0.888
Total :

01/16/2017 - 04:23:19

35.680
11.189
50.000
410.000

342684622.xls

11,400.00

Page : 70 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.
3

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

Kolom K.4 dia.550 ( 143 kg )


4.210
Besi Pokok dia. 19 mm
Skg. Dia. 12 - 12,5 cm

Balok G1. 200x500 ( 210 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

9.00
15.57

6.00
12.60

2.230
0.888
Total :

130.000

2.230
0.617

13.380
7.774
20.000
200.000

Total :
5

Balok G2. 200x500 ( 210 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

6.00
13.07

2.230
0.617
Total :

Balok G3. 300x500 ( 147 kg )


6.667
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

6.00
14.40

2.230
0.617
Total :

C
1

RL.1
Kolom K3.350X350 ( 351 kg )
8.163
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

16.00
12.60

2.230
0.617
Total :

Balok G1.200x350 ( 286 kg )


14.286
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

6.00
10.27

2.230
0.617
Total :

01/16/2017 - 04:23:19

20.070
13.826
30.000

13.380
8.062
20.000
200.000

13.380
8.885
20.000
130.000

35.680
7.774
40.000
330.000

13.380
6.335
20.000
290.000

342684622.xls

K.225
11,400.00

11,400.00

11,400.00

11,400.00

11,400.00

11,400.00

545,375.00

384,900.00

2,412,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

2,412,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

4,236,275.00

Page : 71 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

6.50
12.27

2.230
0.617

14.495
7.569
20.000

Balok G1A.250x400 ( 240 kg )


10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 15 cm

8.00
9.97

Total :

130.000

2.230
0.617

17.840
6.149
20.000
200.000

Total :
D
1

RL.2
Balok G1.250x400 ( 250 kg )
10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

8.00
11.70

2.230
0.617
Total :

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
( Double )

32.000

0.617
Total :

F
1

Total Harga
(Rp.)

Balok G2.300x500 ( 147 kg )


6.667
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 15 cm

Harga
Beton
Rp/m3

RL.3
Balok G1.250x400 ( 250 kg )
10.000
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12,5 cm

RL.4
Balok G1.250x400 ( 300 kg )
10.000
Besi Pokok dia. 19 mm

01/16/2017 - 04:23:19

8.00
11.70

8.00

2.230
0.617

17.840
7.219
30.000
300.000

19.744
19.744
150.000

Total :

17.840
7.219
30.000
300.000

2.230

17.840

342684622.xls

K.225
11,400.00

11,400.00

11,400.00

11,400.00

11,400.00

545,375.00

384,900.00

2,412,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

4,350,275.00

545,375.00

K.225
384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

4,350,275.00

Page : 72 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

B
1

Harga
Beton
Rp/m3

Total Harga
(Rp.)

2.230

4.460

Skg. Dia. 10 - 12,5 cm

11.70

0.617

7.219

Total :

30.000
300.000

11,400.00

545,375.00

K.225
384,900.00

4,350,275.00

13.380
6.335
20.000
290.000

11,400.00

545,375.00

K.225
384,900.00

4,236,275.00

545,375.00

K.225
384,900.00

2,754,275.00

4,236,275.00

4,236,275.00

Balok B1.200x350 ( 286 kg )


14.286
Besi Pokok dia. 19 mm
Skg. Dia. 10 - 12 cm

6.00
10.27

2.230
0.617

Plat Lantai t = 12 cm ( 165 kg )


0.120
Besi dia.10 - 15 cm
( Double )

32.000

0.617

RL.5
Balok G1.200x350 ( 286 kg )
14.286
Besi A & B dia. 19 mm
Skg. Dia. 10 - 12 cm

6.00
10.27

2.230
0.617

Balok B1.200x350 ( 286 kg )


14.286
Besi A & B dia. 19 mm
Skg. Dia. 10 - 11,25 cm

6.00
10.88

19.744
19.744
160.000

11,400.00

13.380
6.335
20.000
290.000

11,400.00

545,375.00

K.225
384,900.00

Total :

13.380
6.712
20.000
290.000

11,400.00

545,375.00

K.225
384,900.00

2.980

71.520

Total :
2

Harga
Bekisting
Rp/m3

2.00

Total :
G
1

Harga Besi
Rata Rata
Rp/ Kg

Skg Extra 2 dia.19 mm

Total :
3

Total
Besi
Kg

2.230
0.617

BANG. R .KELAS.
LANTAI.1
- Kolom K1.400X600 ( 367 kg )
4.167
Besi Pokok dia. 22 mm

01/16/2017 - 04:23:19

24.00

342684622.xls

Page : 73 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
18.00

0.888

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Total Harga
(Rp.)

15.984
90.000

Harga
Beton
Rp/m3

Total :

380.000

2.980
0.888

23.840
9.590
30.000

K.225
11,400.00

545,375.00

384,900.00

5,262,275.00

Kolom K2.300X300 ( 367 kg )


11.111
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

8.00
10.80

Total :

330.000

2.980
0.617

47.680
13.883
60.000
180.000

16.00
22.50

Total :

8.00
14.40

2.980
0.617
Total :

6.00
12.60

2.980
0.617
Total :

4,692,275.00

545,375.00

K.225
384,900.00

11,400.00

2,982,275.00

3,210,275.00

23.840
8.885
30.000
200.000

11,400.00

545,375.00

K.225
384,900.00

17.880
7.774
30.000
300.000

11,400.00

545,375.00

K.225
384,900.00

4,350,275.00

545,375.00

K.225
384,900.00

3,780,275.00

Balok Ornamen BG1.200x200 ( 350 kg )


25.000
Besi Pokok dia. 16 mm
Skg. Dia. 10 - 12,5 cm

6.00
7.20

1.580
0.617
Total :

384,900.00

Balok B1. 200x500 ( 260 kg )


10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

545,375.00

Tie Beam TB2. 300x500 ( 220 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

11,400.00

Tie Beam TB1. 400x850 ( 182 kg )


2.941
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

K.225

9.480
4.442
10.000
250.000

11,400.00

Kolom KG1.200x200 ( 325 kg )


25.000

01/16/2017 - 04:23:19

342684622.xls

Page : 74 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Besi Pokok dia. 16 mm

4.00

1.580

6.320

Skg. Dia. 12 - 12,5 cm

7.20

0.888

6.394

Total :

10.000
250.000

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

11,400.00

545,375.00

K.225
384,900.00

Total Harga
(Rp.)

3,780,275.00

LANTAI.2
1

Kolom K1.400X600 ( 317 kg )


4.167
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Kolom K2.300X300 ( 367 kg )


11.111
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

20.00
18.00

8.00
10.80

2.980
0.888
Total :

330.000

2.980
0.888

23.840
9.590
30.000
330.000

Total :
3

Balok B1. 400x850 ( 156 kg )


2.941
Besi Pokok dia. 22 mm
Besi dia.10 mm
Skg. Dia. 8 - 12,5 cm

14.50
2.00
22.50

2.980
0.617
0.395
Total :

Balok B3. 300x500 ( 260 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

10.00
14.40

2.980
0.617
Total :

Balok B3A. 300x500 ( 227 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

8.50
14.40

2.980
0.617
Total :

01/16/2017 - 04:23:19

59.600
15.984
80.000

43.210
1.234
8.888
50.000
150.000

29.800
8.885
40.000
270.000

25.330
8.885
30.000
200.000

342684622.xls

K.225
11,400.00

11,400.00

11,400.00

11,400.00

11,400.00

545,375.00

384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

4,008,275.00

545,375.00

K.225
384,900.00

3,210,275.00

Page : 75 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.
6

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

Balok B4. 200x500 ( 270 kg )


10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

Balok B6. 200x400 ( 313 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

Balok CB1. 300x500 ( 180 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

6.50
12.60

6.00
10.80

6.00
14.40

2.980
0.617
Total :

300.000

2.980
0.617

17.880
6.664
20.000

Total :

250.000

2.980
0.617

17.880
8.885
30.000
200.000

Total :
9

Balok CB2. 200x500 ( 290 kg )


10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

7.00
12.60

2.980
0.617

11

Kolom KB.200X200 ( 425 kg )


( Lt.1 & 2 )
25.000
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 15 cm

Balok Bordes BS ( 338 kg )


( Lt.1 & 2 )
200x400
12.500
Besi Pokok dia. 22 mm
Besi dia.13 mm

01/16/2017 - 04:23:19

4.00
6.13

6.00
2.00

K.225
11,400.00

545,375.00

384,900.00

11,400.00

11,400.00

545,375.00

384,900.00

3,780,275.00

545,375.00

K.225
384,900.00

3,210,275.00

4,350,275.00

6,630,275.00

11,400.00

545,375.00

K.225
384,900.00

Total :

11.920
5.446
20.000
500.000

11,400.00

545,375.00

K.225
384,900.00

2.980
1.040

17.880
2.080

2.980
0.888

342684622.xls

4,350,275.00

K.225

20.860
7.774
30.000
300.000

Total :
10

19.370
7.774
30.000

Page : 76 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Skg. Dia. 10 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
10.80

0.617

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Total Harga
(Rp.)

6.664
30.000

12

Harga
Beton
Rp/m3

Total :

380.000

0.617

19.744
19.744
150.000

K.225
11,400.00

545,375.00

384,900.00

5,262,275.00

545,375.00

K.225
384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

3,780,275.00

545,375.00

K.225
384,900.00

3,780,275.00

545,375.00

K.225
384,900.00

3,780,275.00

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
( Double )

32.000

Total :

13

Balok Ornamen BG1.200x200 ( 350 kg )


25.000
Besi Pokok dia. 16 mm
6.00
Skg. Dia. 10 - 12,5 cm
7.20

1.580
0.617
Total :

14

Kolom KG1.200x200 ( 325 kg )


25.000
Besi Pokok dia. 16 mm
Skg. Dia. 12 - 12,5 cm

4.00
7.20

1.580
0.888
Total :

LANTAI.3
Kolom K1.400X600 ( 267 kg )
4.167
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

16.00
18.00

2.980
0.888
Total :

Kolom K2.300X300 ( 244 kg )


11.111
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 11,25 cm

01/16/2017 - 04:23:19

4.00
11.87

2.980
0.888

9.480
4.442
10.000
250.000

6.320
6.394
10.000
250.000

47.680
15.984
60.000
250.000

11.920
10.538
20.000

342684622.xls

11,400.00

11,400.00

11,400.00

11,400.00

K.225
Page : 77 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Balok B1. 400x850 ( 159 kg )


2.941
Besi Pokok dia. 22 mm
Besi dia.12 mm
Skg. Dia. 8 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
Total :

220.000

14.50

2.980

43.210

2.00

0.888

1.776

22.50

0.395

8.888
50.000
150.000

Total :

Balok B3. 300x500 ( 207 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

7.50
14.40

2.980
0.617
Total :

Balok B3A. 300x500 ( 287 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

11.50
14.40

2.980
0.617
Total :

Balok B4. 200x500 ( 270 kg )


10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

6.50
12.60

2.980
0.617
Total :

Balok B6. 200x400 ( 313 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

01/16/2017 - 04:23:19

Total
Besi
Kg

6.00
10.80

2.980
0.617

22.350
8.885
30.000
200.000

34.270
8.885
40.000
270.000

19.370
7.774
30.000
300.000

17.880
6.664
20.000

342684622.xls

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

11,400.00

545,375.00

384,900.00

3,438,275.00

545,375.00

K.225
384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

4,008,275.00

11,400.00

11,400.00

11,400.00

11,400.00

545,375.00

Total Harga
(Rp.)

K.225
384,900.00

4,350,275.00

K.225
Page : 78 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Balok CB1. 300x500 ( 180 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

Balok CB2. 200x500 ( 290 kg )


10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
( Double )

RS.1
Balok B4. 200x500 ( 270 kg )
10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

01/16/2017 - 04:23:19

11,400.00

545,375.00

384,900.00

3,780,275.00

3,210,275.00

Total Harga
(Rp.)

2.980

17.880

14.40

0.617

8.885

Total :

30.000
200.000

11,400.00

545,375.00

K.225
384,900.00

20.860
7.774
30.000
300.000

11,400.00

545,375.00

K.225
384,900.00

4,350,275.00

545,375.00

K.225
384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

3,780,275.00

545,375.00

K.225
384,900.00

3,780,275.00

7.00
12.60

32.000

Balok Ornamen BG1.200x200 ( 350 kg )


25.000
Besi Pokok dia. 16 mm
6.00
Skg. Dia. 10 - 12,5 cm
7.20

Kolom KG1.200x200 ( 325 kg )


25.000
Besi Pokok dia. 16 mm
Skg. Dia. 12 - 12,5 cm

Harga
Beton
Rp/m3

6.00

2.980
0.617

0.617

1.580
0.617
Total :

12

Harga
Bekisting
Rp/m3

250.000

Total :
11

Harga Besi
Rata Rata
Rp/ Kg

Total :

Total :

10

Total
Besi
Kg

4.00
7.20

6.50
12.60

1.580
0.888

19.744
19.744
150.000

9.480
4.442
10.000
250.000

Total :

6.320
6.394
10.000
250.000

2.980
0.617

19.370
7.774

342684622.xls

11,400.00

11,400.00

11,400.00

Page : 79 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

30.000
2

Balok B5. 300x500 ( 187 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

Balok B6. 200x400 ( 313 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

Total :

300.000

6.50

2.980

19.370

14.40

0.617

8.885

Total :

30.000
200.000

6.00
10.80

2.980
0.617
Total :

Balok CB1. 300x500 ( 200 kg )


6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

7.00
14.40

2.980
0.617
Total :

8.50
2.00
22.50

2.980
0.617
0.617
Total :

Balok B4. 200x500 ( 260 kg )


10.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

6.00
12.60

2.980
0.617
Total :

K.225
11,400.00

11,400.00

545,375.00

384,900.00

4,350,275.00

545,375.00

K.225
384,900.00

3,210,275.00

17.880
6.664
20.000
250.000

545,375.00

K.225
384,900.00

11,400.00

3,780,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

2,298,275.00

545,375.00

K.225
384,900.00

4,350,275.00

RS.2
Balok B1. 400x850 ( 118 kg )
2.941
Besi Pokok dia. 22 mm
Besi dia.10 mm
Skg. Dia. 10 - 12,5 cm

Total Harga
(Rp.)

Harga
Beton
Rp/m3

20.860
8.885
30.000
200.000

25.330
1.234
13.883
40.000
120.000

17.880
7.774
30.000
300.000

11,400.00

11,400.00

11,400.00

Balok B5. 300x500 ( 187 kg )

01/16/2017 - 04:23:19

342684622.xls

Page : 80 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

6.667
Besi Pokok dia. 22 mm

6.50

2.980

19.370

Skg. Dia. 10 - 12,5 cm

14.40

0.617

8.885
30.000
200.000

11,400.00

19.370
7.219
30.000
200.000

11,400.00

Total :

6.50
11.70

2.980
0.617
Total :

Balok BS. 200x250 ( 540 kg )


20.000
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

7.50
7.20

2.980
0.617
Total :

BANG.LABORATORIUM.
LAB.TEHNIK SIPIL
LAB.TEHNIK PERTAMBANGAN
LAB.TEHNIK MESIN
LAB.TEHNIK INDUSTRI
LAB.TEHNIK FISIKA & KIMIA.
LANTAI.1
Kolom K1.350X450 ( 381 kg )
6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

16.00
14.40

2.980
0.888
Total :

3,210,275.00

545,375.00

K.225
384,900.00

3,210,275.00

545,375.00

K.225
384,900.00

7,770,275.00

545,375.00

K.225
384,900.00

5,262,275.00

BALOK SOPI - SOPI


Balok B5. 300x500 ( 180 kg )
6.667
Besi Pokok dia. 22 mm
Skg. Dia. 10 - 12,5 cm

545,375.00

K.225
384,900.00

22.350
4.442
30.000
600.000

47.680
12.787
60.000
380.000

11,400.00

11,400.00

Kolom K2.350X450 ( 419 kg )


6.349

01/16/2017 - 04:23:19

342684622.xls

Page : 81 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Besi Pokok dia. 22 mm

18.00

2.980

53.640

Skg. Dia. 12 - 12,5 cm

14.40

0.888

12.787

Total :

70.000
440.000

16.00
14.40

2.980
0.888
Total :

Kolom K4.450X450 ( 365 kg )


4.938
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

20.00
16.20

2.980
0.888
Total :

Tie Beam TB1.300X400 ( 342 kg )


8.333
Besi Pokok dia. 22 mm
Besi Extra dia. 22 mm
Besi dia.8 mm - 500
Skg. Dia. 12 - 12,5 cm

8.00
2.00
0.60
12.60

2.980
2.980
0.395
0.888
Total :

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

11,400.00

545,375.00

K.225
384,900.00

5,946,275.00

545,375.00

K.225
384,900.00

5,262,275.00

545,375.00

K.225
384,900.00

4,920,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

4,692,275.00

Total Harga
(Rp.)

Kolom K3.350X450 ( 381 kg )


6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Total
Besi
Kg

Tie Beam TB2.300X500 ( 367 kg )


6.667
Besi Pokok dia. 22 mm
Besi Extra dia. 22 mm
Besi dia.8 mm - 500
Skg. Dia. 12 - 12,5 cm

Tie Beam TB3.250X500 ( 296 kg )


8.000
Besi Pokok dia. 22 mm
Besi Extra dia. 22 mm

01/16/2017 - 04:23:19

12.00
2.00
0.60
14.40

6.00
2.00

2.980
2.980
0.395
0.888

47.680
12.787
60.000
380.000

59.600
14.386
70.000
350.000

23.840
5.960
0.237
11.189
40.000
330.000

Total :

35.760
5.960
0.237
12.787
50.000
330.000

2.980
2.980

17.880
5.960

342684622.xls

11,400.00

11,400.00

11,400.00

11,400.00

Page : 82 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Besi dia.8 mm - 500
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
0.50

0.395

0.198

14.40

0.888

12.787

Total :

40.000
320.000

6.00
2.00
0.50
14.40

2.980
2.980
0.395
0.888
Total :

LANTAI.2
Kolom K1.350X450 ( 311 kg )
6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

12.00
14.40

2.980
0.888
Total :

Kolom K2.350X450 ( 381 kg )


6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

16.00
14.40

2.980
0.888
Total :

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

11,400.00

545,375.00

K.225
384,900.00

4,578,275.00

545,375.00

K.225
384,900.00

4,578,275.00

4,578,275.00

Total Harga
(Rp.)

Tie Beam B1.250X500 ( 296 kg )


8.000
Besi Pokok dia. 22 mm
Besi Extra dia. 22 mm
Besi dia.8 mm - 500
Skg. Dia. 12 - 12,5 cm

Total
Besi
Kg

Kolom K3.350X450 ( 381 kg )


6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

16.00
14.40

2.980
0.888
Total :

01/16/2017 - 04:23:19

17.880
5.960
0.198
12.787
40.000
320.000

11,400.00

35.760
12.787
50.000
320.000

11,400.00

545,375.00

K.225
384,900.00

47.680
12.787
60.000
380.000

11,400.00

545,375.00

K.225
384,900.00

5,262,275.00

545,375.00

K.225
384,900.00

5,262,275.00

47.680
12.787
60.000
380.000

342684622.xls

11,400.00

Page : 83 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

20.00
16.20

2.980
0.888

59.600
14.386
70.000

Balok G1.300x400 ( 325 kg )


8.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

9.50
12.60

Balok G2.250x300 ( 373 kg )


13.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Balok G3.300x500 ( 327 kg )


6.667
Besi Pokok dia. 22 mm
Besi dia.22 mm
Skg. Dia. 12 - 12,5 cm

6.50
9.90

10.00
2.00
14.40

350.000

11,400.00

545,375.00

384,900.00

4,920,275.00

2.980
0.888

28.310
11.189
40.000
330.000

11,400.00

545,375.00

K.225
384,900.00

4,692,275.00

2.980
0.888

Balok CG1.300x400 ( 292 kg )


8.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

8.00
12.60

400.000

2.980
2.980
0.888

29.800
5.960
12.787
50.000
330.000

2.980
0.888
Total :

Balok B1.200x300 ( 433 kg )


16.667
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

01/16/2017 - 04:23:19

6.00
9.00

19.370
8.791
30.000

Total :

Total :
4

K.225

Total :

Total :
2

Total Harga
(Rp.)

Kolom K4.450X450 ( 365 kg )


4.938
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Harga
Beton
Rp/m3

2.980
0.888

23.840
11.189
40.000
330.000

17.880
7.992
30.000

342684622.xls

K.225
11,400.00

11,400.00

11,400.00

545,375.00

384,900.00

5,490,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

4,692,275.00

K.225
Page : 84 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Balok B2.200x400 ( 375 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Balok CB1.200x400 ( 388 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
Total :

500.000

6.50

2.980

19.370

11.70

0.888

10.390

Total :

30.000
380.000

7.00
11.70

2.980
0.888
Total :

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
Besi dia.10 - 15 cm

Total
Besi
Kg

16.00
16.00

0.617
0.617

20.860
10.390
30.000
380.000

12.00
14.40

2.980
0.888
Total :

11,400.00

545,375.00

384,900.00

6,630,275.00

545,375.00

K.225
384,900.00

5,262,275.00

545,375.00

K.225
384,900.00

5,262,275.00

11,400.00

11,400.00

Harga
Beton
Rp/m3

Total Harga
(Rp.)

K.225
11,400.00

545,375.00

384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

4,578,275.00

545,375.00

K.225
384,900.00

4,578,275.00

LANTAI.3.
Kolom K1.350X450 ( 311 kg )
6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Harga
Bekisting
Rp/m3

9.872
9.872
19.744
150.000

Harga Besi
Rata Rata
Rp/ Kg

Kolom K2.350X450 ( 311 kg )


6.349
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Kolom K3.350X450 ( 311 kg )


6.349
Besi Pokok dia. 22 mm

01/16/2017 - 04:23:19

12.00
14.40

12.00

2.980
0.888

35.760
12.787
50.000
320.000

Total :

35.760
12.787
50.000
320.000

2.980

35.760

342684622.xls

11,400.00

11,400.00

Page : 85 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
14.40

0.888

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Total Harga
(Rp.)

12.787
50.000

Harga
Beton
Rp/m3

Total :

320.000

2.980
0.888

47.680
14.386
60.000
300.000

K.225
11,400.00

545,375.00

384,900.00

4,578,275.00

545,375.00

K.225
384,900.00

4,350,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

5,490,275.00

545,375.00

K.225
384,900.00

4,692,275.00

Kolom K4.450X450 ( 306 kg )


4.938
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

16.00
16.20

Total :
1

Balok G1.300x400 ( 325 kg )


8.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

9.50
12.60

2.980
0.888
Total :

Balok G2.250x300 ( 373 kg )


13.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

6.50
9.90

2.980
0.888
Total :

Balok G3.300x500 ( 327 kg )


6.667
Besi Pokok dia. 22 mm
Besi dia.22 mm
Skg. Dia. 12 - 12,5 cm

Balok CG1.300x400 ( 292 kg )


8.333
Besi Pokok dia. 22 mm

01/16/2017 - 04:23:19

10.00
2.00
14.40

8.00

2.980
2.980
0.888

28.310
11.189
40.000
330.000

19.370
8.791
30.000
400.000

Total :

29.800
5.960
12.787
50.000
330.000

2.980

23.840

342684622.xls

11,400.00

11,400.00

11,400.00

11,400.00

Page : 86 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan
Skg. Dia. 12 - 12,5 cm

Jumlah Berat
Besi
Besi
Bh/m'
Kg
12.60

0.888

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Total Harga
(Rp.)

11.189
40.000

Harga
Beton
Rp/m3

Total :

330.000

2.980
0.888

17.880
7.992
30.000
500.000

K.225
11,400.00

545,375.00

384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

6,630,275.00

545,375.00

K.225
384,900.00

5,262,275.00

Balok B1.200x300 ( 433 kg )


16.667
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

6.00
9.00

Total :
6

Balok B2.200x400 ( 375 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

6.50
11.70

2.980
0.888
Total :

Balok CB1.200x400 ( 388 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

Plat Lantai t = 13 cm ( 152 kg )


0.130
Besi dia.10 - 15 cm
Besi dia.10 - 15 cm

RL - 1 .
Balok G1.300x400 ( 325 kg )
8.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

7.00
11.70

16.00
16.00

9.50
12.60

2.980
0.888

380.000

0.617
0.617

9.872
9.872
19.744
150.000

2.980
0.888

11,400.00

20.860
10.390
30.000

Total :

Total :
2

19.370
10.390
30.000
380.000

11,400.00

28.310
11.189
40.000
330.000

K.225
11,400.00

11,400.00

11,400.00

545,375.00

384,900.00

5,262,275.00

545,375.00

K.225
384,900.00

2,640,275.00

545,375.00

K.225
384,900.00

4,692,275.00

Balok G2.250x300 ( 373 kg )


13.333

01/16/2017 - 04:23:19

342684622.xls

Page : 87 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Besi Pokok dia. 22 mm

6.50

2.980

19.370

Skg. Dia. 12 - 12,5 cm

9.90

0.888

8.791

Total :

30.000
400.000

10.00
2.00
14.40

2.980
2.980
0.888
Total :

Balok CG1.300x400 ( 292 kg )


8.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

8.00
12.60

2.980
0.888
Total :

Balok B1.200x300 ( 433 kg )


16.667
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

6.00
9.00

2.980
0.888
Total :

Balok CB1.200x400 ( 375 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

7.00
10.80

2.980
0.888
Total :

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

11,400.00

545,375.00

K.225
384,900.00

5,490,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

4,692,275.00

545,375.00

K.225
384,900.00

6,630,275.00

545,375.00

K.225
384,900.00

5,262,275.00

Total Harga
(Rp.)

Balok G3.300x500 ( 327 kg )


6.667
Besi Pokok dia. 22 mm
Besi dia.22 mm
Skg. Dia. 12 - 12,5 cm

Total
Besi
Kg

29.800
5.960
12.787
50.000
330.000

23.840
11.189
40.000
330.000

17.880
7.992
30.000
500.000

20.860
9.590
30.000
380.000

11,400.00

11,400.00

11,400.00

11,400.00

RL - 2 .
Balok G1.300x400 ( 267 kg )

01/16/2017 - 04:23:19

342684622.xls

Page : 88 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

8.333
Besi Pokok dia. 22 mm

7.00

2.980

20.860

Skg. Dia. 12 - 12,5 cm

12.60

0.888

11.189
30.000
250.000

Total :
2

Balok G2.250x300 ( 360 kg )


13.333
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

6.00
9.90

2.980
0.888
Total :

Balok G3.300x500 ( 293 kg )


6.667
Besi Pokok dia. 22 mm
Besi dia.22 mm
Skg. Dia. 12 - 12,5 cm

8.50
2.00
14.40

2.980
2.980
0.888
Total :

Balok B2.200x400 ( 363 kg )


12.500
Besi Pokok dia. 22 mm
Skg. Dia. 12 - 12,5 cm

6.50
10.80

2.980
0.888
Total :

Plat Lantai t = 15 cm ( 132 kg )


0.150
Besi dia.10 - 15 cm
Besi dia.10 - 15 cm

16.00
16.00

0.617
0.617

17.880
8.791
30.000
400.000

25.330
5.960
12.787
40.000
270.000

19.370
9.590
30.000
380.000

9.872
9.872
19.744
130.000

11,400.00

11,400.00

11,400.00

11,400.00

11,400.00

545,375.00

K.225
384,900.00

3,780,275.00

545,375.00

K.225
384,900.00

5,490,275.00

545,375.00

K.225
384,900.00

4,008,275.00

545,375.00

K.225
384,900.00

5,262,275.00

545,375.00

K.225
384,900.00

2,412,275.00

RL - 3 .
01/16/2017 - 04:23:19

342684622.xls

Page : 89 Of 118

ANALISA HARGA SATUAN


#REF!
#REF!

No.
1

Item Pekerjaan

Jumlah Berat
Besi
Besi
Bh/m'
Kg

Total
Besi
Kg

Harga Besi
Rata Rata
Rp/ Kg

Harga
Bekisting
Rp/m3

Harga
Beton
Rp/m3

Total Harga
(Rp.)

Balok G1.300x400 ( 267 kg )


8.333
Besi Pokok dia. 16 mm
Skg. Dia. 12 - 12,5 cm

6.00
12.60

1.580
0.888
Total :

01/16/2017 - 04:23:19

9.480
11.189
20.000
170.000

342684622.xls

K.225
11,400.00

545,375.00

384,900.00

2,868,275.00

Page : 90 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

- DAFTAR HARGA SATUAN BAHAN


- DAERAH SAMARINDA - KALTIM.
- Pasir Urug
- Pasir Pasang
- Pasir Beton
- Kerikil/Split
- Sirtu
- Batu Kali/Batu Belah
- Batu Bata Ukr 21x10,5x4,5.
- Semen/PC @ 50 kg
- Semen Putih/Warna
- Kayu Meranti/Kaso 5x7
- Kayu ulin
- Papan Bengkirai 3x30
- Balok Bengkirai
- Kayu Kusen (Kamper Oven)
- Papan Kayu Borneo
- Kayu Dolken 8 - 10 Ukr.350 - 400 cm.
- Besi Beton Rata
- Paku Rupa 5,7,10 cm.
- Kawat Beton
- Genteng Beton 1m2 = 14 bh / m2.
- Nock Genteng Beton.
- Ceramic 10/20 Roman ( Gol.B.)
- Ceramic 20/20 Roman
- Ceramic 30/30 Roman
- Triplex 4 mm
- Multiplex 6 mm
- Multiplex 9 mm
- List Kamper.
- Amplas
- Paku Triplex
- Cat Tembok Setara ICI / Dalam.
- Plamur Tembok Setara Matek / Metrolite.
- Cat Kayu/Besi Setara Glotek.
- Manie Kayu Setara Nippon.
- Plamur Kayu
- Minyak Cat / Tinner.
- Lem Aibon
- Kaca Polos 5 mm
- Kaca Ryband 5 mm
- Kaca Ryband 10 mm
- Kaca Polos 10 mm

Printed : 01/16/2017

UNIT

VOLUME

m
m
m
m
m
m
Bh
Zag
kg
m
m
m
m
m
m
Btg
kg
kg
kg
m
m
m
m
m
Lbr
Lbr
Lbr
m1
Lbr
kg
kg
kg
kg
Ltr
Kg
Ltr
kg
m
m
m
m

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

342684622.xls

HARGA SATUAN
( Rp )

55,000.00
140,800.00
201,300.00
180,000.00
120,000.00
201,250.00
450.00
32,500.00
2,500.00
975,500.00
1,200,000.00
1,150,000.00
1,100,000.00
1,100,000.00
875,000.00
15,000.00
9,200.00
19,375.00
11,250.00
55,000.00
14,000.00
27,000.00
47,500.00
52,250.00
37,500.00
47,500.00
79,800.00
2,500.00
2,500.00
9,500.00
27,000.00
8,250.00
30,000.00
11,000.00
12,500.00
15,125.00
17,500.00
60,000.00
86,500.00
258,600.00
147,500.00

TOTAL HARGA
( Rp )

55,000.00
140,800.00
201,300.00
180,000.00
120,000.00
201,250.00
450.00
32,500.00
2,500.00
975,500.00
1,200,000.00
1,150,000.00
1,100,000.00
1,100,000.00
875,000.00
15,000.00
9,200.00
19,375.00
11,250.00
55,000.00
14,000.00
27,000.00
47,500.00
52,250.00
37,500.00
47,500.00
79,800.00
2,500.00
2,500.00
9,500.00
27,000.00
8,250.00
30,000.00
11,000.00
12,500.00
15,125.00
17,500.00
60,000.00
86,500.00
258,600.00
147,500.00

Page : 91 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

- Papan 20/20 (untuk Bekisting)


- Semen Grouting
- Marmer 10/30
- Reng ( 3x4 ) x 400 Kamper Samarinda.
- Amplas Besi
- Cetakan Beton
- Water Proofing (Ekogum - Betek)
- Self Aditive Membrans
- Paving t.8 cm ( Ukr. 8x21x10,5 } Abu - Abu.
- Paving Block Cisangkan t=8cm ( Truepave)
- Kansteen Abu-Abu (10 x 20 x 40)
- Kawat Las AW.SE.6013.
- Papan 3/30 (Kamper Samarinda Oven)
- Baja Profil WF
- Lapisan Aluminium Foil .
- Roster / Krawang 12x11x24.
- Kramik 40 x 40 Royal ( Gol.B ).
- Lantai Beton .
- Kawat Ayam.
- Paku Payung.
- Rangka Metal Furing.
- Kramik Homogeus 40x40 cm.
- Beton Ready Mix K.300 Slump 12 cm.
- Ready Mix K 225 Slump.12 cm.
- Ready Mix K 300 Slump.12 cm.
- Canal C.125x50x20x3,2.
- Pek.Pengecatan.
- Besi L.70x70x7.
- Base Plate t = 12 mm.
- Plate t = 8 mm.
- Pipa Schedule 40.dia.1''
- Pipa Schedule 40.dia.2''
- Pipa Schedule 40.dia.3''
- Balok 8/15 & 6/15 ( Kayu Meranti ).
- Plint Kramik 10 x 20 cm.
- Plint Kramik 10 x 30 cm.
- Batu Candi 10 x 20 cm.
- Kloset Toto Type CW.660 J / SW 660 J.
- Kloset Jongkok Toto Type CE.6 ( Std ).
- Kloset Jongkok Toto Type CE.7 ( Std ).
- Kloset Jongkok Toto Type CE.9/TV 150
NWV 12
- Shower Spray Toto Type TX 403 S CR.
Printed : 01/16/2017

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

m
Kg
m
m
Lbr
m
m
m
m
bh
m1
Btg
m
Kg
m
Bh
m
m
m
m
m
m
m
m
m
kg
kg
kg
kg
kg
kg
kg
kg
m
Bh
Bh
m
unit
unit
unit

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

812,500.00
5,000.00
37,500.00
1,300.00
2,500.00
25,000.00
32,000.00
37,500.00
55,000.00
1,280.00
36,250.00
1,450.00
3,750,000.00
7,500.00
7,500.00
5,000.00
41,000.00
850,000.00
12,500.00
7,500.00
23,000.00
165,000.00
306,800.00
333,550.00
382,250.00
4,500.00
750.00
5,250.00
6,200.00
6,200.00
9,750.00
7,700.00
7,100.00
975,000.00
1,400.00
2,050.00
75,000.00
1,644,000.00
310,800.00
162,000.00

812,500.00
5,000.00
37,500.00
1,300.00
2,500.00
25,000.00
32,000.00
37,500.00
55,000.00
1,300.00
36,250.00
1,450.00
3,750,000.00
7,500.00
7,500.00
5,000.00
41,000.00
850,000.00
12,500.00
7,500.00
23,000.00
165,000.00
306,800.00
333,550.00
382,250.00
4,500.00
750.00
5,250.00
6,200.00
6,200.00
9,750.00
7,700.00
7,100.00
975,000.00
1,400.00
2,050.00
75,000.00
1,644,000.00
310,800.00
162,000.00

unit
unit

1.00
1.00

1,898,400.00
315,600.00

1,898,400.00
315,600.00

342684622.xls

Page : 92 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

- Shower Spray Toto Type TB 19 CSN CR.


- Double Robe Hook Toto Type TS.118 WS
- Wastafel Toto Type L.522.V.3.
- Wastafel Toto Type L.521.V.1 A.
- Urinoir Toto Type U.57 M.
- Penyekat Urinoir Toto Type A.100.
- Floor Drain Toto Type TX.1 AN.
- Kran Toto Type T.23 B.13.
- Tempat Handuk Toto Type TX.4.A.
- Tempat Sabun Toto Type S.11.N ( Std ).
- Tempat Sabun Toto Type S.160.V.1.
- Heavy Duty Mirror ( 455x608mm) Toto
Type TS.119 AS.5
- Fixed Shower Head Toto Type TB.18 R
- Main Tee CKM 3600 x 24 x 38 mm.
- Cross Tee CKM 1200 x 24 x 28 mm.
- Wall Angle L = 3 m.
- Main Tee Clip.
- Rod Drat BWG 8.
- Mur + Ring.
- Angle Clip.
- Paku Peluru.
- Concrete Nail.
- Floor Deck 1.Hi-Ten G.550 t = 0,75mm.
- Atap Spandek HI-TEN t=0,40 TCT
- Underlayer ( Torching )
- Atap Genteng Monier Type Centurion
- Nock Monier Type Centurion
- Floor Hardener Warna Lain 5 kg/M2
- Floor Hardener Warna Cemen 5 kg/M2
- AM.40 ( 5 kg/M2 )
- Kalsiboard t = 3,5 mm
- Kalsiboard t = 4,5 mm
- Sekrup Kalsiboard
- Rangka Metal Kalsiboard
- Joint Tape + Kompon Kalsiboard
- Plamur Semua Permukaan Kalsiboard
- Rangka Metal Partisi Jayaboral
- GRC BOARD.
- 5 mm x 1220 mm x 2440 mm
- 6 mm x 1220 mm x 2440 mm
- 8 mm x 1220 mm x 2440 mm
- 10 mm x 1220 mm x 2440 mm
Printed : 01/16/2017

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

402,000.00
90,000.00
1,416,000.00
1,264,800.00
1,587,600.00
720,000.00
166,800.00
122,400.00
416,400.00
38,400.00
148,800.00
314,400.00

402,000.00
90,000.00
1,416,000.00
1,264,800.00
1,587,600.00
720,000.00
166,800.00
122,400.00
416,400.00
38,400.00
148,800.00
314,400.00

unit
btg
btg
btg
pcs
pcs
pcs
pcs
pcs
pcs
m
m
m
bh
bh
kg
kg
kg
m
m
bh
m
m
m
m

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

765,600.00
21,600.00
6,120.00
12,285.00
600.00
500.00
75.00
240.00
850.00
70.00
117,500.00
64,293.00
66,000.00
2,310.00
3,905.00
8,000.00
5,000.00
5,000.00
10,750.00
14,000.00
55.00
13,000.00
4,000.00
2,300.00
20,500.00

765,600.00
21,600.00
6,100.00
12,300.00
600.00
500.00
75.00
240.00
850.00
70.00
117,500.00
64,300.00
66,000.00
2,300.00
3,900.00
8,000.00
5,000.00
5,000.00
10,800.00
14,000.00
55.00
13,000.00
4,000.00
2,300.00
20,500.00

m
m
m
m

1.00
1.00
1.00
1.00

53,500.00
70,500.00
98,500.00
123,500.00

53,500.00
70,500.00
98,500.00
123,500.00

342684622.xls

Page : 93 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

- DAFTAR HARGA SATUAN UPAH


- DAERAH SAMARINDA - KALTIM.
-Tukang
- Kepala Tukang
- Pekerja
- Mandor
- Upah Giling
- Sewa Alat Bantu (Molen, Vibrator dll.)
- Pembesian (Upah)
- Perataan Permukaan Beton
- Sewa Pompa & Alat Bantu.

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

org / hri
org / hri
org / hri
org / hri
m
Set
Kg
m
m

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

27,500.00
34,375.00
20,625.00
37,500.00
750.00
250,000.00
800.00
17,500.00
12,700.00

27,500.00
34,375.00
20,625.00
37,500.00
750.00
250,000.00
800.00
17,500.00
12,700.00

- BIAYA/SEWA ALAT POMPA


- Volume 15 - 45 m3
- Volume 46 - 100 m3
- Volume 101 - 150 m3
- Volume 151 - 200 m3

m
m
m
m

1.00
1.00
1.00
1.00

25,666.67
12,650.00
9,166.67
7,425.00

25,700.00
12,700.00
9,200.00
7,400.00

- PEKERJAAN BOUWPLANK / M1.


- Bahan :
- Papan Kayu Borneo
- Kayu Dolken 8 - 10 Ukr.350 - 400 cm.
- Paku Rupa 5,7,10 cm.

m
Btg
Kg

0.00
0.35
0.03

875,000.00
15,000.00
19,375.00

3,500.00
5,250.00
484.38

org / hri
org / hri
org / hri

0.03
0.15
0.02

27,500.00
20,625.00
37,500.00
Rounded :

825.00
3,093.75
562.50
13,700.00

m
m
Zag

1.20
0.32
2.56

201,250.00
140,800.00
32,500.00

241,500.00
45,056.00
83,200.00

org / hri
org / hri
org / hri
org / hri

0.60
1.80
0.06
0.02

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

16,500.00
37,125.00
2,062.50
675.00
426,100.00

- Upah :
-Tukang Kayu
- Pekerja
- Mandor

- PEK. PONDASI BATU KALI (1:4)/M


- Bahan :
- Batu Kali/Batu Belah
- Pasir Pasang
- Semen/PC @ 50 kg
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor
Printed : 01/16/2017

342684622.xls

Page : 94 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

- PEK. DINDING BATA (1:2)/M


- Bahan :
- Batu Bata
- Pasir Pasang
- Semen/PC @ 50 kg
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

- PEK. DINDING BATA (1:4)/M


- Bahan :
- Batu Bata
- Pasir Pasang
- Semen/PC @ 50 kg
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

- PEKERJAAN PLESTERAN (1:2)/M


- Bahan :
- Pasir Pasang
- Semen/PC @ 50 kg
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

- PEKERJAAN PLESTERAN (1:4)/M2


- Bahan :
- Pasir Pasang
Printed : 01/16/2017

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

m
m
Zag

70.00
0.06
0.60

450.00
140,800.00
32,500.00

31,500.00
7,884.80
19,500.00

org / hri
org / hri
org / hri
org / hri

0.13
0.36
0.02
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

3,575.00
7,425.00
618.75
375.00
70,900.00

m
m
Zag

70.00
0.06
0.52

450.00
140,800.00
32,500.00

31,500.00
8,448.00
16,900.00

org / hri
org / hri
org / hri
org / hri

0.13
0.36
0.02
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

3,575.00
7,425.00
618.75
375.00
68,800.00

m
Zag

0.03
0.30

140,800.00
32,500.00

4,224.00
9,750.00

org / hri
org / hri
org / hri
org / hri

0.10
0.30
0.02
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

2,750.00
6,187.50
618.75
375.00
23,900.00

0.03

140,800.00

342684622.xls

4,505.60
Page : 95 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Semen/PC @ 50 kg

- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

- PEK. PS. LANTAI KERAMIK (20/20)/M


- Bahan :
- Kramik 20/20
- Pasir Pasang
- Semen/PC @ 50 kg
- Semen Warna
- Upah :
-Tukang Kramik
- Pekerja
- Kepala Tukang
- Mandor

- PEK. PS. LANTAI KERAMIK (30/30)/M


- Bahan :
- Kramik 30/30
- Pasir Pasang
- Semen/PC @ 50 kg
- Semen Warna
- Upah :
-Tukang Kramik
- Pekerja
- Kepala Tukang
- Mandor

- PEK. KUSEN KAYU KAMPER OVEN/M


- Bahan :
- Balok 6/15 Kayu Kamper Oven
- Paku (Rupa)
- Lem Kayu
Printed : 01/16/2017

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

Zag

0.24

32,500.00

7,800.00

org / hri
org / hri
org / hri
org / hri

0.10
0.30
0.02
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

2,750.00
6,187.50
618.75
300.00
22,200.00

m
m
Zag
Kg

1.00
0.03
0.26
0.50

47,500.00
140,800.00
32,500.00
2,500.00

47,500.00
4,224.00
8,450.00
1,250.00

org / hri
org / hri
org / hri
org / hri

0.32
0.42
0.06
0.03

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

8,800.00
8,662.50
2,062.50
937.50
81,900.00

m
m
Zag
Kg

1.00
0.03
0.26
0.50

52,250.00
140,800.00
32,500.00
2,500.00

52,250.00
4,224.00
8,450.00
1,250.00

org / hri
org / hri
org / hri
org / hri

0.32
0.42
0.06
0.03

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

8,800.00
8,662.50
2,062.50
937.50
86,600.00

m
Kg
Kg

1.15
5.00
2.50

1,100,000.00
19,375.00
17,500.00

1,265,000.00
96,875.00
43,750.00

342684622.xls

Page : 96 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

- Upah :
- Tukang Kayu
- Pekerja
- Kepala Tukang
- Mandor

- PEK. KAP/KUDA/M (Kayu Meranti)


- Bahan :
- Balok 8/15 & 6/15
- Paku (Rupa + Beugel)
- Upah :
- Tukang Kayu
- Pekerja
- Kepala Tukang
- Mandor

- PEK. RANGKA ATAP (Kaso + Reng)/M


- Bahan :
- Kaso 5/7 (Borneo)
- Reng 3/4
- Paku (Rupa)
- Upah :
-Tukang Kayu
- Pekerja
- Kepala Tukang
- Mandor

- PEKERJAAN RANGKA PLAFOND/M


- Bahan :
- Kaso/Balok (Borneo)
- Paku (Rupa + Beugel)
- Upah :
-Tukang Kayu
Printed : 01/16/2017

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

org / hri
org / hri
org / hri
org / hri

24.00
6.00
2.40
0.60

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

660,000.00
123,750.00
82,500.00
22,500.00
2,294,400.00

m
Kg

1.10
5.00

975,000.00
19,375.00

1,072,500.00
96,875.00

org / hri
org / hri
org / hri
org / hri

18.00
6.00
1.80
0.60

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

495,000.00
123,750.00
61,875.00
22,500.00
1,872,500.00

m
m1
Kg

0.01
6.00
0.25

975,500.00
1,300.00
19,375.00

11,706.00
7,800.00
4,843.75

org / hri
org / hri
org / hri
org / hri

0.10
0.20
0.12
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

2,750.00
4,125.00
4,125.00
375.00
35,700.00

m
Kg

0.02
0.25

875,000.00
19,375.00

17,500.00
4,843.75

org / hri

0.30

27,500.00

342684622.xls

8,250.00
Page : 97 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Pekerja
- Kepala Tukang
- Mandor

- PEK. PLAFOND (Multiplex 6 mm)/M


- Bahan :
- Multiplex 6 mm
- Paku (Triplex)
- Upah :
- Tukang Kayu
- Pekerja
- Kepala Tukang
- Mandor

- PEK.PENGECATAN DINDING TEMBOK/M


- Bahan :
- Cat tembok
- Plamur
- Amplas
- Upah :
-Tukang Cat
- Pekerja
- Kepala Tukang
- Mandor

- PEK. PENGECATAN PLAFOND/M


- Bahan :
- Cat
- Plamur
- Amplas
- Upah :
- Tukang Cat
- Pekerja
- Kepala Tukang
- Mandor

Printed : 01/16/2017

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

org / hri
org / hri
org / hri

0.10
0.03
0.01

20,625.00
34,375.00
37,500.00
Rounded :

2,062.50
1,031.25
375.00
34,100.00

Lbr
Kg

0.36
0.15

47,500.00
9,500.00

17,100.00
1,425.00

org / hri
org / hri
org / hri
org / hri

0.12
0.18
0.01
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

3,300.00
3,712.50
412.50
375.00
26,300.00

Kg
Kg
Lbr

0.15
0.20
0.50

27,000.00
8,250.00
2,500.00

4,050.00
1,650.00
1,250.00

org / hri
org / hri
org / hri
org / hri

0.20
0.25
0.03
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

5,500.00
5,156.25
1,031.25
375.00
19,000.00

Kg
Kg
Lbr

0.20
0.20
0.50

27,000.00
8,250.00
2,500.00

5,400.00
1,650.00
1,250.00

org / hri
org / hri
org / hri
org / hri

0.20
0.25
0.03
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

5,500.00
5,156.25
1,031.25
375.00
20,400.00

342684622.xls

Page : 98 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- PEKERJAAN CAT KAYU/BESI/M
- Bahan :
- Manie Besi
- Minyak Cat
- Cat dasar
- Cat Besi
- Amplas Besi / Kayu

- Upah :
-Tukang Cat
- Kepala Tukang
- Pekerja
- Mandor

- PEK.BETON RINGAN t.10 cm (1:2:3)/M


- Bahan :
- Semen/PC @ 50 kg
- Pasir Beton
- Split/Krikil
- Tulangan ringan 1 lapis
- Upah :
-Tukang batu
- Pekerja
- Kepala Tukang
- Mandor

- PEK.BETON PRAKTIS K.175/ 1 M


- Bahan :
- Semen/PC @ 50 kg
- Pasir Beton
- Split/Krikil
- Besi Beton
- Kawat Beton
- Cetakan Beton
- Paku rupa-rupa
- Upah :
- Tukang
- Kepala Tukang
- Pekerja
- Mandor

Printed : 01/16/2017

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

Kg
Ltr
Kg
Kg
Lbr

0.15
0.30
0.18
0.08
0.75

11,000.00
15,125.00
12,500.00
30,000.00
2,500.00

1,650.00
4,537.50
2,187.50
2,250.00
1,875.00

org / hri
org / hri
org / hri
org / hri

0.20
0.03
0.30
0.02

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

5,500.00
1,031.25
6,187.50
562.50
25,800.00

Zag
m
m
m

0.58
0.05
0.08
1.00

32,500.00
201,300.00
180,000.00
114,080.00

18,850.00
10,870.20
14,760.00
114,080.00

org / hri
org / hri
org / hri
org / hri

0.25
0.25
0.01
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

6,875.00
5,156.25
343.75
375.00
171,300.00

Zag
m
m
Kg
Kg
m
Kg

5.80
0.54
0.82
96.00
2.50
19.50
2.00

32,500.00
201,300.00
180,000.00
11,400.00
11,250.00
25,000.00
19,375.00

188,500.00
108,702.00
147,600.00
1,094,400.00
28,125.00
487,500.00
38,750.00

org / hri
org / hri
org / hri
org / hri

1.60
0.20
3.20
0.02

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

44,000.00
6,875.00
66,000.00
750.00
2,211,200.00

342684622.xls

Page : 99 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- PEK.WATER PROOFING DAK/ATAP BETON / M2
- Bahan :
- Water Proof. (Ekogum - Betek)
- Self aditive Membrans

- Upah :
-Tukang batu
- Kepala Tukang
- Mandor

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

m
m

1.00
1.00

32,000.00
37,500.00

32,000.00
37,500.00

org / hri
org / hri
org / hri

0.25
0.05
0.03

27,500.00
34,375.00
37,500.00
Rounded :

6,875.00
1,718.75
937.50
79,000.00

- PEK.BETON BERTULANG ( 1:2:3)/M3


( TULANGAN = 100 KG )
- BESI PENULANGAN = 100 KG.
Bahan :
- Besi Beton
- Kwt. Beton

Kg
Kg

110.00
3.60

9,200.00
11,250.00

1,012,000.00
40,500.00

- Upah :
-Tukang Besi (Pembesian)

Kg

110.00

750.00

Jadi Harga Besi Per Kg

kg

1.00

11,350.00

82,500.00
1,135,000.00
11,400.00

- BETON COR K.225 / M


Bahan :
- Ready Mix K 225 Slump.12 cm.

1.05

333,550.00

350,227.50

org / hri
org / hri
m

0.50
0.40
1.00

27,500.00
20,625.00
12,700.00
Rounded :

13,750.00
8,250.00
12,700.00
384,900.00

m
Kg

0.42
5.00

812,500.00
19,375.00

341,250.00
96,875.00

org / hri
org / hri

1.20
3.60

27,500.00
20,625.00

33,000.00
74,250.00

- Upah :
-Tukang Batu
- Pekerja
- Sewa Pompa & Alat Bantu.

- BEKISTING PEKERJAAN BETON / M


- Bahan :
- Papan Cor + Kaso (Borneo)
- Paku (Rupa)
- Upah :
- Tukang Kayu
- Pekerja
Printed : 01/16/2017

342684622.xls

Page : 100 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

VOLUME

HARGA SATUAN
( Rp )

545,375.00
2,065,300.00

T O T A L : (A) + (B) + (C) =


- PEKERJAAN JALAN / PARKIR
( KONSTRUKSI PAVING BLOCK )/M2
- Bahan :
- Sirtu
- Pasir Pasang
- Paving t.8 cm

TOTAL HARGA
( Rp )

m
m
m

0.30
0.06
1.00

55,000.00
140,800.00
55,000.00

16,500.00
8,448.00
55,000.00

org / hri
org / hri
org / hri
Lsm

0.15
0.45
0.05
3.00

27,500.00
20,625.00
37,500.00
750.00
Rounded :

4,125.00
9,281.25
1,687.50
2,250.00
97,300.00

- PEKERJAAN PAS. KANSTEEN / M1.


- Bahan :
- Kasteen Ukuran (15 x 25 x 40)
- Pasir Pasang
- Semen/PC @ 50 kg

Bh
m
Zag

2.50
0.03
0.12

36,250.00
140,800.00
32,500.00

90,625.00
3,520.00
3,900.00

- Upah :

Lsm

1.00

3,000.00
Rounded :

3,000.00
101,000.00

- PEKERJAAN WATER PROOFING


(KM/WC & GROUND TANK) / M2.
- Bahan :
- Clementitious (Bahan Additive)
- Perataan Permukaan Beton

m
m

1.00
1.00

37,500.00
17,500.00

37,500.00
17,500.00

Upah :

Lsm

1.00

3,000.00

3,000.00
58,000.00

- PEK. PASANGAN LISTPLANK


(Kayu Kamper Oven) 3/30/M :
- Bahan :
- Papan 3/30
- Paku (rupa-rupa)

m
kg

0.01
0.05

3,750,000.00
19,375.00

26,250.00
968.75

org / hri
org / hri
org / hri

0.25
0.15
0.03

27,500.00
20,625.00
34,375.00

6,875.00
3,093.75
859.38

- Upah :
-Tukang Gali
- Pekerja
- Mandor
- Biaya Gilling 3 x

- Upah :
-Tukang Kayu
- Pekerja
- Kepala Tukang
Printed : 01/16/2017

342684622.xls

Page : 101 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Mandor

- PEK. BAJA PROFIL/Kg.


- Bahan :
- Baja Profil WF
- Kawat Las AW.SE.6013

- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

UNIT
org / hri

- PEK. PASANGAN LISTPLANK


(Kayu Kamper Oven) 3/20/M :
- Bahan :
- Papan 3/20
- Paku (rupa-rupa)
- Upah :
- Tukang
- Kepala Tukang
- Pekerja
- Mandor

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

0.02

37,500.00
Rounded :

562.50
38,600.00

110.00
15.00

7,500.00
1,450.00

825,000.00
21,750.00

1.80
3.60
1.20
0.60

27,500.00
20,625.00
34,375.00
37,500.00

0.01

1,034,250.00

49,500.00
74,250.00
41,250.00
22,500.00
1,034,250.00
10,300.00

1.20

60,000.00

72,000.00

org / hri
org / hri
org / hri
org / hri

0.20
0.02
0.40
0.04

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

5,500.00
687.50
8,250.00
1,500.00
87,900.00

m
kg

0.01
0.50

3,750,000.00
19,375.00

22,500.00
9,687.50

org / hri
org / hri
org / hri
org / hri

0.20
0.02
0.10
0.01

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

5,500.00
687.50
2,062.50
187.50
40,600.00

Kg
Btg

org / hri
org / hri
org / hri
org / hri

Jadi Harga 1 Kg Pekerjaan Baja Profil :


- PEKERJAAN URUGAN PASIR/1 M3.
- Bahan :
- Pasir Urug.
- Upah :
-Tukang
- Kepala Tukang
- Pekerja
- Mandor

VOLUME

- PEK.LAPISAN ALUMINIUM FOIL


DUA MUKA / M2
- Bahan :
Printed : 01/16/2017

342684622.xls

Page : 102 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Lapisan Aluminium Foil Dua Muka.

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

1.10

7,500.00

8,250.00

org / hri
org / hri
org / hri
org / hri

0.08
0.01
0.08
0.01

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

2,282.50
275.00
1,711.88
300.00
12,800.00

Zak
m

0.11
0.02

32,500.00
140,800.00

3,510.00
2,252.80

- Upah :
- Tukang
- Kepala Tukang
- Pekerja
- Mandor

org / hri
org / hri
org / hri
org / hri

0.07
0.01
0.08
0.01

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

1,925.00
240.63
1,650.00
300.00
9,900.00

- PEK.PEMBERSIHAN LAPANGAN / 1 M2.


- Upah :
-Tukang
- Kepala Tukang
- Pekerja
- Mandor

org / hri
org / hri
org / hri
org / hri

0.02
0.01
0.02
0.00

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

550.00
343.75
412.50
37.50
1,300.00

- PEK.GALIAN TANAH BIASA


SEDALAM 2 METER / M3
- Upah :
- Tukang
- Mandor

org / hri
org / hri

0.36
0.04

27,500.00
37,500.00
Rounded :

9,900.00
1,575.00
11,500.00

bh

32.00

5,000.00

- Upah :
-Tukang
- Kepala Tukang
- Pekerja
- Mandor

- PEK.SIAR PASANGAN BATU BELAH / M2.


( 1 Pc : 2 Psr ).
- Bahan :
- Semen / Pc @ 50 kg.
- Pasir Pasang.

- PEK.PASANGAN DINDING ROSTER /


KRAWANG / M2
12 X 11 X 24 ( 1 Pc : 5 Psr ).
- Bahan :
- Roster / Krawang 12x11x24.
Printed : 01/16/2017

342684622.xls

160,000.00
Page : 103 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Semen / Pc @ 50 kg.
- Pasir Pasang.
- Upah :
- Tukang
- Kepala Tukang
- Pekerja
- Mandor

- PAS.LANTAI KRAMIK 400X400 / M2.


- Bahan :
- Semen / Pc @ 50 kg.
- Pasir Pasang.
- Grouting Nat.
- Kramik 40x40 cm.
- Upah :
-Tukang Kramik
- Pekerja
- Kepala Tukang
- Mandor

- PEK.DINDING KRAMIK 20X20 CM / M2.


- Bahan :
- Kramik 20/20
- Pasir Pasang
- Semen / Pc @ 50 kg.
- Semen Warna
Upah :
-Tukang Kramik
- Pekerja
- Kepala Tukang
- Mandor

- PEK.LANTAI HOMOGENEUS 40X40 CM / M2.


- Bahan :
- Semen / Pc @ 50 kg.
- Pasir Pasang.
Printed : 01/16/2017

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

Zak
m

0.20
0.03

32,500.00
140,800.00

6,500.00
3,520.00

org / hri
org / hri
org / hri
org / hri

0.16
0.02
0.48
0.05

27,500.00
34,375.00
20,625.00
37,500.00
Rounded :

4,400.00
550.00
9,900.00
1,800.00
186,700.00

Zak
m
m
m

0.15
0.05
1.00
1.05

32,500.00
140,800.00
2,500.00
41,000.00

4,940.00
6,688.00
2,500.00
43,050.00

org / hri
org / hri
org / hri
org / hri

0.32
0.42
0.06
0.03

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

8,800.00
8,662.50
2,062.50
937.50
77,600.00

m
m
Zag
Kg

1.00
0.04
0.36
0.50

47,500.00
140,800.00
32,500.00
2,500.00

47,500.00
5,632.00
11,700.00
1,250.00

org / hri
org / hri
org / hri
org / hri

0.32
0.42
0.06
0.03

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

8,800.00
8,662.50
2,062.50
937.50
86,500.00

Zak
m

0.43
0.07

32,500.00
140,800.00

14,105.00
10,137.60

342684622.xls

Page : 104 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Grouting Nat.
- Kramik Homogeus 40x40 cm.

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

m
m

1.00
1.05

2,500.00
165,000.00

2,500.00
173,250.00

org / hri
org / hri
org / hri
org / hri

0.32
0.42
0.06
0.03

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

8,800.00
8,662.50
2,062.50
937.50
220,500.00

m
m

0.26
0.04

32,500.00
140,800.00

8,531.25
6,195.20

org / hri
org / hri
org / hri
org / hri

0.10
0.20
0.02
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

2,750.00
4,125.00
515.63
300.00
22,400.00

1.05

306,800.00

322,140.00

- Upah :
-Tukang
- Kepala Tukang
- Pekerja
- Mandor
- Sewa Pompa & Alat Bantu.

org / hri
org / hri
org / hri
org / hri
m

0.20
0.10
0.60
0.02
1.00

27,500.00
34,375.00
20,625.00
37,500.00
12,700.00
Rounded :

5,500.00
3,437.50
12,375.00
750.00
12,700.00
356,900.00

- PEK.STRIPING SETEBAL 20 CM / M2.


- Upah :
- Tukang
- Mandor.

org / hri
org / hri

0.05
0.01

27,500.00
37,500.00
Rounded :

1,375.00
187.50
1,600.00

- Upah :
-Tukang Kramik
- Pekerja
- Kepala Tukang
- Mandor

- PEK.SCREED LANTAI T = 4 CM / M2.


- Bahan :
- Semen / Pc @ 50 kg.
- Pasir Pasang.
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

- PEK.BETON REDY MIX K.300 SLUMP 12 / M3.


- Bahan :
- Beton Ready Mix K.300 Slump 12 cm.

Printed : 01/16/2017

342684622.xls

Page : 105 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

- PEK.URUGAN TANAH KEMBALI / M3.


- Upah :
- Tukang
- Mandor.

org / hri
org / hri

- PEK.CANAL C.125X50X20X3,2./ KG.


- Bahan :
- Canal C.125x50x20x3,2.
- Pek.Pengecatan.
- Kawat Las.AW.SE.6013.

kg
kg
btg

- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri
org / hri

- HARGA BESI CANAL C.125X50X20X3,2 / KG


- PEK.BESI L.70X70X7 / KG.
- Bahan :
- Besi L.70x70x7.
- Pek.Pengecatan.
- Kawat Las.AW.SE.6013.
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

kg
kg
btg

org / hri
org / hri
org / hri
org / hri

- HARGA BESI L.70x70x7 / KG


- PEK.BASE PLAT T = 12 MM / KG.
- Bahan :
- Base Plate t = 12 mm.
- Pek.Pengecatan.
- Kawat Las.AW.SE.6013.
- Upah :
-Tukang
Printed : 01/16/2017

kg
kg
btg

org / hri
342684622.xls

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

0.19
0.02

27,500.00
37,500.00
Rounded :

5,280.00
712.50
6,000.00

110.00
110.00
15.00

4,500.00
750.00
1,450.00

495,000.00
82,500.00
21,750.00

1.20
2.40
1.20
0.60

27,500.00
20,625.00
34,375.00
37,500.00

0.01

745,500.00

33,000.00
49,500.00
41,250.00
22,500.00
745,500.00
7,500.00

110.00
110.00
15.00

5,250.00
750.00
1,450.00

577,500.00
82,500.00
21,750.00

1.20
2.40
1.20
0.60

27,500.00
20,625.00
34,375.00
37,500.00

0.01

828,000.00

33,000.00
49,500.00
41,250.00
22,500.00
828,000.00
8,300.00

110.00
110.00
15.00

6,200.00
750.00
1,450.00

682,000.00
82,500.00
21,750.00

1.20

27,500.00

33,000.00
Page : 106 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri

HARGA BASE PLATE T = 12 MM / KG.


- PEK. PLAT T = 8 MM / KG.
- Bahan :
- Plate t = 8 mm.
- Pek.Pengecatan.
- Kawat Las.AW.SE.6013.

kg
kg
btg

- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri
org / hri
HARGA PLATE T = 8 MM / KG.

- PEK.PIPA SCHEDULE 40 / KG.


- Bahan :
- Pipa Schedule 40.
- Pek.Pengecatan.
- Kawat Las.AW.SE.6013.

kg
kg
btg

- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri
org / hri
HARGA PIPA SCHEDULE 40 / KG.

- PEK.GORDING ( KAYU BORNEO ) / M3.


- Bahan :
- Balok 8/15 & 6/15
- Paku (Rupa + Beugel)

m
Kg

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

2.40
1.20
0.60

20,625.00
34,375.00
37,500.00

0.01

932,500.00

49,500.00
41,250.00
22,500.00
932,500.00
9,300.00

110.00
110.00
15.00

6,200.00
750.00
1,450.00

682,000.00
82,500.00
21,750.00

1.20
2.40
1.20
0.60

27,500.00
20,625.00
34,375.00
37,500.00

0.01

932,500.00

33,000.00
49,500.00
41,250.00
22,500.00
932,500.00
9,300.00

110.00
110.00
15.00

9,750.00
750.00
1,450.00

1,072,500.00
82,500.00
21,750.00

1.20
2.40
1.20
0.60

27,500.00
20,625.00
34,375.00
37,500.00

0.01

1,323,000.00

33,000.00
49,500.00
41,250.00
22,500.00
1,323,000.00
13,200.00

1.15
25.00

975,000.00
19,375.00

1,121,250.00
484,375.00

- Upah :
Printed : 01/16/2017

342684622.xls

Page : 107 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

- Tukang Kayu
- Pekerja
- Kepala Tukang
- Mandor

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

org / hri
org / hri
org / hri
org / hri

12.00
4.00
1.20
0.20

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

330,000.00
82,500.00
41,250.00
7,500.00
2,066,900.00

Zak
m
bh

0.04
0.05
3.30

32,500.00
140,800.00
2,050.00

1,300.00
7,040.00
6,765.00

- Upah :
- Tukang
- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri
org / hri

0.20
0.02
0.02
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

5,500.00
412.50
687.50
375.00
22,100.00

- Upah :
- Tukang
- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri
org / hri

0.32
0.42
0.06
0.03

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

8,800.00
8,662.50
2,062.50
937.50
20,500.00

unit

1.00

1,644,000.00

1,644,000.00

Ls

0.06

1,644,000.00
Rounded :

98,640.00
1,742,600.00

unit

1.00

315,600.00

315,600.00

Ls

0.10

315,600.00

- PEK.PLINT KRAMIK 10 X 30 CM / M1.


- Bahan :
- Semen / Pc @ 50 kg.
- Pasir Pasang.
- Plint Kramik 10 x 30 cm.

- PAS.KLOSET DUDUK TOTO


TYPE CW.660 J / CW 660 J.
- Bahan :
- Kloset Toto Type CW.660 J / SW 660 J.
- Upah :

- PAS.SHOWER SPRAY TOTO TYPE TX 403 SV3 CR.


- Bahan :
- Shower Spray Toto Type TX 403 SV3 CR.
- Upah :
Printed : 01/16/2017

342684622.xls

31,560.00
Page : 108 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )
347,160.00

- PAS.WASTAFEL TOTO TYPE L.521.V.3.


- Bahan :
- Wastafel Toto Type L.521.V.3.
- Upah :

- PAS.WASTAFEL TOTO
TYPE L.521.V.1A.
- Bahan :
- Wastafel Toto Type L.521.V.1 A.
- Upah :

- PAS.URINOIR TOTO TYPE U.57 M.


- Bahan :
- Urinoir Toto Type U.57 M.
- Upah :

- PAS.PENYEKAT URINOIR TOTO TYPE A.100.


- Bahan :
- Penyekat Urinoir Toto Type A.100.
- Upah :

- PAS.FLOOR DRAIN TOTO TYPE TX.1 B.


- Bahan :
- Floor Drain Toto Type TX.1 B.
- Upah :

- PAS.KRAN DINDING TOTO TYPE T.23 B.13.


- Bahan :
- Kran Toto Type T.23 B.13.
- Upah :
Printed : 01/16/2017

unit

1.00

1,416,000.00

1,416,000.00

Ls

0.15

1,416,000.00
Rounded :

212,400.00
1,628,400.00

unit

1.00

1,264,800.00

1,264,800.00

Ls

0.06

1,264,800.00
Rounded :

75,888.00
1,340,700.00

unit

1.00

1,587,600.00

1,587,600.00

Ls

0.06

1,587,600.00
Rounded :

95,256.00
1,682,900.00

unit

1.00

720,000.00

720,000.00

Ls

0.06

720,000.00
Rounded :

43,200.00
763,200.00

unit

1.00

166,800.00

166,800.00

Ls

0.08

166,800.00
Rounded :

13,344.00
180,100.00

unit

1.00

122,400.00

122,400.00

Ls

0.08

122,400.00
Rounded :

9,792.00
132,200.00

342684622.xls

Page : 109 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

unit

1.00

201,000.00

201,000.00

Ls

0.08

201,000.00
Rounded :

16,080.00
217,100.00

unit

1.00

122,000.00

122,000.00

Ls

0.08

122,000.00
Rounded :

9,760.00
131,800.00

unit

1.00

416,400.00

416,400.00

Ls

0.06

416,400.00
Rounded :

24,984.00
441,400.00

unit

1.00

38,400.00

38,400.00

Ls

0.20

38,400.00
Rounded :

7,680.00
46,100.00

m
m
bh

0.30
0.06
50.00

120,000.00
140,800.00
1,300.00

36,000.00
8,448.00
65,000.00

org / hri
org / hri
org / hri

0.15
0.45
0.05

27,500.00
20,625.00
37,500.00

4,125.00
9,281.25
1,687.50

- PAS.KRAN KITCHEN SINK TOTO TYPE T.30 ARQ 13 N


- Bahan :
- Kran Kitchen Sink Type T.30 ARQ 13 N.
- Upah :

- PAS.KRAN TAMAN TOTO TYPE T.26 - 13


- Bahan :
- Kran Taman Toto Type T.26 - 13
- Upah :

- PAS.TEMPAT HANDUK TOTO TYPE TX.4.A


- Bahan :
-Tempat Handuk Toto Type TX.4.A.
- Upah :

- PAS.TEMPAT SABUN TOTO TYPE S.11.N ( STD )


- Bahan :
-Tempat Sabun Toto Type S.11.N.
- Upah :

- PEK.JALAN / PARKIR ( KONS TRUKSI PAVING BLOCK ).


PAVING BLOCK CISANGKAN/ M2.
- Material :
- Sirtu
- Pasir Pasang
- Paving Block Cisangkan Type Truepave
t = 8 cm.
- Upah :
- Tukang Gali
- Pekerja
- Mandor
Printed : 01/16/2017

342684622.xls

Page : 110 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

- Biaya Giling 3 x

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

Ls

3.00

750.00
Rounded :

2,250.00
126,800.00

1.00

64,300.00

64,300.00

- Upah :
-Tukang
- Pekerja
- Kepala Tukang
- Mandor

org / hri
org / hri
org / hri
org / hri

0.10
0.20
0.01
0.01

27,500.00
20,625.00
34,375.00
37,500.00
Rounded :

2,750.00
4,125.00
343.75
187.50
71,700.00

- PEK.GALIAN TANAH BIASA


SEDALAM 1 M / 1M3.
- Upah :
- Tukang
- Mandor

org / hari
org / hari

0.40
0.04

27,500.00
37,500.00
Rounded :

11,000.00
1,500.00
12,500.00

org / hari
org / hari

0.50
0.05

27,500.00
37,500.00
Rounded :

13,750.00
1,875.00
15,600.00

Zag
m
m
kg

0.29
0.03
0.04
5.00

32,500.00
201,300.00
180,000.00
8,000.00

9,425.00
5,435.10
7,380.00
40,000.00

org / hri
org / hri
org / hri

0.25
0.25
0.01

27,500.00
20,625.00
34,375.00

6,875.00
5,156.25
343.75

- PEK.PEMASANGAN ATAP SPANDEK/M2.


HI - TEN T= 0,40 TCT ( 0,35 BMT )
- Material :
- Atap Spandek HI-TEN t=0,40 TCT

- PEKERJAAN PEMADATAN TANAH / M3.


- Upah :
- Tukang
- Mandor

- PEK.FLOOR HAEDENER + BETON ( 1:2:3 ) T= 5CM/M


- Bahan :
- Semen PC @ 50 kg
- Pasir Beton
- Split/Krikil
- Floor Hardener Warna Lain 5 kg
- Upah :
-Tukang
- Pekerja
- Kepala Tukang
Printed : 01/16/2017

342684622.xls

Page : 111 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Mandor

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

org / hri

0.01

37,500.00
Rounded :

375.00
75,000.00

- Bahan :
- Kalsiboard t = 3,5 mm
- Sekrup Kalsiboard
- Rangka Metal Kalsiboard
- Joint Tape + Kompon Kalsiboard
- Plamur Semua Permukaan Kalsiboard

m
bh
m
m
m

1.00
12.00
1.00
1.00
1.00

10,800.00
55.00
13,000.00
4,000.00
2,300.00

10,800.00
660.00
13,000.00
4,000.00
2,300.00

- Upah :

1.00

13,500.00
Rounded :

13,500.00
44,300.00

- Bahan :
- Kalsiboard t = 4,5 mm
- Sekrup Kalsiboard
- Rangka Metal Kalsiboard
- Joint Tape + Kompon Kalsiboard
- Plamur Semua Permukaan Kalsiboard

m
bh
m
m
m

1.00
12.00
1.00
1.00
1.00

14,000.00
55.00
13,000.00
4,000.00
2,300.00

14,000.00
660.00
13,000.00
4,000.00
2,300.00

- Upah :

1.00

14,000.00
Rounded :

14,000.00
48,000.00

m1
m1
m
m
bh
bh
unit
bh

6.90
2.70
1.78
0.42
3.00
2.00
1.00
1.00

90,000.00
80,000.00
375,000.00
70,000.00
17,500.00
12,500.00
350,000.00
7,500.00

621,000.00
216,000.00
667,500.00
29,400.00
52,500.00
25,000.00
350,000.00
7,500.00

- PEK.PLAFOND KALSIBOARD T = 3,5 MM / M2

- PEK.PLAFOND KALSIBOARD T = 4,5 MM / M2

-PEK.KUSEN PINTU TYPE P1.


( Uk.2,60 m x 0,85 m ) = 2,21 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Daun Pintu Teak Wood Sungkai Fin.Melamik
- Kaca t = 5 mm
- Engsel Pintu
- Engsel Jendela
- Kunci merk
- Slot Jendela
Printed : 01/16/2017

342684622.xls

Page : 112 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

- Upah :

VOLUME

HARGA SATUAN
( Rp )

0.07

1,968,900.00
TOTAL :

6.60
2.40
1.47
0.35
3.00
2.00
1.00
1.00

90,000.00
80,000.00
375,000.00
70,000.00
17,500.00
12,500.00
350,000.00
7,500.00

0.07

1,796,750.00
Rounded :

4.90
1.47
3.00
1.00

90,000.00
375,000.00
17,500.00
350,000.00

0.07

1,394,750.00
Rounded :

3.20
0.63
2.00
1.00

75,000.00
450,000.00
17,500.00
350,000.00

0.07

908,500.00
Rounded :

TOTAL HARGA
( Rp )
1,968,900.00
137,823.00
2,106,700.00

-PEK.KUSEN PINTU TYPE P2.


( Uk.2,60 m x 0,70 m ) = 1,82 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Daun Pintu Teak Wood Sungkai Fin.Melamik
- Kaca t = 5 mm
- Engsel Pintu
- Engsel Jendela
- Kunci merk
- Slot Jendela

m1
m1
m
m
bh
bh
unit
bh

- Upah :

594,000.00
192,000.00
551,250.00
24,500.00
52,500.00
25,000.00
350,000.00
7,500.00
1,796,750.00
125,772.50
1,922,500.00

-PEK.KUSEN PINTU TYPE P3.


( Uk.2,1 m x 0,7 m ) = 1,47 m2.
- Bahan :
- Frame Kusen All
- Daun Pintu Teak Wood Sungkai Fin.Melamik
- Engsel Pintu
- Kunci

m1
m
bh
unit

- Upah :

441,000.00
551,250.00
52,500.00
350,000.00
1,394,750.00
97,632.50
1,492,400.00

-PEK.KUSEN JENDELA TYPE P4.


( Uk.0,9 m x 0,7 m ) = 0,63 m2.
- Bahan :
- Frame Kusen Besi
- Daun Pintu Plat Besi Fin. Cat.
- Engsel Pintu
- Kunci

m1
m
bh
unit

- Upah :
Printed : 01/16/2017

342684622.xls

240,000.00
283,500.00
35,000.00
350,000.00
908,500.00
63,595.00
972,100.00
Page : 113 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

UNIT

VOLUME

m1
m1
m
m
bh
bh
unit
unit
bh

7.26
5.12
3.26
0.78
6.00
4.00
1.00
1.00
2.00

90,000.00
80,000.00
375,000.00
70,000.00
17,500.00
12,500.00
350,000.00
37,500.00
7,500.00

0.07

2,895,725.00
Rounded :

5.00
1.84
6.00
1.00
1.00

75,000.00
450,000.00
17,500.00
350,000.00
37,500.00

0.07

1,695,500.00
Rounded :

375,000.00
828,000.00
105,000.00
350,000.00
37,500.00
1,695,500.00
118,685.00
1,814,200.00

21.24
10.32
3.36
5.28
6.00

90,000.00
80,000.00
375,000.00
70,000.00
17,500.00

1,911,600.00
825,600.00
1,260,000.00
369,600.00
105,000.00

-PEK.KUSEN PINTU TYPE PD1.


( Uk.2,60 m x 1,56 m ) = 4,06 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Daun Pintu Teak Wood Sungkai Fin.Melamik
- Kaca t = 5 mm
- Engsel Pintu
- Engsel Jendela
- Kunci merk
- Espagnolet
- Slot Jendela
- Upah :

653,400.00
409,600.00
1,220,625.00
54,600.00
105,000.00
50,000.00
350,000.00
37,500.00
15,000.00
2,895,725.00
202,700.75
3,098,400.00

-PEK.KUSEN PINTU TYPE PD2.


( Uk.2,05 m x 0,90 m ) = 1.84 m2.
- Bahan :
- Frame Kusen Besi
- Daun Pintu Plat Besi
- Engsel Pintu
- Kunci merk
- Espagnolet

m1
m
bh
unit
unit

- Upah :

-PEK.KUSEN PINTU TYPE PJ1.


( Uk.2,70 m x 3,16 m ) = 8,53 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Daun Pintu Teak Wood Sungkai Fin.Melamik
- Kaca t = 5 mm
- Engsel Pintu
Printed : 01/16/2017

m1
m1
m
m
bh
342684622.xls

Page : 114 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN
- Engsel Jendela
- Kunci merk
- Espagnolet
- Slot Jendela

HARGA SATUAN
( Rp )

UNIT

VOLUME

bh
unit
unit
bh

8.00
1.00
1.00
4.00

12,500.00
350,000.00
37,500.00
7,500.00

0.07

4,989,300.00
Rounded :

8.85
11.80
2.17
8.00
4.00

90,000.00
80,000.00
70,000.00
12,500.00
7,500.00

0.07

2,022,400.00
Rounded :

8.85
2.17

90,000.00
70,000.00

0.07

948,400.00
Rounded :

2.30
2.30
0.32

90,000.00
80,000.00
70,000.00

0.07

413,400.00
Rounded :

- Upah :

TOTAL HARGA
( Rp )
100,000.00
350,000.00
37,500.00
30,000.00
4,989,300.00
349,251.00
5,338,600.00

-PEK.KUSEN JENDELA TYPE J1.


( Uk.1,55 m x 1,40 m ) = 2,17 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Kaca t = 5 mm
- Engsel Jendela
- Slot Jendela

m1
m1
m
bh
bh

- Upah :

796,500.00
944,000.00
151,900.00
100,000.00
30,000.00
2,022,400.00
141,568.00
2,164,000.00

-PEK.KUSEN JENDELA TYPE J2.


( Uk.1,55 m x 1,40 m ) = 2,17 m2.
- Bahan :
- Frame Kusen All
- Kaca t = 5 mm

m1
m

- Upah :

796,500.00
151,900.00
948,400.00
66,388.00
1,014,800.00

-PEK.KUSEN JENDELA TYPE BV1.


( Uk.0,5 m x 0,65 m ) = 0,32 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Kaca t = 5 mm

m1
m1
m

- Upah :

Printed : 01/16/2017

342684622.xls

207,000.00
184,000.00
22,400.00
413,400.00
28,938.00
442,300.00
Page : 115 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )

-PEK.KUSEN JENDELA TYPE BV2.


( Uk.1,3 m x 0,5 m ) = 0,65 m2.
- Bahan :
- Frame Kusen All
- Frame Jendela All
- Kaca t = 5 mm

m1
m1
m

- Upah :

- PEKERJAAN BOUWPLANK / M1
- PEK.PONDASI BATU KALI (1:4)/M
- PEKERJAAN DINDING BATA (1:2)/M
- PEKERJAAN DINDING BATA (1:4)/M
- PEKERJAAN PLESTERAN (1:2)/M
- PEKERJAAN PLESTERAN (1:4)/M2
- PEK.PS.LANTAI KERAMIK (20/20)/M
- PEK.PS.LANTAI KERAMIK (30/30)/m
- PEK.KUZYN KAYU KAMPER OVEN/M
- PEK.KAP/KUDA/M (Kayu Borneo)
- PEKERJAAN RANGKA ATAP (Kaso + Reng) /M
- PEKERJAAN RANGKA PLAFOND/M
- PEK.PASANGAN PLAFOND (Multiplex 6 mm)/M
- PEKERJAAN PENGECATAN DINDING / TEMBOK / M
- PEKERJAAN PENGECATAN PLAFOND / M
- PEKERJAAN CAT KAYU/BESI/M
- PEKERJAAN BETON RINGAN t.10 cm (1:2:3)/M
- PEKERJAAN BETON PRAKTIS K.175 / 1 M
- PEKERJAAN WATER PROOFING DAK/ATAP BETON/M
- PEKERJAAN BETON BERTULANG (1:2:3)/M
Printed : 01/16/2017

342684622.xls

4.10
4.60
0.65

90,000.00
80,000.00
70,000.00

0.70

782,500.00
Rounded :

369,000.00
368,000.00
45,500.00
782,500.00
547,750.00
1,330,300.00

13,700.00
426,100.00
70,900.00
68,800.00
23,900.00
22,200.00
81,900.00
86,600.00
2,294,400.00
1,872,500.00
35,700.00
34,100.00
26,300.00
19,000.00
20,400.00
25,800.00
171,300.00
2,211,200.00
79,000.00
2,065,300.00
Page : 116 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

- PEKERJAAN BESI BETON / KG.


- PEKERJAAN BETON COR K.225 / M3.
- PEKERJAAN BEKISTING BETON / M3.
- PEKERJAAN JALAN/PARKIR KONST. PAVING BLOCK/M
- PEKERJAAN PAS. KANSTEEN/M
- PEK.WATER PROOFING (KM/WC & Ground Tank)/M
- PEK.PASANGAN LISTPLANK (Kayu Kamper) 3/30/M
- PEKERJAAN BAJA PROFIL/Kg.
- PEKERJAAN URUGAN PASIR / 1 M3.
- PEK.PASANGAN LISTPLANK (Kayu Kamper) 3/20/M
- PEK.LAPISAN ALUMINIUM FOIL DUA MUKA / 1 M2.
- PEK.SIAR PASANGAN BATU BELAH / M2.
- PEK.PEMBERSIHAN LAPANGAN / 1 M2.
- PEKERJAAN PEMADATAN TANAH / M3.
- PEK.PASANGAN DINDING ROSTER / KRAWANG / 1M2.
- PASANG LANTAI KRAMIK 400X400 / M2.
- PEKERJAAN DINDING KRAMIK 20X20 CM / M2.
- PEK.LANTAI HOMOGENEUS 40X40 CM / M2.
- PEK.SCREED LANTAI T = 4 CM / M2
- PEK.BETON REDY MIX K.300 SLUMP 12 / M3.
- PEKERJAAN STRIPING SETEBAL 20 CM / M2.
- PEKERJAAN URUGAN TANAH KEMBALI / M3.

- PEKERJAAN CANAL C.125X50X20X3,2./ KG.


- PEKERJAAN BESI L.70X70X7 / KG.
- PEKERJAAN BASE PLAT T = 12 MM / KG.
- PEKERJAAN PLAT T = 8 MM / KG.
- PEKERJAAN PIPA SCHEDULE 40 / KG.
- PEKERJAAN GORDING ( KAYU BORNEO ) / M3.
- PEKERJAAN PLINT KRAMIK 10 X 30 CM / M1.
- PAS.KLOSET DUDUK TOTO TYPE CW.660 J/CW 660 J / UNIT.
- PAS.SHOWER SPRAY TOTO TYPE TX 403 SV3 CR.
- PAS.WASTAFEL TOTO TYPE L.521.V.3 / UNIT.
- PAS.WASTAFEL TOTO TYPE L.521.V.1A / UNIT.
- PAS.URINOIR TOTO TYPE U.57 M / UNIT.
- PAS.PENYEKAT URINOIR TOTO TYPE A.100 / UNIT.
- PAS.FLOOR DRAIN TOTO TYPE TX.1 B / UNIT.
- PAS.KRAN DINDING TOTO TYPE T.23 B.13 / UNIT.
- PAS.KRAN KITCHEN SINK TOTO TYPE T.30 ARQ 13 N
- PAS.KRAN TAMAN TOTO TYPE T.26 - 13
- PAS.TEMPAT HANDUK TOTO TYPE TX.4.A / UNIT.
- PAS.TEMPAT SABUN TOTO TYPE S.11.N ( STD ) / UNIT.
Printed : 01/16/2017

342684622.xls

VOLUME

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )
11,400.00
384,900.00
545,375.00
97,300.00
101,000.00
58,000.00
38,600.00
10,300.00
87,900.00
40,600.00
12,800.00
9,900.00
1,300.00
15,600.00
186,700.00
77,600.00
86,500.00
220,500.00
22,400.00
356,900.00
1,600.00
6,000.00

7,500.00
8,300.00
9,300.00
9,300.00
13,200.00
2,066,900.00
22,100.00
1,742,600.00
347,160.00
1,628,400.00
1,340,700.00
1,682,900.00
763,200.00
180,100.00
132,200.00
217,100.00
131,800.00
441,400.00
46,100.00
Page : 117 Of 118

ANALISA HARGA SATUAN BAHAN & UPAH


#REF!
#REF!

ITEM PEKERJAAN

UNIT

VOLUME

- PEKERJAAN PAVING BLOCK CISANGKAN/ M2.


- PEK.PEMASANGAN ATAP SPANDEK HI-TEN T=0,40 TCT ( 0,35 BMT )/M2.
- PEK.GALIAN TANAH BIASA SEDALAM 1M1./M3.
- PEK.FLOOR HAEDENER + BETON ( 1:2:3 ) T= 5 CM/M
- PEK.PLAFOND KALSIBOARD T = 3,5 MM / M2
- PEK.PLAFOND KALSIBOARD T = 4,5 MM / M2

Printed : 01/16/2017

342684622.xls

HARGA SATUAN
( Rp )

TOTAL HARGA
( Rp )
126,800.00
71,700.00
12,500.00
75,000.00
44,300.00
48,000.00

Page : 118 Of 118