MINDANAO
as of 30 June 2016
POWER PLANT
FACILITY NAME
GRID-CONNECTED
Coal Thermal
MINDANAO COAL
Therma South 1 & 2
Diesel
SUBTYPE
SPPC
PB 104
TMI 2
TMI 1
WMPC
MPC - IDPP
Geothermal
MT APO
Hydro
Large Hydroelectric Plants
AGUS 1
AGUS 2
AGUS 4
AGUS 5
AGUS 6
AGUS 7
PULANGI 4
Small Hydroelectric Plants
TUDAYA 2
Solar
Dam-type HEPP
Dam-type HEPP
Dam-type HEPP
Dam-type HEPP
Dam-type HEPP
Dam-type HEPP
Run-of-River type HEPP
Run-of-River type HEPP
LOCATION
CAPACITY, MW
Number of Unit
Installed
Dependable
MUN/PROV
2,175.7
1,846.8
532.0
470.0
232.0
210.0
2
PHIVIDEC,Villanueva,Misamis
300.0
260.0
2
Davao City/ Sta. Cruz, Davao Del
507.0
462.0
50.0
Alabel, Sarangani
32.0
16.0
Brgy Ilang,Davao
PSALM
100.0
99.0
100.0
99.0
113.0
100.0
10
103.0
98.0
18
108.5
108.5
989.1
982.1
80.0
180.0
158.1
55.0
200.0
54.0
255.0
7.0
7.0
39.1
104.4
104.4
783.0
776.0
50.0
122.0
136.0
52.0
151.0
40.0
225.0
7.0
7.0
27.4
2
3
3
2
5
2
3
PSALM
PSALM
PSALM
PSALM
PSALM
PSALM
PSALM
HEDCOR Inc.
10.5
7.3
DIGOS SOLAR
28.6
20.0
566.2
118.0
118.0
321.1
471.4
105.0
105.0
286.8
18.9
59.0
KIBAWE SOLAR
EMBEDDED
Coal Thermal
SEC
Diesel
OWNER/ OPERATOR
OWNER TYPE
TYPE OF
CONTRACT
DATE COMMISSIONED/
COMMERCIAL OPERATION
NPC-IPP
NON-NPC/IPP
BOT-PPA
Sept.16,2006
Sep. 18, 2015; Feb 2, 2016
NPC-IPP
BOO-ECA
3/26/1998
NPC
Sep 2005
NON-NPC/IPP
2/26/1994
NON-NPC/IPP
7/20/1994
NPC-IPP
BOO-ECA
NON-NPC/IPP
NO
NPC-IPP
NPC
NPC
NPC
NPC
NPC
NPC
NPC
12/121997
5/1/2013
BOO-PPA
12/15/1996
6/23/1992
6/6/1979 11/27/1979
3/16/1985 4/16/1985
2/9/1985 3/8/1985
7/1/1953
4/28/1971
3/5/1983 12/17/1983
12/21/1985
6/21/1986
YES
NON-NPC/IPP
5/9/2014
YES
NON-NPC/IPP
3/13/2016
NO (w/ RESA)
NON-NPC/IPP
3/24/2016
Maasim, Sarangani
NON-NPC/IPP
Apr 29 2016
18.0
NON-NPC/IPP
8/25/1995
27.5
27.0
NON-NPC/IPP
March 2012
10.0
9.9
Cotabato
Cotabato Light
NON-NPC/IPP
1963
58.7
48.0
12
Davao City
Davao Light
NON-NPC/IPP
6/5/1995
3.2
3.1
NON-NPC/IPP
26 August 2012
10.6
10.0
NON-NPC/IPP
9/25/2013
13.0
13.0
13
NON-NPC/IPP
10/1/2013
15.0
15.0
EEI Power
NON-NPC/IPP
12/26/2013
19.0
15.0
19.0
15.0
14
15
NON-NPC/IPP
NON-NPC/IPP
3/22/2014
28 March 2014
15.6
15.0
NON-NPC/IPP
May 2014
POWER PLANT
FACILITY NAME
KEGI-TANDAG
SUBTYPE
Bunker/Diesel Internal Combustion
Engine
CAPACITY, MW
Installed
Dependable
7.8
7.5
Number of Unit
1
LOCATION
MUN/PROV
Tandag, Surigao del Norte
OWNER/ OPERATOR
King Energy Generation Inc
OWNER TYPE
NON-NPC/IPP
TYPE OF
CONTRACT
DATE COMMISSIONED/
COMMERCIAL OPERATION
Oct 2014
POWER PLANT
FACILITY NAME
PSC
MEGC
PSI
PSFI
KEGI - Maramag
KEGI - Camiguin
SUBTYPE
Waste Heat Recovery System
Bunker/Diesel Internal Combustion
Engine
Bunker/Diesel Internal Combustion
Engine
Bunker/Diesel Internal Combustion
Engine
Bunker/Diesel Internal Combustion
Engine
Bunker/Diesel Internal Combustion
Engine
CAPACITY, MW
LOCATION
Number of Unit
OWNER/ OPERATOR
Installed
Dependable
MUN/PROV
37.1
18.4
7
PHIVIDEC,Villanueva,Misamis OrrienPhil. Sinter Corporation
NON-NPC/IPP
2/26/2015
Maramag , Bukidnon
NON-NPC/IPP
4Q 2015
NON-NPC/IPP
2/28/2016
NON-NPC/IPP
2/29/2016
NON-NPC/IPP
5/6/2016
5.0
7.8
7.5
4.1
4.0
11.9
11.9
71.5
42.6
42.6
28.9
1.6
7.0
9.2
4.5
6.6
35.9
35.9
19.7
1.0
12.5
6.2
2,741.9
54.3
36.0
36.0
18.3
1.6
0.0
6.0
4.1
6.6
10.0
10.0
15.3
0.3
10.0
5.0
2,318.1
Note:
Excluding off-grid generators
Release date, 30 June 2016
FIT Approved Plants based on RE Proects under FIT System, March 2016
in GREEN - New Entry
in BLACK - NON-NPC/IPP
in RED - NPC
in BLUE - NPC-IPP
1/26/2015
19.6
5.2
SPC Koronadal
NON-NPC/IPP
20.9
4.8
Iligan City
4.8
12/29/2014
NON-NPC/IPP
15.0
Hydro
Large Hydroelectric Plants
SIBULAN HEP
Small Hydroelectric Plants
AGUSAN
BUBUNAWAN
CABULIG HEP
TALOMO HEP
TUDAYA 1
Biomass
CRYSTAL SUGAR
Solar
CEPALCO SOLAR PV
KIRAHON SOLAR
CENTRALLA SOLAR
TOTAL MINDANAO
NON-NPC/IPP
DATE COMMISSIONED/
COMMERCIAL OPERATION
2008
15.0
OWNER TYPE
TYPE OF
CONTRACT
NO
NON-NPC/IPP
March 2010
2
1
1
5
1
M. Fortich, Bukidnon
Baungon,Bukidnon
Claveria, Misamis Oriental
Mintal, Davao City
Sta. Cruz, Davao del Sur
NO
NO
NO
NO
NO
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
12/28/1957
9/22/2001
24 September 2012
10/1/1998
5/9/2014
Maramag, Bukidnon
NO
NON-NPC/IPP
12/6/2010
NON-NPC/IPP
NON-NPC/IPP
NON-NPC/IPP
September 2004
25 Oct 2015
9 Dec 2015