Anda di halaman 1dari 441

EMPLOYER

Ethiopian Roads Authority


(ERA)
PROJECT NAME:

ANKOBER - AWASH ARBA JUNCTIO

TEST ME

Station:-

Depth:-

Material Desc.:-

Material Source:-

Sampled by:-

0
TYPE OF TEST CONDUCTED

COMPACTION TEST

MDD (g/cm3)
OMC (%)
95% of MDD (g/cm3)

CBR TEST

CBR at 95% of MDD


SWELL (%) @ 100 % Of MDD
LIQUID LIMIT (%)

SOIL CONSISTENCY
Limit)

PLASTIC LIMIT (%)


PLASTICITY INDEX (%)

Soil Classification
Plastic Product
Grading Modulus (GM)
LosAngeles Abrassion From Centeral labo.(LAA)
Grading
Lower Limit

100

Test Result

0.0

Uper limit

100

Remark:-

Tested by:Checked by:(Contractor Lab.


Tech)

(Contractor M.E.

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT
Ethiopian Construction Design and Supervision
works Corporation
Transport Design and Supervision works
section

ASH ARBA JUNCTION ROAD PROJECT

LOT 1 ANKOBER- DULECHA

ATTERBER LIMIT
TEST METHOD : AASHTO T89 - T91

Date Sampled:
Date Tested:Intended Use:Lab. No.:-

TEST RESULT

Existing .OGL Fill/Embankment

0.00

--

--

0.00

--

--

0.00

--

--

45.00

5%

5%

0.00

1.5 %

1.5 %

34.25

60 %

60 %

0.00

--

--

34.25

30 %

30 %

0.00
0.0

0.0
0%

--

--

--

--

--

--

--

--

SP table 5104/1 OR 5105/1

90

51

35

0.0

0.0

0.0

100

80

70

(Contractor M.E.)

Reviwed by:(Consultant LAB.T)


Signature:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

OT 1 ANKOBER- DULECHA (RE-BID)

91

12/30/1899
12/30/1899
12/30/99
12/30/99

Top Subgrade

Sub base

--

--

--

--

--

--

5%

30 %

1.5 %

1.5 %

60 %

45 %

--

--

30 %

8%

--

--

--

< 90 %

--

>1.5%

--

< 51 %

0.0

0.0

15

R 5105/1

Approved By:(Consultant M.E.)

Signature:-

Date:-

EMPLOYER

CO

Ethiopian Construct
Ethiopian Roads Authority works Corporation
(ERA)
Transpo
works section
PROJECT NAME:

ANKOBER - AWASH ARBA JUNCTION RO

Station:-

Km 13+210-13+250 full width

Depth:-

0.2 ~ 1m

Material Desc.:-

Weatherd Gravel Material

Material Source:-

Existing OGL material in Fill section

Sampled by:-

Jointly

TYPE OF TEST CONDUCTED

MDD (g/cm3)

TEST RESULT

1.81

COMPACTION
TEST
OMC (%)

95% of MDD (g/cm3)

CBR TEST

CBR at 95% of MDD

15.50

0.00

45.00

CBR TEST

SWELL (%) @ 95 % Of MDD

0.00

LIQUID LIMIT (%)


SOIL
CONSISTENCY
(Att. Limit)

PP

PLASTIC LIMIT (%)

0.00

PLASTICITY INDEX (%)

#VALUE!

Soil Classification

Linear Shrinkage

Grading Modulus (GM)

LosAngeles Abrassion (LAA)

Grading

REMARKS

--

Tested by:Lab Tech)

(Contractor Checked by:(Contractor)

Signature:

Signature:

Date:-

Date:-

CONSULTANT

CONTRACTOR

thiopian Construction Design and Supervision


orks Corporation
Transport Design and Supervision
orks section

BA JUNCTION ROAD PROJECT

on

EST RESULT

Existing .
OGL

LOT 1 ANKOBER- DULECHA (RE-B

Date Sampled:-

6/24/2016

Date Tested:-

12/30/1899

Intended Use:-

To check suitability of Ro

Lab. No.:-

Exo - 020

Fill/Emba
nkment

Top
Subgrade

1.81

--

--

--

15.50

--

--

--

0.00

--

--

--

5%

5%

5%

45.00

0.00

1.5 %

1.5 %

1.5 %

PP

60 %

60 %

60 %

--

--

30 %

30 %

30 %

--

--

--

--

--

--

--

--

--

--

--

--

--

--

0.00

#VALUE!

(Contractor)

Reviwed by:(Consultant
LAB.T)

Approved By:(Consultant ME)

Signature:

Signature:

Date:-

Date:-

CONTRACTOR
China Railway Seventh
Group CO. LTD. (CRSG)

T 1 ANKOBER- DULECHA (RE-BID)


6/24/2016
12/30/1899
To check suitability of Road bed
Exo - 020

Sub base

--

--

--

30 %

1.5 %

45 %

8%

--

--

>1.5%

< 51 %
SP table
5104/1
OR
5105/1

Approved By:(Consultant ME)


Signature:
Date:-

EMPLOYER
Ethiopian Roads Authority
(ERA)

PROJECT NAME: ANKOBER - AWASH ARBA JUNCTIO

MOISTU

TEST METHOD
Station:-

Km 13+210-13+250 full width

Depth:-

0.2 ~ 1m

Material Visual Desc.:-

Weatherd Gravel Material

Material Source:-

Existing OGL material in Fill section

Sampled by:-

Jointly

Mold No

Wt. of Mold + Wet Soil (g)

Wt. of Mold(g)

Wt. Wet Soil(g)

Volume of Mold(cm3)

Wet Density(g/cm3)

Container

Wt. Cont + Wet soil (g)

Wt. Cont + Dry soil (g)

Weight of Water (g)

Weight of Container (g)

Weight of Dry Soil (g)

Moisture Content (g)

Dry Density

2.00
1.95
1.90
1.85
1.80
1.75
1.70
Dry Density
1.65
1.60
1.55
1.50
1.45
1.40
5.00

6.00

7.00

8.00

9.00

MDD =

1.810

gm/cm3

OMC =

15.50

10.00

REMARKS:-

Tested by:(Contractor Lab. Tech)

Signature:

Date:-

CONSULTANT
Ethiopian Construction Design and Supervision works
Corporation
Transport Design and Supervision works section

WASH ARBA JUNCTION ROAD PROJECT

LOT 1 ANKOBER- D

MOISTURE DENSITY RELATION OF SOIL


TEST METHOD : AASHTO T- 180

+250 full width

METHOD

Date Sampled:Date Tested:-

vel Material

Intended Use:-

aterial in Fill section

Lab. No.:-

W1

11412

11545

11780

W2

7363

7363

7363

W3=W1-W2

4049

4182

4417

2124

2124

2124

Wd=W3/V

1.91

1.97

2.08

No.

57

50

PX

304.30

389.50

369.10

279.90

352.20

330.00

c=a-b

24.40

37.30

39.10

70.60

70.10

70.80

e=b-d

209.30

282.10

259.20

m=(C)/(e)*100

11.66

13.22

15.08

Dd=wd/(100+m)*100

1.71

1.74

1.81

MDD Vs OMC

9.00

10.00

11.00

12.00

Moisture Content

13.00

14.00

15.00

16.00

17.

Checked by:(Contractor M.E)

Reviwed by:(Consultant LAB.T)

Signature:

Signature:

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

LOT 1 ANKOBER- DULECHA (RE-BID)

OF SOIL

THOD

D
6/24/2016
6/27/2016
To check suitability of Road bed
Exo - 020

4
11564
7363
4201
2124
1.98
E
399.10
351.20

00

47.90
70.70
280.50
17.08
1.69

15.00

16.00

17.00

18.00

19.00

20.00

ed by:(Consultant LAB.T)

Approved By:(Consultant M.E)

ure:

Signature:

Date:-

EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:

CONSULT

Ethiopian Construction De
works Corporation
Transport Design a
section

ANKOBER - AWASH ARBA JUNCTION ROA

MOISTURE DEN

TEST METHOD : AASH

Station:Depth:Material Desc.:Material Source:Sampled by:Targate Moisture


A

Mold No

Wt. of Mold + Wet Soil (g) W1

Wt. of Mold(g)

W2

Wt. Wet Soil(g)

W3=W1-W2

Volume of Mold(cm3)

Wet Density(g/cm3)

Wd=W3/V

Container

No.

Wt. Cont + Wet soil (g)

Wt. Cont + Dry soil (g)

Weight of Water (g)

c=a-b

Weight of Container (g)

Weight of Dry Soil (g)

e=b-d

Moisture Content (g)

m=(C)/(e)*100

Dry Density

Dd=wd/(100+m)*100

MDD gm/cm3
OMC %

Dry Density

NMC
5.50
5.00

Remark:-

6.50
6.00

7.50
7.00

8.
8.00

Tested
by:(Contract
or Lab.
Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

NSULTANT

CONTRACTOR

on Design and Supervision

Sun Shine Constru

sign and Supervision works


section

N ROAD PROJECT

LOT 1 ANKOBER- DULECHA (RE-BID

E DENSITY RELATION OF SOIL


AASHTO T- 180

METHOD

Date Sampled:Date Tested:Intended Use:Lab. No.:RFI No:-

100
MDD Vs OMC

8.50
8.00

9.50
9.00

10.50
10.00

11.50
11.00

12.50
12.00

13.50
13.00

14.50
14.00

Moisture Content

15.50
15.00

16.50
16.00

17.50
17.00

18
18.00

Reviwed by:(Consultant

Approved By:(Consultant M.E.)

LAB.T)

Signature:-

Signature:-

Date:-

Date:-

Sun Shine Construction PLC

ANKOBER- DULECHA (RE-BID)

NMC

14.00

14.50

15.50
15.00

16.50
16.00

17.50
17.00

18.50
18.00

19.50
19.00

20.00

M.E.)

EMPLOYER
Ethiopian Roads
Authority (ERA)
PROJECT NAME:

Ethiopian Constructi
Corporation
Transport Design

ANKOBER - AWASH ARBA JUNCTION

ATTE

TEST METHOD

Station:Depth:Material Desc.:Material Source:Sampled by:LIQUID


1
No.of blows
Tare

N
no

Wt. tare + wet soil(g) =(W1)


Wt tare + dry soil(g) =(W2)
Wt. water (g) =(W1-W2)=A
Wt. of tar( g)=W3
Wt. of dry soil(g)=(W2-W3)=B
Moisture content %=(A/B)*100

Liquid Limit %

34.3

LIMIT

f(x) =

Moisture Content %

10

25
Total weight before wash

Sive in mm
4.75mm
2.00mm
0.425mm
0.075mm

Remark:-

Wt retain

% Retain

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

UNCTION ROAD PROJEC


LOT 1 ANKOBER- DULECHA (RE-BID)
ATTERBER LIMIT
METHOD : AASHTO T89 - T91

Date Sampled:
Date Tested:Intended Use:Lab. No.:RFI No:-

LIMIT

PLASTIC

AV.PLASTIC LMIT

LIMIT

25

Number of Blows

LL
%pass

PL
PI
GI
GM
PP

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

R- DULECHA (RE-BID)

PI = LL-PL

100

Classfication

Approved By:(Consultant M.E.)

Signature:Date:-

EMPLOYER
Ethiopian Roads Authority
(ERA)

Ethiopian Constructio
Corporation
Transport Design a

PROJECT NAME:ANKOBER - AWASH ARBA JUNCTION ROAD P

3-POINT CALIFORNI

TEST METHO

AT MOISTURE DENSITY RELATION


Station:Depth:Material Desc.:Material Source:Sampled by:Ring Factor:
PLUNGER
PENT.(mm)
0
0.64
1.27
1.91
2.54
3.18
3.81
4.45
5.08
7.62
9.16
SWELL 10Blows

% Swell

N/Divistion
10 Blows
BOTTOM FACE
DIAL
LOAD (KN)

After in mm

CBR %

SWELL 30 Blows

% Swell

CBR %

PEN.
TOP
BOTTOM
RECO.CBR

10 Blows
2.5mm

5.08mm

SOAKING CONDITION ( Density Determination )


MOLD NUMBER
WEIGHT OF SOIL + MOLD ( g)
WEIGHT OF MOLD ( g)
VOLUME OF MOLD (Cm3)
WEIGHT OF WET SOIL ( g)
WET DENSITY OF SOIL ( g/cm3)
DRY DENSITY OF SOIL ( g/cm3)

SOAKING CONDITION

W1
W2
V
W3 = W1 - W2
Wd = (W3/V)
Dd = Wd/(100+m)*100

BEFORE

CONTAINER NUMBER
WET SOIL + CONTAINER a ( g)
DRY SOIL + CONTAINER b
( g)
WEIGHT OF CONTAINER c ( g)
WEIGHT OF WATER
d=a-b ( g)
WEIGHT OF DRY SOIL e=b-c ( g)
MOISTURE CONTENT m=(d/e)*100

Remark:Tested by:(Contractor L.Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

MOISTURE
10 Blows
AFTER
TOP 1 in.

CONSULTANT

CONTRACTOR

n Construction Design and Supervision works


tion
sport Design and Supervision works section

ION ROAD PROJECT

LOT 1 ANKOBER- DULECHA (RE-BID)

CALIFORNIA BEARING RATIO (CBR)

EST METHOD : AASHTO T-193

Y RELATIONSHIP, AASHTO T -

180

METHOD D

Date Sampled:Date Tested:Intended Use:Lab. No.:Penetration Date


30 Blows
BOTTOM FACE
DIAL
LOAD(KN)

After in mm

65 blows
CBR %

SWELL 65 Blows

% swell

BOTTOM FACE
DIAL
LOAD(KN)

After in mm

PEN.
TOP
BOTTOM
C.CBR

30 Blows
2.5mm

10 Blows
BEFORE
AFTER

STURE
ws

5.08mm

30 Blows
BEFORE

DETERMINATION
30 Blows
BEFORE
AFTER
AVG.
TOP 1 in.

PEN.
TOP
BOTTOM
RECO.CBR

65 Blows
2.5mm

65 Blows
AFTER

BEFORE

65 Blows
BEFORE
AVG.

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant ME)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction
PLC

METHOD D

65 blows
CBR %

65 Blows
5.08mm

65 Blows
AFTER

65 Blows
AFTER
TOP 1 in.

Approved By:(Consultant ME)


Signature:Date:-

EMPLOYER
Ethiopian Roads Authority
(ERA)

PROJECT NAME:
ANKOBER - AWASH ARBA JUNCTION RO

3-POINT CALIFORNIA
TEST METHOD

AT MOISTURE DENSITY RELATIONS


Station:Depth:Material Desc.:Material Source:Sampled by:-

Km 13+210-13+250 full width


0.2 ~ 1m
Weatherd Gravel Material
Existing OGL material in Fill section
Jointly

20.00

UNIT LOAD ON PISTON (KN)

10.00

0.00
0

2.54

5.08

7.62

PENETRATION (mm)

10.16

0.00
0

2.54

5.08

7.62

10.16

PENETRATION (mm)

LOAD (KN)
2.54mm
5.08mm
0.00
0.00
0.00
0.00
0.00
0.00

BLOWS
10
30
65
MDD (g/Cm3)

0.00

95% of MDD(g/Cm3)

1.00

Density

Swell
(%)
0.50

0.00
1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

Dry Den

LOAD (KN)

BLOWS

2.54mm

5.08mm

10

0.00

0.00

30

0.00

0.00

65

0.00

0.00

MDD (g/Cm3)
Remark:-

0.00

95% of MDD(g/Cm3)

Tested by:(Contractor Lab.Tech)

Checked by:(Contractor M.E)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Ethiopian Construction Design and


Supervision works Corporation
Transport Design
and Supervision works section

ARBA JUNCTION ROAD PROJECT LOT 1 ANKOBER- DULECHA (RE-BI

POINT CALIFORNIA BEARING RATIO (CBR)


TEST METHOD : AASHTO T-193

DENSITY RELATIONSHIP, AASHTO T -

ull width

Date Sampled:Date Tested:Intended Use:Penetration date


Lab. No.:-

rial
in Fill section

7.62

180

METHODD
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899

Density Vs CBR Curve

Soaked CBR (%)

10.16

12.7

1.50

1.60

1.70

1.80

1.90

2.00

2.10

Dry Density (gm/cc)

2.20

2.3

7.62

10.16

1.50

12.7

1.60

1.70

1.80

1.90

2.00

2.10

2.20

2.3

Dry Density (gm/cc)

CBR(%)
2.54mm
5.08mm
0.0
0.0
0.0
0.0
0.0
0.0

0.00

5% of MDD(g/Cm3)

DRY DENSITY Vs SOCKED C.B.R.


BLOWS
DRY DENSITY
10
30
65

0.00
0.00
0.00

CBR at 95 % of MDD

Density Vs % Swell

1.70

1.75

1.80

1.85

1.90

1.95

2.00

2.05

2.10

2.15

2.20

2.25

2.30

2.35

Dry Density (gm/cc)

CBR(%)

DRY DENSITY Vs Swell

2.54mm

5.08mm

BLOWS

0.0

0.0

10

0.00

0.0

0.0

30

0.00

0.0

0.0

65

0.00

5% of MDD(g/Cm3)

DRY DENSITY

0.00 Swell at 95% of MDD

Reviwed by:-

ked by:(Contractor M.E)

(Consultant LAB.T)

Approved By:(Consultant ME)

ature:-

Signature:-

Signature:-

:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction
PLC

OT 1 ANKOBER- DULECHA (RE-BID)

O (CBR)
3
-

60

180

METHODD
12/30/1899
12/30/1899
12/30/1899
12/30/1899
12/30/1899

Density Vs CBR Curve

1.70

1.80

1.90

2.00

2.10

Dry Density (gm/cc)

2.20

2.30

2.40

60

1.70

1.80

1.90

2.00

2.10

2.20

2.30

2.40

Dry Density (gm/cc)

DRY DENSITY Vs SOCKED C.B.R.


SOAKED C.B.R.

2.05

0.0
0.0
0.0
45.00

2.10

2.15

2.20

2.25

2.30

2.35

2.40

DRY DENSITY Vs Swell


Swell
0.00
0.00
0.00
0.00

Approved By:(Consultant ME)


Signature:Date:-

PROJECT NAME:
ZEMA RIVER BRIDGE-FELEGEBRIHAN ROAD PROGECT
EMPLOYER
CONSULTANT
Ethiopian Roads Authority (ERA)

HAMDA ENGINEERING CONSULT


PVT.LTO.CO.

China Railw

DATE
REF.
To HAMDA ENGINEERING CONSULT PVT.LTO.CO.
SUBJECT:- CONSTRUCTION MATERIAL APPROVAL REQUEST
We would like to Submite Existing Road Material Proctor , Liquide Limite, Plastic Limit
and CBR test result from km 119+000 Center line. Here we Attached 5 page of test resul, Please
Disposition On Inspection Result
Pass
Procced with Following Instruction (s)
Re-inspection with Following Instruction (S)
Reject with Following Instruction (S)
Instruction (S) and /OR Commetnt ( S)

Received Stamp Area

Approved By:(RE/ARE/ME)
Signature:Date:-

AD PROGECT
CONTRACTOR
China Railway Seventh Group CO. LTD. (CRSG)

Plastic Limit

of test resul, Please refer it.

PROJECT NAME:
ZEMA RIVER BRIDGE-FELEGEBRIHAN ROAD PROJECT
EMPLOYER
Ethiopian Roads Authority (ERA)

HAMDA ENGI

MOISTURE DENSITY
TEST METHOD : AASHTO
Station:-

Km 125+000 CL

Depth:-

0.20 m-1m

Material Desc.:- Brown Clay Soil


Material Source:-Existing
Sampled by:-

Jointly

REMARKS:-

Tested by:(Contractor)

Checked by:(Contractor)

Signature:

Signature:

Date:-

Date:-

PROJECT
CONSULTANT

CONTRACTOR

HAMDA ENGINEERING CONSULT PVT.LTO.CO.

China Railway Sev


Group CO. LTD
(CRSG)

E DENSITY RELATION OF SOIL

: AASHTO T- 180

METHOD

Date Sampled:-

8/4/2015

Date Tested:-

8/19/2015

Intended Use:-

Existing

Lab. No.:-

S-020

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant ME)

Signature:

Signature:

Date:-

Date:-

CONTRACTOR
China Railway Seventh
Group CO. LTD.
(CRSG)

8/4/2015
8/19/2015
Existing
S-020

Approved By:(Consultant ME)


Signature:
Date:-

EMPLOYER

CONSU

Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:

ANKOBER - AWASH ARBA JUNCTION R

MOISTURE D

TEST METHOD : A
Station:Depth:Material Desc.:Material Source:Sampled by:S1 Weight Before Washing
S2 Weight Before Washing
Weight Rei

Sieve Size
S1
63
50
25
4.75
2
0.425
0.075

S2

pan
Total
120.00
Test Result

Lower Limit

100.00

80.00

60.00
% Passing

40.00

20.00

0.00
pan

0.075

4.75

Sieve Siz

Sieve Size in mm
% Passing
Grading Modulus
Remark:-

4.750

2.000

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTO

an Construction Design and Supervision


orporation
Transport Design and Supervision works
section

BA JUNCTION ROAD PROJECT

LOT 1 ANKOBER- DULECHA (RE

MOISTURE DENSITY RELATION OF SOIL

ST METHOD : AASHTO T- 180

METHOD

Date Sampled:Date Tested:Intended Use:Lab. No.:RFI No:gm

Weight After Wash

gm

Weight After Wash

% Retain
S1

% passing
S2

S1

S2

Limit

Uper Limit

4.75

25

50

Sieve Size in mmm Table

0.425

0.075

Soil Cassficati

PP

.)

Reviwed by:(Consultant LAB.T)

Signature:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

ANKOBER- DULECHA (RE-BID)

Average

Specification

passing % Low. Limit U.Lim

100

100

90

100

51

80

35

70

15

50

63

Soil Cassfication

LL
PI

Approved By:(Consultant M.E.)

Signature:-

Date:-

EMPLOYER

Ethiopian Roads
Authority (ERA)
PROJECT NAME:

Ethiopian Constructi
Corporation
Transport Design

ANKOBER - AWASH ARBA JUNCTION

SPECIFIC GRAVITY AND WATER ABSORPTION


AAS
Station:-

Contractor Main Camp Stock

Depth:-

Stock

Material Desc.:-

River Sand

Material Source:-

Nazero River ( Ataye ) & Bekri D

Sampled by:-

Jointly

Material Size
Description

Trial No.

Mass of S.S.D sample in air

Mass of pycnometer filled with water

Mass of pycnometer + sample + water

Mass of oven dry sample

Apparent Specific Gravity (g/cm3)


Bulk Specific Gravity (g/cm3)
(Saturated Surface-Dry Basis)

A/(A+B-C)
Average
S/(B+S-C)

Bulk Specific Gravity (g/cm3)


(Saturated Surface-Dry Basis)
Bulk Specific Gravity (g/cm3)
(Dry Basis)
Water Absorption (%)

Average
A/(B+S-C)
Average
((S-A)/A100
Average
Material Size

Description

Trial No.

Mass of S.S.D sample in air

Mass of pycnometer filled with water

Mass of pycnometer + sample + water

Mass of oven dry sample

Apparent Specific Gravity (g/cm3)

A/(A+B-C)
Average

Bulk Specific Gravity (g/cm3)


(Saturated Surface-Dry Basis)

S/(B+S-C)

Bulk Specific Gravity (g/cm3)


(Dry Basis)

A/(B+S-C)

Water Absorption (%)

Remark:-

Average
Average
((S-A)/A100
Average

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

UNCTION ROAD PROJEC


LOT 1 ANKOBER- DULECHA (RE-BID)

ORPTION FOR CEMENT/BITUMEN


AASHTO T 85

Stock

CONCRETE

AGGREGATE

Date Sampled:7/7/2016
Date Tested:- 7/13/2016
Intended Use:-Cement Concrete

Bekri Daar (1:1 ratiLab. No.:RFI No:-

Nazero River Sand (Ata


1

512.1
1,801.6
2,113.3
500.0
2.7
2.6

2.5
2.4

Bekridaar Rver sand


Ataye & Bekridar (1:3 Ration )

514.2
1,801.6
2,115.1
500.0
2.7
2.6
2.5
2.8

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

R- DULECHA (RE-BID)
CONCRETE

AGGREGATE

7/7/2016
7/13/2016
Cement Concrete

Nazero River Sand (Ataye )


2

Bekridaar Rver sand


2

Approved By:(Consultant M.E.)

Signature:Date:-

EMPLOYER

CONSU

Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:

ANKOBER - AWASH ARBA JUNCTION R

Los A
TEST
Station:Depth:Material Desc.:Material Source:Sampled by:-

S1 Weight Before Test


S2 Weight Before Test
Sieve Size
Passing

Retained on

37.5 (1 1/2 in.)

25.0 (1 in.)

25.0 (1 in.)

19.0 (3/4 in.)

19.0 (3/4 in.)

12.5 (1/2 in.)

12.5 (1/2 in.)

9.5 (3/8 in.)

9.5 (3/8 in.)

6.3 (1/4 in.)

6.3 (1/4 in.)

4.75 (No.4)

4.75 (No.4)

2.36 (No.8)

Total
Number of Spheres

Test Results
Trial No.
Number of Revolution
Tatal Weight of Sample Tested (g)
Weight of Tested Sample
Retained on No.12 ( 1.7mm) Sieve (g)
Percent Loss (%)
Average
Note

Remark:-

Tested by:(Contractor Lab. Tech)

Checked by:-

(Contrac
M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTO

an Construction Design and Supervision


orporation
Transport Design and Supervision works
section

BA JUNCTION ROAD PROJECT

LOT 1 ANKOBER- DULECHA (RE

Los Angeles Abrasion Test


TEST METHOD : ASHTO T-96
Date Sampled:Date Tested:Intended Use:Lab. No.:RFI No:-

gm
gm

Weight After Test


Weight After Test

Grading Type
B

1,250 25

1,250 25

1,250 10

2,500 10

1,250 10

2,500 10

2,500 10

2,500 10

5,000 10

5,000 10

5,000 10

5,000 10

5,000 10

12

11

Grading Type A

Note :- We Use Grading Type A

Grad

d by:-

re:-

(Contractor

Reviwed by:(Consultant LAB.T)


Signature:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

ANKOBER- DULECHA (RE-BID)

Weight After Test


Weight After Test

Grading Type A

Approved By:(Consultant M.E.)


Signature:-

Date:-

EMPLOYER

CONSU

Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:

ANKOBER - AWASH ARBA JUNCTION R

MOISTURE D

TEST METHOD : A

Station:-

Contractor Mai Camp Stock

Depth:-

Stock

Material Desc.:-

River Sand

Material Source:- Bekri Daar River Sand


Sampled by:-

Jointly

S1 Weight Before Washing


S2 Weight Before Washing
Sieve Size

Weight Rei
S1

S2

9.5

195

4.75

212

467

2.36

487

719

1.18

747

783

0.6

944

657

0.3

470

264

0.15

343

52

0.075

43

44

pan

218

172

120.00
Test Result

Lower Limit

100.00

80.00

60.00
% Passing

40.00

20.00

0.00
0.075

0.15

1.18

Sieve Siz

Sieve Size in mm
% Passing
Grading Modulus
Remark:-

4.750

2.000

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTO

an Construction Design and Supervision


orporation
Transport Design and Supervision works
section

BA JUNCTION ROAD PROJECT

LOT 1 ANKOBER- DULECHA (RE

MOISTURE DENSITY RELATION OF SOIL

ST METHOD : AASHTO T- 180

p Stock

nd

METHOD

Date Sampled:-

7/7/2016

Date Tested:-

7/13/2016

Intended Use:-

Cement Cncret

Lab. No.:RFI No:3464

gm

Weight After Wash

3353

gm

Weight After Wash


% passing

% Retain
S1

S2

S1

S2

100

94

14

94

80

14

21

80

59

22

23

58

35

27

20

31

16

14

17

10

Limit

Uper Limit

1.18

2.36

4.75

Sieve Size in mmm Table

0.425

0.075

Soil Cassficati

PP

.)

Reviwed by:(Consultant LAB.T)

Signature:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

ANKOBER- DULECHA (RE-BID)

7/7/2016
7/13/2016
Cement Cncrete

Weight After Wash

3237

Weight After Wash

3130
Specification

Average

passing % L. Limit U.Lim


97

100

100

87

95

100

69

80

100

47

50

85

23

25

60

13

10

37

15

4.75

9.5

Soil Cassfication

LL
PI

10

Approved By:(Consultant M.E.)

Signature:-

Date:-

EMPLOYER

Ethiopian Roads
Authority (ERA)
PROJECT NAME:

Ethiopian Constructi
Corporation
Transport Design

ANKOBER - AWASH ARBA JUNCTION

SPECIFIC GRAVITY AND WATER ABSORPTION


AAS
Station:Depth:Material Desc.:Material Source:Sampled by:-

Material Size
Description

Trial No.

Mass of S.S.D sample in air

Mass of pycnometer filled with water

Mass of pycnometer + sample + water

Mass of oven dry sample

Apparent Specific Gravity (g/cm3)


Bulk Specific Gravity (g/cm3)
(Saturated Surface-Dry Basis)

A/(A+B-C)
Average
S/(B+S-C)

Bulk Specific Gravity (g/cm3)


(Saturated Surface-Dry Basis)
Bulk Specific Gravity (g/cm3)
(Dry Basis)
Water Absorption (%)

Average
A/(B+S-C)
Average
((S-A)/A100
Average
Material Size
Trial No.

Mass of S.S.D sample in air

Mass of pycnometer filled with water

Mass of pycnometer + sample + water

Mass of oven dry sample

Apparent Specific Gravity (g/cm3)

A/(A+B-C)
Average

Bulk Specific Gravity (g/cm3)


(Saturated Surface-Dry Basis)

S/(B+S-C)

Bulk Specific Gravity (g/cm3)


(Dry Basis)

A/(B+S-C)

Water Absorption (%)

Remark:-

Average
Average
((S-A)/A100
Average

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

UNCTION ROAD PROJEC


LOT 1 ANKOBER- DULECHA (RE-BID)

ORPTION FOR CEMENT/BITUMEN


AASHTO T 85

CONCRETE

AGGREGATE

Date Sampled:
Date Tested:Intended Use:Lab. No.:RFI No:-

Coarse Aggregate 1
1

500.0

500.0

Coarse Aggregate 2
1

500.0

500.0

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

R- DULECHA (RE-BID)
CONCRETE

AGGREGATE

500.0

500.0

Approved By:(Consultant M.E.)

Signature:Date:-

EMPLOYER

Ethiopian Roads
Authority (ERA)
PROJECT NAME:

Ethiopian Constructi
Corporation
Transport Design

ANKOBER - AWASH ARBA JUNCTION

SPECIFIC GRAVITY AND WATER ABSORPTION


AAS
Station:-

Contractor Main Camp Stock

Depth:-

Stock

Material Desc.:-

River Sand

Material Source:-

Narero River ( Ataye )

Sampled by:-

Jointly

Material Size
Description

Trial No.

Mass of S.S.D sample in air

Mass of pycnometer filled with water

Mass of pycnometer + sample + water

Mass of oven dry sample

Apparent Specific Gravity (g/cm3)


Bulk Specific Gravity (g/cm3)
(Saturated Surface-Dry Basis)

A/(A+B-C)
Average
S/(B+S-C)

Bulk Specific Gravity (g/cm3)


(Saturated Surface-Dry Basis)
Bulk Specific Gravity (g/cm3)
(Dry Basis)
Water Absorption (%)

Average
A/(B+S-C)
Average
((S-A)/A100
Average
Material Size

Description

Trial No.

Mass of S.S.D sample in air

Mass of pycnometer filled with water

Mass of pycnometer + sample + water

Mass of oven dry sample

Apparent Specific Gravity (g/cm3)

A/(A+B-C)
Average

Bulk Specific Gravity (g/cm3)


(Saturated Surface-Dry Basis)

S/(B+S-C)

Bulk Specific Gravity (g/cm3)


(Dry Basis)

A/(B+S-C)

Water Absorption (%)

Remark:-

Average
Average
((S-A)/A100
Average

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

UNCTION ROAD PROJEC


LOT 1 ANKOBER- DULECHA (RE-BID)

ORPTION FOR CEMENT/BITUMEN


AASHTO T 85

Stock

CONCRETE

AGGREGATE

Date Sampled:
Date Tested:- 7/13/2016
Intended Use:-Cement Concrete
Lab. No.:RFI No:-

Nazero River Sand (Ata


1

518.2
1,801.6
2,109.4
500.0
2.6
2.5

2.4
3.6

Bekridaar Rver sand


1

509.6
1,801.6
2,115.1
500.0
2.7
2.6
2.5
1.9

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

R- DULECHA (RE-BID)
CONCRETE

AGGREGATE

7/13/2016
Cement Concrete

Nazero River Sand (Ataye )


2

Bekridaar Rver sand


2

Approved By:(Consultant M.E.)

Signature:Date:-

EMPLOYER

Ethiopian Roads
Authority (ERA)
PROJECT NAME:

Ethiopian Constructi
Corporation
Transport Design

ANKOBER - AWASH ARBA JUNCTION

Uni
Station:-

Contractor Mani Camp Stock

Depth:-

Stock

Material Desc.:-

River Sand

Material Source:-

Nazero River sand and Bekri Da

Sampled by:-

DRY RODDED UNIT WE


Description
Weight of Mold

Weight of Mold + Sample

Volume of Mold

Weight of Sample

D= B-A

Dry Rodded Unit weight

E= D/C

Average gm / mm3

Average Kg/ m3

Loss unit weigh


Description

Aggregate Size

Weight of Mold

Weight of Mold + Sample

Volume of Mold

Weight of Sample

D= B-A

Loss Unit weight

E= D/C

Average gm / mm3

Loss unit weight Kg/ m3

5-10mm

Average Kg/ m3

Loss unit we
Description
Weight of Mold
Weight of Mold + Sample
Volume of Mold
Weight of Sample
Loss Unit weight
Average gm / mm3
Average Kg/ m3

Remark:-

A
B
C
D= B-A
E= D/C
F
G

Nazero Rive
769
6915
3993
6146
1.539
1539
1534

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

UNCTION ROAD PROJEC


LOT 1 ANKOBER- DULECHA (RE-BID)

Unit weight

Stock

Date Sampled:
Date Tested:Intended Use:-

Bekri Daar river san Lab. No.:RFI No:-

UNIT WEIGHT OF COARSE AGGREGATE


1

unit weight for Course Aggregate


5-10mm

10-20mm

ss unit weight Fine Aggregate

azero River Sand


769
6875
3993
6106
1.529

769
6,563
3993
5794
1.451

1529

1451

1534

Bekri Daar River Sand


769
6,577
3993
5808
1.455
1455
1454

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

R- DULECHA (RE-BID)

E
2

Remark

Bekri Daar River Sand


769
6,589
3993
5820
1.458
1458
1454

Approved By:(Consultant M.E.)

Signature:Date:-

EMPLOYER

CO

Ethiopian Roads
Authority (ERA)

PROJECT NAME:

Ethiopian Construction
Corporation
Transport Design an

ANKOBER - AWASH ARBA

SOUNDNESS OF AGGR

Station:-

Ataye & Bekri Daar River

Depth:-

Stock

Material Desc.:-

Natural sand

Material Source:-

Nazero and Bekri 2:1 mix ratio

Sampled by:-

Jointly

Total Weight (g)


Sieve Size (mm)
10
5
2.36
1.18
0.6
0.30

2,688
Mass
Retained
(g)
0
73
426
568
693
578

Retain
(%)
0.0
2.7
15.8
21.1
25.8
21.5

0.15
0.075

249
54

9.3
2.0

IMMERSION
Cycles

Beginning
Date

Time

1. Immersion

27/07/16

4:00 PM

2. Immersion

28/07//16

4:00 PM

3. Immersion

29/07/16

4:00 PM

4. Immersion

30/07/16

4:00 PM

5. Immersion

31/07/16

4:00 PM
SOUNDNESS

% Retained
of Original Sample

Weight of
Sample
Before Test (g)

9.5-4.75

2.77

100

4.75-2.36

16.53

100

2.36-1.18

21.10

100

1.18-0.6

25.55

100

0.6-0.3

22.49

100

Sieve Size
(mm)
Minus 0.15

0.3-0.15
Total

Tested by:(Contractor Lab. Tech)

Checked by:(Contractor M

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

WASH ARBA JUNCTION ROAD PROJECT ,LOT - 1 ANKOBER - DULECHA (RE-BI

ESS OF AGGREGATE BY USE OF SODIUM SULFATE


AASHTO T104

Date Sampled:Date Tested:Intended Use:-

Lab. No.:RFI No:-

Passing
Percent
(%)
100.0
97.3
81.4
60.3
34.5
13.0

2,730
Mass
Retained
(g)
0
77
470
575
691
641

Retain
(%)
0.0
2.8
17.2
21.1
25.3
23.5

Passing
Percent
(%)
100.0
97.2
80.0
58.9
33.6
10.1

3.8
1.7

228
37

8.4
1.4

1.8
0.4

MMERSION
No. of Hours

End
Date

Time

28/07/16

10: AM

18

29/07/16

10: AM

18

30/07/16

10: AM

18

31/07/16

10: AM

18

01/08/16

10: AM

18

REMA

UNDNESS TEST OF FINE AGGREGATE


Weight of
Sample
After Test (g)

% Loss After Test Weighted % Loss

REMA

4=(2-3)

5=(1*4)/100

80.4

19.60

0.54

93.5

6.50

1.07

88.3

11.70

2.47

92.4

7.60

1.94

92.8

7.20

1.62
7.10

Remark:-

ontractor M.E.)

Reviwed by:-

Approve
(Consulta

(Consultant LAB.T)
Signature:-

Signature:-

Date:-

Date:-

34.5

CONTRACTOR
Sunshine Construction
PLC

ANKOBER - DULECHA (RE-BID)

9/7/2016
27/7/2016
For Concrete
FA-001/16

AVE.%

Ave %

Retain
0.0
2.77
16.53
21.10
25.55
22.49

Pass
100.0
97.2
80.7
59.6
34.1
11.6

8.81
1.68

REMARK

REMARK

2.8
1.1

Approved By:(Consultant M.E.)


Signature:Date:-

Liquid limit

#REF!

Soil class

A-7-5

F=0.075 PASS%

(F-35) *[0.2+0.005*(LL-40)]+ 0.01*(F


F

35

0.2

0.005

LL

#REF!

35.00

0.20

0.005

#REF!

40.00

#REF!

35.00

0.20

0.005

#REF!

40.00

35.00

0.20

0.005

#VALUE!

#REF!

#REF!
#VALUE!
###

Group Index
62.3

60

0.01*(F-15)*(PI-10)
40

0.01

15

PI

10

0.01

#REF!

15.00

#REF!

0.01

#REF!

15.00

#REF!

0.01

#REF!

10.00
10.00
#REF!

#REF!
#REF!

EMPLOYER

CONSU

Ethiopian Construction
Ethiopian Roads works Corporation
Authority (ERA)
Transport Design
sec
PROJECT NAME:

ANKOBER - AWASH ARBA JUNCTION R

MOISTURE D

TEST METHOD : A

Station:-

Contractor Mai Camp Stock

Depth:-

Stock

Material Desc.:-

River Sand

Material Source:- Nazero Rver ( Ataye )


Sampled by:-

Jointly

S1 Weight Before Washing


S2 Weight Before Washing
Sieve Size

Weight Rei
S1

S2

9.5

4.75

211

114

2.36

422

475

1.18

598

605

0.6

674

665

0.3

567

541

0.15

212

219

0.075

44

pan

121

90

120.00
Test Result

Lower Limit

100.00

80.00

60.00
% Passing

40.00

20.00

0.00
0.075

0.15

1.18

Sieve Siz

Sieve Size in mm
% Passing
Grading Modulus
Remark:-

4.750

2.000

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTO

an Construction Design and Supervision


orporation
Transport Design and Supervision works
section

BA JUNCTION ROAD PROJECT

LOT 1 ANKOBER- DULECHA (RE

MOISTURE DENSITY RELATION OF SOIL

ST METHOD : AASHTO T- 180

p Stock

METHOD

Date Sampled:-

7/7/2016

Date Tested:-

7/1/2016

Intended Use:-

Cement Cncret

Lab. No.:RFI No:2811

gm

Weight After Wash

2753

gm

Weight After Wash


% passing

% Retain
S1

S2

S1

S2

100

100

92

96

15

17

77

79

21

22

56

57

24

24

32

32

20

20

12

13

Limit

Uper Limit

1.18

2.36

4.75

Sieve Size in mmm Table

0.425

0.075

Soil Cassficati

PP

.)

Reviwed by:(Consultant LAB.T)

Signature:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

ANKOBER- DULECHA (RE-BID)

7/7/2016
7/1/2016
Cement Cncrete

Weight After Wash

2734

Weight After Wash

2669
Specification

Average

passing % L. Limit U.Lim


100

100

100

94

95

100

78

80

100

56

50

85

32

25

60

12

10

37

15

4.75

9.5

Soil Cassfication

LL
PI

10

Approved By:(Consultant M.E.)

Signature:-

Date:-

EMPLOYER

Ethiopian Roads
Authority (ERA)
PROJECT NAME:

Ethiopian Constructi
Corporation
Transport Design

ANKOBER - AWASH ARBA JUNCTION

Station:-

Contractor Main Camp Stock

Depth:-

Stock

Material Desc.:-

River sand

Material Source:-

Nazero river ( Ataye) & Bekri Da

Sampled by:-

Jointly

Material Size
Description

Trial No.

Weigth of Container +Sample before wash

Weigth of Container +Sample After wash

Weigth of Container

Weigth of Sample passing No.200 sieve


Percentage pass of No.200 sieve
Clay Content in Percent or
pass of No.200 sieve

A-B
C/A*100
Ave.Percentage

Material Size
Description

Trial No.

Weigth of Container +Sample before wash

Weigth of Container +Sample After wash

Weigth of Container

Weigth of Sample passing No.200 sieve


Percentage pass of No.200 sieve
Clay Content in Percent or
pass of No.200 sieve

Remark:-

A-B
C/A*100
Ave.Percentage

Tested by:(Contractor Lab.


Tech)

Checked by:(Contractor M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONSULTANT

CONTRACTOR

Construction Design and Supervision works


on
ort Design and Supervision works section

UNCTION ROAD PROJEC


LOT 1 ANKOBER- DULECHA (RE-BID)

Stock

Bekri Daar

Date Sampled:7/7/2016
Date Tested:- 7/9/2016
Intended Use:-Cement Concrete
Lab. No.:RFI No:-

Nazero river ( Ataye


1

500.0

500.0

485.0

482.0

0.0

0.0

15.0

18.0

3.00

3.60

3.3

Bekri Daar river sa


1

500.0

500.0

475.0

476.0

0.0

0.0

25.0

24.0

5.00

4.80

4.9

Reviwed by:(Consultant LAB.T)

Approved By:(Consultant M.E.)

Signature:-

Signature:-

Date:-

Date:-

CONTRACTOR
Sun Shine
Construction PLC

R- DULECHA (RE-BID)

7/7/2016
7/9/2016
Cement Concrete

Nazero river ( Ataye )


2

500.0
482.0
0.0
18.0
3.60

3.3

Bekri Daar river sand


2

500.0
476.0
0.0
24.0
4.80

4.9

Approved By:(Consultant M.E.)

Signature:Date:-

Liquid limit Determination


Number of Blows
Can no.
Wet Weight + Tare,
Dry Weight + Tare,
Weight of Tare,
Weight of Water,
Dry Weight ,
Moisture Content

gm
gm
gm
gm
gm
%

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

#DIV/0! #DIV/0!

#DIV/0!

#DIV/0!

Liquid limit
Plastic limit
Plasticity index

Soil class

34
0
34

CLASSIFICATION

A-7-6

0
A-6
0
0

Plastic Limit Determination


Can no.
Mass of wet soil + Can
Mass of dry soil + Can
Mass of can
Mass of Moisture
Mass of Dry soil
Moisture content, w %
Average Moisture content, w %

0
0
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
#DIV/0! #DIV/0!
#DIV/0!

Sieve analysis for soil classification


Sieve Size
2mm
0.425mm
0.075mm
Pan

(No10)
(No40)
(No.200 )

Wt.Ret.
0.0
0.0
Err:509

Wt of sample before washing

58

25

62.3

25

62.3

CLASSIFICATION
0
A-6
0
0

soil classification
%Ret.
%Pass
#DIV/0! #DIV/0!
#DIV/0!

washing

0.0

Anda mungkin juga menyukai