IMPORTANT MESSAGE TO PARTNERS: Use this template as a guide in defining your Planning
Services engagement with your Software Assurance customer. This template is provided as
guidance only for your Microsoft Planning Services consulting engagements. While it is not
required to use this template, it is highly recommended you provide the customer a clear
understanding of what is included in this engagement.
1.
2.
3.
4.
5.
6.
7.
Prepared for
Prepared by
{Customer Company}
{Partner}
Customer Name
Name
Customer Title
Title
{Date}
Microsoft Dynamics AX
Table of Contents
Objectives............................................................................................................................... 2
Scope and Approach................................................................................................................ 4
Service Areas within Scope................................................................................................. 4
Service Areas Out of Scope................................................................................................. 8
Key Service Deliverables..................................................................................................... 8
Project Roles and Responsibilities.......................................................................................... 10
General Customer Responsibilities........................................................................................11
Project Assumptions.............................................................................................................. 12
[Right-click on table of contents to UPDATE FIELD.][Again, DO NOT DELETE SECTION BREAK between the chosen table
of content and the body of the document!]
[Step 2 - delete the 2 tables of contents you don't need. Make sure NON-PRINTING CHARACTERS are showing to
remove the page breaks.]
View Gridlines: Use this setting to see the table gridlines so that you dont accidentally click and drag
them. (Layout tab, Table group, View Gridlines button)
Styles: It is recommended to apply styles with the Styles panel (ALT+CTRL+SHFT+S) with Show Preview
selected, but the styles are also available on the Home ribbon. Do not apply any styling other than
those listed.
PDF generation: In order to have crisp, clear logos and images in the final PDF, its important that PDFs
be created in Adobe Acrobat as High Quality Print, rather than the Standard setting that is built into
MS Word. This setting is available in Adobe Acrobat (Standard or Professional), which can be purchased
separately if its not already installed on your system.
New Visual Identity guidelines require Segoe Pro Font, which you can download from Media Bank. To install the
Segoe Pro font onto your computer, extract and open the folder. Copy the files inside that folder into your fonts folder.
Your fonts folder is located at C:\WINDOWS\Fonts. Need to reboot for them to appear in your applications.
Error: Reference source not found will provide a Microsoft Dynamics AX Deployment Planning Services Engagement
which include the offering below:
Only include the sub-Offering text bullet points below for those sub-Offerings which are in the scope of the services
that you will be providing according to required activities of the length of the engagement you will deliver the
customer
Pre-engagement assessment including pre-engagement questionnaire filled up by the Error: Reference source not
found and reviewed and analyzed by Error: Reference source not found as a preparation to the assessment and
process documentation workshop.
Requirements and Process Documentation workshop: Identifies or reviews the high-level requirements and
analyzes selected 1 or few business processes that should be in the scope of a potential deployment of Microsoft
Dynamics AX and document the processes using Dynamics Life Cycle Services.
High Level Solution Architecture: Designed to provide you with an assessment of and guidance for the production
infrastructure regarding a potential deployment of a Microsoft Dynamics AX solution.
Designed to identify any gaps in the customers Standard Operating Environment (SOE) and how
Microsoft Dynamics AX fits the customer business requirements and how much customization will be
required to meet them implementing the identified one or few business processes.
[optional] The objective of solution scoping is to provide with the high-level analysis of the scope and
outline for how to approach and implement the recommended requirements for a potential deployment
of a Microsoft Dynamics AX solution, including but not limited to an estimation of the high-level cost
impact, a high-level project plan, and a discussion of the potential risks to be considered during your
decision-making process.
Proof of Concept: Designed to provide you with demonstration of a partially configured one or few business
processes with Microsoft Dynamics AX in the LCS Windows Azure hosted environment on your selected business
processes, which pertains to a potential deployment of a Microsoft Dynamics AX solution.
Any timelines, dates, and delivery schedules provided here are estimates only and are subject to change.
3 Days Engagement
The following section will be used for the 3-day engagement, consisting of the Assessment phase including preengagement assessment, Microsoft Dynamics AX overview and Business Process Review and documentation
workshops
Partner will provide the Microsoft Dynamics AX Deployment Planning Services as described below. The Dynamics AX
Deployment Planning Services are a consulting Solution provided by Partner.
The Solution described in this Work Order delivers an assessment of the customers existing business processes and
choose one or few processes that can documented using Dynamics Lifecycle Services and be used in planning a
deployment. This Solution utilizes Microsoft tools and technologies to provide the necessary analysis of the customer
environment, which may provide a basis for future design, planning and deployment efforts.
This phase can include during the workshop an overview of Microsoft Dynamics AX according to the readiness and
knowledge of the customer of Dynamics AX. Content will be delivered according to the pre-engagement assessment
results.
Partner will provide customer with a pre-engagement assessment questionnaire, few days before the engagement
is schedule to start. Partner will require customer to complete and return the questionnaire to us within # days,
along with data regarding existing architectural design deployed at your site.
Partner will analyze the design data provided by customer, as well as your responses to the assessment
questionnaire, and respond with any necessary clarification. If necessary a conference call will be held to close any
open issues.
Business Process or
Scenario Covered
Requirements
Review
Process Review
and
Documentation
Number of
Workshops
Duration
of
Workshop
Review business challenges and goals, review business processes and ensure that they can be supported by
Microsoft Dynamics AX. Prioritize the business processes which will be documented, implemented and show case
the benefits during this engagement.
Review of the customer-provided and -prioritized list of high-level functional and integration requirements to be
supported by the implementation of Microsoft Dynamics AX.
Review of the customer provided and prioritized list of high-level business processes to be supported by the
implementation of Microsoft Dynamics AX.
Documentation of prioritized one or few business processes flow, using Dynamics Life Cycle Services Business
Process Modeler.
Validate additional functional, business and integration requirements to ensure they can be met
Additional information collected during the assessment, as time allowed, might include:
Technical assessment
Infrastructure inventory
Gather basic information about any desired additional functionality for Microsoft Dynamics AX that the
customer can readily identify during the demonstration
Delivery of an Assessment Report highlighting the reviewed processes, critical and non-critical issues identified
during the review, including recommendations and workarounds where possible.
A final Review Findings presentation summarizing the results of the review, its findings and recommendations, and
next steps.
Any timelines, dates, and delivery schedules provided here are estimates only, and are subject to change.
5 Days Engagement
The following section will be used for the 5-day engagement, consisting of fit-gap analysis and high level scoping for
the prioritized business processes
Validation of the level of fit between Error: Reference source not found requirements and Microsoft Dynamics AX
Review of the level of customization and configuration will be required for the identified processes
Create a fit gap assessment for the identified processes document in LCS
Deliverables:
A fit gap Excel report generated by LCS for the documented processes
Scoping Assessment
Based on the analysis done on the first 3 days of the engagement of Error: Reference source not found functional
business requirements, non-functional requirements and proposed solution architecture and fit gap approach, the
partner will provide:
A High-Level Costing Worksheet model which will allow what-if analysis about the type of resources
used, the impact on costs and expenses considering where they are sourced, and the impact on costs
and expenses of varying the configuration and customization effort estimates
Development of a High-Level Implementation Plan document which reviews and compares the various implementation
options, summarizes the High-Level Costing Worksheet analysis based on key project activities, resource allocation,
and anticipated durations, and provides suggested high-level project plans and a possible resource plan. Additionally,
the Implementation Plan identifies possible risks to be considered
10 Day Engagement
The following section will be used for the 10-day engagement, consisting of High-Level Solution Architecture Design
Review for the prioritized business processes
This phase will be conducted with Error: Reference source not found staff to provide architectural design review related
to a solution, assessment and recommendation how out of the box capabilities of the solution can meet your
requirement and business processes, high level assessment of customization needed, as well as scoping assessment
that will provide the customer with details about the cost, resources and timeline to complete the recommended
solution implementation.
Based on the analysis of customers requirements and process as well as their current environment the partner will
provide customer with an initial, rough review of the Solution Architecture Design.
Partner will hold a workshop to discuss the suggested architecture and collect customer feedback on the rough
draft of the Architecture Assessment Report and to answer questions.
Based on the workshop partner will deliver a finalized version of the high-level solution architecture design and a
final report which will includes high level description and requirements for Microsoft Dynamics AX architectural
recommendations for the identified process/processes
Microsoft Dynamics AX architecture recommendations for the identified one or few business processes
Infrastructure design recommendations for the identified one or few business processes
A cost model that allows the client to do what-if analysis on resource allocation and changes in project scope
A benefits analysis comparing and contrasting the two most appropriate implementation options
A summary of the findings built into an implementation plan, giving the client clear guidance on how to move
forward
15 Day Engagement
The following section will be used for the 15-day engagement consisting of implementation of Proof of Concept
Note: Make sure you set clear boundaries for the Proof of Concept. You should address the specific scope of the
Proof of Concept and include boundaries and specific scope as it pertains to areas such as number of business
processes (1 or few), number of business requirements, configurations, customizations, time boxed efforts, and so
on. It is recommended to define the scope to specific requirements and associated efforts outlined from the
Requirements and Process Review service and the Fit Gap and Solution Architecture.
The Proof of concept deployment Solution will demonstrate to Error: Reference source not found how they can reduce
costs, improve operational efficiencies, and drive business agility by delivering an integrated Microsoft Dynamics AX
Deployment that is built using industry-leading architectural components and principles.
The Solution described in this Work Order delivers a Proof of Concept using Life Cycle Services Windows Azure-based
workspace that provides a Microsoft hosted online environment for implementing the PoC [partner can recommend an
on-premises PoC if the customers environment is suitable], and demonstrates how a Microsoft Dynamics AX can
provide [list the benefit you expect the customer to gain of the recommended solution and architecture]. This scenario
uses a definitive methodology for implementing Microsoft technology on a limited scale, in order to demonstrate the
technical capabilities of the Solution.
For the PoC phase the partner will suggest a subset of the business process to be implemented by the PoC for
Microsoft Dynamics AX offering # business processes [partner should mentioned how many processes and
requirements will be covered by the PoC and list which ones]
Configuration of Dynamics AX PoC using LCS Windows Azure hosted environment
Configuration of Microsoft Dynamics AX to provide high-level support for the business processes that are defined
through discussions with the client
Dry run of the Proof of Concept for Microsoft Dynamics AX Offering is conducted with the Project Sponsor to
validate that the Offering addresses the key points that need to be demonstrated with business and IT decision
makers.
Feedback from the meeting is incorporated into the Proof of Concept for Microsoft Dynamics AX offering before the
formal Proof of Concept for Microsoft Dynamics AX presentation to the business and IT decision makers.
A walkthrough of the business process flow charts within the scope of the engagement and a discussion of how
Dynamics AX would work within those business processes
A review of the business requirements to determine how they will be addressed in the offering
Prioritization of the processes and requirements identified before and during the workshops
Make updates to the Solution Architecture and Scoping Analysis for Microsoft Dynamics AX
Document any issues resulting from the Proof of Concept for Microsoft Dynamics AX Offering and identify
recommended actions.
Describe action items that were identified as a result of the Proof of Concept for Microsoft Dynamics AX Offering
and designate resources to be responsible for the action item.
Final Report
Review the Proof of Concept for Microsoft Dynamics AX offering reports with your designated Business Project Sponsor
and include feedback where appropriate.
Updated Scoping analysis, Solution Architecture and high-level Implementation Plans and next steps
Results and benefits of the Proof of Concept for Microsoft Dynamics AX Offering.
Establishment or deployment of core central services that do not currently exist at the customer environment.
Other Service Offerings are available for this purpose, such as email, networking, and so on.
Phase
Deliverable Name
Assessment
Phase
Deliverable Name
Solution
Architecture
Deliverable Name
Fit Gap
Analysis
Scoping Assessment
Phase
Deliverable Name
Proof of
Concept
Microsoft Dynamics
AX Extended PoC
The PoC will be deployed on a limited scale using LCS Windows Azure
hosted environment where Microsoft Dynamics AX will be
implemented in a test environment (or test environment of the
customer), using customer data and illustrating three or more
prioritized business process and requirements identified in early
stages as well as illustrating benefits of the Microsoft Dynamics AX
Offerings
Responsibility
Delivery organization
Engagement Manager
Drive subject content on specific areas of expertise including the actual design.
Prepare documentation.
Assist delivery organization during the Hyper-V Cloud PoC or limited Pilot project.
Accept and sign off in a timely manner on documents that pertain to the delivery
organization Work Order, and which are critical to the success of the engagement.
Delivery organization
Infrastructure
Consultant/SME
Customer Technical
Leads
Customer Project
Sponsor
Customer Project
Project management and assigning project manager or managers (owners) as needed, to specific technical
initiatives.
Overall technical direction for customer IT infrastructure, and how it affects the Solution.
Provision of workspace, including desk, phone with internal and external access, network connection, print
services, computer space, and an additional line (analog) for remote access to communicate with internal
corporate network or virtual private network (VPN) access through customers corporate Internet connection.
Provision of access to customers facilities and systems while maintaining appropriate levels of security.
Provision of timely access to people, documentation, and systems as required for successfully implementing and
completing this engagement.
Provision of clear goals and objectives mapped to customers business and IT strategies. Joint goals and objectives
need to be created and reviewed on a project-by-project basis.
Provision of access to customers management and planners. To be successful, Partner team will need regular
access to IT leadership to be able to provide input on customers strategic business and IT directions as they relate
to the use of Microsoft products and technologies.
In addition to any customer activities identified elsewhere in this Work Order, Error: Reference source not found will
perform or provide the following:
Please describe specific Customer responsibilities.
In performing our services under this work order and any applicable work order, we will rely upon any instructions,
authorizations, approvals, or other information provided to us by your Project Manager or personnel duly designated by
your Project Manager.
Project Assumptions
The services, fees, and delivery schedule for this project are based upon the following assumptions:
The availability of your representatives to perform their roles on the project team.
The availability of all the information required for properly envisioning and designing the Solution.
Timely availability of the hardware, software, and physical space for the Solution PoC or production Pilot
environment.
Product licenses. Product licenses (Microsoft or non-Microsoft) will not be provided under this work order.
Customer is responsible for acquiring all necessary product licenses required as a result of this work order.
Source code review. Customer will not provide the delivery organization with access to any type of source code
information. For any code, services will be limited to analysis of binary data only, such as a process dump or network
monitor trace