Anda di halaman 1dari 3

FILEMON FRANE

PERSONAL DATA
Date of Birth
Place of Birth
Sex
Civil Status
Citizenship
Passport No.
Issued At
Valid Until
Language Speak

:
:
:
:
:
:
:
:
:

November 22, 1955


Tulo,
Male
Married
Filipino
EB0417923
19 June 2010
18 June 2015
English, Tagalog

EDUCATIONAL BACKGROUND
1963 1969
1969 - 1973
1973 1975
1975 1976

:
:
:
:

Tulo Elementary School


PBMIT Batangas City
PBMIT Batangas City
PBMIT Batangas City

Intermediate
Secondary
2nd Year College
Vocational

WORK EXPERIENCE
1. June 19, 2012
to present

EEI CONSTRUCTION & MARINE INC.


Pilipinas Shell Petroleum Corporation
Tabangao, Batangas City
Tig & Arc Welder

Responsible for the full welding of different diameter of pipe, from


4, 6, 8, 10, 12, and 16 diameter and also responsible for the full welding of its support.
2. February 27, 2012
May 31, 2012

PRODUCTION SERVICE NETWORK


PHILIPPINES CORPORATION
Pilipinas Shell Petroleum Corporation
Tabangao, Batangas City
Tig & Arc Welder

During this period I was assigned in pipe sleeper area. I was responsible for the full
welding of 12 carbon steel pipe and its support from jetty area going to storage tank. During
shutdown, I was also responsible for the full welding of the pipe that was damaged during the
operation.

3. September 19, 2007


February 26, 2009

IREM SPA SAUDI ARABIA LTD.


Yanbu, K.S.A
Tig & Arc Welder

During this period I was assigned in pipe rack area C, C-1 and C-2
in Yansab Olefins Plant Project. Responsible for the full welding of large and small bore
pipe. Also responsible for the full welding of its support.

4. June 27, 2005


October 5, 2006

CTCI
Formosa, Taiwan
Tig Welder

During this period I was assigned in OL3 Formosa Project. Responsible for the full
welding of heavy wall pipe.

5. January 16, 2003


May 9, 2004

ARCC EEI
JUPC Project, Jubail K.S.A
Tig & Arc Welder

During this period I was assigned in pipe rack area. I was responsible of the full welding
of small and large carbon steel pipe.

6. May 11, 2001


November 11, 2002

ARCC EEI
Ghazlan Power Plant Project
Ratanura K.S.A
Tig & Arc Welder

During this period I was assigned in turbine side Ghazlan Power Plant. I was responsible
of the full welding of small and large bore carbon steel pipe.

7. February 22, 1999


May 15, 2000

DAELIM S.A. CO.


Petro Kemya Ollefin III
Jubail K.S.A
Tig Alloy Welder

During this period I assigned in Petro Kemya Ollefin III base in Jubail Industrial City. I
was responsible for the full welding of heavy wall and standard pipe. Also responsible for the
full welding of alloy pipe which is composed of P11 and P22 line.
8. May 23, 1997

SAMSUNG ENGINEERING CONSTRUCTION


COMPANY
Formosa Plastic, Taiwan
Tig Alloy Welder

During this period I was assigned in OLI Site in Formosa Plastic Corp. on fabrication
shop as Tig Alloy Welder. I was responsible for full welding of different classification such as
chrome and chrome carbon steel heavy wall pipe. After finish fabrication of the spool I was
assigned in furnish department for the installation of said spool.
9. October 25, 1996
Mar. 18, 1997

MHI
Sceco Power Plant
Quarayyah Plant K.S.A.
Tig Alloy Welder

During this period I was assigned in Saudi Consolidated Electrical Company based in
Quarayyah S.A. I was responsible for the full welding of boiler tubes. It was consist of different
materials such as carbon 347 stainless, 2 chrome and 9 chrome. This job is done during
shutdown work.
10. February 13, 1995
February 13, 1996

DAELIM S.A. CO.


Berri Gas Plant Aramco, Jubail
Tig Alloy Welder

During this period I was assigned in BGP treating facilities. I was responsible for the full
welding of 36 line. A 75mm thickness which need to be free heat by 200 C while the
welding is in process. A 30 Carbon steel and also a stainless pipe with thickness of 1/8 or
1.25mm.

11. June 23, 1994


Nov 15.1994

SAUDI ARABIA KENT LTD.


King Khalid Military
City Hafr Al Batin K.S.A
Tig and Arc Welder

During this period I was assigned in the air base facilities of Royal Saudi Airforce. It
consist of extensive structural mechanical and HVAC installation. I was responsible for the full
welding of Carbon, stainless pipe use in jet fuel line., hallon line, water line and air line. This is
located in the tunnel. That this is place under military base.
12. Dec. 22,1990
July 26, 1993

DAELIM INDUSTRIAL CO.LTD.


Shahid Raijah Thermal
Power Plant Qasin Iran
Tig Meg Welder

During this period I was assigned in boiler. I was responsible for the full welding of
boiler tube and other kind of pipe such as 2 & 9 chrome pipe and carbon steel. After working 2
months, I was transfer in electrical division. Aluminum welding I was responsible for the full
welding of aluminum pipe. IPB isolated bust bar I used GMAW process for its bust and GTAW
for its protection cover.

FILEMON FRANE
Applicants Signature

Anda mungkin juga menyukai