Design Paramaters
1 Average flow
2 Average daily flow
3 Average hourly flow
4 Average flow
5 Peak factor
6 Peak flow
7 Peak flow
8 Peak flow
9 Peak flow
10 Biochemical Oxygen Demand (BOD5 )
11 Chemical Oxygen Demand (COD)
12 Total Suspended Solids (TSS)
13 Oil & Grease
14 TKN as N
15 Phosphorus
16 Total Ammonical Nitrogen
17 Design temperature
18 Min. temparature of sewage
19 Max. temparature of sewage
20 Sulphate
Unit
mld
m3/d
m3/h
m3/s
ratio
mld
m3/d
m3/h
m3/s
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
mg/l
oC
oC
oC
mg/l
21 Fecal Coliform
22 DO in aeration tank
23 Elevation
24 Oxygen transfer efficiency
25 Operating Hr/day
MPN/100ml
ppm
m
%
Hr
Inlet Value
0.05
50.00
2.50
0.00
2.50
0.13
125.00
6.25
0.002
1500.00
4500.00
1000.00
20.00
10.00
6.00
17.00
10.00
10.00
35.00
0.00
2 x 107
2.00
435.00
35.00
20.00
#VALUE!
Outlet Value
0.05
50.00
2.50
0.00
2.50
0.13
125.00
6.25
0.00
30.00
250.00
20.00
5.00
0.50
2.00
5.00
10.00
10.00
30.00
0.00
10000.00
2.00
Exit Loss
Tee
Tee
Bend 90 degrees
Sudden Expansion / Contraction
Butterfly Valve
Ball Valve
Swing Check Valve
Electromagnetic flow meter
Manning coefficient for RCC structure
Manning coefficient for MS structure
Conversion factor
C for CI
SN
Design Paramaters
1 Average flow
2 Average daily flow
3 Average hourly flow
4 Average flow
5 Peak factor
6 Peak flow
7 Peak flow
8 Peak flow
9 Peak flow
10 primary sludge flow rate
12 sludge recirculation flow
13 Excess sludge flow rate
14 Filtrate flow rate
Sludge consitancy
15 total sludge widrawal
No of units
Length of the pipe from aeration tank to Secondary
settling tank
Dia of the pipe
Head loss
Number of Outlet points
Losses due to entry in outlet pipe
Losses due to exist from Oulet pipe
Slope required for free flow
Head drop
Total head loss
Head loss due to fittings
No of elbows in line
Head loss due to elbow
No of Tee in line
Head loss due to Tee
No of ball valve in line
Head loss due to ball valve
Length Of Fizono tank
Width Of Fizono tank
Liquid depth Of Fizono tank
Head loss in Fuzino Tank
Total Head Loss
Total losses
No of units
Length of the pipe from Secondary settling tank to
Chlorine Contact / Filter feed Tank
Dia of the pipe
Head loss
Number of Outlet points
Losses due to entry in outlet pipe
Losses due to exist from Oulet pipe
k
0.5
1.00
Material
0.78
1.45
Asbestos-cement
Cast iron
0.75
0.50
1.54
2.00
2.50
0.17
0.013
0.013
0.849
Unit
mld
m3/d
m3/h
m3/s
ratio
mld
m3/d
m3/h
m3/s
m3/sec
m3/sec
m3/sec
m3/sec
%
m3/sec
m
m
m
m
m2
m/s
no
Outlet Value
0.05
50.00
2.50
0.00
2.50
0.13
125.00
6.25
0.00
Inlet Value
0.05
50.00
2.50
0.00
2.50
0.13
125.00
6.25
0.00
0.000
0.000
0.000
0.000
30.00
0.000
-0.4
1.00
0.50
0.49
0.25
1
0.00
1.00
m
m
m/m length of channel
m
m
m
m
m/m length of channel
m
m
m
m
m
m
m
m3/s
m2
No
m
m
m/m length of channel
m
m
m
m
m
m/m length of channel
m
m/m length of channel
m
0.000
0.000
0.000
0.000
0.010
1.000
0.010
0.491
0.500
0.000
0.000
0.010
-0.41
1.5
-0.50
0.50
0.49
0.00
1
0.64
1
0.000
0.000
#DIV/0!
#DIV/0!
0.010
1.000
0.010
0.491
0.500
0.000
0.000
0.000
0.000
m
m
m
m
0.151
5
0.047
0.151
m
no
m
no
m
no
0.984
10
0.382
4
0.296
3
0.306
#DIV/0!
#DIV/0!
1
m
m
m
no
m
m
10
0.045
0.124
1.000
0.009
0.009
0.010
m
0.100
0.242
m
no
m
no
m
no
m
0.285
5
0.069
4
0.106
3
0.110
m
m
m
5.268
5.268
2.090
0.000
0.000
0.527
#DIV/0!
1
m
m
m
no
m
m
6
0.038
0.089
1.000
0.009
0.009
0.010
m
0.060
0.167
m
no
m
no
m
no
m
0.153
5
0.037
4
0.057
3
0.059
m
m
m
2.060
2.060
2.288
0.000
0.000
0.321
#DIV/0!
#DIV/0!
1
m
m
m
no
m
m
6
0.028
0.060
1.000
0.004
0.004
0.010
m
0.060
0.128
m
no
m
no
m
no
m
0.127
5
0.031
4
0.047
3
0.049
2.060
m
m
m/m length of Secondary
settling tank
m
2.060
2.288
0.000
0.000
0.255
#DIV/0!
ed in design, which take into account some increase in roughness as pipe ages are as follows:[4]
C Factor
low
C Factor
high
140
100
140 140 -
140
100
130
90
120
140
130
130 -
150
150 -
Reference
Note
Inlet Sewage
Avg. Flow
3
Peak Flow
6
COD 4500.00
BOD 1500.00
TSS 1000.00
Operating
20.00
Hr
No of unit- 1
No of unit- 1
L= 1 , W=0.5 , H=0.49
Anaerobic Digestor
No of unit- 1
No of unit- 3
L= 2 , W=2.57 , H=5.01
Micron Filter
No of unit - 1
Avg.
Flow
Peak Flow
6
COD 900.00
BOD 300.00
TSS
50.00
Dual Med
No of u
Dia of Vessel= 0.
0.9
COD 250.00
BOD 30.00
TSS 20.00
Hypo-Chloride Dosing
Capacity = 6 LPH @ 15 m head
Air Blower
Centrifuge
0.55
No of unit - 2
L= 5.27 , W= 5.27 , H= 2.59
waste sludge
Flow
No of unit - 1
Dia of tank = 2.06 , Side water Dep
H= 2.29
Avg. Flow
COD
BOD
TSS
Filter feed Tank
No of unit - 1
ride Dosing
PH @ 15 m head
L= 1 , W= 1 , H= 2
Alum Dosing
Capacity = 6 LPH @ 15 m head
0.36
ry settling tank
of unit - 1
06 , Side water Depth
= 2.29
feed Tank
of unit - 1
W= 1 , H= 2
3
300.00
90.00
62.50
2
a
Bar Screen
Mechanical
Total Flow
No of screens
Flow per screen
Velocity at peak flow, V
Clear area of opening
Assume LD
Angle of Inclination of screen with horizontal
Projected depth of the screen
Clear width of openings through racks
Clear spacing between the bars
Flat thickness
L= 1 , W=0.5 ,H=
No of bars
say
No of Openings
say
Width of the screen
say
Velocity through screen chamber, v
Free Board
Length of channel required on downstream
Length of channel required on upstream
Total Length
Head loss through bar screen
For clean condition
HL= 1 /C [ V2 - v2 ] / 2g
Where
Emperical discharge coefficient for clear condition, C
V
v
therefore ,
HL
m3/sec
no
m3/sec
m/s
m2
m
deegree
m
m
mm
m
mm
m
no
m/s
m
0.002
1.00
0.002
1.000
0.002
0.10
60.00
0.12
0.015
5.000
0.005
3.000
0.003
2.01
5.000
6.000
6.000
0.045
0.500
0.035
0.20
m
m
m
0.350
0.500
0.850
no
m
0.600
m/s
m/s
m
1.000
0.035
0.085
m/s
m/s
m
0.700
2.000
0.035
0.291
m
m
m
1.00
0.50
0.49
no.
m3/day
m/hr
hr.
m
m
m/hr
m
m
m
m
m
m
m
m
1.00
125.000
2.500
1.00
2.50
1.50
10.00
0.25
0.17
1.67
0.42
0.50
1.67
1.00
1.50
Equilization Tank
No. of tanks
Incoming flow (peak)
Retainsion time
Volume required
Assume the L.D.
C/S area
W:L ratio
Width
length
Volume of the Tank
Free board
no.
m3/day
hr.
m
m
m
m
m
m
m
1.00
125.000
3.00
15.63
0.50
31.25
1.00
5.59
5.59
15.63
0.50
Anaerobic Digester
FLOW
pH
BOD
COD
TOTAL SOLIDS
SO4
PHOSPHOROUS
BOD load
COD load
Sludge Production
Tss removal efficiency
50.00
6.5 - 8.5
1500.00
4500.00
1000.00
0.00
6.00
75.00
225.00
95%
80%
300
900
50
120
480
200
800
40.00
assumptions :
SRT value
Depth of sludge blanket
Effectiveness coefficient
Average concentration of sludge
Full depth of reactor
Free board of the reactor
HRT
Upflow velocity
Volumetric organic loading
45
2.5
0.85
55
4
0.5
24.64
0.16
3.65
61.60
15.40
0.16
22.00
49.28
0.72
-0.01
no. of reactors be
Volume of each reactor
Surface area of each reactor
Ht of the reactor
Dia of reactor
10.74
3
20.53
5.13
4.00
2.55
180.00
0.00
80%
0
0
0
180.00
0.35
63.00
1.4
61.60
3.08
COD load x eff. x 0.54
97.20
4.05
2.55
4
3
21
4.0
2.0
2.57
1.01
5.01
M3/DAY
mg/L
mg/L
mg/L
mg/L
mg/L
kg/day
kg/day
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
mg/L
kg/day
days
m
kg/m3
m
m
hrs.
m/hr
kg COD/m3-day
m/hr
hrs.
m3/day
m3/day
times
kg COD/kg VSS-day
no.
cum
sqm
m
m say
kg/day
mg/L
mg/L
kg/day
kg/day
kg/day
m3/kg COD removed
m3/day
m3/day
m3/day
m3/hr
m3/day
m3/hr
m dia say
m + 1 m free board
No
m3
m
m
m
m
m
S
Solid production rate in term of Suspended particle
Heterotropic Biomass , A
Cell debris, B
Nitrifying bactetia biomass, C
Non bio degradable VSS in influent, D
Px,tss
Px,vss
No of aeration tank
Volume of the Aeration tank
Liquid depth
C/s Area of the tank
Length / width ratio
width
Length
Free board
Retainsion time
MLVSS in aeration tank
F/M Ratio
Oxygen requirment
Air requirment
Air requirment for mixing
Total air requirment for mixing
Provide the Air blower of capacity
Air requirement
Relative pressure at elevation
Pb/Pa
Oxygen Saturation value at operating temperature
Oxygen Concentration at operating temperature and altutude
Sp. Wt at working temperature
Atm press. At working elevation and temperature
% conc of oxygen in air leaving aeration tank
Oxygen Concentration at operating temperature and altutude in aeration tank
Fouling factor
SOTR
Air flow rate
Provide the air blower of capacity
Diffusers requirment
Area covered by diffusers
Total area to be coverd
No of diffusers required
Air flow through each diffusers
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
g bCOD/m3
g VSS/gbCOD
g vss/g vss.d
g bCOD/m3
unitless
g VSS/gVSS .d
Day
80.00%
480.00
420.00
150.00
540.00
300.00
386.36
850.00
3000.00
20.00 range
0.40 range
0.10 range
30.00 range
0.15 range
5.00 range
8.00
5 - 40
0.3-0.5
0.06-0.20
5 - 40
0.08 - 0.2
3.0 - 13.2
g/g.d
unitless
unitless
g/g.d
g/g.d
g vss/gvss.d
g NM4-N/m3
g vss/g NH4-N
g vss/gvss.d
g/m3
0.75 Range .2 - .9
0.74 range .5 - 1
0.12 range 0.1- .15
0.08 range 0.05 - .15
0.50 range 0.4 - 0.6
Unitless
Unitless
Unitless
g/g.d
0.11
Day
9.27
1.50
13.90 Say
g bCOD/m3
kg/d
kg/d
Kg/d
kg/d
kg/d
kg/d
no
m3
m
m2
m
m
m
m
Hr
ppm
kg/kg.d
1.67
4.75
0.72
0.03
19.32
33.30
24.83
2.00
83.24
3.00
27.75
1.00
5.27
5.27
0.50
66.59
2236.70
0.20
Kg/day
Kg/hr
Kg/hr
M3/hr
M3/hr/m3 of tank volume
m3/hr
18.26
0.91
3.97
3.28
1.20
69.59
m3/hr
69.59
ppm
ppm
KN/m3
m of water
%
ppm
Kg/h
m3/hr
m3/hr @ .5kg/cm2
1.00
11.28
11.28
9.80
10.34
19.00
10.98
0.65
0.95
0.90
1.63
45.27
69.59
gmBOD/m2/day
%
m2/m3 of media
m2
m3
m
m
m
m
m
m3
m3/day
m2/diffuser
m2
No
m3/hr/diffusers
40.00
90.00
120.00
300.00
2.50
0.09
0.50
1.50
2.09
0.50
57.99
7.25
1
55.49
55.49
1.25
Table
Table
Table
Table
Table
no
no
no
no
no
8.10
8.10
8.10
8.10
8.10
metcaff
metcaff
metcaff
metcaff
metcaff
Eddy
Eddy
Eddy
Eddy
Eddy
15
no.
m3/d
m/m/day
m
m
min
m
m
m
Deg
m
m
m3/d
m3/s
m3/s
ppm
%
ppm
m3/s
m3/d
1.00
50.00
15.00 15-30
3.33
2.06
150.00
7.63
2.29
0.50
5.00
0.09
0.10
7.25
0.00
0.00
10.00
1.00%
10000.00
0.00
11.00
0.22
no.
m3/day
hr.
m
m
m
m
m
m
m
1.00
50.00
0.50
1.04
1.50
0.69
1.00
0.83
0.83
1.04
0.50
1m
1m
2m
50.00
20.00
1.00
2.50
8
631
0.95
0.30
4
Flow
operating hrs
No of Filter Vessel
filter capacity
Flow velocity through filtration media bed
Dia of vessel
Ht of vessel, HOS
Volume pf vessel
Thickness of Fabrication plate
Head Type
ICR
IKR
S.F.
Depth of dish
Head ht
Sell surface area
Sell Volume
Head & bottom plate surface area
Head & bottom plate volume
Total volume of the fabrication material
Fabrication material
Density of material
weight of material
Wastage of material
Total fabrication material
Mislanous material like angle, supporting bars etc
Gross weight of fabrication material
Torisperical
0.95
0.08
21
118
139
2
0.008
0.86
0.003
0.011
MS
7850
86
10%
96
0%
96
m3/day
hrs
No
m3/hr
m3/hr
mm
m
m3
mm
0.9-0.95 of ID
0.06-0.1 of ICR
10-30mm or 3.5*t
mm
mm
m2
m3
m2
m3
m3
kg/m3
kg
kg
Kg
Flow
operating hrs
No of Filter Vessel
filter capacity
Flow velocity through filtration media bed
Dia of vessel
Ht of vessel, HOS
Volume pf vessel
Thickness of Fabrication plate
Head Type
ICR
IKR
S.F.
Depth of dish
Head ht
Sell surface area
Sell Volume
Head & bottom plate surface area
Head & bottom plate volume
Total volume of the fabrication material
Fabrication material
Density of material
weight of material
Wastage of material
Total fabrication material
Mislanous material like angle, supporting bars etc
Gross weight of fabrication material
50.00
20.00
1.00
2.50
10
564
0.62
0.16
4
Torisperical
0.95
0.08
21
105
126
1
0.004
0.69
0.003
0.007
MS
7850
56
10%
62
0%
62
m3/day
hrs
No
m3/hr
m3/hr
mm
m
m3
mm
0.9-0.95 of ID
0.06-0.1 of ICR
10-30mm or 3.5*t
mm
mm
m2
m3
m2
m3
m3
kg/m3
kg
kg
Kg
Sl no
1
2
3
4
5
6
7
8
9
Description
Flow rate
Number of Working dosing system
Chemicals to be dosed
Conc of Chem solution to be prepared
Dosing rate (100%)
Purity of Chemical considered
Dosing rate
Dosing rate required
Pump Capacity provided
Pump Head required / provided
Number of Dosing Pumps
11
12
13
14
Storage Capacity
Volume of the tank required
Design margin
Volume of the tank calculated
15
Tank Type
Unit
Alum
m3/h
mg/l
% w/v
kg/h
% w/w
kg/h
lph
lph
mwc
Nos
2.5
1.0
35.6
10.00%
0.09
100
0.09
0.9
6
15
1W
h
m3
%
m3
20
0.018
20
0.021
Vertical
Cylindrical
Remarks
Dear Kamod,
Please find below Bank Account details for transfer of Fund of Rs.
3,000/- towards professional Fees for ST Registration