Anda di halaman 1dari 2

APPD

CERT.
ORIGD

GEMSS-M-22
Revision No. 02

DESCRIPTION

VOLUME - 1
PROPRIETARY INFORMATION
This document contains proprietary information developed by and for exclusive use of
Saudi Electricity Company. Your acceptance of the document is an acknowledgement
that it must be used for the identified purpose/application and during the period indicated.
It cannot be used or copied for any other purposes nor released to others without prior
written authorization of Saudi Electricity Company. Saudi Electricity Company will not be
responsible for misuse and/or misapplication, and any harm resulting therefrom. Saudi
Electricity Company also reserves the right to take any necessary actions to protect its
interest against unauthorized use.

Originated By

Certified By

Approved By

Abdul Rahim Al Harbi

Khaled S. Al Rashed

Tariq M. Al Tahini

Division Manager
Generation Projects
Engineering & Design

Department Manager
Generation Projects
Engineering

Executive Director
Generation Engineering &
Projects

3.

2.

1.

DATE
NO.

REVISIONS

Plant Closed Circuit Cooling Water System


(CCCW)

Date:-

Date:-

Table of Contents

Date:-

Document Responsibility:
Next Planned Update:-

Standard Specification Committee


Based on new development & technology with the
consent of designated committee

Volume-1
01-GEMSS-M-01
Steam Turbine and Auxiliary Equipment

1.0

GENERAL DESCRIPTION---------------------------

2.0

SCOPE--------------------------------------------------

3.0

APPLICABLE CODES AND STANDARDS---------

4.0

DESIGN CRITERIA AND SYSTEM DETAILS


-----------------------------------------------------------

5.0

MATERIALS------------------------------------------

6.0

GENERAL TECHNICAL REQUIREMENT---------

6.1

CCCW and Plant emergency cooling water pumps-------------

6.2

CCCW expansion tank----------------------------------------------

6.3

CCCW heat exchangers---------------------------------------------

6.4

Emergency cooling water tank(s)----------------------------------

6.5

Piping and accessories----------------------------------------------

6.6

Water sampling-------------------------------------------------------

6.7

Cooling water chemical dosing system---------------------------

7.0

MISCELLANEOUS REQUIREMENTS-------------

7.1

Instrumentation and Control System------------------------------

7.1.1
7.1.2

Local instrumentation----------------------------------------------Remote instrumentation---------------------------------------------

7.2

Electrical System-----------------------------------------------------

7.3

Field Quality Control------------------------------------------------

7.4

Sequence of Testing & Commissioning

15

8.0

Technical Schedules/ Data Sheets

15

Page 2 of 17