Renovasi Jambur
Renovasi Jambur
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
: 2015
NO
URAIAN PEKERJAAN
VOLUME
SATUAN
1
A
Bahan
1 Semen
2 Kayu klas II
3 bata
4 Seng Spandex
5 pasir pasang
6 pasir plaster
7 gipsum
8 keramik 30x30
9 keramik 20 x20
10 keramik 20x25
11 kusen 2
12 dompol 25 kg
13 Cat tembok 25 kg
14 paku
15 ember
16 kuas
17 kuas golong
18 ensel
19 talang air
20 Nok seng plat
21 Klosed
22 bola2
23 Kayu piri2 Klas II
24 grendel
25 kunci pintu
30 Hendel jendela
31 pintu kaca alumaniun
32 daun jendela
33 les gipsum
34 paku seng
35 karet paku
36 cat minyak
37 scrap
38 kertas pasir
39 tiner
40 Kusen jendela kecil 2 lobang
41 daun jendela
42 Triplek
Instalasi
1 Instalasi listrik lampu
2 Instalasi listrik Stop kontak
3 Instalasi listrik AC Bongkar/Pasang
4 Instalasi listrik MCB
55
2.25
6,000
358
15
15
130
13
10
5
2
14
14
15
5
5
5
10
3
43
2
18
3
20
6
18
2
8
143
18
10
7
4
40
5
1
2
3
31
10
3
8
zak
M3
Bh
m
m3
m3
m
kotak
kotak
kotak
bh
Kaleng
Kaleng
kg
Bh
Bh
Bh
Bh
btg
lbr
bh
lbr
m3
bh
Bh
bh
bh
Bh
m
kotak
bks
Kaleng
psang
lbr
klng
bh
bh
Lbr
paket
paket
paket
paket
Upah
1 Mandor
1 Tukang
2 Pekerja
Dikeahui Oleh :
Ka. UPTD Tata Ruang dan Cipta Karya
Kec. Minas
40.00
90.00
180.00
OH
OH
OH
D
Penghulu
HENDRA A
NIP. 19
10 M x 12 M
JUMLAH (Rp)
6
82,010
2,922,000
689
57,300
120,000
120,000
165,000
72,715
56,300
63,500
430,000
311,000
603,613
22,962
20,000
21,000
30,000
35,000
81,000
37,000
280,000
28,700
3,090,932
25,870
187,000
20,000
4,368,000
350,000
45,300
35,000
10,000
250,000
20,000
8,000
70,000
362,898
300,000
198,000
Sub Total
4,510,550.00
6,574,500.00
4,134,000.00
20,513,400.00
1,800,000.00
1,800,000.00
21,450,000.00
945,295.00
563,000.00
317,500.00
860,000.00
4,354,000.00
8,450,582.00
344,430.00
100,000.00
105,000.00
150,000.00
350,000.00
243,000.00
1,591,000.00
560,000.00
516,600.00
9,272,796.00
517,400.00
1,122,000.00
360,000.00
8,736,000.00
2,800,000.00
6,477,900.00
630,000.00
100,000.00
1,750,000.00
80,000.00
320,000.00
350,000.00
362,898.00
600,000.00
594,000.00
114,305,851.00
441,000
375,000
447,324
285,000
13,671,000.00
3,750,000.00
1,341,972.00
2,280,000.00
Sub Total
21,042,972.00
130,000.00
120,000.00
80,000.00
Sub Total
5,200,000.00
10,800,000.00
14,400,000.00
30,400,000.00
JUMLAH
DIBULATKAN
165,748,823.00
165,748,823.00
Disetujui Oleh :
Penghulu Kampung Minas Barat
JADWAL PELAKSANAAN
Kegiatan
Pekerjaan
Lokasi
Tahun
NO.
:
:
:
:
URAIAN PEKERJAAN
BOBOT
Agustus
September
03 09 10 16 17 23 24 30 31 06 07 13 14 20
(%)
A.
B.
C.
BAHAN
1 Beton Ready Mix (K-225)
2 Pasir Beton
3 paku 2" - 5"
4 Papan Bekisting
5 kayu perancah / bekisting dalam
6 Minyak Bekisting
7 Aspal drum
8 Kayu Bakar
UPAH
1 Pekerja
2 Tukang
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
REALISASI
CEPAT / LAMBAT
28 04
05 11
Err:509
Err:509
PEKERJAAN LAINNYA
1 Pek. Persiapan
Err:509
PER HARI
AKUMULASI
PER HARI
AKUMULASI
TERCEPAT
TERLAMBAT
21 27
Err:509
0.00
0.00
0.00
JUMLAH
JUMLAH
Okto
2.4
7.3
16.4
12.0
1.1
4.1
13.2
8.8
Err:509
Err:509
2.4
Err:509
Err:509
7.3
Err:509
Err:509
16.4
Err:509
12.0
Err:509
12.8
Err:509
5.3
1.1
4.1
13.2
8.8
9.6
1.3
Diverifikasi Oleh :
Konsultan Manajemen Wilayah (KMW)
PT. CALVINDAM JAYA EC
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Ahaddin, ST
Supervisi Engineer
L PELAKSANAAN
BULAN
Oktober
12 18
KETERANGAN
19 25
November
Desember
26 01 02 08 09 15 16 22 23 29 30 06 07 13 14 20 21 27
28 31
100
Err:509
75
50
Err:509
Err:509
13.3
9.3
25
Err:509
15.1
10.7
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Bambang Siswanto, SE
TPM
Dibuat Oleh :
Organisasi Masyarakat Setempat (OMS)
Kec. Marpoyan Damai
:
:
:
:
NO
URAIAN PEKERJAAN
HARGA SATUAN
1 M3 URUGAN PASIR
TENAGA
0.3000 OH Pekerja
BAHAN
1.2000 M3 Pasir urug
1 M2 SOSOTAN ASPAL
TENAGA
0.002 OH Tukang Aspal
0.020 OH Pekerja
BAHAN
1.5 Kg Aspal drum
0.02 Ikat Kayu Bakar
70,000.00
70,000.00
115,000.00
75,000.00
70,000.00
13,000.00
25,000.00
70,000.00
140,000.00
Menghamparkan
BAHAN
1.0000 m
TENAGA
2.0000 OH
0.2500 OH
650,000.00
70,000.00
75,000.00
1,700,000.00
15,000.00
6,000.00
1,650,000.00
TENAGA
0.2000
0.1000
7
OH Pekerja
OH Tukang
Memasang 1 m
BAHAN
0.088 lbr
0.050 kg
TENAGA
0.114 OH
0.114 OH
70,000.00
75,000.00
wire mesh M8
Menghamparkan
BAHAN
326.000 Kg
0.543 M3
0.762 M3
215.000 Liter
TENAGA
1.650 Oh
0.083 Oh
550,000.00
17,000.00
70,000.00
75,000.00
UPAH
4
52,500.00
52,500.00
JUMLAH
BAHAN
5
TOTAL
6
52,500.00
21,000.00
21,000.00
138,000.00
138,000.00
159,000.00
19,500.00
500.00
20,000.00
21,550.00
1,400.00
1,400.00
2,800.00
150.00
1,400.00
1,550.00
1,400.00
1,400.00
7,000.00
7,000.00
7,000.00
650,000.00
140,000.00
18,750.00
158,750.00
650,000.00
12,410.00
3,000.00
600.00
12,045.00
808,750.00
14,000.00
7,500.00
21,500.00
28,055.00
49,555.00
48,400.00
850.00
7,992.28
8,563.16
16,555.45
49,250.00
65,805.45
:
:
:
:
NO.
JENIS BAHAN
SATUAN
TENAGA KERJA
1 tukang
2 Pekerja
BAHAN
BAHAN PASANGAN
1 pasir urug
2 pasir pasang
3 Pasir Beton
4 Tanah urug
5 Batu pecah
6 Koral Beton
7 Batu Bata Press
8 Semen Portland
9 Buis beton bertulang
10 aspal drum
11 Beton Ready Mix K.175
Hari / Orang
Hari / Orang
II
A.
B.
C.
D.
E.
BAHAN KAYU
1 Kayu Kelas II
2 kayu kelas III
3 papan meranti
4 kayu cerocok / kayu ubar / mahang
5 kayu perancah / bekisting dalam
6 kayu bakar
M3.
M3.
M3.
M3.
M3.
M3.
Bh.
Kg.
Kg.
Kg.
M3.
M3.
M3.
M3.
Batang
M3.
Ikat.
BAHAN BESI
1 besi beton polos
2 kawat ikat beton (bandrat)
3 wire mesh
Kg.
Kg.
Lbr
BAHAN PAKU
1 paku seng
2 paku 2" - 5"
Kg.
Kg.
BAHAN FINISHING
1 minyak cat
2 residu
3 minyak bekisting
4 cat minyak
5 Minyak Tanah
Diverifikasi Oleh :
Konsultan Manajemen Wilayah (KMW)
PT. CALVINDAM JAYA EC
Ahaddin, ST
Supervisi Engineer
Liter
Kg.
Liter
Liter
Liter
Dibuat
Organisasi Masyara
Kec. Marpo
Muhammad Ag
Ke
Ahaddin, ST
Supervisi Engineer
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Muhammad Ag
Ke
Diper
Tenaga Penda
(
Bambang
JUMLAH HARGA
BAHAN / UPAH
4
75,000.00
70,000.00
115,000.00
115,000.00
140,000.00
75,000.00
250,000.00
170,000.00
500.00
1,275.00
12,000.00
13,000.00
650,000.00
2,300,000.00
1,650,000.00
1,700,000.00
35,000.00
1,550,000.00
25,000.00
12,000.00
17,000.00
650,000.00
26,000.00
15,000.00
25,000.00
11,000.00
6,000.00
58,000.00
11,000.00
Dibuat Oleh :
Organisasi Masyarakat Setempat (OMS)
Kec. Marpoyan Damai
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Bambang Siswanto , SE
TPM
NO
URAIAN PEKERJAAN
I.
1
PEKERJAAN PENDAHULUAN
Pembersihan lokasi
II.
1
PEKERJAAN BETON
Pemasangan Papan Bekisting
PANJANG
2.50
LEBAR TEBAL/TINGGI
###
1.20
0.90
7.84
0.65
1.80
2.40
3.00
3.00
4.00
Dinding
2.00
4.00
0.09
1.18
0.05
0.09
0.08
2.50
Pondasi Bata
Pasir Urug
Lantai Kerja
1.4
0.262
0.262
Besi
Dia8 133.333333
Dia10
302.4
TEBAL/TINGGI
VOLUME
KET
6.25
M2
Sisi
Sisi
bh
14.40
10.80
7.84
0.65
1.80
9.60
45.09
M2
M2
M2
M2
M2
M2
M2
8.00
M2
0.36
1.18
0.20
0.35
0.30
2.39
5.60
0.26
0.26
M3
M2
M2
M2
133.33 M
11.11 Btg
302.4 M
25.2 Btg
luasan Atap
1
114.66 m2
2
58.5 m2
3
48.326 m2
4
9.68 m2
5
13.68 m2
6
5.78 m2
250.63 m2
listplank depan
1
9.2 m
2
5.9 m
3
4.6 m
4
13.2 m
5
m
6
m
32.90 m
total listplank
100.78 m
perabung
1
2
3
4
5
6
9m
19.6 m
14.6 m
m
m
m
43.20 m
listplank Belakang
1
2.54 m
2
2.54 m
3
6.7 m
4
5.9 m
5
m
6
m
17.68 m
listplank Kiri
1
19.6 m
2
3m
3
m
4
m
5
m
6
m
22.60 m
listplank Kanan
1
10 m
2
3m
3
14.6 m
4
m
5
m
6
m
27.60 m