% Thd.
No. Mata
Total
Pembayaran
Uraian
Satuan
Perkiraan
Kuantitas
Biaya
a
68.1225
1.2
###Mobilisasi
LS
1.0
0.0014
2.1
M3
1.0
0.0220
2.2
M3
1.0
0.0191
2.3 (1)
M1
1.0
0.0234
2.3 (2)
M1
1.0
0.0397
2.3 (3)
M1
1.0
0.0661
2.3 (4)
M1
1.0
0.0000
2.3 (5)
M1
1.0
0.8077
2.3 (6)
Ton
1.0
0.0056
2.3 (7)
M1
1.0
0.0119
2.4 (1)
M3
1.0
0.0012
2.4 (2)
M2
1.0
0.0030
3.1 (1)
###Galian Biasa
M3
1.0
0.0104
3.1 (2)
###Galian Batu
M3
1.0
0.0041
3.1 (3)
M3
1.0
0.0290
3.1 (4)
M3
1.0
0.0264
3.1 (5)
M3
1.0
0.0000
3.1 (6)
LS
1.0
0.0066
3.1 (7)
M3
1.0
0.0229
3.1 (8)
M3
1.0
0.0005
3.1 (9)
M3/Km
1.0
0.0078
3.2 (1)
M3
1.0
0.0072
3.2 (2)
###Timbunan Pilihan
M3
1.0
0.0063
3.2 (3)
M3
1.0
0.0046
3.2.(4)
M3
1.0
0.0093
3.2.(5)
M3
1.0
0.0037
3.2.(6)
Ton
1.0
0.0000
3.3
M2
1.0
0.0000
3.4
M3
1.0
0.0231
4.2 (1)
M3
1.0
0.0218
4.2 (2)
M3
1.0
0.0372
4.2 (3)
Ton
1.0
0.0078
4.2 (4)
M3
1.0
0.0003
4.2 (5)
M2
1.0
0.0004
4.2 (6)
Liter
1.0
0.0003
4.2 (7)
Liter
1.0
0.0228
5.1 (1)
M3
1.0
0.0210
5.1 (2)
M3
1.0
0.0198
5.2 (1)
M3
1.0
0.0389
5.4 (1)
Ton
1.0
0.0061
5.4 (2)
M3
1.0
0.0000
5.5 (1)
###Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))
M3
1.0
0.0000
5.6 (1)
M3
1.0
0.0003
6.1 (1)
Liter
1.0
0.0003
6.1 (2)
###Lapis Perekat
Liter
1.0
0.0002
6.2 (1)
M2
1.0
0.0004
6.2 (2)
M2
1.0
0.0004
6.2 (3)
Liter
1.0
0.0018
6.3 (1)
M2
1.0
0.0022
6.3 (2)
M2
1.0
0.0031
6.3 (3)
M2
1.0
0.0464
6.3(3a)
Ton
1.0
0.0925
6.3(4)
M3
1.0
0.0403
6.3(4a)
Ton
1.0
0.0036
6.3(5a)
M2
1.0
0.0035
6.3(5b)
M2
1.0
0.0391
6.3(5c)
Ton
1.0
0.0375
6.3(5d)
Ton
1.0
0.0873
6.3(6a)
M3
1.0
0.0840
6.3(6b)
M3
1.0
0.0377
6.3(6c)
Ton
1.0
0.0363
6.3(6d)
Ton
1.0
0.0831
6.3(7a)
M3
1.0
0.0790
6.3(7b)
M3
1.0
0.0353
6.3(7c)
Ton
1.0
0.0342
6.3(7d)
Ton
1.0
0.0006
6.4 (1)
### Lasbutag
M2
1.0
0.0003
6.4 (2)
M2
1.0
0.0004
6.4 (3)
M2
1.0
0.0922
6.4 (4)
Ton
1.0
0.3135
6.4 (5)
Ton
1.0
0.0012
6.4 (6)
Liter
1.0
0.0665
6.5
M3
1.0
0.0600
6.6.1
M3
1.0
0.0640
6.6.2
M3
1.0
0.0751
7.1 (1)
###Beton K500
M3
1.0
0.0715
7.1 (2)
###Beton K400
M3
1.0
0.0702
7.1 (3)
###Beton K350
M3
1.0
0.0556
7.1 (4)
###Beton K300
M3
1.0
0.0539
7.1 (5)
###Beton K250
M3
1.0
0.0395
7.1 (6)
###Beton K175
M3
1.0
0.0332
7.1 (7)
M3
1.0
0.0353
7.1 (8)
###Beton K125
M3
1.0
1.1949
7.2 (1)
Buah
1.0
1.3118
7.2 (2)
Buah
1.0
1.3566
7.2 (3)
Buah
1.0
1.4064
7.2 (4)
Buah
1.0
1.4563
7.2 (5)
Buah
1.0
1.4895
7.2 (6)
Buah
1.0
1.5671
7.2 (7)
Buah
1.0
1.5726
7.2 (8)
Buah
1.0
0.0121
7.2 (9)
###Baja Prategang
Kg
1.0
1.7849
7.2 (10)
Buah
1.0
0.0605
7.2 (11)
1.0
0.0006
7.3 (1)
Kg
1.0
0.0006
7.3 (2)
Kg
1.0
0.0006
7.3 (3)
Kg
1.0
0.0005
7.3 (4)
Kg
1.0
0.0006
7.3 (5)
Kg
1.0
0.0020
7.3 (6)
Kg
1.0
0.0006
7.4 (1)
Kg
1.0
0.0006
7.4 (2)
Kg
1.0
0.0006
7.4 (3)
Kg
1.0
0.0000
7.5 (1)
Kg
1.0
0.0000
7.5 (2)
Kg
1.0
0.0017
7.6 (1)
M1
1.0
0.0000
7.6 (2)
M2
1.0
0.0020
7.6 (3)
M2
1.0
0.0011
7.6 (4)
M2
1.0
0.0000
7.6 (5)
M2
1.0
0.0020
7.6 (6)
M3
1.0
0.0017
7.6 (7)
M3
1.0
0.0043
7.6 (8)
Kg
1.0
0.2232
7.6 (9)
M3
1.0
0.0539
7.6 (10)
M3
1.0
0.0077
7.6 (11)
M1
1.0
0.0026
7.6 (12)
M1
1.0
0.0026
7.6 (13)
M1
1.0
0.0026
7.6 (14)
M1
1.0
0.0026
7.6 (15)
M1
1.0
0.0026
7.6 (16)
M1
1.0
0.0026
7.6 (17)
M1
1.0
0.0364
7.6 (18)
M1
1.0
0.0642
7.6 (19)
M1
1.0
0.0998
7.6 (20)
M1
1.0
0.1434
7.6 (21)
M1
1.0
0.2234
7.6 (22)
M1
1.0
0.0000
7.6 (23)
M1
0.0000
0.0000
7.6 (24)
0.0000
###7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair
0.0000
7.6 (25)
Buah
1.0
0.0000
7.6 (26)
Buah
1.0
0.2256
7.7 (1)
M1
1.0
0.2729
7.7 (2)
M1
1.0
0.3212
7.7 (3)
M1
1.0
0.4036
7.7 (4)
M1
1.0
### 7.6.(17) bila Tiang Pancang Beton dikerjakan ditempat yang Berair
###Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(18) s/d
1.0
-
M1
1.0
0.0111
7.7 (5)
M1
1.0
0.0145
7.7 (6)
M1
1.0
0.0173
7.7 (7)
M1
1.0
0.0275
7.7 (8)
M1
1.0
0.0279
7.9
###Pasangan Batu
M3
1.0
0.0300
7.10 (1)
M3
1.0
0.0134
7.10 (2)
M3
1.0
0.0160
7.10 (3)
###Bronjong
M3
1.0
0.0019
7.11 (1)
M1
1.0
0.0000
7.11 (2)
M1
1.0
0.0000
7.11 (3)
M1
1.0
0.0000
7.11 (4)
M1
1.0
0.0000
7.11 (5)
M1
1.0
0.0000
7.11 (6)
M1
1.0
0.0000
7.12 (1)
###Perletakan Logam
Buah
1.0
0.0000
7.12 (2)
Buah
1.0
0.0000
7.12 (3)
Buah
1.0
0.0000
7.12 (4)
Buah
1.0
0.0000
7.12 (5)
###Perletakan Strip
M1
1.0
0.0007
7.13
###Sandaran (Railing)
M1
1.0
0.0063
7.14
Buah
1.0
0.0000
7.15.(1)
M3
1.0
0.0166
7.15.(2)
###Pembongkaran Beton
M3
1.0
0.0000
7.15.(3)
M3
1.0
0.0000
7.15.(4)
M2
1.0
0.0104
7.15.(5)
M2
1.0
0.0107
7.15.(6)
M1
1.0
0.0000
7.15.(7)
M2
1.0
0.0000
7.15.(8)
M2
1.0
0.0000
7.15.(9)
M3 / Km
1.0
0.0563
7.16 (1)
M3
1.0
0.0000
7.17 (1)
M2
1.0
0.0000
7.17 (2)
M2
1.0
0.0196
8.1 (1)
M3
1.0
0.0181
8.1 (2)
M3
1.0
0.0170
8.1 (3)
###Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur)
1.0
0.0149
8.1 (4)
M3
1.0
0.0966
8.1 (5)
M3
1.0
0.0000
8.1 (6)
M3
1.0
0.0601
8.1 (7)
M3
1.0
0.0614
8.1 (8)
M3
1.0
0.0004
8.1 (9)
Liter
1.0
0.0037
8.2(1)
M3
1.0
0.0022
8.2(2)
M2
1.0
0.0066
8.2(3)
Buah
1.0
0.0103
8.2(4)
Buah
1.0
0.0217
8.2(5)
Buah
1.0
0.0004
8.3.(1)
M2
1.0
0.0003
8.3.(2)
###Semak / Perdu
0.0003
8.3.(3)
###Pohon
0.0058
8.4.(1)
0.0052
8.4.(2)
M2
1.0
Buah
1.0
M2
1.0
M2
1.0
0.0207
8.4.(3) .(a) ###Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade
Buah
1.0
0.0305
8.4.(3) .(b) ###Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade
Buah
1.0
0.0230
8.4.(4) .(a) ###Rambu Jalan Tunggal dengan Pemantul High Intensity Grade
Buah
1.0
0.0350
8.4.(4) .(b) ###Rambu Jalan Ganda dengan Pemantul High Intensity Grade
Buah
1.0
###Patok Pengarah
Buah
1.0
0.0166
Buah
1.0
0.0076
Buah
1.0
0.0049
8.4.(5)
0.0312
8.4.(7)
###Rel Pengaman
M1
1.0
0.0036
8.4.(8)
###Paku Jalan
Buah
1.0
0.0075
8.4.(9)
###Mata Kucing
Buah
1.0
0.0060
8.4.(10)
###Kerb Pracetak
M1
1.0
0.0000
8.4.(11)
M1
1.0
0.0005
8.4.(12)
M2
1.0
0.0034
8.5(1)
M2
1.0
0.0000
8.5(2)
M2
1.0
0.0000
8.5(3)
M2
1.0
0.0308
8.6(1)
M1
1.0
1.1528
8.7(1)
###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt
Buah
1.0
0.0603
8.7(2)
###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt
Buah
1.0
0.0592
8.7(3)
###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt
Buah
1.0
0.0603
8.7(4)
###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt
Buah
1.0
0.0592
8.7(5)
###Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt
Buah
1.0
0.0603
8.7(6)
###Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt
Buah
1.0
0.0161
8.8(1)
M1
1.0
0.0254
8.8(2)
M1
1.0
0.0004
9.1
###Mandor
Jam
1.0
0.0003
9.2
###Pekerja Biasa
Jam
1.0
0.0003
9.3
Jam
1.0
0.0091
9.4
Jam
1.0
0.0183
9.5
Jam
1.0
0.0089
9.6
Jam
1.0
0.0230
9.7
Jam
1.0
0.0190
9.8
Jam
1.0
0.0148
9.9
Jam
1.0
0.0126
9.10
Jam
1.0
0.0212
9.11
Jam
1.0
0.0301
9.12
###Crane 10 - 15 Ton
Jam
1.0
0.0222
9.13
Jam
1.0
0.0185
9.14
Jam
1.0
0.0013
9.15
Jam
1.0
0.0196
9.16
Jam
1.0
0.0062
9.17
Jam
1.0
0.0074
9.18
Jam
1.0
0.0009
9.19
Jam
1.0
0.0009
9.20
###Jack Hammer
Jam
1.0
3.4191
10.1 (1)
LS
1.0
1.6201
10.1 (2)
LS
1.0
2.0981
10.1 (3)
LS
1.0
0.5925
10.1 (4)
LS
1.0
3.1456
10.1 (5)
LS
1.0
TOTAL BIAYA
99.9970
Cumm
Harga
Jumlah
% for
Satuan
Harga-Harga
Major
(Rupiah)
(Rupiah)
Items
1,353,030,000
1,353,030,000
26,934
26,934
437,350
437,350
379,550
379,550
465,089
465,089
788,035
788,035
1,312,035
16,041,846
1,312,035
0
16,041,846
110,910
110,910
236,814
236,814
24,158
24,158
58,790
58,790
206,191
206,191
81,349
81,349
576,439
576,439
523,669
523,669
130,827
130,827
455,318
455,318
9,978
9,978
155,109
155,109
142,479
142,479
124,352
124,352
92,046
92,046
184,684
184,684
72,725
72,725
724
-
724
0
458,588
458,588
432,592
432,592
738,738
738,738
155,911
155,911
6,114
6,114
7,789
7,789
5,443
5,443
453,368
453,368
416,191
416,191
392,322
392,322
772,706
772,706
120,928
120,928
0
0
5,550
5,550
6,446
6,446
4,376
4,376
6,984
6,984
7,342
7,342
36,654
36,654
44,470
44,470
61,939
61,939
921,547
921,547
1,837,831
1,837,831
799,696
799,696
71,846
71,846
69,575
69,575
775,955
775,955
744,571
744,571
1,734,269
1,734,269
1,667,675
1,667,675
749,610
720,606
749,610
720,606
1,649,801
1,649,801
1,568,453
1,568,453
700,913
700,913
679,159
679,159
11,152
11,152
5,481
5,481
7,409
7,409
1,832,188
1,832,188
6,226,190
6,226,190
24,000
24,000
1,320,284
1,320,284
1,192,544
1,192,544
1,270,317
1,270,317
1,491,112
1,491,112
1,420,205
1,420,205
1,394,103
1,394,103
1,104,298
1,104,298
1,070,952
1,070,952
784,714
784,714
660,314
660,314
702,000
702,000
23,733,235
23,733,235
26,054,280
26,054,280
26,943,808
26,943,808
27,933,808
27,933,808
28,923,808
28,923,808
29,583,808
29,583,808
31,126,083
31,126,083
31,233,808
31,233,808
240,555
240,555
35,451,564
35,451,564
1,200,981
1,200,981
11,330
11,330
11,325
11,325
12,051
12,051
10,920
10,920
12,051
12,051
40,172
40,172
12,747
12,747
12,747
12,747
12,747
12,747
642
642
555
555
34,212
-
34,212
0
38,773
38,773
20,958
20,958
40,116
0
40,116
33,814
85,736
33,814
85,736
4,433,302
4,433,302
1,071,398
1,071,398
152,230
152,230
50,743
50,743
50,743
50,743
50,743
50,743
52,245
52,245
52,245
52,245
52,245
52,245
722,283
722,283
1,274,687
1,274,687
1,983,143
1,983,143
2,847,651
2,847,651
4,437,012
4,437,012
4,481,000
4,481,000
5,420,047
5,420,047
6,379,016
6,379,016
8,015,583
8,015,583
221,170
221,170
288,254
288,254
343,065
343,065
546,984
546,984
553,666
553,666
596,242
596,242
265,488
265,488
318,418
318,418
38,419
38,419
14,253
14,253
124,901
124,901
329,646
-
0
329,646
0
0
205,747
205,747
212,009
212,009
1,118,735
0
1,118,735
388,883
388,883
358,719
358,719
337,954
337,954
296,328
296,328
1,918,875
-
1,918,875
0
1,194,059
1,194,059
1,219,159
1,219,159
7,396
7,396
73,130
73,130
43,887
43,887
131,049
131,049
204,945
204,945
430,009
430,009
7,100
7,100
6,880
6,880
6,495
6,495
114,811
114,811
104,086
104,086
411,739
411,739
606,111
606,111
456,289
456,289
694,439
694,439
97,393
97,393
329,572
329,572
151,213
151,213
618,998
618,998
71,559
71,559
148,009
148,009
118,859
118,859
10,097
10,097
66,804
66,804
612,446
0
0
612,446
22,896,888
22,896,888
1,198,338
1,198,338
1,175,715
1,175,715
1,198,338
1,198,338
1,175,715
1,175,715
1,198,338
1,198,338
320,627
320,627
503,887
503,887
7,872
7,872
4,986
4,986
6,560
6,560
181,166
181,166
363,963
363,963
177,181
177,181
457,454
457,454
378,173
378,173
293,475
293,475
251,000
251,000
421,577
421,577
598,101
598,101
441,483
441,483
367,997
367,997
26,645
26,645
389,071
389,071
122,154
122,154
147,180
147,180
18,528
18,528
17,698
17,698
67,909,087
67,909,087
32,178,072
32,178,072
41,671,295
41,671,295
11,768,457
11,768,457
62,477,968
62,477,968
1,986,112,855
No. Mata
Uraian
Pembayaran
a
Satuan
Perkiraan
Kuantitas
d
1.2
Mobilisasi
LS
1.0
2.1
M3
1.0
2.2
M3
1.0
2.3 (1)
M1
1.0
2.3 (2)
M1
1.0
2.3 (3)
M1
1.0
2.3 (4)
M1
1.0
2.3 (5)
M1
1.0
2.3 (6)
Ton
1.0
2.3 (7)
M1
1.0
2.4 (1)
M3
1.0
2.4 (2)
M2
1.0
3.1 (1)
Galian Biasa
M3
1.0
3.1 (2)
Galian Batu
M3
1.0
3.1 (3)
M3
1.0
3.1 (4)
M3
1.0
3.1 (5)
M3
1.0
3.1 (6)
LS
1.0
3.1 (7)
M3
1.0
3.1 (8)
M3
1.0
3.1 (9)
M3/Km
1.0
3.2 (1)
M3
1.0
3.2 (2)
Timbunan Pilihan
M3
1.0
3.2 (3)
M3
1.0
3.2.(4)
M3
1.0
3.2.(5)
M3
1.0
3.2.(6)
Ton
1.0
3.3
M2
1.0
3.4
M3
1.0
4.2 (1)
M3
1.0
4.2 (2)
M3
1.0
4.2 (3)
Ton
1.0
4.2 (4)
M3
1.0
4.2 (5)
M2
1.0
4.2 (6)
Liter
1.0
4.2 (7)
Liter
1.0
5.1 (1)
M3
1.0
5.1 (2)
M3
1.0
5.2 (1)
M3
1.0
5.4 (1)
Ton
1.0
5.4 (2)
M3
1.0
5.5 (1)
Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))
M3
1.0
5.6 (1)
M3
1.0
6.1 (1)
Liter
1.0
6.1 (2)
Lapis Perekat
Liter
1.0
6.2 (1)
M2
1.0
6.2 (2)
M2
1.0
6.2 (3)
Liter
1.0
6.3 (1)
M2
1.0
6.3 (2)
M2
1.0
6.3 (3)
M2
1.0
6.3(3a)
Ton
1.0
6.3(4)
M3
1.0
6.3(4a)
Ton
1.0
6.3(5a)
M2
1.0
6.3(5b)
M2
1.0
6.3(5c)
Ton
1.0
6.3(5d)
Ton
1.0
6.3(6a)
M3
1.0
6.3(6b)
M3
1.0
6.3(6c)
Ton
1.0
6.3(6d)
Ton
1.0
6.3(7a)
M3
1.0
6.3(7b)
M3
1.0
6.3(7c)
Ton
1.0
6.3(7d)
Ton
1.0
6.4 (1)
Lasbutag
M2
1.0
6.4 (2)
Latasbusir Kelas A
M2
1.0
6.4 (3)
Latasbusir Kelas B
M2
1.0
6.4 (4)
Bitumen Asbuton
Ton
1.0
6.4 (5)
Ton
1.0
6.4 (6)
Liter
1.0
M3
1.0
6.6.1
6.5
M3
1.0
6.6.2
M3
1.0
7.1 (1)
Beton K500
M3
1.0
7.1 (2)
Beton K400
M3
1.0
7.1 (3)
Beton K350
M3
1.0
7.1 (4)
Beton K300
M3
1.0
7.1 (5)
Beton K250
M3
1.0
7.1 (6)
Beton K175
M3
1.0
7.1 (7)
M3
1.0
7.1 (8)
Beton K125
M3
1.0
7.2 (1)
Buah
1.0
7.2 (2)
Buah
1.0
7.2 (3)
Buah
1.0
7.2 (4)
Buah
1.0
7.2 (5)
Buah
1.0
7.2 (6)
Buah
1.0
7.2 (7)
Buah
1.0
7.2 (8)
Buah
1.0
7.2 (9)
Baja Prategang
Kg
1.0
7.2 (10)
Buah
1.0
7.2 (11)
1.0
7.3 (1)
Kg
1.0
7.3 (2)
Kg
1.0
7.3 (3)
Kg
1.0
7.3 (4)
Kg
1.0
7.3 (5)
Kg
1.0
7.3 (6)
Kg
1.0
7.4 (1)
Kg
1.0
7.4 (2)
Kg
1.0
7.4 (3)
Kg
1.0
7.5 (1)
Kg
1.0
7.5 (2)
Kg
1.0
7.6 (1)
M1
1.0
7.6 (2)
M2
1.0
7.6 (3)
M2
1.0
7.6 (4)
M2
1.0
7.6 (5)
M2
1.0
7.6 (6)
M3
1.0
7.6 (7)
M3
1.0
7.6 (8)
Kg
1.0
7.6 (9)
M3
1.0
7.6 (10)
M3
1.0
7.6 (11)
M1
1.0
7.6 (12)
M1
1.0
7.6 (13)
M1
1.0
7.6 (14)
M1
1.0
7.6 (15)
M1
1.0
7.6 (16)
M1
1.0
7.6 (17)
M1
1.0
7.6 (18)
M1
1.0
7.6 (19)
M1
1.0
7.6 (20)
M1
1.0
7.6 (21)
M1
1.0
7.6 (22)
M1
1.0
7.6 (23)
M1
1.0
0
7.6 (24)
M1
1.0
7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair
7.6 (25)
Buah
1.0
7.6 (26)
Buah
1.0
7.7 (1)
M1
1.0
7.7 (2)
M1
1.0
7.7 (3)
M1
1.0
7.7 (4)
M1
1.0
7.7 (5)
M1
1.0
7.7 (6)
M1
1.0
7.7 (7)
M1
1.0
7.7 (8)
M1
1.0
Pasangan Batu
M3
1.0
7.10 (1)
M3
1.0
7.10 (2)
M3
1.0
7.10 (3)
Bronjong
M3
1.0
7.11 (1)
M1
1.0
7.11 (2)
M1
1.0
7.11 (3)
M1
1.0
7.11 (4)
M1
1.0
7.11 (5)
M1
1.0
7.11 (6)
M1
1.0
7.12 (1)
Perletakan Logam
Buah
1.0
7.12 (2)
Buah
1.0
7.12 (3)
Buah
1.0
7.12 (4)
Buah
1.0
7.12 (5)
Perletakan Strip
M1
1.0
7.13
Sandaran (Railing)
M1
1.0
7.14
Buah
1.0
7.9
7.15.(1)
M3
1.0
7.15.(2)
Pembongkaran Beton
M3
1.0
7.15.(3)
M3
1.0
7.15.(4)
M2
1.0
7.15.(5)
M2
1.0
7.15.(6)
M1
1.0
7.15.(7)
M2
1.0
7.15.(8)
M2
1.0
7.15.(9)
M3 / Km
1.0
7.16 (1)
M3
1.0
7.17 (1)
M2
1.0
7.17 (2)
M2
1.0
8.1 (1)
M3
1.0
8.1 (2)
M3
1.0
8.1 (3)
Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan Minor M3 (vol. gembur)
1.0
8.1 (4)
M3
1.0
8.1 (5)
M3
1.0
8.1 (6)
M3
1.0
8.1 (7)
M3
1.0
8.1 (8)
M3
1.0
8.1 (9)
Liter
1.0
8.2(1)
M3
1.0
8.2(2)
M2
1.0
8.2(3)
Buah
1.0
8.2(4)
Buah
1.0
8.2(5)
Buah
1.0
8.3.(1)
M2
1.0
8.3.(2)
Semak / Perdu
8.3.(3)
Pohon
8.4.(1)
8.4.(2)
M2
1.0
Buah
1.0
M2
1.0
M2
1.0
8.4.(3) .(a)
Buah
1.0
8.4.(3) .(b)
Buah
1.0
8.4.(4) .(a)
Buah
1.0
8.4.(4) .(b)
Buah
1.0
8.4.(5)
Patok Pengarah
Buah
1.0
8.4.(6) .(a)
Patok Kilometer
Buah
1.0
8.4.(6) .(b)
Patok Hektometer
Buah
1.0
8.4.(7)
Rel Pengaman
M1
1.0
8.4.(8)
Paku Jalan
Buah
1.0
8.4.(9)
Mata Kucing
Buah
1.0
8.4.(10)
Kerb Pracetak
M1
1.0
8.4.(11)
M1
1.0
8.4.(12)
M2
1.0
8.5(1)
M2
1.0
8.5(2)
M2
1.0
8.5(3)
M2
1.0
8.6(1)
M1
1.0
8.7(1)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt
Buah
1.0
8.7(2)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt
Buah
1.0
8.7(3)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt
Buah
1.0
8.7(4)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt
Buah
1.0
8.7(5)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt
Buah
1.0
8.7(6)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt
Buah
1.0
8.8(1)
M1
1.0
8.8(2)
M1
1.0
9.1
Mandor
Jam
1.0
9.2
Pekerja Biasa
Jam
1.0
9.3
Jam
1.0
9.4
Jam
1.0
9.5
Jam
1.0
9.6
Jam
1.0
9.7
Jam
1.0
9.8
Jam
1.0
9.9
Jam
1.0
9.10
Jam
1.0
9.11
Jam
1.0
9.12
Crane 10 - 15 Ton
Jam
1.0
9.13
Jam
1.0
9.14
Jam
1.0
9.15
Jam
1.0
9.16
Jam
1.0
9.17
Jam
1.0
9.18
Jam
1.0
9.19
Jam
1.0
9.20
Jack Hammer
Jam
1.0
10.1 (1)
LS
1.0
10.1 (2)
LS
1.0
10.1 (3)
LS
1.0
10.1 (4)
LS
1.0
10.1 (5)
LS
1.0
Harga
% Thd.
Jumlah
Satuan
Total Biaya
Harga-Harga
(Rupiah)
(%)
(Rupiah)
g = (d x e)
1,353,030,000
68.1225
1,353,030,000
26,934
0.0014
26,934
437,350
0.0220
437,350
379,550
0.0191
379,550
465,089
0.0234
465,089
788,035
0.0397
788,035
1,312,035
0.0661
1,312,035
16,041,846
0.8077
16,041,846
110,910
0.0056
110,910
236,814
0.0119
236,814
24,158
0.0012
24,158
58,790
0.0030
58,790
206,191
0.0104
206,191
81,349
0.0041
81,349
576,439
0.0290
576,439
523,669
0.0264
523,669
130,827
0.0066
130,827
455,318
0.0229
455,318
9,978
0.0005
9,978
155,109
0.0078
155,109
142,479
0.0072
142,479
124,352
0.0063
124,352
92,046
0.0046
92,046
184,684
0.0093
184,684
72,725
0.0037
72,725
724
0.0000
724
458,588
0.0231
458,588
432,592
0.0218
432,592
738,738
0.0372
738,738
155,911
0.0078
155,911
6,114
0.0003
6,114
7,789
0.0004
7,789
5,443
0.0003
5,443
453,368
0.0228
453,368
416,191
0.0210
416,191
392,322
0.0198
392,322
772,706
0.0389
772,706
120,928
0.0061
120,928
5,550
0.0003
5,550
6,446
0.0003
6,446
4,376
0.0002
4,376
6,984
0.0004
6,984
7,342
0.0004
7,342
36,654
0.0018
36,654
44,470
0.0022
44,470
61,939
0.0031
61,939
921,547
0.0464
921,547
1,837,831
0.0925
1,837,831
799,696
0.0403
799,696
71,846
0.0036
71,846
69,575
0.0035
69,575
775,955
0.0391
775,955
744,571
0.0375
744,571
1,734,269
0.0873
1,734,269
1,667,675
0.0840
1,667,675
749,610
0.0377
749,610
720,606
0.0363
720,606
1,649,801
0.0831
1,649,801
1,568,453
0.0790
1,568,453
700,913
0.0353
700,913
679,159
0.0342
679,159
11,152
0.0006
11,152
5,481
0.0003
5,481
7,409
0.0004
7,409
1,832,188
0.0922
1,832,188
6,226,190
0.3135
6,226,190
24,000
0.0012
24,000
1,320,284
0.0665
1,320,284
1,192,544
0.0600
1,192,544
1,270,317
0.0640
1,270,317
1,491,112
0.0751
1,491,112
1,420,205
0.0715
1,420,205
1,394,103
0.0702
1,394,103
1,104,298
0.0556
1,104,298
1,070,952
0.0539
1,070,952
784,714
0.0395
784,714
660,314
0.0332
660,314
702,000
0.0353
702,000
23,733,235
1.1949
23,733,235
26,054,280
1.3118
26,054,280
26,943,808
1.3566
26,943,808
27,933,808
1.4064
27,933,808
28,923,808
1.4563
28,923,808
29,583,808
1.4895
29,583,808
31,126,083
1.5671
31,126,083
31,233,808
1.5726
31,233,808
240,555
0.0121
240,555
35,451,564
1.7849
35,451,564
1,200,981
0.0605
1,200,981
11,330
0.0006
11,330
11,325
0.0006
11,325
12,051
0.0006
12,051
10,920
0.0005
10,920
12,051
0.0006
12,051
40,172
0.0020
40,172
12,747
0.0006
12,747
12,747
0.0006
12,747
12,747
0.0006
12,747
642
0.0000
642
555
0.0000
555
34,212
0.0017
34,212
38,773
0.0020
38,773
20,958
0.0011
20,958
40,116
0.0020
40,116
33,814
0.0017
85,736
0.0043
33,814
85,736
4,433,302
0.2232
4,433,302
1,071,398
0.0539
1,071,398
152,230
0.0077
152,230
50,743
0.0026
50,743
50,743
0.0026
50,743
50,743
0.0026
50,743
52,245
0.0026
52,245
52,245
0.0026
52,245
52,245
0.0026
52,245
722,283
0.0364
722,283
1,274,687
0.0642
1,274,687
1,983,143
0.0998
1,983,143
2,847,651
0.1434
2,847,651
4,437,012
0.2234
4,437,012
4,481,000
0.2256
4,481,000
5,420,047
0.2729
5,420,047
6,379,016
0.3212
6,379,016
8,015,583
0.4036
8,015,583
221,170
0.0111
221,170
288,254
0.0145
288,254
343,065
0.0173
343,065
546,984
0.0275
546,984
553,666
0.0279
553,666
596,242
0.0300
596,242
265,488
0.0134
265,488
318,418
0.0160
318,418
38,419
0.0019
38,419
14,253
0.0007
14,253
124,901
0.0063
124,901
329,646
0.0166
329,646
205,747
0.0104
205,747
212,009
0.0107
212,009
1,118,735
0.0563
1,118,735
388,883
0.0196
388,883
358,719
0.0181
358,719
337,954
0.0170
337,954
296,328
0.0149
296,328
1,918,875
0.0966
1,918,875
1,194,059
0.0601
1,194,059
1,219,159
0.0614
1,219,159
7,396
0.0004
7,396
73,130
0.0037
73,130
43,887
0.0022
43,887
131,049
0.0066
131,049
204,945
0.0103
204,945
430,009
0.0217
430,009
7,100
0.0004
7,100
6,880
0.0003
6,880
6,495
0.0003
6,495
114,811
0.0058
114,811
104,086
0.0052
104,086
411,739
0.0207
411,739
606,111
0.0305
606,111
456,289
0.0230
456,289
694,439
0.0350
694,439
97,393
0.0049
97,393
329,572
0.0166
329,572
151,213
0.0076
151,213
618,998
0.0312
618,998
71,559
0.0036
71,559
148,009
0.0075
148,009
118,859
0.0060
118,859
10,097
0.0005
10,097
66,804
0.0034
66,804
612,446
0.0308
612,446
22,896,888
1.1528
22,896,888
1,198,338
0.0603
1,198,338
1,175,715
0.0592
1,175,715
1,198,338
0.0603
1,198,338
1,175,715
0.0592
1,175,715
1,198,338
0.0603
1,198,338
320,627
0.0161
320,627
503,887
0.0254
503,887
7,872
0.0004
7,872
4,986
0.0003
4,986
6,560
0.0003
6,560
181,166
0.0091
181,166
363,963
0.0183
363,963
177,181
0.0089
177,181
457,454
0.0230
457,454
378,173
0.0190
378,173
293,475
0.0148
293,475
251,000
0.0126
251,000
421,577
0.0212
421,577
598,101
0.0301
598,101
441,483
0.0222
441,483
367,997
0.0185
367,997
26,645
0.0013
26,645
389,071
0.0196
389,071
122,154
0.0062
122,154
147,180
0.0074
147,180
18,528
0.0009
18,528
17,698
0.0009
17,698
67,909,087
3.4191
67,909,087
32,178,072
1.6201
32,178,072
41,671,295
2.0981
41,671,295
11,768,457
0.5925
11,768,457
62,477,968
3.1456
62,477,968
99.99695
###
REKAPITULASI
PERKIRAAN HARGA PEKERJAAN
Proyek / Bagpro
No. Paket Kontrak
Nama Paket
Prop / Kab / Kodya
:
:
:
:
No. Divisi
Uraian
Umum
Drainase
Pekerjaan Tanah
Perkerasan Aspal
Struktur
Pekerjaan Harian
10
(A)
(B)
(C)
Terbilang :
....................................
....................................
Panitia Pelelangan
Ketua,
( ............................. )
( ............................. )
Jumlah Harga
Pekerjaan
(Rupiah)
1,353,030,000
19,883,255
2,814,679
1,805,174
2,155,515
26,754,834
318,147,649
40,905,141
4,672,264
216,004,879
1,986,173,389
198,617,339
2,184,790,728
....................................
....................................
( ............................. )
-2
INFORMASI UMUM
No.
U RAIAN
I N F O R MAS I
1.
2.
Nama Paket
3.
4.
Lokasi pekerjaan
Periksa lampiran
5.
..............................
6.
Panjang efektif
7.
( 0.50
+ 4.50
+ 0.50
8.
Lebar Rencana
( 1.00
+ 6.00
+ 1.00
9.
10.
11.
L=
7.45 Km = a
Lihat lampiran.
8.73 Kilometer
7.45 Km = b
5.0 Km = c
12.
13.
14.
15.
16.
a.
b.
c.
7.0
0.002
15.00
10.00
jam
x Harga Pokok Alat
%
% x Biaya Langsung
d.
e.
f.
g.
17.
Lokasi Quarry
Periksa lampiran.
18
Periksa lampiran.
19
Periksa lampiran.
20
....................................
21
....................................
22
....................................
N F O R MAS I
..
.
................
( Leff = a + b )
meter
meter
eriode Pelaksanaan)
...........
............
.............
...........
............
: 1.2
: MOBILISASI
No.
U RAIAN
A.
Sewa Tanah
B.
PERALATAN
Periksa lembar 1.2-2
C.
68.1225 %
HARGA
SATUAN
(Rp.)
SATUAN
VOL.
M2
20,000
500
1
2
3
4
5
6
FASILITAS KONTRAKTOR
Base Camp
Kantor
Barak
Bengkel
Gudang, dan lain-lain
......................
M2
M2
M2
M2
M2
....
150
60
60
100
100
0
50,000
75,000
45,000
25,000
25,000
0
FASILITAS LABORATORIUM
Ruang Laboratorium (sesuai Gambar)
M2
108
55,000
Set
Set
Set
Set
Set
Set
Set
Bln
1
1
1
1
1
2
2
2
15,000,000
20,000,000
5,000,000
5,000,000
12,500,000
6,500,000
6,000,000
5,000,000
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
Set
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
1
1
1
1
1
1
1
1
6
1
1
20,000,000
9,000,000
9,000,000
9,000,000
15,000,000
15,000,000
1,000,000
5,000,000
1,000,000
6,000,000
15,000,000
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine
Set
Set
Set
Set
1
1
1
1
500,000
10,000,000
10,000,000
50,000,000
D.
Pendukung
Operasional
E.
E.I.
1
2
3
4
5
6
MOBILISASI LAINNYA
PEKERJAAN DARURAT
Perkuatan Jembatan Lama
Pemeliharaan Jalan Kerja / Samping
......................
......................
......................
......................
LS
LS
....
....
....
....
1
1
100,000,000
100,000,000
E.II.
1
2
3
4
5
6
LAIN-LAIN
Komunikasi Lapangan Lengkap
......................
......................
......................
......................
......................
Set
....
....
....
....
....
1
0
0
0
0
0
5,000,000
0
0
0
0
0
LS
78,090,000
F.
DEMOBILISASI
No.
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
: 1.2
: MOBILISASI
JENIS ALAT
KODE
ALAT
SATUAN
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
VOL.
HARGA
SATUAN
(Rp.)
PERALATAN
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3.5 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
1
1
1
1
1
1
1
18
5
3
1
1
1
1
1
2
1
1
1
5
1
200,000,000
500,000
100,000
500,000
150,000
100,000
150,000
150,000
150,000
500,000
150,000
300,000
500,000
500,000
500,000
500,000
500,000
500,000
500,000
50,000
40,000,000
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E37
E36
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
2
1
1
1
2
1
2
2
2
2
2
1
1
50,000
150,000
50,000
50,000
50,000
500,000
500,000
1,000,000
1,000,000
1,000,000
200,000
500,000
300,000
FASILITAS LABOR
Lembar 1.2-1
JUMLAH
HARGA
(Rp.)
SATUAN PENGUKURAN
HARGA SATUAN
NO.
URAIAN
10,000,000
I.
1.
Laboratory Building
Laboratory Building
II.
1.
2.
3
4
5
6
7
8
III.
1.
2.
3
4
5
6
7
8
9
10
11
Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Reflux Method
Specific Gravity of Coarse Aggregate
Specific Gravity of Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor
20,000,000
9,000,000
9,000,000
9,000,000
15,000,000
15,000,000
1,000,000
5,000,000
6,000,000
6,000,000
15,000,000
IV.
1
2
3
4
Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength
Crushing Machine
V.
1
2
3
Peralatan pendukung
Mobil Pick Up
Komputer + Printer
Furniture
500,000
10,000,000
10,000,000
50,000,000
VI.
Operasional
Teknisi Laboratorium
Tenaga Kerja Terampil
225,000,000
VII.
Test Luar
260,300,000
7,500,000
4,500,000
2,700,000
2,500,000
2,500,000
0
5,940,000
15,000,000
20,000,000
5,000,000
5,000,000
12,500,000
13,000,000
12,000,000
10,000,000
276,000,000
100,000,000
100,000,000
0
0
0
0
1.
5,000,000
0
0
0
0
0
78,090,000
1,353,030,000
Lembar 1.2-2
JUMLAH
HARGA
(Rp.)
200,000,000
500,000
100,000
500,000
150,000
100,000
150,000
2,700,000
750,000
1,500,000
150,000
300,000
500,000
500,000
500,000
1,000,000
500,000
500,000
500,000
250,000
40,000,000
2.
Catatan :
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak y
yang dibayar kontrak) dan biaya lain-lainnya.
Test luar adalah test ke lembaga pengujian yang disetujui oleh K
100,000
150,000
50,000
50,000
100,000
500,000
1,000,000
2,000,000
2,000,000
2,000,000
400,000
500,000
300,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
260,300,000
FASILITAS LABORATORIUM
:
:
Lump sum
Rp.
SATUAN
VOLUME
779,940,000.00
HARGA
SATUAN
TOTAL
KETERANGAN
m2
108.00
55,000.00
SUB TOTAL
5,940,000.00
5,940,000.00
Set
Set
Set
Set
Set
Set
Set
Bln
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
15,000,000.00
20,000,000.00
5,000,000.00
5,000,000.00
12,500,000.00
6,500,000.00
6,000,000.00
5,000,000.00
SUB TOTAL
15,000,000.00
20,000,000.00
5,000,000.00
5,000,000.00
12,500,000.00
13,000,000.00
12,000,000.00
10,000,000.00
92,500,000.00
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Sewa
Set
Set
Set
Set
Set
Set
Set
Set
Bln
Set
Set
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
6.00
1.00
1.00
20,000,000.00
9,000,000.00
9,000,000.00
9,000,000.00
15,000,000.00
15,000,000.00
1,000,000.00
5,000,000.00
1,000,000.00
6,000,000.00
15,000,000.00
SUB TOTAL
20,000,000.00
9,000,000.00
9,000,000.00
9,000,000.00
15,000,000.00
15,000,000.00
1,000,000.00
5,000,000.00
6,000,000.00
6,000,000.00
15,000,000.00
110,000,000.00
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Beli
Set
Set
Set
Set
1.00
1.00
1.00
1.00
500,000.00
10,000,000.00
10,000,000.00
50,000,000.00
SUB TOTAL
500,000.00
10,000,000.00
10,000,000.00
50,000,000.00
70,500,000.00
Beli
Beli
Beli
Beli
Unit
Set
Set
2.00
1.00
1.00
100,000,000.00 200,000,000.00
10,000,000.00
10,000,000.00
15,000,000.00
15,000,000.00
SUB TOTAL
225,000,000.00
Beli
Beli
Beli
Bln
Bln
12.00
60.00
8,000,000.00 96,000,000.00
3,000,000.00 180,000,000.00
SUB TOTAL
276,000,000.00
Ls
1.00
0.00
SUB TOTAL
0.00
0.00
Rp 779,940,000.00
Nama Alat
No Item Pekerjaan
Kode
Alat
E01
2 Asphalt Finisher
6.3 (1)
6.3 (2)
6.3 (3)
6.3(3a)
6.3(4)
6.3(4a)
6.3(5a)
6.3(5b)
6.3(5c)
6.3(5d)
6.3(6a)
E02
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
6=4x5
3
9
9
9
9
9
9
9
9
2
9
9
9
9
9
9
9
9
9
75
225
225
225
225
225
225
225
225
50
225
225
225
225
225
225
225
225
225
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
525
1575
1575
1575
1575
1575
1575
1575
1575
350
1575
1575
1575
1575
1575
1575
1575
1575
1575
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
M2
M2
M2
Ton
M3
Ton
M2
M2
Ton
Ton
M3
M3
Ton
Ton
M3
M3
Ton
Ton
M3
9
9
9
9
2
9
9
9
9
9
9
225
225
225
225
50
225
225
225
225
225
225
7
7
7
7
7
7
7
7
7
7
7
1575
1575
1575
1575
350
1575
1575
1575
1575
1575
1575
1
1
1
1
1
1
1
1
1
1
1
M2
M2
M2
Ton
M3
Ton
M2
M2
Ton
Ton
M3
No
Nama Alat
No Item Pekerjaan
Kode
Alat
2
6.3(6b)
6.3(6c)
6.3(6d)
6.3(7a)
6.3(7b)
6.3(7c)
6.3(7d)
6.4 (1)
6.4 (2)
6.4 (3)
3 Asphalt Sprayer
6.6.1
6.6.2
8.1 (7)
8.1 (9)
E03
4 Bulldozer
9.7
E04
5 Concrete Mixer
7.1(5)
7.1(6)
7.1(8)
7.9
9.18
E06
6 Concrete Vibrator
7.1(5)
7.1(6)
7.1(8)
7 Compressor
6.1(1)
9.17
E05
8 Crane
9.12
E07
9 Dump Truck
2.1
E08
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
3
9
9
9
9
9
9
9
9
9
9
4
225
225
225
225
225
225
225
225
225
225
5
7
7
7
7
7
7
7
7
7
7
6=4x5
1575
1575
1575
1575
1575
1575
1575
1575
1575
1575
7
1
1
1
1
1
1
1
1
1
1
9
9
9
9
225
225
225
225
7
7
7
7
1575
1575
1575
1575
1
1
1
1
175
1225
jam
4
4
4
4
7
100
100
100
100
175
7
7
7
7
7
700
700
700
700
1225
m3
m3
m3
m3
jam
4
4
4
100
100
100
7
7
7
700
700
700
m3
m3
m3
9
7
225
175
7
7
1575
1225
liter
jam
175
1225
jam
175
1225
m3
M3
Ton
Ton
M3
M3
Ton
Ton
M2
M2
M2
M3
M3
M3
Liter
No
Nama Alat
No Item Pekerjaan
Kode
Alat
2
3.1(1)
3.2(2)
4.2(1)
5.1(1)
5.1(2)
6.1(1)
6.1(2)
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(1)
8.1(5)
8.4(4)
8.4(6)
9.4
10 Excavator
2.1
3.1(1)
9.11
E10
E11
12 Generator Set
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(5)
E12
13 Motor Grader
3.2(2)
3.3(1)
4.2(1)
5.1(1)
5.1(2)
9.8
E13
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
3
6
6
7
5
5
9
9
9
9
9
9
2
2
2
2
7
4
150
150
175
125
125
225
225
225
225
225
225
50
50
50
50
175
5
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
6=4x5
1050
1050
1225
875
875
1575
1575
1575
1575
1575
1575
350
350
350
350
1225
7
6
7
175
150
175
7
7
7
1225
1050
1225
m3
m3
jam
175
1225
jam
9
9
9
9
2
225
225
225
225
50
7
7
7
7
7
1575
1575
1575
1575
350
m2
m3
m3
m3
m3
6
6
7
5
5
7
150
150
175
125
125
175
7
7
7
7
7
7
1050
1050
1225
875
875
1225
m3
m2
m3
m3
m3
jam
m3
m3
m3
m3
m3
liter
liter
m2
m3
m3
m3
m3
m3
bh
bh
jam
No
Nama Alat
No Item Pekerjaan
Kode
Alat
1
2
14 Pneumatic Tyred Roller
5.1(1)
5.1(2)
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
15 Tandem Roller
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(5)
E17
16 Vibrator Roller
3.2(2)
5.1(1)
5.1(2)
9.14
E19
17 Water Tank
3.3(1)
4.2(1)
5.1(1)
7.1(5)
7.1(6)
7.1(8)
7.9
8.1(1)
9.6
E23
18 Wheel Loader
3.2(2)
4.2(1)
5.1(1)
5.1(2)
6.3(5)
6.3(6)
6.3(6)a
6.3(7)
8.1(1)
8.1(5)
9.9
E15
19 Pedestrian Roller
8.1(1)
E24
bulan
Jadwal Pekerjaan
Hari Kerja
Jam Kerja
per hari
total
Kuantitas
Pekerjaan
Sat
6=4x5
7
5
5
9
9
9
175
125
125
225
225
225
7
7
7
7
7
7
1225
875
875
1575
1575
1575
m3
m3
m2
m3
m3
m3
9
9
9
9
2
225
225
225
225
50
7
7
7
7
7
1575
1575
1575
1575
350
m2
m3
m3
m3
m3
6
5
5
7
150
125
125
175
7
7
7
7
1050
875
875
1225
m3
m3
m3
jam
6
7
5
4
4
4
4
2
7
150
175
125
100
100
100
100
50
175
7
7
7
7
7
7
7
7
7
1050
1225
875
700
700
700
700
350
1225
m2
m3
m3
m3
m3
m3
m3
m3
jam
6
7
5
5
9
9
9
9
2
2
7
150
175
125
125
225
225
225
225
50
50
175
7
7
7
7
7
7
7
7
7
7
7
1050
1225
875
875
1575
1575
1575
1575
350
350
1225
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
jam
50
350
m3
10=8x9
11
12
13
0.002
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.003
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.0007
0.0009
0.0013
0.0201
0.0448
0.0201
0.0019
0.0019
0.0201
0.0201
0.0466
0.0466
0.0201
0.0201
0.0466
0.0466
0.0201
0.0201
0.0554
0.000001
0.000001
0.000001
0.000013
0.000028
0.000013
0.000001
0.000001
0.000013
0.000057
0.000030
0.000030
0.000013
0.000013
0.000030
0.000030
0.000013
0.000013
0.000035
0.00033
0.001
0.001
0.001
0.001
0.003
0.001
0.001
0.001
0.001
0.001
0.001
0.0013
0.0013
0.0013
0.0191
0.0364
0.0041
0.0013
0.0013
0.0137
0.0137
0.0255
0.000001
0.000001
0.000001
0.000012
0.000104
0.000003
0.000001
0.000001
0.000009
0.000009
0.000016
0.00023
Target
Peralatan Yang Diperlukan
Produksi koefisien alat jumlah alat jumlah
minimal kebut. di
Tiap Jam
per item
per item
alat
lapangan
8=7:6
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
0.001
9
0.0255
0.0110
0.0110
0.0212
0.0212
0.0092
0.0092
0.0003
0.0003
0.0003
10=8x9
0.000016
0.000007
0.000007
0.000013
0.000013
0.000006
0.000006
0.000000
0.000000
0.000000
11
12
13
0.001
0.001
0.001
0.001
0.0004
0.0004
0.0359
0.0003
0.000000
0.000000
0.000023
0.000000
0.00002
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
18
18
Target
Peralatan Yang Diperlukan
Produksi koefisien alat jumlah alat jumlah
minimal kebut. di
Tiap Jam
per item
per item
alat
lapangan
8=7:6
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
10=8x9
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
11
12
13
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Target
Peralatan Yang Diperlukan
Produksi koefisien alat jumlah alat jumlah
minimal kebut. di
Tiap Jam
per item
per item
alat
lapangan
8=7:6
10=8x9
11
12
13
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Nama Paket
: ..
No. Mata
Uraian
Satuan
Pembayaran
a
DIVISI 1. UMUM
1.2
Mobilisasi
LS
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1
M3
2.2
M3
2.3 (1)
M1
2.3 (2)
M1
2.3 (3)
M1
2.3 (4)
M1
2.3 (5)
M1
2.3 (6)
Ton
2.3 (7)
M1
2.4 (1)
M3
2.4 (2)
2.4 (3)
M2
M1
2
2
2
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Galian Biasa
M3
3.1 (2)
Galian Batu
M3
3.1 (3)
M3
3.1 (4)
M3
3.1 (5)
M3
3.1 (6)
LS
3.1 (7)
M3
3.1 (8)
3.1 (9)
3.2 (1)
M3
3.2 (2)
Timbunan Pilihan
M3
3.2 (3)
M3
3.2.(4)
M3
3.2.(5)
M3
3.2.(6)
M3
M /Km
3
Ton
3.3
M2
3.4
M3
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
M3
4.2 (2)
M3
4.2 (3)
Ton
4.2 (4)
M3
4.2 (5)
M2
4.2 (6)
Liter
4.2 (7)
Liter
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
M3
5.1 (2)
M3
5.2 (1)
M3
5.4 (1)
Ton
5.4 (2)
M3
5.5 (1)
Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))
M3
5.6 (1)
M3
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Liter
6.1 (2)
Lapis Perekat
Liter
6.2 (1)
M2
6.2 (2)
M2
6.2 (3)
6.3 (1)
M2
6.3 (2)
M2
6.3 (3)
M2
6.3(3a)
Ton
6.3(4)
M3
6.3(4a)
Ton
6.3(5a)
M2
6.3(5b)
M2
Liter
6.3(5c)
Ton
6.3(5d)
Ton
6.3(6a)
M3
6.3(6b)
M3
6.3(6c)
Ton
6.3(6d)
Ton
6.3(7a)
M3
6.3(7b)
M3
6.3(7c)
Ton
6.3(7d)
Ton
6.4 (1)
Lasbutag
M2
6.4 (2)
Latasbusir Kelas A
M2
6.4 (3)
Latasbusir Kelas B
M2
6.4 (4)
Bitumen Asbuton
Ton
6.4 (5)
Ton
6.4 (6)
Liter
M3
6.6.1
6.5
M3
6.6.2
M3
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1)
Beton K500
M3
7.1 (2)
Beton K400
M3
7.1 (3)
Beton K350
M3
7.1 (4)
Beton K300
M3
7.1 (5)
Beton K250
M3
7.1 (6)
Beton K175
M3
7.1 (7)
M3
7.1 (8)
Beton K125
M3
7.2 (1)
Buah
7.2 (2)
Buah
7.2 (3)
Buah
7.2 (4)
Buah
7.2 (5)
Buah
7.2 (6)
Buah
7.2 (7)
Buah
7.2 (8)
Buah
7.2 (9)
Baja Prategang
7.2 (10)
7.2 (11)
Beton Diafragma K350 termasuk pekerjaan penegangan setelah pengecoran (post tension)
M3
7.3 (1)
Kg
7.3 (2)
Kg
7.3 (3)
Kg
7.3 (4)
Kg
7.3 (5)
Kg
7.3 (6)
Kg
7.4 (1)
Kg
7.4 (2)
Kg
7.4 (3)
Kg
7.5 (1)
Kg
7.5 (2)
Kg
7.6 (1)
M1
7.6 (2)
M2
7.6 (3)
M2
7.6 (4)
M2
7.6 (5)
M2
7.6 (6)
M3
7.6 (7)
M3
7.6 (8)
Kg
7.6 (9)
M3
7.6 (10)
M3
7.6 (11)
M1
7.6 (12)
M1
7.6 (13)
M1
7.6 (14)
M1
7.6 (15)
M1
7.6 (16)
M1
7.6 (17)
M1
7.6 (18)
M1
Kg
Buah
7.6 (19)
M1
7.6 (20)
M1
7.6 (21)
M1
7.6 (22)
M1
7.6 (23)
M1
7.6 (24)
7.6.(22) bila Tiang Pancang Bor Beton dikerjakan ditempat yang Berair
7.6 (25)
Buah
7.6 (26)
Buah
7.7 (1)
M1
7.7 (2)
M1
7.7 (3)
M1
7.7 (4)
M1
7.7 (5)
M1
7.7 (6)
M1
7.7 (7)
M1
7.7 (8)
M1
Pasangan Batu
M3
7.10 (1)
7.9
M3
7.10 (2)
M3
7.10 (3)
Bronjong
M3
7.11 (1)
M1
7.11 (2)
M1
7.11 (3)
M1
7.11 (4)
M1
7.11 (5)
M1
7.11 (6)
M1
7.12 (1)
Perletakan Logam
Buah
7.12 (2)
Buah
7.12 (3)
Buah
7.12 (4)
Buah
7.12 (5)
Perletakan Strip
M1
7.13
Sandaran (Railing)
M1
7.14
Buah
7.15.(1)
M3
7.15.(2)
Pembongkaran Beton
M3
7.15.(3)
M3
7.15.(4)
M2
7.15.(5)
M2
7.15.(6)
M1
7.15.(7)
M2
7.15.(8)
M2
7.15.(9)
7.16 (1)
M3
7.17 (1)
M2
7.17 (2)
M2
M3 / Km
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
M3
8.1 (2)
M3
8.1 (3)
8.1 (4)
M3
8.1 (5)
M3
8.1 (6)
M3
M3 (vol. gembur)
8.1 (7)
M3
8.1 (8)
M3
8.1 (9)
8.2(1)
Liter
M3
8.2(2)
M2
8.2(3)
Buah
8.2(4)
Buah
8.2(5)
Buah
8.3.(1)
M2
8.3.(2)
Semak / Perdu
M2
8.3.(3)
Pohon
8.4.(1)
M2
8.4.(2)
M2
Buah
8.4.(3) .(a)
Buah
8.4.(3) .(b)
Buah
8.4.(4) .(a)
Buah
8.4.(4) .(b)
Buah
8.4.(5)
Patok Pengarah
Buah
8.4.(6) .(a)
Patok Kilometer
Buah
8.4.(6) .(b)
Patok Hektometer
Buah
8.4.(7)
Rel Pengaman
M1
8.4.(8)
Paku Jalan
Buah
8.4.(9)
Mata Kucing
Buah
8.4.(10)
Kerb Pracetak
M1
8.4.(11)
M1
8.4.(12)
M2
8.5(1)
M2
8.5(2)
M2
8.5(3)
M2
8.6(1)
8.7(1)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 Watt
Buah
8.7(2)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 Watt
Buah
8.7(3)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt
Buah
8.7(4)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt
Buah
8.7(5)
Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt
Buah
8.7(6)
Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt
Buah
8.8(1)
M1
8.8(2)
M1
M1
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Mandor
Jam
9.2
Pekerja Biasa
Jam
9.3
Jam
9.4
Jam
9.5
Jam
9.6
Jam
9.7
Jam
9.8
Jam
9.9
Jam
9.10
Jam
9.11
Jam
9.12
Crane 10 - 15 Ton
Jam
9.13
Jam
9.14
Jam
9.15
Jam
9.16
Jam
9.17
Jam
9.18
Jam
9.19
Jam
9.20
Jack Hammer
Jam
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
LS
10.1 (2)
LS
10.1 (3)
LS
10.1 (4)
LS
10.1 (5)
LS
Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Perkiraan
Harga
Kuantitas
Satuan
(Rupiah)
1.0
1,353,030,000
1.0
26,934.14
1.0
437,350.41
1.0
379,549.65
1.0
465,088.59
1.0
788,034.79
1.0
1,312,035.14
1.0
1.0
16,041,846.07
1.0
110,909.74
1.0
236,814.09
1.0
24,157.82
1.0
60,534.46
1.0
58,789.85
1.0
206,190.85
1.0
81,348.72
1.0
576,438.68
1.0
523,669.30
1.0
1.0
130,827.38
1.0
455,317.81
1.0
9,978.16
1.0
155,108.97
1.0
142,478.56
1.0
124,351.64
1.0
92,045.92
1.0
184,684.08
1.0
72,725.02
1.0
723.79
1.0
1.0
458,587.66
1.0
432,592.18
1.0
738,737.68
1.0
155,910.63
1.0
6,113.93
1.0
7,788.94
1.0
5,442.57
1.0
453,368.40
1.0
416,190.68
1.0
392,321.88
1.0
772,706.31
1.0
120,927.59
1.0
1.0
1.0
5,550.36
1.0
6,446.25
1.0
4,375.54
1.0
6,983.69
1.0
7,342.13
1.0
36,654.41
1.0
44,470.30
1.0
61,939.16
1.0
921,547.47
1.0
1,837,831.10
1.0
799,695.61
1.0
71,846.43
1.0
69,575.36
1.0
775,955.42
1.0
744,570.87
1.0
1,734,269.48
1.0
1,667,675.12
1.0
749,610.40
1.0
720,605.60
1.0
1,649,800.99
1.0
1,568,453.43
1.0
700,913.05
1.0
679,159.45
1.0
11,151.51
1.0
5,480.77
1.0
7,408.55
1.0
1,832,187.50
1.0
6,226,189.55
1.0
24,000.00
1.0
1,320,283.57
1.0
1,192,544.25
1.0
1,270,316.99
1.0
1,491,111.58
1.0
1,420,205.46
1.0
1,394,103.20
1.0
1,104,297.86
1.0
1,070,952.31
1.0
784,713.63
1.0
660,314.12
1.0
702,000.45
1.0
23,733,234.61
1.0
26,054,279.71
1.0
26,943,808.49
1.0
27,933,808.49
1.0
28,923,808.49
1.0
29,583,808.49
1.0
31,126,083.29
1.0
31,233,808.49
1.0
240,555.10
1.0
35,451,563.78
1.0
1,200,980.98
1.0
11,330.10
1.0
11,324.60
1.0
12,050.60
1.0
10,920.35
1.0
12,050.60
1.0
40,171.68
1.0
12,746.92
1.0
12,746.92
1.0
12,746.92
1.0
642.34
1.0
555.16
1.0
34,211.81
1.0
1.0
38,772.95
1.0
20,957.98
1.0
1.0
40,115.74
1.0
33,814.44
1.0
85,736.42
1.0
4,433,302.19
1.0
1,071,397.58
1.0
152,229.71
1.0
50,743.24
1.0
50,743.24
1.0
50,743.24
1.0
52,244.91
1.0
52,244.91
1.0
52,244.91
1.0
722,283.19
1.0
1,274,686.81
1.0
1,983,142.80
1.0
2,847,651.15
1.0
4,437,011.86
1.0
1.0
1.0
1.0
1.0
4,481,000.36
1.0
5,420,046.69
1.0
6,379,016.40
1.0
8,015,583.29
1.0
221,169.66
1.0
288,254.15
1.0
343,065.30
1.0
546,983.87
1.0
553,666.41
1.0
596,242.08
1.0
265,487.92
1.0
318,417.85
1.0
38,419.32
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
14,253.41
1.0
124,901.04
1.0
1.0
329,646.48
1.0
1.0
1.0
205,746.88
1.0
212,009.34
1.0
1.0
1.0
1.0
1,118,735.17
1.0
1.0
1.0
388,883.32
1.0
358,718.70
1.0
337,954.39
1.0
296,327.81
1.0
1,918,874.99
1.0
1.0
1,194,059.09
1.0
1,219,159.14
1.0
7,396.38
1.0
73,130.07
1.0
43,887.00
1.0
131,048.59
1.0
204,944.60
1.0
430,008.57
1.0
7,100.38
1.0
6,879.96
1.0
6,494.96
1.0
114,811.23
1.0
104,086.23
1.0
411,739.31
1.0
606,111.40
1.0
456,289.31
1.0
694,439.31
1.0
97,393.33
1.0
329,572.40
1.0
151,213.16
1.0
618,998.48
1.0
71,558.78
1.0
148,008.78
1.0
118,858.59
1.0
1.0
10,096.95
1.0
66,803.50
1.0
1.0
1.0
612,445.90
1.0
22,896,888.29
1.0
1,198,338.42
1.0
1,175,714.50
1.0
1,198,338.42
1.0
1,175,714.50
1.0
1,198,338.42
1.0
320,626.72
1.0
503,886.72
1.0
7,871.91
1.0
4,985.55
1.0
6,559.93
1.0
181,166.02
1.0
363,962.58
1.0
177,181.40
1.0
457,453.82
1.0
378,173.40
1.0
Err:511
1.0
251,000.14
1.0
421,577.21
1.0
598,100.70
1.0
441,483.33
1.0
367,997.01
1.0
26,644.52
1.0
389,070.60
1.0
122,154.32
1.0
147,180.48
1.0
18,528.02
1.0
17,698.30
1.0
67,909,086.58
1.0
32,178,071.50
1.0
41,671,295.03
1.0
11,768,457.42
1.0
62,477,968.03
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
: 2.1
: Galian Utk Drainase, Saluran dan Saluran Air
: M3
U RAIAN
KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume bahan
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Sekelompok pekerja akan merapikan hasil galian
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor Konversi (<40 %)
Waktu siklus = T1 x Fv
- Menggali, memuat dan berputar
Kap. Prod. / jam =
2.b.
KOEF.
SATUAN
Tk
Fk
D
7.00
jam
1.20
1.60 Ton/M3
2.00
Km
(E10)
V
Fb
Fa
Fv
Ts1
T1
0.93
1.00
0.83
0.9
0.29
0.3
M3
-
134.01
M3
= 1 : Q1
0.0075
Jam
DUMP TRUCK
Kaasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Muat
= (V x 60)/ D x Q1 x Fk
- Waktu tempuh isi
= (L : v1) x 60
- Waktu tempuh kosong
= (L : v2) x 60
- Lain-lain
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
3.50
0.83
20.00
30.00
ton
Km/Jam
Km/Jam
0.82
6.00
4.00
1.00
11.82
menit
menit
menit
menit
menit
7.68
M3
Koefisien Alat / M3
= 1 : Q2
V x Fa x 60
D x Fk x Ts2
Q2
0.1302
KETERANGAN
menit
menit
Q1
Koefisien Alat / M3
V x Fb x Fa x 60
Ts1 x Fk
Analisa EI-21
Jam
Analisa EI-21
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 2.1
PERKIRAAN VOL. PEK.
: Galian Utk Drainase, Saluran dan SalurTOTAL HARGA (Rp.)
: M3
0 % THD. BIAYA PROYEK
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
B.
(L01)
(L03)
jam
jam
0.0298
0.0075
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
26,934.14
0.00
JUMLAH
HARGA
(Rp.)
135.28
53.40
188.68
0.00
BAHAN
C.
PERALATAN
1.
2.
3.
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
jam
jam
Ls
0.0075
0.1302
1.0000
383,252.01
164,696.38
0.00
3
4
2,859.87
21,437.03
0.00
24,296.89
: 2.1
: Galian Utk Drainase, Saluran dan Saluran Air
: M3
Analisa EI-21
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
URAIAN
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang + Sapu
3.
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
KODE
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
26,934.14 / M3
6.
7.
KOEF.
SATUAN
Q1
Qt
134.01
938.07
P
M
4.00
1.00
orang
orang
0.0298
0.0075
Jam
Jam
(L01)
(L03)
M3/Jam
M3
KETERANGAN
: 3.1 (1)
: Galian Biasa
: M3
No.
I.
1
2
3
4
5
6
II.
Analisa EI-311
URAIAN ANALISA HARGA SATUAN
U RAIAN
KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume tanah (lepas)
URUTAN KERJA
1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi , kedalaman < 40 %
Waktu siklus
- Menggali / memuat (standar)
Tk
Fk
D
7.00
1.20
1.60
Jam
ton/m3
5.00
Km
0.93
1.00
0.83
0.90
M3
-
0.320
menit
menit
Ts1
0.29
menit
Q1
134.01
M3/Jam
= 1 : Q1
(E10)
0.0075
Jam
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
= (V x 60)/(D x Q1 x Fk)
- Waktu tempuh isi
= (L : v1) x 60
- Waktu tempuh kosong
= (L : v2) x 60
- Lain-lain
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
3.50
0.83
20.00
30.00
0.82
15.00
10.00
2.00
27.82
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
3.26
M3/Jam
Koefisien Alat / M3
V x Fb x Fa x 60
Ts1 x Fk
Koefisien Alat / M3
2.d.
SATUAN
(E10)
V
Fb
Fa
Fv
Ts1
T1
Waktu siklus = T1 x Fv
2.b.
KOEF.
= 1 : Q2
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
V x Fa x 60
D x Fk x Ts2
Q2
(E08)
0.3064
KETERANGAN
1.40 - 1.80
lihat panduan
Jam
Lump Sump
Analisa EI-311
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.1 (1)
PERKIRAAN VOL. PEK.
: Galian Biasa
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
B.
(L01)
(L03)
Jam
Jam
0.0149
0.0075
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
58,789.85
0.00
JUMLAH
HARGA
(Rp.)
67.64
53.40
121.04
0.00
BAHAN
C.
PERALATAN
1.
2.
3.
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.0075
0.3064
1.0000
383,252.01
164,696.38
0.00
3
4
2,859.87
50,464.41
0.00
53,324.28
: 3.1 (1)
: Galian Biasa
: M3
Analisa EI-311
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
3.
U RAIAN
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
58,789.85 / M3
6.
7.
KODE
KOEF.
SATUAN
Q1
Qt
134.01
938.07
P
M
2.00
1.00
(L01)
(L03)
0.0149
0.0075
M3/Jam
M3
orang
orang
Jam
Jam
KETERANGAN
Analisa EI-312
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.1 (2)
PERKIRAAN VOL. PEK.
: Galian Batu
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
B.
(L01)
(L03)
Jam
Jam
1.0000
0.1250
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
206,190.85
0.01
JUMLAH
HARGA
(Rp.)
4,532.31
894.54
5,426.85
0.00
BAHAN
C.
1.
2.
3.
4.
5
PERALATAN
Compressor
Jack Hammer
Wheel Loader
Excavator
Dump Truck
Alat bantu
(E05)
(E26)
(E15)
(E10)
(E08)
Jam
Jam
Jam
Jam
Jam
Ls
0.1250
0.1250
0.1250
0.1250
0.5153
1.0000
111,049.38
16,089.36
266,795.62
383,252.01
164,696.38
0.00
3
4
13,881.17
2,011.17
33,349.45
47,906.50
84,871.08
0.00
182,019.38
: 3.1 (2)
: Galian Batu
: M3
No.
I.
1
2
3
4
5
6
II.
Analisa EI-312
URAIAN ANALISA HARGA SATUAN
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat volume tanah (lepas)
URUTAN KERJA
1 Batu yg dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan Excavator, Compresor
dan Jack Hammer, dimuat ke dlm Truk dengan Loader.
3 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh :
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
Koefisien Alat / m3
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
Koefisien Alat / m3
3.
KETERANGAN
Tk
Fk
D
7.00
1.20
1.80
Jam
ton/m3
5.00
Km
Q1
8.00
M3 / Jam
(E05/26/10/15)
(E05/26)
= (V x 60)/D x Q1
= (L : v1) x 60
= (L : v2) x 60
2.d.
SATUAN
2.b.
KOEF.
V x Fa x 60
D x Fk x Ts1
= 1 : Q2
(E08)
V
Fa
v1
v2
Ts1
T1
T2
T3
T4
Ts1
Q2
(E08)
0.1250
Jam
3.50
0.83
20.00
30.00
M3
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
14.58
15.00
10.00
2.00
41.58
1.94 M3 / Jam
0.5153
Jam
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pahat / Tatah
= 2 buah
- Palu Besar
= 2 buah
Lump Sump
TENAGA
Produksi menentukan : JACK HAMMER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
Q1
Qt
8.00
56.00
M3/Jam
M3
P
M
8.00
1.00
orang
orang
(L01)
(L03)
1.0000
0.1250
Jam
Jam
: 3.1 (2)
: Galian Batu
: M3
Analisa EI-312
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
U RAIAN
4.
5.
206,190.85 / M3
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
Analisa EI-313
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.1 (3)
PERKIRAAN VOL. PEK.
: Galian Struktur dengan Kedalaman 0 - 2 TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0298
0.0075
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Urugan Pilihan
(EI-322)
M3
0.5000
PERALATAN
Excavator
Bulldozer
Alat bantu
(E10)
(E04)
Jam
Jam
Ls
0.0075
0.014502
1.0000
3
4
1.00
81,348.72
0.00
JUMLAH
HARGA
(Rp.)
135.28
53.40
188.68
129,525.96
:
:
:
64,762.98
64,762.98
383,252.01
423,504.25
0.00
2,859.87
6,141.85
0.00
9,001.72
: 3.1 (3)
: Galian Struktur dengan Kedalaman 0 - 2 M
: M3
No.
I.
1
2
3
4
5
7
II.
U RAIAN
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sekitar jembatan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Pengurugan kembali (backfill) untuk struktur
III.
1.
BAHAN
- Urugan Pilihan (untuk backfill)
Koefisien Alat / M3
2.a.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
BULLDOZER
Faktor pisau (blade)
Faktor efisiensi kerja
Kecepatan mengupas
Kecepatan mundur
Kapasitas pisau
Faktor kemiringan (grade)
Waktu Siklus
- Waktu gusur
- Waktu kembali
- Waktu lain-lain
= (L x 60) : Vf
= (L x 60) : Vr
Koefisien Alat / M3
2.d.
= Uk x 1M3
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi (kedalaman < 40 %)
Berat isi material
Waktu siklus
- Menggali, memuat, lain-lain (standar)
Waktu siklus = T1 x Fv
Kap. Prod. / jam =
= 1 : Q2
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pacul
= 2 buah
- Sekop
= 2 buah
KODE
METHODE PELAKSANAAN
1 Tanah yang dipotong berada disekitar lokasi
2 Penggalian dilakukan dengan menggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan di sekitar lokasi pekerjaan
4 Bahan pengaman tebing galian (bahan kayu)
2.
2.a.
Analisa EI-313
q x Fb x Fm x Fa x 60/Ts
Fk
KOEF.
SATUAN
Tk
Fk
Uk
7.00
1.20
50.00
Jam
%/M3
0.1000
Km
0.50
M3
M3
(EI-322)
(E10)
V
Fb
Fa
Fv
Bim
0.93
1.00
0.83
0.90
0.85
M3
-
T1
Ts1
0.32
0.29
menit
menit
Q1
134.01
M3/Jam
(E10)
0.0075
Jam
(E04)
Fb
Fa
Vf
Vr
q
Fm
1.00
0.83
3.00
5.00
5.40
1.00
Km/Jam
Km/Jam
M3
Ts
T1
T2
T3
Ts
2.0
1.2
0.05
3.25
menit
menit
menit
menit
Q2
68.95
M3
0.014502
Jam
(E04)
KETERANGAN
Lump Sump
: 3.1 (3)
: Galian Struktur dengan Kedalaman 0 - 2 M
: M3
Analisa EI-313
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
3.
U RAIAN
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
81,348.72 / M3
6.
7.
KODE
KOEF.
SATUAN
Q1
Qt
134.01
938.07
P
M
4.00
1.00
(L01)
(L03)
0.0298
0.0075
M3/Jam
M3
orang
orang
Jam
Jam
KETERANGAN
Analisa EI-314
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.1 (4)
PERKIRAAN VOL. PEK.
: Galian Struktur dengan Kedalaman 2 - 4 TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.1658
0.0166
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2
Urugan Pilihan
(EI-322)
Bahan pengaman tebing galian
M3
Ls
1.0000
1.0000
PERALATAN
Excavator
Bulldozer
Alat bantu
(E10)
(E04)
Jam
Jam
Ls
0.0166
0.029005
1.0000
3
4
1.00
576,438.68
0.03
JUMLAH
HARGA
(Rp.)
751.57
118.67
870.24
129,525.96
375,000.00
:
:
:
129,525.96
375,000.00
504,525.96
383,252.01
423,504.25
0.00
6,355.26
12,283.70
0.00
18,638.96
: 3.1 (4)
: Galian Struktur dengan Kedalaman 2 - 4 M
: M3
No.
I.
1
2
3
4
5
6
7
U RAIAN
Analisa EI-314
URAIAN ANALISA HARGA SATUAN
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sekitar jembatan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Pengurugan kembali (backfill) untuk struktur
Faktor pembayaran
METHODE PELAKSANAAN
1 Tanah yang dipotong berada disekitar jembatan
2 Penggalian dilakukan dengan menggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan di sekitar lokasi pekerjaan
4 Bahan pengaman tebing galian (bahan kayu)
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
KOEF.
SATUAN
Tk
Fk
Uk
Fp
7.00
1.20
50.00
2.00
Jam
%/M3
0.1000
Km
1.00
0.30
M3
M3
(E10)
V
Fb
Fa
Fv
Bim
0.93
1.00
0.83
1.00
0.85
M3
-
T1
0.32
menit
Ts1
0.32
menit
Q1
60.30
M3/Jam
(E10)
0.0166
Jam
(E04)
Fb
Fa
Vf
Vr
q
Fm
1.00
0.83
3.00
5.00
5.40
1.00
Km/Jam
Km/Jam
M3
Ts
T1
T2
T3
Ts
2.0
1.2
0.05
3.25
menit
menit
menit
menit
Q2
34.48
M3
(E04)
0.0290
Jam
KETERANGAN
1.5 - 2
II.
1.
2.
2.a.
BAHAN
- Urugan Pilihan (untuk backfill)
= Uk x 1M3 x Fp
- Bahan pengaman tebing galian
0.2 - 0,4 M3 (kayu)
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi (kedalaman 40 - 75%)
Berat isi material
Waktu siklus
- Menggali / memuat, lain lain, standar
Waktu Siklus = T1 x Fv
Kap. Prod. / jam =
Koefisien Alat / M3
2.a.
V x Fb x Fa x 60
Ts1 x Fk x Fp
= 1 : Q1
BULLDOZER
Faktor pisau (blade)
Faktor efisiensi kerja
Kecepatan mengupas
Kecepatan mundur
Kapasitas pisau
Faktor kemiringan (grade)
Waktu Siklus
- Waktu gusur
- Waktu kembali
- Waktu lain-lain
= (L x 60) : Vf
= (L x 60) : Vr
Koefisien Alat / M3
= 1 : Q2
q x Fb x Fm x Fa x 60/Ts
Fk x Fp
(EI-322)
panduan =datar
: 3.1 (4)
: Galian Struktur dengan Kedalaman 2 - 4 M
: M3
Analisa EI-314
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.d.
3.
U RAIAN
KODE
KOEF.
SATUAN
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pacul
= 2 buah
- Sekop
= 2 buah
Lump Sump
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
KETERANGAN
576,438.68 / M3
6.
7.
Q1
Qt
60.30
422.13
M3/Jam
M3
P
M
10.00
1.00
orang
orang
(L01)
(L03)
0.1658
0.0166
Jam
Jam
Analisa EI-315
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.1 (5)
PERKIRAAN VOL. PEK.
: Galian Struktur Kedalaman 4 m - 6 m TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.2985
0.0249
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2
Urugan Pilihan
(EI-322)
Bahan pengaman tebing galian
M3
Ls
0.6000
1.0000
PERALATAN
Excavator
Bulldozer
Alat bantu
(E10)
(E04)
Jam
Jam
Ls
0.0249
0.029005
1.0000
3
4
1.00
523,669.30
0.02
JUMLAH
HARGA
(Rp.)
1,352.82
178.00
1,530.83
129,525.96
375,000.00
:
:
:
77,715.58
375,000.00
452,715.58
383,252.01
423,504.25
0.00
9,532.89
12,283.70
0.00
21,816.59
: 3.1 (5)
: Galian Struktur Kedalaman 4 m - 6 m
: M3
No.
I.
1
2
3
4
5
6
7
URAIAN
Analisa EI-315
URAIAN ANALISA HARGA SATUAN
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sekitar jembatan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Pengurugan kembali (backfill) untuk struktur
Faktor pembayaran
METHODE PELAKSANAAN
1 Tanah / batu yang dipotong berada disekitar jembatan
2 Penggalian dilakukan dengan mgenggunakan alat
Excavator
3 Bulldozer mengangkut/mengusur hasil galian ke tempat
pembuangan dilokasi sekitar jembatan
4 Bahan pengaman tebing galian (bahan kayu)
III.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
KOEF.
SATUAN
Tk
Fk
Uk
Fp
7.00
1.20
30.00
2.00
Jam
%/M3
0.1000
Km
0.60
0.30
M3
M3
(E10)
V
Fb
Fa
Fv
Bim
0.93
1.00
0.83
1.50
0.85
M3
-
T1
0.32
menit
Ts1
0.48
menit
Q1
40.20
M3/Jam
(E10)
0.0249
Jam
(E04)
Fb
Fa
Vf
Vr
q
Fm
1.00
0.83
3.00
5.00
5.40
1.00
Km/Jam
Km/Jam
M3
T1
T2
T3
Ts
2.0
1.2
0.05
3.25
menit
menit
menit
menit
Q2
34.48
M3
0.029005
Jam
KETERANGAN
1.5 - 2
II.
1.
2.
2.a.
BAHAN
- Urugan Pilihan (untuk backfill)
= Uk x 1M3 x Fp
- Bahan pengaman tebing galian
0.2 - 0,4 M3 (kayu)
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Faktor konversi (kedalaman > 75%)
Berat isi material
Waktu siklus
- Menggali / memuat, lain lain, standar
waktu siklus = T1 x Fv
Kap. Prod. / jam =
Koefisien Alat / M3
2.a.
V x Fb x Fa x 60
Ts1 x Fk x Fp
= 1 : Q1
BULLDOZER
Faktor pisau (blade)
Faktor efisiensi kerja
Kecepatan mengupas
Kecepatan mundur
Kapasitas pisau
Faktor kemiringan (grade)
Waktu Siklus
- Waktu gusur
- Waktu kembali
- Waktu lain-lain
= (L x 60) : Vf
= (L x 60) : Vr
Koefisien Alat / M3
= 1 : Q2
q x Fb x Fm x Fa x 60/Ts
Fk x Fp
(EI-322)
(E04)
: 3.1 (5)
: Galian Struktur Kedalaman 4 m - 6 m
: M3
Analisa EI-315
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.d.
3.
U RAIAN
KODE
KOEF.
SATUAN
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pacul
= 2 buah
- Sekop
= 2 buah
Lump Sump
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
KETERANGAN
523,669.30 / M3
6.
7.
Q1
Qt
40.20
281.42
M3/Jam
M3
P
M
12.00
1.00
orang
orang
(L01)
(L03)
0.2985
0.0249
Jam
Jam
: 3.1 (9)
Analisa EI-319
: Biaya Tambahan untuk jarak angkut bahan galian buangan dengan jarak melebihi 5 Km.
: M3/Km
URAIAN ANALISA HARGA SATUAN
No.
I.
1
2
3
4
5
II.
URAIAN
KODE
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Berat volume bahan
Faktor pengembangan bahan
URUTAN KERJA
1 Tanah yang dipotong umumnya berada di sisi jalan
2 Dump Truck membuang bahan hasil galian keluar
lokasi jalan sejauh
3 Jarak tambahan yang diperhitungkan = (Lo - 5) Km
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu tempuh isi
- Waktu tempuh kosong
= (Lt : v1) x 60
= (Lt : v2) x 60
V x Fa x 60
D x Ts x Fk
TENAGA
Tidak diperlukan tenaga kerja.
4.
5.
9,978.16 / M3
6.
7.
KOEF.
SATUAN
D
Fk
1.60
1.20
Ton/M3
Lo
Lt
8.00
3.00
Km
Km
3.50
0.83
20.00
30.00
Ton
KM/Jam
KM/Jam
9.00
6.00
15.00
menit
menit
menit
6.05
M3
0.0551
Jam
(E08)
V
Fa
v1
v2
Ts
T1
T2
Ts
Q
(E08)
KETERANGAN
Analisa EI-319
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.1 (9)
PERKIRAAN VOL. PEK.
: Biaya Tambahan untuk jarak angkut bahaTOTAL HARGA (Rp.)
: M3/Km
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
HARGA
SATUAN
(Rp.)
:
:
:
1.00
9,978.16
0.00
JUMLAH
HARGA
(Rp.)
TENAGA
B.
0.00
0.00
BAHAN
C.
PERALATAN
1.
Dump Truck
(E08)
Jam
0.0551
164,696.38
3
4
9,071.06
9,071.06
: 3.2 (1)
: Timbunan Biasa dari selain Sumber Galian
: M3
No.
I.
1
2
3
4
5
6
7
II.
URAIAN
Analisa EI-321
URAIAN ANALISA HARGA SATUAN
KODE
ASUMSI
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Tebal hamparan padat
Berat volume bahan (lepas)
URUTAN KERJA
1 Excavator menggali dan memuat ke dalam dump truck
2 Dump Truck mengangkut ke lapangan dengan jarak
quari ke lapangan
3 Material diratakan dengan menggunakan Motor Grader
4 Material dipadatkan menggunakan Vibratory Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
7.00
1.20
0.15
1.60
Jam
M
Ton/M3
8.70
Km
1.20
M3
0.93
1.00
0.83
0.90
M3
-
0.32
0.29
menit
menit
(M08)
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Faktor Konversi
Waktu sklus
- Muat
Waktu Siklus = T1 x Fv
(E15)
V
Fb
Fa
Fv
Ts1
T1
Ts1
Koefisien alat / M3
2.b.
V x Fb x Fa x 60
Fk x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktusiklus :
- Waktu muat =
= (V x 60)/(D x Q1)
- Waktu tempuh isi = (L : v1) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain
Koefisien Alat / M3
= 1 : Q2
134.01
M3
(E10)
0.0075
Jam
3.50
0.83
20.00
30.00
Ton
KM/Jam
KM/Jam
0.98
26.10
17.40
2.00
46.48
menit
menit
menit
menit
menit
2.34
M3
0.4267
Jam
Q2
(E08)
KETERANGAN
Lihat panduan
Q1
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
V x Fa x 60
D x Ts2
SATUAN
Tk
Fk
t
D
III.
1.
1.a.
KOEF.
Analisa EI-321
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.2 (1)
PERKIRAAN VOL. PEK.
: Timbunan Biasa dari selain Sumber GaliaTOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0298
0.0075
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
C.
1.
2.
3.
4
5.
PERALATAN
Excavator
Dump Truck
Motor Grader
Vibro Roller
Alat Bantu
M3
(E15)
(E08)
(E13)
(E19)
Jam
Jam
Jam
Jam
Ls
1.2000
20,000.00
3
4
1.00
155,108.97
0.01
JUMLAH
HARGA
(Rp.)
135.28
53.40
188.68
24,000.00
24,000.00
0.0075
0.4267
0.1190
0.0109
1.0000
1,990.86
70,269.55
40,927.86
3,631.20
0.00
266,795.62
164,696.38
343,794.00
334,542.74
0.00
:
:
:
116,819.47
: 3.2 (1)
: Timbunan Biasa dari selain Sumber Galian
: M3
Analisa EI-321
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
U RAIAN
MOTOR GRADER
Panjang hamparan
Lebar Overlap
Faktor Efisiensi kerja
Kecepatan rata-rata alat
Jumlah lintasan
Lebar pisau effektif
Waktu siklus
- Perataan 1 kali lintasan
- Lain-lain
Lh x 60
v x 1000
Koefisien Alat / M3
2.d.
VIBRATOR ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Koefisien Alat / M3
3.
(v x 1000) x b x t x Fa
n
= 1 : Q4
(E13)
Lh
bo
Fa
v
n
b
Ts3
T1
T2
Ts3
KOEF.
SATUAN
KETERANGAN
50.00
0.30
0.80
4.00
2
2.6
M
M
Km / Jam
lintasan
M
0.75
1.00
1.75
menit
menit
menit
8.40
M3
(E13)
0.1190
Jam
(E19)
v
b
n
Fa
4.00
1.48
8.00
0.83
Km / Jam
M
lintasan
-
Q4
92.13
M3
(E19)
0.0109
Jam
Q3
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
Lump Sump
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Timbunan / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
Lh x (n(b-bo)+bo) x t x Fa x 60
Ts3 x n
= 1 : Q3
Kapasitas Prod./Jam
2.e.
KODE
= (Tk x P) : Qt
= (Tk x M) : Qt
Q1
Qt
134.01
938.07
P
M
4.00
1.00
(L01)
(L02)
0.0298
0.0075
M3/Jam
M3
orang
orang
Jam
Jam
: 3.2 (1)
: Timbunan Biasa dari selain Sumber Galian
: M3
Analisa EI-321
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
5.
URAIAN
155,108.97 / M3
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
Analisa EI-322
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.2 (2)
PERKIRAAN VOL. PEK.
: Timbunan Pilihan
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.7363
0.4341
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
C.
1.
2.
3.
3.
4.
5.
PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Tandem
Water Tanker
Alat Bantu
(M09)
(E15)
(E08)
(E13)
(E17)
(E23)
M3
Jam
Jam
Jam
Jam
Jam
Ls
1.2000
25,000.00
3
4
1.00
142,478.56
0.01
JUMLAH
HARGA
(Rp.)
7,869.28
3,106.29
10,975.57
30,000.00
30,000.00
0.0136
0.4341
0.0020
0.0289
0.0070
1.0000
3,630.39
71,488.95
682.13
11,616.87
1,132.05
0.00
266,795.62
164,696.38
343,794.00
401,348.48
161,074.00
0.00
:
:
:
88,550.39
: 3.2 (2)
: Timbunan Pilihan
: M3
No.
I.
1
2
3
4
5
6
7
II.
Analisa EI-322
URAIAN ANALISA HARGA SATUAN
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Tebal hamparan padat
Berat volume bahan (lepas)
SATUAN
KETERANGAN
Tk
Fk
t
D
7.00
1.20
0.15
1.60
Jam
M
Ton/M3
8.70
Km
(M09)
1.20
M3
1.50
0.85
0.83
M3
-
0.45
0.45
menit
menit
Q1
73.49
M3
Koefisienalat / M3 = = 1 : Q1
(E15)
0.0136
Jam
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktusiklus :
- Waktu muat =
= (V x 60)/(D x Q1)
- Waktu tempuh isi = (L : v1) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
3.50
0.83
20.00
30.00
M3
Km / Jam
Km / Jam
1.79
26.10
17.40
2.00
47.29
menit
menit
menit
menit
menit
2.30
M3
0.4341
Jam
URUTAN KERJA
1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut ke lapangan dengan jarak
quari ke lapangan
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Tandem Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
III.
1.
1.a.
2.
2.a.
ALAT
WHELL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu sklus
- Muat
(E15)
V
Fb
Fa
Ts1
T1
Ts1
2.b.
KOEF.
Koefisien Alat / m3
= 1 : Q2
V x Fb x Fa x 60
D x Fk x Ts1
V x Fa x 60
D x Ts2
Q2
(E08)
: 3.2 (2)
: Timbunan Pilihan
: M3
Analisa EI-322
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
U RAIAN
MOTOR GRADER
Panjang hamparan
Lebar Efektif kerja Blade
Lebar overlap
Faktor Efisiensi Alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 kali lintasan
- Lain-lain
= Lh : (v x 1000) x 60
Kapasitas Produksi/Jam =
Koefisien Alat / m3
2.d.
2.e.
Lh x (n(b-bo)+bo) x t x Fa x 60
Ts3 x n
= 1 : Q3
TANDEM
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kapasitas Prod./Jam
Koefisien Alat / m3
(v x 1000) x b x t x Fa
n
= 1 : Q4
Koefisien Alat / m3
2.f.
3.
pa x Fa x 60
1000 x Wc
= 1 : Q5
(E13)
Lh
b
bo
Fa
v
n
Ts3
T1
T2
Ts3
KOEF.
SATUAN
50.00
2.60
0.30
0.80
4.00
2.00
0.75
1.00
1.75
KETERANGAN
m
m
m
Panduan
Km / Jam
lintasan
menit
menit
menit
Q3
504.00
M3
(E13)
0.0020
Jam
(E17)
v
b
n
Fa
Q4
1.50
1.48
8.00
0.83
34.55
Km / jam
M
lintasan
M3
(E17)
0.0289
Jam
(E23)
V
Wc
pa
Fa
4.00
M3
0.07
M3
200.00 liter/menit
0.83
-
Q5
142.29
M3
(E23)
0.0070
Jam
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
Lump Sump
TENAGA
Produksi menentukan : DUMP TRUCK
Produksi Timbunan / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
KODE
= (Tk x P) : Qt
= (Tk x M) : Qt
Q1
Qt
2.30
16.13
M3/Jam
M3
P
M
4.00
1.00
orang
orang
(L01)
(L03)
1.7363
0.4341
Jam
Jam
: 3.2 (2)
: Timbunan Pilihan
: M3
Analisa EI-322
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
5.
U RAIAN
142,478.56 / M3.
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
: 3.3
: Penyiapan Badan Jalan
: M2
No.
I.
1
2
3
4
5
U RAIAN
II.
URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan yang telah
dipotong/diratakan oleh Motor Grader
3 Sekelompok pekerja akan membantu meratakan
badan jalan dengan alat bantu
III.
1.
2.
2.a.
ALAT
MOTOR GRADER
Panjang operasi grader sekali jalan
Lebar Efektif kerja Blade
Lebae overlap
Faktor Efisiensi Alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60
- Lain-lain
Koefisien Alat / m2
2.b.
Lh x (n*(b-bo)+bo) x Fa x 60
n x Ts1
= 1 : Q1
VIBRATOR ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kapasitas Produksi / Jam =
2.d.
3.
(v x 1000) x b x Fa
n
Koefisien Alat / m2 = 1 : Q2
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
Tk
(E13)
Lh
b
bo
Fa
v
n
Ts1
T1
T2
Ts1
Q1
KOEF.
SATUAN
KETERANGAN
7.00
Jam
50.00
2.60
0.30
0.80
4.00
4.00
M
M
Km / Jam
lintasan
0.75
1.00
1.75
menit
menit
menit
3,257.14
M2
(E13)
0.0003
Jam
(E19)
v
b
n
Fa
4.00
1.48
8.00
0.83
Km / jam
M
lintasan
-
Q2
614.20
M2
(E19)
0.0016
Jam
Lump Sum
TENAGA
Produksi menentukan : MOTOR GRADER
Produksi Pekerjaan / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M2
- Pekerja
- Mandor
KODE
ASUMSI
Pekerjaan dilaksanakan hanya pada tanah galian
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : jelek / belum padat
Jam kerja efektif per-hari
Analisa EI-33
= (Tk x P) : Qt
= (Tk x M) : Qt
Q1
Qt
3,257.14
22,800.00
P
M
4.00
1.00
(L01)
(L02)
0.0012
0.0003
M2/Jam
M2
orang
orang
Jam
Jam
Berlanjut ke halaman berikut
Analisa EI-33
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 3.3
PERKIRAAN VOL. PEK.
: Penyiapan Badan Jalan
TOTAL HARGA (Rp.)
: M2
0 % THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
B.
(L01)
(L02)
jam
jam
0.0012
0.0003
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
723.79
0.00
JUMLAH
HARGA
(Rp.)
5.57
2.20
7.76
0.00
BAHAN
C.
1.
2.
3
PERALATAN
Motor Grader
Vibro Roller
Alat Bantu
(E13)
(E19)
jam
jam
Ls
0.0003
0.0016
1.0000
343,794.00
334,542.74
0.00
3
4
105.55
544.68
0.00
650.23
: 3.3
: Penyiapan Badan Jalan
: M2
Analisa EI-33
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
U RAIAN
4.
5.
723.79 / M2
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
4
: 4.2 (1)
: Lps. Pond. Agg. Kls. A
: M3
URAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis Agregat padat
Berat isi padat
Jam kerja efektif per-hari
Lebar bahu jalan
Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Pasir Urug
Berat Isi Agregat (lepas)
Faktor kehilangan
- Agregat A
1.
BAHAN
- Agregat A
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
Kap. Prod. / jam =
Koefisien Alat / M3
2.b.
KODE
L
t
Bip
Tk
Lb
20-30
KOEF.
SATUAN
PU
Bil
Fh
8.73
0.15
1.81
7.00
1.00
28.00
42.00
30.00
1.51
1.05
KM
M
Jam
M
%
%
%
ton/m3
(M26)
1.25861
M3
(E15)
V
Fb
Fa
1.50
0.85
0.83
M3
-
T1
0.45
menit
Q1
117.71
M3
(E15)
0.0085
Jam
(E08)
V
Fa
v1
v2
3.50
0.80
20.00
30.00
ton
KM / Jam
KM / Jam
T1
T2
T3
T4
Ts2
1.18
26.18
17.45
2.00
46.81
menit
menit
menit
menit
menit
Q2
1.98
M3
0.5043
Jam
5-10&10-20
KETERANGAN
Gradasi harus
memenuhi Spec.
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Tandem Roller
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
III.
2.
2.a.
Analisa EI-421
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat =
(V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain termasuk menurunkan Agregat
Kap. Prod./jam =
Koefisien Alat / M3 = = 1 : Q2
V x Fa x 60
bip x Ts2
(E08)
(lepas)
kondisi sedang
panduan
Analisa EI-421
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 4.2 (1)
PERKIRAAN VOL. PEK.
: Lps. Pond. Agg. Kls. A
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0595
0.0085
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Agregat A
(M26)
M3
1.2586
245,166.36
PERALATAN
1
2
3
4
5
6
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu
E15
E08
E13
E17
E23
Jam
Jam
Jam
Jam
Jam
Ls
0.0085
0.5043
0.0094
0.0428
0.0141
1.0000
266,795.62
164,696.38
343,794.00
401,348.48
161,074.00
0.00
3
4
:
:
:
1.00
458,587.66
0.02
JUMLAH
HARGA
(Rp.)
269.52
60.79
330.32
308,568.65
308,568.65
2,266.49
83,053.72
3,221.63
17,192.97
2,264.09
0.00
107,998.91
: 4.2 (1)
: Lps. Pond. Agg. Kls. A
: M3
Analisa EI-421
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
URAIAN
MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu Siklus
- Perataan 1 lintasan = (Lh x 60) : (v x 1000)
- Lain-lain
Kap.Prod. / jam =
Koefisien Alat / M3
2.d.
Lh x b x t x Fa x 60
n x Ts3
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap.Prod. / jam =
Koefisien Alat / M3
2.e.
(v x 1000) x b x t x Fa
n
= 1 : Q4
WATERTANK TRUCK
Volume tangki air
Kebutuhan air / M3 agregat padat
Kapasitas pompa air
Faktor Efisiensi alat
Kap.Prod. / jam =
Koefisien Alat / M3
2.g.
3.
pa x Fa x 60
1000 x Wc
= 1 : Q5
(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3
KOEF.
SATUAN
50.00
1.00
0.83
4.00
2.00
M
M
KM / Jam
lintasan
0.75
1.00
1.75
menit
menit
menit
Q3
106.71
M3
(E13)
0.0094
Jam
(E17)
v
b
n
Fa
1.50
1.00
8.00
0.83
KM / Jam
M
lintasan
-
Q4
23.34
M3
(E17)
0.0428
Jam
(E23)
V
Wc
pa
Fa
4.00
M3
0.07
M3
100.00 liter/menit
0.83
-
Q5
71.14
M3
(E23)
0.0141
Jam
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Garpu
= 2 buah
KETERANGAN
1 x pp
Lump Sum
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
KODE
= (Tk x P) : Qt
= (Tk x M) : Qt
Q1
Qt
117.71
823.99
P
M
7.00
1.00
(L01)
(L03)
0.0595
0.0085
M3/Jam
M3
orang
orang
Jam
Jam
: 4.2 (1)
: Lps. Pond. Agg. Kls. A
: M3
Analisa EI-421
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
5.
URAIAN
458,587.66 / M3.
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
Analisa EI-422
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 4.2 (2)
PERKIRAAN VOL. PEK.
: Lps. Pond. Ag. Kls. B, CBR Min 60% TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0595
0.0085
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Agregat B
(M27)
M3
1.2586
226,389.88
PERALATAN
1
2
3
4
5
6
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu
E15
E08
E13
E17
E23
Jam
Jam
Jam
Jam
Jam
Ls
0.0085
0.5043
0.0094
0.0428
0.0141
1.0000
266,795.62
164,696.38
343,794.00
401,348.48
161,074.00
0.00
3
4
:
:
:
1.00
432,592.18
0.02
JUMLAH
HARGA
(Rp.)
269.52
60.79
330.32
284,936.40
284,936.40
2,266.49
83,053.72
3,221.63
17,192.97
2,264.09
0.00
107,998.91
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
4
III.
1.
2.
2.a.
: 4.2 (2)
: Lps. Pond. Ag. Kls. B, CBR Min 60%
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis Agregat padat
Berat isi padat
Jam kerja efektif per-hari
Lebar bahu jalan
Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu
Berat volume agregat (lepas)
- Agregat B
KODE
L
t
Bip
Tk
Lb
20-30
KOEF.
SATUAN
St
Bil
Fh
8.73
0.15
1.81
7.00
1.00
18.00
18.00
64.00
1.51
1.05
(M27)
1.2586
M3
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu siklus
- Memuat dan lain-lain
(E15)
V
Fb
Fa
Ts1
T1
1.50
0.85
0.83
M3
-
0.45
menit
Ts1
0.45
menit
Q1
117.71
M3
(E15)
0.0085
Jam
(E08)
V
Fa
v1
v2
3.50
0.80
20.00
30.00
ton
KM / Jam
KM / Jam
T1
T2
T3
T4
Ts2
1.18
26.18
17.45
2.00
46.81
menit
menit
menit
menit
menit
Q2
1.98
M3
0.5043
Jam
5-10&10-20
KETERANGAN
KM
M
Jam
M
%
%
%
ton/m3
Gradasi harus
memenuhi
Spesifikasi
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Tandem Roller
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
Analisa EI-422
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat =
(V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain termasuk menurunkan Agregat
V x Fa x 60
Ts2 x Bip
= 1 : Q2
(E08)
Pemuatan lepas
sedang
panduan
: 4.2 (2)
: Lps. Pond. Ag. Kls. B, CBR Min 60%
: M3
Analisa EI-422
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
URAIAN
MOTOR GRADER
Panjang hamparaan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu Siklus
- Perataan 1 lintasan = (Lh x 60) : (v x 1000)
- Lain-lain
Kap.Prod. / jam =
Koefisien Alat / M3
2.d.
Lh x b x t x Fa x 60
n x Ts3
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap.Prod./jam =
Koefisien Alat / M3
2.e.
(v x 1000) x b x t x Fa
n
= 1 : Q4
WATER TANKER
Volume Tangki air
Kebutuhan air / M3 agregat padat
Kapasitas pompa air
Faktor efisiensi alat
Kap. Prod. / Jam =
Koefisien Alat / M3
pa x Fa x 60
1000 x Wc
= 1 : Q5
KODE
(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3
KOEF.
SATUAN
50.00
1.00
0.83
4.00
2.00
M
M
KM / Jam
lintasan
0.75
1.00
1.75
menit
menit
menit
Q3
106.71
M3
(E13)
0.0094
Jam
(E17)
v
b
n
Fa
1.50
1.00
8.00
0.83
KM / Jam
M
lintasan
-
Q4
23.34
M3
(E17)
0.0428
Jam
(E23)
V
Wc
pa
Fa
4.00
M3
0.07
M3
100.00 liter/menit
0.83
-
Q5
71.14
M3
(E23)
0.0141
Jam
Q1
Qt
117.71
823.99
M3/Jam
M3
P
M
7.00
1.00
KETERANGAN
1 x pp
Lump Sum
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Garpu
= 2 buah
3.
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L03)
0.0595
0.0085
orang
orang
Jam
Jam
: 4.2 (2)
: Lps. Pond. Ag. Kls. B, CBR Min 60%
: M3
Analisa EI-422
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
5.
URAIAN
432,592.18 / M3.
6.
7.
KODE
KOEF.
SATUAN
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
4
III.
1.
1.a.
: 4.2 (5)
: Agregat Penutup BURTU
: M2
URAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pekerjaan ini tidak termasuk aspal
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
Tebal SBST
Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
V - loading
KODE
KOEF.
SATUAN
L
Tk
Fp
t
8.73
7.00
1.15
1.50
Km
Jam
Cm
Ld
1.30
Cm
V x Fb x Fa x 60 x 100
Fp x Ts1 x t
(M04)
Bj
KETERANGAN
1.90 Ton/M3
(M04)
33
(E15)
V
Fb
Fa
Ts1
1.50
0.85
0.83
0.45
Kg.
M3
menit
Q1
8,179.71
M2
= 1 : Q1
(E15)
0.00012
Jam
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat =
(V x 60 x 100)/(Fp x Ts2 x t x Bj)
- Waktu tempuh isi = (L : v1) x 60 menit
- Menumpahkan =
- Waktu tempuh kosong = (L : v2) x 60 menit
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Koefisien Alat / M2
2.b.
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam Dump
Tuck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan langsung dihampar secara manual
Hamparan material dipadatkan dengan menggunakan
Pneumatic Tire Roller
Selama pemadatan, sekelompok pekerja akan
merapikan hamparan dengan menggunakan Alat Bantu
2
2.a.
Analisa EI-425
Kap. Prod./jam =
Koefisien Alat / M2
V x Fa x 60 x 100
Fp x Ts2 x t x Bj
= 1 : Q2
3.50
0.80
20.00
30.00
lihat tabel
V - Loading
ton
kondisi sedang
KM / Jam
KM / Jam
0.78
26.18
2.00
17.45
46.41
menit
menit
menit
menit
menit
Q2
110.45
M2
(E08)
0.0091
Jam
Berlanjut ke hal. berikut.
Analisa EI-425
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 4.2 (5)
PERKIRAAN VOL. PEK.
: Agregat Penutup BURTU
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L02)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0024
0.0001
HARGA
SATUAN
(Rp.)
BAHAN
1.
Chipping
(M41)
Kg
33.0000
4,532.31
7,156.29
111.51
PERALATAN
1.
2.
3.
4.
Wheel Loader
Dump Truck
P. Tyre Roller
Alat Bantu
E15
E08
E18
Jam
Jam
Jam
Ls
0.0001
0.0091
0.0010
1.0000
266,795.62
164,696.38
353,700.54
0.00
3
4
1.00
6,113.93
0.00
JUMLAH
HARGA
(Rp.)
:
:
:
11.08
0.87
11.96
3,679.79
3,679.79
32.62
1,491.12
342.63
0.00
1,866.37
: 4.2 (5)
: Agregat Penutup BURTU
: M2
Analisa EI-425
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
2.c.
URAIAN
Koefisien Alat / M2
2.d.
3.
KODE
(E18)
v
b
n
Fa
(v x 1000) x b x Fa
n
= 1 : Q3
Q3
(E18)
KOEF.
SATUAN
2.50
1.99
4.00
0.83
Km/Jam
M
lintasan
1,032.31
M2
0.0009687
Jam
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu lidi
= 2 buah
Panduan
Lump Sum
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
KETERANGAN
6,113.93 / M2.
6.
7.
Q1
Qt
8,179.71
57,257.97
M2
M2
P
M
20.00
1.00
orang
orang
(L01)
(L02)
0.0024
0.0001
Jam
Jam
: 4.2 (6)
: Bahan aspal untuk Pekerjaan Pelaburan
: LITER
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal Pen 60 atau Pen 80
- Minyak Tanah / Pencair
Berat jenis bahan :
- Aspal Pen 60 atau Pen 80
- Minyak Tanah / Pencair
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Minyak Tanah
3.
= As x Pc x D1 : 100
= K x Pc : 100
ALAT
APHALT DISTRIBUTOR
Lebar penyemprotan
Faktor efisiensi kerja
Kapasitas pompa aspal
KODE
KOEF.
SATUAN
L
Tk
Fh
8.73
7.00
1.10
KM
Jam
-
As
K
95.24
4.76
%
%
D1
D2
1.03
0.80
Kg / Ltr
Kg / Ltr
Pc
1.10
liter
(M10)
(M11)
1.08
0.052
Kg
liter
KETERANGAN
100 bagian
5 bagian
URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
Angkutan Aspal dan Minyak Tanah menggunakan
Dump Truck
III.
2.
2.a.
Analisa EI-426
(E41)
b
Fa
pas
pas x Fa x 60
= 1 : Q1
AIR COMPRESOR
Q1
(E41)
Campuran
3.00
M
0.80
kondisi sedang
100 liter/menit
4,800.00
0.0002
liter
Jam
4,800.00
liter
0.0002
Jam
(E05)
= 1 : Q2
TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
(E05)
Q1
Qt
4,800.00
33,600.00
P
M
10.00
2.00
Ltr/Jam
Liter
orang
orang
Analisa EI-426
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 4.2 (6)
PERKIRAAN VOL. PEK.
: Bahan aspal untuk Pekerjaan PelaburaTOTAL HARGA (Rp.)
: LITER
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0021
0.0004
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Aspal
Minyak Tanah
(M10)
(M11)
Kg
Liter
1.0790
0.0524
6,400.00
1,650.00
PERALATAN
1.
2.
Jam
Jam
0.0002
0.0002
254,201.23
111,049.38
3
4
:
:
:
1.00
7,788.94
0.00
JUMLAH
HARGA
(Rp.)
9.44
2.98
12.42
6,905.90
86.43
6,992.33
52.96
23.14
76.09
: 4.2 (6)
: Bahan aspal untuk Pekerjaan Pelaburan
: LITER
Analisa EI-426
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
URAIAN
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7,788.94 / Liter
6.
7.
KODE
(L01)
(L03)
KOEF.
0.0021
0.0004
SATUAN
Jam
Jam
KETERANGAN
: 4.2 (7)
: Lapis Resap Pengikat
: LITER
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal Pen 60 atau Pen 80
- Kerosene
Berat jenis bahan :
- Aspal Pen 60 atau Pen 80
- Minyak Flux / Pencair
Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan :
( 1 liter x Fh )
1.a.
1.b.
Aspal
Minyak Flux
2.
2.a.
ALAT
ASPHALT DISTRIBUTOR
Lebar penyemprotan
Kecepatan penyemprotan
Kapasitas pompa aspal
Faktor effisiensi kerja
= As x PC x D1
= K x PC
KODE
KOEF.
SATUAN
L
Tk
Fh
8.73
7.00
1.10
As
K
56
44
D1
D2
1.03
0.80
Kg / liter
Kg / liter
PC
1.10
liter
0.6345
0.4840
Kg.
liter
pas x Fa x 60
= 1 : Q1
AIR COMPRESSOR
(M10)
(M11)
(E41)
b
V
pas
Fa
KETERANGAN
KM
Jam
%
%
100 bagian
80 bagian
Q1
3.00
M
30.00 m/menit Asumsi
100 liter/menit Panduan
0.80
Sedang
4,800.00
liter
0.0002
Jam
4,800.00
liter
0.0002
Jam
Q4
Qt
4,800.00
33,600.00
liter
liter
P
M
10.00
2.00
(E03)
Campuran
(E05)
3.
URUTAN KERJA
Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis.
Angkutan Aspal & Minyak Flux menggunakan Dump
Truck
III.
2.b.
Analisa EI-427
= 1 : Q2
TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR
Produksi Lapis Resap Pengikat / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
Q2
(E05)
orang
orang
Analisa EI-427
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 4.2 (7)
PERKIRAAN VOL. PEK.
: Lapis Resap Pengikat
TOTAL HARGA (Rp.)
: LITER
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0021
0.0004
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Aspal
Kerosene
(M10)
(M11)
Kg
liter
0.6345
0.4840
6,400.00
1,650.00
PERALATAN
1.
2.
Asp. Distributor
Air Compresor (E05)
E41
Jam
Jam
0.0002
0.0002
254,201.23
111,049.38
3
4
:
:
:
1.00
5,442.57
0.00
JUMLAH
HARGA
(Rp.)
9.44
2.98
12.42
4,060.67
798.60
4,859.27
52.96
23.14
76.09
: 4.2 (7)
: Lapis Resap Pengikat
: LITER
Analisa EI-427
URAIAN ANALISA HARGA SATUAN
Lanjutan
No.
URAIAN
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
5,442.57 / liter.
6.
7.
KODE
(L01)
(L03)
KOEF.
0.0021
0.0004
SATUAN
Jam
Jam
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
III.
1.
2.
2.a.
: 5.1 (1)
: Lps. Pond. Agg. Kls. A
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Pasir Urug
Berat Isi Agregat (lepas)
Faktor kehilangan
- Agregat A
KODE
L
t
Bip
Tk
20-30
5-10&10-20
PU
Bil
Fh1
KOEF.
8.73
0.15
1.81
7.00
28.00
42.00
30.00
1.51
1.05
SATUAN
KM
M
jam
%
%
%
ton/m3
URUTAN KERJA
Wheel Loader memuat Agregat campuran ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat kelas A ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
- Agregat A
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
Kap. Prod. / jam =
Koefisien Alat / M3
2.b.
V x Fb x Fa x 60
(Bip/Bil) x T1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
(M26)
###
M3
(E15)
V
Fb
Fa
1.50
0.85
0.83
M3
-
T1
0.45
menit
Q1
117.71
M3
(E15)
0.0085
jam
(E08)
V
Fa
v1
v2
3.50
0.80
20.00
30.00
ton
KM/jam
KM/jam
T1
T2
1.18
26.18
menit
menit
T3
T4
Ts2
17.45
2.00
46.81
menit
menit
menit
Q2
1.98
M3
0.5043
jam
Koefisien Alat / M3
V x Fa x 60
Ts2 x Bip
= 1 : Q2
(E08)
Berlanjut ke h
Analisa EI-511
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Gradasi harus
memenuhi Spec.
(lepas)
kondisi sedang
panduan
Analisa EI-511
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 5.1 (1)
PERKIRAAN VOL. PEK.
: Lps. Pond. Agg. Kls. A
TOTAL HARGA
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
0.0595
0.0085
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Aggrgat A
M26
M3
1.2586
245,166.36
PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu
(E15)
(E08)
(E13)
(E17)
(E23)
jam
jam
jam
jam
jam
Ls
0.0085
0.5043
0.0039
0.0357
0.0141
1.0000
266,795.62
164,696.38
343,794.00
401,348.48
161,074.00
0.00
:
:
:
1.00
453,368.40
0.02
JUMLAH
HARGA
(Rp.)
269.52
60.79
330.32
308,568.65
308,568.65
2,266.49
83,053.72
1,342.35
14,327.48
2,264.09
0.00
103,254.13
3
4
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
: 5.1 (1)
: Lps. Pond. Agg. Kls. A
: M3
No.
2.c.
U RAIAN
MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu Siklus :
- Perataan 1 lintasan = Lh : (v x 1000) x 60
- Lain-lain
2.d.
50.00
2.40
0.83
4.00
2.00
M
M
KM/jam
lintasan
0.75
1.00
1.75
menit
menit
menit
(E13)
0.0039
jam
(E17)
v
b
n
Fa
1.50
1.20
8.00
0.83
KM/jam
M
lintasan
-
Q4
28.01
M3
= 1 : Q4
(E19)
0.0357
jam
(E23)
V
Wc
pa
Fa
4.00
0.07
100.00
0.83
M3
M3
liter/menit
-
Q5
71.14
M3
(E23)
0.0141
jam
Q1
Qt
117.71
823.99
M3/jam
M3
P
M
7.00
1.00
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
(v x 1000) x b x t x Fa
n
3.
SATUAN
M3
Koefisien Alat / M3
2.g.
(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3
KOEF.
256.11
2.e.
KODE
Q3
Koefisien Alat / M3
Lh x b x t x Fa x 60
n x Ts3
pa x Fa x 60
1000 x Wc
Koefisien Alat / M3
= 1 : Q5
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 2 buah.
= 3 buah.
= 2 buah.
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
= (Tk x P) : Qt
(L01)
0.0595
orang
orang
jam
- Mandor
4.
= (Tk x M) : Qt
(L03)
0.0085
jam
Berlanjut ke h
Analisa EI-511
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
1 x pp
Lump Sum
: 5.1 (1)
: Lps. Pond. Agg. Kls. A
: M3
No.
5.
U RAIAN
453,368.40 / M3.
6.
7.
KODE
KOEF.
SATUAN
Analisa EI-511
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
III.
1.
2.
2.a.
: 5.1 (2)
: Lps. Pond. Agg. Kls. B
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu
Berat volume agregat (lepas)
Faktor kehilangan
- Agregat Pecah Mesin 20 - 30 mm
Faktor kehilangan
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu
Faktor kehilangan
URUTAN KERJA
Wheel Loader mencampur dan memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Agregat B
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
2.b.
KODE
L
t
Bip
Tk
20-30
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
KOEF.
SATUAN
St
Bil
Fh1
Fh2
Fh3
8.73
0.15
1.81
7.00
18.00
18.00
64.00
1.51
1.05
1.05
1.05
jam
%
%
%
ton/m3
(M27)
1.2586
M3
1.50
0.85
0.83
M3
-
0.45
0.45
menit
menit
5-10&10-20
(E15)
V
Fb
Fa
Ts1
T1
Ts1
KM
M
Q1
117.71
M3
(E15)
0.0085
jam
(E08)
V
Fa
v1
v2
3.50
0.83
20.00
30.00
ton
KM/jam
KM/jam
T1
T2
T3
T4
Ts2
1.18
26.18
17.45
2.00
46.81
menit
menit
menit
menit
menit
Q2
2.06
M3
0.4861
jam
Koefisien Alat / M3
V x Fa x 60
Ts2 x Bip
= 1 : Q2
Berlanjut ke h
Analisa EI-512
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Gradasi harus
memenuhi
Spesifikasi
lepas
kondisi sedang
panduan
Analisa EI-512
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 5.1 (2)
PERKIRAAN VOL. PEK.
: Lps. Pond. Agg. Kls. B
TOTAL HARGA
: M3
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
0.0595
0.0085
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Aggregat B
M27
M3
1.2586
226,389.88
PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu
(E15)
(E08)
(E13)
(E17)
(E23)
jam
jam
jam
jam
jam
Ls
0.0085
0.4861
0.0039
0.0178
0.0141
1.0000
266,795.62
164,696.38
343,794.00
401,348.48
161,074.00
0.00
:
:
:
1.00
416,190.68
0.02
JUMLAH
HARGA
(Rp.)
269.52
60.79
330.32
284,936.40
284,936.40
2,266.49
80,051.78
1,342.35
7,163.74
2,264.09
0.00
93,088.44
3
4
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
: 5.1 (2)
: Lps. Pond. Agg. Kls. B
: M3
No.
2.c.
U RAIAN
MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu Siklus :
- Perataan 1 lintasan = Lh : (v x 1000) x 60
- Lain-lain
2.d.
50.00
2.40
0.83
4.00
2.00
M
M
KM/jam
lintasan
0.75
1.00
1.75
menit
menit
menit
(E13)
0.0039
jam
(E17)
v
b
n
Fa
3.00
1.20
8.00
0.83
KM/jam
M
lintasan
-
Q4
56.03
M3
= 1 : Q4
(E17)
0.0178
jam
(E23)
V
Wc
pa
Fa
4.00
0.07
100.00
0.83
M3
M3
liter/menit
-
Q6
71.14
M3
(E23)
0.0141
jam
Q1
Qt
117.71
823.99
M3/jam
M3
P
M
7.00
1.00
0.0595
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
(v x 1000) x b x t x Fa
n
3.
SATUAN
M3
Koefisien Alat / M3
2.g.
(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3
KOEF.
256.11
2.e.
KODE
Q3
Koefisien Alat / M3
Lh x b x t x Fa x 60
n x Ts3
pa x Fa x 60
Wc x 1000
Koefisien Alat / M3
= 1 : Q6
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 2 buah.
= 3 buah.
= 2 buah.
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
= (Tk x P) : Qt
orang
orang
jam
- Mandor
4.
= (Tk x M) : Qt
0.0085
jam
Berlanjut ke h
Analisa EI-512
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
1 x pp
Lump Sum
: 5.1 (2)
: Lps. Pond. Agg. Kls. B
: M3
No.
5.
U RAIAN
416,190.68 / M3.
6.
7.
KODE
KOEF.
SATUAN
Analisa EI-512
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
: 5.2 (1)
: Lapis Pondasi Agregat Kelas C
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis Agregat padat
Berat isi padat
Jam kerja efektif per-hari
Berat isi agregat (lepas)
Faktor kehilangan
- Agregat C
1.
BAHAN
Material Agregat Kelas C hasil produksi di Base Camp
Setiap 1 M3 Agregat padat diperlukan : 1 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu siklus
- Muat
L
t
Bip
Tk
Bil
Fh
Koefisien Alat / M3
(M28)
KOEF.
8.73
0.15
1.81
7.00
1.51
1.05
SATUAN
KM
M
Jam
ton/M3
1.2586
M3
1.50
0.85
0.83
M3
-
0.45
0.45
menit
menit
Q1
77.96
M3
(E15)
0.0128
Jam
(E08)
V
Fa
v1
v2
3.50
0.80
20.00
30.00
ton
KM/jam
KM/jam
T1
T2
1.78
26.18
menit
menit
(E15)
V
Fb
Fa
Ts1
T1
Ts1
2.b.
KODE
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam Dump
Tuck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaandan dihampar dengan Motor Grader
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Tandem
Roller
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
III.
2.
2.a.
V x Fb x Fa x 60
Fk x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu memuat =
(V x 60)/(Q1 x Bj)
- Waktu tempuh isi = (L : v1) x 60 menit
T3
T4
Ts2
17.45
2.00
47.41
menit
menit
menit
Kap. Prod./jam =
Q2
2.35
M3
0.4261
Jam
Koefisien Alat / M3
V x Fa x 60
Ts2 x Bj
= 1 : Q2
(E08)
Berlanjut ke h
Analisa EI-521
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Agregat lepas
(lepas)
Pemuatan sedang
panduan
Analisa EI-521
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 5.2 (1)
PERKIRAAN VOL. PEK.
: Lapis Pondasi Agregat Kelas C
TOTAL HARGA
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
PERKIRAAN
SATUAN KUANTITAS
Jam
Jam
0.0898
0.0128
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
M3
1.2586
210,248.97
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
Motor Grader
Tandem Roller
Water Tanker
Alat Bantu
(E15)
(E08)
(E13)
(E17)
(E23)
Jam
Jam
Jam
Jam
Jam
Ls
0.0128
0.4261
0.0039
0.0357
0.0141
1.0000
266,795.62
164,696.38
343,794.00
401,348.48
161,074.00
0.00
:
:
:
1.00
392,321.88
0.02
JUMLAH
HARGA
(Rp.)
406.98
91.80
498.78
264,621.31
264,621.31
3,422.40
70,179.86
1,342.35
14,327.48
2,264.09
0.00
91,536.17
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
: 5.2 (1)
: Lapis Pondasi Agregat Kelas C
: M3
No.
2.c.
U RAIAN
MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu Siklus
- Perataan 1 lintasan = (Lh x 60) : (v x 1000)
- Lain-lain
Kap.Prod. / jam =
Koefisien Alat / M3
2.d.
Lh x b x t x Fa x 60
n x Ts3
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap.Prod. / jam =
Koefisien Alat / M3
2.e.
(v x 1000) x b x t x Fa
n
= 1 : Q4
WATERTANK TRUCK
Volume tangki air
Kebutuhan air / M3 agregat padat
Kapasitas pompa air
Faktor Efisiensi alat
Kap.Prod. / jam =
Koefisien Alat / M3
pa x Fa x 60
Wc x 1000
= 1 : Q5
2.g.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Garpu
= 2 buah
3.
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3
KODE
(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3
KOEF.
SATUAN
50.00
2.40
0.83
4.00
2.00
M
M
KM / Jam
lintasan
0.75
1.00
1.75
menit
menit
menit
Q3
256.11
M3
(E13)
0.0039
Jam
(E17)
v
b
n
Fa
1.50
1.20
8.00
0.83
KM / Jam
M
lintasan
-
Q4
28.01
M3
(E17)
0.0357
Jam
(E23)
V
Wc
pa
Fa
4.00
0.07
100.00
0.83
M3
M3
liter/menit
-
Q5
71.14
M3
(E23)
0.0141
Jam
Q1
Qt
77.96
545.69
M3 / Jam
M3
P
M
7.00
1.00
orang
orang
- Pekerja
- Mandor
4.
= (Tk x P) : Qt
= (Tk x M) : Qt
(L01)
(L03)
0.0898
0.0128
Jam
Jam
Berlanjut ke h
Analisa EI-521
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
1 x pp
Lump Sum
: 5.2 (1)
: Lapis Pondasi Agregat Kelas C
: M3
No.
5.
U RAIAN
392,321.88 / M3.
6.
7.
KODE
KOEF.
SATUAN
Analisa EI-521
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
: 6.1 (1)
: Lapis Resap Pengikat
: Liter
No.
I.
1
2
3
4
5
6
II.
1
2
3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal Pen 60 atau Pen 80
- Kerosene
Berat isi bahan :
- Aspal Pen 60 atau Pen 80
- Kerosene
Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
L
Tk
Fh
As
K
D1
D2
URUTAN KERJA
Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.
III.
1.
BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan :
( 1 liter x Fh )
1.a.
1.b.
Aspal
Kerosene
2.
2.a.
ALAT
ASPHALT DISTRIBUTOR
Lebar penyemprotan
Kecepatan penyemprotan
Kapasitas pompa aspal
Faktor effisiensi kerja
= As x PC x D1
= K x PC
KODE
AIR COMPRESSOR
(E41)
b
V
pas
Fa
Q1
(E41)
(E05)
(M10)
(M11)
pas x Fa x 60
= 1 : Q1
PC
= 1 : Q2
Q2
(E05)
3.
TENAGA
Produksi menentukan : ASPHALT DISTRIBUTOR
Produksi Lapis Resap Pengikat / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
Q4
Qt
P
M
Analisa EI-611
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
8.73
7.00
1.03
64
36
KETERANGAN
KM
Jam
%
%
1.03
0.80
Kg / liter
Kg / liter
1.03
liter
0.6790
0.3708
Kg.
Liter
terhadap volume
terhadap volume
3.00
M
30.00 m/menit Asumsi
100 liter/menit Panduan
0.80
Sedang
4,800.00
liter
0.0002
Jam
4,800.00
liter
0.0002
Jam
4,800.00
33,600.00
10.00
2.00
liter
liter
orang
orang
Analisa EI-611
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 6.1 (1)
PERKIRAAN VOL. PEK.
: Lapis Resap Pengikat
TOTAL HARGA (Rp.)
: Liter
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0021
0.0004
HARGA
SATUAN
(Rp.)
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Aspal
Kerosene
(M10)
(M11)
Kg
liter
0.6790
0.3708
6,400.00
1,650.00
PERALATAN
1.
2.
Asp. Distributor
Compressor
E41
E05
Jam
Jam
0.0002
0.0002
254,201.23
111,049.38
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-611
AN
1.00
5,550.36
0.00
JUMLAH
HARGA
(Rp.)
9.44
2.98
12.42
4,345.45
611.82
4,957.27
52.96
23.14
76.09
5,045.78
504.58
5,550.36
n, volume dan/atau ukuran
: 6.1 (1)
: Lapis Resap Pengikat
: Liter
No.
U RAIAN
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
5,550.36 / liter.
6.
7.
KODE
(L01)
(L03)
Analisa EI-611
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
0.0021
0.0004
Jam
Jam
KETERANGAN
Analisa EI-612
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 6.1 (2)
PERKIRAAN VOL. PEK.
: Lapis Perekat
TOTAL HARGA (Rp.)
: Liter
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0021
0.0004
HARGA
SATUAN
(Rp.)
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Aspal
Kerosene
(M10)
(M11)
Kg
liter
0.8487
0.2060
6,400.00
1,650.00
PERALATAN
1.
2.
Asp. Distributor
Compressor
E41
E05
Jam
Jam
0.0002
0.0002
254,201.23
111,049.38
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-612
AN
1.00
6,446.25
0.00
JUMLAH
HARGA
(Rp.)
9.44
2.98
12.42
5,431.81
339.90
5,771.71
52.96
23.14
76.09
5,860.23
586.02
6,446.25
n, volume dan/atau ukuran
: 6.1 (2)
: Lapis Perekat
: Liter
No.
I.
1
2
3
4
5
6
II.
1
2
3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran (Spesifikasi) :
- Aspal Pen 60 atau Pen 80
- Kerosene
Berat isi bahan :
- Aspal Pen 60 atau Pen 80
- Kerosene
Bahan dasar (aspal & minyak pencair) semuanya
diterima di lokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis Resap Pengikat
diperlukan :
( 1 liter x Fh )
1.a.
1.b.
Aspal
Kerosene
2.
2.a.
ALAT
ASPHALT DISTRIBUTOR
Lebar penyemprotan
Kecepatan penyemprotan
Kapasitas pompa aspal
Faktor effesiensi kerja
= As x PC x D1
= K x PC
As
K
D1
D2
= 1 : Q1
AIR COMPRESSOR
PC
(M10)
(M11)
(E41)
b
v
pas
Fa
pas x Fa x 60
Q1
(E41)
(E05)
3.
L
Tk
Fh
URUTAN KERJA
Aspal dan Minyak Flux dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compressor
Campuran aspal cair disemprotkan dengan Asphalt
Distributor ke atas permukaan yang akan dilapis.
III.
2.b.
KODE
= 1 : Q2
Q1
(E05)
= (Tk x P) : Qt
= (Tk x M) : Qt
Q4
Qt
P
M
(L01)
(L03)
Analisa EI-612
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
8.73
7.00
1.03
80
20
KETERANGAN
KM
Jam
%
%
1.03
0.80
Kg / liter
Kg / liter
1.03
liter
0.8487
0.2060
Kg
liter
terhadap volume
terhadap volume
3.00
M
30.00 M/menit asumsi
100 liter/menit Panduan
0.80
sedang
4,800.00
liter
0.0002
Jam
4,800.00
liter
0.0002
Jam
4,800.00
33,600.00
liter
liter
10.00
2.00
orang
orang
0.0021
0.0004
Jam
Jam
: 6.1 (2)
: Lapis Perekat
: Liter
No.
U RAIAN
4.
5.
6,446.25 / liter.
6.
7.
KODE
Analisa EI-612
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
: 6.2 (1)
: Agregat Penutup BURTU
: M2
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pekerjaan ini tidak termasuk aspal
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Berat Isi Agregat Chipping :
padat
lepas
Faktor Kehilangan
Tebal SBST
Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan material ukuran
KODE
L
Tk
Bip
Bil
Fh
t
Ld
URUTAN KERJA
1
2
3
4
III.
1.
1.a.
2
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
(E15)
V
Fb
Fa
Ts1
V - loading
Koefisien Alat / M2
(M04)
V x Fb x Fa x 60 x 100
(Bip/Bil) x Ts1 x t
= 1 : Q1
Q1
(E15)
Analisa EI-621
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
8.73
7.00
1.47
1.27
1.05
1.50
Km
Jam
-
1.30
Cm
23
Kg.
1.50
0.85
0.83
0.45
KETERANGAN
Cm
M3
menit
8,126.85
M2
0.00012
Jam
lihat tabel
V - Loading
Analisa EI-621
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 6.2 (1)
PERKIRAAN VOL. PEK.
: Agregat Penutup BURTU
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0025
0.0001
HARGA
SATUAN
(Rp.)
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Chipping
(M41)
Kg
23.0000
111.51
PERALATAN
1.
2.
3.
4.
Wheel Loader
Dump Truck
P. Tyre Roller
Alat Bantu
E15
E08
E18
Jam
Jam
Jam
Ls
0.0001
0.0062
0.0010
1.0000
266,795.62
164,696.38
353,700.54
10.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-621
AN
1.00
4,375.54
0.00
JUMLAH
HARGA
(Rp.)
11.15
0.88
12.03
2,564.70
2,564.70
32.83
1,015.57
342.63
10.00
1,401.03
3,977.77
397.78
4,375.54
n, volume dan/atau ukuran
: 6.2 (1)
: Agregat Penutup BURTU
: M2
No.
2.b.
U RAIAN
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat =
(V x 60 x 100)/(Q1 x Bil x t )
- Waktu tempuh isi
= (L : v1) x 60 menit
- Menumpahkan =
- Waktu tempuh kosong
= (L : v2) x 60 menit
Kap. Prod./jam =
Koefisien Alat / M2
2.c.
V x Fa x 60 x 100
Bip x Ts2 x t
= 1 : Q2
(v x 1000) x b x Fa
n
= 1 : Q3
Q3
(E18)
2.d.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu lidi
= 2 buah
3.
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
4.
Q2
(E18)
v
b
n
Fa
Kap.Prod. / jam =
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
(E08)
Koefisien Alat / M2
KODE
= (Tk x P) / Qt
= (Tk x M) / Qt
Q1
Qt
P
M
(L01)
(L02)
Analisa EI-621
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
3.50
0.80
20.00
30.00
ton
kondisi sedang
KM / Jam
KM / Jam
1.36
26.18
2.00
17.45
46.98
menit
menit
menit
menit
menit
162.17
M2
0.0062
Jam
2.50
1.99
4.00
0.83
KETERANGAN
Km/Jam
M
lintasan
1,032.31
M2
0.00097
Jam
Panduan
Lump Sum
8,126.85
56,887.94
M2
M2
20.00
1.00
orang
orang
0.0025
0.0001
Jam
Jam
: 6.2 (1)
: Agregat Penutup BURTU
: M2
No.
5.
U RAIAN
Rp.
4,375.54 / M2.
6.
7.
KODE
Analisa EI-621
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
: 6.2 (2)
: Agregat Penutup BURDA
: M2
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pekerjaan ini tidak termasuk aspal
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Berat Isi Agregat Chipping :
padat
lepas
Faktor Kehilangan
Tebal DBST
Lapisan DBST terdiri dari (spesifikasi) :
- Lapisan pertama ukuran normal = 13 mm
- Lapis kedua ukuran normal
KODE
L
Tk
Bip
Bil
Fh
t
Ld
URUTAN KERJA
1
2
3
4
III.
1.
1.a.
(M04)
ALD
m2/m3
V1
V2
B1
1.b.
(M04)
B2
1.c.
Bt
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
V - Loading
(E15)
V
Fb
Fa
Ts1
Ts1
Koefisien Alat / M2
V x Fa x Fb x 60 x 100
(Bip/Bil) x Ts x t
= 1 : Q1
Q1
(E15)
Analisa EI-622
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
8.73
7.00
1.47
1.27
1.05
2.50
KM
jam
-
6.00
mm
6.70
99.40
m2/m3
0.0101
M3
0.0148
M3
0.0088
M3
35
Kg.
1.50
0.85
0.83
0.45
0.45
Cm
M3
menit
menit
KETERANGAN
4,876.11
M2
0.0002
Jam
Analisa EI-622
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 6.2 (2)
PERKIRAAN VOL. PEK.
: Agregat Penutup BURDA
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0041
0.0002
HARGA
SATUAN
(Rp.)
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Chipping
(M41)
Kg
35.0000
111.51
PERALATAN
1.
2.
3.
4.
Wheel Loader
Dump Truck
P. Tyre Roller
Alat Bantu
E15
E08
E18
Jam
Jam
Jam
Ls
0.0002
0.0102
0.0019
1.0000
266,795.62
164,696.38
353,700.54
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-622
AN
1.00
6,983.69
0.00
JUMLAH
HARGA
(Rp.)
18.59
1.47
20.06
3,902.81
3,902.81
54.71
1,685.97
685.26
0.00
2,425.94
6,348.81
634.88
6,983.69
n, volume dan/atau ukuran
: 6.2 (2)
: Agregat Penutup BURDA
: M2
No.
2.b.
U RAIAN
DUMP TRUCK (DT)
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat =
(V x 60 x 100)/(Q1 x Bip x t)
- Waktu tempuh isi = (L : v1) x 60 menit
- Menumpahkan =
- Waktu tempuh kosong = (L : v2) x 60 menit
Koefisien Alat / M2
2.e.
V x Fa x 60 x 100
Bip x Ts2 x t
= 1 : Q2
Koefisien Alat / M2
= 1 : Q3
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu Lidi
= 2 buah
3.
TENAGA
Produksi menentukan : Wheel Loader
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
Q2
(E18)
v
b
n
Fa
(v x 1000) x b x Fa
nx2
2.d.
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T2
Ts2
(E08)
KODE
Q3
(E18)
Q1
Qt
P
M
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
(L01)
(L03)
6,983.69 / M2.
6.
7.
Analisa EI-622
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
3.50
0.80
20.00
30.00
KETERANGAN
ton
kondisi sedang
KM / Jam
KM / Jam
1.17
26.18
2.00
17.45
46.80
menit
menit
menit
menit
menit
97.69
M2 / Jam
0.0102
Jam
2.50
1.990
4.00
0.83
Km/Jam
M
lintasan
516.16
M2
0.0019
Jam
Panduan
Lump Sum
4,876.11
34,132.76
M2
M2
20.00
1.00
orang
orang
0.0041
0.0002
Jam
Jam
: 6.2 (3)
: Bahan Aspal untuk Pekerjaan Pelaburan
: Liter
No.
I.
1
2
3
4
5
6
II.
1
2
3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal Pen 60 atau Pen 80
- Kerosene
Berat isi bahan :
- Aspal Pen 60 atau Pen 80
- Kerosene
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Minyak Tanah
= As x Pc x D1 : 100
= K x Pc : 100
As
K
D1
D2
AIR COMPRESOR
Kap. Prod. / jam =
(E41)
b
Fa
pas
pas x Fa x 60
= 1 : Q1
Pc
(M10)
(M11)
ALAT
APHALT DISTRIBUTOR
Lebar penyemprotan
Faktor efisiensi kerja
Kapasitas pompa aspal
2.b.
L
Tk
Fh
URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
III.
2.
2.a.
KODE
Q1
(E41)
(E05)
asphalt distributor
Q2
= 1 : Q2
(E05)
Analisa EI-623
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
8.73
7.00
1.03
KM
Jam
-
96.00
4.00
%
%
1.03
0.80
Kg / Ltr
Kg / Ltr
1.03
liter
1.02
0.041
Kg
liter
3.00
M
0.80
100 liter/menit
4,800.00
liter
0.0002
Jam
4,800.00
liter
KETERANGAN
terhadap volume
terhadap volume
0.0002
Jam
Analisa EI-623
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 6.2 (3)
PERKIRAAN VOL. PEK.
: Bahan Aspal untuk Pekerjaan Pelabura TOTAL HARGA (Rp.)
: Liter
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0021
0.0004
HARGA
SATUAN
(Rp.)
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Aspal
Minyak Tanah
(M10)
(M11)
Kg
Liter
1.0185
0.0412
6,400.00
1,650.00
PERALATAN
1.
2.
Asp. Distributor
Compresor
E41
E05
Jam
Jam
0.0002
0.0002
254,201.23
111,049.38
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-623
AN
1.00
7,342.13
0.00
JUMLAH
HARGA
(Rp.)
9.44
2.98
12.42
6,518.17
67.98
6,586.15
52.96
23.14
76.09
6,674.67
667.47
7,342.13
n, volume dan/atau ukuran
: 6.2 (3)
: Bahan Aspal untuk Pekerjaan Pelaburan
: Liter
No.
3.
U RAIAN
TENAGA
Produksi menentukan : ASPHALT DISTIRBUTOR
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / Ltr :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7,342.13 / Liter
6.
7.
KODE
Q1
Qt
P
M
(L01)
(L03)
Analisa EI-623
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
4,800.00
33,600.00
liter
liter
10.00
2.00
orang
orang
0.0021
0.0004
Jam
Jam
KETERANGAN
: 6.3 (1)
: Latasir Kelas A (SS-A), (t = cm)
: M2
No.
I.
1
2
3
4
5
6
7
10
11
II.
1
2
III.
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis Latasir padat
Jam kerja efektif per-hari
Faktor kehilangan material :
- Agregat
- Aspal
Berat isi Agregat (padat)
Berat Isi Agregat (lepas)
Komposisi campuran SS Kelas A
- Pasir Kasar
- Pasir Halus
- Semen
- Asphalt
Berat Isi bahan :
- Latasir (SS) Kelas A
- Pasir Kasar
- Pasir Halus
Jarak Stock pile ke Cold Bin
KODE
L
t
Tk
Fh1
Fh2
Bip
Bil
PK
PH
FF
As
D1
D2
D3
l
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam
Cold Bin AMP
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung ke dalam
Dump Truck dan diangkut kelokasi pekerjaan
Campuran panas Latasir dihampar dengan Finisher
dan dipadatkan dengan Tandem & Pneumatic
Tire Roller
Selama pemadatan, sekelompok pekerja akan
merapikan tepi hamparaan dengan menggunakan
Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
1.c.
1.d.
BAHAN
Pasir Kasar
Pasir Halus
Semen
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
T1 + T2 + T3
- Kecepatan maju rata rata
(M01d)
(M01c)
(M05)
(M10)
(E15)
V
Fb
Fa
Ts1
Vf
Koefisien Alat / M2
Vr
T1
T2
T3
V x Fb x Fa x 60
t x Ts1 x Fh1x (Bip/Bil)
= 1 : Q1
Q1
(E15)
Analisa EI-631
URAIAN ANALISA HARGA SATUAN
KOEF.
SATUAN
8.73
0.015
7.00
1.05
1.03
1.81
1.51
KM
M
Jam
ton/m3
ton/m3
29.00
58.00
3.00
10.00
%
%
%
%
2.20
1.46
1.46
0.05
ton / M3
ton / M3
ton / M3
km
0.0069
0.0138
1.0395
3.3990
M3
M3
Kg
Kg
1.50
0.85
0.83
1.10
15.00
M3
menit
km/jam
KETERANGAN
panduan
panduan
20.00
0.20
0.15
0.75
km/jam
menit
menit
menit
3,057.49
M2
0.0003
Jam
panduan
Analisa EI-631
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 6.3 (1)
PERKIRAAN VOL. PEK.
: Latasir Kelas A (SS-A), (t = cm)
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
0.0046
0.0007
HARGA
SATUAN
(Rp.)
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
3
4
Pasir Kasar
Pasir Halus
Semen
Aspal
M01a
M01c
(M05)
(M10)
M3
M3
Kg
Kg
0.0069
0.0138
1.0395
3.3990
96,600.00
210,171.86
550.00
6,400.00
PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Asphalt Finisher
Tandem Roller
P. Tyre Roller
Alat Bantu
E15
E01
E12
E08
E02
E17
E18
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0003
0.0007
0.0007
0.0122
0.0013
0.0011
0.0010
1.0000
266,795.62
4,886,762.12
288,170.35
164,696.38
869,616.54
401,348.48
353,700.54
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-631
AN
1.00
36,654.41
0.00
JUMLAH
HARGA
(Rp.)
21.02
4.74
25.77
664.85
2,893.03
571.73
21,753.60
25,883.21
87.26
3,238.22
190.96
2,009.81
1,108.71
435.63
342.63
0.00
7,413.21
33,322.19
3,332.22
36,654.41
n, volume dan/atau ukuran
: 6.3 (1)
: Latasir Kelas A (SS-A), (t = cm)
: M2
No.
2.b.
U RAIAN
KODE
(E01)
V
Fa
V x Fa
D1 x t
= 1 : Q2
Q2
(E01)
2.c.
(E12)
Q3
(E12)
2.d.
(E08)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
Kap.Prod. / jam =
Koefisien Alat / M2
2.e.
(E09)
V x b x 60 x Fa
= 1 : Q5
Koefisien Alat / M2
(E17)
v
b
n
Fa
(v x 1000) x b x Fa
n
= 1 : Q6
(E02)
V
Fa
b
Q5
(E02)
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod./jam =
2.g.
Q4
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
2.f.
V x Fa x 60
D1 x t x Ts2
Q6
(E17)
(E18)
Kecepatan rata-rata
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap.Prod./jam =
Koefisien Alat / M2
v
b
n
Fa
(v x 1000) x b x Fa
n
= 1 : Q7
Q7
(E18)
Analisa EI-631
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
60.00
0.83
ton / Jam
-
1,509.09
M2
0.0007
Jam
1,509.09
0.0007
M2
Jam
3.50
0.80
20.00
30.00
1.00
1.00
ton
panduan
KM / Jam
KM / Jam
ton
menit
3.50
26.18
15.00
17.45
62.13
menit
menit
menit
menit
menit
81.95
M2
0.0122
Jam
5.00
0.83
3.15
784.35
m/menit
meter
M2
0.0013
Jam
1.50
1.48
2.00
0.83
KETERANGAN
Km / Jam
M
lintasan
-
921.30
M2
0.0011
Jam
panduan
2.50
1.99
4.00
0.83
KM / jam
M
lintasan
-
1,032.31
M2
0.0010
Jam
: 6.3 (1)
: Latasir Kelas A (SS-A), (t = cm)
: M2
No.
U RAIAN
2.h.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Garpu
= 2 buah
- Tongkat Kontrol ketebalan hanparan
3.
TENAGA
Produksi menentukan : Mixing Plant
Produksi Latasir / hari = Tk x Q2
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
Q2
Qt
P
M
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
KODE
36,654.41 / M2.
6.
7.
(L01)
(L03)
Analisa EI-631
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.
SATUAN
KETERANGAN
Lump Sum
1,509.09
10,563.64
7.00
1.00
0.0046
0.0007
M2
M2
orang
orang
Jam
Jam
No.
I.
1
2
3
4
5
6
7
8
9
10
11
II.
1
2
3
4
5
6
: 6.4 (1)
: Lasbutag
: M2
U RAIAN
ASUMSI
Menggunakan cara mekanik
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Pek. ini tdk. termasuk Bitumen Asbuton & Peremaja
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
Tebal LASBUTAG
Lasbutag terdiri dari (spesifikasi) :
- Agregat Kasar
- Pasir
- Asbuton
- Peremaja, terdiri atas :
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping (jarang digunakan)
Penyiapan campuran dilaksanakan di Base Camp
Berat Isi bahan :
- Agregat Kasar
- Pasir
- Asbuton
- Modifier
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Lasbutag
URUTAN KERJA
KODE
KOEF.
SATUAN
L
Tk
Fp
t
8.73
7.00
1.15
3.00
Km
Jam
Cm
CA
Ps
Asb
Md
Bo
Asp
Mt
As
30.00
49.50
16.00
4.50
47.00
38.00
15.00
0.00
%
%
%
%
%
%
%
%
D1
D2
D3
D4
D5
D6
D7
D8
1.80
1.80
1.05
0.99
0.97
1.03
0.80
2.20
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
III.
1.
BAHAN
1.a
1.b
1.c
1.d
Agregat Kasar
= (CA x (D8 x tM3) x 1.025) : D1
Pasir
= (Ps x (D8 x tM3) x 1.025) : D2
Asbuton (dibayar terpisah)
Peremaja (dibayar terpisah)
(M03)
(M01)
0.0113
0.0186
M3
M3
Berlanjut ke hal. be
No.
2
2.a.
: 6.4 (1)
: Lasbutag
: M2
U RAIAN
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
Koefisien Alat / M2
V x Fb x Fa x 60 x 100
Fp x Ts1 x t
= 1 : Q1
KOEF.
SATUAN
Koefisien Alat / M2
V x Fa x 60 x 100
D8 x Ts2 x t
= 1 : Q2
Koefisien Alat / M2
(v x 1000) x b x Fa
n
= 1 : Q3
(E15)
V
Fb
Fa
Ts1
1.50
0.90
0.83
0.45
M3
menit
Ts1
0.45
menit
Q1
4,330.43
M2
0.0002
Jam
3.50
0.80
20.00
30.00
Ton
KM / Jam
KM / Jam
0.73
26.18
15.00
17.45
59.36
menit
menit
menit
menit
menit
Q2
42.88
M2
(E08)
0.0233
Jam
(E18)
v
b
n
Fa
4.00
2.29
6.00
0.83
(E15)
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat = ( V : D8 ) : ( Q1 x t/100 ) x 60
- Waktu tempuh isi = (L : v1) x 60 menit
- Tuang ke penghampar dan lain-lain
- Waktu tempuh kosong = (L : v2) x 60 menit
Kap. Prod./jam =
2.c.
KODE
ALAT
2.b.
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q3
(E18)
Km/Jam
M
lintasan
1,267.13
M2
0.0008
Jam
2.d.
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
(E17)
v
b
n
Fa
Kap. Prod./jam =
Koefisien Alat / M2
2.e.
(v x 1000) x b x Fa
n
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
V x b x 60 x Fa
= 1 : Q5
Q4
3.50
1.68
4.00
0.83
Km / Jam
M
lintasan
-
1,220.10
M2
(E17)
0.0008
Jam
(E02)
V
Fa
b
Q5
20.00
0.85
3.15
3,213.00
(E02)
0.0003
m/menit
meter
M2
Jam
Berlanjut ke hal. be
No.
2.f.
: 6.4 (1)
: Lasbutag
: M2
U RAIAN
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
2.d.
3.
ALAT BANTU
diperlukan :
- Kereta dorong
- Sekop
- Sapu lidi
KODE
(E06)
V
Fa
Ts3
T1
T2
T3
T4
Ts1
Koefisien Alat / M2
V x Fa x 60 x 100
1000 x Ts1 x t
= 1 : Q6
KOEF.
500.00
0.85
0.50
1.00
0.30
0.20
2.00
SATUAN
liter
menit
menit
menit
menit
menit
Q6
425.00
M2
(E06)
0.0024
jam
Q5
Qt
3,213.00
22,491.00
M2
M2
P
M
20.00
1.00
= 2 buah
= 3 buah
= 5 buah
TENAGA
Produksi menentukan : ASPHALT FINISHER
Produksi / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
orang
orang
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7.
No.
I.
1
2
3
4
5
6
7
8
9
0.0062
0.0003
Jam
Jam
11,151.51 / M2.
6.
(L01)
(L02)
: 6.4 (2)
: Latasbusir Kelas A
: M2
U RAIAN
ASUMSI
Menggunakan cara mekanik
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pek. ini tdk. termasuk Asbuton & Peremaja
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
Tebal Latasbusir
Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar (umumnya tidak digunakan)
- Pasir
- Asbuton
- Peremaja, terdiri atas :
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
KODE
KOEF.
SATUAN
L
Tk
Fp
t
8.73
7.00
1.15
1.50
Km
Jam
Cm
CA
Ps
Asb
Md
Bo
Asp
Mt
0.00
73.00
21.00
6.00
44.00
38.00
18.00
%
%
%
%
%
%
%
10
11
As
0.00
D1
D2
D3
D4
D5
D6
D7
1.80
1.80
1.05
0.99
0.97
1.03
0.80
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
- Latasbusir
II.
D8
2.20
T/m3
URUTAN KERJA
1
2
3
4
5
6
III.
1.
BAHAN
1.a
1.b
1.c
1.d
Agregat Kasar
= (CA x (D8 x tM3) x 1.025) : D1
Pasir
= (Ps x (D8 x tM3) x 1.025) : D2
Asbuton (dibayar terpisah)
Peremaja (dibayar terpisah)
2
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
(M03)
(M01)
0.0000
0.0137
M3
M3
(E15)
V
Fb
Fa
Ts1
1.50
0.90
0.85
0.45
M3
menit
Ts1
0.45
menit
Berlanjut ke hal. be
No.
U RAIAN
Koefisien Alat / M2
2.b.
: 6.4 (2)
: Latasbusir Kelas A
: M2
V x Fb x Fa x 60 x 100
Fp x Ts1 x t
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat = ( V : D8 ) : ( Q1 x t/100 ) x 60
- Waktu tempuh isi = (L : v1) x 60 menit
KODE
Q1
(E15)
(E08)
V
Fa
v1
v2
Ts2
T1
T2
KOEF.
SATUAN
8,869.57
M2
0.0001
Jam
3.50
0.80
20.00
30.00
Ton
KM / Jam
KM / Jam
0.94
26.18
menit
menit
T3
T4
Ts2
17.45
15.00
59.56
menit
menit
menit
Kap. Prod./jam =
Koefisien Alat / M2
2.c.
V x Fa x 60 x 100
D8 x Ts2 x t
= 1 : Q2
Koefisien Alat / M2
2.d.
(v x 1000) x b x Fa
n
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod./jam =
Koefisien Alat / M2
2.e.
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
2.f.
(v x 1000) x b x Fa
n
V x b x 60 x Fa
= 1 : Q5
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
Q2
85.47
M2
(E08)
0.0117
Jam
(E18)
v
b
n
Fa
4.00
2.29
6.00
0.83
Q3
Km/Jam
M
lintasan
1,267.13
M2
(E18)
0.0008
Jam
(E17)
v
b
n
Fa
3.50
1.68
4.00
0.83
Q4
Km / Jam
M
lintasan
-
1,220.10
M2
(E17)
0.0008
Jam
(E02)
V
Fa
b
Q5
20.00
0.83
3.15
3,137.40
(E02)
0.0003
Jam
500.00
0.83
liter
-
(E06)
V
Fa
Ts3
T1
T2
T3
T4
Ts1
0.50
1.00
0.30
0.20
2.00
m/menit
meter
M2
menit
menit
menit
menit
menit
Berlanjut ke hal. be
No.
: 6.4 (2)
: Latasbusir Kelas A
: M2
U RAIAN
V x Fa x 60 x 100
1000 x Ts1 x t
KODE
Q6
KOEF.
830.00
SATUAN
M2
Koefisien Alat / M2
= 1 : Q6
(E06)
2.d.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu lidi
= 2 buah
3.
TENAGA
Produksi menentukan : Asphal Finisher
Produksi / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
0.0012
jam
Q5
Qt
3,137.40
21,961.80
M2
M2
P
M
20.00
1.00
orang
orang
(L01)
(L02)
0.0064
0.0003
Jam
Jam
: 6.4 (2)
: Latasbusir Kelas A
: M2
No.
U RAIAN
4.
5.
5,480.77 / M2.
6.
7.
460.0000
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
8
9
: 6.4 (3)
: Latasbusir Kelas B
: M2
U RAIAN
ASUMSI
Menggunakan cara mekanik
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Dalam pek. ini tdk. termasuk Asbuton & Peremaja
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pemadatan material
Tebal Latasbusir
Latasbusir terdiri dari (spesifikasi) :
- Agregat Kasar
- Pasir
KODE
KOEF.
SATUAN
L
Tk
Fp
t
8.73
7.00
1.15
2.00
Km
Jam
Cm
CA
Ps
14.00
63.00
%
%
- Asbuton
- Peremaja, terdiri atas :
- Bunker Oil (BO)
Asb
Md
Bo
18.00
5.00
44.00
%
%
%
10
11
II.
1
2
3
4
5
6
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping
Penyiapan campuran dilaksanakan di Base Camp
Berat Isi bahan :
- Agregat Kasar
- Pasir
- Asbuton
- Modifier
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Latasbusir
URUTAN KERJA
Asp
Mt
As
38.00
18.00
0.00
%
%
%
D1
D2
D3
D4
D5
D6
D7
D8
1.80
1.80
1.05
0.99
0.97
1.03
0.80
2.20
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
T/m3
III.
1.
BAHAN
1.a
1.b
1.c
1.d
Agregat Kasar
= (CA x (D8 x tM3) x 1.025) : D1
Pasir
= (Ps x (D8 x tM3) x 1.025) : D2
Asbuton (dibayar terpisah)
Peremaja (dibayar terpisah)
2
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
(M03)
(M01)
0.0035
0.0158
M3
M3
(E15)
V
Fb
Fa
Ts1
1.50
0.90
0.83
0.45
M3
menit
Ts1
0.45
menit
Berlanjut ke hal. be
No.
: 6.4 (3)
: Latasbusir Kelas B
: M2
U RAIAN
V x Fb x Fa x 60 x 100
Fp x Ts1 x t
KODE
Q1
KOEF.
6,495.65
SATUAN
M2
Koefisien Alat / M2
= 1 : Q1
(E15)
0.0002
Jam
2.b.
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus
- Waktu muat = ( V : D8 ) : ( Q1 x t/100 ) x 60
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Tuang ke penghampar dan lain-lain
Kap. Prod./jam =
Koefisien Alat / M2
2.c.
V x Fa x 60 x 100
D8 x Ts2 x t
= 1 : Q2
Koefisien Alat / M2
2.d.
(v x 1000) x b x Fa
n
= 1 : Q3
TANDEM ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod./jam =
Koefisien Alat / M2
2.e.
= 1 : Q4
ASPHALT FINISHER
Kecepatan menghampar
Faktor efisiensi alat
Lebar hamparan
Kap.Prod. / jam =
Koefisien Alat / M2
2.f.
(v x 1000) x b x Fa
n
= 1 : Q5
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Menunggu, dll.
V x b x 60 x Fa
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
3.50
0.80
20.00
30.00
Ton
KM / Jam
KM / Jam
1.28
26.18
17.45
15.00
59.90
menit
menit
menit
menit
menit
Q2
63.74
M2
(E08)
0.0157
Jam
(E18)
v
b
n
Fa
4.00
2.29
6.00
0.83
Q3
Km/Jam
M
lintasan
1,267.13
M2
(E18)
0.0008
Jam
(E17)
v
b
n
Fa
3.50
1.68
4.00
0.83
Q4
Km / Jam
M
lintasan
-
1,220.10
M2
(E17)
0.0008
Jam
(E02)
V
Fa
b
Q5
20.00
0.83
3.15
3,137.40
(E02)
0.0003
Jam
500.00
0.83
liter
-
(E06)
V
Fa
Ts3
T1
T2
T3
T4
Ts1
0.50
1.00
0.30
0.20
2.00
m/menit
meter
M2
menit
menit
menit
menit
menit
Berlanjut ke hal. be
: 6.4 (3)
JENIS PEKERJAAN
SATUAN PEMBAYARAN
: Latasbusir Kelas B
: M2
No.
U RAIAN
Koefisien Alat / M2
KODE
V x Fa x 60 x 100
1000 x Ts1 x t
= 1 : Q6
2.d.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 3 buah
- Sapu lidi
= 2 buah
3.
TENAGA
Produksi menentukan : Asphalt Finisher
Produksi / hari = Tk x Q5
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M2 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7,408.55 / M2.
6.
7.
KOEF.
SATUAN
Q6
622.50
M2
(E06)
0.0016
jam
Q5
Qt
3,137.40
21,961.80
M2
M2
P
M
20.00
1.00
orang
orang
(L01)
(L02)
0.0064
0.0003
Jam
Jam
No.
I.
: 6.4 (4)
: Bitumen Asbuton
: Ton
U RAIAN
KODE
KOEF.
SATUAN
ASUMSI
1
2
3
4
5
6
II.
L
Tk
Ba
Ma
8.73
7.00
20.00
80.00
Km
Jam
%
%
(M55)
5.1250
Ton
URUTAN KERJA
Tidak ada kegiatan yang signifikan kecuali sedikit
pemeliharaan tumpukan stock
III.
1.
BAHAN
1.a
Asbuton halus =
( 1 Ton : Ba ) x 1.025
ALAT
Tidak diperlukan peralatan dalam mata pembayaran ini
3.
TENAGA
Tidak diperlukan tenaga kerja dalam mata pemb. ini
4.
5.
1,832,187.50 / M2.
6.
7.
No.
I.
1
2
3
4
5
6
II.
U RAIAN
ASUMSI
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kandungan Bitumen dalam Bunker Oil (BO)
Kandungan Bitumen dalam Aspal Semen
Kandungan Bitumen dalam Kerosene
Proporsi Peremaja (modifier Lasbutag) :
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
- Bahan Anti Stripping (umumnya tidak digunakan)
Berat Isi bahan :
- Modifier
- Bunker Oil (BO)
- Aspal Semen
- Minyak Tanah
Penyiapan Peremaja dilaksanakan di Base Camp
URUTAN KERJA
1
III.
: 6.4 (5)
: Bitumen Bahan Peremaja
: Ton
KODE
KOEF.
SATUAN
L
Tk
Bbo
Bas
Bk
8.73
7.00
80.00
100.00
0.00
Km
Jam
%
%
%
Bo
Asp
Mt
As
D1
D2
D3
D4
47.00
38.00
15.00
0.00
0.99
0.97
1.03
0.80
%
%
%
%
T/m3
T/m3
T/m3
T/m3
1.
BAHAN
1 Ton Bahan Peremaja terdiri atas :
= Bo x 1 Ton x 1000
= Asp x 1 Ton x 1000
= Mt x 1 Ton x 1000
Bp1
Bp2
Bp3
470.00
380.00
150.00
Kg
Kg
Kg
Bit
756.00
Kg
(M54)
(M10)
(M11)
647.3300
507.6720
250.4960
Liter
Kg
Liter
1,000.00
0.83
liter
-
ALAT
LIQUID ASPHALT MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Pemanasan
- Mengaduk
- Menuang
- Tunggu, dll.
(E34)
V
Fa
Ts3
T1
T2
T3
T4
T5
Ts1
3.00
20.00
10.00
3.00
3.00
39.00
menit
menit
menit
menit
menit
menit
Berlanjut ke hal. be
No.
: 6.4 (5)
: Bitumen Bahan Peremaja
: Ton
U RAIAN
Koefisien Alat/Ton
3.
4.
KODE
V x Fa x 60 x D1
1000 x Ts1
= 1 : Q1
Q1
= (Tk x P) / Qt
= (Tk x M) / Qt
KOEF.
SATUAN
1.26
Ton
0.7910
jam
Q1
Qt
1.26
8.85
Ton
Ton
P
M
10.00
1.00
orang
orang
(L01)
(L02)
7.9104
0.7910
Jam
Jam
(E34)
TENAGA
Produksi menentukan : Liquid Asphalt Mixer
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Lihat lampiran.
5.
6,226,189.55
/ Ton
6.
7.
Analisa EI-641
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Analisa EI-641
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
lihat tabel
V - loading
Analisa EI-641
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-642
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Campuran
Total Campuran
Total Campuran
Total Campuran
Total Modifier
Total Modifier
Total Modifier
Total Modifier
lihat tabel
V - loading
Analisa EI-643
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-643
KETERANGAN
Lump Sum
Analisa EI-644
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-645
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Total Modifier
Total Modifier
Total Modifier
Total Modifier
Analisa EI-645
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 6.4 (1)
: Lasbutag
: M2
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0062
0.0003
BAHAN
1.
2.
Agr. Kasar
Pasir
(M03)
(M01)
M3
M3
0.0113
0.0186
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
P. Tyre Roller
Tnd. Roller
Asp. Finisher
Conc. Mixer
Alat Bantu
(E15)
(E08)
(E18)
(E17)
(E02)
(E06)
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0002
0.0233
0.0008
0.0008
0.0003
0.0024
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah k
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasu
yang dibayar dari kontrak) dan biaya-biaya lainnya.
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 6.4 (2)
: Latasbusir Kelas A
: M2
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
Pekerja
(L01)
Jam
0.0064
2.
Mandor
(L02)
Jam
0.0003
BAHAN
1.
Pasir
(M01)
M3
0.0137
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
P. Tyre Roller
Tnd. Roller
Asp. Finisher
Conc. Mixer
Alat Bantu
(E15)
(E08)
(E18)
(E17)
(E02)
(E06)
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0001
0.0117
0.0008
0.0008
0.0003
0.0012
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 6.4 (3)
: Latasbusir Kelas B
: M2
NO.
KOMPONEN
PERKIRAAN
SATUAN KUANTITAS
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
0.0064
0.0003
BAHAN
1.
2.
Agr. Kasar
Pasir
(M03)
(M01)
M3
M3
0.0035
0.0158
PERALATAN
1.
2.
3.
4.
5.
6.
7.
Wheel Loader
Dump Truck
P. Tyre Roller
Tnd. Roller
Asp. Finisher
Conc. Mixer
Alat Bantu
(E15)
(E08)
(E18)
(E17)
(E02)
(E06)
Jam
Jam
Jam
Jam
Jam
Jam
Ls
0.0002
0.0157
0.0008
0.0008
0.0003
0.0016
1.0000
JUMLAH HARGA PERALATAN
D.
E.
F.
Note: 1
2
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 6.4 (4)
: Bitumen Asbuton
: Ton
NO.
A.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
TENAGA
BAHAN
1.
Asbuton halus
(M55)
M3
5.1250
PERALATAN
3
4
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 6.4 (5)
: Bitumen Bahan Peremaja
: Ton
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L02)
Jam
Jam
7.9104
0.7910
BAHAN
1.
2.
4.
Bunker Oil
Aspal Semen
Minyak Tanah
(M54)
(M10)
(M11)
Ltr
Kg
Ltr
647.3300
507.6720
250.4960
C.
PERALATAN
1.
Liq.Asp.Mixer
(E34)
Jam
0.7910
3
4
Analisa EI-641
NTUK
NG HARGA SATUAN
..
.
HARGA
SATUAN
(Rp.)
:
:
:
1.00
11,151.51
0.00
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
210,171.86
142,000.00
266,795.62
164,696.38
353,700.54
401,348.48
869,616.54
133,800.44
0.00
28.21
2.23
30.44
2,369.69
2,641.73
5,011.42
61.61
3,840.70
279.13
328.95
270.66
314.82
0.00
5,095.88
10,137.74
1,013.77
11,151.51
Analisa EI-642
NTUK
NG HARGA SATUAN
..
.
HARGA
SATUAN
(Rp.)
4,532.31
:
:
:
1.00
5,480.77
0.00
JUMLAH
HARGA
(Rp.)
28.89
7,156.29
142,000.00
2.28
31.17
1,947.94
266,795.62
164,696.38
353,700.54
401,348.48
869,616.54
133,800.44
0.00
1,947.94
30.08
1,926.86
279.13
328.95
277.18
161.21
0.00
3,003.40
4,982.52
498.25
5,480.77
Analisa EI-643
NTUK
NG HARGA SATUAN
..
.
HARGA
SATUAN
(Rp.)
:
:
:
1.00
7,408.55
0.00
JUMLAH
HARGA
(Rp.)
4,532.31
7,156.29
210,171.86
142,000.00
266,795.62
164,696.38
353,700.54
401,348.48
869,616.54
133,800.44
0.00
28.89
2.28
31.17
737.24
2,241.47
2,978.71
41.07
2,583.89
279.13
328.95
277.18
214.94
0.00
3,725.17
6,735.05
673.50
7,408.55
Analisa EI-644
NTUK
NG HARGA SATUAN
..
.
HARGA
SATUAN
(Rp.)
325,000.00
:
:
:
1.00
1,832,187.50
0.08
JUMLAH
HARGA
(Rp.)
0.00
1,665,625.00
1,665,625.00
0.00
1,665,625.00
166,562.50
1,832,187.50
Analisa EI-645
NTUK
NG HARGA SATUAN
..
.
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
3,000.00
6,400.00
1,650.00
:
:
:
1.00
6,226,189.55
0.28
JUMLAH
HARGA
(Rp.)
35,852.55
5,660.93
41,513.48
1,941,989.85
3,249,100.53
413,318.45
5,604,408.84
18,014.19
14,250.00
14,250.00
5,660,172.32
566,017.23
6,226,189.55
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
: 7.1 (3)
: Beton K-350
: M3
U RAIAN
URAIAN ANAL
KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
KOEF.
L
Tk
Ks
Ag
Wcr
Sm
Ps
Kr
8.73
7.00
365
19
0.45
456.0
637.0
992.0
D1
D2
D3
D4
2.40
1.25
1.30
1.40
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Semen (PC)
=
Sm x 1.03
Pasir Beton
=
(Ps/1000 : D3) x 1.05
Agregat Kasar
=
(Kr/1000 : D4) x 1.05
Kayu Perancah dan/atau Bekisting
Paku
2.
2.a.
ALAT
CONCRETE PAN MIXER (BATCHING PLANT)
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M12)
(M01a)
(M03)
(M19)
(M18)
(E43)
V
Fa
Ts
T1
T2
T3
T4
Ts
469.680
0.5145
0.7440
0.4000
3.2000
600.00
0.83
1.00
1.00
0.50
0.50
3.00
Q1
9.960
(E43)
0.1004
2.b.
TRUK MIXER
Kapasitas drum
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Waktu siklus :
(T1 + T2 + T3 + T4)
- memuat
V : Q1 x 60
- tempuh isi
L x 60 : v1
- tempuh kosong
L x 60 : v2
- menumpahkan
(E49)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
5.00
0.83
20.00
30.00
30.12
26.18
17.45
5.00
78.75
Analisa EI-713
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
jam
Kg/M3
mm
Kg/M3
Kg/M3
Kg/M3
KETERANGAN
Berdasarkan
JMF & sesuai
dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
menit
menit
menit
menit
menit
M3/jam
jam
669
1,042
M3
km/jam
km/jam
menit
menit
menit
menit
menit
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.1 (3)
PERKIRAAN VOL. PEK.
: Beton K-350
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
0.8032
1.8072
0.1004
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir Beton
Agregat Kasar
Kayu Perancah
Paku
(M12)
(M01a)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
469.6800
0.5145
0.7440
0.4000
3.2000
688.66
96,600.00
210,171.86
1,250,000.00
5,500.00
PERALATAN
1.
2.
3.
4.
Pan. Mixer
Truk Mixer
Water Tanker
Alat Bantu
E43
E49
E23
jam
jam
jam
Ls
0.1004
0.3162
0.0637
1.0000
478,489.26
464,251.69
161,074.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-713
1.00
1,394,103.20
0.06
JUMLAH
HARGA
(Rp.)
3,640.41
10,777.54
718.50
15,136.45
323,448.07
49,700.70
156,367.86
500,000.00
17,600.00
1,047,116.63
48,041.09
146,818.17
10,254.20
0.00
205,113.46
1,267,366.55
126,736.65
1,394,103.20
me dan/atau ukuran
u satuan pekerjaan
: 7.1 (3)
: Beton K-350
: M3
No.
U RAIAN
Koefisien Alat / M3
3.
Q2
= 1 : Q2
2.c.
KODE
V x Fa x 60
Ts2
Koefisien Alat / M3
2.b.
URAIAN ANAL
= 1 : Q3
KOEF.
3.16
(E49)
0.3162
(E23)
V
Wc
Fa
n
4.00
0.21
0.83
1.00
Q3
15.71
(E23)
0.0637
Qt
69.72
M
Tb
1.00
18.00
8.00
ALAT BANTU
Alat bantu
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Tk Kayu =
- Pekerja
4
14
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
1,394,103.20
/ M3
6.
7.
(L03)
(L02)
(L01)
0.1004
1.8072
0.8032
Analisa EI-713
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
M3
jam
M3
M3
kali
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
: 7.1 (4)
: Beton K-300
: M3
U RAIAN
URAIAN ANAL
KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
KOEF.
L
Tk
Ks
Ag
Wcr
Sm
Ps
Kr
8.73
7.00
350
19
0.45
456.0
631.0
992.0
D1
D2
D3
D4
2.40
1.25
1.30
1.40
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Semen (PC)
=
Sm x 1.03
Pasir Beton
=
(Ps/1000 : D3) x 1.05
Agregat Kasar
=
(Kr/1000 : D4) x 1.05
Kayu Perancah dan/atau Bekisting
Paku
2.
2.a.
ALAT
CONCRETE PAN MIXER (BATCHING PLANT)
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M12)
(M01a)
(M03)
(M19)
(M18)
(E43)
V
Fa
Ts
T1
T2
T3
T4
Ts
469.680
0.5097
0.7440
0.2000
1.6000
600.00
0.83
1.00
1.00
0.50
0.50
3.00
Q1
9.960
(E43)
0.1004
2.b.
TRUK MIXER
Kapasitas drum
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Waktu siklus :
(T1 + T2 + T3 + T4)
- memuat
V : Q1 x 60
- tempuh isi
L x 60 : v1
- tempuh kosong
L x 60 : v2
- menumpahkan
(E49)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
5.00
0.83
20.00
30.00
30.12
26.18
17.45
5.00
78.75
Analisa EI-714
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
jam
Kg/M3
mm
Kg/M3
Kg/M3
Kg/M3
KETERANGAN
Berdasarkan
JMF & sesuai
dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
menit
menit
menit
menit
menit
M3/jam
jam
663
1,042
M3
km/jam
km/jam
menit
menit
menit
menit
menit
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.1 (4)
PERKIRAAN VOL. PEK.
: Beton K-300
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
0.8032
1.1044
0.1004
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir beton
Agregat Kasar
Kayu Perancah
Paku
(M12)
(M01a)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
469.6800
0.5097
0.7440
0.2000
1.6000
688.66
96,600.00
210,171.86
1,250,000.00
5,500.00
PERALATAN
1.
2.
3.
4.
(E43)
(E49)
(E23)
jam
jam
jam
Ls
0.1004
0.3162
0.0637
1.0000
478,489.26
464,251.69
161,074.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-714
1.00
1,104,297.86
0.05
JUMLAH
HARGA
(Rp.)
3,640.41
6,586.27
718.50
10,945.19
323,448.07
49,232.56
156,367.86
250,000.00
8,800.00
787,848.49
48,041.09
146,818.17
10,254.20
0.00
205,113.46
1,003,907.14
100,390.71
1,104,297.86
me dan/atau ukuran
u satuan pekerjaan
: 7.1 (4)
: Beton K-300
: M3
No.
U RAIAN
Koefisien Alat / M3
3.
Q2
= 1 : Q2
2.d.
KODE
V x Fa x 60
Ts2
Koefisien Alat / M3
2.c.
URAIAN ANAL
= 1 : Q2
KOEF.
3.16
(E49)
0.3162
(E23)
V
Wc
Fa
n
4.00
0.21
0.83
1.00
Q3
15.71
(E23)
0.0637
Qt
69.72
M
Tb
1.00
11.00
8.00
ALAT BANTU
Alat bantu
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Tk Kayu =
- Pekerja
4
7
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
1,104,297.86 / M3
6.
7.
(L03)
(L02)
(L01)
0.1004
1.1044
0.8032
Volume pekerjaan :
1.00 M3
Analisa EI-714
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
M3
jam
M3
M3
kali
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
: 7.1 (5)
: Beton K-250
: M3
U RAIAN
URAIAN ANAL
KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
KOEF.
L
Tk
Ks
Ag
Wcr
Sm
Ps
Kr
8.73
7.00
340
19
0.50
410.0
670.0
992.0
D1
D2
D3
D4
2.40
1.25
1.30
1.40
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Semen (PC)
=
Sm x 1.03
Pasir Beton
=
(Ps/1000 : D3) x 1.05
Agregat Kasar
=
(Kr/1000 : D4) x 1.05
Kayu Perancah dan/atau Bekisting
Paku
2.
2.a.
ALAT
CONCRETE PAN MIXER (BATCHING PLANT)
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M12)
(M01a)
(M03)
(M19)
(M18)
(E43)
V
Fa
Ts
T1
T2
T3
T4
Ts
422.300
0.5412
0.7440
0.2000
1.6000
600.00
0.83
1.00
1.00
0.50
0.50
3.00
Q1
9.960
(E43)
0.1004
2.b.
TRUK MIXER
Kapasitas drum
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Waktu siklus :
(T1 + T2 + T3 + T4)
- memuat
V : Q1 x 60
- tempuh isi
L x 60 : v1
- tempuh kosong
L x 60 : v2
- menumpahkan
(E49)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
5.00
0.83
20.00
30.00
30.12
26.18
17.45
5.00
78.75
Analisa EI-715
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
jam
Kg/M3
mm
Kg/M3
Kg/M3
Kg/M3
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
menit
menit
menit
menit
menit
M3
jam
KETERANGAN
Berdasarkan
JMF & sesuai
dgn Spesifikasi
M3
km/jam
km/jam
menit
menit
menit
menit
menit
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.1 (5)
PERKIRAAN VOL. PEK.
: Beton K-250
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
0.8032
1.1044
0.0000
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir beton
Agregat Kasar
Kayu Perancah
Paku
(M12)
(M01a)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
422.3000
0.5412
0.7440
0.2000
1.6000
688.66
96,600.00
210,171.86
1,250,000.00
5,500.00
PERALATAN
1.
2.
3.
4.
E43
E49
E23
jam
jam
jam
Ls
0.1004
0.3162
0.0636
1.0000
478,489.26
464,251.69
161,074.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-715
1.00
1,070,952.31
0.05
JUMLAH
HARGA
(Rp.)
3,640.41
6,586.27
0.00
10,226.69
290,819.53
52,275.46
156,367.86
250,000.00
8,800.00
758,262.86
48,041.09
146,818.17
10,244.21
0.00
205,103.47
973,593.01
97,359.30
1,070,952.31
me dan/atau ukuran
u satuan pekerjaan
: 7.1 (5)
: Beton K-250
: M3
No.
U RAIAN
Koefisien Alat / M3
3.
Q2
= 1 : Q2
2.c.
KODE
V x Fa x 60
Ts2
Koefisien Alat / M3
2.b.
URAIAN ANAL
= 1 : Q2
KOEF.
3.16
(E49)
0.3162
(E23)
V
Wc
Fa
n
4.00
0.21
0.83
1.00
Q2
15.72
(E23)
0.0636
Qt
69.72
M
Tb
1.00
11.00
8.00
ALAT BANTU
Alat bantu
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Tk Kayu =
- Pekerja
4
7
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
1,070,952.31 / M3
6.
7.
(L03)
(L02)
(L01)
0.0000
1.1044
0.8032
Volume pekerjaan :
1.00 M3
Analisa EI-715
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
M3
jam
M3
M3
kali
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
: 7.1 (6)
: Beton K-175
: M3
U RAIAN
URAIAN ANAL
KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Isi :
- Beton
- Semen
- Pasir
- Agregat Kasar
L
Tk
Ks
KOEF.
8.73
7.00
300
Wcr
Sm
Ps
Kr
0.57
318.0
622.0
1,207.0
D1
D2
D3
D4
2.40
1.25
1.30
1.40
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
BAHAN
Semen (PC)
=
Sm x 1.03
Pasir Beton
=
(Ps/1000 : D3) x 1.05
Agregat Kasar =
(Kr/1000 : D4) x 1.05
Kayu Perancah dan/atau Bekisting
Paku
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
(T1 + T2 + T3 + T4)
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M12)
(M01a)
(M03)
(M19)
(M18)
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
327.540
0.5024
0.9053
0.1000
0.8000
500.00
0.83
8.00
4.00
2.00
3.00
17.00
Q1
1.465
(E06)
0.6827
2.b.
Koefisien Alat / M3
V x Fa x n
Wc
= 1 : Q2
(E23)
V
Wc
Fa
n
4.00
0.19
0.83
1.00
Q2
17.78
(E23)
0.0562
Analisa EI-716
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
jam
Kg/M3
Kg/M3
Kg/M3
Kg/M3
Berdasarkan
JMF & sesuai
dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
menit
menit
menit
menit
menit
M3/jam
jam
653.10
1,267.35
M3
M3
kali
M3
jam
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.1 (6)
PERKIRAAN VOL. PEK.
: Beton K-175
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
1.3655
1.3655
0.6827
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
4.
5.
Semen
Pasir beton
Agregat Kasar
Kayu Perancah
Paku
(M12)
(M01a)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
327.5400
0.5024
0.9053
0.1000
0.8000
688.66
96,600.00
210,171.86
1,250,000.00
5,500.00
PERALATAN
1.
2.
3.
Conc. Mixer
Water Tanker
Alat Bantu
E06
E23
jam
jam
Ls
0.6827
0.0562
1.0000
133,800.44
161,074.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-716
1.00
784,713.63
0.04
JUMLAH
HARGA
(Rp.)
me dan/atau ukuran
u satuan pekerjaan
6,188.70
8,143.03
4,885.82
19,217.55
225,562.47
48,530.35
190,258.08
125,000.00
4,400.00
593,750.90
91,349.70
9,057.88
0.00
100,407.58
713,376.02
71,337.60
784,713.63
: 7.1 (6)
: Beton K-175
: M3
No.
2.c.
3.
URAIAN ANAL
U RAIAN
KODE
KOEF.
ALAT BANTU
Alat bantu
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Tk Kayu =
- Pekerja
Qt
10.25
M
Tb
1.00
2.00
2.00
1
1
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
784,713.6 / M3
6.
7.
(L03)
(L02)
(L01)
0.6827
1.3655
1.3655
Analisa EI-716
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.1 (7)
PERKIRAAN VOL. PEK.
: Beton Siklop K175
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
8.1928
0.6827
0.6827
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
4.
Semen
Pasir beton
Agregat Kasar
Batu Belah
(M12)
(M01a)
(M03)
(M06)
Kg
M3
M3
M3
229.2780
0.3517
0.6337
0.6518
688.66
96,600.00
210,171.86
182,600.00
PERALATAN
1.
2.
3.
4.
Conc. Mixer
Water Tanker
Con. Vibrator
Alat Bantu
E06
E23
E20
jam
jam
jam
Ls
0.6827
0.0394
0.6827
1.0000
133,800.44
161,074.00
18,228.49
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-717
1.00
660,314.12
0.03
JUMLAH
HARGA
(Rp.)
me dan/atau ukuran
u satuan pekerjaan
37,132.21
4,071.51
4,885.82
46,089.55
157,893.73
33,971.25
133,180.65
119,015.03
444,060.66
91,349.70
6,340.52
12,445.15
0.00
110,135.36
600,285.57
60,028.56
660,314.12
: 7.1 (7)
: Beton Siklop K175
: M3
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
U RAIAN
URAIAN ANAL
KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Kerikil Pecah
Berat Isi :
- Beton
- Semen
- Pasir
- Kerikil Pecah (Agregat Kasar)
L
Tk
Ks
KOEF.
8.73
7.00
300
Wcr
Sm
Ps
Kr
0.57
318.0
622.0
1,207.0
D1
D2
D3
D4
2.40
1.25
1.30
1.40
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton dicor ke dlm cincin sumuran yang telah disiapkan dan memasukkan batu pecah (batu siklop)
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.d.
BAHAN
Semen (PC)
Pasir Beton
Agregat Kasar
Batu Belah
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
=
=
=
=
Sm x 0.7 x 1.03
(Ps/1000 : D3) x 0.7 x 1.05
(Kr/1000 : D4) x 0.7 x 1.05
{(Kr/1000 x D1) : D4} x 0.30 * 1.05
(T1 + T2 + T3 + T4)
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M12)
(M01)
(M03)
(M06)
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
229.278
0.3517
0.6337
0.6518
500.00
0.83
8.00
4.00
2.00
3.00
17.00
Q1
1.465
(E06)
0.6827
2.b.
Koefisien Alat / M3
V x Fa x n
Wc
= 1 : Q2
(E23)
V
Wc
Fa
n
4.00
0.13
0.83
1.00
Q2
25.40
(E23)
0.0394
Analisa EI-717
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
jam
Kg/M3
K-175
Kg/M3
Kg/M3
Kg/M3
Berdasarkan
JMF & sesuai
dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
liter
menit
menit
menit
menit
menit
M3
jam
M3
M3
kali
M3
jam
: 7.1 (7)
: Beton Siklop K175
: M3
No.
2.c.
U RAIAN
= 1 : Q3
ALAT BANTU
Diperlukan :
- Sekop
- Pacul
- Sendok Semen
- Ember Cor
- Gerobak Dorong
=
=
=
=
=
2
2
2
4
2
Q3
1.465
(E20)
0.6827
Qt
10.25
M
Tb
1.00
1.00
P
P
2.00
12.00
(L03)
(L02)
(L01)
0.6827
0.6827
8.1928
buah
buah
buah
buah
buah
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
KOEF.
(E20)
Koefisien Alat / M3
3.
KODE
CONCRETE VIBRATOR
Kebutuhan Alat Penggetar Beton ini disesuaikan dengan
kapasitas produksi Alat Pencampur (Concrete Mixer)
Kap. Prod. / jam =
2.c.
URAIAN ANAL
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Pekerja
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
660,314.1 / M3
6.
7.
Analisa EI-717
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
M3
jam
M3
orang
orang
1 Tk = 20 m3 btn
orang
orang
jam
jam
jam
: 7.1 (8)
: Beton K125
: M3
No.
URAIAN ANAL
U RAIAN
I.
1
2
3
4
5
6
7
8
II.
1
2
3
KODE
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Kadar Semen Minimum (Spesifikasi)
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Kerikil Pecah
Berat Isi :
- Beton
- Semen
- Pasir
- Kerikil Pecah (Agregat Kasar)
L
Tk
Ks
KOEF.
8.73
7.00
250
Wcr
Sm
Ps
Kr
0.60
302.0
633.0
1,207.0
D1
D2
D3
D4
2.40
1.25
1.30
1.40
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixer
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
1.c.
1.e.
1.f
BAHAN
Semen (PC)
Pasir Beton
Kerikil Pecah
Kayu Perancah
Paku
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
=
=
=
Sm x 1.03
(Ps/1000 : D3) x 1.05
(Kr/1000 : D4) x 1.05
(T1 + T2 + T3 + T4)
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M12)
(M01a)
(M03)
(M19)
(M18)
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
311.060
0.5113
0.9053
0.0500
0.4000
500.00
0.83
8.00
4.00
2.00
3.00
17.00
Q1
1.465
(E06)
0.6827
2.b.
Koefisien Alat / M3
V x Fa x n
Wc
= 1 : Q2
(E23)
V
Wc
Fa
n
4.00
0.19
0.83
1.00
Q2
17.79
(E23)
0.0562
Analisa EI-718
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
jam
Kg/M3
Kg/M3
Kg/M3
Kg/M3
Berdasarkan
JMF & sesuai
dgn Spesifikasi
T/M3
T/M3
T/M3
T/M3
Kg
M3
M3
M3
Kg
liter
menit
menit
menit
menit
menit
M3
jam
Agregat Kasar
M3
M3
kali
M3
jam
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.1 (8)
PERKIRAAN VOL. PEK.
: Beton K125
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
1.3655
1.3655
0.6827
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
4
5
Semen
Pasir beton
Agregat Kasar
Kayu Perancah
Paku
(M12)
(M01a)
(M03)
(M19)
(M18)
Kg
M3
M3
M3
Kg
311.0600
0.5113
0.9053
0.0500
0.4000
688.66
96,600.00
210,171.86
1,250,000.00
5,500.00
PERALATAN
1.
2.
3.
Conc. Mixer
Water Tanker
Alat Bantu
E06
E23
jam
jam
Ls
0.6827
0.0562
1.0000
133,800.44
161,074.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-718
1.00
702,000.45
0.03
JUMLAH
HARGA
(Rp.)
me dan/atau ukuran
u satuan pekerjaan
6,188.70
8,143.03
4,885.82
19,217.55
214,213.41
49,388.61
190,258.08
62,500.00
2,200.00
518,560.10
91,349.70
9,054.88
0.00
100,404.58
638,182.22
63,818.22
702,000.45
: 7.1 (8)
: Beton K125
: M3
No.
2.c.
3.
URAIAN ANAL
U RAIAN
KODE
ALAT BANTU
Alat bantu
KOEF.
(E20)
TENAGA
Produksi Beton dalam 1 hari
Kebutuhan tenaga :
= Tk x Q1
- Mandor
- Tukang
- Tk Batu =
- Tk Kayu =
- Pekerja
Qt
10.25
M
Tb
1.00
2.00
2.00
1
1
Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
702,000.4 / M3
6.
7.
(L03)
(L02)
(L01)
0.6827
1.3655
1.3655
Analisa EI-718
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
M3
orang
orang
1 Tk = 20 m3 btn
1 Tk = 2 m3 kayu
orang
jam
jam
jam
: 7.3 (1)
: Baja Tulangan 24 Polos
: Kg
No.
I.
1
2
3
4
5
6
II.
1
2
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor Kehilangan Besi Tulangan
L
Tk
Fh
KOEF.
8.73
7.00
1.10
URUTAN KERJA
Besi tulangan dipotong dan dibengkokkan sesuai
dengan yang diperlukan
Batang tulangan dipasang / disusun sesuai dengan
Gambar Pelaksanaan dan persilangannya diikat kawat
III.
1.
1.a.
1.b.
BAHAN
Baja Tulangan (Polos) U24
Kawat beton
2.
2.a.
ALAT
ALAT BANTU
Diperlukan :
- Gunting Potong Baja
- Kunci Pembengkok Tulangan
- Alat lainnya
3.
URAIAN ANAL
TENAGA
Produksi kerja satu hari
dibutuhkan tenaga :
(M39a)
(M14)
1.1000
0.0025
Qt
M
Tb
P
200.00
1.00
1.00
3.00
(L03)
(L02)
(L01)
0.0350
0.0350
0.1050
= 2 buah
= 2 buah
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Kg :
- Mandor
- Tukang
- Pekerja
= ( M x Tk ) : Qt
= ( Tb x Tk ) : Qt
= ( P x Tk ) : Qt
4.
5.
11,330.10 / Kg
6.
7.
Analisa EI-731
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
jam
-
Kg
Kg
Ls
Kg
orang
orang
orang
jam
jam
jam
KETERANGAN
Analisa E
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
.
:
: 7.3 (1)
PERKIRAAN VOL. PEK.
: Baja Tulangan 24 Polos
TOTAL HARGA (Rp.)
: Kg
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
0.1050
0.0350
0.0350
:
:
:
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
(M39a)
(M14)
Kg
Kg
1.1000
0.0025
8,500.00
6,000.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-731
1.00
11,330.10
0.00
JUMLAH
HARGA
(Rp.)
me dan/atau ukuran
u satuan pekerjaan
475.89
208.73
250.47
935.09
9,350.00
15.00
9,365.00
0.00
0.00
10,300.09
1,030.01
11,330.10
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
: 7.9
: Pasangan Batu
: M3
U RAIAN
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Perbandingan Pasir & Semen
: - Volume Semen
: - Volume Pasir
Perbandingan Batu & Mortar :
- Batu
- Mortar (campuran semen & pasir)
Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar
- Batu
- Adukan (mortar)
- Pasir
- Semen Portland
KODE
KOEF.
SATUAN
L
Tk
Sm
Ps
8.73
7.00
25
75
Bt
Mr
65
35
D1
D2
D3
D4
D5
2.40
1.60
1.80
1.30
1.44
KM
jam
%
%
%
%
ton/M3
ton/M3
ton/M3
ton/M3
ton/M3
URUTAN KERJA
Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan Concrete Mixer
Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
Penyelesaian dan perapihan setelah pemasangan
III.
1.
1.a.
1.b.
BAHAN
Batu ----->
Semen ---->
1.c.
Pasir
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
----->
Koefisien Alat / M3
V x Fa x 60
1000 x Ts
= 1 : Q1
(M02)
(M12)
(M12)
(M01)
1.1700
0.1225
176.00
0.5088
M3
M3
Kg
M3
500.00
0.83
liter
-
8.00
4.00
3.00
2.00
17.00
menit
menit
menit
menit
menit
Q1
1.465
M3
(E06)
0.6827
jam
(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts
2.b.
Koefisien Alat / M3
V x Fa x n
Wc
= 1 : Q2
(E23)
V
Wc
Fa
n
4.00
0.190
0.83
1.00
M3
M3
kali
Q2
17.47
M3
(E23)
0.0572
jam
Berlanjut ke h
Analisa EI-79
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Spec.
Spec.
Lepas
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
:
:
: ..
.
:
: 7.9
PERKIRAAN VOL. PEK.
: Pasangan Batu
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
5.4618
1.3655
0.6827
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(Rp
4,532.31
5,963.57
7,156.29
BAHAN
1.
2.
3.
Batu Kali
Semen (PC)
Pasir
(M02)
(M12)
(M01)
M3
Kg
M3
1.1700
176.0000
0.5088
146,600.00
688.66
142,000.00
PERALATAN
1.
2.
3.
Conc. Mixer
Water Tanker
Alat Bantu
(E06)
(E23)
jam
jam
Ls
0.6827
0.0572
1.0000
133,800.44
161,074.00
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-79
1.00
553,666.41
0.03
JUMLAH
HARGA
(Rp.)
an/atau ukuran
tuan pekerjaan
24,754.81
8,143.03
4,885.82
37,783.66
171,522.00
121,203.50
72,256.15
364,981.65
91,349.70
9,218.09
0.00
100,567.79
503,333.10
50,333.31
553,666.41
diubah kecuali
Peserta Lelang
termasuk PPN
PROYEK
JENIS PEKERJAAN
SATUAN PEMBAYARAN
: 7.9
: Pasangan Batu
: M3
No.
2.c.
3.
U RAIAN
ALAT BANTU
Diperlukan :
- Sekop
- Pacul
- Sendok Semen
- Ember Cor
- Gerobak Dorong
=
=
=
=
=
2
2
2
2
1
KODE
:
Mandor
Tukang
Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
KOEF.
SATUAN
buah
buah
buah
buah
buah
TENAGA
Produksi menetukan : Produksi Concrete Mxer
Produksi Pasangan Batu dengan Mortar / hari = Tk x Q1
Kebutuhan tenaga : - Mandor
- Tukang Batu
- Pekerja
Koefisien Tenaga / M3
-
553,666.41 / M3
6.
7.
Q1
Qt
M
Tb
P
1.465
10.25
1.00
2.00
8.00
M3/Jam
M3
orang
orang
orang
(L03)
(L02)
(L01)
0.6827
1.3655
5.4618
jam
jam
jam
Analisa EI-79
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
: 7.7 (1)
: Penyediaan Dinding Sumuran Silinder, Diameter 250 cm
: M1
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
d
L
Tk
t
Mb
KOEF.
SATUAN
2.50
8.73
7.00
0.40
150
M
Km
Jam
M
Kg/M3
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
(M37)
(M39)
(M19)
(M18)
1.45
216.77
0.5890
2.00
M3
Kg
M3
Kg
Qt
6.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
10.500
3.500
1.167
jam
jam
jam
4,481,000
/ M'
6.
7.
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
: 7.7 (2)
: Penyediaan Dinding Sumuran Silinder, Diameter 300 cm
: M1
U RAIAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
KODE
d
L
Tk
t
Mb
KOEF.
SATUAN
3.00
8.73
7.00
0.40
150
M
Km
Jam
M
Kg/M3
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
(M37)
(M39)
(M19)
(M18)
1.76
263.89
0.7069
2.00
M3
Kg
M3
Kg
Qt
6.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
5,420,047
7.
No.
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.
10.500
3.500
1.167
jam
jam
jam
/ M'
6.
(L01)
(L02)
(L03)
: 7.7 (3)
: Penyediaan Dinding Sumuran Silinder, Diameter 350 cm
: M1
U RAIAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
KODE
d
L
Tk
t
Mb
KOEF.
SATUAN
3.50
8.73
7.00
0.40
150
M
Km
Jam
M
Kg/M3
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
(M37)
(M39)
(M19)
2.07
311.02
0.8247
M3
Kg
M3
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
6,379,016
7.
No.
I.
1
2
3
4
5
6
7
2.50
Kg
Qt
5.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
12.600
4.200
1.400
jam
jam
jam
/ M'
6.
(M18)
: 7.7 (4)
: Penyediaan Dinding Sumuran Silinder, Diameter 400 cm
: M1
U RAIAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Kebutuhan baja tulangan
KODE
d
L
Tk
t
Mb
KOEF.
SATUAN
4.00
8.7
7.00
0.45
150
M
Km
Jam
M
Kg/M3
II.
1
2
3
III.
1.
URUTAN KERJA
Caison dicetak di Lokasi
Pengecoran dengan Beton K 250 berdasarkan
analisa item pekerjaan ybs
Sekelompok pekerja akan mengerjakan pekerjaan
dengan cara manual dengan menggunakan alat bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Kebutuhan bahan untuk 1 M' Caison
- Beton K-250
= { Phi {(d/2)^2 - {(d-t)/2}^2)}
- Baja Tulangan
= (M37 x Mb)
- Kayu Bekisting = (2 x phi x (d/2) x 1 x 0.025 x 2 x 1.5)
- Paku
2.
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
2 buah
- Alat-alat kecil lain
3.
TENAGA
Produksi Caison / hari
Kebutuhan tenaga tambahan :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Tukang
- Mandor
= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt
4.
5.
8,015,583
2.67
400.26
0.9425
3.00
M3
Kg
M3
Kg
Qt
5.00
M'
P
T
M
9.00
3.00
1.00
orang
orang
orang
(L01)
(L02)
(L03)
12.600
4.200
1.400
jam
jam
jam
/ M'
6.
7.
(M37)
(M39)
(M19)
(M18)
: 7.7 (5)
: Penurunan Dinding Sumuran Silinder, Diameter 250 cm
: M1
No.
I.
1
2
3
4
5
6
7
8
II.
1
U RAIAN
KODE
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
2.50
8.7
7.00
0.40
4.91
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
Fa
0.93
0.90
0.83
M3
-
Ts1
T1
T2
Ts1
0.75
0.50
1.25
menit
menit
menit
menit
Q1
Q1
27.79
5.66
M3/Jam
M'/Jam
(E10)
0.1766
Jam
3.50
0.83
20.00
30.00
7.56
6.00
4.00
5.00
22.56
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
6.44
1.31
M3/Jam
M'/Jam
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
KOEF.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
= 1 : Q2
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Fk x Ts2
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q2
Q2
(E08)
0.7623
Jam
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
NAMA PAKET
JENIS PEKERJAAN
SATUAN PEMBAYARAN
: 7.7 (5)
: Penurunan Dinding Sumuran Silinder, Diameter 250 cm
: M1
No.
3.
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
4.
5.
221,169.66 / M'
6.
7.
KOEF.
SATUAN
Q1
Qt
5.66
194.52
P
M
8.00
1.00
(L01)
(L03)
1.4394
0.1799
M'/Jam
M3
orang
orang
Jam
Jam
No.
I.
1
2
3
4
5
6
7
8
II.
1
: 7.7 (6)
: Penurunan Dinding Sumuran Silinder, Diameter 300 cm
: M1
U RAIAN
KODE
KOEF.
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
3.00
8.7
7.00
0.45
7.07
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
0.93
0.90
M3
-
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Fa
0.83
Waktu siklus
- Menggali / memuat
- Lain-lain
Ts1
T1
T2
Ts1
0.75
0.50
1.25
menit
menit
menit
menit
Q1
Q1
27.79
3.93
M3/Jam
M'/Jam
(E10)
0.2544
Jam
3.50
0.83
20.00
30.00
7.56
6.00
4.00
2.00
19.56
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
7.43
1.05
M3/Jam
M'/Jam
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
2.d.
3.
V x Fa x 60
Fk x Ts2
= 1 : Q2
Q2
Q2
(E08)
0.9517
Jam
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
No.
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
: 7.7 (6)
: Penurunan Dinding Sumuran Silinder, Diameter 300 cm
: M1
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
KOEF.
SATUAN
Q1
Qt
3.93
194.52
P
M
8.00
1.00
(L01)
(L03)
1.4394
0.1799
M'/Jam
M3
orang
orang
Jam
Jam
4.
5.
288,254.15 / M'
6.
7.
: 7.7 (7)
: Penurunan Dinding Sumuran Silinder, Diameter 350 cm
: M1
No.
I.
1
2
3
4
5
6
7
8
II.
1
U RAIAN
KODE
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
3.50
8.7
7.00
0.45
9.62
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
Fa
0.93
0.90
0.83
M3
-
Ts1
T1
T2
Ts1
0.50
0.50
1.00
menit
menit
menit
menit
Q1
Q1
34.74
3.61
M3/Jam
M'/Jam
(E10)
0.2770
Jam
3.50
0.83
20.00
30.00
6.05
6.00
4.00
2.00
18.05
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
8.05
0.84
M3/Jam
M'/Jam
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
KOEF.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
= 1 : Q2
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Fk x Ts2
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q2
Q2
(E08)
1.1953
Jam
2.d.
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
: 7.7 (7)
: Penurunan Dinding Sumuran Silinder, Diameter 350 cm
: M1
No.
3.
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
4.
5.
343,065.30
/ M'
6.
7.
KOEF.
SATUAN
Q1
Qt
3.61
243.15
M'/Jam
M3
P
M
12.00
1.00
orang
orang
(L01)
(L03)
1.7273
0.1439
Jam
Jam
No.
I.
1
2
3
4
5
6
7
8
II.
1
: 7.7 (8)
: Penurunan Dinding Sumuran Silinder, Diameter 400 cm
: M1
U RAIAN
KODE
KOEF.
SATUAN
ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sekitar jembatan
Diameter bagian luar Caison
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Caison
Banyak Galian pada Caison / M'
Faktor pengembangan bahan
d
L
Tk
t
Vt
Fk
4.00
8.7
7.00
0.45
12.57
1.20
M
Km
Jam
M
M3
-
URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
dan tenaga manusia. Excavator menuangkan material
hasil galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Lb
2.00
Km
(E10)
V
Fb
Fa
0.93
0.75
0.75
M3
-
III.
1.
2.
2.a.
ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu muat
- Waktu tempuh isi
- Waktu tempuh kosong
- lain-lain
2.d.
3.
= 1 : Q2
menit
menit
menit
menit
Q1
Q1
26.16
2.08
M3/Jam
M'/Jam
(E10)
0.4804
Jam
3.50
0.83
20.00
30.00
8.03
6.00
4.00
3.00
21.03
ton
KM/Jam
KM/Jam
menit
menit
menit
menit
menit
menit
6.91
0.55
M3/Jam
M'/Jam
(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q2
Q2
(E08)
1.8193
: 7.7 (8)
: Penurunan Dinding Sumuran Silinder, Diameter 400 cm
: M1
U RAIAN
KODE
TENAGA
Produksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1 x Vt
Kebutuhan tenaga untuk 20% galian :
- Pekerja
- Mandor
Koefisien tenaga / M' :
- Pekerja
- Mandor
4.
V x Fa x 60
Fk x Ts2
0.50
0.50
1.00
Jam
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang, dan lain-lain
No.
= (V : Q1) x 60
= (L : v1) x 60
= (L : v2) x 60
Ts1
T1
T2
Ts1
= (Tk x P) : (20%Qt)
= (Tk x M) : (20%Qt)
KOEF.
SATUAN
Q1
Qt
2.08
183.09
M'/Jam
M3
P
M
14.00
1.00
orang
orang
(L01)
(L03)
2.6762
0.1912
Jam
Jam
5.
546,983.87
/ M'
6.
7.
No.
: 7.16.1
: Perkerasan Jalan Beton
: M3
U RAIAN
KODE
KOEF.
SATUAN
I.
1
2
3
4
5
6
7
8
9
10
11
II.
1
2
3
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
1.f.
1.g.
1.h.
1.i.
1.j.
1.k.
1.l.
1.m.
2.
2.a.
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal Lapis perkerasan beton padat
Kadar Semen Minimum (Spesifikasi)
Ukuran Agregat Maksimum
Perbandingan Air/Semen Maksimum (Spesifikasi)
Perbandingan Camp.
: Semen
: Pasir
: Agregat Kasar
Berat Jenis Material :
- Beton
- Semen
- Pasir
- Agregat Kasar
L
Tk
t
Ks
Ag
Wcr
Sm
Ps
Kr
8.7
7.00
0.30
365
19
0.50
400.0
791.0
1,077.0
D1
D2
D3
D4
2.20
1.25
1.30
1.40
KM
jam
m
Kg/M3
mm
%
%
%
T/M3
T/M3
T/M3
T/M3
URUTAN KERJA
Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Batching Plant
Beton di-cor ke dalam bekisting yang telah disiapkan
Penyelesaian dan perapihan setelah pemasangan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
Bahan untuk 1 m2 perkerasan beton t = 30 cm
BAHAN
Semen (PC)
= Sm x 1.025
Pasir Beton
= (Ps/1000 : D3) x 1.025
Agregat Kasar
= (Kr/1000 : D4) x 1.025
Baja Tulangan Polos
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound
Multiplex 12 mm
Kayu Acuan
Paku
Additive
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Muat
- Lain lain
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
Koefisien Alat/M2
(M12)
(M01a)
(M03)
(M39a)
(M94)
(M95)
(M96)
(M97)
(M98)
(M63)
(M99)
(M18)
(M67a)
V x Fb x Fa x 60
Ts1
= 1 : Q1
Q1
410.000
0.6237
0.7885
15.8750
0.9900
0.0200
0.1700
0.4375
0.8700
0.1600
0.096
1.024
0.9139
Kg
M3
M3
Kg
Kg
Kg
M2
Kg
Ltr
Lbr
M3
Kg
Ltr
1.50
0.85
0.83
M3
-
0.55
1.00
1.55
menit
menit
menit
40.96
M3
0.0244
Jam
No.
2.b.
U RAIAN
Kap.Prod. / jam =
Koefisien Alat/M2
2.c.
: 7.16.1
: Perkerasan Jalan Beton
: M3
V x Fa x 60
1000 x Ts2
= 1 : Q2
TRUCK MIXER
Kapasitas drum
Faktor Efisiensi alat
Kecepatan rata-rata isi
Kecepatan rata-rata kosong
Waktu Siklus
- mengisi
= (V : Q2) x 60
- mengangkut
= (L : v1) x 60 menit
- Kembali
= (L : v2) x 60 menit
- menumpahkan dll
Kap.Prod. / jam =
Koefisien Alat/M2
2.d.
V x Fa x 60
Ts3
2.e.
KODE
SATUAN
600.0
0.83
liter
-
T1
T2
T3
T4
Ts2
0.50
0.50
0.25
0.25
1.50
menit
menit
menit
menit
menit
Q2
19.92
M2
0.0502
Jam
(E49)
V
Fa
v1
v2
5.00
0.83
20.00
30.00
M3
KM / Jam
KM / Jam
T1
T2
T3
T4
Ts3
15.06
26.18
17.45
2.00
60.69
menit
menit
menit
menit
menit
Q3
4.1031
M3
0.2437
Jam
19.920
M3
0.0502
jam
4.00
0.07
0.83
M3
M3
-
(E20)
Q4
= 1 : Q4
KOEF.
(E43)
V
Fa
= 1 : Q3
CONCRETE VIBRATOR
Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas BATCHING PLANT
Koefisien Alat / M2
(E23)
V
Wc
Fa
V x Fa x n
Wc
Koefisien Alat / M3
2.f.
b x t Fa x v x 60
Koefisien Alat / M2
3.
Q5
47.43
M3
0.0211
jam
(E42)
b
t
v
Fa
Q6
3.00
0.30
3.00
0.83
ALAT BANTU
Diperlukan :
- Concrete Cutter
=
- Bar Bending Machine=
- Bar Cutting Machine =
- Sekop
=
- Pacul
=
- Sendok Semen
=
- Ember Cor
=
2
2
2
2
2
3
8
M3
0.0074
jam
KODE
KOEF.
SATUAN
buah
buah
buah
buah
buah
buah
buah
TENAGA
Produksi Beton dalam 1 hari
= Tk x Q2
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M3
-
M
M
M/menit
134.460
: 7.16.1
: Perkerasan Jalan Beton
: M3
U RAIAN
Kebutuhan tenaga :
kali
= 1 : Q6
No.
2.h.
1.00
= 1 : Q5
:
Mandor
Tukang
Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
Qt
139.44
M3
M
Tb
P
3.00
14.00
28.00
orang
orang
orang
(L03)
(L02)
(L01)
0.1506
0.7028
1.4056
jam
jam
jam
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.
1.00
/ M2
6.
7.
Analisa EI-771
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 7.7 (1)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
10.5000
3.5000
1.1667
Tambahan
Tambahan
B.
BAHAN
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
1.4451
216.7699
0.5890
2.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-772
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 7.7 (2)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
10.5000
3.5000
1.1667
Tambahan
Tambahan
B.
BAHAN
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
1.7593
263.8938
0.7069
2.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-773
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 7.7 (3)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
12.6000
4.2000
1.4000
BAHAN
Tambahan
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
2.0735
311.0177
0.8247
2.5000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-774
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
:
:
: 7.7 (4)
: Penyediaan Dinding Sumuran Silinder,
: M1
PERKIRAAN
NO.
KOMPONEN
SATUAN KUANTITAS
Spec.
A.
TENAGA
1.
2.
3.
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
Jam
Jam
Jam
12.6000
4.2000
1.4000
Tambahan
Tambahan
B.
BAHAN
1.
2.
3.
4.
Beton K-250
Baja Tulangan
Kayu Perancah
Paku
(EI-715)
(EI-73)
(M19)
(M18)
M3
Kg
M3
Kg
2.6684
400.2585
0.9425
3.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-775
URAIAN ANALISA HARGA SATUAN
NO.
:
:
:
:
: 7.7 (5)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.4394
0.1799
BAHAN
PERALATAN
1.
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.1766
0.7623
1.0000
3
4
Lump Sump
Analisa EI-775
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-776
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 7.7 (6)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.4394
0.1799
BAHAN
PERALATAN
1.
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.2544
0.9517
1.0000
3
4
Lump Sump
Analisa EI-776
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-777
URAIAN ANALISA HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 7.7 (7)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
1.7273
0.1439
BAHAN
PERALATAN
1
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.2770
1.1953
1.0000
3
4
Lump Sump
Analisa EI-777
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-778
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 7.7 (8)
: Penurunan Dinding Sumuran Silinder,
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
2.6762
0.1912
BAHAN
PERALATAN
1
2
3
Excavator
Dump Truck
Alat Bantu
(E10)
(E08)
Jam
Jam
Ls
0.4804
1.8193
1.0000
3
4
Lump Sump
Analisa EI-778
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-7.16.1
KETERANGAN
PROYEK
NAMA PAKET
:
:
NO.
Berdasarkan
JMF & sesuai
dgn Spesifikasi
:
: 7.16.1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
1.
2.
3.
TENAGA
Pekerja
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.4056
0.7028
0.1506
BAHAN
Semen
Pasir
Agregat Kasar
Baja Tulangan Polos
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound
C.
1
2
3
4
5
6
7
8
PERALATAN
Wheel Loader
Batching Plant
Truck Mixer
Con. Vibrator
Water Tank Truck
Conc. Paver
Alat Bantu
Multiplex 12 mm
Kayu Acuan
Paku
Additive
D.
E.
F.
G.
Note: 1
2
3
4
(M12)
(M01a)
(M03)
(M39a)
(M94)
(M95)
(M96)
(M97)
(M98)
(M73)
(M99)
(M18)
(M67a)
Kg
M3
M3
Kg
Kg
Kg
M2
Kg
Ltr
Lbr
M3
Kg
Ltr
E15
E43
E49
E20
E23
E42
jam
jam
jam
jam
jam
jam
Ls
410.0000
0.6237
0.7885
15.8750
0.9900
0.0200
0.1700
0.4375
0.8700
0.1600
0.0960
1.0240
0.9139
JUMLAH HARGA BAH
0.0244
0.0502
0.2437
0.0502
0.0211
0.0074
1.0000
Analisa EI-7.16.1
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
945
Analisa EI-7.16.1
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-771
NDAR UNTUK
G-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
:
:
:
1.00
4,481,000.36
0.21
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
973,593.01
8,500.00
1,250,000.00
5,500.00
0.00
47,589.30
20,872.50
8,349.00
76,810.80
1,406,971.02
1,842,544.09
736,310.78
11,000.00
3,996,825.89
0.00
0.00
AN ( A + B + C )
4,073,636.69
407,363.67
4,481,000.36
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-772
NDAR UNTUK
G-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
:
:
:
1.00
5,420,046.69
0.25
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
973,593.01
8,500.00
1,250,000.00
5,500.00
0.00
47,589.30
20,872.50
8,349.00
76,810.80
1,712,834.29
2,243,097.15
883,572.93
11,000.00
4,850,504.38
0.00
0.00
AN ( A + B + C )
4,927,315.18
492,731.52
5,420,046.69
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-773
NDAR UNTUK
G-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
:
:
:
1.00
6,379,016.40
0.29
JUMLAH
HARGA
(Rp.)
57,107.16
25,047.00
10,018.80
92,172.96
973,593.01
8,500.00
1,250,000.00
5,500.00
2,018,697.55
2,643,650.22
1,030,835.09
13,750.00
5,706,932.86
0.00
0.00
0.00
AN ( A + B + C )
5,799,105.82
579,910.58
6,379,016.40
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-774
NDAR UNTUK
G-MASING HARGA SATUAN
..
HARGA
:
:
:
1.00
8,015,583.29
0.37
JUMLAH
SATUAN
(Rp.)
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
973,593.01
8,500.00
1,250,000.00
5,500.00
0.00
57,107.16
25,047.00
10,018.80
92,172.96
2,597,926.11
3,402,197.58
1,178,097.25
16,500.00
7,194,720.94
0.00
0.00
AN ( A + B + C )
7,286,893.90
728,689.39
8,015,583.29
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
Analisa EI-775
..
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
221,169.66
0.01
JUMLAH
HARGA
(Rp.)
6,524.04
1,287.64
7,811.68
0.00
383,252.01
164,696.38
0.00
67,700.33
125,551.32
0.00
193,251.65
AN ( A + B + C )
201,063.33
20,106.33
221,169.66
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-776
NDAR UNTUK
G-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
288,254.15
0.01
JUMLAH
HARGA
(Rp.)
6,524.04
1,287.64
7,811.68
383,252.01
164,696.38
0.00
0.00
97,488.48
156,749.08
0.00
254,237.55
AN ( A + B + C )
262,049.23
26,204.92
288,254.15
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
Analisa EI-777
..
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
343,065.30
0.02
JUMLAH
HARGA
(Rp.)
7,828.85
1,030.11
8,858.96
0.00
383,252.01
164,696.38
0.00
106,154.12
196,864.47
0.00
303,018.59
AN ( A + B + C )
311,877.54
31,187.75
343,065.30
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-778
NDAR UNTUK
G-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
:
:
:
1.00
546,983.87
0.03
JUMLAH
HARGA
(Rp.)
12,129.49
1,367.99
13,497.48
383,252.01
164,696.38
0.00
0.00
184,127.57
299,633.02
0.00
483,760.59
AN ( A + B + C )
497,258.07
49,725.81
546,983.87
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
G-MASING HARGA SATUAN
..
Analisa EI-7.16.1
PERKIRAAN VOL. PEK.
TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
:
:
:
1.00
1,118,735.17
0.05
JUMLAH
HARGA
(Rp.)
6,370.72
4,191.27
1,077.75
11,639.74
550.93
96,600.00
210,171.86
8,500.00
34,100.00
35,750.00
6,050.00
19,250.00
38,500.00
181,500.00
1,250,000.00
5,500.00
38,500.00
JUMLAH HARGA BAHAN
225,879.25
60,246.82
165,724.27
134,937.50
33,759.00
715.00
1,028.50
8,421.88
33,495.00
29,040.00
120,000.00
5,632.00
35,185.92
854,065.13
266,795.62
478,489.26
464,251.69
18,228.49
161,074.00
448,693.06
0.00
6,512.85
24,020.55
113,145.49
915.08
3,396.14
3,337.00
0.00
AH HARGA PERALATAN
AN ( A + B + C )
151,327.10
1,017,031.97
101,703.20
1,118,735.17
1,118,735.17
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
0.025
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
: 8.1 (1)
: Pondasi Agregat Kls. A Untuk Pek. Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran :
- Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Pasir Urug
Berat Isi Agregat (lepas)
Faktor kehilangan
- Agregat A
1.
BAHAN
- Agregat A
= 1 M3 x (Bip/Bil) x Fh
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
Kap. Prod. / jam =
Koefisien Alat / M3
2.b.
KODE
L
t
Bip
Tk
20-30
5-10&10-20
PU
Bil
Fh
KOEF.
8.7
0.15
1.81
7.00
28.00
42.00
30.00
1.51
1.05
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar secara manual
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
III.
2.
2.a.
URAIAN
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
(M26)
###
(E15)
V
Fb
Fa
1.50
0.85
0.83
Ts1
0.45
Q1
117.71
(E15)
0.0085
(E08)
V
Fa
v1
v2
T1
T2
3.50
0.83
20.00
30.00
1.18
26.18
T3
T4
Ts2
17.45
2.00
46.81
Q2
2.06
Koefisien Alat / M3
V x Fa x 60
Ts2 x Bip
= 1 : Q2
U RAIAN
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
Koefisien Alat / M3
2.d.
2.g.
(v x 1000) x b x t x Fa
n
= 1 : Q3
pa x Fa x 60
1000 x Wc
= 1 : Q4
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 10 buah
= 10 buah
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
3.
0.4861
: 8.1 (1)
: Pondasi Agregat Kls. A Untuk Pek. Minor
: M3
No.
2.c.
(E09)
URAIAN
KODE
KOEF.
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
Q3
18.99
(E24)
0.0527
(E23)
V
Wc
pa
Fa
4.00
0.07
100.00
0.83
Q4
71.14
(E23)
0.0141
Q1
Qt
117.71
823.99
P
M
25.00
1.00
(L01)
(L03)
0.2124
0.0085
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
388,883.32 / M3.
6.
7.
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
: 8.1 (2)
: Pondasi Agregat Kls. B Untuk Pek. Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Berat isi padat
Jam kerja efektif per-hari
Proporsi Campuran :
- Agregat Pecah Mesin 20 - 30 mm
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm
- Sirtu
Berat volume agregat (lepas)
- Agregat B
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan pekerja
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
URAIAN
KODE
L
t
Bip
Tk
20-30
5-10&10-20
St
Bil
Fh
KOEF.
8.7
0.15
1.81
7.00
18.00
18.00
64.00
1.51
1.05
(M27)
1.2586
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Memuat dan lain-lain
(E15)
V
Fb
Fa
Ts1
T1
V x Fb x Fa x 60
Bip/Bil x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain (termasuk dumping setempat-setempat)
V x Fa x 60
Bip/Bil x Ts2
= 1 : Q2
U RAIAN
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
Koefisien Alat / M3
2.d.
0.45
Ts1
0.45
Q1
117.71
(E15)
0.0085
(E08)
V
Fa
v1
v2
T1
T2
T3
T4
Ts2
3.50
0.83
20.00
30.00
1.18
26.18
17.45
2.00
46.81
Q2
(E09)
3.11
0.3219
: 8.1 (2)
: Pondasi Agregat Kls. B Untuk Pek. Minor
: M3
No.
2.c.
1.50
0.85
0.83
(v x 1000) x b x t x Fa
n
= 1 : Q3
URAIAN
KODE
KOEF.
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
Q3
18.99
(E24)
0.0527
(E23)
V
Wc
pa
4.00
0.07
100.00
pa x Fa x 60
Fa
0.83
Q4
71.14
2.e.
3.
Koefisien Alat / M3
Wc x 1000
= 1 : Q4
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 10 buah
= 10 buah
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
(E23)
0.0141
Q1
Qt
117.71
823.99
P
M
15.00
1.00
(L01)
(L03)
0.1274
0.0085
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
358,718.70 / M3.
6.
7.
: 8.1 (3)
: Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor
SATUAN PEMBAYARAN
: M3
URAIAN
No.
I.
1
2
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
KODE
KOEF.
3
4
5
6
7
8
II.
1
2
3
4
III.
1.
2.
2.a.
L
t
Bip
Tk
Bil
8.7
0.15
1.81
7.00
1.51
(M28)
1.20
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu siklus
- Muat
(E15)
V
Fb
Fa
Ts1
T1
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam Dump
Tuck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaandan dihampar dengan pekerja
Hamparaan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller.
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu
V x Fb x Fa x 60
Bip/Bil x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat =
V x 60/Q1 x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain (termasuk dumping setempat-setempat)
Kap. Prod./jam =
Koefisien Alat / M3
V x Fa x 60
Bip/Bil x Ts2
= 1 : Q2
1.50
0.85
0.83
0.45
Ts1
0.45
Q1
117.71
(E15)
0.0085
(E09)
V
Fa
v1
v2
T1
T2
T3
T4
Ts2
10.00
0.83
20.00
30.00
3.38
26.18
17.45
10.00
57.00
Q2
7.29
(E09)
0.1372
: 8.1 (3)
: Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup Aspal Utk. Pek. Minor
SATUAN PEMBAYARAN
: M3
URAIAN
No.
2.c.
U RAIAN
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
(v x 1000) x b x t x Fa
n
= 1 : Q3
Koefisien Alat / M3
2.d.
2.g.
3.
Koefisien Alat / M3
pa x Fa x 60
Wc x 1000
= 1 : Q4
ALAT BANTU
diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 10 buah
= 10 buah
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3
KOEF.
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
Q3
18.99
(E24)
0.0527
(E23)
V
Wc
pa
Fa
0.84
0.07
100.00
0.83
Q4
71.14
(E23)
0.0141
Q1
Qt
117.71
823.99
P
M
15.00
1.00
(L01)
(L03)
0.1274
0.0085
:
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
KODE
337,954.39 / M3.
6.
7.
No.
I.
1
2
3
4
5
6
7
8
9
10
II.
1
2
3
: 8.1 (4)
: Waterbound Macadam Utk. Pek. Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan material Agregat
Komposisi campuran (taksiran) :
- Agregat Kasar
- Agregat Halus
Berat jenis bahan :
- Agregat
Berat isi padat
Berat volume agregat (lepas)
URAIAN
KODE
KOEF.
L
Tk
Fh
8.7
7.00
1.10
Ak
Ah
85.00
15.00
D1
Bip
Bil
1.80
1.81
1.51
URUTAN KERJA
Permukaan dasar dibersihkan dan diratakan
Agregat dimuat ke dalam Dump Truck dengan
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Agregat Halus ditebarkan dan dipadatkan dengan
disiram air agar mengisi rongga Agregat Kasar
III.
1.
1.a.
1.b.
(M03)
(M04)
0.9350
0.1650
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
(E15)
V
1.50
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Menunggu, dan lain lain
Fb
Fa
Ts1
T1
0.85
0.83
Ts1
0.45
0.45
Q1
98.09
(E15)
0.0102
(E09)
V
Fa
v1
v2
10.00
0.83
40.00
50.00
Waktu Siklus
- Mengisi Bak = V : Q1 x 60
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit
Ts2
T1
T2
T3
T4
Ts2
6.12
13.09
15.00
10.47
44.67
Kap.Prod. / jam =
Q2
11.15
Koefisien Alat/M3
2.b.
V x Fb x Fa x 60
Ts1 x (Bip/Bil)
= 1 : Q1
Koefisien Alat / M3
V x Fa x 60
Ts2
= 1 : Q2
2.d.
3.
U RAIAN
0.0897
: 8.1 (4)
: Waterbound Macadam Utk. Pek. Minor
: M3
No.
2.c.
(E09)
Koefisien Alat / M3
(v x 1000) x b x t x Fa
n
= 1 : Q3
ALAT BANTU
diperlukan :
- Kereta dorong
- Sekop
- Sapu
- Sikat
=
=
=
=
3
5
5
3
URAIAN
KODE
KOEF.
(E16)
v
b
t
n
Fa
Q3
3.00
1.20
0.10
8.00
0.83
37.35
(E16)
0.0268
Q1
Qt
98.09
686.66
16.00
buah
buah
buah
buah
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
1.00
Koefisien Tenaga / M3
:
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7.
No.
I.
1
2
3
4
5
6
7
8
0.1631
0.0102
296,327.81 / M3.
6.
(L01)
(L03)
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis Hotmix padat untuk patching
Jam kerja efektif per-hari
Faktor kehilangan material :
- Agregat
- Aspal
Komposisi campuran ATB :
- Coarse Agregat
- Fine Agregat
URAIAN
KODE
KOEF.
L
t
Tk
Fh1
Fh2
8.7
0.04
7.00
1.10
1.05
CA
FA
55.00
37.50
- Fraksi Filler
- Asphalt
Berat jenis bahan :
minimum 6 %
FF
As
1.00
6.50
10
11
II.
1
2
3
4
- ATB
- Coarse Agregat & Fine Agregat
- Fraksi Filler
- Asphalt
Jarak stock pile ke cold bin
Faktor kembang
2.30
1.80
2.00
1.03
100.00
1.20
(M03)
(M04)
(M05)
(M10)
0.7731
0.5271
25.300
157.0
URUTAN KERJA
Wheel Loader memuat Agregat ke dalam
Cold Bin AMP
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan
Campuran panas ATB dihampar dengan manual
dan dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparaan dengan menggunakan
Alat Bantu
III.
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Kecepatan maju (ke bin)
Kecepatan kembali (ke stock pile)
Waktu Siklus
- Muat =
l x 60
- Lain lain
1000 x Vf
Koefisien Alat/M3
+ l x 60
1000 x Vr
V x Fb x Fa x 60
Fh1 x Ts1xFk
= 1 : Q1
(E15)
V
Fb
Fa
Vf
Vr
Ts1
T1
T2
Ts1
1.50
0.85
0.83
15.00
20.00
0.70
0.75
1.45
Q1
33.17
(E15)
0.0301
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
: M3
No.
2.b.
D1
D2
D3
D4
l
Fk
U RAIAN
URAIAN
KODE
(E01)
KOEF.
Kapasitas produksi
60.0
Fa
0.83
Q2
18.04
(E01)
0.0554
GENERATORSET ( GENSET )
Kap.Prod. / Jam = SAMA DENGAN AMP
Koefisien Alat/M3
= 1 : Q3
(E12)
Q3
(E12)
18.04
0.0554
(E09)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
Kap.Prod. / jam =
Koefisien Alat/M3
2.c.
2.d.
Kap.Prod. / jam =
Koefisien Alat/M3
2.e.
Koefisien Alat/M3
3.
= 1 : Q4
(v x 1000) x b x t x Fa
n
= 1 : Q5
Q4
10.00
0.83
20.00
30.00
1.00
1.00
10.00
26.18
25.00
17.45
78.63
2.29
(E09)
0.4358
(E17)
v
b
n
Fa
1.50
0.61
6.00
0.83
Q5
5.06
(E17)
0.1975
Q6
Qt
18.04
126.30
P
M
20.00
2.00
(L01)
(L03)
1.1084
0.1108
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop, Garpu = 5 buah
- Pacul, Linggis = 4 buah
- Tongkat Kontrol ketebalan hanparan
TENAGA
Produksi menentukan : AMP
Produksi ATB / hari = Tk x Q6
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3
4.
V x Fa x 60
D1 x Ts2 x Fk
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
2.h.
V x Fa
D1 x Fk
= 1 : Q2
:
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
: 8.1 (5)
: Camp. Aspal Panas Utk.Pek.Minor
: M3
No.
5.
U RAIAN
15,970.89 / M3.
6.
7.
URAIAN
KODE
KOEF.
No.
I.
1
2
3
4
5
6
7
8
10
II.
1
2
3
4
5
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal rata2 Lapen
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Aspal
:
- Paska Agregat Pokok
(Perata)
URAIAN
KODE
KOEF.
L
t
Tk
Fh1
Fh2
8.73
0.055
7.00
1.10
1.05
Ak
Ap
As1
As2
133.00
25.00
5.20
94.55
D1
D2
1.80
1.01
Fk
1.20
URUTAN KERJA
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
III.
1.
BAHAN
1.a.
Agregat Kasar
(M03)
1.4778
1.b.
1.c.
Agregat Pengunci
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Memuat, menuang, kembali
Koefisien Alat/M3
2.b.
No.
2.c.
V x Fb x Fa x 60
Ts1 x Fk
= 1 : Q1
0.2778
99.2727
1.50
0.85
0.83
0.45
Ts1
0.45
Q1
117.58
(E15)
0.0085
(E09)
V
Fa
v1
v2
10.00
0.83
20.00
30.00
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
U RAIAN
URAIAN
KODE
KOEF.
Waktu Siklus
- Mengisi Bak =
(V x 60)/(Q1 x D1 x Fk)
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump (setempat2) + Putar
- Kembali
= (L : v2) x 60 menit
Ts2
T1
T2
T3
T4
Ts2
2.36
26.18
2.00
17.45
47.99
Kap.Prod. / jam =
Q2
4.80
V x Fa x 60
Ts2 x D1 x Fk
Koefisien Alat / M3 = 1 : = 1 : Q2
(E09)
0.2081
(E16)
v
b
n
Fa
2.00
1.70
6.00
0.83
Q3
25.87
(E16)
0.0387
(E15)
V
Fb
Fa
Ts1
T1
(M04)
(M10)
ASPHALT SPRAYER
(v x 1000) x b x t x Fa
n
= 1 : Q3
(E03)
Kapasitas alat
850.00
2.e.
3.
Fa
pas
0.83
55
Pemakaian aspal =
M10
99.2727
pas x Fa x 60 x D2 x 1000
1000 x M10
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
diperlukan setiap :
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
=
=
=
=
=
=
=
(E03)
0.0359
Q1
Qt
117.58
823.08
P
M
20.00
2.00
(L01)
(L03)
0.1701
0.0170
M3 pekerjaan
= (Tk x P) / Qt
= (Tk x M) / Qt
: 8.1 (7)
: Penetrasi Macadam Utk.Pek.Minor
: M3
No.
U RAIAN
6.
:
- Pekerja
- Mandor
27.87
5.
75.00
buah
buah
buah
buah
buah
buah
buah
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3
4.
3
5
5
3
5
3
3
Q4
1,194,059.09 / M3.
URAIAN
KODE
KOEF.
Masa Pelaksanaan :
7.
. . . . . . . . . . . bulan
Volume pekerjaan :
No.
1.00 M3
: 8.1 (8)
: Camp. Aspal Dingin Utk.Pek.Minor
: M3
U RAIAN
URAIAN
KODE
KOEF.
I.
1
2
3
4
5
7
II.
ASUMSI
Menggunakan buruh dan alat (semi mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum
- Kadar Aspal terhadap berat total campuran
- Tebal nominal padat untuk patching
Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil)
- Aspal (diambil)
- Agregat (diambil)
Faktor kembang campuran
4
III.
URUTAN KERJA
Agregat dan Aspal dicampur di dalam Pengaduk
Beton Mekanis (Concrete Mixer)
Campuran dibawa ke lokasi pekerjaan dengan
menggunakan Dump Truck
Pekerja membuat/merapikan lubang patching/galian,
campuran dihampar manual dengan alat bantu
Hamparan dipadatkan dengan Pedestrian Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
BAHAN
Agregat Halus
Aspal Emulsi
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
1
2
3
Koefisien Alat / M3
2.b.
Koefisien Alat / M3
8.7
7.00
Sa
As
t
19.00
7.00
0.04
D1
D2
D3
Fk
2.01
1.00
1.60
1.20
(M04)
(M31)
(E06)
V
Fa
Ts1
T1
T2
T3
T4
Ts1
V x Fa x 60
1000 x Ts1x Fk
= 1 : Q1
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
L
Tk
(v x 1000) x b x t x Fa
n
= 1 : Q2
1.1683
140.700
500.00
0.83
0.50
1.00
0.30
0.20
2.00
Q1
10.375
(E06)
0.0964
(E 24)
v
b
n
Fa
1.50
0.61
6.00
0.83
Q2
5.06
0.1975
: 8.1 (8)
: Camp. Aspal Dingin Utk.Pek.Minor
: M3
No.
2.c.
U RAIAN
Kap.Prod. / jam =
Koefisien Alat / M3
2.d.
3.
ALAT BANTU
Diperlukan :
- Sekop
- Sapu
- Alat Perata
- Gerobak Dorong
V x Fa x 60
D1 x Ts2 x Fk
= 1 : Q3
=
=
=
=
3
4
3
2
URAIAN
KODE
(E09)
V
Fa
v1
v2
Q1b
Tb
Ts2
T1
T2
T3
T4
Ts2
Q3
KOEF.
10.00
0.83
20.00
30.00
0.35
2.00
23.98
26.18
10.00
17.45
77.60
2.66
(E09)
0.3759
Q1
Qt
M
P
10.375
72.63
2.00
12.00
(L03)
(L01)
0.1928
1.1566
buah
buah
buah
buah
TENAGA
Produksi menentukan (Produksi Concrete Mixer)
Produksi Campuran dalam 1 hari
= Tk x Q1
Kebutuhan tenaga :
- Mandor
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Pekerja
= (Tk x M) : Qt
= (Tk x P) : Qt
4.
5.
1,219,159.14 / M3
6.
7.
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
: 8.1 (9)
: Residu Bitumen Untuk Pek.Minor
: LITER
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Berat jenis bahan :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Minyak Tanah (Kerosene)
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
URAIAN
KODE
KOEF.
L
Tk
Fh
8.7
7.00
1.10
As
K
87.00
13.00
D1
D2
1.03
0.80
Pc
1.10
URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
Angkutan Aspal dan Minyak tanah menggunakan Dump
Truck
III.
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Kerosene
2.
ALAT
= As x Pc x D1 : 100
= K x Pc : 100
(M10)
(M11)
0.99
0.14
2.a.
2.b.
APHALT SPRAYER
Kapasitas alat
Faktor Efisiensi Alat
Kapasitas pompa aspal
(E03)
V
Fa
pas
Kap.Prod. / jam =
pas x fa x fh x 60
= 1 : Q1
Q1
(E03)
AIR COMPRESOR
850.00
0.83
55.00
3,012.90
0.0003
(E05)
Q2
= 1 : Q2
(E09)
(E09)
= 1 : Q3
Q3
0.0003
3,012.90
0.0003
: 8.1 (9)
: Residu Bitumen Untuk Pek.Minor
: LITER
No.
3.
(E05)
3,012.90
U RAIAN
TENAGA
Produksi menentukan : ASPHALT SPRAYER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / Ltr
:
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
7,396.38 / Liter
URAIAN
KODE
KOEF.
Q1
Qt
3,012.90
21,090.30
P
M
10.00
1.00
(L01)
(L03)
0.0033
0.0003
6.
7.
No.
I.
1
2
3
4
5
6
: 8.2 (1)
: Galian untuk Bahu Jalan & Pek. Minor Lain
: M3
U RAIAN
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Berat jenis bahan (lepas)
URAIAN
KODE
Tk
Fk
D
KOEF.
7.00
1.20
1.60
II.
1
2
URUTAN KERJA
Tanah yang dipotong umumnya berada disisi jalan
Penggalian dilakukan dengan menggunakan pekerja
3
4
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
Koefisien Alat / M3
2.d.
3.
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
D x Fk x Ts2
= 1 : Q1
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q1
2.00
10.0
0.83
20.00
30.00
35.00
6.00
4.00
2.00
47.00
5.52
(E08)
0.1812
Qt
70.00
P
M
10.00
1.00
(L01)
(L03)
1.0000
0.1000
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang
TENAGA
Produksi Galian / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
= (Tk x P) : Qt
= (Tk x M) : Qt
: 8.2 (1)
: Galian untuk Bahu Jalan & Pek. Minor Lain
: M3
URAIAN
No.
5.
U RAIAN
73,130.07 / M3
6.
7.
KODE
KOEF.
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
4
III.
1.
1a
2.
2.a
U RAIAN
ASUMSI
Menggunakan alat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang/baik
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor pengembangan bahan
Tebal hamparan padat
Hasil bongkaran per M2 luas area
URUTAN KERJA
Alat penyapu mekanis atau kompresor atau alat sapu yang lebih kaku
membersihkan kotoran di lokasi
Gergaji listrik atau alat tebang manual lainnya digunakan untuk menebang
tanaman, dipotong mulai dari atas ke bawah
Pembersihan dan pengangkatan akar tanaman dengan linggis dan sekop
Dump truck membawa tanaman bongkaran ke tempat pembuangan sejauh
Sekelompok pekerja membuat timbunan, pemadatan pada galian bekas
pembongkaran tanaman, merapikan dan levelling permukaan
dengan menggunakan Alat Bantu
KODE
URAIAN
KOEF.
L
Tk
Fk
t
d
8.7
7.00
1.20
0.15
0.50
2.00
(M08)
1.20
(E09)
V
Fa
v1
v2
10.00
0.83
20.00
30.00
T1
T2
T3
Ts2
Q2
26.18
17.45
2.00
45.63
21.83
(E09)
0.0458
= 1 x Fk
ALAT
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
- Lain-lain (termasuk dumping setempat-setempat)
Kap. Prod. / jam =
2.b
: 8.2 (2)
: Pembersihan dan Pembongkaran Tanaman (diameter < 30 cm)
: M2
Koefisien Alat / M3
V x Fa x 60
Ts2 x d
= 1 : Q2
ALAT BANTU
Diperlukan :
- Linggis
= 2 buah
- Sekop
- Garpu
- Gergaji listrik
= 2 buah
= 2 buah
= 2 buah
TENAGA
Produksi pembersihan dan pembongkaran/hari
Qt
500.00
P
M
5.00
1.00
Kebutuhan tenaga :
- Pekerja
- Mandor
3.
Koefisien tenaga / M3 :
- Pekerja
- Mandor
4.
(L01)
(L03)
0.0700
0.0140
: 8.2 (2)
: Pembersihan dan Pembongkaran Tanaman (diameter < 30 cm)
: M2
No.
5.
= (Tk x P) : Qt
= (Tk x M) : Qt
U RAIAN
43,887.00 / M3.
6.
7.
KODE
URAIAN
KOEF.
No.
I.
1
2
3
4
5
6
II.
1
2
2
3
4
: 8.2 (3)
: Penebangan Pohon, diameter 30 - 50 CM
: Buah
U RAIAN
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
1 Pohon diameter 30-50 cm setara dengan volume
Berat Jenis Kayu
URUTAN KERJA
Pemotongon Pohon dilakukan menggunakan peralatan alat
bantu Chainsaw, Kampak dan Parang
Pohon ditebang dimulai dari atas
Penggalian akar pohon dilakukan menggunakan pekerja
Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh
URAIAN
KODE
KOEF.
Tk
Vp
BjK
7.00
3.00
0.90
2.00
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
= (L : v1) x 60
= (L : v2) x 60
Koefisien Alat / M3
'2.b.
V x Fa x 60
Vp x Ts x Bjk
= 1 : Q1
35.00
6.00
4.00
10.00
55.00
3.35
0.2982
= H : Tk
= 1 : Q2
Q2
1.0000
(E08)
1.00
No.
3.
10.0
0.83
20.00
30.00
2.d.
Q1
(E09)
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
: 8.2 (3)
: Penebangan Pohon, diameter 30 - 50 CM
: Buah
U RAIAN
URAIAN
KODE
KOEF.
TENAGA
Produksi Galian akar pohon / hari =
Qt
20.00
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / buah :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
131,048.59 / Buah
6.
7.
P
M
10.00
1.00
(L01)
(L03)
3.50
0.35
: 8.2 (4)
: Penebangan Pohon, diameter 50 - 75 CM
: Buah
No.
I.
1
2
3
4
5
6
II.
1
2
2
3
4
U RAIAN
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
1 Pohon diameter 50 - 75 cm setara dengan volume
Berat jenis kayu
URUTAN KERJA
Pemotongon Pohon dilakukan menggunakan peralatan
Chainsaw, Kampak dan Parang
Pohon ditebang dimulai dari atas
Penggalian akar pohon dilakukan menggunakan pekerja
Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh
III.
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
Koefisien Alat / M3
'2.b.
= 1 : Q1
= (L : v1) x 60
= (L : v2) x 60
V x Fa x 60
Vp x Ts2 x bjk
URAIAN
KODE
KOEF.
Tk
Vp
Bjk
7.00
5.00
0.90
2.00
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
Q1
(E09)
10.0
0.83
20.00
30.00
35.00
6.00
4.00
10.00
55.00
2.01
0.4970
Q2
1.00
1.00
: 8.2 (4)
: Penebangan Pohon, diameter 50 - 75 CM
: Buah
No.
3.
= 1 : Q2
U RAIAN
URAIAN
KODE
KOEF.
TENAGA
Produksi Galian akar pohon / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Qt
20.00
P
M
10.00
1.00
(L01)
(L03)
3.5000
0.3500
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
204,944.60 / Buah
6.
7.
No.
I.
1
2
3
4
5
6
II.
1
2
2
3
4
III.
: 8.2 (5)
: Penebangan Pohon, diameter > 75 CM
: Buah
U RAIAN
ASUMSI
Menggunakan tenaga pekerja/peralatan
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
1 Pohon diameter > 75 cm setara dengan volume
Berat jenis kayu
URUTAN KERJA
Pemotongon Pohon dilakukan menggunakan peralatan
Chainsaw, Kampak dan Parang
Pohon ditebang dimulai dari atas
Penggalian akar pohon dilakukan menggunakan pekerja
Pohon yang sudah ditebang dipotong-potong dan
dimuat kedalam Dump Truck menggunakan pekerja
Dump Truck membuang material hasil tebangan keluar
lokasi jalan sejauh
URAIAN
KODE
KOEF.
Tk
Vp
Bjk
7.00
10.00
0.90
2.00
1.
BAHAN
Tidak ada bahan yang diperlukan
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain
= (L : v1) x 60
= (L : v2) x 60
Koefisien Alat / M3
'2.b.
V x Fa x 60
Vp x Ts x Bjk
= 1 : Q1
Koefisien Alat / M3
(E08)
35.00
6.00
4.00
15.00
60.00
0.92
1.0843
= 1 : Q2
Q2
0.75
(E08)
1.33
No.
3.
Q1
10.0
0.83
20.00
30.00
2.d.
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts
: 8.2 (5)
: Penebangan Pohon, diameter > 75 CM
: Buah
U RAIAN
URAIAN
KODE
KOEF.
TENAGA
Produksi Galian akar pohon / hari =
Kebutuhan tenaga :
- Pekerja
- Mandor
Qt
15.00
P
M
10.00
1.00
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
430,008.57 / Buah
6.
7.
: 8.3.(1)
(L01)
(L03)
4.6667
0.4667
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
I.
1
2
3
4
5
6
II.
1
U RAIAN
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (gebalan rumput) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
KODE
L
Tk
Fh
KOEF.
0.00
7.00
1.10
URUTAN KERJA
Gebalan rumput dipasang di atas permukaan
tanah yang telah siap ditanami
III.
1.
1.a.
BAHAN
Gebalan Rumput
= 1 M2 x Fh
2.
2.a.
ALAT
ALAT BANTU
- Gerobak Dorong
- Tusuk Bambu
- Pagar Tali
= 2 buah
= 5 buah / M2
= sesuai kebutuhan
3.
URAIAN
TENAGA
Produksi penanaman rumput dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M2 :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
7,100.38 / M2
6.
7.
(M32)
1.1000
Qt
M
Tb
P
100.00
1.00
2.00
4.00
(L03)
(L02)
(L01)
0.0700
0.1400
0.2800
: 8.3.(2)
: Semak/perdu
: M2
No.
I.
U RAIAN
1
2
3
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : di sepanjang jalan
Bahan dasar (semak/perdu) diterima seluruhnya di lokasi pekerjaan
5
6
1
2
3
URUTAN KERJA
Penggalian lubang/ penggemburan tanah dan persiapan tempat
Penanaman perdu, penimbunan dengan tanah humus
Pemagaran (sesuai kebutuhan)
II.
III.
1.
1.a.
1.b.
1.c.
BAHAN
- Semak/perdu
- Tanah humus setebal 20 cm
- Pupuk
2.
2.a.
ALAT
ALAT BANTU
- Pacul/sekop
- Gerobak Dorong
- Pagar Bambu/kayu
3.
URAIAN
KODE
KOEF.
Tk
Fh
7.00
1.10
(M32)
mxx
mxx
1.10
0.22
0.25
= 4 buah
= 1 buah
= sesuai kebutuhan
TENAGA
Produksi penanaman rumput dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M2 :
- Mandor
= (Tk x M) : Qt
Qt
M
Tb
P
100.00
1.00
0.00
6.00
(L03)
0.0700
- Tukang
- Pekerja
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
7.
: 8.3.(3)
: Pohon
: Buah
No.
I.
U RAIAN
1
2
3
4
ASUMSI
Menggunakan tenaga pekerja
Lokasi pekerjaan : di sepanjang jalan
Bahan dasar pohon dan bahan lainnya diterima di lokasi pekerjaan
ukuran lubang 0,5 x 0,5 x 0,5 m
5
6
1
2
3
URUTAN KERJA
Penggalian lubang
Penanaman pohon dan penimbunan dengan tanah humus
Pemagaran (sesuai kebutuhan)
II.
0.0000
0.4200
6,879.96 / M2
6.
(L02)
(L01)
III.
1.
1.a.
1.b.
1.c.
BAHAN
- pohon
- Tanah humus setebal 20 cm
- Pupuk
URAIAN
KODE
KOEF.
Tk
Fh
7.00
1.10
(M32)
mxx
mxx
1.00
0.22
0.50
2.
2.a.
3.
ALAT
ALAT BANTU
- Pacul/sekop
- Gerobak Dorong
- Pagar Bambu/kayu
= 4 buah
= 1 buah
= sesuai kebutuhan
TENAGA
Produksi penanaman rumput dalam 1 hari
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M2 :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
7.
No.
I.
1
2
3
4
5
6
II.
(L03)
(L02)
(L01)
0.0700
0.0000
0.4200
: 8.5.(1)
: Pengembalian kondisi lantai jembatan beton
: M2
U RAIAN
ASUMSI
Pekerjaan dilakukan secara manual/mekanis
Lokasi pekerjaan : di lokasi jembatan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tebal plat jembatan
URUTAN KERJA
100.00
1.00
0.00
6.00
6,494.96 / bh
6.
Qt
M
Tb
P
URAIAN
KODE
Tk
Fk
KOEF.
7.00
1.10
0.20
1
2
3
4
III.
1.
BAHAN
- Beton K300
- Baja tulangan (bila diperlukan)
2.
2.a.
0.22
ALAT
COMPRESSOR, JACK HAMMER & LOADER
Q1
Koefisien Alat / m3
2.d.
3.
= 1 : Q1
(E05/26)
7.50
0.1333
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Pahat / Tatah
= 2 buah
- Palu Besar
= 1 buah
- Alat2 pertukangan
= 1 set
TENAGA
Produksi menentukan : JACK HAMMER
Produksi Galian / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Q1
Qt
7.50
52.50
P
M
12.00
1.00
(L01)
(L03)
1.6000
0.1333
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
4.
5.
66,803.50 / M3
6.
7.
Analisa EI-811
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
M
jam
%
%
%
ton/m3
KETERANGAN
Gradasi harus
memenuhi Spec.
M3
M3
menit
M3
jam
ton
KM/jam
KM/jam
menit
menit
panduan
menit
menit
menit
M3
jam
Analisa EI-811
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
KM/jam
M
lintasan
M3
jam
M3
M3
liter/menit
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-812
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
M
jam
%
%
%
KETERANGAN
Gradasi harus
memenuhi
Spesifikasi
M3
M3
menit
menit
M3
jam
ton
KM/jam
KM/jam
menit
menit
menit
menit
menit
M3
jam
Analisa EI-812
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KM/jam
M
lintasan
M3
jam
M3
M3
liter/menit
KETERANGAN
M3
jam
Lump Sum
M3/jam
M3
orang
orang
jam
jam
Analisa EI-813
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
M
Jam
M3
M3
menit
menit
M3
Jam
ton
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Agregat lepas
Analisa EI-813
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
KM/jam
M
lintasan
M3
jam
M3
M3
liter/menit
M3
jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Analisa EI-814
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
Jam
%
%
ton / M3
M3
M3
M3
KETERANGAN
menit
menit
M3
Jam
ton
KM / Jam
KM / Jam
menit
menit
menit
menit
menit
M3
Jam
Berlanjut ke halaman berikut
Analisa EI-814
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
Km / Jam
M
M
lintasan
M3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-815
URAIAN ANALISA HARGA SATUAN
SATUAN
KM
M
Jam
%
%
KETERANGAN
Rata-rata
%
%
Spesifikasi
ton / M3
ton / M3
ton / M3
ton / M3
m
M3
M3
Kg
Kg
M3
km/jam
km/jam
menit
menit
menit
M3
Jam
Analisa EI-815
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
ton / Jam
M3
Jam
M3
Jam
Ton
KM / Jam
KM / Jam
Ton
menit
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
M3
Jam
Lump Sum
M3 / Jam
M3
orang
orang
Jam
Jam
Analisa EI-815
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
Analisa EI-817
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
M
Jam
Kg/M2
Kg/M2
Kg/M2
Kg/M3
ton / M3
ton / M3
(As1 : t)
M3
M3
Kg
M3
menit
menit
M3
Jam
ton
KM / Jam
KM / Jam
Analisa EI-817
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
menit
menit
menit
menit
menit
M3
Jam
Km / Jam
M
lintasan
M3
Jam
KETERANGAN
liter
liter/menit
kg/m3
m3
Jam
Lump Sum
M3/Jam
M3
orang
orang
Jam
Jam
Analisa EI-817
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
Analisa EI-818
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
jam
MM
%
M
Rata-rata
Ton/M3
Ton/M3
Ton/M3
diambil
M3
Kg
liter
menit
menit
menit
menit
menit
M3
jam
KM/jam
M
lintasan
M3
jam
Analisa EI-818
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
ton
KM / Jam
KM / Jam
M3
menit
menit
menit
menit
menit
menit
M3
Melayani 1 buah
molen
Jam
M3/Jam
M3
orang
orang
jam
jam
Analisa EI-819
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
Jam
%
%
100 bagian
15 bagian
Kg / Ltr
Kg / Ltr
liter
campuran
Kg
liter
liter
liter/menit
liter
Jam
liter
Jam
liter
Jam
Analisa EI-819
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
liter
liter
orang
orang
Jam
Jam
KETERANGAN
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
SATUAN
Jam
ton/m3
KETERANGAN
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
M3 / Jam
jam
Lump Sum
M3
orang
orang
jam
jam
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
Analisa EI-822
URAIAN ANALISA HARGA SATUAN
SATUAN
KETERANGAN
KM
jam
M
ton
km
M3
Borrow Pit
ton
KM/jam
KM/jam
menit
menit
menit
menit
M2
jam
Lump Sum
M2
asumsi
orang
orang
jam
jam
Analisa EI-811
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
KETERANGAN
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
SATUAN
Jam
M3
ton/M3
Km
KETERANGAN
TON
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
buah
Buah / Jam
jam
Lump Sum
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
buah
KETERANGAN
orang
orang
jam
jam
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
SATUAN
Jam
M3
ton/m3
Km
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
Buah / Jam
jam
Buah / Jam
KETERANGAN
jam
Lump Sum
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
M2
orang
orang
jam
jam
KETERANGAN
Analisa EI-825
URAIAN ANALISA HARGA SATUAN
SATUAN
Jam
M3
ton/m3
Km
KETERANGAN
ton
Km/Jam
Km/Jam
menit
menit
menit
menit
menit
menit
Buah
jam
Buah
jam
Lump Sum
Analisa EI-821
URAIAN ANALISA HARGA SATUAN
Lanjutan
SATUAN
buah
orang
orang
KETERANGAN
jam
jam
Analisa LI-831
SATUAN
KM
jam
-
M2
M2
orang
orang
orang
jam
jam
jam
KETERANGAN
Analisa LI-832
URAIAN ANALISA HARGA SATUAN
SATUAN
jam
-
M2
m3
kg
M2
orang
orang
orang
jam
KETERANGAN
jam
jam
Analisa LI-833
URAIAN ANALISA HARGA SATUAN
SATUAN
jam
-
bh
m3
kg
KETERANGAN
M2
orang
orang
orang
jam
jam
jam
Analisa EI-851
URAIAN ANALISA HARGA SATUAN
SATUAN
Jam
cm
KETERANGAN
m3
kg
(E05/26/10/15)
M3 / Jam
Jam
Lump Sump
M3/Jam
M3
orang
orang
Jam
Jam
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.1 (1)
PERKIRAAN VOL. PEK.
: Pondasi Agregat Kls. A Untuk TOTAL HARGA (Rp.)
: M3
Pek. Minor
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.2124
0.0085
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
4,532.31
7,156.29
BAHAN
1.
2.
Agregat Kasar
Agregat Halus
(M03)
(M04)
(M03)
(M04)
M3
M3
1.2586
0.0000
210,171.86
210,171.86
PERALATAN
1.
2.
3.
4.
5.
Wheel Loader
Dump Truck
Pedestrian Roller
Water Tanker
Alat Bantu
E15
E08
E24
E23
jam
jam
jam
jam
Ls
0.0085
0.4861
0.0527
0.0141
1.0000
266,795.62
164,696.38
64,559.15
161,074.00
0.00
3
4
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.1 (2)
PERKIRAAN VOL. PEK.
: Pondasi Agregat Kls. B Untuk TOTAL HARGA (Rp.)
: M3
Pek. Minor
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.1274
0.0085
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
:
:
:
JUM
HAR
(R
1.
2.
3.
Agregat Kasar
Agregat Halus
Sirtu
(M03)
(M04)
(M16)
M3
M3
M3
1.2586
0.0000
0.0000
210,171.86
210,171.86
140,000.00
PERALATAN
1.
2.
3.
4.
5.
Wheel Loader
Dump Truck
Pedestrian Roller
Water Tanker
Alat Bantu
E15
E08
E24
E23
jam
jam
jam
jam
Ls
0.0085
0.3219
0.0527
0.0141
1.0000
266,795.62
164,696.38
64,559.15
161,074.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
:
:
: ..
:
: 8.1 (3)
PERKIRAAN VOL. PEK.
: Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup AspTOTAL HARGA (Rp.)
% THD. BIAYA PROYEK
: M3
SATUAN PEMBAYARAN
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1274
0.0085
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
4,532.31
7,156.29
BAHAN
1.
M3
1.2000
210,248.97
PERALATAN
1
2
3
4
5
Wheel Loader
Dump Truck
Pedestrian Roller
Water Tanker
Alat Bantu
E15
E09
E24
E23
Jam
Jam
Jam
Jam
Ls
0.0085
0.1372
0.0527
0.0141
1.0000
266,795.62
337,926.64
64,559.15
161,074.00
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.1 (4)
PERKIRAAN VOL. PEK.
: Waterbound Macadam Utk. Pek. TOTAL HARGA (Rp.)
: M3
Minor
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1631
0.0102
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Agregat Kasar
Agregat Halus
(M03)
(M04)
(M03)
(M04)
M3
M3
0.9350
0.1650
210,171.86
210,171.86
PERALATAN
:
:
:
JUM
HAR
(R
1.
2.
3.
4.
Wheel Loader
Dump Truck
3-Wheel Roller
Alat BAntu
E15
E09
E16
Jam
Jam
Jam
Ls
0.0102
0.0897
0.0268
1.0000
266,795.62
337,926.64
162,603.45
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.1 (5)
PERKIRAAN VOL. PEK.
: Camp. Aspal Panas Utk.Pek.Minor
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
(L01)
(L03)
Jam
Jam
1.1084
0.1108
4,532.31
7,156.29
BAHAN
1.
2.
3
4
Agregat Kasar
Agregat Halus
Filler
Aspal
(M03)
(M04)
(M05)
(M10)
M3
M3
Kg
Kg
0.7731
0.5271
25.3000
156.9750
210,171.86
210,171.86
550.00
6,400.00
PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Pedestrian Roller
Alat Bantu
E15
E01
E12
E09
E24
Jam
Jam
Jam
Jam
Jam
Ls
0.0301
0.0554
0.0554
0.4358
0.1975
1.0000
266,795.62
4,886,762.12
288,170.35
337,926.64
64,559.15
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.1 (7)
PERKIRAAN VOL. PEK.
: Penetrasi Macadam Utk.Pek.Minor
TOTAL HARGA
: M3
(Perata)
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.1701
0.0170
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
3
Agregat Kasar
Agregat Halus
Aspal
(M03)
(M04)
(M10)
M3
M3
Kg
1.7556
0.0000
99.2727
210,171.86
210,171.86
6,400.00
PERALATAN
1.
2.
3.
Wheel Loader
Dump Truck
3-Wheel Roller
E15
E09
E16
Jam
Jam
Jam
0.0085
0.2081
0.0387
266,795.62
337,926.64
162,603.45
:
:
:
JUM
HAR
(R
4.
Asp. Sprayer
E03
Jam
0.0359
39,336.25
5.
Alat bantu
Ls
1.0000
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
NO.
:
: ..
:
: 8.1 (8)
PERKIRAAN VOL. PEK.
: Camp. Aspal Dingin Utk.Pek.Minor
TOTAL HARGA
: M3
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
1.1566
0.1928
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
4,532.31
7,156.29
BAHAN
1.
2.
Agregat Halus
Aspal Emulsi
(M04)
(M31)
M3
Kg
1.1683
140.7000
210,171.86
5,000.00
PERALATAN
1.
2.
3.
4.
Conc. Mixer
Pedestrian Roller
Dump Truck
Alat Bantu
E06
E24
E09
jam
jam
jam
Ls
0.0964
0.1975
0.3759
1.0000
133,800.44
64,559.15
337,926.64
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.1 (9)
PERKIRAAN VOL. PEK.
: Residu Bitumen Untuk Pek.Minor
TOTAL HARGA
: LITER
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
0.0033
0.0003
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Aspal
Kerosene
(M10)
(M11)
Kg
Liter
0.9857
0.1430
6,400.00
1,650.00
:
:
:
JUM
HAR
(R
C.
PERALATAN
1.
2.
Asphalt Sprayer
Compresor
E03
E05
Jam
Jam
0.0003
0.0003
39,336.25
111,049.38
3.
Dump Truck
E09
Jam
0.0003
337,926.64
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: ..
:
: 8.2 (1)
PERKIRAAN VOL. PEK.
: Galian untuk Bahu Jalan & Pek. Minor Lain
TOTAL HARGA (Rp.)
: M3
% THD. BIAYA PROYEK
:
:
:
NO.
KOMPONEN
SATUAN
PERKIRAAN
KUANTITAS
HARGA
SATUAN
(Rp.)
JUM
HAR
(R
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
(L01)
(L03)
Jam
Jam
1.0000
0.1000
4,532.31
7,156.29
BAHAN
PERALATAN
1
2
Dump Truck
Alat Bantu
E09
Jam
Ls
0.1812
1.0000
337,926.64
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
MATA PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.2 (2)
PERKIRAAN VOL. PEK.
: Pembersihan dan Pembongkaran Tanaman
TOTAL HARGA (Rp.)
: M2
(diameter < 30 cm)
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
jam
jam
PERKIRAAN
KUANTITAS
0.0700
0.0140
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
4,532.31
7,156.29
BAHAN
1.
Bahan timbunan
(M08)
M3
1.2000
20,000.00
PERALATAN
1
2
Dump Truck
Alat Bantu
E09
jam
Ls
0.0458
1.0000
337,926.64
0.00
3
4
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
A.
:
:
: ..
:
: 8.2 (3)
PERKIRAAN VOL. PEK.
: Penebangan Pohon, diameter 30 - 50 CM
TOTAL HARGA (Rp.)
: Buah
% THD. BIAYA PROYEK
KOMPONEN
TENAGA
SATUAN
PERKIRAAN
KUANTITAS
:
:
:
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
1.
2.
Pekerja Biasa
Mandor
(L01)
(L03)
Jam
Jam
3.5000
0.3500
4,532.31
7,156.29
BAHAN
PERALATAN
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
E09
Jam
Jam
Ls
0.2982
1.0000
1.0000
337,926.64
0.00
0.00
D.
E.
F.
Note: 1
2
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.2 (4)
PERKIRAAN VOL. PEK.
: Penebangan Pohon, diameter 50 - 75 CM
TOTAL HARGA (Rp.)
: Buah
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
3.5000
0.3500
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
4,532.31
7,156.29
BAHAN
PERALATAN
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
E09
Jam
Jam
Ls
0.4970
1.0000
1.0000
337,926.64
0.00
0.00
:
:
:
F.
Note: 1
2
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.2 (5)
PERKIRAAN VOL. PEK.
: Penebangan Pohon, diameter > 75 CM
TOTAL HARGA (Rp.)
: Buah
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
Pekerja Biasa
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
PERKIRAAN
KUANTITAS
4.6667
0.4667
:
:
:
HARGA
SATUAN
JUM
HAR
(Rp.)
(R
4,532.31
7,156.29
BAHAN
PERALATAN
1.
2.
3.
Dump Truck
Chainsaw
Alat Bantu
E09
Jam
Jam
Ls
1.0843
1.0843
1.0000
337,926.64
0.00
0.00
3
4
Analis
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.3.(1)
PERKIRAAN VOL. PEK.
: Stabilisasi Dengan Tanaman
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
0.2800
0.1400
0.0700
HARGA
SATUAN
(Rp.)
:
:
:
JUM
HAR
(R
4,532.31
5,963.57
7,156.29
BAHAN
1.
Gebalan Rumput
M32
M2
1.1000
3,500.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
0.00
3
4
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.3.(2)
PERKIRAAN VOL. PEK.
: Semak/perdu
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
0.4200
0.0000
0.0700
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
B.
BAHAN
1.
Gebalan Rumput
M32
M2
1.1000
3,500.00
:
:
:
JUM
HAR
(R
C.
PERALATAN
1.
Alat Bantu
Ls
1.0000
0.00
3
4
Analis
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.3.(3)
PERKIRAAN VOL. PEK.
: Pohon
TOTAL HARGA (Rp.)
: Buah
% THD. BIAYA PROYEK
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
SATUAN
(L01)
(L02)
(L03)
jam
jam
jam
PERKIRAAN
KUANTITAS
0.4200
0.0000
0.0700
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
:
:
:
JUM
HAR
(R
B.
BAHAN
1.
M2
1.0000
3,500.00
PERALATAN
1.
Alat Bantu
Ls
1.0000
0.00
3
4
Analisa
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
: ..
:
: 8.5.(1)
PERKIRAAN VOL. PEK.
: Pengembalian kondisi lantai jembatan beton
TOTAL HARGA (Rp.)
: M2
% THD. BIAYA PROYEK
PERKIRAAN
HARGA
:
:
:
JUM
NO.
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
SATUAN
(L01)
(L03)
Jam
Jam
KUANTITAS
1.6000
0.1333
SATUAN
HAR
(Rp.)
(R
4,532.31
7,156.29
BAHAN
PERALATAN
Compressor
Jack Hammer
Wheel Loader
Alat bantu
E05
E26
E15
Jam
Jam
Jam
Ls
0.1333
0.1333
0.1333
1.0000
111,049.38
16,089.36
266,795.62
0.00
3
4
Analisa EI-811
1.00
388,883.32
0.02
JUMLAH
HARGA
(Rp.)
962.58
60.79
1,023.37
264,524.25
0.00
264,524.25
2,266.49
80,051.78
3,400.31
2,264.09
0.00
87,982.67
353,530.29
35,353.03
388,883.32
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-812
1.00
358,718.70
0.02
JUMLAH
HARGA
(Rp.)
577.55
60.79
638.34
264,524.25
0.00
0.00
264,524.25
2,266.49
53,014.42
3,400.31
2,264.09
0.00
60,945.31
326,107.91
32,610.79
358,718.70
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-813
1.00
337,954.39
0.02
JUMLAH
HARGA
(Rp.)
577.55
60.79
638.34
252,298.77
252,298.77
2,266.49
46,363.27
3,400.31
2,264.09
0.00
54,294.16
307,231.27
30,723.13
337,954.39
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-814
1.00
296,327.81
0.01
JUMLAH
HARGA
(Rp.)
739.26
72.95
812.21
196,510.69
34,678.36
231,189.05
2,719.78
30,314.37
4,353.51
0.00
37,387.66
269,388.91
26,938.89
296,327.81
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-815
1.00
1,918,874.99
0.09
JUMLAH
HARGA
(Rp.)
5,023.77
793.23
5,817.00
162,474.52
110,778.08
13,915.00
1,004,640.00
1,291,807.61
8,042.32
270,832.60
15,970.89
147,252.55
12,751.16
0.00
446,807.20
1,744,431.81
174,443.18
1,918,874.99
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-817
1.00
1,194,059.09
0.05
JUMLAH
HARGA
(Rp.)
770.91
121.72
892.63
368,968.38
0.00
635,345.45
1,004,313.83
2,268.99
70,335.40
6,285.81
1,411.59
0.00
80,301.80
1,085,508.26
108,550.83
1,194,059.09
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-818
1.00
1,219,159.14
0.06
JUMLAH
HARGA
(Rp.)
5,242.19
1,379.52
6,621.72
245,546.41
703,500.00
949,046.41
12,896.43
12,751.16
127,010.76
0.00
152,658.36
1,108,326.49
110,832.65
1,219,159.14
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-819
1.00
7,396.38
0.00
JUMLAH
HARGA
(Rp.)
15.04
2.38
17.42
6,308.54
235.95
6,544.49
13.06
36.86
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
112.16
162.07
6,723.99
672.40
7,396.38
Analisa EI-821
1.00
73,130.07
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
4,532.31
715.63
5,247.94
0.00
61,233.94
0.00
61,233.94
66,481.88
6,648.19
73,130.07
Analisa EI-822
1.00
43,887.00
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
317.26
100.19
417.45
24,000.00
24,000.00
15,479.82
0.00
15,479.82
39,897.27
3,989.73
43,887.00
Analisa EI-821
1.00
131,048.59
0.01
JUMLAH
HARGA
(Rp.)
15,863.10
2,504.70
18,367.80
0.00
100,767.28
0.00
0.00
100,767.28
119,135.08
11,913.51
131,048.59
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-821
1.00
204,944.60
0.01
JUMLAH
HARGA
(Rp.)
15,863.10
2,504.70
18,367.80
0.00
167,945.47
0.00
0.00
167,945.47
186,313.27
18,631.33
204,944.60
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-825
1.00
430,008.57
0.02
JUMLAH
HARGA
(Rp.)
21,150.80
3,339.60
24,490.40
0.00
366,426.48
0.00
0.00
366,426.48
390,916.88
39,091.69
430,008.57
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-831
1.00
7,100.38
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
1,269.05
834.90
500.94
2,604.89
3,850.00
3,850.00
0.00
0.00
6,454.89
645.49
7,100.38
Analisa LI-832
1.00
6,879.96
0.00
JUMLAH
HARGA
(Rp.)
1,903.57
0.00
500.94
2,404.51
3,850.00
3,850.00
0.00
0.00
6,254.51
625.45
6,879.96
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa LI-833
1.00
6,494.96
0.00
JUMLAH
HARGA
(Rp.)
1,903.57
0.00
500.94
2,404.51
3,500.00
3,500.00
0.00
0.00
5,904.51
590.45
6,494.96
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
Analisa EI-851
1.00
66,803.50
0.00
JUMLAH
HARGA
(Rp.)
e dan/atau ukuran
u satuan pekerjaan
pat diubah kecuali
ada Peserta Lelang
7,251.70
954.17
8,205.87
0.00
14,806.58
2,145.25
35,572.75
0.00
52,524.58
60,730.46
6,073.05
66,803.50
No.
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
: 8.4.(1)
: Marka Jalan Termoplastik
: M2
U RAIAN
(M17b)
(M33)
(M34)
1.9500
1.0500
0.4500
Kg
Liter
Kg
(E05)
V
R
40.00
3.00
Ltr/Jam
Ltr/M2
V:R
Q1
13.333
M2/Jam
= 1 : Q1
(E05)
0.0750
Jam
13.333
0.0750
M2/Jam
Jam
1.
1.a.
1.b.
1.c.
BAHAN
Cat Marka Thermoplastic
Minyak Pencair (Thinner)
Blass Bead
2.
2.a.
ALAT
COMPRESSOR
Kapasitas penyemprotan
Jumlah cat cair =
2.c.
= C x R x (BJ.Cat)
= TxR
(1 M x 1 M) x t x 1000
DUMP TRUCK
Pada dasarnya alat ini digunakan bersama-sama
dengan Compressor
Koef. Alat / M2
= 1 : Q3
ALAT BANTU
Diperlukan :
- Sapu Lidi
- Sikat Ijuk
- Rambu-rambu pengaman
- Maal Tripleks
SATUAN
8.7
7.00
1.05
0.015
1.00
65
35
Koef. Alat / M2
KOEF.
L
Tk
Fh
t
BJ.Cat
C
T
III.
2.b.
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor Kehilangan Material
Tebal lapisan cat secara manual
Berat Jenis Bahan Cat
Perbandingan pemakaian bahan :
- Cat
- Thinner
URUTAN KERJA
Permukaan jalan dibersihkan dari debu/kotoran
Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
KM
jam
M
Kg/Liter
%
%
(E08)
Q3
(E08)
Ls
=
=
=
=
3
3
2
4
buah
buah
buah
lembar
3.
TENAGA
Produksi pekerjaan per hari = Q1 x Tk
dibutuhkan tenaga :
- Mandor
- Tukang Cat
- Pekerja
Qt
M
Tb
P
93.33
1.00
3.00
8.00
M2
orang
orang
orang
(L03)
(L02)
(L01)
0.0750
0.2250
0.6000
jam
jam
jam
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= ( M x Tk ) : Qt
= ( Tb x Tk ) : Qt
= ( P x Tk ) : Qt
Berlanjut ke hal.
: 8.4.(1)
: Marka Jalan Termoplastik
: M2
No.
U RAIAN
4.
5.
114,811.23 / M2
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
: 8.4.(2)
: Marka Jalan Bukan Termoplastic
: M2
U RAIAN
KODE
ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor Kehilangan Material
Tebal lapisan cat secara manual
Berat Jenis Bahan Cat
Perbandingan pemakaian bahan :
- Cat
- Thinner
URUTAN KERJA
Permukaan jalan dibersihkan dari debu/kotoran
Cat disemprotkan dengan Compressor di atas maal
tripleks yang dipasang di permukaan jalan
Glass Bit diberikan segera setelah cat marka selesai
disemprotkan
III.
1.
1.a.
BAHAN
Cat Marka Non Thermoplastic
= C x R x (BJ.Cat)
KOEF.
SATUAN
L
Tk
Fh
t
BJ.Cat
C
T
8.7
7.00
1.05
0.0038
1.00
65
35
KM
jam
M
Kg/Liter
%
%
(M17a)
1.9500
Kg
1.b.
1.c.
2.
2.a.
ALAT
COMPRESSOR
Kapasitas penyemprotan
Jumlah cat cair =
Kap. Prod. / Jam =
Koef. Alat / M2
2.b.
2.c.
3.
= TxR
(M33)
(M34)
1.0500
0.4500
Liter
Kg
(E05)
V
R
40.00
3.00
Ltr/Jam
Ltr/M2
V:R
Q1
13.333
M2/Jam
= 1 : Q1
(E05)
0.0750
Jam
13.333
0.0750
M2/Jam
Jam
(1 M x 1 M) x t x 1000
DUMP TRUCK
Pada dasarnya alat ini digunakan bersama-sama
dengan Compressor
Koef. Alat / M2
= 1 : Q3
ALAT BANTU
Diperlukan :
- Sapu Lidi
- Sikat Ijuk
- Rambu-rambu pengaman
- Maal Tripleks
(E08)
Q3
(E08)
Ls
=
=
=
=
3
3
2
4
buah
buah
buah
lembar
TENAGA
Produksi pekerjaan per hari = Q1 x Tk
dibutuhkan tenaga :
- Mandor
- Tukang Cat
- Pekerja
Qt
M
Tb
P
93.33
1.00
3.00
8.00
M2
orang
orang
orang
(L03)
(L02)
(L01)
0.0750
0.2250
0.6000
jam
jam
jam
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= ( M x Tk ) : Qt
= ( Tb x Tk ) : Qt
= ( P x Tk ) : Qt
Berlanjut ke hal.
No.
: 8.4.(2)
: Marka Jalan Bukan Termoplastic
: M2
U RAIAN
4.
5.
KODE
KOEF.
SATUAN
Rp.
104,086.23 / M2
6.
7.
: 8.4.(3) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
No.
I.
1
2
3
4
5
II.
1
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
BAHAN
Pelat Rambu Jadi (Engineering Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
- Menurunkan
= Rata-rata 2.5 menit / buah
- Lain-lain
= geser, atur, tunggu, dll.
Cp
Ts : 60
3.
4.
L
Tk
KOEF.
8.7
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
III.
2.b.
KODE
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
(M35a)
(M24)
(M60)
-
1.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
30.0
41.9
37.5
30.0
139.4
menit
menit
menit
menit
menit
Q1
6.457
Buah
(E08)
0.1549
Jam
Qt
M
Tb
P
45.20
1.00
3.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1549
0.4646
0.7743
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Berlanjut ke hal.
: 8.4.(3) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
No.
5.
U RAIAN
KODE
411,739.31
/ Buah
6.
7.
KOEF.
SATUAN
No.
I.
1
2
3
4
5
II.
1
: 8.4.(3) .(b)
: Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
KODE
L
Tk
KOEF.
8.7
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
III.
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
BAHAN
Pelat Rambu Jadi (Engineering Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
(M35a)
(M24)
(M60)
(E08)
Cp
Ts
T1
T2
2.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
15.0
Buah
30.0
41.9
menit
menit
- Menurunkan
- Lain-lain
Cp
Ts : 60
2.b.
3.
4.
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
T3
T4
Ts
37.5
30.0
139.4
menit
menit
menit
Q1
6.457
Buah
(E08)
0.1549
Jam
Qt
M
Tb
P
45.20
1.00
3.00
6.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1549
0.4646
0.9292
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
Berlanjut ke hal.
: 8.4.(3) .(b)
: Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade
: BH
URAIAN ANALISA HARGA S
No.
5.
U RAIAN
6.
KODE
606,111.40
/ Buah
KOEF.
SATUAN
7.
: 8.4.(4) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
: BH
URAIAN ANALISA HARGA S
No.
I.
1
2
3
4
5
II.
1
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
BAHAN
Pelat Rambu Jadi (High Intensity Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
- Menurunkan
= Rata-rata 2.5 menit / buah
- Lain-lain
= geser, atur, tunggu, dll.
Cp
Ts : 60
3.
L
Tk
KOEF.
8.7
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
III.
2.b.
KODE
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
(M35b)
(M24)
(M60)
-
1.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
30.0
41.9
37.5
30.0
139.4
menit
menit
menit
menit
menit
Q1
6.457
Buah
(E08)
0.1549
Jam
Qt
M
Tb
P
45.20
1.00
3.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1549
0.4646
0.7743
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
216,500.00
/ Buah
Berlanjut ke hal.
No.
: 8.4.(4) .(a)
: Rambu Jalan Tunggal dengan Permukaan Pemantul High Intensity Grade
: BH
URAIAN ANALISA HARGA S
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
II.
1
III.
1.
1.a.
1.b.
1.c.
1.d.
2.
2.a.
: 8.4.(4) .(b)
: Rambu Jalan Ganda dengan Permukaan Pemantul High Intensity Grade
: BH
URAIAN ANALISA HARGA S
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (plat rambu jadi, pipa dan beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
KODE
L
Tk
KOEF.
8.7
7.00
SATUAN
KM
jam
URUTAN KERJA
Kesatuan pondasi, pelat & tiang rambu disiapkan dan
dipasang di tempat yang telah ditentukan
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Pelat Rambu Jadi (High Intensity Grade)
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
= atur, ikat, dll.
- Angkut
= (2 x L : 25 Km/Jam) x 60 menit
- Menurunkan
= Rata-rata 2.5 menit / buah
- Lain-lain
= geser, atur, tunggu, dll.
(M35b)
(M24)
(M60)
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
2.00
1.00
0.016
1.0000
BH
Batang
M3
Ls
15.0
Buah
30.0
41.9
37.5
30.0
139.4
menit
menit
menit
menit
menit
Cp
Ts : 60
3.
ALAT BANTU
- Tang, Obeng, dll
- Pacul / Sekop
5.
6.457
Buah
(E08)
0.1549
Jam
Qt
M
Tb
P
45.20
1.00
3.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1549
0.4646
0.7743
jam
jam
jam
= 2 set
= 4 buah
TENAGA
Produksi pemasangan rambu dalam 1 hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
4.
Q1
694,439.31
/ Buah
6.
7.
No.
I.
1
2
3
4
5
6
7
II.
1
: 8.4.(5)
: Patok Pengarah
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (patok beton cetak, dll) diangkut dengan
Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
URUTAN KERJA
Patok ditanam di tepi luar bahu jalan sesuai dengan
gambar rencana dan di-cat
KODE
L
Tk
Fh
Rc
KOEF.
8.7
7.00
1.05
125.00
SATUAN
KM
jam
Kg/M3
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Faktor Efisiensi Alat
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp x Fa
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
(M60)
(M39)
-
(E08)
Cp
Fa
Ts
T1
T2
T3
T4
Ts
0.0354
4.6512
M3
Kg
Ls
20.0
0.83
Buah
-
20.0
41.9
20.0
10.0
91.9
menit
menit
menit
menit
menit
11
Buah
(E08)
0.0922
Jam
Qt
M
Tb
P
75.88
1.00
4.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.0922
0.3690
0.7380
jam
jam
jam
Q1
= 4 buah
TENAGA
Produksi pasang patok pengarah / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
97,393.33 / Buah
Berlanjut ke hal.
No.
: 8.4.(5)
: Patok Pengarah
: BH
U RAIAN
KODE
KOEF.
SATUAN
6.
7.
No.
I.
1
2
3
4
5
6
7
II.
1
2
: 8.4.(6) .(a)
: Patok Kilometer
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
KODE
KOEF.
SATUAN
L
Tk
Fh
Rc
8.7
7.00
1.05
125.00
KM
jam
Kg/M3
(M60)
(M39)
-
0.1512
18.9000
M3
Kg
Ls
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
III.
1.
1.a.
1.b.
1.c.
2.b.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
20.0
41.88
22.5
10.0
94.4
menit
menit
menit
menit
menit
Q1
9.536
Buah
(E08)
0.1049
Jam
Qt
M
66.75
1.00
Buah
orang
= 4 buah
= 2 buah
TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Tb
P
2.00
5.00
orang
orang
Koefisien Tenaga / Bh :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
329,572.40
(L03)
(L02)
(L01)
0.1049
0.2097
0.5243
jam
jam
jam
/ Buah
Berlanjut ke hal.
No.
: 8.4.(6) .(a)
: Patok Kilometer
: BH
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
II.
1
2
III.
: 8.4.(6) .(b)
: Patok Hektometer
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (patok kilometer beton cetak)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
PEMAKAIAN BAHAN, ALAT DAN TENAGA
KODE
L
Tk
Fh
Rc
KOEF.
8.7
7.00
1.05
125.00
SATUAN
KM
jam
Kg/M3
1.
1.a.
1.b.
1.c.
BAHAN
Beton K-175
Baja Tulangan
Cat, dan material lainnya
2.
2.a.
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
(M60)
(M39)
-
0.0630
7.8750
M3
Kg
Ls
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
15.0
Buah
20.0
41.88
22.5
10.0
94.4
menit
menit
menit
menit
menit
Q1
9.536
Buah
(E08)
0.1049
Jam
Qt
M
Tb
P
66.75
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1049
0.2097
0.5243
jam
jam
jam
= 4 buah
= 2 buah
TENAGA
Produksi pasang patok kilometer / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
151,213.16
/ Buah
Berlanjut ke hal.
No.
6.
: 8.4.(6) .(b)
: Patok Hektometer
: BH
U RAIAN
KODE
KOEF.
SATUAN
7.
No.
I.
1
2
3
4
5
6
7
II.
1
: 8.4.(7)
: Rel Pengaman
: M'
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar rel pengaman diterima di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2,a
ALAT
DUMP TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
(E08)
= (2 x L : 25 Km/Jam) x 60
Cp
Ts : 60
3.
KODE
KOEF.
SATUAN
L
Tk
Fh
Rc
8.7
7.00
1.00
50.00
Km
jam
Kg/Cu.m
(M36)
(M38)
(M39)
1.0000
0.0929
4.6452
M'
M3
Kg
Ls
15.0
M'
50.0
41.88
60.0
30.0
181.9
menit
menit
menit
menit
menit
URUTAN KERJA
Kesatuam pondasi, pelat dan tiang rambu disiapkan dan
dipasang ditempat yang telah ditentukan
III.
1.
1.a.
1.b.
1.c.
1.d.
2.b.
ALAT BANTU
- Linggis / Sekop
- Kunci Baut
- Palu
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
Q1
4.9
M'
(E08)
0.2021
Qt
M
Tb
P
34.64
1.00
2.00
8.00
M'
orang
orang
orang
(L03)
0.2021
jam
= 4 buah
= 2 buah
= 2 buah
TENAGA
Produksi pasang pagar pengaman / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / M' :
- Mandor
= (Tk x M) : Qt
- Tukang
- Pekerja
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
618,998.48
(L02)
(L01)
0.4042
1.6167
jam
jam
/ M'
Berlanjut ke hal.
No.
: 8.4.(7)
: Rel Pengaman
: M'
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
II.
1
2
III.
1.
1.a.
1.b.
1.c.
: 8.4.(8)
: Paku Jalan
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar paku jalan diterima di lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
KODE
Tk
Fh
KOEF.
7.00
1.05
SATUAN
jam
-
URUTAN KERJA
Tempat penanaman paku jalan disiapkan / digali
Paku jalan ditanam ke dalam perkerasan,
selanjutnya dilakukan pengecoran
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Paku jalan
Beton setara K175
mXX
(M38)
1 buah
0.0630
M3
2.
ALAT
2.a
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
3.
= 4 buah
= 2 buah
TENAGA
Produksi pasang paku jalan/ hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
71,558.78
7.
No.
I.
1
2
3
4
20.00
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.3500
0.7000
1.7500
jam
jam
jam
/ Buah
6.
Qt
M
Tb
P
: 8.4.(9)
: Mata Kucing
: BH
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar mata kucing diterima di lokasi pekerjaan
Jam kerja efektif per-hari
KODE
Tk
KOEF.
7.00
SATUAN
jam
1
2
URUTAN KERJA
Tempat penanaman paku jalan disiapkan / digali
Paku jalan ditanam ke dalam perkerasan,
selanjutnya dilakukan pengecoran
II.
III.
1.
1.a.
1.b.
1.c.
2.
2.b.
3.
Fh
mXX
(M38)
1.05
1 buah
0.0630
M3
ALAT
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
= 4 buah
= 2 buah
TENAGA
Produksi pasang mata kucing/ hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
148,008.78
/ Buah
6.
7.
Qt
M
Tb
P
20.00
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.3500
0.7000
1.7500
jam
jam
jam
No.
I.
1
2
3
4
5
6
7
II.
1
2
: 8.4.(10)
: Kerb Pracetak
: M
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (kerb pracetak) dicetak di base camp dan
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
KODE
KOEF.
SATUAN
L
Tk
Fh
Rc
8.7
7.00
1.05
125.00
KM
jam
Kg/M3
(M38)
(M39)
-
0.0788
M3
Kg
Ls
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
III.
1.
1.a.
1.b.
1.c.
2.b.
ALAT BANTU
- Pacul / Sekop
- Alat pertukangan
Cp
Ts
T1
T2
T3
T4
Ts
20.0
Buah
20.0
33.38
30.0
10.0
93.4
menit
menit
menit
menit
menit
Q1
12.851
Buah
(E08)
0.0778
Jam
Qt
M
Tb
P
89.96
1.00
2.00
5.00
Buah
orang
orang
orang
(L03)
(L02)
0.0778
0.1556
jam
jam
= 4 buah
= 1 set
TENAGA
Produksi pasang kerb pracetak / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
118,858.59
(L01)
0.3891
jam
/ Meter
Berlanjut ke hal.
No.
: 8.4.(10)
: Kerb Pracetak
: M
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
III.
1.
1.a.
1.b.
1.c.
: 8.4.(12)
: Perkerasan Blok Beton pada Trotoar dan Median
: M2
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan frontage
Bahan dasar ( blok beton ) telah berada di lokasi
pekerjaan / proyek
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
KODE
L
Tk
Fh
KOEF.
SATUAN
8.7
7.00
1.05
KM
jam
-
1.05
0.05
0.50
M2
M3
Kg
URUTAN KERJA
Tempat pemasangan blok beton disiapkan / dipadatkan
Blok beton dipasang dilelevasi sesuai dengan ketentuan/
gambar
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
luas =
Paving Blok
Pasir
volume =
1x1x0,05x1.05
Angker
berat =
2.
2.a.
ALAT
TAMPER
Kecepatan
Efisiensi alat
Lebar pemadatan
Banyak lintasan
Tebal lapis hamparan rata-rata
v x 1000 x Fa x Lb
n
2.b.
3.
(E25)
V
Fa
Lb
n
tp
= 1 : Q1 x Vp
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
Q1
0.60
0.83
0.40
4
0.05
Km / Jam
M
lintasan
M
49.8000 M2 / Jam
(E25)
0.0120
jam
Qt
M
Tb
P
348.60
1.00
4.00
6.00
M2
orang
orang
orang
(L03)
(L02)
(L01)
0.0201
0.0803
0.1205
jam
jam
jam
2184790728.34933
= 4 buah
= 2 buah
TENAGA
Produksi paving block / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
10,096.95 / Meter
Berlanjut ke hal.
No.
: 8.4.(12)
: Perkerasan Blok Beton pada Trotoar dan Median
: M2
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
: 8.6(1)
: Kerb Pracetak Pemisah Jalan (Concrete Barrier)
SATUAN PEMBAYARAN
No.
I.
1
2
3
4
5
6
7
II.
1
2
: M
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (kerb pemisah jalan)
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Tulangan praktis
2.
2.a.
ALAT
DUMP TRUK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
4.
L
Tk
Fh
Rc
KOEF.
8.7
7.00
1.05
100.00
SATUAN
KM
jam
Kg/M3
URUTAN KERJA
Tempat penanaman patok disiapkan / digali
Patok Kilometer ditanam ke dalam tanah dengan
elevasi puncak patok sesuai dgn. ketentuan dan dicat
III.
1.
1.a.
1.b.
2.b.
KODE
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Cetakan besi
(EI-715) 0.2570
(M39)b 26.9837
M3
Kg
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
10.0
Buah
20.0
41.88
15.0
10.0
86.9
menit
menit
menit
menit
menit
Q1
6.906
Buah
(E08)
0.1448
Jam
Qt
M
Tb
P
48.34
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1448
0.2896
1.1584
jam
jam
jam
= 4 buah
= 2 buah
TENAGA
Produksi pasang kerb pemisah jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
612,445.90 / Meter
Berlanjut ke hal.
No.
: 8.6(1)
: Kerb Pracetak Pemisah Jalan (Concrete Barrier)
: M
U RAIAN
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
III.
1.
1.a.
1.b.
1.c.
1.d.
1.e.
1.f.
: 8.7(1)
: Unit lampu penerangan jalan tunggal
Type sodium 250 watt
: Buah
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
KODE
KOEF.
SATUAN
L
Tk
Fh
8.7
7.00
1.10
KM
jam
-
(EI-715)
(M39)b
1.00
1.00
15.00
0.72
58.80
1.00
buah
buah
m1
M3
Kg
buah
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Tiang lampu type tunggal, Lighting Pole Galvanis, H=11
Lampu sodium 250 watt
Kabel type
NYY/NYM 2 x 2,5 mm2
Beton K 250
Reinforcing Steel deform = 56 x 1.05
MCB,1P, 16 A
1.g.
1.h.
1.i.
1.j.
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
0.72
1.21
15.00
1.00
M3
Kg
M3
buah
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
10.0
buah
20.0
41.88
15.0
10.0
86.9
menit
menit
menit
menit
menit
Q1
6.906
Buah
(E08)
0.1448
Jam
Qt
M
Tb
P
48.34
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1448
0.2896
1.1584
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
Berlanjut ke hal.
No.
: 8.7(1)
: Unit lampu penerangan jalan tunggal
Type sodium 250 watt
: Buah
U RAIAN
4.
5.
KODE
KOEF.
SATUAN
Rp.
22,896,888.29
/ buah
6.
7.
: 8.7(2)
: Unit lampu penerangan jalan ganda
Type sodium 250 watt
: Buah
No.
I.
1
2
3
4
5
6
II.
1
2
3
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
4.
L
Tk
Fh
KOEF.
SATUAN
8.7
7.00
1.10
KM
jam
-
0.2570
1.0000
2.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.b.
KODE
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
8.0
Buah
20.0
41.88
12.0
10.0
83.9
menit
menit
menit
menit
menit
Q1
5.722
Buah
(E08)
0.1748
Jam
Qt
M
Tb
P
40.06
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1748
0.3495
1.3980
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
5.
Berlanjut ke hal.
: 8.7(2)
: Unit lampu penerangan jalan ganda
Type sodium 250 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,198,338.42 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
: 8.7(3)
: Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
: Buah
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
KODE
L
Tk
Fh
KOEF.
SATUAN
8.7
7.00
1.10
KM
jam
-
0.2570
1.0000
1.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
(EI-715)
(M39)b
(E08)
Cp
Ts
T1
10.0
Buah
20.0
menit
- Angkut
- Menurunkan
- Lain-lain
= (2 x L : 25 Km/Jam) x 60
= Rata-rata 1.5 menit / buah
= geser, tunggu, dll
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
T2
T3
T4
Ts
41.88
15.0
10.0
86.9
menit
menit
menit
menit
Q1
6.906
Buah
(E08)
0.1448
Jam
Qt
M
Tb
P
48.34
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1448
0.2896
1.1584
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
Berlanjut ke hal.
: 8.7(3)
: Unit lampu penerangan jalan tunggal
Type merkuri 250 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,175,714.50 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
: 8.7(4)
: Unit lampu penerangan jalan ganda
Type merkuri 250 watt
: Buah
U RAIAN
KODE
KOEF.
SATUAN
I.
1
2
3
4
5
6
II.
1
2
3
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
8.7
7.00
1.10
KM
jam
-
0.2570
1.0000
2.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.b.
L
Tk
Fh
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
(EI-715)
(M39)b
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
8.0
Buah
20.0
41.88
12.0
10.0
83.9
menit
menit
menit
menit
menit
Q1
5.722
Buah
(E08)
0.1748
Jam
Qt
M
Tb
P
40.06
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1748
0.3495
1.3980
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
Berlanjut ke hal.
: 8.7(4)
: Unit lampu penerangan jalan ganda
Type merkuri 250 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,198,338.42 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
: 8.7(5)
: Unit lampu penerangan jalan tunggal
Type merkuri 400 watt
: Buah
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
KODE
L
Tk
Fh
KOEF.
SATUAN
8.7
7.00
1.10
KM
jam
-
0.2570
1.0000
1.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
(EI-715)
(M39)b
(E08)
Cp
Ts
T1
T2
T3
10.0
Buah
20.0
41.88
15.0
menit
menit
menit
- Lain-lain
Cp
Ts : 60
3.
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
T4
Ts
10.0
86.9
menit
menit
Q1
6.906
Buah
(E08)
0.1448
Jam
Qt
M
Tb
P
48.34
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1448
0.2896
1.1584
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
Berlanjut ke hal.
: 8.7(5)
: Unit lampu penerangan jalan tunggal
Type merkuri 400 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,175,714.50 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
: 8.7(6)
: Unit lampu penerangan jalan ganda
Type merkuri 400 watt
: Buah
U RAIAN
KODE
KOEF.
SATUAN
I.
1
2
3
4
5
6
II.
1
2
3
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar diterima di base camp
diangkut dengan Truk ke lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Instalasi jaringan induk telah tersedia
2.
2.a.
ALAT
FLAT BED TRUCK
Kapasitas 1 kali Angkut
Waktu Siklus :
- Memuat
- Angkut
- Menurunkan
- Lain-lain
=
=
=
=
Cp
Ts : 60
3.
8.7
7.00
1.10
KM
jam
-
0.2570
1.0000
2.0000
100.00
bh
Kg
m1
URUTAN KERJA
Bahan diangkut ke lokasi pekerjaan
Pemasangan tiang
Pemasangan intalasi dan lampu
III.
1.
1.a.
1.b.
2.b.
L
Tk
Fh
ALAT BANTU
- Pacul / Sekop
- Kunci Baut
- Peralatan tukang
- Beton cor, dll
(EI-715)
(M39)b
MXX
(E08)
Cp
Ts
T1
T2
T3
T4
Ts
8.0
Buah
20.0
41.88
12.0
10.0
83.9
menit
menit
menit
menit
menit
Q1
5.722
Buah
(E08)
0.1748
Jam
Qt
M
Tb
P
40.06
1.00
2.00
8.00
Buah
orang
orang
orang
(L03)
(L02)
(L01)
0.1748
0.3495
1.3980
jam
jam
jam
= 4 buah
= 2 buah
= 1 set
TENAGA
Produksi pasang unit lampu jalan / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang
- Pekerja
Koefisien Tenaga / Bh :
- Mandor
= (Tk x M) : Qt
- Tukang
= (Tk x Tb) : Qt
- Pekerja
= (Tk x P) : Qt
4.
5.
SATUAN.
Berlanjut ke hal.
: 8.7(6)
: Unit lampu penerangan jalan ganda
Type merkuri 400 watt
: Buah
SATUAN PEMBAYARAN
No.
U RAIAN
1,198,338.42 / buah
6.
7.
KODE
KOEF.
SATUAN
No.
I.
: 8.8(1)
: Pagar Pemisah Pedestrian Carbon Steel
: M1
U RAIAN
4
5
6
7
8
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
Bahan dasar pagar pemisah pedestrian corbon steel
seluruhnya diterima di base camp
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Pipa Carbon Steel Dia 3"
= (3x2)+(1.4x2) m / 3 M
Pipa Carbon Steel Dia 1,5" = (1.0 x 20) / 3 M
1
2
URUTAN KERJA
Pagar diproduksi di Bengkel kerja Base Camp
Dipasang di tempat dengan ditanam dan di cor
1
2
3
II.
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
Flat Bed Truck
Kapsitas Bak
Waktu Siklus :
- Memuat
- Angkut V=40 Km/jam
- Kembali V=60 Km/jam
- Menurunkan
- Lain-lain
KODE
L
Tk
Fh
V1
V2
(M47)
(M60)a
(M60)b
(E11)
Cp
Ts
T1
T2
T3
T4
T5
KOEF.
SATUAN
8.7
7.00
1.05
2.93
6.67
KM
jam
M
M
0.0567
3.0800
7.0000
M3
M
M
kg
30.00
50.00
13.09
8.73
25.00
5.00
menit
menit
menit
menit
menit
Cp
Ts : 60
= 1 : Q1
Weldeng Set
Kapasitas Pengelasan
Jumlah pengelasan per meter
17.97
4.49
22.47
2.b.
3.
Nw
Cw : 60
= 1 : Q2
ALAT BANTU
Diperlukan :
- Gerinda Potong
- Gerinda
- Ampelas
- Kuas
- Cangkul, sekop dll
= 1 buah
= 1 buah/ M
= 2 Lbr
= 1 Bh
= 1 set
TENAGA
Produksi penanaman rumput / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang Las
- Pekerja
Ts
101.81
menit
Q1
17.6796
(E11)
0.0566
Jam
(E32)
Cw
Nw
120.00
53.92
cm/jam
cm
Q2
0.2696
(E32)
3.7091
Jam
Qt
M
Tb
P
123.76
1.00
2.00
4.00
M2
orang
orang
orang
Berlanjut ke hal.
: 8.8(1)
: Pagar Pemisah Pedestrian Carbon Steel
: M1
No.
U RAIAN
KODE
KOEF.
SATUAN
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
320,626.72 / Meter
(L03)
(L02)
(L01)
0.0566
0.1131
0.2263
jam
jam
jam
6.
7.
No.
I.
1
2
: 8.8(2)
: Pagar Pemisah Pedestrian Galvanised
: M1
U RAIAN
ASUMSI
Menggunakan cara manual
Lokasi pekerjaan : sepanjang jalan
KODE
KOEF.
SATUAN
3
4
5
6
7
8
1
2
URUTAN KERJA
Pagar diproduksi di Bengkel kerja Base Camp
Dipasang di tempat dengan ditanam dan di cor
II.
III.
1.
1.a.
1.b.
1.c.
2.
2.a.
ALAT
Flat Bed Truck
Kapsitas Bak
Waktu Siklus :
- Memuat
- Angkut V=40 Km/jam
- Kembali V=60 Km/jam
- Menurunkan
- Lain-lain
2.b
Cp
Ts : 60
= 1 : Q1
Weldeng Set
Kapasitas Pengelasan
Jumlah pengelasan per meter
17.97
4.49
22.47
2.b.
3.
(M47)
(M60)a
(M60)b
L
Tk
Fh
V1
V2
Nw
Cw : 60
= 1 : Q2
ALAT BANTU
Diperlukan :
- Gerinda Potong
- Gerinda
- Ampelas
- Kuas
- Cangkul, sekop dll
= 1 buah
= 1 buah/ M
= 2 Lbr
= 1 Bh
= 1 set
TENAGA
Produksi penanaman rumput / hari = Tk x Q1
Kebutuhan tenaga :
- Mandor
- Tukang Las
- Pekerja
8.7
7.00
1.05
2.93
6.67
KM
jam
M
M
0.0567
3.0800
7.0000
M3
M
M
kg
(E11)
Cp
Ts
T1
T2
T3
T4
T5
Ts
30.00
50.00
13.09
8.73
25.00
5.00
101.81
menit
menit
menit
menit
menit
menit
Q1
17.6796
(E11)
0.0566
Jam
(E32)
Cw
Nw
120.00
53.92
cm/jam
cm
Q2
0.2696
(E32)
3.7091
Jam
Qt
M
Tb
P
123.76
1.00
2.00
4.00
M2
orang
orang
orang
Berlanjut ke hal.
: 8.8(2)
: Pagar Pemisah Pedestrian Galvanised
: M1
No.
U RAIAN
KODE
KOEF.
SATUAN
Koefisien Tenaga / M2 :
- Mandor
- Tukang
- Pekerja
= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt
4.
5.
503,886.72 / Meter
6.
7.
(L03)
(L02)
(L01)
0.0566
0.1131
0.2263
jam
jam
jam
Analisa EI-841
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: ..
:
: 8.4.(1)
: Marka Jalan Termoplastik
: M2
PERKIRAAN
SATUAN KUANTITAS
Spec.10.4.3(2)(d)
NO.
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.6000
0.2250
0.0750
Spec.10.4.3(2)(e)
B.
BAHAN
1.
2.
3.
Cat Marka
Thinner
Blass Bit
M17b
M33
M34
Kg
Liter
Kg
1.9500
1.0500
0.4500
PERALATAN
1.
2.
3.
Compressor
Dump Truck
Alat Bantu
E05
E08
Jam
Jam
Ls
0.0750
0.0750
1.0000
3
4
Analisa EI-841
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-842
URAIAN ANALISA HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: ..
:
: 8.4.(2)
: Marka Jalan Bukan Termoplastic
: M2
Spec.10.4.3(2)(d)
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.6000
0.2250
0.0750
BAHAN
Spec.10.4.3(2)(e)
1.
2.
3.
Cat Marka
Thinner
Blass Bit
(M17a)
(M33)
(M34)
Kg
Liter
Kg
1.9500
1.0500
0.4500
PERALATAN
1.
2.
3.
Compressor
Dump Truck
Alat Bantu
E05
E08
Jam
Jam
Ls
0.0750
0.0750
1.0000
3
4
Analisa EI-842
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-843a
Engineering Grade
URAIAN ANALISA HARGA SATUAN
NO.
:
:
: ..
:
: 8.4.(3) .(a)
: Rambu Jalan Tunggal dengan Permuka
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.7743
0.4646
0.1549
BAHAN
1.
2.
3.
4.
Pelat Rambu
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
(M35a)
(M24)
(M60)
BH
Batang
M3
Ls
1.0000
1.0000
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1549
1.0000
3
4
Analisa LI-843a
gineering Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-843b
ngineering Grade
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(3) .(b)
: Rambu Jalan Ganda dengan Permukaa
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.9292
0.4646
0.1549
BAHAN
1.
2.
Pelat Rambu
Pipa Galvanis Dia.1,6"
(M35a)
(M24)
BH
Batang
2.0000
1.0000
3.
4.
Beton K-175
Cat, dan bahan lainnya
(M60)
M3
Ls
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1549
1.0000
3
4
Analisa LI-843b
neering Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-844a
High Intensity Grade
URAIAN ANALISA HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(4) .(a)
: Rambu Jalan Tunggal dengan Permukaa
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.7743
0.4646
0.1549
BAHAN
1.
2.
3.
4.
Pelat Rambu
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
(M35b)
(M24)
(M60)
BH
Batang
M3
Ls
1.0000
1.0000
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1549
1.0000
3
4
Analisa LI-844a
h Intensity Grade
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa LI-844b
gh Intensity Grade
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(4) .(b)
: Rambu Jalan Ganda dengan Permukaan
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.7743
0.4646
0.1549
BAHAN
1.
2.
3.
4.
Pelat Rambu
Pipa Galvanis Dia.1,6"
Beton K-175
Cat, dan bahan lainnya
(M35b)
(M24)
(M60)
BH
Batang
M3
Ls
2.0000
1.0000
0.0160
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1549
1.0000
3
4
Analisa EI-845
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
KOMPONEN
:
:
: ..
:
: 8.4.(5)
: Patok Pengarah
: BH
PERKIRAAN
SATUAN KUANTITAS
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.7380
0.3690
0.0922
BAHAN
1.
2.
3.
Beton K-175
Baja Tulangan
Cat, dan material lainnya
(M60)
(M39)
M3
Kg
Ls
0.0354
4.6512
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.0922
1.0000
3
4
Analisa EI-845
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-846a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(6) .(a)
: Patok Kilometer
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.5243
0.2097
0.1049
BAHAN
1.
2.
3.
Beton K-175
Baja Tulangan
Cat, dan material lainnya
(M60)
(M39)
M3
Kg
Ls
0.1512
18.9000
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1049
1.0000
E.
F.
Note: 1
2
3
4
Analisa EI-846a
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-846b
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(6) .(b)
: Patok Hektometer
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
Pekerja Biasa
(L01)
jam
0.5243
2.
3.
Tukang
Mandor
(L02)
(L03)
jam
jam
0.2097
0.1049
BAHAN
1.
2.
3.
Beton K-175
Baja Tulangan
Cat, dan material lainnya
(M60)
(M39)
M3
Kg
Ls
0.0630
7.8750
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.1049
1.0000
3
4
Analisa EI-846b
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-847
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
ukuran
sesuai
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
: ..
:
: 8.4.(7)
: Rel Pengaman
: M'
drawing
NO.
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
PEKERJA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.6167
0.4042
0.2021
BAHAN
1.
2.
3.
4.
Rel Pengaman
Patok Beton K-175
Baja Tulangan
Baut, dan material lain
(M36)
(M38)
(M39)a
M'
buah
buah
buah
1.0000
0.0929
4.6452
1.0000
PERALATAN
1.
2.
Dump Truck
Alat Bantu
E08
Jam
Ls
0.2021
1.0000
3
4
Analisa EI-847
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-848
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(8)
: Paku Jalan
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.7500
0.7000
0.3500
BAHAN
1.
2.
3.
Beton K-175
Paku jalan
Cat, dan material lainnya
(M60)
M3
Ls
0.0630
1.0000
1.0000
PERALATAN
Alat Bantu
Ls
1.0000
3
4
Analisa EI-849
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
:
:
: ..
:
: 8.4.(9)
: Mata Kucing
SATUAN PEMBAYARAN
NO.
: BH
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.7500
0.7000
0.3500
BAHAN
1.
2.
3.
Beton K-175
Mata kucing
Cat, dan material lainnya
(M60)
M3
Kg
Ls
0.0630
1.0000
1.0000
PERALATAN
1.
Alat Bantu
Ls
1.0000
3
4
Analisa EI-8410
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4 (10)
: Kerb Pracetak
: M
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.3891
0.1556
0.0778
BAHAN
1.
2
Beton K-300
(M59)
Mortar, dan material lainnya
M3
Ls
0.0788
1.0000
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.0778
1.0000
1.0000
3
4
Analisa EI-8410
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tida
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai da
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (teta
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-8412
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.4.(12)
: Perkerasan Blok Beton pada Trotoar d
: M2
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.02
0.08
0.12
B.
BAHAN
1.
2.
3.
Paving Blok
Pasir
Angker
M2
M3
Kg
1.05
0.05
0.50
PERALATAN
1.
2.
Tamper
Alat Bantu
E25
Jam
Ls
0.01
1.00
0.0000
0.24825
D.
E.
F.
Note: 1
2
3
4
Analisa EI-8412
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-861
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
0.0000
0.24825
:
: ..
:
: 8.6(1)
: Kerb Pracetak Pemisah Jalan (Concrete
: M
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.16
0.29
0.14
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
0.26
26.98
PERALATAN
1.
2.
E11
Jam
Ls
0.14
1.00
Analisa EI-861
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (teta
yang dibayar dari kontrak) dan biaya-biaya lainnya.
0.0000
0.24825
Analisa EI-871
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: ..
:
: 8.7(1)
: Unit lampu penerangan jalan tunggal
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.16
0.29
0.14
BAHAN
1
2
3
4
5
6
7
8
9
10
buah
buah
m1
M3
Kg
buah
M3
Kg
M3
buah
1.00
1.00
15.00
0.72
58.80
1.00
0.72
1.21
15.00
1.00
lumpsum
C.
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.14
1.00
1.00
3
4
Berlanjut ke hal. berikut.
Analisa EI-871
KETERANGAN
0.0000
0.24825
Analisa EI-861
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: ..
:
: 8.7(2)
: Unit lampu penerangan jalan ganda
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.40
0.35
0.17
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
2.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.17
1.00
1.00
lumpsum
3
4
Analisa EI-861
KETERANGAN
0.0000
0.24825
Analisa EI-873
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: ..
:
: 8.7(3)
: Unit lampu penerangan jalan tunggal
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.16
0.29
0.14
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
1.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.14
1.00
1.00
lumpsum
3
4
Analisa EI-873
KETERANGAN
0.0000
0.24825
Analisa EI-874
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: ..
:
: 8.7(4)
: Unit lampu penerangan jalan ganda
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.40
0.35
0.17
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
2.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.17
1.00
1.00
lumpsum
0.0000
0.24825
3
4
Analisa EI-874
KETERANGAN
Analisa EI-875
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
: ..
:
: 8.7(5)
: Unit lampu penerangan jalan tunggal
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.16
0.29
0.14
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
1.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.14
1.00
1.00
lumpsum
3
4
Analisa EI-875
KETERANGAN
Analisa EI-876
KETERANGAN
PROYEK
NO.
:
: ..
:
: 8.7(6)
: Unit lampu penerangan jalan ganda
: Buah
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
1.40
0.35
0.17
BAHAN
1.
2.
Beton K-300
Besi Tulangan (Ulir) U 32
(M39)b
M3
Kg
1.00
2.00
PERALATAN
1.
2.
3
E11
Jam
Ls
Ls
0.17
1.00
1.00
lumpsum
3
4
Analisa EI-876
KETERANGAN
Analisa EI-881
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: 8.8(1)
: Pagar Pemisah Pedestrian Carbon Stee
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.0566
0.1131
0.2263
B.
BAHAN
1.
Beton K-125
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"
M47
M2
M
M
0.0567
3.0800
7.0000
C.
PERALATAN
1.
2.
3
E11
E32
Jam
Jam
Ls
0.0566
3.7091
1.0000
Lump Sum
3
4
Analisa EI-881
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-882
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KETERANGAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
:
:
: ..
:
NO.
: 8.8(2)
: Pagar Pemisah Pedestrian Galvanised
: M1
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
3.
Pekerja Biasa
Tukang
Mandor
(L01)
(L02)
(L03)
jam
jam
jam
0.0566
0.1131
0.2263
B.
BAHAN
1.
Beton K-125
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"
M47
M76
M77
M2
M
M
0.0567
3.0800
7.0000
PERALATAN
1.
2.
3
E11
E32
Jam
Jam
Ls
0.0566
3.7091
1.0000
Lump Sum
D.
E.
F.
Note: 1
2
3
4
Analisa EI-882
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-841
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
27,500.00
12,000.00
28,600.00
111,049.38
164,696.38
0.00
:
:
:
1.00
114,811.23
0.01
JUMLAH
HARGA
(Rp.)
2,719.39
1,341.80
536.72
4,597.91
53,625.00
12,600.00
12,870.00
79,095.00
8,328.70
12,352.23
0.00
20,680.93
TAN ( A + B + C )
104,373.85
10,437.38
114,811.23
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-842
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
:
:
:
1.00
104,086.23
0.00
JUMLAH
HARGA
(Rp.)
2,719.39
1,341.80
536.72
4,597.91
22,500.00
12,000.00
28,600.00
111,049.38
164,696.38
0.00
43,875.00
12,600.00
12,870.00
69,345.00
8,328.70
12,352.23
0.00
20,680.93
TAN ( A + B + C )
94,623.85
9,462.38
104,086.23
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
Analisa LI-843a
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
176,000.00
154,000.00
713,376.02
0.00
164,696.38
0.00
:
:
:
1.00
411,739.31
0.02
JUMLAH
HARGA
(Rp.)
3,509.52
2,770.68
1,108.27
7,388.47
176,000.00
154,000.00
11,414.02
0.00
341,414.02
25,505.98
0.00
25,505.98
TAN ( A + B + C )
374,308.46
37,430.85
411,739.31
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa LI-843b
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
176,000.00
154,000.00
:
:
:
1.00
606,111.40
0.03
JUMLAH
HARGA
(Rp.)
4,211.43
2,770.68
1,108.27
8,090.37
352,000.00
154,000.00
713,376.02
0.00
164,696.38
0.00
11,414.02
0.00
517,414.02
25,505.98
0.00
25,505.98
TAN ( A + B + C )
551,010.37
55,101.04
606,111.40
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa LI-844a
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
216,500.00
154,000.00
713,376.02
0.00
164,696.38
0.00
:
:
:
1.00
456,289.31
0.02
JUMLAH
HARGA
(Rp.)
3,509.52
2,770.68
1,108.27
7,388.47
216,500.00
154,000.00
11,414.02
0.00
381,914.02
25,505.98
0.00
25,505.98
TAN ( A + B + C )
414,808.46
41,480.85
456,289.31
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa LI-844b
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
216,500.00
154,000.00
713,376.02
0.00
:
:
:
1.00
694,439.31
0.03
JUMLAH
HARGA
(Rp.)
3,509.52
2,770.68
1,108.27
7,388.47
433,000.00
154,000.00
11,414.02
0.00
598,414.02
164,696.38
0.00
25,505.98
0.00
25,505.98
TAN ( A + B + C )
631,308.46
63,130.85
694,439.31
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-845
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
:
:
:
1.00
97,393.33
0.00
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
713,376.02
9,000.00
0.00
164,696.38
0.00
3,344.81
2,200.53
660.16
6,205.51
25,280.26
41,860.55
0.00
67,140.81
15,193.08
0.00
15,193.08
TAN ( A + B + C )
88,539.39
8,853.94
97,393.33
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-846a
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
713,376.02
9,000.00
0.00
164,696.38
0.00
TAN ( A + B + C )
:
:
:
1.00
329,572.40
0.02
JUMLAH
HARGA
(Rp.)
2,376.44
1,250.76
750.46
4,377.66
107,862.45
170,100.00
0.00
277,962.45
17,271.16
0.00
17,271.16
299,611.27
29,961.13
329,572.40
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-846b
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
:
:
:
1.00
151,213.16
0.01
JUMLAH
HARGA
(Rp.)
2,376.44
5,963.57
7,156.29
JUMLAH HARGA TENAGA
713,376.02
9,000.00
0.00
164,696.38
0.00
1,250.76
750.46
4,377.66
44,942.69
70,875.00
0.00
115,817.69
17,271.16
0.00
17,271.16
TAN ( A + B + C )
137,466.51
13,746.65
151,213.16
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-847
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
412,500.00
713,376.02
8,500.00
0.00
164,696.38
0.00
TAN ( A + B + C )
:
:
:
1.00
618,998.48
0.03
JUMLAH
HARGA
(Rp.)
7,327.44
2,410.34
1,446.21
11,183.99
412,500.00
66,274.80
39,483.79
0.00
518,258.59
33,283.31
0.00
33,283.31
562,725.89
56,272.59
618,998.48
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-848
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
:
:
:
1.00
71,558.78
0.00
JUMLAH
HARGA
(Rp.)
7,931.55
4,174.50
2,504.70
14,610.75
713,376.02
5,500.00
0.00
44,942.69
5,500.00
0.00
50,442.69
0.00
0.00
0.00
TAN ( A + B + C )
65,053.44
6,505.34
71,558.78
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-849
NDAR UNTUK
NG-MASING HARGA SATUAN
..
:
:
1.00
148,008.78
HARGA
SATUAN
(Rp.)
0.01
JUMLAH
HARGA
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
713,376.02
75,000.00
0.00
0.00
7,931.55
4,174.50
2,504.70
14,610.75
44,942.69
75,000.00
0.00
119,942.69
0.00
0.00
TAN ( A + B + C )
134,553.44
13,455.34
148,008.78
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-8410
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
0.00
330,875.08
0.00
0.00
:
:
:
1.00
118,858.59
0.01
JUMLAH
HARGA
(Rp.)
1,763.42
928.12
556.87
3,248.40
79,057.69
0.00
79,057.69
25,747.17
0.00
0.00
25,747.17
TAN ( A + B + C )
108,053.26
10,805.33
118,858.59
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-8412
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
:
:
:
1.00
10,096.95
0.00
JUMLAH
HARGA
(Rp.)
91.01
479.00
862.20
1,432.22
0.00
142,000.00
0.00
24,222.29
0.00
0.00
7,455.00
0.00
7,455.00
291.83
0.00
291.83
TAN ( A + B + C )
9,179.05
917.90
10,096.95
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-861
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
9,000.00
330,875.08
0.00
:
:
:
1.00
612,445.90
0.03
JUMLAH
HARGA
(Rp.)
5,250.23
1,727.05
1,036.23
8,013.51
257,991.59
242,853.19
500,844.77
47,910.71
0.00
47,910.71
TAN ( A + B + C )
556,769.00
55,676.90
612,445.90
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-871
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
:
:
:
1.00
22,896,888.29
1.05
JUMLAH
HARGA
(Rp.)
5,250.23
1,727.05
1,036.23
8,013.51
15,665,000.00
249,286.00
7,840.00
973,593.01
14,562.50
36,400.00
18,750.00
4,480.00
40,464.00
2,508,000.00
330,875.08
0.00
0.00
15,665,000.00
249,286.00
117,600.00
700,986.97
856,275.00
36,400.00
13,500.00
5,420.80
606,960.00
2,508,000.00
20,759,428.77
47,910.71
0.00
0.00
47,910.71
TAN ( A + B + C )
20,815,352.99
2,081,535.30
22,896,888.29
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-861
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
9,000.00
330,875.08
0.00
0.00
:
:
:
1.00
1,198,338.42
0.05
JUMLAH
HARGA
(Rp.)
6,336.18
2,084.27
1,250.56
9,671.00
1,003,907.14
18,000.00
1,021,907.14
57,820.42
0.00
0.00
57,820.42
TAN ( A + B + C )
1,089,398.57
108,939.86
1,198,338.42
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-873
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
9,000.00
:
:
:
1.00
1,175,714.50
0.05
JUMLAH
HARGA
(Rp.)
5,250.23
1,727.05
1,036.23
8,013.51
1,003,907.14
9,000.00
330,875.08
0.00
0.00
1,012,907.14
47,910.71
0.00
0.00
47,910.71
TAN ( A + B + C )
1,068,831.37
106,883.14
1,175,714.50
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-874
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
9,000.00
330,875.08
0.00
0.00
:
:
:
1.00
1,198,338.42
0.05
JUMLAH
HARGA
(Rp.)
6,336.18
2,084.27
1,250.56
9,671.00
1,003,907.14
18,000.00
1,021,907.14
57,820.42
0.00
0.00
57,820.42
TAN ( A + B + C )
1,089,398.57
108,939.86
1,198,338.42
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-875
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
9,000.00
:
:
:
1.00
1,175,714.50
0.05
JUMLAH
HARGA
(Rp.)
5,250.23
1,727.05
1,036.23
8,013.51
1,003,907.14
9,000.00
330,875.08
0.00
0.00
1,012,907.14
47,910.71
0.00
0.00
47,910.71
TAN ( A + B + C )
1,068,831.37
106,883.14
1,175,714.50
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
Analisa EI-876
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
1,003,907.14
9,000.00
330,875.08
0.00
0.00
:
:
:
1.00
1,198,338.42
0.05
JUMLAH
HARGA
(Rp.)
6,336.18
2,084.27
1,250.56
9,671.00
1,003,907.14
18,000.00
1,021,907.14
57,820.42
0.00
0.00
57,820.42
TAN ( A + B + C )
1,089,398.57
108,939.86
1,198,338.42
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-881
NDAR UNTUK
NG-MASING HARGA SATUAN
..
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
638,182.22
0.00
0.00
:
:
:
1.00
320,626.72
0.01
JUMLAH
HARGA
(Rp.)
256.36
674.63
1,619.11
2,550.10
36,184.93
0.00
0.00
36,184.93
330,875.08
63,095.33
0.00
18,715.12
234,028.68
0.00
252,743.81
TAN ( A + B + C )
291,478.84
29,147.88
320,626.72
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
NDAR UNTUK
NG-MASING HARGA SATUAN
..
Analisa EI-882
HARGA
SATUAN
(Rp.)
4,532.31
5,963.57
7,156.29
JUMLAH HARGA TENAGA
638,182.22
20,000.00
15,000.00
330,875.08
63,095.33
0.00
:
:
:
1.00
503,886.72
0.02
JUMLAH
HARGA
(Rp.)
256.36
674.63
1,619.11
2,550.10
36,184.93
61,600.00
105,000.00
202,784.93
18,715.12
234,028.68
0.00
252,743.81
TAN ( A + B + C )
458,078.84
45,807.88
503,886.72
Tenaga Kerja dan Peralatan, volume dan/atau ukuran
: 9.4
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
12,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
16,109.04
Rupiah
120.00
Rupiah
16,229.04
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
78,580.20
Rupiah
2.
Pelumas
49,500.00
Rupiah
5,250
Rupiah
7,500.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
148,467.34
Rupiah
164,696.38
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
i
U1
U2
Mb
Ms
15.00 % / Tahun
4,054.29 Rp./Jam
3,582.86 Rp./Jam
5,833.80
Liter
6,548.35
Liter
6.
Minyak Pelumas
Mp
18,000.00
Liter
: 9.5
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
33,080,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
44,407.25
Rupiah
330.80
Rupiah
44,738.05
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
149,302.38
Rupiah
2.
Pelumas
94,050.00
Rupiah
14,473
Rupiah
20,675.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
286,137.02
Rupiah
330,875.08
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
15.00 % / Tahun
2.
3.
4.
5.
6.
U1
U2
Mb
Ms
Mp
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Rp./Jam
Liter
Liter
Liter
: 9.6
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
10,500,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
14,095.41
Rupiah
105.00
Rupiah
14,200.41
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
78,580.20
Rupiah
2.
Pelumas
49,500.00
Rupiah
4,594
Rupiah
6,562.50
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
146,873.59
Rupiah
161,074.00
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.7
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
BULLDOZER 100-150 HP
Pw
155.0
HP
Cp A
5.0
Tahun
W
2,000
Jam
B
900,000,000
Rupiah
1.
2.
3.
C.
90,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
120,817.80
Rupiah
900.00
Rupiah
121,717.80
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
121,799.31
Rupiah
2.
Pelumas
76,725.00
Rupiah
3.
Biaya bengkel
39,375
Rupiah
4.
5.
Perawatan dan
perbaikan
56,250.00
Rupiah
294,149.31
Rupiah
415,867.11
Rupiah
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
=
(12,5 % - 17,5 %) x B
W
=
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
3.
4.
5.
i
U1
U2
Mb
Ms
15.00 % / Tahun
4,054.29 Rp./Jam
3,582.86 Rp./Jam
5,833.80
Liter
6,548.35
Liter
6.
Minyak Pelumas
Mp
18,000.00
Liter
: 9.8
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
67,600,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
90,747.59
Rupiah
676.00
Rupiah
91,423.59
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
106,083.27
Rupiah
2.
Pelumas
66,825.00
Rupiah
29,575
Rupiah
42,250.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
252,370.41
Rupiah
343,794.00
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.9
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
56,400,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
75,712.49
Rupiah
564.00
Rupiah
76,276.49
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
75,436.99
Rupiah
2.
Pelumas
47,520.00
Rupiah
3.
Biaya bengkel
24,675
4.
Perawatan dan
perbaikan
35,250.00
Rupiah
5.
6.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
190,519.13
Rupiah
266,795.62
Rupiah
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
=
(12,5 % - 17,5 %) x B
W
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.10
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
54,200,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
72,759.16
Rupiah
542.00
Rupiah
73,301.16
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
55,006.14
Rupiah
2.
Pelumas
34,650.00
Rupiah
23,713
Rupiah
33,875.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
154,880.78
Rupiah
228,181.95
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.11
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
Pw
Cp
A
W
B
EXCAVATOR 80-140 HP
133.0
HP
0.9
M3
5.0
Tahun
2,000
Jam
850,000,000
Rupiah
1.
2.
3.
C.
85,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
114,105.70
Rupiah
850.00
Rupiah
114,955.70
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
104,511.67
Rupiah
2.
Pelumas
65,835.00
Rupiah
37,188
Rupiah
53,125.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
268,296.31
Rupiah
383,252.01
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.12
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
Pw
Cp
A
W
B
1.
2.
3.
C.
148,800,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
199,752.09
Rupiah
1,488.00
Rupiah
201,240.09
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
108,440.68
Rupiah
2.
Pelumas
68,310.00
Rupiah
65,100
Rupiah
93,000.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
342,487.82
Rupiah
543,727.91
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.13
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
119,542,500
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
160,476.24
Rupiah
1,195.43
Rupiah
161,671.67
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
64,435.76
Rupiah
2.
Pelumas
40,590.00
Rupiah
52,300
Rupiah
74,714.06
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
239,676.81
Rupiah
401,348.48
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.14
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
91,878,750
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
123,339.87
Rupiah
918.79
Rupiah
124,258.66
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
64,435.76
Rupiah
2.
Pelumas
40,590.00
Rupiah
40,197
Rupiah
57,424.22
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
210,284.08
Rupiah
334,542.74
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.15
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
VIBRATORY COMPACTOR
Pw
4.7
HP
Cp
121.000
Ton
A
4.0
Tahun
W
1,000
Jam
B
17,000,000
Rupiah
1.
2.
3.
C.
1,700,000
i x (1 + i)^A
(1 + i)^A - 1
0.35027
(B-C)xD
W
5,359.06
Rupiah
34.00
Rupiah
5,393.06
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
1.
4,616.59
Rupiah
2.
Pelumas
2,538.00
Rupiah
1,063
Rupiah
2,975.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
18,829.23
Rupiah
24,222.29
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.16
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
90,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
120,817.80
Rupiah
900.00
Rupiah
121,717.80
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
78,973.10
Rupiah
2.
Pelumas
49,747.50
Rupiah
39,375
Rupiah
56,250.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
231,982.74
Rupiah
353,700.54
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.17
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
11,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
14,766.62
Rupiah
110.00
Rupiah
14,876.62
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
47,148.12
Rupiah
2.
Pelumas
29,700.00
Rupiah
4,813
Rupiah
6,875.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
96,172.76
Rupiah
111,049.38
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.18
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
17,550,000
i x (1 + i)^A
(1 + i)^A - 1
0.61512
(B-C)xD
W
64,771.74
Rupiah
234.00
Rupiah
65,005.74
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
-
1.
19,645.05
Rupiah
2.
Pelumas
10,800.00
Rupiah
10,238
Rupiah
20,475.00
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
68,794.69
Rupiah
133,800.44
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.19
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
1.
2.
3.
C.
500,000
Rupiah
i x (1 + i)^A
(1 + i)^A - 1
0.43798
(B-C)xD
W
985.45
Rupiah
5.00
Rupiah
990.45
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
4,714.81
Rupiah
2.
Pelumas
2,970.00
Rupiah
219
Rupiah
312.50
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
15,853.20
Rupiah
16,843.65
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
: 9.20
: PEKERJAAN HARIAN
: JAM
No.
A.
1.
2.
3.
4.
5.
6.
B.
U RAIAN
KODE
KOEF.
SATUAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Umur Ekonomis
Jam Operasi Dalam 1 Tahun
Harga Alat
Pw
Cp
A
W
B
JACK HAMMER
0.0
HP
1,330.0
5.0
Tahun
2,000
Jam
35,000,000
Rupiah
1.
2.
3.
C.
3,500,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
4,698.47
Rupiah
35.00
Rupiah
4,733.47
Rupiah
b. Asuransi, dll =
0.002 x B
W
(E+F)
Rupiah
1.
0.00
Rupiah
2.
Pelumas
0.00
Rupiah
1,531
Rupiah
2,187.50
Rupiah
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
Perawatan dan
perbaikan
(12,5 % - 17,5 %) x B
W
4.
5.
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
L
M
4,054.29
3,582.86
Rupiah
Rupiah
11,355.89
Rupiah
16,089.36
Rupiah
(H+I+K+L+M)
D.
E.
LAIN - LAIN
1.
2.
i
U1
15.00 % / Tahun
4,054.29 Rp./Jam
3.
4.
5.
6.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
Rp./Jam
Liter
Liter
Liter
KET.
E08
KETERANGAN
(E11)
KETERANGAN
(E23)
0
0
0
KETERANGAN
(E04)
KETERANGAN
(E13)
0
0
0
KETERANGAN
(E15)
KETERANGAN
(E14)
KETERANGAN
(E10)
KETERANGAN
(E07)
KETERANGAN
(E16)
KETERANGAN
(E19)
KETERANGAN
(E25)
KETERANGAN
(E18)
KETERANGAN
(E05)
KETERANGAN
(E06)
KETERANGAN
(E22)
KETERANGAN
E26
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (1)
: Pemeliharaan Rutin Perkerasan
: Lump Sum / Bulan
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
378.0000
75.6000
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
3.
4.
M3
M3
Liter
LS
10.7280
10.7280
1,006.0000
1.0000
539,669.22
1,345,284.59
7,618.70
11,795,000.00
PERALATAN
1.
2.
3.
Motor Grader
Flat Bed Truck (E11)
Air Compressor (E05)
(E13)
Jam
Jam
Jam
25.2000
25.2000
25.2000
343,794.00
330,875.08
111,049.38
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (2)
: Pemeliharaan Rutin Bahu Jalan
: Lump Sum / Bulan
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
126.0000
25.2000
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
2.
Lap.Pond.Agg.Kelas B
Bahan-bahan lainnya
M3
LS
44.7000
1.0000
365,095.04
1,632,000.00
PERALATAN
1.
2.
3.
Motor Grader
Flat Bed Truck (E11)
Roller
(E16)
(E13)
Jam
Jam
Jam
12.6000
12.6000
12.6000
343,794.00
330,875.08
162,603.45
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (3)
: Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
: Lump Sum / Bulan
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
252.0000
50.4000
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Umum
LS
1.0000
10,752,260.00
PERALATAN
1.
2.
Motor Grader
Dump Truck
(E13)
(E08)
Jam
Jam
50.4000
50.4000
343,794.00
164,696.38
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (4)
: Pemeliharaan Rutin Perlengkapan Jalan
: Lump Sum / Bulan
% THD. BIAYA PROYEK
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
63.0000
6.3000
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Umum
LS
1.0000
6,198,951.30
PERALATAN
1.
(E11)
Jam
12.6000
330,875.08
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-101
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROPINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
:
:
: 10.1 (5)
: Pemeliharaan Rutin Jembatan
: Lump Sum / Bulan
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
Jam
Jam
756.0000
151.2000
HARGA
SATUAN
(Rp.)
4,532.31
7,156.29
BAHAN
1.
Umum
LS
1.0000
10,599,433.18
PERALATAN
1.
(E11)
Jam
126.0000
330,875.08
JUMLAH
HARGA
(Rp.)
2
3
Harga Lump Sum harus mencakup seluruh pajak yang berkaitan (tapi tidak termasuk PPN yang dibayarkan
dari Kontrak), bahan-bahan tambahan, tenaga kerja atau peralatan yang mungkin diperlukan.
Pekerjaan dan kuantitas yang ditunjukkan di atas adalah perkiraan semata yang menjadi dasar penetapan Mata
Pembayaran Pekerjaan Pemeliharaan Rutin ini. Pelaksanaan pemeliharaan kondisi jalan dilakukan sesuai
ketentuan dalam Spesifikasi yang tidak perlu dikaitkan dengan kuantitas yang ditunjukkan dalam Analisa ini.
Analisa EI-1011
2.83
JUMLAH
HARGA
(Rp.)
1,713,214.80
541,015.20
2,254,230.00
5,789,571.34
14,432,213.06
7,664,413.60
11,795,000.00
39,681,198.00
8,663,608.90
8,338,051.92
2,798,444.44
19,800,105.26
61,735,533.26
6,173,553.33
67,909,086.58
8,488,635.82
4,715,908.79
Analisa EI-1012
1.47
JUMLAH
HARGA
(Rp.)
571,071.60
180,338.40
751,410.00
16,319,748.36
1,632,000.00
17,951,748.36
4,331,804.45
4,169,025.96
2,048,803.50
10,549,633.91
29,252,792.27
2,925,279.23
32,178,071.50
4,022,258.94
2,234,588.30
Analisa EI-1013
1.91
JUMLAH
HARGA
(Rp.)
1,142,143.20
360,676.80
1,502,820.00
10,752,260.00
10,752,260.00
17,327,217.80
8,300,697.69
25,627,915.48
37,882,995.48
3,788,299.55
41,671,295.03
5,208,911.88
2,893,839.93
Analisa EI-1014
0.54
JUMLAH
HARGA
(Rp.)
285,535.80
45,084.60
330,620.40
6,198,951.30
6,198,951.30
4,169,025.96
4,169,025.96
10,698,597.66
1,069,859.77
11,768,457.42
1,471,057.18
817,253.99
Analisa EI-1015
2.86
JUMLAH
HARGA
(Rp.)
3,426,429.60
1,082,030.40
4,508,460.00
10,599,433.18
10,599,433.18
41,690,259.58
41,690,259.58
56,798,152.75
5,679,815.28
62,477,968.03
7,809,746.00
4,338,747.78
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
II.
: 10.1 (1)
: Pemeliharaan Rutin Perkerasan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
t
h
Ar
Lp
Ap1
Ap2
Tp
Tpk
Tmd
Te
Pk
Md
7.00
4.50
1.00
0.04
0.055
1.50
14.90
1.00
2.00
360.00
1.00
1.00
1.00
15.00
3.00
jam
Meter
Meter
Meter
Meter
Ltr/M2
Km
%
%
Hari
%
%
%
orang
orang
(L01)
(L03)
378.00
75.60
Jam
Jam
10.73
10.73
7.38
1,006
10.00
M3
M3
M3
Liter
%
25.20
25.20
25.20
Jam
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tmd x Tp x Tk
BAHAN
1
2
3
4
5
IV.
(EI-10B)
(EI-10D)
(EI-10C)
(EI-10E)
ALAT
1
2
3
Motor Grader
Flat Bed Truck
Air Compressor
= Te x Tp x Tk
= Te x Tp x Tk
= Te x Tp x Tk
(E13)
(E11)
(E05)
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
II.
: 10.1 (2)
: Pemeliharaan Rutin Bahu Jalan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
t
Ar
Lp
As1
As2
Tp
Tpk
Tmd
Te
Pk
Md
7.00
4.50
1.00
0.15
0.50
14.90
2.00
4.00
360.00
0.50
0.50
0.50
10.00
2.00
jam
Meter
Meter
Meter
Ltr/M2
Km
%
%
Hari
%
%
%
orang
orang
(L01)
(L03)
126.00
25.20
Jam
Jam
(EI-10A)
44.70
10.00
M3
%
(E13)
(E11)
(E16)
12.60
12.60
12.60
Jam
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
2
IV.
Lap.Pond.Agr.Kls.B = As x t x Ws x Lp x 1000
Bahan-bahan lainnya (diasumsikan)
ALAT
1
2
3
Motor Grader
Flat Bed Truck
Roller
= Te x Tp x Tk
= Te x Tp x Tk
= Te x Tp x Tk
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
II.
: 10.1 (3)
: Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
Wsd
Vtp
Vpb
Lp
Ad1
Ad2
Tp
Tpk
Tmd
Te
Pk
Md
7.00
4.50
1.00
0.60
220.00
330.00
14.90
0.50
1.00
360.00
1.00
1.00
2.00
10.00
2.00
jam
Meter
Meter
Meter
M3/Km
M3/Km
Km
%
%
Hari
%
%
%
orang
orang
(L01)
(L03)
252.00
50.40
Jam
Jam
(EI-22)
(EI-323)
24.59
16.39
10.00
M3
M3
%
(E13)
(E08)
50.40
50.40
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
IV.
ALAT
1
2
Motor Grader
Dump Truck
= Te x Tp x Tk
= Te x Tp x Tk
No.
I.
1
2
3
4
5
6
7
8
9
10
11
II.
: 10.1 (4)
: Pemeliharaan Rutin Perlengkapan Jalan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
Wsd
Lp
Tp
Tpk
Tmd
Te
Pk
Md
7.00
4.50
1.00
0.60
14.90
360.00
0.50
0.25
0.50
5.00
1.00
jam
Meter
Meter
Meter
Km
Hari
%
%
%
orang
orang
(L01)
(L03)
63.00
6.30
Jam
Jam
(M42)
(M12)
(M01)
-
29.80
298.00
14.90
100.00
Kg
Kg
M3
%
(E11)
12.60
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
IV.
= Te x Tp x Tk
No.
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
II.
: 10.1 (5)
: Pemeliharaan Rutin Jembatan
: Lump Sum / Bulan
U RAIAN
KODE
KOEF.
SATUAN
Tk
Wr
Ws
Kj
Lj
Wj
Lp
Tp
Tpk
Tmd
Te
Pk
Md
7.00
4.50
1.00
3.00
15.00
5.50
14.90
360.00
2.00
2.00
5.00
15.00
3.00
jam
Meter
Meter
Buah
Meter
Meter
Km
Hari
%
%
%
orang
orang
(L01)
(L03)
756.00
151.20
Jam
Jam
(M42)
(M12)
(M01)
-
223.50
2,235.00
7.76
25.00
Kg
Kg
M3
%
(E13)
(E08)
126.00
126.00
Jam
Jam
PEKERJA
1
2
III.
Kebutuhan Pekerja
Kebutuhan Mandor
= Pk x Tpk x Tp x Tk
= Md x Tpk x Tp x Tk
BAHAN
1
IV.
1
2
Motor Grader
Dump Truck
= Te x Tp x Tk
= Te x Tp x Tk
KETERANGAN
Retak sedang
Thd. Total Luas
Thd. Total Luas
Thd. Total Waktu
Thd. Total Waktu
Thd. Total Waktu
40%
40%
20%
Thd.Biaya Bahan
KETERANGAN
Thd.Biaya Bahan
KETERANGAN
Thd.Total Pjg.Jln
Thd.Total Pjg.Jln
Thd. Total Waktu
Thd. Total Waktu
Thd. Total Waktu
Thd.Biaya Bahan
KETERANGAN
819,500.00
164,175.65
2,115,800.00
Thd.Biaya Bahan
KETERANGAN
6,146,250.00
1,231,317.38
1,101,979.17
Thd.Biaya Bahan
No.
I.
1
2
3
4
5
6
7
8
II.
1
2
3
4
III.
1.
2.
2.a.
: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : setempat2 di sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapis agregat padat
Jam kerja efektif per-hari
Berat isi padat
Berat volume agregat (lepas)
KODE
KOEF.
SATUAN
L
t
Tk
Bip
Bil
8.7
0.15
7.00
1.81
1.51
KM
M
jam
ton/m3
ton/m3
M27
1.0000
M3
1.50
0.85
0.83
M3
-
1.00
0.45
1.45
menit
menit
menit
Q1
76.81
M3
(E15)
0.0130
jam
(E08)
V
Fa
v1
v2
T1
T2
T3
3.50
0.83
20.00
30.00
4.13
26.18
17.45
ton
KM/jam
KM/jam
menit
menit
menit
URUTAN KERJA
Wheel Loader mencampur & memuat Agregat ke
dalam Dump Truck di Base Camp
Dump Truck mengangkut Agregat ke lokasi
pekerjaan dan dihampar dengan pekerja
Hamparan Agregat dibasahi dengan Water Tank
Truck sebelum dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparan dan level permukaan
dengan menggunakan Alat Bantu
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Agregat B
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor Efisiensi alat
Waktu Siklus :
- Mencampur
- Memuat dan lain-lain
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
V x Fb x Fa x 60
(Bip/Bil) x Ts1
= 1 : Q1
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus : - Waktu memuat = V x (60/Q1) x Bil
- Waktu tempuh isi = (L : v1) x 60 menit
- Waktu tempuh kosong = (L : v2) x 60 menit
T4
Ts2
2.00
49.75
menit
menit
Berlanjut ke halama
: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3
No.
U RAIAN
2.c.
0.7802
jam
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
KM/jam
M
lintasan
-
Q3
18.99
M3
= 1 : Q3
(E24)
0.0527
jam
(E23)
V
Wc
pa
Fa
4.00
M3
0.07
M3
100.00 liter/menit
0.83
-
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Koefisien Alat / M3
(v x 1000) x b x t x Fa
n
2.e.
3.
SATUAN
(E09)
= 1 : Q2
pa x Fa x 60
Wc x 1000
Koefisien Alat / M3
= 1 : Q4
ALAT BANTU
Diperlukan :
- Kereta dorong
- Sekop
- Garpu
= 5 buah
= 5 buah
= 5 buah
TENAGA
Produksi menentukan : WHEEL LOADER
Produksi agregat / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) : Qt
= (Tk x M) : Qt
Q2
KOEF.
M3
2.d.
KODE
1.28
Koefisien Alat / M3
V x Fa x 60
(Bip/Bil) x Ts2
Q4
71.14
M3
(E23)
0.0141
jam
Q1
Qt
76.81
537.66
M3/jam
M3
P
M
15.00
1.00
orang
orang
(L01)
(L03)
0.1953
0.0130
jam
jam
Berlanjut ke halama
: 10.A
: Pondasi Agregat Kls. B Untuk Pek. Rutin
: M3
No.
U RAIAN
4.
5.
401,604.55 / M3.
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
7
8
9
10
11
11
II.
1
2
: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal Lapis Hotmix padat
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Berat isi padat
Berat Isi Agregat (lepas)
Komposisi campuran AC-WC :
- Agr Pch Mesin 5 - 10 & 10 - 15 mm
- Agregat Pecah Mesin 0 - 5 mm
- Semen
- Asphalt
Berat Isi bahan :
- AC-WC
- Agr Pch Mesin 5 - 10 & 10 - 15 mm
- Agr Pch Mesin 0 - 5 mm
Jarak Stock pile ke Cold Bin
KODE
L
t
Tk
Fh1
Fh2
Bip
Bil
KOEF.
SATUAN
8.7
0.04
7.00
1.05
1.03
1.81
1.51
KM
M
Jam
ton/m3
ton/m3
0-5
FF
As
44.70
48.00
1.90
5.40
%
%
%
%
D1
D2
D3
l
2.32
1.42
1.57
50.00
ton / M3
ton / M3
ton / M3
m
(M92)
(M91)
(M05)
(M10)
0.0307
0.0298
1.8514
5.1615
M3
M3
Kg
Kg
(E15)
V
Fb
Fa
1.50
0.85
0.83
M3
-
5-10&10-15
URUTAN KERJA
Wheel Loader memuat Agregat dan Aspal ke dalam
Cold Bin AMP
Agregat dan aspal dicampur dan dipanaskan
dengan AMP untuk dimuat langsung kedalam
Dump Truck dan diangkut ke lokasi pekerjaan
Penghamparan dilaksanakan manual oleh pekerja
untuk keperluan penambalan/patching kecil2
dan dipadatkan dengan Pedestrian Roller
Sekelompok pekerja membuat galian lubang/patching,
merapikan tepi hamparaan dengan menggunakan
Alat Bantu
III.
1.
1.a.
1.b.
1.c.
1.d.
BAHAN
Agr 5-10 & 10-15
Agr 0-5
Semen
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Kecepatan maju
Kecepatan kembali
Waktu siklus
((l x 60 : (Vf x 1000)) + (l x 60 : (Vr x 1000))) + 0.75
Vf
Vr
15.00
20.00
km/jam
km/jam
Ts1
1.10
menit
Berlanjut ke halama
: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3
No.
U RAIAN
2.b.
(E15)
0.0218
Jam
(E01)
V
Fa
60.0
0.83
ton / Jam
-
Q2
21.47
M3
(E01)
0.0466
Jam
GENERATORSET ( GENSET )
Kap.Prod. / Jam = SAMA DENGAN AMP
Koefisien Alat/M3
= 1 : Q3
(E12)
Q3
(E12)
21.47
0.0466
M3
Jam
(E08)
V
Fa
v1
v2
Q2b
Tb
Ts2
T1
T2
T3
T4
Ts2
3.50
0.80
20.00
30.00
1.00
1.00
Ton
KM / Jam
KM / Jam
Ton
menit
3.50
26.18
30.00
17.45
77.13
menit
menit
menit
menit
menit
0.94
M3
(E09)
1.0651
Jam
(E02)
V
Fa
b
Q5
0.00
0.00
0.00
0.00
Koefisien Alat/M3
(E02)
0.0000
(E24)
v
b
n
Fa
1.50
0.61
6.00
0.83
= 1 : Q1
Kap.Prod. / jam =
Koefisien Alat/M3
2.e.
2.f.
SATUAN
M3
Koefisien Alat/M3
2.d.
KOEF.
45.86
Kap.Prod. / jam =
2.c.
KODE
Q1
Koefisien Alat/M3
V x Fb x Fa x 60
Fh1 x (Bip/Bil) x Ts1
V x Fa x 60
D1 x Ts2
= 1 : Q4
= 1 : Q5
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Q4
km / jam
M
M3
Jam
Km / Jam
M
lintasan
-
Berlanjut ke halama
: 10.B
: Camp. Aspal Panas Utk.Pek.Rutin
: M3
No.
U RAIAN
(v x 1000) x b x t x Fa
n
= 1 : Q6
(v x 1000) x b x t x Fa
n
Koefisien Alat/M3
= 1 : Q7
2.h.
ALAT BANTU
diperlukan :
- Kereta dorong = 2 buah
- Sekop
= 4 buah
- Garpu
= 4 buah
- Tongkat Kontrol ketebalan hanparan
3.
TENAGA
Produksi menentukan : DUMP TRUCK
Produksi ATB / hari = Tk x Q4
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3 :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
593,636.14 / M3.
6.
7.
KODE
Q6
KOEF.
SATUAN
5.06
M3
(E17)
0.1975
Jam
(E18)
v
b
n
Fa
5.00
1.20
8.00
0.83
KM / jam
M
lintasan
-
Q7
24.90
M3
(E18)
0.0000
Jam
Q4
Qt
0.94
6.57
M3 / Jam
M3
P
M
10.00
2.00
orang
orang
(L01)
(L03)
10.6506
2.1301
Jam
Jam
: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3
No.
U RAIAN
I.
1
2
3
4
5
6
7
8
10
II.
1
2
3
4
5
III.
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal rata2 Lapen
Jam kerja efektif per-hari
Faktor kehilanganmaterial :
- Agregat
- Aspal
Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Aspal
:
- Paska Agregat Pokok
KODE
KOEF.
SATUAN
L
t
Tk
Fh1
Fh2
8.73
0.055
7.00
1.10
1.05
KM
M
Jam
-
Ak
Ap
As1
As2
133.00
25.00
5.20
94.55
Kg/M2
Kg/M2
Kg/M2
Kg/M3
D1
D2
1.80
1.01
Fk
1.20
ton / M3
ton / M3
URUTAN KERJA
Permukaan dasar dibersihkan dan disemprot aspal cair
bilamana diperlukan
Agregat kasar dimuat ke dalam Dump Truck
menggunakan Wheel Loader (di Base Camp)
Agregat Kasar ditebarkan (manual) sesuai tebal yang
diperlukan dan dipadatkan dengan Three Wheel
Roller (6-8 Ton) minimum 6 lintasan
Aspal disemprotkan di atas agregat kasar yang telah
diratakan menggunakan Aspal Sprayer (merata)
Agregat Pengunci ditebarkan dan dipadatkan dengan
cara yang sama dengan pemadatan agregat kasar
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
1.c.
BAHAN
Agregat Kasar
Agregat Pengunci
Aspal
2.
2.a.
ALAT
WHEEL LOADER
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu Siklus
- Memuat, menuang, kembali
(M03)
(M04)
(M10)
(E15)
V
Fb
Fa
Ts1
T1
Ts1
1.4778
0.2778
99.2727
M3
M3
Kg
1.50
0.85
0.83
M3
-
0.45
0.45
menit
menit
Berlanjut ke halama
: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3
No.
U RAIAN
2.b.
2.c.
KOEF.
SATUAN
117.58
M3
= 1 : Q1
(E15)
0.0085
Jam
(E08)
V
Fa
v1
v2
3.50
0.83
20.00
30.00
ton
KM / Jam
KM / Jam
Waktu Siklus
- Mengisi Bak = (V x 60) : (Q1 x D1 X Fk)
- Angkut
= (L : v1) x 60 menit
- Tunggu + dump + Putar
- Kembali
= (L : v2) x 60 menit
Ts2
T1
T2
T3
T4
Ts2
0.83
26.18
2.00
17.45
46.45
menit
menit
menit
menit
menit
Kap.Prod. / jam =
Q2
1.74
M3
Jam
V x Fa x 60
Ts2 x D1 x Fk
Koefisien Alat / M3 = = 1 : Q2
(E09)
0.5757
(E16)
v
b
n
Fa
2.00
1.70
6.00
0.83
Km / Jam
M
lintasan
-
Q3
25.87
M3
(E16)
0.0387
Jam
KODE
Q1
Koefisien Alat/M3
V x Fb x Fa x 60
Ts1 x Fk
(v x 1000) x b x t x Fa
n
= 1 : Q3
ASPHALT SPRAYER
Kapasitas alat
Faktor efisiensi alat
Kapasitas Pompa Aspal
Pemakaian Aspal
= As2 x Fh2 = M10
Kapasitas prod/jam
= (pas x Fa x 60 x D2 x 1000) : (1000 x kas)
Koefesien alat/jam = 1 : Q4
(E03)
V
Fa
pas
kas
Q4
850.00
liter
0.83
55.00 liter/menit
99.2727
Kg/m3
27.87
M3
0.0359
jam
Berlanjut ke halama
: 10.C
: Penetrasi Macadam Utk.Pek.Rutin
: M3
No.
2.e.
3.
U RAIAN
ALAT BANTU
diperlukan setiap :
- Kereta dorong
- Sekop
- Sapu
- Sikat
- Karung
- Cerek Aspal
- Kaleng Aspal
=
=
=
=
=
=
=
75.00
3 buah
5 buah
5 buah
3 buah
5 buah
3 buah
3 buah
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
KODE
KOEF.
SATUAN
M3 pekerjaan
TENAGA
Produksi menentukan (Produksi Wheel Loader)
Produksi Lapen / hari = Q1 x Tk
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / M3 :
- Pekerja
- Mandor
1,221,143.55 / M3.
6.
7.
Q1
Qt
117.58
823.08
M3/Jam
M3
P
M
20.00
2.00
orang
orang
(L01)
(L03)
0.1701
0.0170
Jam
Jam
No.
I.
1
2
3
4
5
7
II.
: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: M3
U RAIAN
ASUMSI
Menggunakan buruh dan alat (semi mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Batasan Spesifikasi :
- Ukuran Agregat Nominal Maksimum
- Kadar Aspal terhadap berat total campuran
- Tebal nominal padat
Berat Jenis Bahan :
- Campuran Aspal Dingin (diambil)
- Aspal (diambil)
- Agregat (diambil)
Faktor kembang campuran
III.
URUTAN KERJA
Agregat dan Aspal dicampur di dalam Pengaduk
Beton Mekanis (Concrete Mixer)
Campuran dibawa ke lokasi pekerjaan dengan
menggunakan Dump Truck
Pekerja membuat/merapikan lubang patching/galian,
campuran dihampar manual dengan alat bantu
Hamparan dipadatkan dengan Pedestrian Roller
PEMAKAIAN BAHAN, ALAT DAN TENAGA
1.
1.a.
1.b.
BAHAN
Agregat Halus
Aspal Emulsi
2.
2.a.
ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
(T1 + T2 + T3 + T4)
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.
1
2
3
4
KODE
SATUAN
L
Tk
8.7
7.00
KM
jam
Sa
As
t
19.00
4.50
0.04
MM
%
M
D1
D2
D3
Fk
2.01
1.00
1.60
1.20
Ton/M3
Ton/M3
Ton/M3
(M04)
(M31)
(E06)
V
Fa
Ts1
T1
T2
T3
T4
Ts1
V x Fa x 60
1000 x Ts1
KOEF.
Q1
1.1997
90.4500
M3
Kg
500.00
0.83
liter
-
5.00
3.50
3.00
2.00
13.50
menit
menit
menit
menit
menit
1.844
M3
Koefisien Alat / M3
= 1 : Q1
(E06)
0.5422
jam
Berlanjut ke halama
: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: M3
No.
2.b.
U RAIAN
PEDESTRIAN ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
Kap. Prod. / jam =
Koefisien Alat / M3
2.c.
(v x 1000) x b x t x Fa
n
Kap.Prod. / jam =
2.d.
3.
ALAT BANTU
Diperlukan :
- Sekop
- Sapu
- Alat Perata
- Gerobak Dorong
KODE
V x Fa x 60
D1 x Ts2
= 1 : Q3
=
=
=
=
3
4
3
2
KOEF.
SATUAN
v
b
n
Fa
2.50
0.65
12.00
0.83
KM/jam
M
lintasan
-
Q2
4.50
M3
0.2224
jam
6.00
0.83
40.00
50.00
0.42
13.50
M3
KM / Jam
KM / Jam
M3
menit
195.18
13.09
10.00
10.47
228.74
menit
menit
menit
menit
menit
= 1 : Q2
Koefisien Alat / M3
(E09)
V
Fa
v1
v2
Q1b
Tb
Ts2
T1
T2
T3
T4
Ts2
Q3
0.65
M3
(E09)
1.5387
Jam
Q1
Qt
M
P
1.844
12.91
1.00
12.00
M3/Jam
M3
orang
orang
(L03)
(L01)
0.5422
6.5060
jam
jam
buah
buah
buah
buah
TENAGA
Produksi menentukan (Produksi Concrete Mixer)
Produksi Campuran dalam 1 hari
= Tk x Q1
Kebutuhan tenaga : - Mandor
- Pekerja
Koefisien Tenaga / M3 :
- Mandor
- Pekerja
= (Tk x M) : Qt
= (Tk x P) : Qt
Berlanjut ke halama
: 10.D
: Camp. Aspal Dingin Utk.Pek.Rutin
: 10.D
No.
U RAIAN
4.
5.
1,479,813.05 / M3
6.
7.
KODE
KOEF.
SATUAN
No.
I.
1
2
3
4
5
6
II.
1
2
3
4
: 10.E
: Aspal Pengisian Retak
: LITER
U RAIAN
ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Faktor kehilangan bahan
Komposisi campuran :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Berat jenis bahan :
- Aspal AC - 10 atau AC - 20
- Minyak Fluk / Pencair
Bahan dasar (aspal & minyak pencair) semuanya
diterima dilokasi pekerjaan
1.
BAHAN
Untuk mendapatkan 1 liter Lapis resap Pengikat
diperlukan :
(1 liter x Fh)
Aspal
Kerosene
= As x Pc x D1 : 100
= K x Pc : 100
ALAT
APHALT SPRAYER
Kapasitas alat
Faktor Efisiensi Alat
Waktu Siklus (termasuk proses pemanasan)
Kap.Prod. / jam =
Koefisien Alat / Ltr
2.b.
KODE
KOEF.
SATUAN
L
Tk
Fh
8.7
7.00
1.10
KM
Jam
-
As
K
87.00
13.00
%
%
D1
D2
1.03
0.80
Kg / Ltr
Kg / Ltr
Pc
1.10
liter
(M10)
(M11)
0.99
0.14
Kg
liter
(E03)
V
Fa
Ts
850.00
0.83
2.00
liter
Jam
Q1
352.75
liter
(E03)
0.0028
Jam
(E05)
V
Ap
400.00
0.80
M2 / Jam
liter / M2
Q2
320.00
liter
URUTAN KERJA
Aspal dan minyak tanah dicampur dan dipanaskan
sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu
dan kotoran dengan Air Compresor
Campuran aspal cair disemprotkan dengan Asphalt
Sprayer ke atas permukaan yang akan dilapis
Angkutan Aspal dan Minyak tanah menggunakan
Dump Truck
III.
2.
2.a.
V x Fa
Ts
= 1 : Q1
AIR COMPRESOR
Kapasitas Alat ------>> diambil
Aplikasi Lapis Resap Pengikat rata-rata (Spesifikasi)
Kap. Prod. / jam =
(V x Ap)
= 1 : Q2
(E05)
0.0031
Jam
Berlanjut ke halama
: 10.E
: Aspal Pengisian Retak
: LITER
No.
2.c.
3.
U RAIAN
KODE
KOEF.
SATUAN
(E08)
Q3
352.75
liter
(E08)
0.0028
Jam
Q1
Qt
352.75
2,469.25
liter
liter
P
M
10.00
1.00
orang
orang
(L01)
(L03)
0.0283
0.0028
Jam
Jam
= 1 : Q3
TENAGA
Produksi menentukan : ASPHALT SPRAYER
Produksi / hari = Tk x Q1
Kebutuhan tenaga :
- Pekerja
- Mandor
Koefisien Tenaga / Ltr :
- Pekerja
- Mandor
= (Tk x P) / Qt
= (Tk x M) / Qt
4.
5.
8,380.57 / Liter
6.
7.
Analisa EI-10A
URAIAN ANALISA HARGA SATUAN
KETERANGAN
padat
Analisa EI-10A
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-10A
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10B
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-10B
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10B
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-10C
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Tabel 6.6.4.
Tabel 6.6.4.
Tabel 6.6.4.
(As1 : t)
Lihat panduan
Analisa EI-10C
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10C
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Lump Sum
Analisa EI-10D
URAIAN ANALISA HARGA SATUAN
KETERANGAN
Analisa EI-10D
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Melayani 1 buah
molen
Analisa EI-10D
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
Analisa EI-10E
URAIAN ANALISA HARGA SATUAN
KETERANGAN
100 bagian
15 bagian
campuran
Analisa EI-10E
URAIAN ANALISA HARGA SATUAN
Lanjutan
KETERANGAN
DAFTAR
HARGA DASAR SATUAN BAHAN
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
U RAIAN
KODE
SATUAN
HARGA
SATUAN
( Rp.)
M01b
M01a
M01c
M01d
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M12
M13
M14
M15
M16
M17a
M17b
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35a
M35b
M36
M37
M39a
M39b
M40
M41
M41kg
M42
M43
M3
M3
M3
M3
M3
M3
M3
Kg
M3
M3
M3
M3
KG
LITER
Zak
Kg
Kg
Kg
Kg
M3
Kg
Kg
Kg
M3
LITER
LITER
LITER
M2
Batang
M'
M3
M3
M3
M3
M2
Kg
M2
LITER
Kg
BH
BH
M'
M3
Kg
Kg
M3
M3
Kg
Kg
Bh.
142,000.00
96,600.00
210,171.86
96,600.00
146,600.00
210,171.86
210,171.86
550.00
182,600.00
224,500.00
20,000.00
25,000.00
6,400.00
1,650.00
27,546.25
550.93
7,000.00
6,000.00
5,500.00
140,000.00
22,500.00
27,500.00
5,500.00
1,250,000.00
5,833.80
6,548.35
18,000.00
15,000.00
154,000.00
40,000.00
245,166.36
226,389.88
210,248.97
0.00
27,500.00
5,000.00
3,500.00
12,000.00
28,600.00
176,000.00
216,500.00
412,500.00
973,593.01
8,500.00
9,000.00
40,000.00
210,171.86
111.51
27,500.00
12,600.00
KETERANGAN
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Borrow Pit/quarry
Quarry
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Tidak tersedia
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Hasil Proses
Base Camp
Base Camp
Base Camp
Base Camp
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
Pasir Urug
Arbocell
Baja Bergelombang
Beton K-125
Baja Struktur
Tiang Pancang Baja
Tiang Pancang Beton Pratekan
Kawat Las
Pipa Baja
Minyak Fluks
Bunker Oil
Asbuton Halus
Baja Prategang
Baja Tulangan (Polos) U32
Baja Tulangan (Ulir) D39
Baja Tulangan (Ulir) D48
PCI Girder L=17m
PCI Girder L=21m
PCI Girder L=26m
PCI Girder L=32m
PCI Girder L=36m
PCI Girder L=41m
Beton K-300
Beton K-175
Cerucuk
Elastomer
Bahan pengawet: kreosot
Mata Kucing
Anchorage
Anti strpping agent
Bahan Modifikasi
Beton K-500
Beton K-400
Ducting (Kabel prestress)
Ducting (Strand prestress)
Beton K-350
Multipleks 12 mm
Elastomer jenis 1
Elastomer jenis 2
Elastomer jenis 3
Expansion Tipe Joint Asphaltic Plug
Expansion Join Tipe Rubber
Expansion Join Baja Siku
Marmer
Kerb Type A
Paving Block
Mini Timber Pile
Expansion Joint Tipe Torma
Strip Bearing
Joint Socket Pile 35x35
Joint Socket Pile 16x16x16
Mikro Pile 16x16x16
Matras Concrete
Assetilline
Oxygen
Batu Bara
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"
Agregat Pecah Mesin 0-5 mm
M44
M45
M46
M47
M48
M49
M50
M51
M52
M53
M54
M55
M56
M57a
M39c
M39d
M58a
M58b
M58c
M58d
M58e
M58f
M59
M60
M61
M62
M63
M64
M65
M66
M67
M68
M69
M70
M71
M72
M73
M74a
M74b
M74c
M75d
M75e
M75f
M76
M77
M78
M79
M80
M81
M82
M83
M84
M85
M86
M87
M88
M24a
M24b
M91
M3
Kg.
Kg
M3
Kg
M'
M3
Dos
Kg
Liter
Liter
Ton
Kg
Kg
Kg
Kg
Buah
Buah
Buah
Buah
Buah
Buah
M3
M3
M
buah
liter
buah
buah
liter
Kg
M3
M3
M'
M'
M3
Lbr
buah
buah
buah
M
M
M
Buah
Buah
Buah
Buah
M1
Buah
Set
Set
M1
Buah
Botol
Botol
Kg
M
M
M3
110,200.00
32,000.00
12,500.00
638,182.22
11,000.00
25,247.37
423,957.93
16,000.00
15,000.00
6,237.00
3,000.00
325,000.00
8,000.00
8,400.00
8,450.00
9,000.00
86,000,000
97,000,000
124,000,000
157,000,000
168,000,000
192,000,000
1,003,907.14
713,376.02
15,000
300,000
5,000
75,000
480,000
24,000.00
1,000.00
1,355,555.98
1,291,095.87
150,000
50,000
1,267,366.55
181,500.00
385,500.00
650,000.00
838,000.00
1,000,000.00
1,200,000.00
275,000.00
400,000.00
45,000.00
40,000.00
27,000.00
1,200,000.00
229,500.00
607,500.00
67,500.00
60,750.00
405,000.00
229,500.00
114,750.00
600.00
20,000.00
15,000.00
210,171.86
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
110
111
112
113
114
115
116
117
118
119
120
121
122
M92
M93
M94
M95
M96
M97
M98
M99
M67a
M100
M3
M3
Kg
Kg
M2
Kg
Ltr
M3
Ltr
M2
1.
U RAIAN
HARGA
ROYALTY
(Rp)
SATUAN
JARAK
QUARRY
( Km )
2.
M01 - P a s i r Pasang
M01 - P a s i r Beton
M02 - Batu Kali
M3
M3
M3
25,750.00
20,000.00
19,500.00
20.00
7.00
20.00
3.
M3
9,000.00
25.00
4.
M07 - G r a v e l
M3
8,000.00
25.00
5.
KG
6.
M16 - S i r t u
M3
17,500.00
20.00
7.
M3
18,000.00
15.00
M3
20,300.00
10.00
M3
20,300.00
10.00
190.00
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
7,45 km
Medan
km 000+000
7,45 km
5,00 km
10,00 km
Lokasi Quarry Patumbak
- Gravel
- Batu Kali
- Batu Belah
Base Camp
ke Rantau Prapat
Catatan :
Patumbak - Medan
Medan - Lokasi Proyek
Total Sumber Quarry Patumbak s/d Lokasi Proyek
= 10 km
= 165.20 km
= 175.20 km
= 8.73 km
= 176.73 km
= 50 km
= 45 km
= 18.73 km
= 10 km
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi Base Camp
Harga satuan pasir di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume pasir
KODE
L
RpM01
RpE10
RpE09
Bil
KOEF.
SATUAN
20.00
1.00
1.00
1.00
1.42
Km
M3
Jam
Jam
ton/m3
0.93
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
Pasir digali dengan Excavator
Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
Dump Truck mengangkut pasir ke lokasi
Base Camp
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
41.6826 M3 / Jam
9,194.53
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
10.14
60.00
40.00
1.00
111.14
menit
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
3.16
Rp2
107,087.80
Rupiah
M01
142,032.33
Rupiah
M01
142,000.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke Lokasi Pekerjaan
Harga satuan batu kali di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume batu kali
KODE
L
RpM02
RpE10
RpE09
Bil
KOEF.
SATUAN
20.00
1.00
1.00
1.00
1.44
Km
M3
Jam
Jam
ton/m3
0.93
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
URUTAN KERJA
Batu kali digali dengan Excavator
Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
Dump Truck mengangkut batu kali ke
lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
27.7884 M3 / Jam
13,791.80
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
14.99
60.00
40.00
1.00
115.99
menit
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
2.98
Rp2
113,342.32
Rupiah
M02
146,634.12
Rupiah
M02
146,600.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
8
9
II.
1
2
3
III.
3.a
3.b
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke Lokasi Pekerjaan
Harga satuan batu kali di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Harga Satuan Dasar Wheel Loader
Harga Satuan Upah Pekerja
Berat volume batu belah
KODE
L
RpM06
RpE10
RpE09
RpE15
RpL01
Bil
KOEF.
SATUAN
25.00
1.00
1.00
1.00
1.00
1.00
1.60
Km
M3
Jam
Jam
Jam
Jam
ton/m3
0.93
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
URUTAN KERJA
Batu kali digali dengan Excavator
Batu kali dibelah oleh Pekerja
Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
WHEEL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi Alat
Waktu sklus
- Muat
- Lain-lain
(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q2
27.7884 M3 / Jam
13,791.80
Rupiah
1.50
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
44.82 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q2) x RpE15
Rp2
5,952.60
Rupiah
No.
3.c
3.d
IV.
URAIAN
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
- Waktu tempuh kosong = (L/v2) x 60
- Lain-lain
KODE
(E09)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2
KOEF.
SATUAN
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
13.49
75.00
50.00
1.00
139.49
menit
menit
menit
menit
menit
Q3
2.23
Rp3
151,450.68
M3 / Jam
Rupiah
PEKERJA
Produksi menentukan : Excavator
Hasil galian batu / hari = Q1 x 7 Jam
Kebutuhan Pekerja
Q1
Qt
P
27.7884 M3 / Jam
194.5188 M3 / 7 jam
15.00
Orang
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01
Rp4
2,446.51
Rupiah
M06
182,641.59
Rupiah
M06
182,600.00
Rupiah
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke Lokasi Pekerjaan
Harga satuan Gravel di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume gravel
KODE
L
RpM07
RpE10
RpE09
Bil
KOEF.
SATUAN
25.00
1.00
1.00
1.00
2.20
Km
M3
Jam
Jam
ton/m3
0.93
0.75
0.83
M3
-
0.75
0.50
1.25
menit
menit
menit
URUTAN KERJA
Gravel digali dengan Excavator
Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
Dump Truck mengangkut gravel ke
lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
- Waktu tempuh isi = (L/v1) x 60
(E09)
V
Fa
v1
v2
Ts2
T1
T2
27.7884 M3 / Jam
13,791.80
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
9.81
75.00
menit
menit
T3
T4
Ts2
50.00
1.00
135.81
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
1.67
Rp2
202,750.38
Rupiah
M07
224,542.18
Rupiah
M07
224,500.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi Base Camp
Harga satuan Sirtu di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume sirtu
KODE
L
RpM16
RpE10
RpE09
Bil
KOEF.
SATUAN
20.00
1.00
1.00
1.00
1.51
Km
M3
Jam
Jam
ton/m3
0.93
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
Sirtu digali dengan Excavator
Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
Dump Truck mengangkut sirtu ke lokasi
Base Camp
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
(E09)
V
Fa
v1
v2
Ts2
T1
41.6826 M3 / Jam
9,194.53
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
9.53
menit
T2
T3
T4
Ts2
60.00
40.00
1.00
110.53
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
2.98
Rp2
113,255.98
Rupiah
M16
139,950.51
Rupiah
M16
140,000.00
Rupiah
M3 / Jam
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi pekerjaan
Harga satuan pasir urug di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat volume pasir urug
KODE
L
RpM44
RpE10
RpE09
Bil
KOEF.
SATUAN
15.00
1.00
1.00
1.00
1.42
Km
M3
Jam
Jam
ton/m3
0.93
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
pasir urug digali dengan Excavator
Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
Dump Truck mengangkut pasir urug
ke lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
9,194.53
Rupiah
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
(E09)
V
Fa
v1
v2
Ts2
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
41.6826 M3 / Jam
T1
T2
T3
T4
Ts2
10.14
45.00
30.00
1.00
86.14
menit
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
4.07
Rp2
82,998.65
Rupiah
M44
110,193.18
Rupiah
M44
110,200.00
Rupiah
M3 / Jam
No.
URAIAN
I.
1
2
3
4
5
6
7
II.
1
2
3
III.
ASUMSI
Menggunakan alat berat
Kondisi Jalan : baik
Jarak Quarry ke lokasi pekerjaan
Harga satuan pasir urug di Quarry
Harga Satuan Dasar Excavator
Harga Satuan Dasar Dump Truck
Berat isi volume pasir beton
KODE
L
RpM44
RpE10
RpE09
Bil
KOEF.
SATUAN
7.00
1.00
1.00
1.00
1.69
Km
M3
Jam
Jam
ton/m3
0.50
0.90
0.83
M3
-
0.50
0.50
1.00
menit
menit
menit
URUTAN KERJA
pasir urug digali dengan Excavator
Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
Dump Truck mengangkut pasir urug
ke lokasi pekerjaan
PERHITUNGAN
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1
Rp1
DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Muat = (V x 60)/(Q1 x Bil)
(E09)
V
Fa
v1
v2
Ts2
T1
22.41 M3 / Jam
17,101.83
Rupiah
10.00
0.83
20.00
30.00
ton
KM/Jam
KM/Jam
15.84
menit
T1
T2
T4
Ts2
21.00
14.00
1.00
51.84
menit
menit
menit
menit
No.
IV.
URAIAN
KODE
KOEF.
SATUAN
Q2
5.68
Rp2
59,451.86
Rupiah
M44
96,553.69
Rupiah
M44
96,600.00
Rupiah
M3 / Jam
Y)
KET.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
7,45 km
Sp. Kawat
Km 172+900
ke Tanjung
Balai
ke Rantau Prapat
HAN
HARGA
SATUAN
(Rp.)
25,750.00
383,252.01
337,926.64
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
19,500.00
383,252.01
337,926.64
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
9,000.00
383,252.01
337,926.64
266,795.62
4,532.31
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
8,000.00
383,252.01
337,926.64
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
17,500.00
383,252.01
337,926.64
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
18,000.00
383,252.01
337,926.64
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
HAN
HARGA
SATUAN
(Rp.)
20,000.00
383,252.01
337,926.64
Bersambung
HAN
Lanjutan
HARGA
SATUAN
(Rp.)
Uraian Kegiatan
1 Harga di Cibinong
Biaya
Rp/satuan Jumlah (Rp)
Rp/ton
2 Handling
Jumlah Kombinasi
(Rp)
45,000.00
45,000.00
3 Transport ke proyek
Rp/ton
4 Pembongkaran, gudang
Rp/ton
1,250.00
1,250.00
5 Waste 5%
Rp/ton
2,250.00
2,250.00
subtotal
Rp/ton
48,500.00
Rp/ton
2,425.00
total jumlah
Rp/ton
Rp/zak
50,925.00
2,546.25
Harga Netto
Harga setelah ditambah
Rp/zak
Rp/zak
25,000.00
27,546.25
7
8
Bahan : Aspal
No
Uraian Kegiatan
Biaya
Rp/satuan Jumlah (Rp)
Jumlah Kombinasi
(Rp)
1 Harga di pelabuhan
dari Jakarta
Rp/ton
214,700.00
214,700.00
2 Handling
Rp/ton
1,500.00
1,500.00
3 Transport ke proyek
Rp/ton
3,360.00
3,360.00
4 Pembongkaran, gudang
Rp/ton
1,500.00
1,500.00
5 Waste 2%
Rp/ton
4,300.00
4,300.00
subtotal
6 Keuntungan & Overhead
5 % (hanya utk pekerjaan
harian)
total jumlah
Rp/ton
225,360.00
Rp/ton
11,268.00
Rp/ton
Rp/kg
236,628.00
236.63
7
8
Harga Netto
Harga setelah ditambah
Rp/kg
Rp/kg
1,850.00
2,086.63
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
URAIAN
KO
DE
HP
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
294.0
72.4
4.0
155.0 60.0
20.0
138.0
100.0
190.0
133.0
190.0
180.0
135.0
70.0
96.0
55.0
82.0
100.5
82.0
5.5
220.0
6.0 100.0
8.8
4.7
0.0
345.0
100.0
175.0
25.0
125.0
40.0
150.0
5.0
150.0
248.0
3.0 900.0
400.0
115.0
115.0
105.0
134.0
290.0
190.0
190.0
20.0
4.2
220.0
125.0
200.0
KAP.
60.0 T/Jam
10.0 Ton
850.0 Liter
5,000.0
5,000.00
500.0 Liter
15.0 Ton
3.5 Ton
10.0 Ton
0.9 M3
10.0 ton
135.0 KVA
10,800.0
10,800.00
0.8 M3
1.5 M3
8.0 Ton
8.1 Ton
9.0 Ton
7.1 Ton
25.0
25.00
50.0 T/Jam
4,000.0 Liter
835.00 Ton
121.00 Ton
1,330.00
1,330.00
2,005.00
2,005.00
8.00 M3
20.00 Ton
2.50 Ton
35.0 Ton
250.0 Amp
2,000.0 Meter
1,000.0 Liter
15.0 Ton
1,000.0 m
2.2 M
3.0 M
3.5 M
4,000.0 Liter
2.5 M
600.0 Liter
20.0 m3/jam
4,000.0 liter
4,000.0 liter
350.0 liter
80.0 KG
5.0 M3
60.0 CM
75.0 Ton
HARGA
ALAT
3,135,000,000
2,205,000,000
87,000,000
900,000,000
110,000,000
175,500,000
1,488,000,000
120,000,000
360,000,000
850,000,000
330,800,000
207,000,000
676,000,000
542,000,000
564,000,000
350,000,000
1,195,425,000
900,000,000
918,787,500
4,000,000
1,010,989,671
5,000,000
105,000,000
150,000,000
17,000,000
35,000,000
900,000,000
112,500,000
600,000,000
875,000,000
850,000,000
17,500,000
2,250,000,000
15,000,000
450,000,000
4,945,000,000
900,000,000
19,500,000,000
29,250,000,000
395,000,000
395,000,000
1,337,142,857
1,000,000,000
900,000,000
500,000,000
500,000,000
35,000,000
20,000,000
750,000,000
1,170,000,000
900,000,000
52
BLENDING EQUIPMENT
E52
50.0
30.0 Ton
500,000,000
R JAM KERJA
BIAYA
SEWA
ALAT/JAM
(di luar PPN)
4,886,762.12
869,616.54
39,336.25
423,504.25
111,049.38
133,800.44
543,727.91
164,696.38
337,926.64
383,252.01
330,875.08
288,170.35
343,794.00
228,181.95
266,795.62
162,603.45
401,348.48
353,700.54
334,542.74
18,228.49
537,142.36
16,843.65
161,074.00
64,559.15
24,222.29
16,089.36
1,032,079.19
161,159.96
367,471.46
250,962.69
359,970.51
63,095.33
708,609.81
18,014.19
376,288.79
1,519,539.41
284,855.73
5,850,924.08
7,579,344.82
377,933.73
254,201.23
448,693.06
478,489.26
595,298.88
384,836.82
358,643.42
46,124.02
23,991.38
464,251.69
510,353.65
475,430.44
159,858.72
A.
1.
2.
3.
4.
U RAIAN
KODE
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
Pw
Cp
A
W
B
KOEF.
TRONTON
150.0
15.0
10.0
1,500.0
450,000,000
5.
B.
1.
2.
3.
b. Asuransi, dll =
45,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.19925
(B-C)xD
W
53,798.06
600.00
54,398.06
0.002 x B
W
(E+F)
1.
147,337.88
2.
Pelumas
81,000.00
26,250
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
52,500.00
L
M
4,054.29
10,748.57
321,890.73
376,288.79
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
7.
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
494,500,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
663,826.68
4,945.00
668,771.68
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
243,598.62
2.
Pelumas
66,960.00
216,344
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
309,062.50
L
M
4,054.29
10,748.57
850,767.73
1,519,539.41
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
i
U1
U2
Mb
Ms
15.00
4,054.29
3,582.86
5,833.80
6,548.35
6.
7.
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Mp
18,000.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
90,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.19925
(B-C)xD
W
107,596.11
1,200.00
108,796.11
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
2,946.76
2.
Pelumas
810.00
52,500
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
105,000.00
L
M
4,054.29
10,748.57
176,059.61
(H+I+K+L+M)
D.
284,855.73
E.
1.
LAIN - LAIN
Tingkat Suku Bunga
15.00
2.
3.
4.
5.
6.
7.
U1
U2
Mb
Ms
Mp
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
A.
1.
2.
3.
4.
U RAIAN
KODE
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
KOEF.
Pw
Cp
A
W
B
COLD RECYCLER
900.0
2,200
5.0
2,000.0
19,500,000,000
1,950,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
2,617,718.97
19,500.00
2,637,218.97
5.
B.
1.
2.
3.
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
884,027.25
2.
Pelumas
243,000.00
853,125
Biaya bengkel
3.
4.
5.
D.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
1,218,750.00
L
M
4,054.29
10,748.57
3,213,705.11
5,850,924.08
(H+I+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
Pw
Cp
A
W
B
HOT RECYCLER
400.0
3
5.0
2,000.0
29,250,000,000
2,925,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
3,926,578.46
29,250.00
3,955,828.46
0.002 x B
W
KOEF.
(E+F)
1.
392,901.00
2.
Pelumas
108,000.00
1,279,688
(12,5 % - 17,5 %) x B
W
= ( 1 Orang / Jam ) x U1
1,828,125.00
4,054.29
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
Perawatan dan
perbaikan
Operator
5.
10,748.57
3,623,516.36
7,579,344.82
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
KOEF.
39,500,000
i x (1 + i)^A
(1 + i)^A - 1
0.35027
(B-C)xD
W
124,519.33
790.00
125,309.33
0.002 x B
W
=
(E+F)
1.
112,959.04
2.
Pelumas
31,050.00
24,688
Biaya bengkel
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 13 Orang / Jam ) x U2
69,125.00
L
M
4,054.29
10,748.57
252,624.39
377,933.73
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
Pw
Cp
A
W
B
KOEF.
ASPHALT DISTRIBUTOR
115
4,000
5.0
2,000.0
395,000,000
39,500,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
53,025.59
395.00
53,420.59
112,959.04
0.002 x B
W
=
(E+F)
2.
Pelumas
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
31,050.00
17,281
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
24,687.50
L
M
4,054.29
10,748.57
200,780.64
254,201.23
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
133,714,286
i x (1 + i)^A
(1 + i)^A - 1
0.26424
(B-C)xD
W
158,995.12
1,337.14
160,332.26
0.002 x B
W
=
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
103,136.51
2.
Pelumas
28,350.00
58,500
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 3 Orang / Jam ) x U2
83,571.43
L
M
4,054.29
10,748.57
288,360.80
448,693.06
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
Pw
Cp
A
W
B
KOEF.
100,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.19925
(B-C)xD
W
119,551.24
1,333.33
0.002 x B
W
(E+F)
120,884.57
1.
131,621.84
2.
Pelumas
36,180.00
58,333
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
116,666.67
L
M
4,054.29
10,748.57
357,604.69
478,489.26
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
Pw
Cp
A
W
B
KOEF.
CONCRETE BREAKER
290
20.00
5.0
2,000.0
900,000,000
90,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
120,817.80
W
b. Asuransi, dll =
0.002 x B
W
(E+F)
900.00
121,717.80
1.
284,853.23
2.
Pelumas
78,300.00
39,375
= (2.5%-3%) x Pw x Mp
Biaya bengkel
3.
4.
5.
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
56,250.00
L
M
4,054.29
10,748.57
473,581.08
595,298.88
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
2.
3.
4.
5.
B.
1.
U RAIAN
KODE
KOEF.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
Pw
Cp
A
W
B
Ca
4,000.00
50,000,000
ASPAHLT TANKER
190
4,000.00
6.0
2,000.0
500,000,000
2.
i x (1 + i)^A
(1 + i)^A - 1
0.26424
3.
(B-C)xD
W
59,453.30
500.00
(E+F)
59,953.30
1.
H1
H2
186,627.98
26,193.40
2.
Pelumas
51,300.00
21,875
b. Asuransi, dll =
0.002 x B
W
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
31,250.00
L
M
4,054.29
3,582.86
324,883.52
384,836.82
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
2.
3.
4.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
KODE
Pw
Cp
A
W
B
KOEF.
CEMENT TANKER
190
4,000.00
6.0
2,000.0
500,000,000
B.
1.
2.
3.
b. Asuransi, dll =
50,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.26424
(B-C)xD
W
59,453.30
500.00
59,953.30
0.002 x B
W
(E+F)
1.
186,627.98
2.
Pelumas
51,300.00
21,875
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
31,250.00
L
M
4,054.29
3,582.86
298,690.12
358,643.42
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
2.
3.
4.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
KODE
Pw
Cp
A
W
KOEF.
c. Harga Alat
B.
1.
35,000,000
3,500,000
i x (1 + i)^A
(1 + i)^A - 1
0.61512
(B-C)xD
W
9,688.08
35.00
9,723.08
2.
3.
b. Asuransi, dll =
0.002 x B
W
(E+F)
1.
19,645.05
2.
Pelumas
5,400.00
1,531
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
2,187.50
L
M
4,054.29
3,582.86
36,400.94
46,124.02
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
A.
1.
U RAIAN
URAIAN PERALATAN
Jenis Peralatan
KODE
KOEF.
VIBRATING RAMMER
2.
3.
4.
B.
1.
Tenaga
Kapasitas
Alat Baru
4
80.00
4.0
1,000.0
20,000,000
2,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.35027
(B-C)xD
W
6,304.78
40.00
6,344.78
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
2.
3.
b. Asuransi, dll =
0.002 x B
W
Pw
Cp
A
W
B
(E+F)
1.
4,125.46
2.
Pelumas
1,134.00
1,250
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
3,500.00
L
M
4,054.29
3,582.86
17,646.60
23,991.38
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
KOEF.
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
75,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
100,681.50
750.00
101,431.50
0.002 x B
W
Pw
Cp
A
W
B
(E+F)
1.
216,095.55
2.
Pelumas
59,400.00
32,813
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
46,875.00
L
M
4,054.29
3,582.86
362,820.19
464,251.69
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
117,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.19925
(B-C)xD
W
139,874.95
1,560.00
141,434.95
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
122,781.56
2.
Pelumas
33,750.00
68,250
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
136,500.00
L
M
4,054.29
3,582.86
368,918.71
510,353.65
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
(H+I+K+L+M)
D.
E.
1.
2.
3.
4.
5.
6.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
7.
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
90,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.29832
(B-C)xD
W
120,817.80
900.00
121,717.80
0.002 x B
W
KOEF.
(E+F)
1.
196,450.50
2.
Pelumas
54,000.00
39,375
Biaya bengkel
3.
4.
5.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
56,250.00
L
M
4,054.29
3,582.86
353,712.64
475,430.44
(H+I+K+L+M)
D.
E.
1.
2.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
i
U1
15.00
4,054.29
3.
4.
5.
6.
7.
U2
Mb
Ms
Mp
3,582.86
5,833.80
6,548.35
18,000.00
U RAIAN
KODE
A.
1.
2.
3.
4.
URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat
B.
1.
2.
3.
b. Asuransi, dll =
C.
BLENDING EQUIPMENT
50
30.00
10.0
1,500.0
500,000,000
50,000,000
i x (1 + i)^A
(1 + i)^A - 1
0.19925
(B-C)xD
W
59,775.62
666.67
60,442.29
0.002 x B
W
Pw
Cp
A
W
B
KOEF.
(E+F)
1.
49,112.63
2.
Pelumas
13,500.00
29,167
Biaya bengkel
3.
4.
5.
D.
= (2.5%-3%) x Pw x Mp
(6.25% dan 8.75%) x B
W
Perawatan dan =
(12,5 % - 17,5 %) x B
perbaikan
W
Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2
0.0000
L
M
4,054.29
3,582.86
99,416.43
159,858.72
(H+I+K+L+M)
E.
1.
2.
3.
4.
5.
6.
7.
LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
i
U1
U2
Mb
Ms
Mp
15.00
4,054.29
3,582.86
5,833.80
6,548.35
18,000.00
SATUAN
RONTON
E35
HP
Ton
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
UE'
###
E35
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
###
###
###
###
###
###
###
###
###
###
###
###
HARGA
SATUAN
KET.
BARU
Depresiasi
LLING MACHINE
HP
m
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
E37
E38
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
##
E40
###
###
###
###
###
###
###
###
###
###
###
###
Liter
###
Kondisi Alat
Nilai B' dari
SATUAN
KET.
##
E41
RILL BREAKER
E36
HP
Tahun
Jam
Rupiah
Rupiah
-
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Depresiasi
##
E42
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Depresiasi
#
E43
###
###
###
###
###
###
###
###
###
###
###
###
###
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
##
SATUAN
KET.
###
###
###
D RECYCLER
E38
HP
M
Tahun
Jam
Rupiah
Rupiah
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Depresiasi
##
E45
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
##
E46
###
###
###
###
###
###
###
###
###
###
###
###
###
###
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
E47
###
SATUAN
KET.
###
###
###
RECYCLER
E39
HP
M
Tahun
Jam
Rupiah
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Depresiasi
#
E48
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Rupiah
Depresiasi
##
E49
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
#
E50
###
###
SATUAN
KET.
###
###
###
(CHIP) SPREADER
HP
M
Tahun
Jam
Rupiah
E40
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
##
E51
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Kondisi Alat
Nilai B' dari
Rupiah
Rupiah
Depresiasi
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
###
E
###
###
###
###
SATUAN
KET.
###
###
###
T DISTRIBUTOR
HP
Liter
Tahun
Jam
Rupiah
E41
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
-
Rupiah
Rupiah
Rupiah
###
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
SATUAN
KET.
###
###
###
FORM PAVER
E42
HP
M
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
Depresiasi
#
E
###
###
###
###
###
###
###
###
SATUAN
KET.
###
###
###
E43
HP
Liter
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Kondisi Alat
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Depresiasi
#
E
###
###
###
###
###
###
###
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
###
###
###
SATUAN
KET.
###
> 15th ?
Kondisi Alat
ETE BREAKER
E44
HP
m3/jam
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Kondisi Alat
Nilai B' dari
Depresiasi
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
###
###
###
SATUAN
KET.
Kondisi Alat
Nilai B' dari
Depresiasi
HLT TANKER
E45
HP
liter
Tahun
Jam
Rupiah
liter
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Kondisi Alat
Nilai B' dari
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Nilai B' dari
Rupiah
Depresiasi
#
E
###
###
###
###
###
###
###
###
###
###
###
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
###
> 15th ?
Kondisi Alat
SATUAN
KET.
Depresiasi
ENT TANKER
E46
HP
liter
Tahun
Jam
Rupiah
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
-
Kondisi Alat
Rupiah
#
E
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Kondisi Alat
Rupiah
Rupiah
###
###
###
###
###
###
###
###
###
###
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
#
E
###
###
###
###
###
SATUAN
KET.
###
###
###
E47
###
###
> 15th ?
Kondisi Alat
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN
TING RAMMER
KET.
E48
HP
KG
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN
KET.
XER (AGITATOR)
HP
M3
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
E49
SATUAN
PILE MACHINE
KET.
E50
HP
CM
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
SATUAN
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
KET.
E51
Rp./Jam
Liter
Liter
Liter
SATUAN
NG EQUIPMENT
KET.
E52
HP
Ton
Tahun
Jam
Rupiah
Rupiah
-
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
Rupiah
% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter
ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
III.2.
III.3.
3.a.
U RAIAN
KODE
KOEFISIEN
70.00
HSAk
210,171.86
H
Hs1
30.00
210,171.86
SATUAN
KETERANGAN
%
Rupiah
Di Luar PPN
%
Rupiah
per 1 M3
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: AGREGAT KELAS A
: PENGADAAN AGREGAT KELAS A
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
HARGA
SATUAN
(Rp.)
0.0755
0.0378
4,532.31
7,156.29
BAHAN
1.
2.
3
Agregat 20-30
Agregat 5-10 & 10-20
Pasir Urug
M93
M92
M44
M3
M3
M3
0.3524
0.5286
0.3776
210,171.86
210,171.86
110,200.00
PERALATAN
Wheel Loader
Blending Equpment
Alat Bantu
(E15)
(E52)
jam
jam
Ls
0.0378
0.0482
1.0000
266,795.62
159,858.72
0.00
:
:
:
JUMLAH
HARGA
(Rp.)
TUAN
JUMLAH
HARGA
(Rp.)
342.25
270.20
612.45
74,066.79
111,100.19
41,609.62
226,776.60
10,073.28
7,704.03
0.00
17,777.31
245,166.36
PROYEK
No. PAKET KONTRAK
NAMA PAKET
PROP / KAB / KODYA
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
:
:
: ..
:
: AGREGAT KELAS B
: PENGADAAN AGREGAT KELAS B
: M3
PERKIRAAN
SATUAN KUANTITAS
KOMPONEN
A.
TENAGA
1.
2.
Pekerja
Mandor
(L01)
(L03)
jam
jam
HARGA
SATUAN
(Rp.)
0.0755
0.0378
4,532.31
7,156.29
BAHAN
1.
2.
3
Aggregat 20-30
Agg 5 - 10 & 10 - 20
Sirtu
M93
M92
M16
M3
M3
M3
0.2265
0.2265
0.8055
210,171.86
210,171.86
140,000.00
PERALATAN
Wheel Loader
Blending Equpment
Alat Bantu
(E15)
(E52)
jam
jam
Ls
0.0378
0.0482
1.0000
266,795.62
159,858.72
0.00
:
:
:
JUMLAH
HARGA
(Rp.)
TUAN
JUMLAH
HARGA
(Rp.)
342.25
270.20
612.45
47,614.37
47,614.37
112,771.39
208,000.12
10,073.28
7,704.03
0.00
17,777.31
226,389.88
ITEM PEMBAYARAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
No.
I
1
2
3
: AGREGAT KELAS C
: PENGADAAN AGREGAT KELAS C
: M3
U RAIAN
ASUMSI
Bahan Agregat Kasar, Pasir dan Tanah diterima di lokasi
Base Camp
Kegiatan dilakukan di dalam lokasi Base Camp
Proporsi campuran : - Agregat Kasar
- Pasir
Ak
Ps
Harga Satuan :
- Agregat Kasar
- Pasir
HSAk
HSPs
5
6
7
- Wheel Loader
- Wheel Loader
- Wheel Loader
Rp1
Fa1
Cp2
II
32.50
67.50
210,171.86
142,000.00
%
%
Rp./M3
Rp./M3
266,795.62 Rp./Jam
0.83
1.50
M3
METHODE PELAKSANAAN
1
III.1
1.a.
1.b.
III.2
- Agregat Kasar
= Ak x 1 M3
- Pasir
= Ps x 1 M3
- Tanah
= Tn x 1 M3
- Total volume agregat = Vk + Vp + Vt
Waktu pencampuran (blending) oleh Blending Equipmen
Vk
Vp
Vt
Va
0.325
0.675
0.000
1.000
M3
M3
M3
M3
Tc
0.083 Jam/M3
2.a.
Agregat Kasar
= Vk x HSAk
Hs1
46,150.00
Rupiah
2.b.
Pasir
= Vh x HSPs
Hs2
141,866.01
Rupiah
2.c.
Tanah
= Vs x HSTn
Hs3
0.00
Rupiah
2.d.
Biaya Pencampuran
= Tc x Rp1
Hs4
22,232.97
Rupiah
2.e.
HSAB
210,248.97
Rupiah
KETERANGAN
Kap. Bucket
Di luar PPN