Anda di halaman 1dari 4

4m

24 PIPE
SUPPORT

11m

DUIKER PLATE DI ANGKAT

STEP 1:
PENGANGKATAN
DUIKKER PLATE YANG
MENUTUPI PIPA.
ISI UDITH DIKURAS,
DIBERSIHKAN,
DIKERINGKAN.

14m

DUIKER PLATE DI ANGKAT

DUIKER PLATE DI ANGKAT

DUIKER PLATE DI ANGKAT

4m

18m

KARYA MUKTI

4m

24 PIPE
SUPPORT

11m

STEP 2
PIPA PERTAMA DI ANGKAT DAN
DIKELUARKAN DARI UDITH.
UNTUK DI BERSIHKAN DENGAN
WIREBRUSH, DIKERINGKAN , DICAT
ULANG, SERTA DI WRAPPING
DENGAN POLIKEN

LAYER 1
LAYER 2
LAYER 3

"POLIKEN WRAPPING"

14m

4m

18m

KARYA MUKTI

4m

24 PIPE
SUPPORT

A
11m

PLAT BAJA 20mm


As Temporary Cover

STEP 3
PLAT BAJA 20MM SEBAGAI
TEMPORARY COVER DILETAKKAN
DIATAS UDITH, UNTUK LINTASAN
TRUK
STEP 4
PIPA PERTAMA DIKEMBALIKAN KE
UDITH DAN DISAMBUNG KEMBALI.
PIPA KEDUA DI ANGKAT DAN
DIKELUARKAN DARI UDITH.
UNTUK DI BERSIHKAN DENGAN
WIREBRUSH, DIKERINGKAN , DICAT
ULANG, SERTA DI WRAPPING
DENGAN POLIKEN
DAN SETERUSNYA SAMPAI PIPA KE
EMPAT

14m

PLAT BAJA 20mm


As Temporary Cover

4m

18m

KARYA MUKTI

4m

24 PIPE
SUPPORT
DETIL B

A
11m

PLAT BAJA 20mm


As Temporary Cover

STEP 5
SETELAH SEMUA PIPA
DIKEMBALIKAN KE UDITH.
UDITH DIISI DENGAN PASIR,
DIATAS PASIR DI PLESTER.

2700m

PASIR PADAT & KERING

PIPA DI WRAPPING "POLIKEN"

ACIAN 1:3

U-DITH
COVER
EXISTING

KEMUDIAN DUIKKER PLATE


DIKEMBALIKAN DIATAS UDITH

1140m

POTONGAN A-A

14m

DETIL B

PASIR PADAT & KERING

PIPA DI WRAPPING "POLIKEN"

U-DITH COVER EXISTING


ACIAN 1:3

CONCRETE K175

DETIL B

PLAT BAJA 20mm


As Temporary Cover

4m

18m

KARYA MUKTI