TEST ME
Station:-
Depth:-
Material Desc.:-
Material Source:-
Sampled by:-
0
TYPE OF TEST CONDUCTED
COMPACTION TEST
MDD (g/cm3)
OMC (%)
95% of MDD (g/cm3)
CBR TEST
SOIL CONSISTENCY
Limit)
Soil Classification
Plastic Product
Grading Modulus (GM)
LosAngeles Abrassion From Centeral labo.(LAA)
Grading
Lower Limit
100
Test Result
0.0
Uper limit
100
Remark:-
(Contractor M.E.
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
Ethiopian Construction Design and Supervision
works Corporation
Transport Design and Supervision works
section
ATTERBER LIMIT
TEST METHOD : AASHTO T89 - T91
Date Sampled:
Date Tested:Intended Use:Lab. No.:-
TEST RESULT
0.00
--
--
0.00
--
--
0.00
--
--
45.00
5%
5%
0.00
1.5 %
1.5 %
34.25
60 %
60 %
0.00
--
--
34.25
30 %
30 %
0.00
0.0
0.0
0%
--
--
--
--
--
--
--
--
90
51
35
0.0
0.0
0.0
100
80
70
(Contractor M.E.)
Date:-
CONTRACTOR
Sun Shine
Construction PLC
91
12/30/1899
12/30/1899
12/30/99
12/30/99
Top Subgrade
Sub base
--
--
--
--
--
--
5%
30 %
1.5 %
1.5 %
60 %
45 %
--
--
30 %
8%
--
--
--
< 90 %
--
>1.5%
--
< 51 %
0.0
0.0
15
R 5105/1
Signature:-
Date:-
EMPLOYER
CO
Ethiopian Construct
Ethiopian Roads Authority works Corporation
(ERA)
Transpo
works section
PROJECT NAME:
Station:-
Depth:-
0.2 ~ 1m
Material Desc.:-
Material Source:-
Sampled by:-
Jointly
MDD (g/cm3)
TEST RESULT
1.81
COMPACTION
TEST
OMC (%)
CBR TEST
15.50
0.00
45.00
CBR TEST
0.00
PP
0.00
#VALUE!
Soil Classification
Linear Shrinkage
Grading
REMARKS
--
Signature:
Signature:
Date:-
Date:-
CONSULTANT
CONTRACTOR
on
EST RESULT
Existing .
OGL
Date Sampled:-
6/24/2016
Date Tested:-
12/30/1899
Intended Use:-
To check suitability of Ro
Lab. No.:-
Exo - 020
Fill/Emba
nkment
Top
Subgrade
1.81
--
--
--
15.50
--
--
--
0.00
--
--
--
5%
5%
5%
45.00
0.00
1.5 %
1.5 %
1.5 %
PP
60 %
60 %
60 %
--
--
30 %
30 %
30 %
--
--
--
--
--
--
--
--
--
--
--
--
--
--
0.00
#VALUE!
(Contractor)
Reviwed by:(Consultant
LAB.T)
Signature:
Signature:
Date:-
Date:-
CONTRACTOR
China Railway Seventh
Group CO. LTD. (CRSG)
Sub base
--
--
--
30 %
1.5 %
45 %
8%
--
--
>1.5%
< 51 %
SP table
5104/1
OR
5105/1
EMPLOYER
Ethiopian Roads Authority
(ERA)
MOISTU
TEST METHOD
Station:-
Depth:-
0.2 ~ 1m
Material Source:-
Sampled by:-
Jointly
Mold No
Wt. of Mold(g)
Volume of Mold(cm3)
Wet Density(g/cm3)
Container
Dry Density
2.00
1.95
1.90
1.85
1.80
1.75
1.70
Dry Density
1.65
1.60
1.55
1.50
1.45
1.40
5.00
6.00
7.00
8.00
9.00
MDD =
1.810
gm/cm3
OMC =
15.50
10.00
REMARKS:-
Signature:
Date:-
CONSULTANT
Ethiopian Construction Design and Supervision works
Corporation
Transport Design and Supervision works section
LOT 1 ANKOBER- D
METHOD
vel Material
Intended Use:-
Lab. No.:-
W1
11412
11545
11780
W2
7363
7363
7363
W3=W1-W2
4049
4182
4417
2124
2124
2124
Wd=W3/V
1.91
1.97
2.08
No.
57
50
PX
304.30
389.50
369.10
279.90
352.20
330.00
c=a-b
24.40
37.30
39.10
70.60
70.10
70.80
e=b-d
209.30
282.10
259.20
m=(C)/(e)*100
11.66
13.22
15.08
Dd=wd/(100+m)*100
1.71
1.74
1.81
MDD Vs OMC
9.00
10.00
11.00
12.00
Moisture Content
13.00
14.00
15.00
16.00
17.
Signature:
Signature:
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
OF SOIL
THOD
D
6/24/2016
6/27/2016
To check suitability of Road bed
Exo - 020
4
11564
7363
4201
2124
1.98
E
399.10
351.20
00
47.90
70.70
280.50
17.08
1.69
15.00
16.00
17.00
18.00
19.00
20.00
ed by:(Consultant LAB.T)
ure:
Signature:
Date:-
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
CONSULT
Ethiopian Construction De
works Corporation
Transport Design a
section
MOISTURE DEN
Mold No
Wt. of Mold(g)
W2
W3=W1-W2
Volume of Mold(cm3)
Wet Density(g/cm3)
Wd=W3/V
Container
No.
c=a-b
e=b-d
m=(C)/(e)*100
Dry Density
Dd=wd/(100+m)*100
MDD gm/cm3
OMC %
Dry Density
NMC
5.50
5.00
Remark:-
6.50
6.00
7.50
7.00
8.
8.00
Tested
by:(Contract
or Lab.
Tech)
Signature:-
Signature:-
Date:-
Date:-
NSULTANT
CONTRACTOR
N ROAD PROJECT
METHOD
100
MDD Vs OMC
8.50
8.00
9.50
9.00
10.50
10.00
11.50
11.00
12.50
12.00
13.50
13.00
14.50
14.00
Moisture Content
15.50
15.00
16.50
16.00
17.50
17.00
18
18.00
Reviwed by:(Consultant
LAB.T)
Signature:-
Signature:-
Date:-
Date:-
NMC
14.00
14.50
15.50
15.00
16.50
16.00
17.50
17.00
18.50
18.00
19.50
19.00
20.00
M.E.)
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Constructi
Corporation
Transport Design
ATTE
TEST METHOD
N
no
Liquid Limit %
34.3
LIMIT
f(x) =
Moisture Content %
10
25
Total weight before wash
Sive in mm
4.75mm
2.00mm
0.425mm
0.075mm
Remark:-
Wt retain
% Retain
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
Date Sampled:
Date Tested:Intended Use:Lab. No.:RFI No:-
LIMIT
PLASTIC
AV.PLASTIC LMIT
LIMIT
25
Number of Blows
LL
%pass
PL
PI
GI
GM
PP
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
R- DULECHA (RE-BID)
PI = LL-PL
100
Classfication
Signature:Date:-
EMPLOYER
Ethiopian Roads Authority
(ERA)
Ethiopian Constructio
Corporation
Transport Design a
3-POINT CALIFORNI
TEST METHO
% Swell
N/Divistion
10 Blows
BOTTOM FACE
DIAL
LOAD (KN)
After in mm
CBR %
SWELL 30 Blows
% Swell
CBR %
PEN.
TOP
BOTTOM
RECO.CBR
10 Blows
2.5mm
5.08mm
SOAKING CONDITION
W1
W2
V
W3 = W1 - W2
Wd = (W3/V)
Dd = Wd/(100+m)*100
BEFORE
CONTAINER NUMBER
WET SOIL + CONTAINER a ( g)
DRY SOIL + CONTAINER b
( g)
WEIGHT OF CONTAINER c ( g)
WEIGHT OF WATER
d=a-b ( g)
WEIGHT OF DRY SOIL e=b-c ( g)
MOISTURE CONTENT m=(d/e)*100
Signature:-
Signature:-
Date:-
Date:-
MOISTURE
10 Blows
AFTER
TOP 1 in.
CONSULTANT
CONTRACTOR
Y RELATIONSHIP, AASHTO T -
180
METHOD D
After in mm
65 blows
CBR %
SWELL 65 Blows
% swell
BOTTOM FACE
DIAL
LOAD(KN)
After in mm
PEN.
TOP
BOTTOM
C.CBR
30 Blows
2.5mm
10 Blows
BEFORE
AFTER
STURE
ws
5.08mm
30 Blows
BEFORE
DETERMINATION
30 Blows
BEFORE
AFTER
AVG.
TOP 1 in.
PEN.
TOP
BOTTOM
RECO.CBR
65 Blows
2.5mm
65 Blows
AFTER
BEFORE
65 Blows
BEFORE
AVG.
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction
PLC
METHOD D
65 blows
CBR %
65 Blows
5.08mm
65 Blows
AFTER
65 Blows
AFTER
TOP 1 in.
EMPLOYER
Ethiopian Roads Authority
(ERA)
PROJECT NAME:
ANKOBER - AWASH ARBA JUNCTION RO
3-POINT CALIFORNIA
TEST METHOD
20.00
10.00
0.00
0
2.54
5.08
7.62
PENETRATION (mm)
10.16
0.00
0
2.54
5.08
7.62
10.16
PENETRATION (mm)
LOAD (KN)
2.54mm
5.08mm
0.00
0.00
0.00
0.00
0.00
0.00
BLOWS
10
30
65
MDD (g/Cm3)
0.00
95% of MDD(g/Cm3)
1.00
Density
Swell
(%)
0.50
0.00
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
Dry Den
LOAD (KN)
BLOWS
2.54mm
5.08mm
10
0.00
0.00
30
0.00
0.00
65
0.00
0.00
MDD (g/Cm3)
Remark:-
0.00
95% of MDD(g/Cm3)
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
ull width
rial
in Fill section
7.62
180
METHODD
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
10.16
12.7
1.50
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.3
7.62
10.16
1.50
12.7
1.60
1.70
1.80
1.90
2.00
2.10
2.20
2.3
CBR(%)
2.54mm
5.08mm
0.0
0.0
0.0
0.0
0.0
0.0
0.00
5% of MDD(g/Cm3)
0.00
0.00
0.00
CBR at 95 % of MDD
Density Vs % Swell
1.70
1.75
1.80
1.85
1.90
1.95
2.00
2.05
2.10
2.15
2.20
2.25
2.30
2.35
CBR(%)
2.54mm
5.08mm
BLOWS
0.0
0.0
10
0.00
0.0
0.0
30
0.00
0.0
0.0
65
0.00
5% of MDD(g/Cm3)
DRY DENSITY
Reviwed by:-
(Consultant LAB.T)
ature:-
Signature:-
Signature:-
:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction
PLC
O (CBR)
3
-
60
180
METHODD
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
60
1.70
1.80
1.90
2.00
2.10
2.20
2.30
2.40
2.05
0.0
0.0
0.0
45.00
2.10
2.15
2.20
2.25
2.30
2.35
2.40
PROJECT NAME:
ZEMA RIVER BRIDGE-FELEGEBRIHAN ROAD PROGECT
EMPLOYER
CONSULTANT
Ethiopian Roads Authority (ERA)
China Railw
DATE
REF.
To HAMDA ENGINEERING CONSULT PVT.LTO.CO.
SUBJECT:- CONSTRUCTION MATERIAL APPROVAL REQUEST
We would like to Submite Existing Road Material Proctor , Liquide Limite, Plastic Limit
and CBR test result from km 119+000 Center line. Here we Attached 5 page of test resul, Please
Disposition On Inspection Result
Pass
Procced with Following Instruction (s)
Re-inspection with Following Instruction (S)
Reject with Following Instruction (S)
Instruction (S) and /OR Commetnt ( S)
Approved By:(RE/ARE/ME)
Signature:Date:-
AD PROGECT
CONTRACTOR
China Railway Seventh Group CO. LTD. (CRSG)
Plastic Limit
PROJECT NAME:
ZEMA RIVER BRIDGE-FELEGEBRIHAN ROAD PROJECT
EMPLOYER
Ethiopian Roads Authority (ERA)
HAMDA ENGI
MOISTURE DENSITY
TEST METHOD : AASHTO
Station:-
Km 125+000 CL
Depth:-
0.20 m-1m
Jointly
REMARKS:-
Tested by:(Contractor)
Checked by:(Contractor)
Signature:
Signature:
Date:-
Date:-
PROJECT
CONSULTANT
CONTRACTOR
: AASHTO T- 180
METHOD
Date Sampled:-
8/4/2015
Date Tested:-
8/19/2015
Intended Use:-
Existing
Lab. No.:-
S-020
Signature:
Signature:
Date:-
Date:-
CONTRACTOR
China Railway Seventh
Group CO. LTD.
(CRSG)
8/4/2015
8/19/2015
Existing
S-020
EMPLOYER
CONSU
Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:
MOISTURE D
TEST METHOD : A
Station:Depth:Material Desc.:Material Source:Sampled by:S1 Weight Before Washing
S2 Weight Before Washing
Weight Rei
Sieve Size
S1
63
50
25
4.75
2
0.425
0.075
S2
pan
Total
120.00
Test Result
Lower Limit
100.00
80.00
60.00
% Passing
40.00
20.00
0.00
pan
0.075
4.75
Sieve Siz
Sieve Size in mm
% Passing
Grading Modulus
Remark:-
4.750
2.000
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTO
METHOD
gm
% Retain
S1
% passing
S2
S1
S2
Limit
Uper Limit
4.75
25
50
0.425
0.075
Soil Cassficati
PP
.)
Signature:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
Average
Specification
100
100
90
100
51
80
35
70
15
50
63
Soil Cassfication
LL
PI
Signature:-
Date:-
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Constructi
Corporation
Transport Design
Depth:-
Stock
Material Desc.:-
River Sand
Material Source:-
Sampled by:-
Jointly
Material Size
Description
Trial No.
A/(A+B-C)
Average
S/(B+S-C)
Average
A/(B+S-C)
Average
((S-A)/A100
Average
Material Size
Description
Trial No.
A/(A+B-C)
Average
S/(B+S-C)
A/(B+S-C)
Remark:-
Average
Average
((S-A)/A100
Average
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
Stock
CONCRETE
AGGREGATE
Date Sampled:7/7/2016
Date Tested:- 7/13/2016
Intended Use:-Cement Concrete
512.1
1,801.6
2,113.3
500.0
2.7
2.6
2.5
2.4
514.2
1,801.6
2,115.1
500.0
2.7
2.6
2.5
2.8
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
R- DULECHA (RE-BID)
CONCRETE
AGGREGATE
7/7/2016
7/13/2016
Cement Concrete
Signature:Date:-
EMPLOYER
CONSU
Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:
Los A
TEST
Station:Depth:Material Desc.:Material Source:Sampled by:-
Retained on
25.0 (1 in.)
25.0 (1 in.)
4.75 (No.4)
4.75 (No.4)
2.36 (No.8)
Total
Number of Spheres
Test Results
Trial No.
Number of Revolution
Tatal Weight of Sample Tested (g)
Weight of Tested Sample
Retained on No.12 ( 1.7mm) Sieve (g)
Percent Loss (%)
Average
Note
Remark:-
Checked by:-
(Contrac
M.E.)
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTO
gm
gm
Grading Type
B
1,250 25
1,250 25
1,250 10
2,500 10
1,250 10
2,500 10
2,500 10
2,500 10
5,000 10
5,000 10
5,000 10
5,000 10
5,000 10
12
11
Grading Type A
Grad
d by:-
re:-
(Contractor
Date:-
CONTRACTOR
Sun Shine
Construction PLC
Grading Type A
Date:-
EMPLOYER
CONSU
Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:
MOISTURE D
TEST METHOD : A
Station:-
Depth:-
Stock
Material Desc.:-
River Sand
Jointly
Weight Rei
S1
S2
9.5
195
4.75
212
467
2.36
487
719
1.18
747
783
0.6
944
657
0.3
470
264
0.15
343
52
0.075
43
44
pan
218
172
120.00
Test Result
Lower Limit
100.00
80.00
60.00
% Passing
40.00
20.00
0.00
0.075
0.15
1.18
Sieve Siz
Sieve Size in mm
% Passing
Grading Modulus
Remark:-
4.750
2.000
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTO
p Stock
nd
METHOD
Date Sampled:-
7/7/2016
Date Tested:-
7/13/2016
Intended Use:-
Cement Cncret
gm
3353
gm
% Retain
S1
S2
S1
S2
100
94
14
94
80
14
21
80
59
22
23
58
35
27
20
31
16
14
17
10
Limit
Uper Limit
1.18
2.36
4.75
0.425
0.075
Soil Cassficati
PP
.)
Signature:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
7/7/2016
7/13/2016
Cement Cncrete
3237
3130
Specification
Average
100
100
87
95
100
69
80
100
47
50
85
23
25
60
13
10
37
15
4.75
9.5
Soil Cassfication
LL
PI
10
Signature:-
Date:-
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Constructi
Corporation
Transport Design
Material Size
Description
Trial No.
A/(A+B-C)
Average
S/(B+S-C)
Average
A/(B+S-C)
Average
((S-A)/A100
Average
Material Size
Trial No.
A/(A+B-C)
Average
S/(B+S-C)
A/(B+S-C)
Remark:-
Average
Average
((S-A)/A100
Average
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
CONCRETE
AGGREGATE
Date Sampled:
Date Tested:Intended Use:Lab. No.:RFI No:-
Coarse Aggregate 1
1
500.0
500.0
Coarse Aggregate 2
1
500.0
500.0
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
R- DULECHA (RE-BID)
CONCRETE
AGGREGATE
500.0
500.0
Signature:Date:-
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Constructi
Corporation
Transport Design
Depth:-
Stock
Material Desc.:-
River Sand
Material Source:-
Sampled by:-
Jointly
Material Size
Description
Trial No.
A/(A+B-C)
Average
S/(B+S-C)
Average
A/(B+S-C)
Average
((S-A)/A100
Average
Material Size
Description
Trial No.
A/(A+B-C)
Average
S/(B+S-C)
A/(B+S-C)
Remark:-
Average
Average
((S-A)/A100
Average
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
Stock
CONCRETE
AGGREGATE
Date Sampled:
Date Tested:- 7/13/2016
Intended Use:-Cement Concrete
Lab. No.:RFI No:-
518.2
1,801.6
2,109.4
500.0
2.6
2.5
2.4
3.6
509.6
1,801.6
2,115.1
500.0
2.7
2.6
2.5
1.9
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
R- DULECHA (RE-BID)
CONCRETE
AGGREGATE
7/13/2016
Cement Concrete
Signature:Date:-
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Constructi
Corporation
Transport Design
Uni
Station:-
Depth:-
Stock
Material Desc.:-
River Sand
Material Source:-
Sampled by:-
Volume of Mold
Weight of Sample
D= B-A
E= D/C
Average gm / mm3
Average Kg/ m3
Aggregate Size
Weight of Mold
Volume of Mold
Weight of Sample
D= B-A
E= D/C
Average gm / mm3
5-10mm
Average Kg/ m3
Loss unit we
Description
Weight of Mold
Weight of Mold + Sample
Volume of Mold
Weight of Sample
Loss Unit weight
Average gm / mm3
Average Kg/ m3
Remark:-
A
B
C
D= B-A
E= D/C
F
G
Nazero Rive
769
6915
3993
6146
1.539
1539
1534
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
Unit weight
Stock
Date Sampled:
Date Tested:Intended Use:-
10-20mm
769
6,563
3993
5794
1.451
1529
1451
1534
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
R- DULECHA (RE-BID)
E
2
Remark
Signature:Date:-
EMPLOYER
CO
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Construction
Corporation
Transport Design an
SOUNDNESS OF AGGR
Station:-
Depth:-
Stock
Material Desc.:-
Natural sand
Material Source:-
Sampled by:-
Jointly
2,688
Mass
Retained
(g)
0
73
426
568
693
578
Retain
(%)
0.0
2.7
15.8
21.1
25.8
21.5
0.15
0.075
249
54
9.3
2.0
IMMERSION
Cycles
Beginning
Date
Time
1. Immersion
27/07/16
4:00 PM
2. Immersion
28/07//16
4:00 PM
3. Immersion
29/07/16
4:00 PM
4. Immersion
30/07/16
4:00 PM
5. Immersion
31/07/16
4:00 PM
SOUNDNESS
% Retained
of Original Sample
Weight of
Sample
Before Test (g)
9.5-4.75
2.77
100
4.75-2.36
16.53
100
2.36-1.18
21.10
100
1.18-0.6
25.55
100
0.6-0.3
22.49
100
Sieve Size
(mm)
Minus 0.15
0.3-0.15
Total
Checked by:(Contractor M
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
Passing
Percent
(%)
100.0
97.3
81.4
60.3
34.5
13.0
2,730
Mass
Retained
(g)
0
77
470
575
691
641
Retain
(%)
0.0
2.8
17.2
21.1
25.3
23.5
Passing
Percent
(%)
100.0
97.2
80.0
58.9
33.6
10.1
3.8
1.7
228
37
8.4
1.4
1.8
0.4
MMERSION
No. of Hours
End
Date
Time
28/07/16
10: AM
18
29/07/16
10: AM
18
30/07/16
10: AM
18
31/07/16
10: AM
18
01/08/16
10: AM
18
REMA
REMA
4=(2-3)
5=(1*4)/100
80.4
19.60
0.54
93.5
6.50
1.07
88.3
11.70
2.47
92.4
7.60
1.94
92.8
7.20
1.62
7.10
Remark:-
ontractor M.E.)
Reviwed by:-
Approve
(Consulta
(Consultant LAB.T)
Signature:-
Signature:-
Date:-
Date:-
34.5
CONTRACTOR
Sunshine Construction
PLC
9/7/2016
27/7/2016
For Concrete
FA-001/16
AVE.%
Ave %
Retain
0.0
2.77
16.53
21.10
25.55
22.49
Pass
100.0
97.2
80.7
59.6
34.1
11.6
8.81
1.68
REMARK
REMARK
2.8
1.1
Liquid limit
#REF!
Soil class
A-7-5
F=0.075 PASS%
35
0.2
0.005
LL
#REF!
35.00
0.20
0.005
#REF!
40.00
#REF!
35.00
0.20
0.005
#REF!
40.00
35.00
0.20
0.005
#VALUE!
#REF!
#REF!
#VALUE!
###
Group Index
62.3
60
0.01*(F-15)*(PI-10)
40
0.01
15
PI
10
0.01
#REF!
15.00
#REF!
0.01
#REF!
15.00
#REF!
0.01
#REF!
10.00
10.00
#REF!
#REF!
#REF!
EMPLOYER
CONSU
Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:
MOISTURE D
TEST METHOD : A
Station:-
Depth:-
Stock
Material Desc.:-
River Sand
Jointly
Weight Rei
S1
S2
9.5
4.75
211
114
2.36
422
475
1.18
598
605
0.6
674
665
0.3
567
541
0.15
212
219
0.075
44
pan
121
90
120.00
Test Result
Lower Limit
100.00
80.00
60.00
% Passing
40.00
20.00
0.00
0.075
0.15
1.18
Sieve Siz
Sieve Size in mm
% Passing
Grading Modulus
Remark:-
4.750
2.000
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTO
p Stock
METHOD
Date Sampled:-
7/7/2016
Date Tested:-
7/1/2016
Intended Use:-
Cement Cncret
gm
2753
gm
% Retain
S1
S2
S1
S2
100
100
92
96
15
17
77
79
21
22
56
57
24
24
32
32
20
20
12
13
Limit
Uper Limit
1.18
2.36
4.75
0.425
0.075
Soil Cassficati
PP
.)
Signature:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
7/7/2016
7/1/2016
Cement Cncrete
2734
2669
Specification
Average
100
100
94
95
100
78
80
100
56
50
85
32
25
60
12
10
37
15
4.75
9.5
Soil Cassfication
LL
PI
10
Signature:-
Date:-
EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:
Ethiopian Constructi
Corporation
Transport Design
Station:-
Depth:-
Stock
Material Desc.:-
River sand
Material Source:-
Sampled by:-
Jointly
Material Size
Description
Trial No.
Weigth of Container
A-B
C/A*100
Ave.Percentage
Material Size
Description
Trial No.
Weigth of Container
Remark:-
A-B
C/A*100
Ave.Percentage
Signature:-
Signature:-
Date:-
Date:-
CONSULTANT
CONTRACTOR
Stock
Bekri Daar
Date Sampled:7/7/2016
Date Tested:- 7/9/2016
Intended Use:-Cement Concrete
Lab. No.:RFI No:-
500.0
500.0
485.0
482.0
0.0
0.0
15.0
18.0
3.00
3.60
3.3
500.0
500.0
475.0
476.0
0.0
0.0
25.0
24.0
5.00
4.80
4.9
Signature:-
Signature:-
Date:-
Date:-
CONTRACTOR
Sun Shine
Construction PLC
R- DULECHA (RE-BID)
7/7/2016
7/9/2016
Cement Concrete
500.0
482.0
0.0
18.0
3.60
3.3
500.0
476.0
0.0
24.0
4.80
4.9
Signature:Date:-
gm
gm
gm
gm
gm
%
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
Liquid limit
Plastic limit
Plasticity index
Soil class
34
0
34
CLASSIFICATION
A-7-6
0
A-6
0
0
0
0
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
#DIV/0! #DIV/0!
#DIV/0!
(No10)
(No40)
(No.200 )
Wt.Ret.
0.0
0.0
Err:509
58
25
62.3
25
62.3
CLASSIFICATION
0
A-6
0
0
soil classification
%Ret.
%Pass
#DIV/0! #DIV/0!
#DIV/0!
washing
0.0