TABLA DOSIFICADORA DE CEMENTO

RENDIMIENTOS PROMEDIO DE TRABAJOS DE ALBAILERA

DOSIF. CONCRETO DE
REV. DE 10 CM.

SACO
CEMENTO

AGUA BOTE
19 LTS.

ARENA BOTE
19 LTS.

GRAVA BOTE
19 LTS.

MUROS Y PISOS F'C=100


KG/CM2

1.0

3.0

8.0

8.5

CASTILLOS Y DALAS
F'C=150 KG/CM2

1.0

2.5

5.5

6.5

M2

10.00

FIRMES DE CONCRETO P/PISOS, ESPESOR DE 8-10 CM

LOSAS Y ZAPATAS
F'C=200 KG/CM2

1.0

2.0

4.0

6.0

M2

35.00

ACABADO ESCOBILLADO INTEGRAL SOBRE FIRMES

COLUMNAS Y TECHOS
F'C=250 KG/CM2

1.0

1.5

3.5

4.5

M2

18.00

FINO NO INTEGRAL ACABADO PULIDO

M2

50.00

ARMADO CON MALLA EN PISOS

TABLA DISIFICADORA PARA RESISTENCIA DE CONCRETO

GPO.

UNI

REND. (JOR)

CONCEPTO

PISOS

RESISTENCIA POR M3 DE
CONCRETO

SACO
CEMENTO

AGUA BOTE
19 LTS.

ARENA BOTE
19 LTS.

GRAVA BOTE
19 LTS.

M2

5.00

PISOS CERMICA SIN FIRME

F'C=100 KG/CM2

5.0

12.0

32.0

34.0

M2

7.00

PISOS LOSETA 15X15X1.0 CM, A 2 CM

F'C=150 KG/CM2

6.5

12.5

27.5

32.5

M2

7.00

PISOS LOSETA 10X20X1.0 CM, A 2 CM

F'C=200 KG/CM2

7.5

13.0

26.0

39.0

M2

13.00

PISOS LOSETA 30X30X2.50 CM

F'C=250 KG/CM2

8.0

11.3

26.3

33.8

M2

11.00

PISOS MOSAICO 20X20X2.0 CM

M2

9.50

PISO MOSAICO TERRAZO S/JTA MET. 50X50X2.50 CM

ARENA (BOTES DE 19 LTS)

1 SACO DE 50 KG + No. DE BOTES DE ARENA DE 19 LTS.


(Aada la cantidad suficiente de agua para formar una masa
plstica de consistencia similar a la de una pasta de dientes).

ML

18.00

ZOCLO MOSAICO 10X20X2.0 CM

PISOS, FIRMES, BANQUETAS Y GUARNICIONES (Aadir 4 botes


de grava de 19 lts. Por saco de 50 kg.)

ML

18.00

ZOCLO LOSETA 10X15X30 A 40 CM

APLANADOS Y RECUBRIMIENTOS EN PANELES DE


POLIESTILENO
1
1
1
1

M2
M2
M2
M2

4.00
2.00
3.00
2.00

MARTELINADO FINO SOBRE PISO


MARTELINADO FINO SOBRE COLUMNAS
MARTELINADO FINO SOBRE MUROS
MARTELINADO FINO SOBRE TRABES Y LOSAS

M3

2.00

RELLENOS DE TEZONTLE EN AZOTEAS

M2

20.00

ENTORTADO SOBRE CASCO

M2

11.00

ENLADRILLADO Y ESCOBILLADO

TABLA DOSIFICADORA DE MORTERO

MARTELINADOS

3
8 a 10
7a9
8 a 10

APLANADOS Y RECUBRIMIENTOS DE ALTA RESISTENCIA


APLANADOS, ENJARRES, REPELLADOS Y ENTORTADOS
JUNTEO DE BLOCK, TABIQUES Y MOSAICO
CIMENTACIONES DE PIEDRA BRAZA

9 a 11

PLANTILLAS

AZOTEAS

TABLA DE REAS, PERMETROS Y PESOS TERICOS DE VARILLAS


DIAM. NOMINAL
PUL.

PULGADAS

REA EN
CM2

PERMETRO
EN CM.

KG X M. L.

PZA X TON

**-

--

5 / 32

0.12

--

0.100

1666

M2

7.00

ENLADRILLADO APARENTE

**-

--

3 / 16

0.18

--

0.133

1253

ML

24.00

CHAFLANES DE PEDACERA

**-

--

1/4

0.32

--

0.250

667

**-

--

5 / 16

0.49

--

0.384

434

PZA

19.00

HECHURA DE TARIMAS 50X100 CM

*2.5

7.9

5 / 16

0.49

2.48

0.384

217

M2

3.50

MURO BLOCK VIDRIO 10X20X20 CM. INC. RFZO. JUNTAS

*3

9.5

3/8

0.71

2.98

0.557

150

PZA

2.00

REGISTROS DE 40X60 CM. CON PROF. PROM. 1.25 M

*4

12.7

1/2

1.27

3.99

0.996

84

PZA

6.00

TAPA DE REGISTROS DE 40X60 CM.

*5

15.9

5/8

1.99

1.580

53

ML

35.00

IMPERMEABILIZACIN EN CIMIENTOS

*6

19.1

3/4

2.87

2.250

37

ML

26.00

ALBAALES DE 15 CM DE DIAM. TENDIDO Y JUNTEO

*8

25.4

5.07

7.98

3.975

21

M2

7.50

COLOCACIN DE HERRERA

*10

31.8

1 1/4

7094

9.99

6.225

13

M2

30.00

*12

38.1

1 1/2

11.4

11.97

8.938

No.

**

= R-6000 (VARILLAS DE 6 METROS DE LONGITUD)

= R-42 (VARILLAS DE 12 METROS DE LONGITUD)


DIMETRO

IMPERMEABILIZACIN AZOTEA POR CAPA

LECHADA CEMENTO GRIS O BLANCO


CONCEPTO

DIMETRO MNIMO DE DOBLEZ


VARILLA

VARIOS

UNIDAD

CANTIDAD

1.300

TON CEMENTO + 3% DE DESP.

TON

1.339

0.900

M3 DE AGUA + 30% DE DESP.

M3

1.170

PASTA DE CEMENTO GRIS O BLANCO

D= DIMETRO NOMINAL

MNIMO

No. VAR

CM

No. VAR

CM

UNIDAD

CANTIDAD

# 3, 4 Y 5

3.5 D

3.320

12.701

1.500

TON CEMENTO + 3% DE DESP.

CONCEPTO

TON

1.545

#6Y8

5D

4.445

10

22.259

0.700

M3 DE AGUA + 30% DE DESP.

M3

0.910

# 10

7D

5.570

12

30.481

# 12

8D

9.549

UNIDAD

CANTIDAD

TON

0.834

M3

1.170

PASTA DE YESO
CONCEPTO

TABLA DE INTEGRACIN DE CUADRILLAS

0.810

TON YESO + 3% DE DESP.

0.900

M3 DE AGUA + 30% DE DESP.

0.10 CABO+1.0 PEN

0.25 OFICIAL +1.0 PEN

1.0 OF. CARPINTERO + 1.0 AYUDANTE

UNIDAD

CANTIDAD

0.5 OF. FIERRERO + 1.0 AYUDANTE

0.540

TON CEMENTO BLANCO + 3% DE DESP.

TON

0.556

1.0 OFICIAL + 1.0 PEN

2.100

TON DE POLVO DE MRMOL + 5% DE DESP.

TON

2.205

1.0 OF. ESPECIALISTA + 1.0 PEN

0.280

M3 DE AGUA + 30% DE DESP.

M3

0.364

PASTA CEMENTO BLANCO POLVO DE MRMOL 1:3


CONCEPTO

RENDIMIENTOS PROMEDIO DE TRABAJOS DE ALBAILERA


GPO

REND. (JOR)

PASTAS CEMENTO BLANCO POLVO DE MRMOL

CONCEPTO

CONCEPTO

PRELIMINARES Y CIMENTACIN

CEM (TON)

P. MR. (TON)

AGUA

PROPORCIN

1:3

0.540

2.100

0.280

M2

50.00

LIMPIA Y TRAZO

PROPORCIN

1:4

0.440

2.200

0.275

M3

4.00

EXC. TIERRA 0.00-2.00 M

PROPORCIN

1:5

0.380

2.300

0.272

M3

2.00

EXC.TEPETATE BLANDO 0.00-2.00 M

M3

18.00

TRASPALEO 0.00-2.00 M

UNIDAD

CANTIDAD

M3

5.00

ACARREO CON CARRETILLA 20.00 M

0.270

TON CEMENTO BLANCO + 3% DE DESP.

TON

0.278

M3

7.00

RELLENOS POR CAPAS, COMPACTADAS CON PISN

0.125

TON DE CALHIDRA + 3% DE DESP.

TON

0.129

M2

35.00

COMPACTACIN DE CEPAS CON PISN

2.100

TON DE POLVO DE MRMOL + 5% DE DESP.

TON

2.205

M2

14.00

PLANTILLAS ENTRE 0.07 Y 0.10 M

0.280

M3 DE AGUA + 30% DE DESP.

M3

0.364

M3

3.00

CIMIENTOS DE PIEDRA BRAZA

CEM (TON)

CAL ( TON)

P. MR. (TON)

AGUA

TON

0.17

EN CIMENTACIN

PROPORCIN

1:1:6

0.270

0.125

2.100

0.280

TON

0.16

EN ESTRUCTURA

PROPORCIN

1:1:8

0.220

0.100

2.200

0.278

TON

0.13

HAB. Y ARMADO DE ALAMBRN DE 1/4" Y 5/16"

PROPORCIN

1:1:10

0.190

0.085

2.300

0.276

PROPORCIN

1:1:12

0.135

0.075

2.400

0.274

HABILITADO Y ARMADO DE ACERO DE REFUERZO

CIMBRAR Y DESCIMBRAR, ACABADO NO APARENTE


3

M2

9.50

EN CIMIENTOS

M2

7.50

EN COLUMNAS RECTANGULARES

M2

6.00

EN COLUMNAS CIRCULARES

M2

8.50

EN TRABES

M2

9.00

EN LOSAS

PINTURAS E IMPERMEABILIZANTES

PASTA CEMENTO BLANCO-CAL-POLVO MRMOL 1:1:6


CONCEPTO

PASTA CEMENTO BLANCO-CAL-POLVO MRMOL


CONCEPTO

FORMULA PARA CONVERTIR A PIE TABLN.


A= DIMENSIN CORTA EN PULGADAS

PT=

A" X B" X C mts.

B= DIMENSIN LARGA EN PULGADAS

3.657

C= DIMENSIN EN METROS DE LA PIEZA

MEZCLA CALHIDRA-ARENA 1:3

REND.
1/8 M2

UNIDAD
LT

CONCEPTO
PRIMARIO

UNIDAD

CANTIDAD

0.250

TON CALHIDRA + 3% DE DESP.

CONCEPTO

TON

0.258

2/1 LT PRI

LT

THINNER

1.000

M3 DE ARENA + 8% DE DESP.

M3

1.080

1/4 M2

LT

PINTURA

0.270

M3 DE AGUA + 30% DE DESP.

M3

0.351

RENDIMIENTOS PROMEDIO DE TRABAJOS DE ALBAILERA


GPO

REND. (JOR)

MEZCLA CALHIDRA-ARENA

CONCEPTO

CONCEPTO

HECHURA DE CIMBRA
3
3
3
3
3
3

M2
M2
M2
M2
M2
ML

17.00
8.50
4.00
10.00
10.00
15.00

EN CIMIENTOS
EN COLUMNAS RECTANGULARES
EN COLUMNAS CIRCULARES
EN TRABES
EN LOSAS
CIMBRAR Y DESCIMBRAR CON SONOTUBO
LOSAS RETICULARES

CAJA

100.00

COLOC.BLOCK HASTA 20X40X40 CM

2
2
2

CAJA
CAJA
CAJA

2
2
2
2
1
1
1

M3
M3
M3
M3
M3
M2
M2

5
5
5
5
5

M2
M2
M2
M2
M2

5
5
5
5
5

M2
M2
M2
M2
M2

6
6
6
6
6

M2
M2
M2
M2
M2

5
5
5
5
5

ML
ML
ML
ML
ML

5
5
5
5
5
6
6
6

M2
M2
M2
M2
M2
M2
M2
M2

M2

5.50

RECUBRIMIENTO AZULEJO

6
6
5
6
3

M2
M2
M2
ML
M2

4.50
5.00
9.00
16.00
43.00

RECUBRIMIENTO TIPO VITRICOTA 6 X 20 X 18 CM


RECUBRIMIENTO TIPO VITRICOTA 6 X 20 X 1.8 CM
RECUBRIMIENTO MOSAICO 20 X 20 X 2 CM
BOQUILLA INCL. CORTES A 45 MATERIAL VERIFICADOS
SOBREPRECIO POR TENDIDO EN FACHADAS

CAL (TON)

ARENA (M3)

AGUA (M3)

PROPORCIN

1:3

0.250

1.000

0.270

PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN

1:4
1:5
1:6
1:7
1:8
1:9
1:10

0.200
0.170
0.145
0.125
0.110
0.100
0.090

1.070
1.130
1.180
1.220
1.250
1.270
1.285

0.260
0.255
0.250
0.245
0.240
0.235
0.230

MEZCLA MORTERO-ARENA 1:4

40.00
COLOC.BLOCK HASTA 35X60X60 CM
40.00
ENTREPISO RETICULAR CELULADO LNEA MENOR
30.00
ENTREPISO RETICULAR CELULADO LNEA MAYOR
COLADOS ( NO INCLUYE LA FABRICACIN DEL CONCRETO)
1.50
EN CIMIENTOS
0.85
EN COLUMNAS Y MUROS
0.95
EN TRABES Y LOSAS
0.80
EN LOSAS RETICULARES
10.00
CURADO CONCRETO C/AGUA EN SUP. HORIZONTALES
300.00
CURADO CONCRETO CON AGUA
100.00
CURADO CONCRETO C/AGUA EN SUP. VERTICALES
MUROS TABIQUE COMN O LIGERO NO APARENTE
11.00
DE 0.07 M DE ESPESOR
10.00
DE 0.14 M DE ESPESOR
8.00
DE 0.21 M DE ESPESOR
6.00
DE 0.28 M DE ESPESOR
40.00
SOBREPRECIO PARA CARA APARENTE
MUROS DE BLOCK TIPO PIRMIDE
10.00
DE 0.10 M DE ESPESOR
9.50
DE 0.12 M DE ESPESOR
9.00
DE 0.15 M DE ESPESOR
8.50
DE 0.20 M DE ESPESOR
80.00
SOBREPRECIO PARA CARA APARENTE
MURO DE BLOCK EXTRUIDO
4.50
DE 5X10X15 EN 10 CM DE ESPESOR
5.00
DE 6X10X20 EN 10 CM DE ESPESOR
5.50
DE 10X10X20 EN 10 CM DE ESPESOR
5.50
DE 10X15X20 EN 15 CM DE ESPESOR
55.00
SOBREPRECIO PARA CARA APARENTE
CASTILLOS Y CADENAS
30.00
CASTILLO CENTRO DE BLOCK 1 DIAM. (3/8")
10.00
CASTILLOS Y CADENAS 15 X 15 CON 4 DIAM. (3/8")
9.50
CASTILLOS Y CADENAS 15 X 20 CON 4 DIAM. (3/8")
8.00
CASTILLOS Y CADENAS 15 X 30 CON 4 DIAM. (3/8")
25.00
SOBREPRECIO PARA CARA APARENTE CAST. Y CAD.
RECUBRIMIENTOS
19.00
REPELLADOS DE MEZCLA
14.00
APLANADOS DE MEZCLA (ROSTREADOS)
11.00
APLANADOS FINOS DE MEZCLA
10.00
APLANADOS PULIDOS DE CEMENTO A LLANA
23.00
CONFITILLO SOBRE APLANADOS
RECUBRIMIENTO DE CERMICA O MOSAICO VENECIANO,
4.00
INCLUYE REPELLADO
4.50
RECUBRIMIENTO CINTILLA 5.5 X 22 X 1 A 6 X 24 X 1 CM
5.00
RECUB. FACHALETA 10 X 20 X 1 A 11 X 22 X 1 CM

0.300
1.150
0.290

CONCEPTO
TON MORTERO + 3% DE DESP.
M3 DE ARENA + 8% DE DESP.
M3 DE AGUA + 30% DE DESP.

EXCAVACIN EN MAT B

27.7 M3/HR DE
RETRO

40 M3/HR CARGADOR

ACERO DE REFUERZO

140 KG/JOR

CUADRILLA DE FIERRERO + AYUDANTE

CIMBRA

12 M2/JOR

CUADRILLA DE CARPINTERO + AYUDANTE

MAMPOSTERA

2.5 M3/JOR

CUADRILLA DE ALBAIL + AYUDANTE

PV ASFALTO

2.321 TON/M3
COMPACTO

1.75 TON/M3
SUELTO

FORMACIN Y COMPACTACIN
DE TERR ADIC.

AGUA 0.25

64 M3/HR MOTONIV

250 M3/HR COMP


815

BASE HIDRULICA

AGUA 0.25

33.3 M3/HR
MOTONIV

40 M3/HR COMP
VIBR

MEZCLADO TENDIDO CAPA


SUBRAS.

AGUA 0.25

40 M3/HR MOTONIV

40 M3/HR COMP
VIBR

RIEGO DE SELLO 3-A

0.013 M3/M2
MAT 3A

EMUL 1.03 LT/M2

125 M2/HR COMP


VIBR=CAMION

RIEGO DE IMPREGNACIN

1.2-1.5 LT/M2

RIEGO DE LIGA

0.5 LT/M2

PAVIMENTOS

100 M2/HR
PAVIMENTADO
RA

143 LT/HR PETROLIZADORA

BOYAS

50 PZA/JOR

CUADRILLA DE 1 PEN

DEFENSA METLICA

15 ML/JOR

CUADRILLA DE 1 ALBAIL + 1 PEN

SEAL RESTRICTIVA 86X86 CM

10 PZA/JOR

CUADRILLA DE 1 ALBAIL + 1 PEN

96 M3/HR COMP.
VIBRATORIO

169 M2/HR
PETROLIZADORA

CANTIDAD
0.309
1.242
0.377

ARENA (M3)
1.150
1.200
1.240
1.270
1.290

AGUA (M3)
0.290
0.285
0.280
0.275
0.270

MEZCLA MORTERO-ARENA
CONCEPTO
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN

MORT. (TON)
0.300
0.260
0.225
0.195
0.170

1:4
1:5
1:6
1:7
1:8

MEZCLA CEMENTO-ARENA 1:2


0.600
1.000
0.275

CONCEPTO
TON CEMENTO + 3% DE DESP.
M3 DE ARENA + 8% DE DESP.
M3 DE AGUA + 30% DE DESP.

UNIDAD
TON
M3
M3

CANTIDAD
0.618
1.080
0.358

ARENA (M3)
1.000
1.100
1.120
1.150
1.190
1.240
1.300

AGUA (M3)
0.275
0.272
0.266
0.261
0.257
0.252
0.246

MEZCLA CEMENTO-ARENA
CONCEPTO
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN

CEM. (TON)
0.600
0.510
0.430
0.360
0.300
0.250
0.210

1:2
1:3
1:4
1:5
1:6
1:7
1:8

MEZCLA CEMENTO-ARENA CERNIDA 1:2


0.630
1.000
0.285

CONCEPTO
TON CEMENTO + 3% DE DESP.
M3 DE ARENA + 8% DE DESP.
M3 DE AGUA + 30% DE DESP.

UNIDAD
TON
M3
M3

CANTIDAD
0.649
1.350
0.370

MEZCLA CEMENTO-ARENA CERNIDA


CONCEPTO
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN

CEM. (TON)
0.630
0.540
0.440
0.380
0.310

1:2
1:3
1:4
1:5
1:6

ARENA (M3)
1.000
1.050
1.100
1.150
1.170

AGUA (M3)
0.285
0.280
0.278
0.275
0.273

MEZCLA CEMENTO-CALHIDA-ARENA 1:1:4


0.300
0.150
1.000
0.280

CONCEPTO
TON CEMENTO + 3% DE DESP.
TON DE CALHIDRA + 3% DE DESP.
M3 DE ARENA + 8% DE DESP.
M3 DE AGUA + 30% DE DESP.

UNIDAD
TON
TON
M3
M3

CANTIDAD
0.309
0.155
1.080
0.364

MEZCLA CEMENTO-CALHIDA-ARENA

CONCEPTO

RENDIMIENTOS DE EQUIPOS Y MANO DE OBRA PARA LOS CORRESPONDIENTES


CONCEPTOS:
ACTIVIDAD
MATERIALES, M. DE O. Y EQUIPO

UNIDAD
TON
M3
M3

PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN
PROPORCIN

1:1:4
1:1:6
1:1:8
1:1:10
1:1:12

CEM (TON)

CAL ( TON)

ARENA (M3)

AGUA

0.300
0.255
0.215
0.180
0.150

0.150
0.125
0.100
0.085
0.075

1.000
1.050
1.095
1.065
1.185

0.280
0.279
0.278
0.275
0.273