Project
Client
EPC Contractor
Design Consultant
Proof Consultant
Authority Engineer
RSW Design Consultant
Designed
Checked
Approved
VD
SV
SV
Wall Height (m)
Static
Seismic
Project No
Revision
Date
2.50
TFI/RW-75 (12/2015)
R0
26-12-2015
2.50
Design Methodology
BS 8006 : 2010 Code of practice for strengthened / reinforced
soils and other fills
US Department of Transportation FHWA-NHI-10-024
Mechanically stabilized earth walls and reinforced soil slopes
design and construction guidelines
INPUT DATA
Project
Designed by
Reference No
VD
TFI/RW-75 (12/2015)
'
c'
Reinforced Infill Soil
Retained Soil
Foundation Soil
0.00
0.00
0.00
(kN/m )
(kN/m 2)
(kN/m 2)
32
32
30
(Degrees)
(Degrees)
(Degrees)
15.00
15.00
18.00
(kN/m )
3
(kN/m )
(kN/m 3)
2.50
Hf - Hd
0
(kN/m 3)
2.50
(metres)
0.54
0
(metres)
(Degrees)
Wall Height , m
22
0
0
(metres)
(Degrees)
11.88
0.00
24.00
24.00
0.00
(kN/m 2)
2
(kN/m )
2
(kN/m )
(kN/m)
(kN/m)
1.250
2.500
0.85
0.85
0.18
0.16
25
(metres)
3
(kN/m )
(metres)
(metres)
0
1.00
1.00
2.50 (metres)
2.50
3.04 (metres)
3.00 (metres)
3.00 (metres)
0.80 (metres)
3.00 (metres)
0.00
0.307
LOAD COMBINATION
A
LOAD COMBINATION
B
Rh
21.60
13.69
27.65
0.00
(kN)
(kN)
(kN)
(kN)
62.95
(kN)
Rh
21.60
13.69
27.65
0.00
(kN)
(kN)
(kN)
(kN)
62.95
(kN)
112.50
35.64
24
0.00
(kN)
(kN)
(kN)
(kN)
172.14
(kN)
69.68
(kN-m)
1.58
SAFE
0.40
2.19
78.59
30.14
22.40
18.40
1.00
692.21
10.78
(metres)
(metres)
(kN/m2)
Rv
Moment (M d):
168.75
161.46
36.00
0.00
(kN)
(kN)
(kN)
(kN)
366.21
(kN)
69.68
(kN-m)
Rv
3.36
SAFE
0.19
2.62
139.80
30.14
22.40
18.40
1.000
778.72
6.21
(metres)
(metres)
(kN/m2)
(kN/m2)
SAFE
(kN/m2)
SAFE
0.307
(Ka1h)
0.307
hj
(m)
S vj
(m)
M dj
(kN-m)
ej
(m)
0.400
1.200
2.000
-
2.10
1.30
0.50
-
0.8
0.8
0.9
-
47.13
16.50
2.21
-
0.155
0.066
0.009
-
D j (m)
T pj
(kN)
T sj
(kN)
T fj
(kN)
T cj
(kN)
3.55
3.15
2.75
-
27.72
21.36
18.07
-
2.49
2.81
3.62
-
0.00
0.00
0.00
-
0.00
0.00
0.00
-
Tj
(kN)
30.21
24.17
21.69
-
hj
(m)
S vj
(m)
M dj
(kN-m)
ej
(m)
Dj
(m)
T pj
(kN)
T sj
(kN)
T fj
(kN)
T cj
(kN)
Tj
(kN)
0.4
1.2
2
-
2.10
1.30
0.50
-
0.8
0.8
0.9
-
47.13
16.50
2.21
-
0.362
0.175
0.029
-
3.55
3.15
2.75
-
14.06
8.73
5.44
-
1.66
1.87
2.41
-
0.00
0.00
0.00
-
0.00
0.00
0.00
-
15.72
10.61
7.85
-
Target FOS =
Tj
1.10
Reinforcement Properties
Geogrid
T ult
RF tot
(kN)
PSF avail
Case A
Case B
Remarks
Case A
Case B
zj
(m)
hj
(m)
S vj
(m)
Case A
(kN)
Case B
(kN)
0.400
2.10
0.8
30.21
15.72
TechGrid TGU-150-2
72.00
2.076
34.68
1.15
2.21
SAFE
SAFE
1.200
1.30
0.8
24.17
10.61
TechGrid TGU-120-2
57.60
2.076
27.74
1.15
2.62
SAFE
SAFE
2.000
0.50
0.9
21.69
7.85
TechGrid TGU-120-2
57.60
2.076
27.74
1.28
3.53
SAFE
SAFE
TD
(kN)
Target FOS =
R hj
(kN)
49.97
27.34
9.13
-
1.30
Load Case - A
R vj
PSF avail
(kN)
339.21
3.61
285.21
5.54
289.77
16.85
-
Remarks
SAFE
SAFE
SAFE
-
R hj
(kN)
49.97
27.34
9.13
-
Load Case - B
R vj
PSF avail
(kN)
154.14
1.64
118.14
2.30
99.58
5.79
-
Remarks
SAFE
SAFE
SAFE
-
Target FOS =
1.73
Load Case - A
z j (m)
L (m)
0.40
1.20
2.00
-
3.00
3.00
3.90
-
L ej
(m)
2.78
2.33
2.79
-
L new
(m)
3.00
3.00
3.90
-
L ej(new)
(m)
2.78
2.33
2.79
-
Coverage, Rc
0.48
0.48
0.48
-
T rj
(kN)
83.80
50.94
37.61
-
Load Case - B
PSF avail
Remarks
2.77
2.11
1.73
-
SAFE
SAFE
SAFE
-
T rj
(kN)
55.87
33.96
25.08
-
PSF avail
Remarks
3.55
3.20
3.19
-
SAFE
SAFE
SAFE
-
0.18
Am(ext)
0.23
Am(int)
0.23
0.00
(ext)
12.88
(int)
(H2*)
12.88
(Degrees)
75% of static FOS
3.29
(metres)
(H1*)
3.29
(Kae)
0.465
(Kdyn)
0.157
Rh(dyn))
12.78
(kN)
(FhIR(fp))
2.29
(kN)
(Degrees)
(metres)
(FhIR(cb))
5.49
(kN)
(FhIR(s-q))
18.58
(kN)
(RhIR)
26.35
(kN)
14.40
9.13
0.00
(kN)
(kN)
(kN)
(Rh(static))
23.53
(kN)
(Rh)
56.27
(kN)
112.50
35.64
24
0.00
(kN)
(kN)
(kN)
(kN)
(Rv)
172.14
(kN)
(Qh)
99.39
1.77
(kN)
Disturbing Moment
1.125
SAFE
(Md)
83.19
(kN-m)
(e)
0.48
2.03
(metres)
(qr)
84.65
Nc
30.14
N
Nq
22.40
Rw
1.00
(qult)
660.57
BC Factors
2
(kN/m )
18.40
2
(kN/m )
9.40
1.875
SAFE
(e)
(eall.)
0.48
(metres)
1.00
(metres)
SAFE
Layer No.
1
2
3
-
zj
(m)
0.40
1.20
2.00
-
L (m)
h j =H-z j
(m)
3.00
3.00
3.90
-
2.10
1.30
0.50
-
R hj (kN) R vj (kN)
44.51
130.14
25.40
94.14
12.19
75.58
-
PSF avail
1.24
1.57
2.63
-
Remarks
SAFE
SAFE
SAFE
-
D j (m)
3.55
3.15
2.75
-
T pj (kN)
10.66
7.71
5.36
-
T sj (kN)
1.66
1.87
2.41
-
12.59 kN
T fj (kN)
0.00
0.00
0.00
-
T md
4.42
3.72
4.44
-
T cj
0.00
0.00
0.00
-
Tj
16.75
13.30
12.22
-
T dj
34.68
27.74
27.74
-
PSF avail
2.07
2.09
2.27
-
Remarks
SAFE
SAFE
SAFE
-
L (m)
3.00
3.00
3.90
-
L ej (m)
2.78
2.33
2.79
-
T rj (kN)
102.42
62.26
45.97
-
PSF avail
6.12
4.68
3.76
-
Remarks
SAFE
SAFE
SAFE
-
REINFORCEMENT LAYOUT
Qr
64.00 kN/m2
Ref
Qs
TFI/RW-75 (12/2015)
Wall height (m)
2.50
Design height (m)
2.50
94.00 kN/m2
Layer No.
zj
Geogrid
Length
(m)
Tult
(kN/m)
TD
(kN/m)
1
2
3
-
0.400
1.200
2.000
-
TechGrid TGU-150-2
TechGrid TGU-120-2
TechGrid TGU-120-2
-
3.00
3.00
3.90
-
72.00
57.60
57.60
-
34.68
27.74
27.74
-
Notes:
1. Reinforcement layers are seqenced from bottom to top. Layer no. 1 is the bottom most.
2. zj is the height of the jth layer measured from top of levelling pad
3. Tult is the short-term peak tensile strength of the geogrid
4. TD is the long-term design strength of the geogrid