Office Building
515 MINOR AVE, SEATTLE WA
DPD# 3020828
RECOMMENDATION MEETING
1.11.17
Project Information
ADDRESS
F E BR UA R Y 1 7 , 2 0 1 6
PARCELS
DPD PROJECT #
OWNER
ARCHITECT
Table of Contents
DESIGN
PROPOSAL
2 Table of Contents
3 Project Description
STRUCTURAL
ENGINEERING
Brumbaugh Associates
600 N 85th St #102
Seattle, WA 98103
206.782.3650
Coffman
1601 Fifth Avenue, Ste. 900
Seattle, WA 98101-1620
(206) 623-0717
Coffman
1601 Fifth Avenue, Ste. 900
Seattle, WA 98101-1620
(206) 623-0717
CONTEXT
5 Site Survey
6 Existing Site Conditions
7 Existing Minor & James Building
DCI
818 Stewart St # 1000
Seattle, WA 98101
206) 332-1900
27 Exterior Materials
DESIGN
OUTDOOR
SPACES
14 Entry Level
37 Wayfinding
16 Levels 3-5 / P1
18 Building Section AA Looking South
19-20 North Patio Garden Off James Street
21 South Patio Garden Off Jefferson Street
41
APPENDIX
40
24 West Elevation
23 East Elevation
26 South Elevation
MATERIALS
25 North Elevation
LANDSCAPE
DESIGN
DESIGN
DEPARTURES
43 Bike Room
46 Comparative Heights of Residential
Buildings to the East
Project Description
DEVELOPMENT OBJECTIVES
PROJECT SITE
IN
ST
O
E.
AV
ES
JAM
SITE
RE
BO
E.
AV
FE
JEF
T.
NS
O
RS
2 CONTEXT
Surrounding Land Uses
MAP KEY
SURROUNDING USES
ARTS
MEDICAL
RESIDENTIAL
E MARION ST.
COMMERCIAL
ST
ON
E COLUMBIA ST.
S
DI
F E BR UA R Y 1 7 , 2 0 1 6
CULTURAL
ST
E CHERRY ST.
VE
EDUCATION / INSTITUTIONAL
.
MI
T.
AV
SITE
E.
BROADWAY
ST
RY
R
HE
RE
PUBLIC PARKS
BO
CO
VE
RA
NO
AS
BI
M
LU
E JEFFERSON ST.
9T
E.
AV
IO
AR
YA
RR
TE
HOSPITALITY
ME
JA
.
ST
ON
EF
EJ
ST
S
ER
E TERRACE ST.
OBSERVATIONS
Situated within the south portion of a significant Institutional Medical triangular block area bounded by
Boren, Broadway and Madison. The only anomalies
are the neighboring structures of a parking garage
to the north and a residential apartment building to
the east.
The grain of the neighborhood is large: many of
theadjacent blocks contain single buildings only.
E ALDER ST.
I-5
MA
ER
D
AL
ST
E SPRUCE ST.
2 CONTEXT
Site Survey
SITE PLAN
10 DOWN
SITE ADDRESS
Surface Parking
(to be removed)
ZONING DESIGNATION
NC3-85
+361
Driveway Entry
SCL Substation
FEBRUA R Y 1 7 , 2 0 1 6
(High Pt.)
30,670 sf
COMBINED LOT SIZE
+351
FAR POTENTIAL
4.5
Project Site
36,097 sf
Concrete stair up
from sidewalk
On the east portion of the site there are currently 17 trees. All
are ornamental trees which were installed when the parking
lot was originally developed (circa 1989). None of these are
exceptional, but some may be considered significant based
on size only. The majority are 10 diameter.
All of these trees will be removed, but new planting will need
required green factor of .30.
128
240
12
Driveway Entry
Garage Entry
240
+349
+347
Level 1 Skybridge
Connection
(to be removed)
Main Entrance
Positioned at middle of the site 13'+
above mid-block elevations of James
& Jefferson; 4' above Minor)
Existing Parcel
24,500 sf
(lowpoint)
+343
Garage Exit
(currently only limited use)
+337
TREES
There are 11 existing street trees immediately adjacent to the
east parcel, outboard of the public sidewalks. The majority of
street trees will be removed (new green factor planting will be
installed along all sidewalk planting strips).
DOWN
85
HEIGHT LIMIT
DOWN
2 story Medical
Office Bldg
(to be removed)
60,600 sf
F E BR UA R Y 1 7 , 2 0 1 6
2 CONTEXT
6
Looking Northwest over the site
2 CONTEXT
Existing Minor & James Building
Reference map
01
02
FEBRUA R Y 1 7 , 2 0 1 6
04
03
|
C OLLI NSW OE RMA N
3 DESIGN
F E BR UA R Y 1 7 , 2 0 1 6
Connects lobbies
Moderate slope
Familiarity to users
3 DESIGN
Aerial
East facade
To achieve the Green Factor requirements the majority of the new building roof or as much as half of the
existing roof non-mechanical areas
will be vegetated. This location is
visible to new building occupants
and reduces severity of unpleasant
rooftop view and glare.
Tying the 2 front doors together with adequate dimensional width produces an unusually large area of lobby
for buildings of this size. To help support this commitment it is envisioned that program elements might
include a caf, sundries shop and/or an education/
conferencing center. The latter would be positioned to
the south and from its elevated position would overlook Jefferson Street and sidewalk with large
glass frontage.
3 DESIGN
Summary
1. Mid-block pedestrian access important to
retain and develop
F E BR UA R Y 1 7 , 2 0 1 6
10
3 DESIGN
FEBRUA R Y 1 7 , 2 0 1 6
|
C OLLI NSW OE RMA N
11
F E BR UA R Y 1 7 , 2 0 1 6
3 DESIGN
12
Looking Southwest From Above Minor and James Corner
3 DESIGN
FEBRUA R Y 1 7 , 2 0 1 6
|
F I R S T H I L L M E D I C A L O F F I C E BUI LD IN G: MIN OR & JAM E S
|
C OLLI NSW OE RMA N
13
3 DESIGN
Entry Level
F E BR UA R Y 1 7 , 2 0 1 6
Medical Tenant
Lobby
|
U F IRS T H ILL ME DI CA L O F F I C E BUI L D I N G : M I N O R & J A M E S
|
CO LLIN SW OER MAN
14
Medical Tenant
Retail Tenant
65'
3 DESIGN
MINOR
11
FEBRUA R Y 1 7 , 2 0 1 6
Circulation
Medical Office
Porte Cochere
Entry Vestibule
Lobby
New Garage
Existing Garage
10
Patio / Garden
11
Exist Bus
Stop
10
10
Existing Building
Main Entry
Level 1 Plan
Retail
15
3 DESIGN
Levels 3-5
F E BR UA R Y 1 7 , 2 0 1 6
LEVELS 3-5
16
10
STAIR 2
515
413' - 6"
STAIR 3
520
STAIR 2
515
UP
UP
DN
DN
EVTR 3
CORRIDOR
503
CORRIDOR
503
ELEC
504
EVTR
EVTR
34
EVTR
EVTR
21
UP
DN
DN
MEN
511
MEN
511
2
LAB CL
509
EVTR 2
UP
EVTR 4
STAIR 3
520
COMM
506
EVTR 1
LAB CL
509
WOMEN
510
COMM
506
JAN
508
JAN
508
WOMEN
510
3 DESIGN
LEVEL P1
10
10 9
A
MAIN ELEC
P107
MEZZANINE
P124
11
RAMP UP
MEZZANINE
P124
LOADING DOCK
P128
RAMP UP
RAMP DN
8' @ 6% SLOPE
RAMP DN
RAMP DN
8' @ 6% SLOPE
RAMP DN
RAMP DN
RAMP DN
8' @ 6% SLOPE
SHOWER
P116
RAMP UP
SHOWER
SHOWER
P117 P116
UP
RECYCLING
P131
UP
B
STAIR 2
P115
MEZZANINE 2
P121
UP
STAIR 2
P115UP
EVTR 3 2
MEZZANINE
P121
EVTR
EVTR
4 3
EVTR 4
EVTR MACHINE
P126
STAIR 4
P111
EVTR
EMERG
MACHINE
ELEC
P126
P127
EMERG ELEC
P127
UP
UP
UP
UP
VAN
VAN
PARK MGR
P103
VAN
EVTR
EVTR
1 2
DN
UP
PARK MGR
P103
DELIVERY
DELIVERY DELIVERY
DELIVERY
Patio / Garden
Main Electrical
Existing Garage
10
Patio / Garden
11
Main Electrical
12
13
DELIVERY
STAIR 1
P105
FUEL TANK
P142
UP
FUEL TANK
P142
DN
NEW
RAMP UP
8' @ 6% SLOPE
RAMP UP
8' @ 6% SLOPE
EXISTING
RAMP UP
NEW
RAMP UP
EXISTING
RAMP UP
24' - 0"
RAMP UP
8' @ 6% SLOPE
24' - 0"
DN
UP
13
UP
STAIR 1
P105
UP
EVTR 1
DELIVERY
UP
Existing Garage
EVTR 2
VAN
DNSTAIR 4
P111
STORAGE
P106
SHOWERSHOWER
P118 P117
New Garage
STORAGE
P106
8' @ 6% SLOPE
SHOWER
P118
RECYCLING
P131
LOCKER ROOM
P119
RAMP UP
LOCKER ROOM
P119
12
LOADING DOCK
P128
Retail
FEBRUA R Y 1 7 , 2 0 1 6
MAIN ELEC
P107
COMM
P120
17
3 DESIGN
F E BR UA R Y 1 7 , 2 0 1 6
18
Retail
Circulation
Medical Office
Porte Cochere
Entry Vestibule
Lobby
New Garage
Existing Garage
10
ROOF LEVEL
439' - 6"
LEVEL 6
426' - 6"
LEVEL 5
413' - 6"
LEVEL 4
400' - 6"
LEVEL 3
387' - 6"
LEVEL 2
374' - 6"
1 (beyond)
LEVEL 1
358' - 0"
6
5
4
10
L3
2
1
L2
L1
P1b
8
LEVEL M
346' - 0"
LEVEL P1
342' - 0"
LEVEL P2
332' - 0"
LEVEL P3
322' - 0"
LEVEL P4
312' - 0"
P2b
P3b
3 DESIGN
FEBRUA R Y 1 7 , 2 0 1 6
|
C OLLI NSW OE RMA N
19
Looking South
3 DESIGN
F E BR UA R Y 1 7 , 2 0 1 6
Looking South
20
3 DESIGN
Looking North
|
C OLLI NSW OE RMA N
21
F E BR UA R Y 1 7 , 2 0 1 6
3 DESIGN
22
Looking Southwest From Minor & James Streets
14 Metal Handrails
15 Wood Bench
24 Colored Concrete
4 MATERIALS
East Elevation
13
13
LEVEL 6
426' - 6"
10
7
4
3
LEVEL 4
400' - 6"
4
13
12
13
1
LEVEL 3
387' - 6"
LEVEL 2
374' - 6"
LEVEL 1
358' - 0"
16
15
20
22
10
17
LEVEL 5
413' - 6"
FEBRUA R Y 1 7 , 2 0 1 6
ROOF LEVEL
439' - 6"
Entry
Porte Cochere
Exit
23
4 MATERIALS
West Elevation
14 Metal Handrails
15 Wood Bench
24 Colored Concrete
19
F E BR UA R Y 1 7 , 2 0 1 6
18
14
13
10
11
LEVEL 6
426' - 6"
LEVEL 5
413' - 6"
3
7
13
17
|
CO LLIN SW OER MAN
24
ROOF LEVEL
439' - 6"
South Patio
Link Building
LEVEL 4
400' - 6"
LEVEL 3
387' - 6"
LEVEL 2
374' - 6"
LEVEL 1
358' - 0"
4 MATERIALS
North Elevation
8
3
FEBRUA R Y 1 7 , 2 0 1 6
ROOF LEVEL
439' - 6"
14
13
LEVEL 6
426' - 6"
9
3
10
LEVEL 5
413' - 6"
LEVEL 4
400' - 6"
LEVEL 3
387' - 6"
19
9
LEVEL 2
374' - 6"
LEVEL 1
358' - 0"
LEVEL P1
342' - 0"
1
10
Existing
Link & Patios
25
4 MATERIALS
F E BR UA R Y 1 7 , 2 0 1 6
South Elevation
8
3
14
13
10
LEVEL 5
413' - 6"
3
7
LEVEL 4
400' - 6"
13
19
17
LEVEL 3
387' - 6"
13
9
LEVEL 2
374' - 6"
2
1
LEVEL 1
358' - 0"
5
CO LLIN SW OER MAN
LEVEL 6
426' - 6"
3
4
26
ROOF LEVEL
439' - 6"
10
Pedestrian
Portal
Existing
Garage
Exit
Garage Entry
10
Retail
Bike Room
4 MATERIALS
Exterior Materials
13
26
21
24
22
23
25
FEBRUA R Y 1 7 , 2 0 1 6
25 Pedestal Paver
|
26 Metal Soffit
10
11
27
Raised Planter
New Planting
Green Roof
Minor Ave
B
F E BR UA R Y 1 7 , 2 0 1 6
James Street
CO L L I N S W O E R M A N
CLIENT NAME
28
Jefferson Street
PRIJEC T NAME/ADDRESS
M O N T H D AY, Y E A R
Jefferson Street
PRIJEC T NAME/ADDRESS
James Street
|
M O N T H D AY, Y E A R
|
C OLLI NSW OE RMA N
CLIENT NAME
FEBRUA R Y 1 7 , 2 0 1 6
CO L L I N S W O E R M A N
29
2
Minor Ave
Plant Images
Green Roof
Courtyard W/ Seating
F E BR UA R Y 1 7 , 2 0 1 6
Bioretention Planters
Site Furniture
|
PRIJEC T NAME/ADDRESS
|
Autumn Fern
Sedum
Allium
Brass Buttons
CO L L I N S W O E R M A N
30
Carpet Bugle
CLIENT NAME
M O N T H D AY, Y E A R
Garage Entrance
Plant Images
Plant Images
FEBRUA R Y 1 7 , 2 0 1 6
Bioretention Plants
Common Rush
Hicks Yew
Fireglow Spurge
Slough Sedge
Variegated Sedge
CLIENT NAME
PRIJEC T NAME/ADDRESS
Sarcococca
Stewartia
CO L L I N S W O E R M A N
Ladys Mantle
M O N T H D AY, Y E A R
Sword Fern
Fountain Grass
English Lavender
Hardstem Bullrush
31
6 OUTDOOR SPACES
F E BR UA R Y 1 7 , 2 0 1 6
32
6 OUTDOOR SPACES
FEBRUA R Y 1 7 , 2 0 1 6
|
Projecting canopy elements help define recessed court and main entry
Porte cochere is separated from sidewalk by planters with low profile vegetation
Porte cochere provides level drop-off area with small ramping down to Minor upon exit
33
F E BR UA R Y 1 7 , 2 0 1 6
6 OUTDOOR SPACES
34
6 OUTDOOR SPACES
A
B
A Projected Canopy
D
FEBRUA R Y 1 7 , 2 0 1 6
The large ceiling surface area above the recessed entry court will be
broken down in scale with a modulated geometry, differing materials
and stepped surfaces. The overall field will be a single color exterior
drywall soffit material with large recessed coffers defined by bay spacing. These will be articulated with a wood-appearance, sheet material
(similar in tone and color to projecting soffits at L2 and L3). Projecting canopy elements extend into the recessed area and provide a
framework for down-lighting over the planters and exit/entry drives.
Additional directional lighting at the projecting vestibule and flanking
accent/signage wall will provide a focus to the entry.
Sidewalk at Minor Avenue with seating and overhead projecting canopy elements. Note that central element
will have glass (or acrylic panels) to provide overhead weather protection above seating.
35
F E BR UA R Y 1 7 , 2 0 1 6
6 OUTDOOR SPACES
36
6 OUTDOOR SPACES
Wayfinding
FEBRUA R Y 1 7 , 2 0 1 6
= To link building entries via stairs info also for ADA and main entry direction
37
F E BR UA R Y 1 7 , 2 0 1 6
6 OUTDOOR SPACES
Southwest Corner
38
6 OUTDOOR SPACES
FEBRUA R Y 1 7 , 2 0 1 6
|
|
C OLLI NSW OE RMA N
Bike Room off Jefferson sidewalk has high windows and utilizes mezzanine space in tall P1 level
39
7 DESIGN DEPARTURES
REQUIREMENT
REQUEST
RATIONALE
23.47A.008.A.2B
This portion of opaque exterior wall is enclosing 2 central elevator shafts to the
building. The wall is recessed 54 from the public sidewalk. The neighboring portions of exterior wall are transparent as is the majority (71%) of this faade between 2 and 8 feet. Elevator location is centralized in the floorplate for conventional
reasons. Enclosing exterior wall does not merit transparency as a feature due to
distance from the sidewalk.
The 22 wide wall which forms the exterior enclosure to the central elevator shaft will serve as a feature wall signifying the main entrance immediately adjacent. This wall will have a distinctive exterior skin, dedicated
lighting and signage. This conforms with Citywide Design Guidelines
PL3 (A1: Entries / Design Objectives) which suggests the design of
primary entries to be obvious, identifiable and distinctive.
Street-level
Development Standards:
Blank Facades
See 1 / G0.4
23.54.030.G.1 B
Sight Triangle
F E BR UA R Y 1 7 , 2 0 1 6
ITEM / REQUIREMENT
40
Structural limitations and vehicle maneuvering dimensions limit our ability to conform with sight triangle requirements to the north side of the exit driveway. Either
convex mirror(s) and /or audio/visual warning devices will be utilized at this location
to provide pedestrian safety. Additionally, STOP signage will be installed at the
exit area prior to the sidewalk intersection. Note that driveway throat engagement
with Minor Avenue is 20' beyond the property line and has a compliant, unobstructed sight triangle view to the street in both directions.
See 2 / G0.4
23.47A.008.B3
Street-level
Development Standards:
Use Depth
23.47A.008.B4
Street-level
Development Standards:
Use Height
We have oriented the room such that the longer dimension is along the sidewalk.
Capturing the otherwise unused volume of the garage upper level as a
A 30 depth is more than required for a Bike room of this size and would impact the building amenity Bike Room supports the Design Guideline PL4 (A1:
Entry Locations / Serving all Modes of Travel) by providing a safe and
maneuvering area for truck loading in the below grade garage.
convenient access point off the public sidewalk and not forcing bicyclists
into the garage with cars and trucks.
Non-residential uses at
street level shall have a
floor-to-floor height of at
least 13 feet.
For a 30 portion of
the 80 south faade
(facing Jefferson St.)
we request a floor to
floor height of 9 at
the building amenity
Bike Room.
As the sloped site descends to the west, it creates a void beneath the Ground
Level -- L1 (@ el.+358) which has the main building entrance off Minor. Typically
in our design this is below-grade garage. We have placed a 43 stall Bike Room
in this 30 wide by 22 deep area which is accessible from the Jefferson Street
sidewalk. This amenity will provide both an active use and help fulfill transparency
requirements at this faade. The compressed, but functional floor height is a result
of 1) alignment with sidewalk grade (for access) and 2) a level, primary Medical
Office floor above.
See 3 / G0.4
We believe this meets the intent of the requirement by providing both transparency
and an active programmatic use adjacent to the public sidewalk while maintaining
an efficient Medical Office use floorplate above.
See 4 / G0.4
STOP SIGN
OWNER
7 DESIGN DEPARTURES
CONSULTANT
TO MAIN ENTRY
ISSUED
MARK
DATE
05/06/2016
08/25/2016
DESCRIPTION
MUP SUBMITTAL
MUP CYCLE 1 RESUBMITTAL
B
2 23.54.030.G.1
Sight Triangle
DRAWN BY
DN
ISSUE DATE
Blank Facade
SEAL
BLANK FACADE
LY
ON
Approximate 4"
encroachment
MEDICAL OFFICE
TENANT 02
121
23.47A.008.B3
Street-level Development Standards: Use
23.47A.008.B4
Street-level Development Standards: Use Height
Bike Rm
13'-0"
Min
LEVEL 2
374' - 6"
LEVEL 2
374' - 6"
LEVEL 1
358' - 0"
LEVEL 1
358' - 0"
|
C OLLI NSW OE RMA N
8'-0"
Ht
G0.4
DEPARTURE
DIAGRAMS
Author
08/25/2016
CE
EN
R
FE
RE
R
FO
VESTIBULE
101
MEDICAL OFFICE
TENANT 01
116
FIRE COMMAND
CENTER
113
HEAL01.14.030
10' - 0"
10' - 0"
22' - 3"
20'-0" MAX ALLOWED
FEBRUA R Y 1 7 , 2 0 1 6
PROJECT NO.
41
APPENDIX
Jefferson St
Office
23.5'
F E BR UA R Y 1 7 , 2 0 1 6
Jefferson St
Office
Retail
Tenant
Office
James St
Office
Minor Ave
Tenant
+0' to +2.5'
42
Office
Tenant
+0' to +1.5'
APPENDIX
13'
Elec
Substation
Office
FEBRUA R Y 1 7 , 2 0 1 6
Retail
Office
Minor Ave
Office
Minor Ave
Entry Vestibule
Vehicle Drop-Off
James St
Minor Ave
4
3
9
10
11
2
1
James St
11.5'
Tenant
+0' to +8'
Boren Ave
Key Plan
Jefferson St
James St
Office
Stair Exit
Retail Entrance
43
APPENDIX
Column Options
STUDIED
DESIGNED
F E BR UA R Y 1 7 , 2 0 1 6
Study A
44
Study B
APPENDIX
Bike Room
BIKE ROOM
RETAIL
GARAGE (P1)
SIDEWALK
Bus Stop
Stairs to
South Patio
Bike Room
45
APPENDIX
F E BR UA R Y 1 7 , 2 0 1 6
Comparative Heights of Residential Buildings to the East (on Minor & Broadway Avenues
46