Anda di halaman 1dari 99

REKAPITULASI RENCANA ANGGARAN BIAYA ( RAB )

Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
No.

JENIS PEKERJAAN

JUMLAH HARGA

A
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
B
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
C

REHABILITASI 3 RUANG KELAS, 2 KM/WC, dan DAPUR


Rp.
PEK. PERSIAPAN DAN PEMBONGKARAN
Rp.
PEKERJAAN TANAH
Rp.
PEKERJAAN PONDASI
PEKERJAAN DINDING
Rp.
Rp.
PEKERJAAN PLESTERAN
Rp.
PEKERJAAN BETON
Rp.
PEKERJAAN KAYU
Rp.
PEKERJAAN PENUTUP ATAP
PEKERJAAN LANGIT - LANGIT
Rp.
PEKERJAAN PIPA DAN SANITASI
Rp.
Rp.
PEKERJAAN PENGUNCI DAN KACA
PEKERJAAN PENUTUP LANTAI DAN DINDING
Rp.
Rp.
PEKERJAAN PENGECATAN
Rp.
PEKERJAAN LAIN - LAIN
Rp.
SUB TOTAL A ( I s/d XIV )
REHABILITASI 1 RUANG KELAS
Rp.
PEK. PERSIAPAN DAN PEMBONGKARAN
Rp.
PEKERJAAN DINDING
Rp.
PEKERJAAN PLESTERAN
Rp.
PEKERJAAN KAYU
Rp.
PEKERJAAN PENUTUP ATAP
Rp.
PEKERJAAN LANGIT - LANGIT
Rp.
PEKERJAAN BESI
Rp.
PEKERJAAN PENGUNCI DAN KACA
Rp.
PEKERJAAN PENUTUP LANTAI
Rp.
PEKERJAAN PENGECATAN
Rp.
PEKERJAAN LAIN - LAIN
Rp.
SUB TOTAL B ( I s/d XI )
Rp.
PENGADAAN MEUBELAIR
Rp.
SUB TOTAL C

JUMLAH A +B + C
PPn 10%
JUMLAH SUB TOTAL
JUMLAH SUB TOTAL DIBULATKAN ( BKF )
PERINCIAN
A BIAYA KONSTRUKSI FISIK ( BKF )
B BIAYA PERENCANAAN
C BIAYA PENGAWASAN
D BIAYA UMUM
JUMLAH TOTAL ( A+B+C+D )

1,216,283.00
4,079,687.10
22,425,705.87
27,288,403.89
18,074,234.96
390,571,842.95
99,602,439.88
23,910,037.80
10,404,059.70
5,553,395.80
#N/A
11,162,976.00
30,437,202.90
4,449,660.00
#N/A

Rp.
Rp.
Rp.
Rp.

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Rp.
Rp.
Rp.
Rp.
Rp.

TERBILANG : LIMA RATUS ENAM PULUH EMPAT JUTA TIGA RATUS RIBU RUPIAH

Mengetahui / Menyetujui :
Pejabat Pelaksana Teknis Kegiatan

Kediri, . 2009
Dibuat oleh ;
Konsultan Perencana
CV. SETIA GRAHA CONSULTAN

Drs.SUKUR
NIP. 131 663 112

Ir. SUHARI
Direktur

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Rek 1/1

Mengetahui / Menyetujui :
Kepala Dinas Pekerjaan Umum
Kota Kediri

Mengetahui / Menyetujui :
Plt. Kepala Dinas Pendidikan
Kota Kediri

Ir. H. WIDODO, MM
NIP. 510 077 638

Drs. H .SUJARWOTO. M Si
NIP. 131 287 490

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Rek 2/1

#REF!

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Rek 3/1

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Rek 4/1

RENCANA ANGGARAN BIAYA

Program
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran

NO.

URAIAN PEKERJAAN

KODE
SAT.
ANALIS
3

HARGA
VOLUME SATUAN

HIT

JUMLAH
HARGA
( Rp )

( Rp )
7

PEK. PERSIAPAN DAN PEMBONGKARAN


1 Pengukuran & Pemasangan Bowplank
2 Membersihkan Lapangan & Perataan

II

m1

4.00

m2

165.00

4.00
165.00

102,977.00
4,875.00

411,908.00
804,375.00
1,216,283.00

77.68
10.20
6.92
7.77

35,625.00
11,875.00
81,090.00
81,090.00

2,767,350.00
121,125.00
561,142.80
630,069.30
4,079,687.10

15.54

33.99
15.54

535,391.00
272,057.00

18,197,940.09
4,227,765.78
22,425,705.87

JUMLAH
PEKERJAAN TANAH

1 Galian Tanah Biasa Sedalam 1 M1


2 Urugan Tanah Kembali
Urugan pasir bawah lantai t=10cm
3 Urugan pasir

III

A,6 4
A,6 8

#N/A #N/A
#N/A #N/A
B.6 11
#N/A #N/A

#N/A

77.68

#N/A

10.20

m3

6.92

#N/A

7.77

C.6 7
m3
#N/A #N/A #N/A

33.99

JUMLAH
PEKERJAAN PONDASI

1 Pasang Pondasi Batu Kali 1 Pc : 6 Ps


2 Pasang pondasi batu kosong

JUMLAH
IV PEKERJAAN DINDING
1 Pasang bata merah tebal 1/2 bata 1 Pc : 6 Ps

1 Plesteran 1 Pc : 6 Ps tebal 15 mm
2 Benangan

VI
1
3
4
5

D.6 4

m2

334.47

334.47

81,587.00

27,288,403.89
27,288,403.89

E.6 6
E.6 7a

m2

668.94

m1

51.50

668.94
51.50

26,484.00
6,952.00

17,716,206.96
358,028.00
18,074,234.96

E.a 39
E.a 45
E.a 46
E.a 47

m3

2.91

m'

117.50

JUMLAH
PEKERJAAN PLESTERAN

JUMLAH
PEKERJAAN BETON
Membuat beton sloof praktis
Membuat kolom praktis 11 x 11 cm
memasang ring balok 10 x 15 cm
Membuat plat beton

m'

63.40

m3

0.60

m'

57.82

m2

7.35

JUMLAH
VII PEKERJAAN KAYU DAN ALUMUNIUM
1
2
3
9
10
11

Pasang kusen pintu & jendela alumunium alexindo


Pasang pintu ex.anzdor
pasang jendela rangka kayu isi kaca bening 5 mm
Pasang rangka langit-langit
Pasang lisplank woodplank lebar 30 cm
Pasang papan reuter

J.6 1
F.6 5a
F.6 6
F.6 19.b
F.6 22.c
#N/A 22.d

m2

3.42

m2

69.20

m'

19.50

m'

15.50

G.6 3
G.6 6
Ls. 15.a

M2

93.38

M1

15.50

M2

69.20

H.6 7b
H.6 8

M2

69.20

M1

71.30

2.91
5,025,855.00 14,625,238.05
117.50
67,033.00
7,876,377.50
63.40
91,251.00
5,785,313.40
0.60 603,808,190.00 362,284,914.00
390,571,842.95
57.82
7.35
3.42
69.20
19.50
15.50

1,462,144.00

93.38
15.50
69.20

81,160.00
71,038.00
220,090.00

7,578,720.80
1,101,089.00
15,230,228.00
23,910,037.80

69.20
71.30

132,126.00
17,685.00

9,143,119.20
1,260,940.50
10,404,059.70

2.00
1.00
10.70
10.80
15.20
2.00
1.00
3.00
2.00

307,835.00
389,495.00
15,530.00
44,916.00
57,050.00
1,238,665.00
361,562.00
32,955.00
46,025.00

615,670.00
389,495.00
166,171.00
485,092.80
867,160.00
2,477,330.00
361,562.00
98,865.00
92,050.00
5,553,395.80

6.00
2.00
16.00
16.00
8.00
8.00
14.00
3.07

107,825.00
100,925.00
26,722.00
12,037.00
21,287.00
#N/A
35,025.00
130,310.00

646,950.00
201,850.00
427,552.00
192,592.00
170,296.00
#N/A
490,350.00
400,051.70

675,900.00
555,430.00
96,376.00
34,877.00
54,485.00

JUMLAH
VIII PEKERJAAN ATAP
1 Pasangan atap genteng pres super
2 Pasangan bubungan genteng pres super
2 Pasangan rangaka atap baja ringan

JUMLAH

84,541,166.08
4,967,865.00
1,899,570.60
6,669,219.20
680,101.50
844,517.50
99,602,439.88

IX PEKERJAAN LANGIT - LANGIT


1 Pasang langit-langit gypsum
2 Pasang list plafon gypsum

JUMLAH
X

PEKERJAAN PIPA DAN SANITASI

1 Pasang Closed jongkok porselin


Pasang bak kontrol 30 x 30 cm
2 Pasang Pipa PVC tipe AW diameter 3/4"
3 Pasang Pipa PVC tipe D diameter 3"
4 Pasang Pipa PVC tipe D diameter 4"
Pasangan bak mandi pasangan batu bata+keramik

#N/A #N/A #N/A


I.6 16

bh

#N/A #N/A #N/A


I.6 31
m1

2.00
1.00
10.70
10.80

I.6 32

m1

15.20

I.6 8

bh

2.00

5 Pasang Kitchen Set Stainless Steel

#N/A #N/A #N/A

1.00

6 Pasang kran dia 3/4" atau 1/2"

#N/A #N/A #N/A

3.00

8 Pasang floor drain

#N/A #N/A #N/A

2.00

#N/A #N/A #N/A

6.00

XI

JUMLAH
PEKERJAAN PENGUNCI DAN KACA

1 Pasang kunci tanam biasa


2 Pasang kunci tanam KM/WC

K.6 4

#N/A

2.00

#N/A #N/A #N/A


#N/A #N/A #N/A

16.00

4 Pasang engsel jendela


5 Pasang Hak angin

#N/A #N/A #N/A

8.00

6 Pasang Handel Jendela


7 Pasang grendel pintu

#N/A #N/A #N/A


#N/A #N/A #N/A

14.00

8 Pasang kaca tebal 5 mm

#N/A #N/A #N/A

3.07

3 Pasang engsel pintu kuningan

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

16.00
8.00

RAB I 5/2

JUMLAH
XII PEKERJAAN PENUTUP LANTAI DAN DINDING

#N/A

1 Pasang lantai keramik 30 x 30 cm

L.6 35

m2

67.20

2 Pasangan lantai dan dinding keramik 20 x 20 cm

L.6 36

m3

6.00

67.20
6.00

152,030.00
157,760.00

10,216,416.00
946,560.00
11,162,976.00

668.94
69.20

41,235.00
41,235.00

27,583,740.90
2,853,462.00
30,437,202.90

24.00
4.00
3.00
7.00
1.00
1.00

137,100.00
18,340.00
21,440.00
20,940.00
425,000.00
450,000.00

JUMLAH
XIII PEKERJAAN PENGECATAN
4 Mendempul dan Mengecat 2x selesai Tembok Baru
5 Mengecat bidang plafond baru

#N/A #N/A #N/A


#N/A #N/A #N/A

668.94
69.20

JUMLAH
XIV PEKERJAAN LAIN - LAIN
1 Pasang instalasi listrik

#N/A

#N/A

24.00

2 Pasang Saklar Tunggal

#N/A

#N/A

4.00

3 Pasang Saklar ganda

#N/A

#N/A

3.00

4 Pasang stop kontak

#N/A

#N/A

7.00

8 Pasang Pompa Air Nasional GP 125 JB l/dt

Un

1.00

9 Membuat Sumuran

Bh

1.00

JUMLAH
TOTAL A

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

3,290,400.00
73,360.00
64,320.00
146,580.00
425,000.00
450,000.00
4,449,660.00
#N/A

RAB I 6/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 7/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 8/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 9/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 10/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 11/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 12/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 13/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 14/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 15/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 16/2

###

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 17/2

292,800,000.00

#VALUE!

71.65
71.65

71.95

33.01
10.67

132.04
10.67
40.5
9
192.21

#VALUE!

#VALUE!

#VALUE!

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 18/2

#VALUE!

#VALUE!

#REF!
-

292,800,000.00
#REF!
#REF!

Kediri, . 2009
Dibuat oleh :
Konsultan Perencana
CV. SETIA GRAHA CONSULTAN

Ir. SUHARI
Direktur

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 19/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 20/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 21/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 22/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 23/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 24/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 25/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 26/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 27/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 28/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 29/2

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

RAB I 30/2

REKAPITULASI HARGA PEKERJAAN

NO

URAIAN PEKERJAAN

KODE
ANALIS

SATUA JUMLAH
N
4

HARGA
( Rp )
5

A
1
2
3
4

PEKERJAAN PERSIAPAN
Pengukuran & Pemasangan Bowplank
Membersihkan Lapangan & Perataan
Bongkar Beton Bertulang
Bongkaran Dinding Bata Merah

A,6
A,6
A,6
A,6

4
8
13
14

m1
m2
m3
m3

93,496.00
3,520.00
234,656.00
234,656.00

B
1
2
3
4
5
6

PEKERJAAN TANAH
Galian Tanah Biasa Sedalam 1 M1
Galian Tanah Biasa Sedalam 2 M1
Urugan Tanah Kembali
Pemadatan Tanah
Urugan pasir
Urugan Tanah

B.6
B.6
B.6
B.6
B.6
B.6

1.
2.
9
10
11
15.a

m3
m3
m3
m3
m3
m3

25,600.00
31,680.00
8,531.00
19,200.00
54,880.00
55,540.00

C
1
2
3

PEKERJAAN PONDASI
Pasang Pondasi Batu Kali 1 Pc : 4 Ps
Pasang Pondasi Batu Kali 1 Pc : 6 Ps
Pasang pondasi batu kosong

C.6
C.6
C.6

5
7
14

m3
m3
m3

446,983.00
390,918.00
191,537.00

D
1
2
3
4
5
6
7

PEKERJAAN DINDING
Pasang bata merah tebal 1/2 bata 1 Pc : 2 Ps
Pasang bata merah tebal 1/2 bata 1 Pc : 3 Ps
Pasang bata merah tebal 1/2 bata 1 Pc : 4 Ps
Pasang bata merah tebal 1/2 bata 1 Pc : 6 Ps
Pasang bata merah tebal 1/2 bata 1 Pc : 3 Kp : 10 Ps
Pasang dinding roster / krawang 20 X 20 cm
Pasang dinding glass block ( 20 X 20 )cm

D.6
D.6
D.6
D.6
D.6
D.6
D.6

7
3
3a
4
5
23
24

m2
m2
m2
m2
m2
m2
m2

69,036.00
63,339.00
59,865.00
56,164.00
64,762.00
146,025.00
532,625.00

E
1
2
3
4
5
6
7
8

PEKERJAAN PLESTERAN
Plesteran 1 Pc : 3 Ps tebal 15 mm
Plesteran 1 Pc : 4 Ps tebal 15 mm
Plesteran 1 Pc : 6 Ps tebal 15 mm
Plesteran Beton 1 Pc : 2 Ps tebal 15 mm
Plesteran 1 Pc : 3 Kp : 10 Ps tebal 15 mm
Benangan
Plester siar adukan 1 pc : 2 ps ( Dinding batu kali )
Acian

E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6

3
4
6
2
7
7a
26
27

m2
m2
m2
m2
m2
m1
m2
m2

30,524.00
28,632.00
26,484.00
33,463.00
29,943.00
6,952.00
28,096.00
17,051.00

Ea
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

PEKERJAAN BETON
Membuat lantai kerja Beton tumbuk
Membuat Beton Bertulang 1 PC : 2 PS : 3 Kr
Mengerjakan Besi Beton
Membuat bekesting untuk pondasi
Membuat bekesting untuk Sloof / Kolom / Ring balk Praktis
Membuat bekesting untuk Kolom Struktur
Membuat bekesting untuk Balok
Membuat bekesting untuk Lantai
Membuat bekesting untuk Tangga
Membuat Pondasi beton bertulang
Membuat beton Sloof Praktis 10/10
Membuat beton Sloof Praktis 15/15
Membuat beton Sloof Praktis 15/18
Membuat beton Sloof Praktis 15/20
Membuat beton Sloof Struktur 15/30
Membuat beton Strauss 25 cm
Membuat plat Poer 130/60/25
Membuat plat Poer 50/50/20
Membuat Kolom Praktis 12/12
Membuat Kolom Struktur praktis 15/15
Membuat Kolom Struktur 15/20
Membuat Kolom Struktur 20/30
Membuat Kolom Struktur 25/30
Membuat Kolom Struktur 30/30
Membuat Balok Induk 20/50
Membuat Balok Induk 30/40
Membuat Balok Induk 30/50
Membuat Balok anak 15/35
Membuat Balok 20/25

E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a

4
13
25
28
30.a
30
31
32
34
38
39.a
39.b
39.c
39.d
39.e
36
37.a
37.b
40.a
40.b
40.c
40.d
40.e
40.f
41.a
41.b
41.c
41.d
41.e

m3
m3
Kg
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

60,335.00
749,137.00
13,230.00
54,872.00
60,122.00
116,656.00
126,853.00
211,584.00
141,844.00
2,970,684.00
4,495,706.00
3,351,563.00
3,441,527.00
3,223,232.00
3,334,761.00
2,002,944.00
2,985,119.00
3,233,471.00
4,443,603.00
3,465,870.00
3,496,696.00
3,571,626.00
4,239,119.00
3,815,392.00
4,223,037.00
3,661,275.00
3,180,972.00
4,707,577.00
4,373,916.00

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1
2
30 Membuat Balok gantung dan konsol 12/20 cm
31 Membuat Ring balk praktis 12/12
32 Membuat Ring balk praktis dan balok latay 12/15
Membuat balok latay 12/15
33 Membuat Ring Balk 20/30
34 Membuat beton plat atap / deck t = 10 cm
35 Membuat beton plat atap / deck t = 12 cm
36 Membuat Tangga beton bertulang
37 Rabat Beton 1 Pc : 3 Ps : 6 Kr

3
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a

41.f
41.g
41.h
41.h
41.i
42.a
42.b
43.a
44

4
m3
m3
m3
m3
m3
m3
m3
m3
m3

5
3,764,149.00
4,439,996.00
3,949,957.00
3,949,957.00
2,905,153.00
5,279,240.00
4,561,580.00
4,209,735.00
516,269.00

32
33
34
35
36
37
38
39
40
41
42

PEKERJAAN KAYU
Pasang kusen pintu & jendela kayu jati
Pasang kusen pintu & jendela kayu kamfer
Pasang kusen pintu & jendela kayu Balau
Pasang kusen pintu & jendela kayu Kruing
Pasang kembali kusen pintu & jendela lama
Pasang pintu panil kayu jati
Pasang pintu panil kayu Kamper
Pasang pintu panil kayu Balau
Pasang kembali daun pintu lama
Pasang Pintu & Jendela Kaca Kayu Jati + Kaca 5 mm
Pasang Pintu & Jendela Kaca Kayu kamfer+ kaca 5 mm
Pasang Pintu & Jendela Kaca Kayu balau + kaca 5 mm
Pasang Pintu & Jendela Kaca Kayu Kruing + kaca 5 mm
Pasang Pintu Double Teakwood rangka kayu Kamper
Pasang Pintu Double Teakwood rangka kayu Kruing
Pas. Pintu Double Teakwood Lps Almunium rangk. Ky.Kruing
Pasang jalusi kayu jati
Pasang jalusi kayu kamfer
Pasang jalusi kayu balau
Pasang jalusi kayu Kruing
Pasang Konstruksi Kuda - kuda kayu Kamper
Pasang Konstruksi Kuda - kuda kayu Balau
Pasang Konstruksi Kuda - kuda kayu Kruing
Pasang Kembali Konstruksi Kuda - kuda kayu lama
Pasang Konstruksi Gording kayu Kamper
Pasang Konstruksi Gording kayu Balau
Pasang Konstruksi Gording kayu Kruing
Pasang kembali Konstruksi Gording kayu lama
Pasang Kasau + reng kayu ( Kruing - Jati )
Pasang Kasau + reng kayu ( Kruing - kruing )
Pasang Kasau + reng kayu ( Meranti - kruing )
Pasang kembali Kasau + reng kayu baru
Pasang kembali Kasau + reng kayu lama
Pas rangka langit - langit 1 x 1 m kayu Kruing
Pas rangka langit - langit 1 x 1 m kayu Meranti
Pas rangka langit - langit 1 x 1 m kayu Tahun
Pas kembali rangka langit - langit 1 x 1 m kayu lama
Pasang lisplank uk. 3 x 20 cm, kayu kamfer
Pasang lisplank uk. 3 x 20 cm, kayu Kruing
Pasang lisplank uk. 3 x 20 cm, kayu balau
Pasang kembali lisplank kayu lama
Pasang papan reuter
Pasang papan kompres

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

1
2
3
4
4.a
5
5.a
5.b
5.e
6
6.a
6.b
6.c
8.b
8.c
8.d
10
10.a
10.b
10.c
13.a
13.c
13.b
13.d
15.a
15.c
15.b
15.d
17.b
17.a
17.c
17.e
17.d
19.b
19.c
19.d
19.e
21.a
21.b
21.c
21.d
22
23

m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1

29,309,490.00
11,886,900.00
9,882,900.00
8,862,900.00
1,271,400.00
1,229,116.00
571,200.00
504,400.00
211,900.00
564,834.00
367,460.00
347,420.00
337,220.00
430,774.00
367,774.00
407,774.00
1,678,974.00
692,100.00
591,900.00
540,900.00
10,822,980.00
8,985,980.00
8,050,980.00
1,049,940.00
10,445,460.00
8,608,460.00
7,673,460.00
620,460.00
213,675.00
123,990.00
90,726.00
43,130.00
11,630.00
98,270.00
77,858.00
51,830.00
28,750.00
112,036.00
84,820.00
94,000.00
16,040.00
27,870.00
40,030.00

G
1
2
3

PEKERJAAN PENUTUP ATAP


Pasang atap genteng kodok
Pasang kembali atap genteng lama
Pasang bubung genteng kodok

G.6
G.6
G.6

2
2.a
5

m2
m2
m1

42,259.00
9,759.00
62,218.00

H
1
2
3
4
5

PEKERJAAN LANGIT - LANGIT


Pasang langit - langit asbest 1 x 1 m
Pasang langit - langit asbest 1 x 1 m Rangka Kayu Kruing
Pasang langit - langit asbest 1 x 1 m Rangka Kayu Meranti
Pasang langit - langit asbest 1 x 1 m Rangka Kayu Tahun
Pasang list kayu profil

H.6
H.6
H.6
H.6
H.6

1
1.a
1.b
1.c
10

m2
m2
m2
m2
m1

20,150.00
115,475.00
95,063.00
69,035.00
8,875.00

I
1
2
3
4
5
6
7
8
9

PEKERJAAN PIPA DAN SANITASI


Pasang Closed Duduk porselin
Pasang Closed jongkok porselin
Pasang Urinoir
Pasang Wastafel
Pasang Bak Mandi Fiber glass vol. 0,30 m3
Pasang Bak Mandi Bata vol. 0,30 m3
Pasang bak kontrol 45 x 45 cm t. 50 cm
Pasang Pipa GIP 2"
Pasang Pipa PVC tipe AW diameter 1/2"

I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6

1
2
4
5
7
8
17
22.a
25

bh
bh
bh
bh
bh
bh
bh
m1
m1

1,481,375.00
252,150.00
459,710.00
289,602.00
505,030.00
933,947.00
371,954.00
151,877.00
12,927.00

F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1
10
11
12
13
14
15
16

2
Pasang Pipa PVC tipe AW diameter 3/4"
Pasang Pipa PVC tipe D diameter 2"
Pasang Pipa PVC tipe D diameter 3"
Pasang Pipa PVC tipe D diameter 4"
Pasang Kitchen Set Stainless Steel
Pasang kran dia 3/4" atau 1/2"
Pasang floor drain

3
I.6
I.6
I.6
I.6
I.6
I.6
I.6

26
29
31
32
34
35
36

4
m1
m1
m1
m1
bh
bh
bh

5
14,177.00
20,622.00
29,552.00
38,850.00
346,126.00
24,525.00
24,430.00

J
1
2
3
4
5
6
7
8

PEKERJAAN BESI DAN ALUMUNIUM


Pasang Rangka Kuda - kuda Baja IWF
Pasang Pintu Rolling Door Alumunium
Pasang Kusen Pintu/ jendela Kaca Alumunium
Pasang Pintu Kaca rangka Alumunium
Pasang Jendela Kaca rangka Alumunium
Pasang jendela Naco & tralis
Pasang jendela Naco kaca 5 mm
Pasang talang datar/ juray seng BJLS 28 lebar 90 cm

J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6

2
10
11
13
13.a
17
17.a
18

Kg
m2
m2
m2
m2
m2
m2
m1

18,526.00
566,600.00
189,840.00
629,270.00
539,290.00
411,150.00
315,363.00
133,572.00

K
1
2
3
4
5
6
7
8
9
10
11
12

PEKERJAAN PENGUNCI DAN KACA


Pasang kunci tanam biasa
Pasang kunci tanam KM/WC
Pasang engsel pintu kuningan
Pasang engsel jendela
Pasang Hak angin
Pasang Handel Pintu
Pasang Handel Jendela
Pasang grendel pintu
Pasang grendel jendela
Pasang kaca tebal 3 mm
Pasang kaca tebal 5 mm
Pasang Kaca Rayband Hitam tebal 5 mm

K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6

2
2.a
5
6
9
12
12.a
15,b
15.c
16
17
17.a

bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2

92,680.00
60,815.00
20,852.00
10,652.00
7,502.00
117,650.00
15,150.00
15,623.00
13,683.00
80,616.00
112,076.00
139,796.00

L.6
L.6
L.6
L.6
L.6
L.6
L.6

34.a
35
35a
36
39
50
58.a

m2
m2
m2
m2
m1
m2
m2

128,518.00
105,231.00
122,609.00
107,276.00
18,111.00
139,131.00
152,176.00

M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6

7
8
11
12
14
14
15
15

m2
m2
m2
m2
m2
m2
m2
m2

25,985.00
30,223.00
27,380.00
4,109.00
12,033.00
12,033.00
9,556.00
9,556.00

L.5
L.6
L.7
L.9
L.13
Ls.1
Ls.2
Ls.2a
Ls.4
Ls.5
Ls.6
Ls.7
Ls.7a
Ls.7b
Ls.7c
Ls.7d
Ls.9
Ls.10
Ls.11
Ls.15c
Ls.16
Ls.17
Ls.15.c
Ls.15.d
Ls.18

m2
m2
m2
m2
m3
m2
m2
m3
Ttk
bh
bh
bh
Ttk
Ttk
Ttk
Ttk
Un
Un
m2
Kg
m2
m1
m2
m2
m2

7,040.00
3,200.00
1,280.00
2,152.00
494,200.00
55,286.00
48,226.00
201,600.00
97,360.00
22,501.00
23,102.00
16,702.00
98,802.00
56,802.00
33,802.00
89,302.00
3,560,280.00
1,433,580.00
740,495.00
341,468.00
1,164,385.00
45,900.00
242,464.00
105,417.00
89,856.00

L PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pasang lantai keramik polos 40X 40 cm
2 Pasang lantai keramik polos 30 x 30 cm
Pasang lantai keramik warna 30 x 30 cm
3 Pasang lantai keramik 20 x 20 cm
4 Pasang plint keramik 10X 20 cm
5 Pasang dinding keramik 20 x 25 cm
6 Pasang dinding batu tempel palimanan
M
1
2
3
4
5

PEKERJAAN PENGECATAN
Pengecatan bidang kayu Lama
Pengecatan bidang kayu Baru
Politur
Mengecat permukaan kayu dengan Residu
Mendempul dan Mengecat 2x selesai Tembok Baru
Mengecat bidang plafond baru
6 Pengecatan dinding Lama
Mengecat bidang plafond lama

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

PEKERJAAN LAIN - LAIN


Membongkar lantai
Membongkar Plesteran
Membongkar genteng
Membongkar Usuk / reng
Bongkar Kayu Rangka
Paving stone merah segi enam tebal 6 cm
Paving stone abu - abu tebal 6 cm
Tebaran kerikil
Pasang instalasi listrik
Pasang Saklar Tunggal
Pasang Saklar ganda
Pasang stop kontak
Pasang lampu TL 2 x 20 watt + kaap lampuper
Pasang lampu TL 20 watt + kaap lampuper
Pasang lampu SL
Pasang lampu Baret
Pasang Septic Tank Bio Filter kaps. 1,5 m3
Pasang Peresapan
Pasang Atap Poly Carbonate
Pasang Rangka Atap Baja Ringan Mutu Tinggi 30 bentang 16 m '
Pasang pintu Harmonika
Pasang Buis beton U 20 cm
Memasang Rangka Atap Baja Ringan Mutu Tinggi
Memasang Rangka Plafond Metal Furing + Asbes 100 X 100 cm
Memasang Kaca Film

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

2
Membuang eks. Bongkaran keluar Proyek

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

3
Ls.19

4
M3

5
24,250.00

MANDYS

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

01/26/2017 / 00:56:59 /file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

ANALISA HARGA SATUAN PEKERJAAN ( SNI )


KOTA KEDIRI TAHUN 2009

No.

URA
IAN

VOL.

A,6
4

PEKERJAAN PERSIAPAN
1 m1 Pengukuran & Pemasangan Bowplank
Kayu Meranti Usuk 5/7 cm
0.0120
Kayu Meranti Papan
0.0070
Paku biasa
0.0200
Tenaga
Pekerja
0.1000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0050

HARGA SAT. HARGA SAT.


SAT BAHAN
TENAGA
( Rp. )
( RP. )
4

M3
M3
Kg

4,410,000
4,410,000
14,800

13

14

B.6
1.

2.

10

11

15.a

1 m3 Bongkaran Dinding Bata Merah


Tenaga
Pekerja
Mandor

PEKERJAAN TANAH
1 m3 Galian Tanah Biasa Sedalam 1 M1
Tenaga
Pekerja
Mandor

1 m3 Galian Tanah Biasa Sedalam 2 M1


Tenaga
Pekerja
Mandor

1 m3
Urugan Tanah Kembali
Tenaga
Pekerja
Mandor
1 m3
Pemadatan Tanah
Tenaga
Pekerja
Mandor

1 m3
Urugan pasir
Bahan
Pasir Urug
Tenaga
Pekerja
Mandor

1 m3

32,000
53,000
59,000
64,000

3,200
5,300
590
320
84,086
9,410
Dibulatkan

32,000.00
64,000.00

3,200.00
320.00
3,520.00
Dibulatkan

6.6670 Oh
0.3330 Oh
7.0000

32,000.00
64,000.00

213,344.00
21,312.00
234,656.00
Dibulatkan

6.6670 Oh
0.3330 Oh
7.0000

32,000.00
64,000.00

213,344.00
21,312.00
234,656.00
Dibulatkan

0.7500 Oh
0.0250 Oh
0.7750

32,000.00
64,000.00

24,000.00
1,600.00
25,600.00
Dibulatkan

0.9000 Oh
0.0450 Oh
0.9450

32,000.00
64,000.00

28,800.00
2,880.00
31,680.00
Dibulatkan

0.2500 Oh
0.0083 Oh
0.2583

32,000.00
64,000.00

8,000.00
531.20
8,531.20
Dibulatkan

0.5000 Oh
0.0500 Oh
0.5500

32,000.00
64,000.00

16,000.00
3,200.00
19,200.00
Dibulatkan

Oh
Oh
Oh
Oh

1 m2 Membersihkan Lapangan & Perataan


Tenaga
Pekerja
0.1000 Oh
Mandor
0.0050 Oh
0.1050
1 m3 Bongkar Beton Bertulang
Tenaga
Pekerja
Mandor

52,920
30,870
296

0.2150
8

JUMLAH
JUMLAH
HRG BAHAN HRG TENAGA
( Rp. )
( Rp. )

1.2000 M3

44,640

37,200.00

0.3000 Oh
0.0100 Oh
0.3100

32,000.00
64,000.00
44,640.00

9,600.00
640.00
10,240.00
Dibulatkan

Urugan Tanah

Bahan
Tanah Urug
Tenaga
Pasir Urug
Mandor

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1.2000 M3
0.2500 M3
0.0250 Oh
0.2750

37,200.00

44,640.00
37,200.00
64,000.00
44,640.00

9,300.00
1,600.00
10,900.00
Anal -9

1
C.6
5

14

D.6
7

3a

PEKERJAAN PONDASI
1 m3 Pasang Pondasi Batu Kali 1 Pc : 4 Ps
Bahan
Batu Belah 15/20 cm
1.1000
Semen PC Gresik
163.000
Pasir Pasang
0.5200
Tenaga
Tukang
0.7500
Kepala Tukang
0.0750
Pekerja
1.5000
Mandor
0.0750
2.4000
1 m3 Pasang Pondasi Batu Kali 1 Pc : 6 Ps
Bahan
Batu Belah 15/20 cm
1.1000
Semen PC Gresik
117.000
Pasir Pasang
0.5610
Tenaga
Pekerja
1.5000
Tukang
0.7500
Kepala Tukang
0.0750
Mandor
0.0750
2.4000
1 m3 Pasang pondasi batu kosong
Bahan
Batu Belah 15/20 cm
Pasir Urug
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

M3
Kg
M3

104,200.00
1,268.00
55,200.00

Oh
Oh
Oh
Oh

M3
Kg
M3

53,000.00
59,000.00
32,000.00
64,000.00

104,200.00
1,268.00
55,200.00

Oh
Oh
Oh
Oh

39,750.00
4,425.00
48,000.00
4,800.00
96,975.00
Dibulatkan

114,620.00
148,356.00
30,967.20
32,000.00
53,000.00
59,000.00
64,000.00
293,943.20

104,200.00
37,200.00

Oh
Oh
Oh
Oh

8
Dibulatkan

114,620.00
206,684.00
28,704.00

350,008.00

1.2000 M3
0.4320 M3
0.7800
0.3900
0.0390
0.0390
1.2480

48,000.00
39,750.00
4,425.00
4,800.00
96,975.00
Dibulatkan

125,040.00
16,070.40
32,000.00
53,000.00
59,000.00
64,000.00
141,110.40

24,960.00
20,670.00
2,301.00
2,496.00
50,427.00
Dibulatkan

PEKERJAAN DINDING
1 m2 Pasang bata merah tebal 1/2 bata 1 Pc : 2 Ps
Bahan
Bata Merah Kelas I
70.0000
Semen PC Gresik
18.9500
Pasir Pasang
0.0380
Tenaga
Pekerja
0.3000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0150
0.4250
1 m2 Pasang bata merah tebal 1/2 bata 1 Pc : 3 Ps
Bahan
Bata Merah Kelas I
70.0000
Semen PC Gresik
14.3700
Pasir Pasang
0.0400
Tenaga
Pekerja
0.3000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0150
0.4250
1 m2 Pasang bata merah tebal 1/2 bata 1 Pc : 4 Ps
Bahan
Bata Merah Kelas I
70.0000
Semen PC Gresik
11.5000
Pasir Pasang
0.0430
Tenaga
Pekerja
0.3000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0150
0.4250
1 m2 Pasang bata merah tebal 1/2 bata 1 Pc : 6 Ps
Bahan
Bata Merah Kelas I
70.0000
Semen PC Gresik
8.3200
Pasir Pasang
0.0490
Tenaga
Pekerja
0.3000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0150

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

M3
Kg
M3

378.00
1,268.00
55,200.00

Oh
Oh
Oh
Oh

26,460.00
24,028.60
2,097.60
32,000.00
53,000.00
59,000.00
64,000.00
52,586.20

Bh
Kg
M3

378.00
1,268.00
55,200.00

Oh
Oh
Oh
Oh

26,460.00
18,221.16
2,208.00
32,000.00
53,000.00
59,000.00
64,000.00
46,889.16

Bh
Kg
M3

378.00
1,268.00
55,200.00

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

9,600.00
5,300.00
590.00
960.00
16,450.00
Dibulatkan

26,460.00
14,582.00
2,373.60
32,000.00
53,000.00
59,000.00
64,000.00
43,415.60

Bh
Kg
M3

9,600.00
5,300.00
590.00
960.00
16,450.00
Dibulatkan

378.00
1,268.00
55,200.00

9,600.00
5,300.00
590.00
960.00
16,450.00
Dibulatkan

26,460.00
10,549.76
2,704.80
32,000.00
53,000.00
59,000.00
64,000.00

9,600.00
5,300.00
590.00
960.00
Anal -10

23

24

E.6
3

3
0.4250

1 m2 Pasang bata merah tebal 1/2 bata 1 Pc : 3 Kp : 10 Ps


Bahan
Bata Merah Kelas I
70.0000 Bh
Semen PC Gresik
4.5000 Kg
Pasir Pasang
0.0500 M3
Kapur pasang
0.0150 M3
Tenaga
Pekerja
0.1000 Oh
Tukang
0.0100 Oh
Kepala Tukang
0.3000 Oh
Mandor
0.0150 Oh
0.4250
1 m2 Pasang dinding roster / krawang 20 X 20 cm
Bahan
Roaster beton 20 X 20
30.0000
Semen PC Gresik
11.0000
Pasir Pasang
0.0350
Tenaga
Pekerja
0.3000
Tukang
0.1000
Kepala Tukang
0.0150
Mandor
0.0150
0.4300
1 m2 Pasang dinding glass block ( 20 X 20 )cm
Bahan
Glass Block
25.0000
Semen PC Gresik
11.0000
Pasir Pasang
0.0350
Tenaga
Pekerja
0.3000
Tukang
0.1000
Kepala Tukang
0.0150
Mandor
0.0150
0.4300
PEKERJAAN PLESTERAN
1 m2 Plesteran 1 Pc : 3 Ps tebal 15 mm
Bahan
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Plesteran 1 Pc : 4 Ps tebal 15 mm
Bahan
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Plesteran 1 Pc : 6 Ps tebal 15 mm
Bahan
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Bh
Kg
M3

0.3000
0.1500
0.0150
0.0150
0.4800

0.3000
0.1500
0.0150
0.0150
0.4800

1 m2 Plesteran 1 Pc : 3 Kp : 10 Ps tebal 15 mm
Bahan
Semen PC Gresik
10.2240
Pasir Pasang
0.0200
Tenaga
Tukang
0.1500
Kepala Tukang
0.0150

20,000.00
1,268.00
55,200.00

Kg
M3

1,268.00
55,200.00

Kg
M3
Oh
Oh

129,280.00

9,600.00
5,300.00
885.00
960.00
16,745.00
Dibulatkan

515,880.00

9,600.00
5,300.00
885.00
960.00
16,745.00
Dibulatkan

9,859.97
1,269.60
32,000.00
53,000.00
59,000.00
64,000.00

1,268.00
55,200.00

11,129.568

9,600.00
7,950.00
885.00
960.00
19,395.00
Dibulatkan

7,912.32
1,324.80
32,000.00
53,000.00
59,000.00
64,000.00

1,268.00
55,200.00

9,237.12

9,600.00
7,950.00
885.00
960.00
19,395.00
Dibulatkan

5,599.49
1,490.40
32,000.00
53,000.00
59,000.00
64,000.00

1,268.00
55,200.00

Oh
Oh
Oh
Oh

42,372.00

3,200.00
530.00
17,700.00
960.00
22,390.00
Dibulatkan

500,000.00
13,948.00
1,932.00
32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

8
16,450.00
Dibulatkan

113,400.00
13,948.00
1,932.00
32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

4.4160 Kg
0.0270 M3
0.3000
0.1500
0.0150
0.0150
0.4800

3,780.00
1,268.00
55,200.00

Oh
Oh
Oh
Oh

7
39,714.56

26,460.00
5,706.00
2,760.00
7,446.00
32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

6.2400 Kg
0.0240 M3

378.00
1,268.00
55,200.00
496,400.00

Oh
Oh
Oh
Oh

7.7760 Kg
0.0230 M3

1 m2 Plesteran Beton 1 Pc : 2 Ps tebal 15 mm


Bahan
Semen PC Gresik
10.2240
Pasir Pasang
0.0200
Tenaga
Tukang
0.1500
Kepala Tukang
0.0150
Pekerja
0.3000
Mandor
0.0150
0.4800

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Bh
Kg
M3

7,089.89

9,600.00
7,950.00
885.00
960.00
19,395.00
Dibulatkan

12,964.03
1,104.00
53,000.00
59,000.00
32,000.00
64,000.00

1,268.00
55,200.00

14,068.03

7,950.00
885.00
9,600.00
960.00
19,395.00
Dibulatkan

12,964.03
1,104.00
53,000.00
59,000.00

7,950.00
885.00
Anal -11

7a

26

27

E.a
4

13

25

28

2
Pekerja
Mandor

1 m1 Benangan
Bahan
Semen PC Gresik
Pasir Pasang
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

3
4
0.2000 Oh
0.0100 Oh
0.3750

0.5000 Kg
0.0020 M3
0.0380
0.0380
0.0570
0.0020
0.1350

PEKERJAAN BETON
1 m3 Membuat lantai kerja Beton tumbuk
Bahan
Semen PC Gresik
Pasir Beton
Batu Kali Pecah 2/3 cm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m3 Membuat Beton Bertulang 1 PC : 2 PS : 3 Kr


Bahan
Semen PC Gresik
336.000
Pasir Beton
0.5400
Batu Kali Pecah 2/3 cm
0.8100
Tenaga
Pekerja
2.0000
Tukang
0.3500
Kepala Tukang
0.0350
Mandor
1.0000
3.3850

1 Kg Mengerjakan Besi Beton


Bahan
Besi Beton Polos
Kawat Ikat Beton ( Bendrat )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m2 Membuat bekesting untuk pondasi


Bahan
Kayu begesting ( Meranti )
Paku biasa
Minyak Bekisting
Tenaga
Pekerja
Tukang

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1,268.00
55,200.00

8,701.52

1,268.00
53,000.00
59,000.00
32,000.00
64,000.00

1,268.00
55,200.00
178,600.00

1,268.00
55,200.00
178,600.00

600,522.00

0.0400 M3
0.3000 Kg
0.1000 Ltr
0.5200 Oh
0.2600 Oh

36,800.00
1,060.00
118.00
384.00
38,362.00
Dibulatkan

426,048.00
29,808.00
144,666.00
32,000.00
53,000.00
59,000.00
64,000.00

11,700.00
18,900.00

Oh
Oh
Oh
Oh

5,300.00
590.00
6,400.00
640.00
12,930.00
Dibulatkan

12,680.00
1,435.20
7,858.40
32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

7,950.00
885.00
9,600.00
960.00
19,395.00
Dibulatkan

4,121.00

21,973.60

Kg
M3
M3

2,014.00
2,242.00
1,824.00
128.00
6,208.00
Dibulatkan

8,039.12
662.40
53,000.00
59,000.00
32,000.00
64,000.00

Oh
Oh
Oh
Oh

8
6,400.00
640.00
15,875.00
Dibulatkan

634.00
110.40

4,121.00

1.0500 Kg
0.0150 Kg
0.0070
0.0070
0.0007
0.0004
0.0151

14,068.03

53,000.00
59,000.00
32,000.00
64,000.00

Oh
Oh
Oh
Oh

10.000 Kg
0.0260 M3
0.0440 M3
1.1500
0.0200
0.0020
0.0060
1.1780

744.40

3.2500 Kg
0.1000
0.0100
0.2000
0.0100
0.3200

6
32,000.00
64,000.00

1,268.00
55,200.00

Oh
Oh
Oh
Oh

1 m2 Plester siar adukan 1 pc : 2 ps ( Dinding batu kali )


Bahan
Semen PC Gresik
6.3400 Kg
Pasir Pasang
0.0120 M3
Tenaga
Tukang
0.1500 Oh
Kepala Tukang
0.0150 Oh
Pekerja
0.3000 Oh
Mandor
0.0150 Oh
0.4800
1 m2 Acian
Bahan
Semen PC Gresik
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

64,000.00
18,550.00
2,065.00
64,000.00
148,615.00
Dibulatkan

12,285.00
283.50
32,000.00
53,000.00
59,000.00
64,000.00
12,568.50

3,150,000.00
14,800.00
5,600.00

224.00
371.00
41.30
25.60
661.90
Dibulatkan

126,000.00
4,440.00
560.00
32,000.00
53,000.00

16,640.00
13,780.00
Anal -12

30.a

30

31

32

2
Kepala Tukang
Mandor

1 m2
Membuat bekesting untuk Sloof / Kolom / Ring balk Praktis
Bahan
Kayu begesting ( Meranti )
0.0450 M3
3,150,000.00
Paku biasa
0.3000 Kg
14,800.00
Minyak Bekisting
0.1000 Ltr
5,600.00
Tenaga
Tukang
0.2600 Oh
Kepala Tukang
0.0260 Oh
Pekerja
0.5200 Oh
Mandor
0.0260 Oh
0.8320

1 m2
Membuat bekesting untuk Kolom Struktur
Bahan
Kayu begesting ( Meranti )
0.0400
Paku biasa
0.4000
Minyak Bekisting
0.2000
Kayu Meranti Usuk 5/7 cm
0.0150
Multipleks 122x244x9 mm
0.3500
Kayu Dolken 8-10 cm
2.0000
Tenaga
Pekerja
0.6600
Tukang
0.3300
Kepala Tukang
0.0330
Mandor
0.0330
1.0560

1 m2
Membuat bekesting untuk Balok
Bahan
Kayu tahun
Paku biasa
Minyak Bekisting
Kayu Meranti Usuk 5/7 cm
Multipleks 122x244x9 mm
Kayu Dolken 8-10 cm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m2
Membuat bekesting untuk Lantai
Bahan
Kayu tahun
Paku biasa
Minyak Bekisting
Kayu Meranti Usuk 5/7 cm
Multipleks 122x244x9 mm
Kayu Dolken 8-10 cm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

34

3
4
0.0260 Oh
0.0260 Oh
0.8320

1 m2
Membuat bekesting untuk Tangga
Bahan
Kayu tahun
Paku biasa
Minyak Bekisting
Kayu Meranti Usuk 5/7 cm
Multipleks 122x244x9 mm
Kayu Dolken 8-10 cm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

M3
Kg
Ltr
M3
Lbr
Bt

M3
Kg
Ltr
M3
Lbr
Bt

0.6600
0.3300
0.0330
1.0230

Oh
Oh
Oh
Oh

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000

M3
Kg
Ltr
M3
Lbr
Bt

0.6600
0.3300
0.0330
0.0330
1.0560

Oh
Oh
Oh
Oh

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

M3
Kg
Ltr
M3
Lbr
Bt

0.6600
0.3300
0.0330
0.0330
1.0560

Oh
Oh
Oh
Oh

8
1,534.00
1,664.00
131,000.00
33,618.00
Dipakai 3 X
Dibulatkan

141,750.00
4,440.00
560.00
53,000.00
59,000.00
32,000.00
64,000.00

3,150,000.00
14,800.00
5,600.00
4,410,000.00
138,600.00
29,800.00

Oh
Oh
Oh
Oh

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

6
59,000.00
64,000.00

13,780.00
1,534.00
16,640.00
1,664.00
146,750.00
33,618.00
Dipakai 3 X
Dibulatkan

126,000.00
5,920.00
1,120.00
66,150.00
48,510.00
59,600.00
32,000.00
53,000.00
59,000.00
64,000.00

2,000,000.00
14,800.00
5,600.00
4,410,000.00
138,600.00
29,800.00

21,120.00
17,490.00
1,947.00
2,112.00
307,300.00
42,669.00
Dipakai 3 X
Dibulatkan

80,000.00
5,920.00
1,120.00
79,380.00
48,510.00
59,600.00
32,000.00
53,000.00
59,000.00
64,000.00

2,000,000.00
14,800.00
5,600.00
4,410,000.00
138,600.00
29,800.00

21,120.00
17,490.00
1,947.00
65,472.00
274,530.00
106,029.00
549,060.00 Dipakai 3 X
Dibulatkan

80,000.00
5,920.00
1,120.00
66,150.00
48,510.00
178,800.00
32,000.00
53,000.00
59,000.00
64,000.00

2,000,000.00
14,800.00
5,600.00
4,410,000.00
138,600.00
29,800.00

21,120.00
17,490.00
1,947.00
2,112.00
380,500.00
42,669.00
Dipakai 2 X
Dibulatkan
60,000.00
5,920.00
840.00
66,150.00
48,510.00
59,600.00

32,000.00
53,000.00
59,000.00
64,000.00

21,120.00
17,490.00
1,947.00
2,112.00
241,020.00
42,669.00
Dipakai 2 X
Dibulatkan
Anal -13

1
38

1 m3

2
Membuat Pondasi beton bertulang
Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos
Membuat bekesting untuk pondasi

7
1.0000
150.0000
4.3200

8
749,137.00
13,230.00
54,872.00
Dibulatkan

39.a

1 m3

Membuat beton Sloof Praktis 10/10


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 8, 6 - 200 mm
Bekisting Sloof praktis 3 X Pakai

1.0000
192.3000
20.0000

749,137.00
13,230.00
60,122.00
Dibulatkan

39.b

1 m3

Membuat beton Sloof Praktis 15/15


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 10, 6 - 200 mm
Bekisting Sloof praktis 3 X Pakai

1.0000
136.1300
13.3300

749,137.00
13,230.00
60,122.00
Dibulatkan

39.c

1 m3

Membuat beton Sloof Praktis 15/18


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 5 10, 6 - 200 mm
Bekisting Sloof praktis 3 X Pakai

1.0000
142.9300
13.3300

749,137.00
13,230.00
60,122.00
Dibulatkan

39.d

1 m3

Membuat beton Sloof Praktis 15/20


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 5 10, 6 - 200 mm
Bekisting Sloof praktis 3 X Pakai

1.0000
126.4300
13.3300

749,137.00
13,230.00
60,122.00
Dibulatkan

39.e

1 m3

Membuat beton Sloof Struktur 15/30


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 5 12, 8 - 200 mm
Bekisting Sloof praktis 3 X Pakai

1.0000
134.8600
13.3300

749,137.00
13,230.00
60,122.00
Dibulatkan

36

1 m3

Membuat beton Strauss 25 cm


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 6 10, 8 - 150 mm

1.0000
94.7700

749,137.00
13,230.00
Dibulatkan

37.a

1 m3

Membuat plat Poer 130/60/25


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 17 10 mm
Bekisting 3 X Pakai

1.0000
148.8100
4.8700

749,137.00
13,230.00
54,872.00
Dibulatkan

37.b

1 m3

Membuat plat Poer 50/50/20


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 10 10 mm
Bekisting 3 X Pakai

1.0000
154.6000
8.0000

749,137.00
13,230.00
54,872.00
Dibulatkan

40.a

1 m3

Membuat Kolom Praktis 12/12


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 10, 6 - 200 mm
Bekisting kolom praktis 3 X Pakai

1.0000
203.5400
16.6600

749,137.00
13,230.00
60,122.00
Dibulatkan

40.b

1 m3

Membuat Kolom Struktur praktis 15/15


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 10, 6 - 150 mm
Bekisting kolom praktis 3 X Pakai

1.0000
144.7700
13.3300

749,137.00
13,230.00
60,122.00
Dibulatkan

40.c

1 m3

Membuat Kolom Struktur 15/20


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 6 10, 6 - 200 mm
Bekisting kolom struktur 3 X Pakai

1.0000
147.1000
13.3300

749,137.00
13,230.00
60,122.00
Dibulatkan

40.d

1 m3

Membuat Kolom Struktur 20/30


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 6 12, 2 10, 8 - 200 mm
Bekisting kolom struktur 3 X Pakai

1.0000
139.8900
8.3300

749,137.00
13,230.00
116,656.00
Dibulatkan

40.e

1 m3

Membuat Kolom Struktur 25/30


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 6 16, 2 10, 8 - 200 mm
Bekisting kolom struktur 3 X Pakai

1.0000
169.7100
10.6700

749,137.00
13,230.00
116,656.00
Dibulatkan

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Anal -14

1
40.f

2
1 m3

Membuat Kolom Struktur 30/30


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 6 16, 2 10, 8 - 200 mm
Bekisting kolom struktur 3 X Pakai

7
1.0000
143.5900
10.0000

8
749,137.00
13,230.00
116,656.00
Dibulatkan

41.a

1 m3

Membuat Balok Induk 20/50


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 8 16, 2 12, 8 - 200 mm
Bekisting balok 3 X Pakai

1.0000
170.5300
9.6000

749,137.00
13,230.00
126,853.00
Dibulatkan

41.b

1 m3

Membuat Balok Induk 30/40


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 8 16, 2 12, 8 - 200 mm
Bekisting balok 3 X Pakai

1.0000
141.7800
8.1700

749,137.00
13,230.00
126,853.00
Dibulatkan

41.c

1 m3

Membuat Balok Induk 30/50


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 8 16, 2 12, 8 - 200 mm
Bekisting balok 3 X Pakai

1.0000
116.0230
7.0700

749,137.00
13,230.00
126,853.00
Dibulatkan

41.d

1 m3

Membuat Balok anak 15/35


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 6 12, 2 10, 8 - 150 mm
Bekisting balok 3 X Pakai

1.0000
171.3900
13.3300

749,137.00
13,230.00
126,853.00
Dibulatkan

41.e

1 m3

Membuat Balok 20/25


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 5 12, 2 10, 8 - 150 mm
Bekisting balok 3 X Pakai

1.0000
146.1700
13.3300

749,137.00
13,230.00
126,853.00
Dibulatkan

41.f

1 m3

Membuat Balok gantung dan konsol 12/20 cm


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 10, 6 - 200 mm
Bekisting balok 3 X Pakai

1.0000
129.4600
21.6600

749,137.00
13,230.00
60,122.67
Dibulatkan

41.g

1 m3

Membuat Ring balk praktis 12/12


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 10, 6 - 200 mm
Bekisting balok 3 X Pakai

1.0000
203.5400
16.6000

749,137.00
13,230.00
60,122.00
Dibulatkan

41.h

1 m3

Membuat Ring balk praktis dan balok latay 12/15


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 4 10, 6 - 200 mm
Bekisting balok 3 X Pakai

1.0000
166.5000
16.6000

749,137.00
13,230.00
60,122.00
Dibulatkan

41.i

m3

Membuat Ring Balk 20/30


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 5 12, 8 - 150 mm
Bekisting balok 3 X Pakai

1.0000
117.5200
10.0000

749,137.00
13,230.00
60,122.67
Dibulatkan

42.a

1 m3

Membuat beton plat atap / deck t = 10 cm


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 10 - 150 mm
Bekisting plat 3 X Pakai

1.0000
182.4840
10.0000

749,137.00
13,230.00
211,584.00
Dibulatkan

42.b

1 m3

Membuat beton plat atap / deck t = 12 cm


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos 10 - 130 mm, 8 - 100 mm
Bekisting plat 3 X Pakai

1.0000
154.9470
8.3300

749,137.00
13,230.00
211,584.00
Dibulatkan

43.a

1 m3

Membuat Tangga beton bertulang


Beton Bertulang 1 PC : 2 Ps : 3 Kr
Besi polos
Bekisting plat 2 X Pakai

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1.0000
200.0000
3.8500

749,137.00
13,230.00
211,584.00
Anal -15

8
Dibulatkan

44

F.6
1

4.a

5.a

1 m3 Rabat Beton 1 Pc : 3 Ps : 6 Kr
Bahan
Semen PC Gresik
Pasir Beton
Batu Kali Pecah 2/3 cm
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

197.000 Kg
0.4700 M3
0.9400 M3
0.2500
0.0250
1.6500
0.0800
2.0050

PEKERJAAN KAYU
1 m3 Pasang kusen pintu & jendela kayu jati
Bahan
Kayu Jati Balok
1.1000
Paku biasa
1.2500
Lem kayu ( Fox )
1.0000
Tenaga
Pekerja
7.0000
Tukang
21.0000
Kepala Tukang
2.1000
Mandor
0.3500
30.4500
1 m3 Pasang kusen pintu & jendela kayu kamfer
Bahan
Kayu Kamper Balok
1.2000
Paku biasa
1.2500
Lem kayu ( Fox )
1.0000
Tenaga
Pekerja
6.0000
Tukang
18.0000
Kepala Tukang
1.8000
Mandor
0.3000
26.1000
1 m3 Pasang kusen pintu & jendela kayu Balau
Bahan
Kayu Balau
1.2000
Paku biasa
1.2500
Lem kayu ( Fox )
1.0000
Tenaga
Pekerja
6.0000
Tukang
18.0000
Kepala Tukang
1.8000
Mandor
0.3000
26.1000
1 m3 Pasang kusen pintu & jendela kayu Kruing
Bahan
Kayu Kruing Balok
1.2000
Paku biasa
1.2500
Lem kayu ( Fox )
1.0000
Tenaga
Pekerja
6.0000
Tukang
18.0000
Kepala Tukang
1.8000
Mandor
0.3000
26.1000
1 m3 Pasang kembali kusen pintu & jendela lama
Tenaga
Pekerja
6.0000
Tukang
18.0000
Kepala Tukang
1.8000
Mandor
0.3000
26.1000
1 m2 Pasang pintu panil kayu jati
Bahan
Kayu Jati Papan
Lem kayu ( Fox )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Pasang pintu panil kayu Kamper
Bahan
Kayu Kamper Papan
Lem kayu ( Fox )
Tenaga
Pekerja

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Oh
Oh
Oh
Oh

249,796.00
25,944.00
167,884.00
53,000.00
59,000.00
32,000.00
64,000.00
443,624.00

M3
Kg
Kg

25,267,900.00
14,800.00
13,000.00

Oh
Oh
Oh
Oh

M3
Kg
Kg

32,000.00
53,000.00
59,000.00
64,000.00

8,820,000.00
14,800.00
13,000.00

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

7,150,000.00
14,800.00
13,000.00

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

6,300,000.00
14,800.00
13,000.00

Oh
Oh
Oh
Oh

7,591,500.00

32,000.00
53,000.00
59,000.00
64,000.00

25,267,900.00
13,000.00

Oh
Oh
Oh
Oh

0.0400 M3
0.5000 Kg
1.0000 Oh

192,000.00
954,000.00
106,200.00
19,200.00
1,271,400.00
Dibulatkan

7,560,000.00
18,500.00
13,000.00
32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

192,000.00
954,000.00
106,200.00
19,200.00
1,271,400.00
Dibulatkan

8,580,000.00
18,500.00
13,000.00

8,611,500.00

M3
Kg
Kg

224,000.00
1,113,000.00
123,900.00
22,400.00
1,483,300.00
Dibulatkan

10,584,000.00
18,500.00
13,000.00

10,615,500.00

M3
Kg
Kg

13,250.00
1,475.00
52,800.00
5,120.00
72,645.00
Dibulatkan

27,794,690.00
18,500.00
13,000.00

27,826,190.00

0.0400 M3
0.5000 Kg
1.0000
3.0000
0.3000
0.0500
4.3500

1,268.00
55,200.00
178,600.00

192,000.00
954,000.00
106,200.00
19,200.00
1,271,400.00
Dibulatkan
192,000.00
954,000.00
106,200.00
19,200.00
1,271,400.00
Dibulatkan

1,010,716.00
6,500.00
32,000.00
53,000.00
59,000.00
64,000.00
1,017,216.00

8,820,000.00
13,000.00

32,000.00
159,000.00
17,700.00
3,200.00
211,900.00
Dibulatkan

352,800.00
6,500.00
32,000.00

32,000.00
Anal -16

5.b

5.e

6.a

6.b

6.c

8.b

2
Tukang
Kepala Tukang
Mandor
1 m2 Pasang pintu panil kayu Balau
Bahan
Kayu Balau
Lem kayu ( Fox )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Pasang kembali daun pintu lama
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

3
4
3.0000 Oh
0.3000 Oh
0.0500 Oh
4.3500

0.0400 M3
0.5000 Kg
1.0000
3.0000
0.3000
0.0500
4.3500

Oh
Oh
Oh
Oh

1.0000
3.0000
0.3000
0.0500
4.3500

Oh
Oh
Oh
Oh

359,300.00

7,150,000.00
13,000.00

1 m2 Pasang Pintu & Jendela Kaca Kayu kamfer+ kaca 5 mm


Bahan
Kayu Kamper Papan
0.0120 M3
8,820,000.00
Kaca Polos t. 5 mm
1.0000 M2
88,200.00
Lem kayu ( Fox )
0.3000 Kg
13,000.00
Tenaga
Pekerja
0.8000 Oh
Tukang
2.4000 Oh
Kepala Tukang
0.2400 Oh
Mandor
0.0400 Oh
3.4800

1 m2 Pasang Pintu & Jendela Kaca Kayu balau + kaca 5 mm


Bahan
Kayu Balau
0.0120 M3
7,150,000.00
Kaca Polos t. 5 mm
1.0000 M2
88,200.00
Lem kayu ( Fox )
0.3000 Kg
13,000.00
Tenaga
Pekerja
0.8000 Oh
Tukang
2.4000 Oh
Kepala Tukang
0.2400 Oh
Mandor
0.0400 Oh
3.4800
1 m2 Pasang Pintu & Jendela Kaca Kayu Kruing + kaca 5 mm
Bahan
Kayu Kruing Papan
0.0120 M3
6,300,000.00
Kaca Polos t. 5 mm
1.0000 M2
88,200.00
Lem kayu ( Fox )
0.3000 Kg
13,000.00
Tenaga
Pekerja
0.8000 Oh
Tukang
2.4000 Oh
Kepala Tukang
0.2400 Oh
Mandor
0.0400 Oh
3.4800
1 m2 Pasang Pintu Double Teakwood rangka kayu Kamper
Bahan
Kayu Kamper Papan
0.0250 M3
8,820,000.00
Paku biasa
0.0300 Kg
14,800.00
Lem kayu ( Fox )
0.5000 Kg
13,000.00
Teakwood 900 x 210 x 3 mm
1.0000 Lbr
55,000.00
Tenaga
Pekerja
0.7000 Oh
Tukang
2.1000 Oh

8
159,000.00
17,700.00
3,200.00
211,900.00
Dibulatkan

286,000.00
6,500.00
32,000.00
53,000.00
59,000.00
64,000.00
292,500.00

1 m2 Pasang Pintu & Jendela Kaca Kayu Jati + Kaca 5 mm


Bahan
Kayu Jati Papan
0.0120 M3 25,267,900.00
Kaca Polos t. 5 mm
1.0000 M2
88,200.00
Lem kayu ( Fox )
0.3000 Kg
13,000.00
Tenaga
Pekerja
0.8000 Oh
Tukang
2.4000 Oh
Kepala Tukang
0.2400 Oh
Mandor
0.0400 Oh
3.4800

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

6
53,000.00
59,000.00
64,000.00

32,000.00
53,000.00
59,000.00
64,000.00

32,000.00
159,000.00
17,700.00
3,200.00
211,900.00
Dibulatkan
32,000.00
159,000.00
17,700.00
3,200.00
211,900.00
Dibulatkan

303,214.80
88,200.00
3,900.00
32,000.00
53,000.00
59,000.00
64,000.00
395,314.8

25,600.00
127,200.00
14,160.00
2,560.00
169,520.00
Dibulatkan

105,840.00
88,200.00
3,900.00
32,000.00
53,000.00
59,000.00
64,000.00
197,940.00

25,600.00
127,200.00
14,160.00
2,560.00
169,520.00
Dibulatkan

85,800.00
88,200.00
3,900.00
32,000.00
53,000.00
59,000.00
64,000.00
177,900.00

25,600.00
127,200.00
14,160.00
2,560.00
169,520.00
Dibulatkan

75,600.00
88,200.00
3,900.00
32,000.00
53,000.00
59,000.00
64,000.00
167,700.00

25,600.00
127,200.00
14,160.00
2,560.00
169,520.00
Dibulatkan

220,500.00
444.00
6,500.00
55,000.00
32,000.00
53,000.00

22,400.00
111,300.00
Anal -17

8.c

8.d

10

10.a

10.b

10.c

13.a

13.c

2
Kepala Tukang
Mandor

3
4
0.2100 Oh
0.0350 Oh
3.0450

1 m2 Pasang Pintu Double Teakwood rangka kayu Kruing


Bahan
Kayu Kruing Papan
0.0250 M3
Paku biasa
0.0300 Kg
Lem kayu ( Fox )
0.5000 Kg
Teakwood 900 x 210 x 3 mm
1.0000 Lbr
Tenaga
Pekerja
0.7000 Oh
Tukang
2.1000 Oh
Kepala Tukang
0.2100 Oh
Mandor
0.0350 Oh
3.0450

1 m2 Pasang jalusi kayu kamfer


Bahan
Kayu Kamper Papan
Paku biasa
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Pasang jalusi kayu balau
Bahan
Kayu Balau
Paku biasa
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Pasang jalusi kayu Kruing
Bahan
Kayu Kruing Papan
Paku biasa
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

0.0600 M3
0.1500 Kg
0.6700
2.0000
0.2000
0.3350
3.2050

6,300,000.00
14,800.00
13,000.00
55,000.00

0.6700
2.0000
0.2000
0.3350
3.2050

219,444.00

0.0600 M3
0.1500 Kg
0.6700
2.0000
0.2000
0.3350
3.2050

0.0600 M3
0.1500 Kg
0.6700
2.0000
0.2000
0.3350
3.2050

1 m2 Pasang Konstruksi Kuda - kuda kayu Kamper


Bahan
Kayu Kamper Balok
1.1000
Besi Plat Strip ( konstruksi )
15.0000
Paku biasa
5.6000
Tenaga
Pekerja
4.0000
Tukang
12.0000
Kepala Tukang
1.2000
Mandor
0.2000
17.4000

8,820,000.00
14,800.00

1,518,294.00

21,440.00
106,000.00
11,800.00
21,440.00
160,680.00
Dibulatkan

529,200.00
2,220.00
32,000.00
53,000.00
59,000.00
64,000.00

7,150,000.00
14,800.00

531,420.00

21,440.00
106,000.00
11,800.00
21,440.00
160,680.00
Dibulatkan

429,000.00
2,220.00
32,000.00
53,000.00
59,000.00
64,000.00

6,300,000.00
14,800.00

431,220.00

21,440.00
106,000.00
11,800.00
21,440.00
160,680.00
Dibulatkan

378,000.00
2,220.00
32,000.00
53,000.00
59,000.00
64,000.00

M3
Kg
Kg

8,820,000.00
12,700.00
14,800.00

Oh
Oh
Oh
Oh

259,444.00

22,400.00
111,300.00
12,390.00
2,240.00
148,330.00
Dibulatkan

1,516,074.00
2,220.00

Oh
Oh
Oh
Oh

1 m3 Pasang Konstruksi Kuda - kuda kayu Balau


Bahan
Kayu Balau
1.1000 M3
Besi Plat Strip ( konstruksi )
15.0000 Kg
Paku biasa
5.6000 Kg

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

32,000.00
53,000.00
59,000.00
64,000.00

32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

22,400.00
111,300.00
12,390.00
2,240.00
148,330.00
Dibulatkan

157,500.00
444.00
6,500.00
95,000.00

25,267,900.00
14,800.00

Oh
Oh
Oh
Oh

8
12,390.00
2,240.00
148,330.00
Dibulatkan

157,500.00
444.00
6,500.00
55,000.00
32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

0.0600 M3
0.1500 Kg

7
282,444.00

1 m2 Pas. Pintu Double Teakwood Lps Almunium rangk. Ky.Kruing


Bahan
Kayu Kruing Papan
0.0250 M3
6,300,000.00
Paku biasa
0.0300 Kg
14,800.00
Lem kayu ( Fox )
0.5000 Kg
13,000.00
Teakwood Lps Almunium
1.0000 Lbr
95,000.00
Tenaga
Pekerja
0.7000 Oh
Tukang
2.1000 Oh
Kepala Tukang
0.2100 Oh
Mandor
0.0350 Oh
3.0450
1 m2 Pasang jalusi kayu jati
Bahan
Kayu Jati Papan
Paku biasa
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

6
59,000.00
64,000.00

32,000.00
53,000.00
59,000.00
64,000.00

380,220.00

9,702,000.00
190,500.00
82,880.00
128,000.00
636,000.00
70,800.00
12,800.00
847,600.00

7,150,000.00
12,700.00
14,800.00

21,440.00
106,000.00
11,800.00
21,440.00
160,680.00
Dibulatkan

9,975,380.00
Dibulatkan

7,865,000.00
190,500.00
82,880.00
Anal -18

13.b

13.d

15.a

15.c

15.b

15.d

17.b

2
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

3
4.0000
12.0000
1.2000
0.2000
17.4000

1 m3 Pasang Konstruksi Kuda - kuda kayu Kruing


Bahan
Kayu Kruing Balok
1.1000
Besi Plat Strip ( konstruksi )
15.0000
Paku biasa
5.6000
Tenaga
Pekerja
4.0000
Tukang
12.0000
Kepala Tukang
1.2000
Mandor
0.2000
17.4000

4
Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

1 m3 Pasang Konstruksi Gording kayu Balau


Bahan
Kayu Balau
1.1000
Besi Plat Strip ( konstruksi )
15.0000
Paku biasa
3.0000
Tenaga
Pekerja
2.4000
Tukang
7.2000
Kepala Tukang
0.7200
Mandor
0.1200
10.4400
1 m3 Pasang Konstruksi Gording kayu Kruing
Bahan
Kayu Kruing Balok
1.1000
Besi Plat Strip ( konstruksi )
15.0000
Paku biasa
3.0000
Tenaga
Pekerja
2.4000
Tukang
7.2000
Kepala Tukang
0.7200
Mandor
0.1200
10.4400

1 m3 Pasang kembali Konstruksi Gording kayu lama


Bahan
Besi Strip 2 X 3 ( tralis )
15.0000 M1
Paku biasa
3.0000 Kg
Tenaga
Pekerja
2.4000 Oh
Tukang
7.2000 Oh
Kepala Tukang
0.7200 Oh
Mandor
0.1200 Oh
10.4400
1 m2 Pasang Kasau + reng kayu ( Kruing - Jati )
Bahan
Kayu Kruing Usuk 5/7 cm
0.0140 M3
Kayu Jati reng 3/5 cm
0.0072 M3
Paku biasa
0.2500 Kg

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

128,000.00
636,000.00
70,800.00
12,800.00
847,600.00

32,000.00
53,000.00
59,000.00
64,000.00

8,820,000.00
12,700.00
14,800.00

7,150,000.00
12,700.00
14,800.00

6,300,000.00
12,700.00
14,800.00

4,500.00
14,800.00

8,099,900.00
Dibulatkan

7,164,900.00
Dibulatkan

67,500.00
44,400.00
76,800.00
381,600.00
42,480.00
7,680.00
508,560.00

6,300,000.00
15,606,300.00
14,800.00

9,936,900.00
Dibulatkan

6,930,000.00
190,500.00
44,400.00
76,800.00
381,600.00
42,480.00
7,680.00
508,560.00

32,000.00
53,000.00
59,000.00
64,000.00

202,340.00
Dibulatkan

7,865,000.00
190,500.00
44,400.00
76,800.00
381,600.00
42,480.00
7,680.00
508,560.00

32,000.00
53,000.00
59,000.00
64,000.00

7,203,380.00
Dibulatkan

9,702,000.00
190,500.00
44,400.00
76,800.00
381,600.00
42,480.00
7,680.00
508,560.00

32,000.00
53,000.00
59,000.00
64,000.00

8,138,380.00
Dibulatkan

190,500.00
11,840.00
128,000.00
636,000.00
70,800.00
12,800.00
847,600.00

32,000.00
53,000.00
59,000.00
64,000.00

6,930,000.00
190,500.00
82,880.00

12,700.00
14,800.00

M3
Kg
Kg
Oh
Oh
Oh
Oh

128,000.00
636,000.00
70,800.00
12,800.00
847,600.00

32,000.00
53,000.00
59,000.00
64,000.00

M3
Kg
Kg
Oh
Oh
Oh
Oh

6,300,000.00
12,700.00
14,800.00

M3
Kg
Kg
Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

M3
Kg
Kg

1 m3 Pasang Kembali Konstruksi Kuda - kuda kayu lama


Bahan
Besi Plat Strip ( konstruksi )
15.0000 Kg
Paku biasa
0.8000 Kg
Tenaga
Pekerja
4.0000 Oh
Tukang
12.0000 Oh
Kepala Tukang
1.2000 Oh
Mandor
0.2000 Oh
17.4000
1 m3 Pasang Konstruksi Gording kayu Kamper
Bahan
Kayu Kamper Balok
1.1000
Besi Plat Strip ( konstruksi )
15.0000
Paku biasa
3.0000
Tenaga
Pekerja
2.4000
Tukang
7.2000
Kepala Tukang
0.7200
Mandor
0.1200
10.4400

111,900.00
Dibulatkan

88,200.00
112,365.36
3,700.00
Anal -19

17.a

17.c

17.d

17.e

19.b

19.c

19.d

2
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

3
0.1000
0.1000
0.0100
0.0050
0.2150

1 m2 Pasang Kasau + reng kayu ( Kruing - kruing )


Bahan
Kayu Kruing Usuk 5/7 cm
0.0140
Kayu Kruing Reng 3/5 cm
0.0036
Paku biasa
0.2500
Tenaga
Pekerja
0.1000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0050
0.2150
1 m2 Pasang Kasau + reng kayu ( Meranti - kruing )
Bahan
Kayu Meranti Usuk 5/7 cm
0.0140
Kayu Meranti Reng 3/5 cm
0.0036
Paku biasa
0.2500
Tenaga
Pekerja
0.1000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0050
0.2150
1 m2 Pasang kembali Kasau + reng kayu lama
Bahan
Paku biasa
0.1500
Tenaga
Pekerja
0.1000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0050
0.2150
1 m2 Pasang kembali Kasau + reng kayu baru
Bahan
Kayu Kruing Reng 3/5 cm
0.0050
Paku biasa
0.1500
Tenaga
Pekerja
0.1000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0050
0.2150
1 m2 Pas rangka langit - langit 1 x 1 m kayu Kruing
Bahan
Kayu Kruing Usuk 4/6 cm
0.0108
Paku biasa
0.2000
Tenaga
Pekerja
0.1500
Tukang
0.3000
Kepala Tukang
0.0300
Mandor
0.0750
0.5550
1 m2 Pas rangka langit - langit 1 x 1 m kayu Meranti
Bahan
Kayu Meranti Usuk 4/6 cm
0.0108
Paku biasa
0.2000
Tenaga
Pekerja
0.1500
Tukang
0.3000
Kepala Tukang
0.0300
Mandor
0.0750
0.5550
1 m2 Pas rangka langit - langit 1 x 1 m kayu Tahun
Bahan
Kayu tahun
0.0108
Paku biasa
0.2000
Tenaga
Pekerja
0.1500
Tukang
0.3000
Kepala Tukang
0.0300
Mandor
0.0750
0.5550

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

4
Oh
Oh
Oh
Oh

5
32,000.00
53,000.00
59,000.00
64,000.00

M3
M3
Kg
Oh
Oh
Oh
Oh

3,200.00
5,300.00
590.00
320.00
9,410.00

32,000.00
53,000.00
59,000.00
64,000.00

4,410,000.00
14,800.00

33,720.00
Dibulatkan

71,000.00
Dibulatkan
47,628.00
2,960.00

4,800.00
15,900.00
1,770.00
4,800.00
27,270.00

2,000,000.00
14,800.00
32,000.00
53,000.00
59,000.00
64,000.00

2,220.00
Dibulatkan

68,040.00
2,960.00
4,800.00
15,900.00
1,770.00
4,800.00
27,270.00

32,000.00
53,000.00
59,000.00
64,000.00

81,316.00
Dibulatkan

31,500.00
2,220.00

6,300,000.00
14,800.00

M3
Kg
Oh
Oh
Oh
Oh

3,200.00
5,300.00
590.00
320.00
9,410.00

32,000.00
53,000.00
59,000.00
64,000.00

114,580.00
Dibulatkan

2,220.00

6,300,000.00
14,800.00

M3
Kg
Oh
Oh
Oh
Oh

3,200.00
5,300.00
590.00
320.00
9,410.00

32,000.00
53,000.00
59,000.00
64,000.00

204,265.36
Dibulatkan

61,740.00
15,876.00
3,700.00

14,800.00

M3
Kg
Oh
Oh
Oh
Oh

3,200.00
5,300.00
590.00
320.00
9,410.00

32,000.00
53,000.00
59,000.00
64,000.00

88,200.00
22,680.00
3,700.00

4,410,000.00
4,410,000.00
14,800.00

Kg
Oh
Oh
Oh
Oh

3,200.00
5,300.00
590.00
320.00
9,410.00

32,000.00
53,000.00
59,000.00
64,000.00

Kg
Oh
Oh
Oh
Oh

6,300,000.00
6,300,000.00
14,800.00

M3
M3
Kg
Oh
Oh
Oh
Oh

50,588.00
Dibulatkan
21,600.00
2,960.00

4,800.00
15,900.00
1,770.00
4,800.00
27,270.00

24,560.00
Dibulatkan
Anal -20

1
19.e

21.a

21.b

21.c

21.d

22

23

G.6
2

2
3
4
1 m2 Pas kembali rangka langit - langit 1 x 1 m kayu lama
Bahan
Paku biasa
0.1000 Kg
Tenaga
Pekerja
0.1500 Oh
Tukang
0.3000 Oh
Kepala Tukang
0.0300 Oh
Mandor
0.0750 Oh
0.5550
1 m1 Pasang lisplank uk. 3 x 20 cm, kayu kamfer
Bahan
Kayu Kamper Papan
0.0108
Paku biasa
0.1000
Tenaga
Pekerja
0.1000
Tukang
0.2000
Kepala Tukang
0.0200
Mandor
0.0050
0.3250
1 m1 Pasang lisplank uk. 3 x 20 cm, kayu Kruing
Bahan
Kayu Kruing Papan
0.0108
Paku biasa
0.1000
Tenaga
Pekerja
0.1000
Tukang
0.2000
Kepala Tukang
0.0200
Mandor
0.0050
0.3250
1 m1 Pasang lisplank uk. 3 x 20 cm, kayu balau
Bahan
Kayu Balau
0.0108
Paku biasa
0.1000
Tenaga
Pekerja
0.1000
Tukang
0.2000
Kepala Tukang
0.0200
Mandor
0.0050
0.3250
1 m1 Pasang kembali lisplank kayu lama
Bahan
Paku biasa
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m1 Pasang papan reuter
Bahan
Kayu tahun
Paku biasa
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor
1 m1 Pasang papan kompres
Bahan
Kayu Kamper Papan
Seng datar BJLS 30 ( 0,2x 1,0 ) )
Paku biasa
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

PEKERJAAN PENUTUP ATAP


1 m2 Pasang atap genteng kodok
Bahan
Genteng Kodok ( Eks. Trenggalek
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

25.0000

Bj

0.1500
0.0750
0.0080
0.0080

Oh
Oh
Oh
Oh

3,200.00
10,600.00
1,180.00
320.00
15,300.00

53,000.00
59,000.00
32,000.00
64,000.00

8,820,000.00
10,193.00
14,800.00

9,880.00
Dibulatkan
18,522.00
2,038.60
1,480.00

7,950.00
2,360.00
6,400.00
1,280.00
17,990.00

1,300.00
32,000.00
53,000.00
59,000.00
64,000.00

740.00
Dibulatkan
8,400.00
1,480.00

7,950.00
2,360.00
6,400.00
1,280.00
17,990.00

53,000.00
59,000.00
32,000.00
64,000.00

78,700.00
Dibulatkan
740.00

2,000,000.00
14,800.00

0.0021 M3
0.2000 M1
0.1000 Kg
0.1500
0.0400
0.2000
0.0200
0.4100

3,200.00
10,600.00
1,180.00
320.00
15,300.00

32,000.00
53,000.00
59,000.00
64,000.00

69,520.00
Dibulatkan
77,220.00
1,480.00

14,800.00

0.0042 M3
0.1000 Kg
0.1500
0.0400
0.2000
0.0200
0.4100

3,200.00
10,600.00
1,180.00
320.00
15,300.00

32,000.00
53,000.00
59,000.00
64,000.00

96,736.00
Dibulatkan

68,040.00
1,480.00

7,150,000.00
14,800.00

0.0500 Kg
0.1000
0.2000
0.0200
0.0050
0.3250

3,200.00
10,600.00
1,180.00
320.00
15,300.00

32,000.00
53,000.00
59,000.00
64,000.00

1,480.00
Dibulatkan

95,256.00
1,480.00

6,300,000.00
14,800.00

M3
Kg
Oh
Oh
Oh
Oh

4,800.00
15,900.00
1,770.00
4,800.00
27,270.00

32,000.00
53,000.00
59,000.00
64,000.00

8
1,480.00

8,820,000.00
14,800.00

M3
Kg
Oh
Oh
Oh
Oh

14,800.00

M3
Kg
Oh
Oh
Oh
Oh

22,040.60
Dibulatkan

32,500.00
4,800.00
3,975.00
472.00
512.00
Anal -21

1
2.a

2
1 m2 Pasang kembali atap genteng lama
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

3
0.2410

0.1500
0.0750
0.0080
0.0080
0.2410

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

7
9,759.00

8
32,500.00
Dibulatkan

4,800.00
3,975.00
472.00
512.00
9,759.00
Dibulatkan

H.6
1

1.a

1.b

1.c

10

I.6
1

1 m1 Pasang bubung genteng kodok


Bahan
Genteng Wuwung kodok ( Eks. Tr
Semen PC Gresik
Pasir Beton
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
PEKERJAAN LANGIT - LANGIT
1 m2 Pasang langit - langit asbest 1 x 1 m
Bahan
Eternit gresik
Paku Tripleks
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

5.0000 Bj
10.8000 Kg
0.0320 M3
0.4000
0.2000
0.0200
0.0020
0.6220

Oh
Oh
Oh
Oh

4,410.00
1,268.00
55,200.00
32,000.00
53,000.00
59,000.00
64,000.00

1.1000 Lbr
0.0100 Kg
0.0300
0.0700
0.0070
0.0040
0.1110

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

1 m2 Pasang langit - langit asbest 1 x 1 m Rangka Kayu Meranti


Bahan
Kayu Meranti Usuk 4/6 cm
0.0108 M3
Paku biasa
0.2000 Kg
Eternit gresik
1.1000 Lbr
Paku Tripleks
0.0100 Kg
Tenaga
Pekerja
0.1800 Oh
32,000.00
Tukang
0.3200 Oh
53,000.00
Kepala Tukang
0.0320 Oh
59,000.00
Mandor
0.0790 Oh
64,000.00
0.6110

1 m1 Pasang list kayu profil


Bahan
List kayu profil
Paku biasa
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

12,800.00
10,600.00
1,180.00
128.00
24,708.00

13,330.00
14,800.00

1 m2 Pasang langit - langit asbest 1 x 1 m Rangka Kayu Kruing


Bahan
Kayu Kruing Usuk 4/6 cm
0.0108 M3
Paku biasa
0.2000 Kg
Eternit gresik
1.1000 Lbr
Paku Tripleks
0.0100 Kg
Tenaga
Pekerja
0.1800 Oh
32,000.00
Tukang
0.3200 Oh
53,000.00
Kepala Tukang
0.0320 Oh
59,000.00
Mandor
0.0790 Oh
64,000.00
0.6110

1 m2 Pasang langit - langit asbest 1 x 1 m


Bahan
Kayu tahun
Paku biasa
Eternit gresik
Paku Tripleks
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

22,050.00
13,694.40
1,766.40

37,510.80
Dibulatkan

14,663.00
148.00
960.00
3,710.00
413.00
256.00
5,339.00

6,300,000.00
14,800.00
13,330.00
14,800.00

14,811.00
Dibulatkan

68,040.00
2,960.00
14,663.00
148.00
5,760.00
16,960.00
1,888.00
5,056.00
29,664.00

4,410,000.00
14,800.00
13,330.00
14,800.00

85,811.00
Dibulatkan
47,628.00
2,960.00
14,663.00
148.00

5,760.00
16,960.00
1,888.00
5,056.00
29,664.00

65,399.00
Dibulatkan

Rangka Kayu Tahun


0.0108
0.2000
1.1000
0.0100

M3
Kg
Lbr
Kg

0.1800
0.3200
0.0320
0.0790
0.6110

Oh
Oh
Oh
Oh

2,000,000.00
14,800.00
13,330.00
14,800.00
32,000.00
53,000.00
59,000.00
64,000.00

1.0500 M1
0.0100 Kg
0.0500
0.0500
0.0050
0.0030
0.1080

Oh
Oh
Oh
Oh

21,600.00
2,960.00
14,663.00
148.00
5,760.00
16,960.00
1,888.00
5,056.00
29,664.00

3,800.00
14,800.00
32,000.00
53,000.00
59,000.00
64,000.00

39,371.00
Dibulatkan
3,990.00
148.00

1,600.00
2,650.00
295.00
192.00
4,737.00

4,138.00
Dibulatkan

PEKERJAAN PIPA DAN SANITASI


1 bh
Pasang Closed Duduk porselin
Bahan

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Anal -22

17

2
Closed duduk keramik ( monobloc
Perlengkapan 6 %
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang Closed jongkok porselin
Bahan
Closed jongkok keramik
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 bh
Pasang Urinoir
Bahan
Urinoir
Perlengkapan
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 bh
Pasang Wastafel
Bahan
Wastafel besar warna
Perlengkapan
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

3
4
1.0000 Bh
0.0600 Set
3.3000
1.1000
0.0110
0.1600
4.5710

1.0000
1.5000
0.1500
0.1600
2.8100

Oh
Oh
Oh
Oh

1.0000
0.3000
6.0000
0.0100

Bh
Set
Kg
M3

1.0000
1.0000
0.1000
0.1000
2.2000

Oh
Oh
Oh
Oh

1.0000
0.1200
6.0000
0.0100

Bh
Bh
Kg
M3

1.2000
1.4500
0.1500
0.1000
2.9000

Oh
Oh
Oh
Oh

1 bh
Pasang Bak Mandi Bata vol. 0,30 m3
Bahan
Bata Merah Kelas I
300.0000
Semen PC Gresik
120.0000
Pasir Pasang
0.3000
Keramik 20 x 25 cm
4.1860
Semen warna
6.0000
Tenaga
Pekerja
6.0000
Tukang
3.0000
Kepala Tukang
0.3000
Mandor
0.3000
9.6000
1 bh
Pasang bak kontrol 45 x 45 cm t. 50 cm
Bahan
Bata Merah Kelas I
187.5000
Semen PC Gresik
77.0000
Pasir Pasang
0.1300
Batu Kali Pecah 2/3 cm
0.0200
Besi Beton Polos
2.6000
Pasir Beton
0.0900
Tenaga
Pekerja
3.2000
Tukang
1.0150
Kepala Tukang
0.0015
Mandor
0.0160
4.2325

32,000.00
79,500.00
8,850.00
10,240.00
130,590.00

32,000.00
53,000.00
59,000.00
64,000.00

148,800.00
17,856.00
1,268.00
55,200.00

257,100.00
46,278.00

378.00
1,268.00
55,200.00
56,600.00
4,500.00

159,102.72
Dibulatkan

265,430.04
Dibulatkan
113,400.00
152,160.00
16,560.00
236,927.60
27,000.00

192,000.00
159,000.00
17,700.00
19,200.00
387,900.00

378.00
1,268.00
55,200.00
178,600.00
11,700.00
55,200.00
32,000.00
53,000.00
59,000.00
64,000.00

362,410.00
Dibulatkan

257,100.00
8,330.04
57,600.00
143,100.00
31,860.00
7,040.00
239,600.00

32,000.00
53,000.00
59,000.00
64,000.00

121,560.00
Dibulatkan

148,800.00
2,142.72
7,608.00
552.00
38,400.00
76,850.00
8,850.00
6,400.00
130,500.00

32,000.00
53,000.00
59,000.00
64,000.00

1,306,586.84
Dibulatkan

325,000.00
29,250.00
7,608.00
552.00
32,000.00
53,000.00
5,900.00
6,400.00
97,300.00

32,000.00
53,000.00
59,000.00
64,000.00

8
1,301,900.00
4,686.84

113,400.00
7,608.00
552.00

325,000.00
97,500.00
1,268.00
55,200.00

Bh
Kg
M3
M3
Kg
M3
Oh
Oh
Oh
Oh

105,600.00
58,300.00
649.00
10,240.00
174,789.00

32,000.00
53,000.00
59,000.00
64,000.00

Bh
Kg
M3
M2
Kg
Oh
Oh
Oh
Oh

113,400.00
1,268.00
55,200.00

Bh
Set
Oh
Oh
Oh
Oh

6
1,301,900.00
78,114.00

32,000.00
53,000.00
59,000.00
64,000.00

1.0000 Bh
6.0000 Kg
0.0100 M3

1 bh
Pasang Bak Mandi Fiber glass vol. 0,30 m3
Bahan
Bak Mandi Fiberglass
1.0000
Perlengkapan
0.1800
Tenaga
Pekerja
1.8000
Tukang
2.7000
Kepala Tukang
0.5400
Mandor
0.1100
5.1500

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Oh
Oh
Oh
Oh

546,047.60
Dibulatkan
70,875.00
97,636.00
7,176.00
3,572.00
30,420.00
4,968.00

102,400.00
53,795.00
88.50
1,024.00
157,307.50

214,647.00
Anal -23

1
22.a

25

26

29

31

32

34

35

2
1 m1 Pasang Pipa GIP 2"
Bahan
Pipa Galvanis 2 " ( BSA )
Perlengkapan
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

0.1080
0.1800
0.0180
0.0054
0.3114

1 m1 Pasang Pipa PVC tipe AW diameter 3/4"


Bahan
Pipa PVC 3/4" type AW ( Maspion
1.2000
Perlengkapan 35%
0.3500
Tenaga
Pekerja
0.0360
Tukang
0.0600
Kepala Tukang
0.0060
Mandor
0.0018
0.1038

1 m1 Pasang Pipa PVC tipe D diameter 3"


Bahan
Pipa PVC D 3" ( Maspion )
Perlengkapan
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m1 Pasang Pipa PVC tipe D diameter 4"


Bahan
Pipa PVC D 4" ( Maspion )
Perlengkapan
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang Kitchen Set Stainless Steel
Bahan
Kitchen Set Stainless Steel
Waterdrain + asesories
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang kran dia 3/4" atau 1/2"
Bahan
Kran air
Sealtape
Tenaga
Pekerja

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1.2000 M1
0.3500 Bh

1 m1 Pasang Pipa PVC tipe AW diameter 1/2"


Bahan
Pipa PVC 1/2" type AW ( Maspion
1.2000
Perlengkapan 35%
0.3500
Tenaga
Pekerja
0.0360
Tukang
0.0600
Kepala Tukang
0.0060
Mandor
0.0018
0.1038

1 m1 Pasang Pipa PVC tipe D diameter 2"


Bahan
Pipa PVC 2" type D ( Maspion )
Perlengkapan 35%
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

2,592.00
7,155.00
796.50
262.40
10,805.90

32,000.00
53,000.00
59,000.00
64,000.00

28,044.94
Dibulatkan
215,800.00
111,600.00

960.00
15,900.00
1,770.00
96.00
18,726.00

17,900.00
3,810.00
32,000.00

18,746.44
Dibulatkan

25,447.20
2,597.74

215,800.00
111,600.00

1.0000 Bh
0.0250 Roll
0.0100 Oh

2,592.00
7,155.00
796.50
262.40
10,805.90

32,000.00
53,000.00
59,000.00
64,000.00

13,420.73
Dibulatkan
17,010.00
1,736.44

21,206.00
7,422.10

1.0000 Bh
1.0000 Set
0.0300
0.3000
0.0300
0.0015
0.3615

1,728.00
4,770.00
531.00
172.80
7,201.80

32,000.00
53,000.00
59,000.00
64,000.00

9,376.53
Dibulatkan
12,177.60
1,243.13

14,175.00
4,961.25

1.2000 M1
0.3500 Bh
0.0810
0.1350
0.0135
0.0041
0.2336

1,152.00
3,180.00
354.00
115.20
4,801.20

32,000.00
53,000.00
59,000.00
64,000.00

8,126.76
Dibulatkan

8,508.00
868.53

10,148.00
3,551.80

1.2000 M1
0.3500 Bh
0.0810
0.1350
0.0135
0.0041
0.2336

1,152.00
3,180.00
354.00
115.20
4,801.20

32,000.00
53,000.00
59,000.00
64,000.00

137,473.88
Dibulatkan

7,374.00
752.76

7,090.00
2,481.50

1.2000 M1
0.3500 BH
0.0540
0.0900
0.0090
0.0027
0.1557

3,456.00
9,540.00
1,062.00
345.60
14,403.60

32,000.00
53,000.00
59,000.00
64,000.00

8
Dibulatkan

124,740.00
12,733.88

6,145.00
2,150.75

M1
Bh
Oh
Oh
Oh
Oh

103,950.00
36,382.50

M1
Bh
Oh
Oh
Oh
Oh

327,400.00
Dibulatkan
17,900.00
95.25

320.00
Anal -24

36

J.6
2

10

11

13

13.a

17

2
Tukang
Kepala Tukang
Mandor

1 bh
Pasang floor drain
Bahan
Floor draine
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

3
4
0.1000 Oh
0.0100 Oh
0.0050 Oh
0.1250

1.0000 Bh
0.0100
0.1000
0.0100
0.0050
0.1250

PEKERJAAN BESI DAN ALUMINIUM


1 Kg Pasang Rangka Kuda - kuda Baja IWF
Bahan
Besi Profil WF 200 mm s/d 400 mm 1.1500
Tenaga
Pekerja
0.0600
Tukang
0.0600
Kepala Tukang
0.0060
Mandor
0.0030
0.1290
1 m2 Pasang Pintu Rolling Door Alumunium
Bahan
Rolling Door Alumunium
1.0000
Tenaga
Pekerja
1.0000
Tukang
1.0000
Kepala Tukang
0.1000
Mandor
0.0500
2.1500

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

1 m2 Pasang Pintu Kaca rangka Alumunium


Bahan
Pintu Alumunium
4.4000
Profil Kaca
4.5000
Kaca Polos t. 5 mm
1.1000
Sealent
0.2700
Tenaga
Pekerja
0.0850
Tukang
0.0850
Kepala Tukang
0.0080
Mandor
0.0040
0.1820
1 m2 Pasang Jendela Kaca rangka Alumunium
Bahan
Jendela Alumunium
4.4000
Profil Kaca
4.5000
Kaca Polos t. 5 mm
1.1000
Sealent
0.2700
Tenaga
Pekerja
0.0850
Tukang
0.0850
Kepala Tukang
0.0080
Mandor
0.0040
0.1820

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

32,000.00
53,000.00
59,000.00
64,000.00

472,500.00

166,375.00
485.00
30,250.00

114,950.00
2,300.00
88,200.00
30,250.00

M2
M1
M2
Tube
Oh
Oh
Oh
Oh

94,500.00
2,300.00
88,200.00
30,250.00

1.1000 M2
10.0000 Bh
3.6000 Kg
0.3000
0.3000
0.0300
0.0150
0.6450

Oh
Oh
Oh
Oh

185,797.50
Dibulatkan

621,317.50
Dibulatkan
415,800.00
10,350.00
97,020.00
8,167.50

2,720.00
4,505.00
472.00
256.00
7,953.00

306,000.00
60.00
12,700.00
32,000.00
53,000.00
59,000.00
64,000.00

472,500.00
Dibulatkan

505,780.00
10,350.00
97,020.00
8,167.50
2,720.00
4,505.00
472.00
256.00
7,953.00

32,000.00
53,000.00
59,000.00
64,000.00

12,880.00
Dibulatkan

183,012.50
970.00
1,815.00
1,376.00
2,279.00
253.70
134.40
4,043.10

32,000.00
53,000.00
59,000.00
64,000.00

17,900.00
Dibulatkan

472,500.00
32,000.00
53,000.00
5,900.00
3,200.00
94,100.00

32,000.00
53,000.00
59,000.00
64,000.00

17,995.25
Dibulatkan

12,880.00
1,920.00
3,180.00
354.00
192.00
5,646.00

32,000.00
53,000.00
59,000.00
64,000.00

17,900.00
320.00
5,300.00
590.00
320.00
6,530.00

32,000.00
53,000.00
59,000.00
64,000.00

M2
M1
M2
Tube
Oh
Oh
Oh
Oh

7
5,300.00
590.00
320.00
6,530.00

11,200.00

M2
Oh
Oh
Oh
Oh

17,900.00

Kg

1 m2 Pasang Kusen Pintu/ jendela Kaca Alumunium


Bahan
Kusen profil Alumunium ( YKK )
1.1000 M1
Fiser
2.0000 Bh
Sealent
0.0600 Tube
Tenaga
Pekerja
0.0430 Oh
Tukang
0.0430 Oh
Kepala Tukang
0.0043 Oh
Mandor
0.0021 Oh
0.0924

1 m2 Pasang jendela Naco & tralis


Bahan
Kaca Nako + Rangka
Paku Skrup
Besi Plat Strip ( konstruksi )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

5
53,000.00
59,000.00
64,000.00

531,337.50
Dibulatkan
336,600.00
600.00
45,720.00

9,600.00
15,900.00
1,770.00
960.00
28,230.00

382,920.00
Dibulatkan
Anal -25

1
17.a

18

K.6
2

2.a

12

2
1 m2 Pasang jendela Naco kaca 5 mm
Bahan
Kaca Nako + Rangka
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

1.0000 M2
0.1500
0.0150
0.0150
0.0008
0.1808

Oh
Oh
Oh
Oh

1 m1 Pasang talang datar/ juray seng BJLS 28 lebar 90 cm


Bahan
Seng datar BJLS 30 ( 0,9x 1,0 ) )
1.0500 M1
Paku biasa
0.0150 Kg
Kayu begesting ( Meranti )
0.0190 M3
Tenaga
Tukang
0.4000 Oh
Kepala Tukang
0.0250 Oh
Pekerja
0.2000 Oh
Mandor
0.0100 Oh
0.6350
PEKERJAAN PENGUNCI DAN KACA
1 bh
Pasang kunci tanam biasa
Bahan
Kunci Pintu 2x putar ( Kuda Terba
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 bh
Pasang kunci tanam KM/WC
Bahan
Kunci KM/WC
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor
1 bh
Pasang engsel pintu kuningan
Bahan
Engsel Pintu kuningan ( Arch )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang engsel jendela
Bahan
Engsel jendela
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang Hak angin
Bahan
Hak angin
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang Handel Pintu
Bahan
Handle pintu
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Oh
Oh
Oh
Oh

53,000.00
59,000.00
32,000.00
64,000.00

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

480.00
6,625.00
767.00
480.00
8,352.00

32,000.00
53,000.00
59,000.00
64,000.00

1,260.00

4,410.00
Dibulatkan
1,260.00

320.00
5,300.00
590.00
32.00
6,242.00

110,000.00
32,000.00
53,000.00
59,000.00
64,000.00

12,500.00
Dibulatkan
4,410.00

320.00
5,300.00
590.00
32.00
6,242.00

32,000.00
53,000.00
59,000.00
64,000.00

33,700.00
Dibulatkan
12,500.00

4,410.00

1.0000 Bh
0.0500
0.1000
0.0100
0.0025
0.1625

26,500.00
295.00
160.00
160.00
27,115.00

32,000.00
53,000.00
59,000.00
64,000.00

56,700.00
Dibulatkan

33,700.00

12,500.00

1.0000 Bh
0.0100
0.1000
0.0100
0.0005
0.1205

320.00
31,800.00
3,540.00
320.00
35,980.00

53,000.00
59,000.00
32,000.00
64,000.00

103,857.00
Dibulatkan

56,700.00

33,700.00

1.0000 Bh
0.0100
0.1000
0.0100
0.0005
0.1205

21,200.00
1,475.00
6,400.00
640.00
29,715.00

32,000.00
53,000.00
59,000.00
64,000.00

306,000.00
Dibulatkan

43,785.00
222.00
59,850.00

56,700.00

1.0000 Bh
0.0150
0.1250
0.0130
0.0075
0.1605

7,950.00
885.00
480.00
48.00
9,363.00

53,000.00
59,000.00
32,000.00
64,000.00

306,000.00

41,700.00
14,800.00
3,150,000.00

1.0000 Bh
0.5000
0.0050
0.0050
0.0025
0.5125

306,000.00

1.0000 Bh
0.0100
0.6000
0.0600
0.0050
0.6750

1,260.00
Dibulatkan
110,000.00

1,600.00
5,300.00
590.00
160.00
7,650.00

110,000.00
Anal -26

1
12.a

15,b

15.c

16

17

17.a

L.6
34.a

35

2
1 bh
Pasang Handel Jendela
Bahan
Handle jendela
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang grendel pintu
Bahan
Grendel pintu
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 bh
Pasang grendel jendela
Bahan
Grendel jendela
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Pasang kaca tebal 3 mm
Bahan
Kaca Polos t. 3 mm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2 Pasang kaca tebal 5 mm
Bahan
Kaca Polos t. 5 mm
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1.0000 Bh
0.0500
0.1000
0.0100
0.0025
0.1625

Oh
Oh
Oh
Oh

0.0069
0.1000
0.0100
0.0002
0.1171

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

1.1000 M2
0.1600
0.1600
0.0160
0.0080
0.3440

7,560.00

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

PEKERJAAN LANTAI & DINDING


1 m2 Pasang lantai keramik polos 40X 40 cm
Bahan
Keramik motif 40 x 40 cm
1.0500
Semen PC Gresik
8.1900
Pasir Pasang
0.0450
Semen warna
1.6200
Tenaga
Pekerja
0.7000
Tukang
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
1.1200
1 m2 Pasang lantai keramik polos 30 x 30 cm
Bahan
Keramik polos 30 x 30 cm
1.0500
Semen PC Gresik
10.0000
Pasir Pasang
0.0450
Semen warna
1.5000
Tenaga
Pekerja
0.7000
Tukang
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
1.1200

88,200.00
32,000.00
53,000.00
59,000.00
64,000.00

M2
Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

5,120.00
8,480.00
944.00
512.00
15,056.00

32,000.00
53,000.00
59,000.00
64,000.00

124,740.00
Dibulatkan

63,105.00
10,384.92
2,484.00
7,290.00
22,400.00
18,550.00
2,065.00
2,240.00
45,255.00

36,250.00
1,268.00
55,200.00
4,500.00
32,000.00
53,000.00
59,000.00
64,000.00

97,020.00
Dibulatkan
124,740.00

60,100.00
1,268.00
55,200.00
4,500.00

M2
Kg
M3
Kg
Oh
Oh
Oh
Oh

5,120.00
8,480.00
944.00
512.00
15,056.00

32,000.00
53,000.00
59,000.00
64,000.00

5,120.00
8,480.00
944.00
512.00
15,056.00
Dibulatkan
97,020.00

113,400.00

M2
Kg
M3
Kg

7,560.00
Dibulatkan

65,560.00

65,560.00

Oh
Oh
Oh
Oh

9,500.00
Dibulatkan
7,560.00

220.80
5,300.00
590.00
12.80
6,123.60

59,600.00

7,500.00
Dibulatkan
9,500.00

220.80
5,300.00
590.00
12.80
6,123.60

32,000.00
53,000.00
59,000.00
64,000.00

8
Dibulatkan
7,500.00

1,600.00
5,300.00
590.00
160.00
7,650.00

32,000.00
53,000.00
59,000.00
64,000.00

1.1000 M2
0.1600
0.1600
0.0160
0.0080
0.3440

9,500.00

1.0000 Bh
0.0069
0.1000
0.0100
0.0002
0.1171

7,500.00

1.0000 Bh

1 m2 Pasang Kaca Rayband Hitam tebal 5 mm


Bahan
Kaca Raybend t. 5 mm
1.1000
Tenaga
Pekerja
0.1600
Tukang
0.1600
Kepala Tukang
0.0160
Mandor
0.0080
0.3440

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

83,263.92
Dibulatkan
38,062.50
12,680.00
2,484.00
6,750.00

22,400.00
18,550.00
2,065.00
2,240.00
45,255.00

59,976.50
Anal -27

1
35a

36

39

50

58.a

1 m2 Pasang lantai keramik warna 30 x 30 cm


Bahan
Keramik motif 30 x 30 cm
1.0500
Semen PC Gresik
10.0000
Pasir Pasang
0.0450
Semen warna
1.5000
Tenaga
Pekerja
0.7000
Tukang
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
1.1200

1 m2 Pasang lantai keramik 20 x 20 cm


Bahan
Keramik lantai 20 x 20 cm
Semen PC Gresik
Pasir Pasang
Semen warna
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m1 Pasang plint keramik 10X 20 cm
Bahan
Keramik plint 10 X 20 cm
Semen PC Gresik
Pasir Pasang
Semen warna
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m2 Pasang dinding keramik 20 x 25 cm


Bahan
Keramik 20 x 25 cm
Semen PC Gresik
Pasir Beton
Semen warna
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

PEKERJAAN PENGECATAN
1 m2 Pengecatan bidang kayu Lama
Bahan
Plamir kayu
Cat Kayu emco
Cat Kayu emco
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

M2
Kg
M3
Kg
Oh
Oh
Oh
Oh

1.0500
10.4000
0.0450
1.6200

M2
Kg
M3
Kg

0.7000
0.3500
0.0350
0.0350
1.1200

Oh
Oh
Oh
Oh

5.3000
1.1400
0.0030
0.0250

Bh
Kg
M3
Kg

0.0900
0.0900
0.0090
0.0050
0.1940

Oh
Oh
Oh
Oh

1.0500
9.3000
0.0180
1.9400

M2
Kg
M3
Kg

0.9000
0.4500
0.0450
0.0450
1.4400

Oh
Oh
Oh
Oh

1 m2 Pengecatan bidang kayu Baru


Bahan
Cat meni cap pedang
Plamir kayu

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

0.7000
0.3500
0.0350
0.0350
1.1200

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

Oh
Oh
Oh
Oh

0.2000 Kg
0.1500 Kg

22,400.00
18,550.00
2,065.00
2,240.00
45,255.00

32,000.00
53,000.00
59,000.00
64,000.00

1,488.00
1,268.00
55,200.00
4,500.00

56,600.00
1,268.00
55,200.00
4,500.00

81,900.00
1,268.00
55,200.00

16,400.00
49,140.00
49,140.00

106,921.00
Dibulatkan

2,460.00
8,353.80
8,353.80

2,240.00
3,975.00
442.50
160.00
6,817.50

17,010.00
16,400.00

80,946.00
Dibulatkan
90,090.00
14,899.00
1,932.00

22,400.00
18,550.00
2,065.00
2,240.00
45,255.00

32,000.00
53,000.00
59,000.00
64,000.00

9,610.02
Dibulatkan

59,430.00
11,792.40
993.60
8,730.00
28,800.00
23,850.00
2,655.00
2,880.00
58,185.00

32,000.00
53,000.00
59,000.00
64,000.00

62,021.20
Dibulatkan
7,886.40
1,445.52
165.60
112.50

2,880.00
4,770.00
531.00
320.00
8,501.00

32,000.00
53,000.00
59,000.00
64,000.00

77,354.00
Dibulatkan

39,060.00
13,187.20
2,484.00
7,290.00
22,400.00
18,550.00
2,065.00
2,240.00
45,255.00

32,000.00
53,000.00
59,000.00
64,000.00

8
Dibulatkan
55,440.00
12,680.00
2,484.00
6,750.00

37,200.00
1,268.00
55,200.00
4,500.00

0.1500 Kg
0.1700 Kg
0.1700 Kg

0.0700
0.0750
0.0075
0.0025
0.1550

52,800.00
1,268.00
55,200.00
4,500.00

1 m2 Pasang dinding batu tempel palimanan


Bahan
Batu Palimanan
1.1000 M2
Semen PC Gresik
11.7500 Kg
Pasir Beton
0.0350 M3
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

M.6
7

19,167.60
Dibulatkan

3,402.00
2,460.00
Anal -28

11

12

14

2
Cat Kayu emco
Cat Kayu emco
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m2 Politur
Bahan
Politur
Politur jadi
Kertas Gosok
Tenaga
Tukang
Kepala Tukang
Mandor

L.5

0.0700
0.0090
0.0060
0.0025
0.0875

Oh
Oh
Oh
Oh

0.0600 Oh
0.0160 Oh
0.0025 Oh
0.0785

1 m2 Pengecatan dinding Lama


Bahan
Cat tembok decolith ( sejenis )
Cat tembok decolith ( sejenis )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

PEKERJAAN LAIN - LAIN


1 m2 Membongkar lantai
Tenaga
Pekerja
Mandor

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

2.0000 Oh
0.1000 Oh

2,240.00
477.00
354.00
160.00
3,231.00

53,000.00
59,000.00
64,000.00

3,180.00
944.00
160.00
4,284.00

32,000.00
64,000.00

27,600.00
13,230.00
13,230.00

13,230.00
13,230.00

525.00
Dibulatkan

7,522.80
Dibulatkan

1,587.60
2,381.40
1,920.00
3,180.00
295.00
192.00
5,587.00

32,000.00
64,000.00

23,096.88
Dibulatkan

2,760.00
1,323.00
3,439.80

640.00
3,339.00
371.70
160.00
4,510.70

32,000.00
53,000.00
59,000.00
64,000.00

26,992.20
Dibulatkan

525.00
3,200.00
384.00
3,584.00

32,000.00
53,000.00
59,000.00
64,000.00

8
8,353.80
12,776.40

3,204.00
13,592.88
6,300.00

1,500.00

0.1200 Kg
0.1800 Kg
0.0600
0.0600
0.0050
0.0030
0.1280

21,360.00
36,540.00
3,150.00

0.1060
1 m2 Mendempul dan Mengecat 2x selesai Tembok Baru
Bahan
Plamir tembok
0.1000
Cat tembok decolith ( sejenis )
0.1000 Kg
Cat tembok decolith ( sejenis )
0.2600 Kg

0.0200
0.0630
0.0063
0.0025
0.0918

6
49,140.00
49,140.00

32,000.00
53,000.00
59,000.00
64,000.00

0.1500 Ltr
0.3720 Ltr
2.0000 Lbr

1 m2 Mengecat permukaan kayu dengan Residu


Bahan
Residu
0.3500 Ltr
Tenaga
Pekerja
0.1000 Oh
Mandor
0.0060 Oh

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

15

3
4
0.1700 Kg
0.2600 Kg

3,969.00
Dibulatkan

64,000.00
6,400.00
70,400.00

2.1000
Dibulatkan
L.6

1 m2 Membongkar Plesteran
Tenaga
Pekerja
Mandor

0.5000 Oh
0.2500 Oh

32,000.00
64,000.00

16,000.00
16,000.00
32,000.00

0.7500
Dibulatkan
L.7

1 m2 Membongkar genteng
Tenaga
Pekerja
Mandor

0.2000 Oh
0.1000 Oh

32,000.00
64,000.00

6,400.00
6,400.00
12,800.00

0.3000
Dibulatkan
L.9

1 m2 Membongkar Usuk / reng


Tenaga
Pekerja
Tukang bongkar
Kepala Tukang
Mandor

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

0.2000
0.2500
0.0250
0.1000
0.5750

Oh
Oh
Oh
Oh

32,000.00
29,000.00
59,000.00
64,000.00

6,400.00
7,250.00
1,475.00
6,400.00
21,525.00
Anal -29

L.13

Ls.1

Ls.2

Ls.2a

1 m3 Bongkar Kayu Rangka


Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

6.0000
0.6000
4.0000
0.2000
10.8000

1 m2 Paving stone merah segi enam tebal 6 cm


Bahan
Paving stone merah segi enam te
1.0000
Pasir Pasang
0.0800
Tenaga
Pekerja
0.2000
Tukang
0.1000
Kepala Tukang
0.0100
Mandor
0.0200
0.3300
1 m2 Paving stone abu - abu tebal 6 cm
Bahan
Paving stone abu - abu tebal 6 c
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1 m3 Tebaran kerikil
Bahan
Batu kerikil
Tenaga
Pekerja
Mandor

8
Dibulatkan

Oh
Oh
Oh
Oh

53,000.00
59,000.00
32,000.00
64,000.00

318,000.00
35,400.00
128,000.00
12,800.00
494,200.00
Dibulatkan

M2
M3

37,300.00
55,200.00

37,300.00
4,416.00

Oh
Oh
Oh
Oh

32,000.00
53,000.00
59,000.00
64,000.00

1.0000 M2
0.0800 M3
0.2000
0.1000
0.0100
0.0200
0.3300

Oh
Oh
Oh
Oh

30,240.00
55,200.00
32,000.00
53,000.00
59,000.00
64,000.00

1.2000 M3
0.2500 Oh
0.0250 Oh

6,400.00
5,300.00
590.00
1,280.00
13,570.00

30,240.00
4,416.00
6,400.00
5,300.00
590.00
1,280.00
13,570.00

160,000.00
32,000.00
64,000.00

41,716.00
Dibulatkan

34,656.00
Dibulatkan

192,000.00
8,000.00
1,600.00
9,600.00

192,000.00

0.2750
Ls.4

1 Ttk Pasang instalasi listrik


Bahan
Kabel NYA 500 V 1 x 2.5 mm2
Pipa PVC 1/4"
T Dos PVC
Fitting plafond
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor

Ls.5

1 bh
Pasang Saklar Tunggal
Bahan
Saklar tunggal ( Broco )
Tenaga
Tukang
Mandor

10.0000
3.0000
1.0000
1.0000

M1
M1
Bh
Set

0.3200
0.1600
0.2400
0.1200
0.8400

Oh
Oh
Oh
Oh

1.0000

Bh

0.0640
0.0064

Oh
Oh

2,700.00
4,500.00
7,500.00
7,600.00
53,000.00
59,000.00
32,000.00
64,000.00

27,000.00
13,500.00
7,500.00
7,600.00
16,960.00
9,440.00
7,680.00
7,680.00
41,760.00

18,700.00
53,000.00
64,000.00

18,700.00
3,392.00
409.60
3,801.60

0.0704
Ls.6

1 bh
Pasang Saklar ganda
Bahan
Saklar ganda ( Broco )
Tenaga
Tukang
Mandor

1.0000

Bh

0.0640
0.0064

Oh
Oh

19,300.00
53,000.00
64,000.00

Ls.7a

1 bh
Pasang stop kontak
Bahan
Stop kontak ( Broco )
Tenaga
Tukang
Mandor

1.0000

Bh

0.0640
0.0064
0.0704

Oh
Oh

3,392.00
410.44
3,802.44

1 Ttk
Pasang lampu TL 2 x 20 watt + kaap lampuper
Bahan
Lampu TL 2 x 20 Watt
1.0000
Tenaga
Tukang
0.0640
Mandor
0.0064
0.0704

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

12,900.00
53,000.00
64,000.00

Bh
Oh
Oh

19,300.00
Dibulatkan
12,900.00

3,392.00
410.44
3,802.44

95,000.00
53,000.00
64,000.00

18,700.00
Dibulatkan
19,300.00

0.0704
Ls.7

55,600.00
Dibulatkan

12,900.00
Dibulatkan

95,000.00
3,392.00
410.44
3,802.44

95,000.00
Anal -30

8
Dibulatkan

Ls.7b

Ls.7c

Ls.7d

Ls.9

Ls.10

Ls.11

Ls.15c

Ls.16

Ls.17

1 Ttk
Pasang lampu TL 20 watt + kaap lampuper
Bahan
Lampu TL 20 Watt komplit ( Phillip )
1.0000
Tenaga
Tukang
0.0640
Mandor
0.0064
0.0704
1 Ttk
Pasang lampu SL
Bahan
Lampu SL 18 watt
Tenaga
Tukang
Mandor
1 Ttk
Pasang lampu Baret
Bahan
Lampu Baret
Tenaga
Tukang
Mandor

Bh
Oh
Oh

1.0000

Bh

0.0640
0.0064
0.0704

Oh
Oh

1.0000

Bh

0.0640
0.0064
0.0704

Oh
Oh

1 Un
Pasang Septic Tank Bio Filter kaps. 1,5 m3
Bahan
Bio Filter kaps. 1,5m3
1.0000 Unit
Tenaga
Pekerja
0.8000 Oh
Tukang
1.6000 Oh
Kepala Tukang
0.2000 Oh
Mandor
0.0200 Oh
2.6200
1 Un
Pasang Peresapan
Bahan
Sumur Peresap
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
1 m2
Pasang Atap Poly Carbonate
Bahan
Polly carbonat + rangka stainless ste
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

1.0000

Bh

1.2000
0.8000
0.2000
0.0200
2.2200

Oh
Oh
Oh
Oh

1.0000

M2

0.7000
0.3500
0.0350
0.0700
1.1550

Oh
Oh
Oh
Oh

53,000.00
53,000.00
64,000.00

1 m1 Pasang Buis beton U 20 cm


Bahan
Buis beton U dia 20 cm
Batu bata 1 : 3
Semen PC Gresik
Pasir Pasang
Pasir Urug
Tenaga
Tukang
Kepala Tukang
Pekerja

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

1.0000 M2
0.0600 Kg
0.0060 M3
0.3275
0.3275
0.0327
0.0033
0.6910

Oh
Oh
Oh
Oh

1.1000
0.0270
3.9200
0.0560
0.2400

Bh
M3
Kg
M3
M3

3,392.00
410.44
3,802.439

30,000.00
53,000.00
64,000.00

3,392.00
410.44
3,802.44

53,000.00
64,000.00

3,436,800.00

1,339,700.00

693,000.00

31,858.75
24,158.75
14,630.00
387.50
1,875.00
7,500.00
17,688.60
17,688.60

323,780.04
Dibulatkan

1,134,000.00
76.08
331.20
32,000.00
53,000.00
59,000.00
64,000.00

16,500.00
63,339.00
1,268.00
55,200.00
37,200.00
53,000.00
59,000.00
32,000.00

693,000.00
Dibulatkan

117,240.20
105,573.74
87,341.10
9,687.50
937.50
3,000.00

1,134,407.28

0.0700 Oh
0.0070 Oh
0.1400 Oh

1,339,700.00
Dibulatkan
693,000.00

22,400.00
18,550.00
2,065.00
4,480.00
47,495.00

1,134,000.00
1,268.00
55,200.00

3,436,800.00
Dibulatkan
1,339,700.00

38,400.00
42,400.00
11,800.00
1,280.00
93,880.00

32,000.00
53,000.00
59,000.00
64,000.00

85,500.00
Dibulatkan
3,436,800.00

25,600.00
84,800.00
11,800.00
1,280.00
123,480.00

32,000.00
53,000.00
59,000.00
64,000.00

30,000.00
Dibulatkan
85,500.00

3,392.00
410.44
3,802.44

32,000.00
53,000.00
59,000.00
64,000.00

53,000.00
Dibulatkan
30,000.00

85,500.00

1 Kg Pasang Rangka Atap Baja Ringan Mutu Tinggi 30 bentang 16 m '


Bahan
Profil C 75.100
3.6800 M1
Profil C 75.75
4.3700 M1
Reng baja ringan
5.9700 M1
Screw
25.0000 Bh
Dynabolt
0.5000 Bh
Plat Bracing baja ringan
0.4000 M1
Tenaga
Ongkos Pasang Baja ringan
0.9000 M2
19,654.00
1 m2 Pasang pintu Harmonika
Bahan
Pintu Harmonika
Semen PC Gresik
Pasir Pasang
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

53,000.00

10,480.00
17,357.50
1,929.30
211.20
29,978.00
Dibulatkan
18,150.00
1,710.15
4,970.56
3,091.20
8,928.00

3,710.00
413.00
4,480.00
Anal -31

Ls.15.c

2
Mandor

3
4
0.0070 Oh
0.2240

5
64,000.00

1 m2 Memasang Rangka Atap Baja Ringan Mutu Tinggi


Bahan
2.2700 M1
Baja ringan profil C 75,100
2.0500 M1
Baja ringan profil C 75, 75
5.9700 M1
Reng baja ringan
25.0000 Bh
Screw
0.5000 Bh
Dynabolt
0.4000 M1
Plat Bracing

7
448.00
9,051.00

31,858.75
24,158.75
14,630.00
387.50
1,875.00
7,500.00

8
36,849.91
Dibulatkan
72,319.36
49,525.44
87,341.10
9,687.50
937.50
3,000.00

Tenaga

Ongkos Pasang Baja ringan


Ls.15.d

0.1500
0.2500
0.0250
0.0750
0.5000

Oh
Oh
Oh
Oh

19,654.00
19,654.00

16,750.00
26,500.00
13,330.00
550.00

32,000.00
53,000.00
59,000.00
64,000.00

222,810.90
Dibulatkan
12,562.50
53,000.00
13,330.00
2,200.00

4,800.00
13,250.00
1,475.00
4,800.00
24,325.00

81,092.50
Dibulatkan

1 m2 Memasang Kaca Film


Bahan

Kaca Film
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
Ls.19

19,654.00

1 m2 Memasang Rangka Plafond Metal Furing + Asbes 100 X 100 cm


Bahan
0.7500 M1
Besi Hollow 20/20
2.0000 M1
Besi Hollow 40/40
1.0000 Lbr
Eternit gresik
4.0000 Bh
Skrup
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Ls.18

1.0000 M2
1.0000

1 M3
Bahan

0.7500 M2
0.3500
0.1750
0.0170
0.0020
0.5440

Oh
Oh
Oh
Oh

91,000.00
32,000.00
53,000.00
59,000.00
64,000.00

68,250.00
11,200.00
9,275.00
1,003.00
128.00
21,606.00

68,250.00
Dibulatkan

Membuang eks. Bongkaran keluar Proyek


Sewa Dump truck 5 T

0.2500 jam

Pekerja

0.2500 Oh

65,000.00

16,250.00

Tenaga

32,000.00

8,000.00
8,000.00

Kediri.

16,250.00
Dibulatkan

2009

Mengetahui / Menyetujui :
KEPALA DINAS PEKERJAAN UMUM
KOTA KEDIRI

Disusun :
Konsultan Perencana
CV. SETIA GRAHA CONSULTANT

Ir. H. WIDODO, MM
Pembina TK. I
NIP. 510 077 638

Ir. SUHARI
Direktur

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Anal -32

JUMLAH
TOTAL
( Rp. )
9

93,496.00
93,496.00

3,520.00
3,520.00

234,656.00
234,656.00

234,656.00
234,656.00

25,600.00
25,600.00

31,680.00
31,680.00

8,531.20
8,531.00

19,200.00
19,200.00

54,880.00
54,880.00

55,540.00
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
A,6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6
B.6

m1
- Tenaga
8
m2
- Tenaga
13
m3
0 Tenaga
0
0
0
0
14
m3
0 Tenaga
0
0
0
0
0
B.6
1.
m3
0 Tenaga
0
0
0
0
0
2.
m3
0 Tenaga
0
0
0
0
0
9
m3
0 Tenaga
0
0
0
0
10
m3
0 Tenaga
0
0
0
0
0
11
m3
0 Bahan
0
0 Tenaga
0
0
0
0
0
15.a
m3
0
0 Bahan
0
0 Tenaga
0
0
0
-

93,496.00

3,520.00

234,656.00

234,656.00

25,600.00

31,680.00

8,531.00

19,200.00

54,880.00

55,540.00

Anal -33

9
55,540.00

446,983.00
446,983.00

390,918.20
390,918.00

191,537.40
191,537.00

69,036.20
69,036.00

63,339.16
63,339.00

59,865.60
59,865.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

B.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
C.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6

5
0
0
0
0
0
0
0
0
0
0
0
7
0
0
0
0
0
0
0
0
0
0
0
0
14
0
0
0
0
0
0
0
0
0
0
D.6
0
7
0
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
0
3a
0
0
0
0
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0

m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

C.6

446,983.00

390,918.00

191,537.00

69,036.00

63,339.00

59,865.00

56,164.00

Anal -34

9
56,164.56
56,164.00

64,762.00
64,762.00

146,025.00
146,025.00

532,625.00
532,625.00

30,524.57
30,524.00

28,632.12
28,632.00

26,484.89
26,484.00

33,463.03
33,463.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
D.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6

0
0
0
5
0
0
0
0
0
0
0
0
0
0
0
0
23
0
0
0
0
0
0
0
0
0
0
0
24
0
0
0
0
0
0
0
0
0
0
0
0
E.6
3
0
0
0
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
0
6
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
7
0
0
0
0
0
0

m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

64,762.00

146,025.00

532,625.00

30,524.00

28,632.00

26,484.00

33,463.00

29,943.00

Anal -35

9
29,943.03
29,943.00

6,952.40
6,952.00

28,096.52
28,096.00

17,051.00
17,051.00

60,335.60
60,335.00

749,137.00
749,137.00

13,230.40
13,230.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.6
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
26
0
0
0
0
0
0
0
0
0
0
27
0
0
0
0
0
0
0
0
0
0
E.a
4
0
0
0
0
0
0
0
0
0
0
0
13
0
0
0
0
0
0
0
0
0
0
0
0
0
25
0
0
0
0
0
0
0
0
0
0
0
0
0
28
0
0
0
0
0
0
0

m1
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
Kg
Bahan
Tenaga
m2
Bahan
Tenaga
-

7a

6,952.00

28,096.00

17,051.00

60,335.00

749,137.00

13,230.00

54,872.00

Anal -36

9
164,618.00
54,872.67
54,872.00

180,368.00
60,122.67
60,122.00

349,969.00
116,656.33
116,656.00

380,559.00
126,853.00
126,853.00

423,169.00
211,584.50
211,584.00

283,689.00
141,844.50
141,844.00
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a

0
0
0
0
0
0
30.a
0
0
0
0
0
0
0
0
0
0
0
0
0
30
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
31
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
32
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
34
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

60,122.00

116,656.00

126,853.00

211,584.00

141,844.00

Anal -37

9
749,137.00
1,984,500.00
237,047.04
2,970,684.04
2,970,684.00
749,137.00
2,544,129.00
1,202,440.00
4,495,706.00
4,495,706.00
749,137.00
1,800,999.90
801,426.26
3,351,563.16
3,351,563.00
749,137.00
1,890,963.90
801,426.26
3,441,527.16
3,441,527.00
749,137.00
1,672,668.90
801,426.26
3,223,232.16
3,223,232.00
749,137.00
1,784,197.80
801,426.26
3,334,761.06
3,334,761.00
749,137.00
1,253,807.10
2,002,944.10
2,002,944.00
749,137.00
1,968,756.30
267,226.64
2,985,119.94
2,985,119.00
749,137.00
2,045,358.00
438,976.00
3,233,471.00
3,233,471.00
749,137.00
2,692,834.20
1,001,632.52
4,443,603.72
4,443,603.00
749,137.00
1,915,307.10
801,426.26
3,465,870.36
3,465,870.00
749,137.00
1,946,133.00
801,426.26
3,496,696.26
3,496,696.00
749,137.00
1,850,744.70
971,744.48
3,571,626.18
3,571,626.00
749,137.00
2,245,263.30
1,244,719.52
4,239,119.82
4,239,119.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a

38
0
0
0
0
0
0
39.a
0
0
0
0
0
0
39.b
0
0
0
0
0
39.c
0
0
0
0
0
39.d
0
0
0
0
0
39.e
0
0
0
0
0
36
0
0
0
0
37.a
0
0
0
0
0
37.b
0
0
0
0
0
40.a
0
0
0
0
0
40.b
0
0
0
0
0
0
40.c
0
0
0
0
0
0
40.d
0
0
0
0
0
40.e
0
0
0
0
0
0

m3

2,970,684.00
-

m3

4,495,706.00
-

m3

3,351,563.00
-

m3

3,441,527.00
-

m3

3,223,232.00
-

m3

3,334,761.00
-

m3

2,002,944.00
-

m3

2,985,119.00
-

m3

3,233,471.00
-

m3

4,443,603.00
-

m3

3,465,870.00
-

m3

3,496,696.00
-

m3

3,571,626.00
-

m3

4,239,119.00
Anal -38

9
749,137.00
1,899,695.70
1,166,560.00
3,815,392.70
3,815,392.00
749,137.00
2,256,111.90
1,217,788.80
4,223,037.70
4,223,037.00
749,137.00
1,875,749.40
1,036,389.01
3,661,275.41
3,661,275.00
749,137.00
1,534,984.29
896,850.71
3,180,972.00
3,180,972.00
749,137.00
2,267,489.70
1,690,950.49
4,707,577.19
4,707,577.00
749,137.00
1,933,829.10
1,690,950.49
4,373,916.59
4,373,916.00
749,137.00
1,712,755.80
1,302,256.96
3,764,149.76
3,764,149.00
749,137.00
2,692,834.20
998,025.20
4,439,996.40
4,439,996.00
749,137.00
2,202,795.00
998,025.20
3,949,957.20
3,949,957.00
749,137.00
1,554,789.60
601,226.67
2,905,153.27
2,905,153.00

749,137.00
2,414,263.32
2,115,840.00
5,279,240.32
5,279,240.00
749,137.00
2,049,948.81
1,762,494.72
4,561,580.53
4,561,580.00
749,137.00
2,646,000.00
814,598.40
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a

0
40.f
0
0
0
0
0
0
41.a
0
0
0
0
0
0
41.b
0
0
0
0
0
0
41.c
0
0
0
0
0
0
41.d
0
0
0
0
0
41.e
0
0
0
0
0
0
41.f
0
0
0
0
0
0
41.g
0
0
0
0
0
0
41.h
0
0
0
0
0
41.i
0
0
0
0
0
0
0
42.a
0
0
0
0
0
0
42.b
0
0
0
0
0
0
43.a
0
0
0

m3

3,815,392.00
-

m3

4,223,037.00
-

m3

3,661,275.00
-

m3

3,180,972.00
-

m3

4,707,577.00
-

m3

4,373,916.00
-

m3

3,764,149.00
-

m3

4,439,996.00
-

m3

3,949,957.00
-

m3

2,905,153.00
-

m3

5,279,240.00
-

m3

4,561,580.00
-

m3

4,209,735.00
Anal -39

9
4,209,735.40
4,209,735.00

516,269.00
516,269.00

29,309,490.00
29,309,490.00

11,886,900.00
11,886,900.00

9,882,900.00
9,882,900.00

8,862,900.00
8,862,900.00

1,271,400.00
1,271,400.00

1,229,116.00
1,229,116.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
E.a
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

0
0
0
44
0
0
0
0
0
0
0
0
0
0
0
F.6
1
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
4.a
0
0
0
0
0
0
0
5
0
0
0
0
0
0
0
0
0
0
5.a
0
0
0
0
0

m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

516,269.00

29,309,490.00

11,886,900.00

9,882,900.00

8,862,900.00

1,271,400.00

1,229,116.00

571,200.00

Anal -40

571,200.00
571,200.00

504,400.00
504,400.00

211,900.00
211,900.00

564,834.80
564,834.00

367,460.00
367,460.00

347,420.00
347,420.00

337,220.00
337,220.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

0
0
0
0
0
5.b

m2
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
5.e
m2
0 Tenaga
0
0
0
0
0
0
0
6
m2
0 Bahan
0
0
0
0 Tenaga
0
0
0
0
0
0
0
0
6.a
m2
0 Bahan
0
0
0
0 Tenaga
0
0
0
0
0
0
0
0
6.b
m2
0 Bahan
0
0
0
0 Tenaga
0
0
0
0
0
0
0
6.c
m2
0 Bahan
0
0
0
0 Tenaga
0
0
0
0
0
0
0
8.b
m2
0 Bahan
0
0
0
0
0 Tenaga
0
0
-

504,400.00

211,900.00

564,834.00

367,460.00

347,420.00

337,220.00

430,774.00

Anal -41

9
430,774.00
430,774.00

367,774.00
367,774.00

407,774.00
407,774.00

1,678,974.00
1,678,974.00

692,100.00
692,100.00

591,900.00
591,900.00

540,900.00
540,900.00

10,822,980.00
10,822,980.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

0
0
0
0
8.c

m2
0 Bahan
0
0
0
0
0 Tenaga
0
0
0
0
0
0
8.d
m2
0 Bahan
0
0
0
0
0 Tenaga
0
0
0
0
0
0
10
m2
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
10.a
m2
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
10.b
m2
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
10.c
m2
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
13.a
m2
0 Bahan
0
0
0
0 Tenaga
0
0
0
0
0
0
0
13.c
m3
0 Bahan
0
0
0
-

367,774.00

407,774.00

1,678,974.00

692,100.00

591,900.00

540,900.00

10,822,980.00

8,985,980.00

Anal -42

8,985,980.00
8,985,980.00

8,050,980.00
8,050,980.00

1,049,940.00
1,049,940.00

10,445,460.00
10,445,460.00

8,608,460.00
8,608,460.00

7,673,460.00
7,673,460.00

620,460.00
620,460.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

0
0
0
0
0
0
0
0
13.b
0
0
0
0
0
0
0
0
0
0
0
13.d
0
0
0
0
0
0
0
0
0
0
15.a
0
0
0
0
0
0
0
0
0
0
0
15.c
0
0
0
0
0
0
0
0
0
0
0
15.b
0
0
0
0
0
0
0
0
0
0
0
15.d
0
0
0
0
0
0
0
0
0
0
17.b
0
0
0
0

Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m3
Bahan
Tenaga
m2
Bahan
-

8,050,980.00

1,049,940.00

10,445,460.00

8,608,460.00

7,673,460.00

620,460.00

213,675.00

Anal -43

213,675.36
213,675.00

123,990.00
123,990.00

90,726.00
90,726.00

11,630.00
11,630.00

43,130.00
43,130.00

98,270.00
98,270.00

77,858.00
77,858.00

51,830.00
51,830.00
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

0
0
0
0
0
0
0
0
17.a
0
0
0
0
0
0
0
0
0
0
0
17.c
0
0
0
0
0
0
0
0
0
0
0
17.d
0
0
0
0
0
0
0
0
0
17.e
0

Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6

0
0
0
0
0
0
0
0
19.b
0
0
0
0
0
0
0
0
0
0
19.c
0
0
0
0
0
0
0
0
0
0
19.d
0
0
0
0
0
0
0
0
0
0

Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

123,990.00

90,726.00

11,630.00

43,130.00

98,270.00

77,858.00

51,830.00

Anal -44

28,750.00
28,750.00

112,036.00
112,036.00

84,820.00
84,820.00

94,000.00
94,000.00

16,040.00
16,040.00

27,870.00
27,870.00

40,030.60
40,030.00

F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
F.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

19.e
0
0
0
0
0
0
0
0
0
0
21.a
0
0
0
0
0
0
0
0
0
0
0
21.b
0
0
0
0
0
0
0
0
0
0
21.c
0
0
0
0
0
0
0
0
0
0
21.d
0
0
0
0
0
0
0
0
0
22
0
0
0
0
0
0
0
0
0
0
23
0
0
0
0
0
0
0
0
0
0
0
0
G.6
2
0
0
0
0
0
0
0

m2
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m2
Bahan
Tenaga
-

28,750.00

112,036.00

84,820.00

94,000.00

16,040.00

27,870.00

40,030.00

42,259.00

Anal -45

9
42,259.00
42,259.00

9,759.00
9,759.00

62,218.80
62,218.00

20,150.00
20,150.00

115,475.00
115,475.00

95,063.00
95,063.00

69,035.00
69,035.00

8,875.00
8,875.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
G.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
H.6
I.6
I.6
I.6

0
0
2.a

m2
0 Tenaga
0
0
0
0
0
0
5
m1
0 Bahan
0
0
0
0 Tenaga
0
0
0
0
0
0
H.6
1
m2
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
0
1.a
m2
0 Bahan
0
0
0
0
0 Tenaga
0
0
0
0
0
0
1.b
m2
0 Bahan
0
0
0
0
0 Tenaga
0
0
0
0
0
0
1.c
m2
0 Bahan
0
0
0
0
0 Tenaga
0
0
0
0
0
0
10
m1
0 Bahan
0
0
0 Tenaga
0
0
0
0
0
0
I.6
1
bh
0 Bahan

9,759.00

62,218.00

20,150.00

115,475.00

95,063.00

69,035.00

8,875.00

1,481,375.00
Anal -46

1,481,375.84
1,481,375.00

252,150.00
252,150.00

459,710.00
459,710.00

289,602.72
289,602.00

505,030.04
505,030.00

933,947.60
933,947.00

371,954.50
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6

0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
4
0
0
0
0
0
0
0
0
0
0
0
0
0
5
0
0
0
0
0
0
0
0
0
0
0
0
7
0
0
0
0
0
0
0
0
0
0
8
0
0
0
0
0
0
0
0
0
0
0
0
0
17
0
0
0
0
0
0
0
0
0
0
0
0
0

Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
-

252,150.00

459,710.00

289,602.00

505,030.00

933,947.00

371,954.00

Anal -47

9
371,954.00

151,877.48
151,877.00

12,927.96
12,927.00

14,177.73
14,177.00

20,622.53
20,622.00

29,552.34
29,552.00

38,850.84
38,850.00

346,126.00
346,126.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6

0
0
22.a
0
0
0
0
0
0
0
0
0
0
0
25
0
0
0
0
0
0
0
0
0
0
0
26
0
0
0
0
0
0
0
0
0
0
29
0
0
0
0
0
0
0
0
0
0
31
0
0
0
0
0
0
0
0
0
0
0
32
0
0
0
0
0
0
0
0
0
0
34
0
0
0
0
0
0
0
0
0
0
35
0
0
0
0
0

m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
m1
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
-

151,877.00

12,927.00

14,177.00

20,622.00

29,552.00

38,850.00

346,126.00

24,525.00

Anal -48

24,525.25
24,525.00

24,430.00
24,430.00

18,526.00
18,526.00

566,600.00
566,600.00

189,840.60
189,840.00

629,270.50
629,270.00

539,290.50
539,290.00

411,150.00
411,150.00
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
I.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6

0
0
0
0
0
0
36
0
0
0
0
0
0
0
0
0
0
J.6
2
0
0
0
0
0
0
0
0
0
10
0
0
0
0
0
0
0
0
0
11
0
0
0
0
0
0
0
0
0
0
0
13
0
0
0
0
0
0
0
0
0
0
0
0
13.a
0
0
0
0
0
0
0
0
0
0
0
0
17
0
0
0
0
0
0
0
0
0
0
0

bh
Bahan
Tenaga
Kg
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

24,430.00

18,526.00

566,600.00

189,840.00

629,270.00

539,290.00

411,150.00

Anal -49

315,363.00
315,363.00

133,572.00
133,572.00

92,680.00
92,680.00

60,815.00
60,815.00

20,852.00
20,852.00

10,652.00
10,652.00

7,502.00
7,502.00

117,650.00
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
J.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6

0
17.a
0
0
0
0
0
0
0
0
0
0
0
0
18
0
0
0
0
0
0
0
0
0
0
0
0
K.6
2
0
0
0
0
0
0
0
0
0
0
2.a
0
0
0
0
0
0
0
0
0
5
0
0
0
0
0
0
0
0
0
6
0
0
0
0
0
0
0
0
0
9
0
0
0
0
0
0
0
0
0
12
0
0
0
0
0
0
0
0

m2
Bahan
Tenaga
m1
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
-

315,363.00

133,572.00

92,680.00

60,815.00

20,852.00

10,652.00

7,502.00

117,650.00

Anal -50

9
117,650.00

15,150.00
15,150.00

15,623.60
15,623.00

13,683.60
13,683.00

80,616.00
80,616.00

112,076.00
112,076.00

139,796.00
139,796.00

128,518.92
128,518.00

105,231.50
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
K.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6

0
12.a
0
0
0
0
0
0
0
0
0
15,b
0
0
0
0
0
0
0
0
0
15.c
0
0
0
0
0
0
0
0
0
16
0
0
0
0
0
0
0
0
0
17
0
0
0
0
0
0
0
0
0
17.a
0
0
0
0
0
0
0
0
0
0
L.6
34.a
0
0
0
0
0
0
0
0
0
0
0
0
35
0
0
0
0
0
0
0
0
0
0
0

bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

15,150.00

15,623.00

13,683.00

80,616.00

112,076.00

139,796.00

128,518.00

105,231.00

Anal -51

9
105,231.00

122,609.00
122,609.00

107,276.20
107,276.00

18,111.02
18,111.00

139,131.00
139,131.00

152,176.00
152,176.00

25,985.10
25,985.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
L.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6

0
0
0
0
0
0
0
0
0
0
0
0
0

m2
Bahan
Tenaga
-

0
36
0
0
0
0
0
0
0
0
0
0
0
0
39
0
0
0
0
0
0
0
0
0
0
0
0
0
50
0
0
0
0
0
0
0
0
0
0
0
0
58.a
0
0
0
0
0
0
0
0
0
0
0
0
M.6
7
0
0
0
0
0
0
0
0
0
0
0
0
8
0
0
0

m2
Bahan
Tenaga
m1
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
-

35a

122,609.00

107,276.00

18,111.00

139,131.00

152,176.00

25,985.00

30,223.00

Anal -52

30,223.20
30,223.00

27,380.88
27,380.00

4,109.00
4,109.00

12,033.50
12,033.00

9,556.00
9,556.00

M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6
M.6

0
0
0
0
0
0
0
0
0
11
0
0
0
0
0
0
0
0
0
0
12
0
0
0
0
0
0
0
14
0
0
0
0
0
0
0
0
0
0
0
0
0
15
0
0
0
0
0
0
0
0
0
0
0

L.5
0
0
0
0
0
0

70,400.00
7,040.00
7,040.00
L.6

0
0
0
0
0
0

32,000.00
3,200.00
3,200.00
L.7

0
0
0
0
0
0

12,800.00
1,280.00
1,280.00
L.9

21,525.00
2,152.50
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

0
0
0
0
0
0
0

Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Tenaga
m2
Tenaga
m2
Tenaga
m2
Tenaga
-

27,380.00

4,109.00

12,033.00

9,556.00

7,040.00

3,200.00

1,280.00

2,152.00

Anal -53

9
2,152.00

0
0
L.13
0
0
0
0
0
0
0

494,200.00
494,200.00
Ls.1

0
0
0
0
0
0
0
0
0
0

55,286.00
55,286.00
Ls.2

0
0
0
0
0
0
0
0
0
0

48,226.00
48,226.00
Ls.2a

0
0
0
0
0
0
0
0

201,600.00
201,600.00
Ls.4

97,360.00
97,360.00

22,501.60
22,501.00

23,102.44
23,102.00

Ls.5

Ls.6

Ls.7

16,702.44
16,702.00

Ls.7a

98,802.44
file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

m3
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
m3
Bahan
Tenaga
Ttk
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
bh
Bahan
Tenaga
Ttk
Bahan
Tenaga
-

494,200.00

55,286.00

48,226.00

201,600.00

97,360.00

22,501.00

23,102.00

16,702.00

98,802.00

Anal -54

9
98,802.00

56,802.44
56,802.00

33,802.44
33,802.00

89,302.44
89,302.00

3,560,280.00
3,560,280.00

1,433,580.00
1,433,580.00

740,495.00
740,495.00

341,468.64
341,468.00

1,164,385.28
1,164,385.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Ls.7b

Ls.7c

Ls.7d

Ls.9

Ls.10

Ls.11

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
Ls.15c
0
0
0
0
0
0
0
0
0
0
0
Ls.16
0
0
0
0
0
0
0
0
0
0
0
Ls.17
0
0
0
0
0
0
0
0
0
0
0

Ttk
Bahan
Tenaga
Ttk
Bahan
Tenaga
Ttk
Bahan
Tenaga
Un
Bahan
Tenaga
Un
Bahan
Tenaga
m2
Bahan
Tenaga
Kg
Bahan
Tenaga
m2
Bahan
Tenaga
m1
Bahan
Tenaga
-

56,802.00

33,802.00

89,302.00

3,560,280.00

1,433,580.00

740,495.00

341,468.00

1,164,385.00

45,900.00

Anal -55

9
45,900.91
45,900.00

242,464.90
242,464.00

105,417.50
105,417.00

89,856.00
89,856.00

0
0
0
Ls.15.c
0
0
0
0
0
0
0
0
0
0
0
0
Ls.15.d
0
0
0
0
0
0
0
0
0
0
0
0
0
Ls.18
0
0
0
0
0
0
0
0
0
0

m2
Bahan
Tenaga
m2
Bahan
Tenaga
m2
Bahan
Tenaga
-

24,250.00
24,250.00

105,417.00

89,856.00

24,250.00

M3

Ls.19

242,464.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Anal -56

HARGA SATUAN UPAH DAN BAHAN


KOTA KEDIRI TAHUN 2009

NO
1
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

URAIAN BAHAN
2
HARGA BAHAN
Asbes Gelb. besar ( 3,05x1,05) t. 5 mm
Asbes Gelb. kecil ( 3,05x1,05) t. 4 mm
Asbes Wuwung GLB besar 5 mm
Asbes Wuwung GLB kecil 4 mm
Baja ringan profil C 75,100
Baja ringan profil C 75, 75
Bata Merah Kelas I
Batu Candi
Bak Mandi Fiberglass
Bak Cuci piring Stainless Steel
Bambu
Batu Belah 20/20 cm
Batu Belah 15/20 cm
Batu Belah 5/7 cm
Batu Belah 3/5 cm
Batu Kali Pecah 2/3 cm
Batu kerikil
Batu Palimanan
Besi Beton Polos
Besi Beton Ulir
Besi Beugel / baut 250 cm 12 mm
Besi Hollow 20/20
Besi Hollow 40/40
Besi Strip 2 X 3 ( tralis )
Besi Plat Strip ( konstruksi )
Besi profil WF
Besi Profil WF 200 mm
Besi Profil WF 200 mm s/d 400 mm
Besi Siku L 30,30,3
Besi Siku L 40,40,4
Besi Siku L 60,60,6
Bio Filter kaps. 1,5m3
Buis beton U dia 20 cm
Canal C 125 X 50X2,3m pj 6 m
Baut moor
Buis beton dia 20 cm
Got R. 20 ( 1/2 lingkaran )
Cat besi emco
Cat Kayu emco
Cat meni cap pedang
Cat tembok decolith ( sejenis )
Cat Genteng
Closed jongkok keramik
Closed duduk keramik ( monoblock )
Dynabolt
Eternit gresik
Engsel H
Engsel jendela
Engsel Pintu kuningan ( Arch )
Fitting plafond
Fiser
Floor draine
Genteng Kodok ( Eks. Trenggalek )
Genteng Wuwung kodok ( Eks. Trenggalek )
Glass Block
Grendel pintu
Grendel jendela
Grendel Kuningan / Krom
Grendel Tanam
Gypsum Board ( 120 X 240 ) cm t. 9 mm
Hak angin
Hak angin sikutan
Hak angin lurus ( bisa distel maju/ mundur
Handle pintu

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

SATUAN
3
Lbr
Lbr
Psg
Psg
M1
M1
Bh
M2
Bh
Bh
Lj
M3
M3
M3
M3
M3
M3
M2
Kg
Kg
Bj
M1
M1
M1
Kg
Kg
Kg
Kg
Ljr
Ljr
Ljr
Unit
Bh
Ljr
Kg
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Lbr
Bh
Bh
Bh
Set
Bh
Bh
Bj
Bj
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Stl
Stl
Bh

HARGA SATUAN BAHAN / UPAH


( Rp. )
4
86,000.00
62,000.00
26,800.00
37,600.00
31,858.75
24,158.75
378.00
94,500.00
257,100.00
215,800.00
15,150.00
96,800.00
104,200.00
134,000.00
156,300.00
178,600.00
160,000.00
81,900.00
11,700.00
11,701.00
4,570.00
16,750.00
26,500.00
4,500.00
12,700.00
10,800.00
11,200.00
11,200.00
88,200.00
109,480.00
176,400.00
3,436,800.00
16,500.00
264,600.00
14,000.00
31,500.00
15,750.00
44,100.00
49,140.00
17,010.00
13,230.00
24,000.00
113,400.00
1,301,900.00
1,875.00
13,330.00
8,820.00
4,410.00
12,500.00
7,600.00
485.00
17,900.00
1,300.00
4,410.00
20,000.00
9,500.00
7,560.00
10,700.00
25,200.00
54,450.00
1,260.00
19,400.00
33,700.00
110,000.00
HS -1

1
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137

2
Handle jendela
Ijuk
Jendela Alumunium
Kaca Film
Kapur pasang
Karet Al
Kawat Ikat Beton ( Bendrat )
Kayu Dolken 8-10 cm
Kayu Jati Balok
Kayu Jati Usuk 5/7 cm
Kayu Jati reng 3/5 cm
Kayu Jati Papan
Kayu Kamper Balok
Kayu Kamper Usuk 5/7 cm
Kayu Kamper reng 3/5 cm
Kayu Kamper Papan
Kayu Balau
Kayu Kruing Balok
Kayu Kruing Usuk 5/7 cm
Kayu Kruing Usuk 4/6 cm
Kayu Kruing Reng 3/5 cm
Kayu Kruing Papan
Kayu Meranti Balok 8/12 cm
Kayu Meranti Usuk 5/7 cm
Kayu Meranti Usuk 4/6 cm
Kayu Meranti Reng 3/5 cm
Kayu Meranti Papan
Kayu tahun
Kayu begesting ( Meranti )
Kaca Polos t. 3 mm
Kaca Polos t. 5 mm
Kaca Raybend t. 5 mm
Kaca Nako + Rangka
Karpet
Kertas Gosok
Kabel NYA 500 V 1 x 2.5 mm2
Kabel NYA 450 - 750 V x 1.5 mm2
Kabel NYA 450 - 750 V x 2.5 mm3
Kawat Harmonika
Kawat Nyamuk Al
Kawat duri pagar
Kunci Pintu 2x putar ( Kuda Terbang )
Kunci Tanam 808
Kunci Selot ( Alfa )
Kunci KM/WC
Kunci Silinder
Kuas
Kran air
Keramik polos 30 x 30 cm
Keramik motif 30 x 30 cm
Keramik motif 40 x 40 cm
Keramik polos 20 x 20 cm
Keramik lantai 20 x 20 cm
Keramik 20 x 25 cm
Keramik plint 10 X 20 cm
Kitchen Set Stainless Steel
List kayu profil
List gypsum profil
Lem rajawali
Lem kayu ( Fox )
Lampu Baret
Lampu Pijar
Lampu TL 2 x 20 Watt
Lampu TL 20 Watt komplit ( Phillip )
Lampu SL 18 watt
Multipleks 122x244x9 mm
Minyak Bekisting
Ongkos Pasang Baja ringan
Panul Box 290x 30 cm
Pintu rolling door Alumunium ( Alexindo / Super )
Polly carbonat + rangka stainless steel
Pintu Harmonika
Pintu KM / WC PVC + Pasang

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

3
Bh
Kg
M2
M2
M3
M1
Kg
Bt
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
Lbr
M1
M1
M1
M1
M2
M1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Bh
Bh
M1
M1
Bks
Kg
Bh
Bh
Bh
Bh
Bh
Lbr
Ltr
M2
M2
M2
M2
Unit

4
7,500.00
32,100.00
94,500.00
91,000.00
496,400.00
2,300.00
18,900.00
29,800.00
25,267,900.00
15,606,300.00
15,606,300.00
25,267,900.00
8,820,000.00
8,820,000.00
8,820,000.00
8,820,000.00
7,150,000.00
6,300,000.00
6,300,000.00
6,300,000.00
6,300,000.00
6,300,000.00
4,410,000.00
4,410,000.00
4,410,000.00
4,410,000.00
4,410,000.00
2,000,000.00
3,150,000.00
59,600.00
88,200.00
113,400.00
306,000.00
27,830.00
3,150.00
2,700.00
2,880.00
3,150.00
25,200.00
22,050.00
2,810.00
56,700.00
9,450.00
154,800.00
33,700.00
193,000.00
12,000.00
17,900.00
36,250.00
52,800.00
60,100.00
37,200.00
37,200.00
56,600.00
1,488.00
215,800.00
3,800.00
15,080.00
11,340.00
13,000.00
85,500.00
3,300.00
95,000.00
53,000.00
30,000.00
138,600.00
5,600.00
19,654.00
372,000.00
472,500.00
693,000.00
1,134,000.00
350,000.00
HS -2

1
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205

Paving stone abu - abu tebal 6 cm


Paving stone abu - abu segi enam tebal 6 cm
Paving stone merah segi enam tebal 6 cm
Pagar BRC 1,2x2,4 m
Pemasangan listrik baru 1.300 watt
Pintu dorong BRC 1,2x 3 m
Pintu swing ganda BRC 1,2 x 3,m
Pintu besi Komplit
Pintu Alumunium
Pintu pagar besi komplit
Pipa PVC 1/4"
Pipa PVC 1/2" type AW ( Maspion )
Pipa PVC 3/4" type AW ( Maspion )
Pipa PVC 1" type AW ( Maspion )
Pipa PVC 2" type D ( Maspion )
Pipa PVC D 3" ( Maspion )
Pipa PVC D 4" ( Maspion )
Pipa Galvanis 2 " ( BSA )
Plat Bracing baja ringan
Plamir tembok
Plamir kayu
Politur
Politur jadi
Pompa Air Nasional GP 125 JB l/dt
Pompa Air Gold Star 10 KPOa 185 l/dt
Profil Kaca
Profil pintu Alumunium ( YKK )
Profil jendela Alumunium ( YKK )
Profil C 75.100
Profil C 75.75
Kusen profil Alumunium ( YKK )
Reng baja ringan
Residu
Roof Light Fiberglass 0,85 x 2,5
Roaster beton 20 X 20
Roaster beton 11X12X24
Roaster beton 11X23X23
Roaster merah
Rolling Door Alumunium
Stop kontak ( Broco )
Saklar ganda ( Broco )
Saklar tunggal ( Broco )
Sealtape
Sealent
Skrup
Screw
Sekrup Fiser
Septictank & rembesan 6M3
Septictank Bio Filter Kap. 4 M 3
Seng gelombang BJLS 30 ( 1,8x 0,9 )
Seng datar BJLS 30 ( 0,9x 1,0 ) )
Seng datar BJLS 30 ( 0,2x 1,0 ) )
Semen PC Gresik
Semen Putih
Semen warna
Semen merah
Sumur Peresap

206
207
208
209

Tiang pagar BRC 2" tinggi 1,5 m


Tripleks 90x200x4 mm
Tripleks 110x210x4 mm
Tripleks 120x240x4 mm

Pasir Urug
Pasir Pasang
Pasir Beton
Paku Asbes
Paku biasa
Paku Tripleks
Paku payung
Paku pancing
Paku Sumbat
Paku Skrup
Plat Bracing

Sewa Dump truck 5 T

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

3
M3
M3
M3
Bh
Kg
Kg
Bj
Kg
Bj
Bh
M1
M2
M2
M2
Unit
Unit
Unit
Unit
M2
M2
M2
M1
M1
M1
M1
M1
M1
M1
M1
M1
Kg
Kg
Ltr
Ltr
Bh
Bh
M1
M1
M1
M1
M1
M1
M1
Ltr
Lbr
Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Roll
Tube
Bh
Bh
Bh
Bh
Bh
Lbr
M1
M1
Kg
Kg
Kg
M3
Bh
jam
Bt
Lbr
Lbr
Lbr

4
37,200.00
55,200.00
55,200.00
275.00
14,800.00
14,800.00
125.00
20,900.00
60.00
60.00
7,500.00
30,240.00
34,020.00
37,300.00
176,400.00
1,228,500.00
1,102,500.00
441,000.00
114,950.00
472,500.00
4,500.00
6,145.00
7,090.00
8,978.00
10,148.00
14,175.00
21,206.00
103,950.00
7,500.00
27,600.00
16,400.00
21,360.00
36,540.00
394,300.00
1,053,500.00
2,300.00
114,950.00
94,500.00
31,858.75
24,158.75
166,375.00
14,630.00
1,500.00
120,000.00
3,780.00
4,000.00
7,900.00
3,780.00
472,500.00
12,900.00
19,300.00
18,700.00
3,810.00
30,250.00
550.00
387.50
485.00
3,500,000.00
9,373,300.00
70,000.00
41,700.00
10,193.00
1,268.00
1,700.00
4,500.00
178,600.00
1,339,700.00
65,000.00
113,400.00
43,520.00
50,530.00
54,750.00
HS -3

1
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
B
1
2
3
4
5

2
Tripleks 122x244x4 mm
Tandon Air Fiberglass Kap. 1100 Ltr ( Penguin )
Teakwood 900 x 210 x 3 mm
Teakwood 110 x 210 x 4 mm
Teakwood 122 x 244 x 4 mm
Teakwood Lps Almunium
TBA / isolasi
T Dos PVC
Tanah Urug
Tanah katel
Tanah Sirtu
Tiner B ( minyak cat )
Urinoir
Wastafel besar warna
Waterdrain + asesories
Watermoor
Wall paper Lbr. 50 cm ( Contrac Paper )
Zekering SPA 60 A
UPAH TENAGA KERJA
Mandor
Kepala Tukang
Tukang
Tukang bongkar
Pekerja

3
Lbr
Bh
Lbr
Lbr
Lbr
Lbr
Rol
Bh
M3
M3
M3
Ltr
Bh
Bh
Set
Bh
M1
Bh

4
63,530.00
1,487,900.00
55,000.00
81,900.00
119,100.00
95,000.00
3,810.00
7,500.00
37,200.00
44,700.00
44,700.00
7,500.00
325,000.00
148,800.00
111,600.00
12,700.00
21,900.00
6,500.00
64,000.00
59,000.00
53,000.00
29,000.00
32,000.00

Oh
Oh
Oh
Oh
Oh

Kediri.

2009

Mengetahui / Menyetujui :
KEPALA DINAS PEKERJAAN UMUM

Disusun :
Konsultan Perencana

KOTA KEDIRI

CV. SETIA GRAHA CONSULTANT

Ir. H. WIDODO, MM

Ir. SUHARI

Pembina TK. I
NIP. 510 077 638

Direktur

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

HS -4

CV. SETIA GRAHA CONSULTANT


LAPORAN SURVEY
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.

X.

XI.

XII.
XIII.

XIV.

XV.

XVI.
XVII.
XVIII.

NAMA KEGIATAN
: Rehab Sedang / Berat Ruang Kelas SMAN
STATUS KEGIATAN
: MILIK PEMERINTAH KOTA KEDIRI
LOKASI PROYEK
: KECAMATAN KOTA
KEADAAN JALAN
: BAIK
BANGUNAN YANG HARUS DIBONGKAR
: 2 RUANG KELAS LAMA
AIR BERSIH DISEKITAR KEGIATAN
: ADA
JARAK KEGIATAN SAMPAI JALAN BESAR
: 100 M
ALIRAN LISTRIK SEKITAR KEGIATAN
a. JALUR PLN
: ADA
BENTUK KEGIATAN YANG AKAN DIRENCANAKAN
a. REHABILITASI RUANG KELAS
b.
KEGIATAN TERSEBUT DIGUNAKAN UNTUK
a. MENINGKATKAN KUALITAS BELAJAR MENGAJAR
b. MENINGKATKAN KUALITAS SARANA BELAJAR MENGAJAR
DATA LOKASI MATERIAL / TENAGA
a. BATU BELAH DIAMBIL SEJAUH
: 10 KM
b. PASIR DIAMBIL SEJAUH
: 10 KM
c. TENAGA DIAMBIL SEJAUH
: 5 KM
JUMLAH PENDUDUK SELURUH KOTA
: . Jiwa
KEGIATAN TSB. SANGAT DIPERLUKAN KARENA
a. SEMAKIN DITUNTUTNYA KEMAMPUAN DAN DAYA SAING SISWA DALAM ERA GLOBALISASI
b. AGAR SISWA AMAN DAN NYAMAN SELAMA MENGIKUTI KEG. BELAJAR MENGAJAR
DATA LAIN-LAIN YANG BERPENGARUH
PADA PERENCANAAN
: 1 RKB DIDIRIKAN DIATAS RUANG KELAS LAMA
2 RKB DIDIRIKAN DIBAWAH
BIAYA YANG DIPERLUKAN UNTUK FISIK
: Rp540,000,000.00
BIAYA PERENCANAAN, PENGAWASAN, DAN
ADMINISTRASI
: Rp24,300,000.00
RENCANA PERKIRAAN TENAGA KERJA YANG
DAPAT DISERAP
: 21 Jiwa
RENCANA PERKIRAAN WAKTU PENYELESAIAN : 90 HARI
LAIN-LAIN
:

Demikian Laporan Survey ini kami buat untuk bahan Perencanaan Kegiatan :
Rehab Sedang / Berat Ruang Kelas SMAN 7
Petugas Survey :
Arif Mabrury
David Irmawan
Aris Susanto
Ganif Soewasono

Kediri, Mei 2009


Dibuat :
Konsultan Perencana
CV. SETIA GRAHA CONSULTANT

Ir. SUHARI
Direktur

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Lap Sur5/1

PERHITUNGAN RENCANA MANDAYS


Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran

NO.

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

: Rehab Sedang / Berat Ruang Kelas SMAN 7


: Rehab. Ruang Kelas SMAN 7
: Jl. Penanggungan Kota Kediri
: 2009

URAIAN PEKERJAAN

Pengukuran & Pemasangan Bowplank


Membersihkan Lapangan & Peralatan
Galian Tanah Biasa Sedalam 1 M1
Urugan Tanah Kembali
Urugan pasir
Urugan Tanah
Pasang Pondasi Batu Kali 1 Pc : 6 Ps
Pasang bata merah tebal 1/2 bata 1 Pc : 3 Ps
Pasang bata merah tebal 1/2 bata 1 Pc : 6 Ps
Pasang dinding roster / terawang 12 x 11 x 24
Plesteran 1 Pc : 3 Ps tebal 15 mm
Plesteran 1 Pc : 6 Ps tebal 15 mm
Plesteran Beton 1 Pc : 2 Ps tebal 15 mm
Benangan
Membuat Pondasi beton bertulang
Membuat beton Sloof Praktis 10/10
Membuat beton Sloof Struktur 15/30
Membuat Kolom Praktis 12/12
Membuat Kolom Struktur 20/30
Membuat Kolom Struktur 30/30
Membuat Balok Induk 30/40
Membuat Balok Induk 30/50
Membuat Balok anak 15/35
Membuat Balok 20/25
Membuat konsol 30/40 cm
Membuat Balok gantung dan konsol 12/20 cm
Membuat Ring balk praktis 12/12
Membuat Ring balk praktis dan balok latay 10/15
Membuat beton plat atap / deck t = 10 cm
Membuat beton plat atap / deck t = 12 cm
Membuat Tangga beton bertulang
Rabat Beton 1 Pc : 3 Ps : 6 Kr
Pasang kusen pintu & jendela kayu kamfer
Pasang pintu panil kayu Kamper
Pasang Pintu & Jendela Kaca Kayu kamfer+ kaca 5
Pasang jalusi kayu kamfer
Pasang Pintu Double Teakwood rangka kayu Kruing
Pasang Konstruksi Kuda - kuda kayu Kruing
Pasang Konstruksi Gording kayu Kruing
Pasang rangka atap genteng Kodok Kayu Kruing
Pasang lisplank uk. 3 x 20 cm, kayu kamfer
Pasang papan reuter
Pasang papan kompres
Pasang atap genteng kodok

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

VOL.

3
7.00
216.00
21.71
5.43
19.02
26.46
4.46
24.18
250.97
1.15
48.37
501.94
124.45
474.27
5.54
0.20
2.70
0.43
1.82
6.50
5.40
8.40
1.10
0.90
1.13
1.04
0.44
1.93
0.82
21.99
3.46
7.51
2.09
8.52
9.66
20.87
1.64
0.84
1.33
169.92
51.81
10.00
13.81
169.92

SAT.

KEBUTUHAN
TENAGA KERJA
STANDAR ( TS ) PER
SATUAN

M1
M2
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
M2
M1
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M1
M3
M3
M3
M3
M3
M2
M2
M2
M2
M3
M3
M2
M1
M1
M1
M2

MANDAYS

6=3x5
0.22
0.11
0.78
0.26
0.31
0.28
2.40
0.43
0.43
0.43
0.48
0.48
0.48
0.14
4.23
4.23
4.23

1.51
22.68
16.83
1.40
5.90
7.28
10.70
10.28
106.66
0.49
23.22
240.93
59.74
64.03
23.45
0.85
11.43

4.23
4.23
4.46
4.46
4.46
4.46
4.46
4.46
4.46
4.23
4.23
4.46
4.46
4.46
2.01
26.10
4.35
3.48
3.21
3.05
17.40
10.44
0.22
0.33
0.41
0.41
0.24

1.82
7.70
28.96
24.06
37.43
4.90
4.01
5.04
4.63
1.86
8.17
3.65
97.99
15.42
15.06
54.55
37.06
33.62
66.89
4.99
14.62
13.89
36.53
16.84
4.10
5.66
40.95
Mand 6/2

1
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69

Pasang bubung genteng kodok


Pasang langit - langit asbest 1 x 1 m Rangka Kayu M
Pasang list kayu profil
Pasang Pipa GIP 2"
Pasang kunci tanam
Pasang engsel pintu kuningan
Pasang engsel jendela
Pasang Hak angin
Pasang Handel jendela
Pasang grendel pintu
Pasang grendel Jendela
Pasang kaca tebal 5 mm
Pasang lantai keramik polos 30 X 30 cm
Pengecatan bidang kayu Baru
Melabur kayu dengan Residu / Ter
Mendempul dan Mengecat 2x selesai Tembok Baru
Cat plafond baru
Memasang instalasi listrik
Memasang saklar ganda
Memasang Stop Kontak
Pasang lampu TL 2 x 20 watt + kaap lampu
Pasang lampu SL
Pasang lampu Baret
Pasang Buis beton U 20 cm
Membongkar gedung lama

3
10.00
146.11
150.31
68.20
4.00
21.00
48.00
24.00
24.00
7.00
24.00
8.20
275.70
212.29
40.78
871.46
146.11
32.00
5.00
3.00
18.00
3.00
3.00
35.49
1.00

M1
M2
M1
M1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Ttk
Bh
Bh
Ttk
Ttk
Ttk
M1
-

6=3x5
0.62
0.61
0.11
0.31
0.68
0.16
0.12
0.12
0.16
0.12
0.12
0.34
1.12
0.09
0.11
0.09
0.09
0.84
0.07
0.07
0.07
0.07
0.07
0.22
0.50

JUMLAH MANDYS
JANGKA WAKTU PELAKSANAAN
JUMLAH TENAGA KERJA

90.00
21.00

6.22
89.27
16.23
21.24
2.70
3.37
5.78
2.89
3.90
0.82
2.81
2.82
308.78
18.58
4.32
80.00
13.41
26.88
0.35
0.21
1.27
0.21
0.21
7.95
0.50
1,818.49
Hari
Orang/Hari

Kediri,2009
Dibuat :
Konsultan Perencana
CV. SETIA GRAHA CONSULTANT

Ir. SUHARI
Direktur

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Mand 7/2

PEKERJAAN PERSIAPAN
Membersihkan Lapangan & Peralatan
PEKERJAAN DINDING
Pasang bata merah tebal 1/2 bata 1 Pc : 3
Pasang bata merah tebal 1/2 bata 1 Pc : 6
Pasang dinding roster / terawang 12 x 11 x
PEKERJAAN PLESTERAN
Plesteran 1 Pc : 3 Ps tebal 15 mm
Plesteran 1 Pc : 6 Ps tebal 15 mm
Plesteran Beton 1 Pc : 2 Ps tebal 15 mm
Benangan

9.74
93.86
0.40

19.49
187.72
16.32
90.51

PEKERJAAN BETON
Membuat Kolom Praktis 12/12
Membuat Kolom Struktur 20/30
Membuat Balok gantung dan konsol 12/20

0.22
1.82

Membuat Ring balk praktis dan balok latay

1.28

0.64

1.056

PEKERJAAN KAYU
Pasang kusen pintu & jendela kayu kamfer
Pasang pintu panil kayu Kamper
Pasang Pintu & Jendela Kaca Kayu kamfe
Pasang jalusi kayu kamfer
0.832 Pasang Konstruksi Kuda - kuda kayu Kruin
Pasang Konstruksi Gording kayu Kruing
1.056 Pasang rangka atap genteng Kodok Kayu K
Pasang lisplank uk. 3 x 20 cm, kayu kamfe
Pasang papan reuter
Pasang papan kompres

0.68
2.84
3.22
7.38
0.84
0.98
138.06
33.81
10.00
13.81

PEKERJAAN PENUTUP ATAP


Pasang atap genteng kodok
Pasang bubung genteng kodok

138.06
10.00

PEKERJAAN LANGIT - LANGIT


Pasang langit - langit asbest 1 x 1 m Ran
Pasang list kayu profil

119.11
111.01

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Mand 8/2

PEKERJAAN PIPA DAN SANITASI


Pasang Pipa GIP 2"

25.50

PEKERJAAN PENGUNCI DAN KACA


Pasang kunci tanam
Pasang engsel pintu kuningan
Pasang engsel jendela
Pasang Hak angin
Pasang Handel jendela
Pasang kaca tebal 5 mm
Pasang grendel pintu
Pasang grendel Jendela

1.00
6.00
16.00
8.00
8.00
4.10
2.00
8.00

PEKERJAAN PENUTUP LANTAI


Pasang lantai keramik polos 30 X 30 cm

88.90

PEKERJAAN PENGECATAN
Pengecatan bidang kayu Baru
Melabur kayu dengan Residu / Ter
Mendempul dan Mengecat 2x selesai Temb
Cat plafond baru

113.20
33.13
216.83
119.11

PEKERJAAN LAIN - LAIN


Memasang instalasi listrik
Memasang saklar ganda
Memasang Stop Kontak
Pasang lampu TL 2 x 20 watt + kaap lampu
Pasang lampu SL
Pasang lampu Baret

11.00
2.00
1.00
6.00
1.00
1.00

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

Mand 9/2

TIME SCHEDULE
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran

: Rehab Sedang / Berat Ruang Kelas SMAN 7


: Rehab. Ruang Kelas SMAN 7
: Jl. Penanggungan Kota Kediri
: 2009

1 TAHUN KALENDER
NO.

URAIAN PEKERJAAN

BULAN I
1

A
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
B
I
II
III
IV
V
VI
VII
VIII
IX
X
XI

BULAN II
4

BULAN III
4

LANTAI BAWAH
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN BETON
PEKERJAAN KAYU
PEKERJAAN PENUTUP ATAP
PEKERJAAN LANGIT - LANGIT
PEKERJAAN BESI DAN ALUMUNIUM
PEKERJAAN PENGUNCI DAN KACA
PEKERJAAN PENUTUP LANTAI
PEKERJAAN PENGECATAN
PEKERJAAN LAIN - LAIN
LANTAI ATAS
PEKERJAAN PERSIAPAN
PEKERJAAN DINDING
PEKERJAAN PLESTERAN
PEKERJAAN BETON
PEKERJAAN KAYU
PEKERJAAN PENUTUP ATAP
PEKERJAAN BESI DAN ALUMUNIUM
PEKERJAAN PENGUNCI DAN KACA
PEKERJAAN PENUTUP LANTAI
PEKERJAAN PENGECATAN
PEKERJAAN LAIN - LAIN
Kediri,2009
Dibuat :
Konsultan Perencana
CV. SETIA GRAHA CONSULTANT

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

file:///var/www/apps/conversion/tmp/scratch_6/343630137.xls

LEMBAR ASISTENSI

NO

BENDEL

CATATAN

DIPERIKSA

Anda mungkin juga menyukai