21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 2+0
21-Aug-2014
Concepto
Anlisis: 11071
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
0.520000
Subtotal: MATERIALES
$62.40
52.78%
$62.40
52.78%
$54.20
45.84%
$54.20
45.84%
$1.63
1.38%
$1.63
1.38%
MANO DE OBRA
PEON
JOR
$298.08
0.181818
$54.20
0.030000
$118.23
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.08
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$12.55
$0.59
$144.45
Pgina: 3+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 4+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 5+0
21-Aug-2014
Concepto
Anlisis: 11131
Unidad
Costo
cantidad
Importe
Unidad: M3
SUM. Y RELLENO DE MATERIAL INERTE COMPACTADO CON PISON Y AGUA EN CAPAS DE 20 CM. DE
ESPESOR, INCL. ACARREO DENTRO DE LA OBRA, MEDIR COMPACTO.
MATERIALES
AGUA
M3
$50.00
0.300000
$15.00
5.58%
MATERIAL INERTE
M3
$120.00
1.300000
$156.00
58.07%
$171.00
63.65%
$59.62
22.19%
$59.62
22.19%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
0.67%
2.000000
$36.24
13.49%
$38.03
14.16%
$268.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$29.72
CARGOS ADICINALES
0.5%
$1.34
PRECIO UNITARIO
$28.51
$328.22
Pgina: 6+0
21-Aug-2014
Concepto
Anlisis: 12010
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$511.17
0.300000
$153.35
8.90%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.060000
$30.67
1.78%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
$362.86
21.06%
$10.89
0.63%
$10.89
0.63%
$34.94
2.03%
$362.86
0.030000
M3
$34.94
1.000000
M3
$42.42
1.000000
$42.42
2.46%
M3
$1,211.05
1.050000
$1,271.60
73.81%
Subtotal: BASICOS
$1,348.96
78.30%
Costo directo
$1,722.71
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$182.83
$0.00
$190.55
$8.61
$2,104.70
Pgina: 7+0
21-Aug-2014
Concepto
Anlisis: 12021
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3a., ACABADO COMUN, INCL. CIMBRADO Y
DESCIMBRADO.
MATERIALES
MADERA DE PINO 3 a.
PT
$6.23
4.000000
$24.92
20.00%
KG
$13.79
0.200000
$2.76
2.22%
KG
$13.86
0.200000
$2.77
2.22%
DIESEL
LT
$11.64
1.000000
Subtotal: MATERIALES
$11.64
9.34%
$42.09
33.78%
MANO DE OBRA
AYUDANTE
JOR
$298.06
0.091000
$27.12
21.77%
JOR
$582.29
0.091000
$52.99
42.53%
$80.11
64.29%
$2.40
1.93%
$2.40
1.93%
$80.11
0.030000
$124.60
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.78
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$13.22
$0.62
$152.22
Pgina: 8+0
21-Aug-2014
Concepto
Anlisis: 12032
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON ALAMBRON #2 F'y=2530 KG/CM2 INCL. SUMINISTRO,
HABILITADO, ARMADO, TRASLAPES, GANCHOS Y DESPERDICIOS.
MATERIALES
ALAMBRON No.2 Fy=2530 KG/CM2
KG
$11.50
1.050000
Subtotal: MATERIALES
$12.08
57.14%
$12.08
57.14%
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.010000
$5.82
27.53%
AYUDANTE
JOR
$298.06
0.010000
$2.98
14.10%
$8.80
41.63%
$0.26
1.23%
$0.26
1.23%
$8.80
0.030000
$21.14
INDIRECTOS
10.6129%
$2.24
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.34
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.11
$25.83
Pgina: 9+0
21-Aug-2014
Concepto
Anlisis: 12034
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON VARILLA #3 F'y=4200 KG/CM2, INCL. SUMINISTRO,
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIO.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.030000
$0.41
2.18%
KG
$11.50
1.050000
$12.08
64.08%
$12.49
66.26%
21.64%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.007000
$4.08
AYUDANTE
JOR
$298.06
0.007000
$2.09
11.09%
$6.17
32.73%
$0.19
1.01%
$0.19
1.01%
$6.17
0.030000
$18.85
INDIRECTOS
10.6129%
$2.00
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.09
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$23.03
Pgina: 10+0
21-Aug-2014
Concepto
Anlisis: 12035
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON VARILLA #4 F'y=4200 KG/CM2, INCL. SUMINISTRO,
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIO.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.030000
$0.41
2.29%
KG
$11.50
1.050000
$12.08
67.37%
$12.49
69.66%
19.46%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.006000
$3.49
AYUDANTE
JOR
$298.06
0.006000
$1.79
9.98%
$5.28
29.45%
$0.16
0.89%
$0.16
0.89%
$5.28
0.030000
$17.93
INDIRECTOS
10.6129%
$1.90
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.98
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$21.90
Pgina: 11+0
21-Aug-2014
Concepto
Anlisis: 12036
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON VARILLA #5 F'y=4200 KG/CM2, INCL. SUMINISTRO,
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIO.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.020000
$0.28
1.69%
KG
$11.50
1.090000
$12.54
75.59%
$12.82
77.28%
14.59%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.004149
$2.42
PEON
JOR
$298.08
0.004149
$1.24
7.47%
$3.66
22.06%
$0.11
0.66%
$0.11
0.66%
$3.66
0.030000
$16.59
INDIRECTOS
10.6129%
$1.76
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.84
CARGOS ADICINALES
0.5%
$0.08
PRECIO UNITARIO
$20.27
Pgina: 12+0
21-Aug-2014
Concepto
Anlisis: 12037
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON VARILLA DEL #6 AL #12 F'y=4200 KG/CM2, INCL.
SUMINISTRO, HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIO.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.014600
$0.20
1.20%
KG
$11.50
1.110000
$12.77
76.93%
$12.97
78.13%
14.04%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.004000
$2.33
PEON
JOR
$298.08
0.004000
$1.19
7.17%
$3.52
21.20%
$0.11
0.66%
$0.11
0.66%
$3.52
0.030000
$16.60
INDIRECTOS
10.6129%
$1.76
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.84
CARGOS ADICINALES
0.5%
$0.08
PRECIO UNITARIO
$20.28
Pgina: 13+0
21-Aug-2014
Concepto
Anlisis: 12076
Unidad
Costo
cantidad
Importe
Unidad: M2
MURETE DE ENRASE EN CIMENTACION DE BLOCK DE CONCRETO ASENTADO CON MORTERO CEM-ARENA 1:3
DE 15 CM. ESPESOR.
MATERIALES
TABICON DE CONCRETO PESADO 10X14X28
PZA
$3.10
32.700000
Subtotal: MATERIALES
$101.37
45.36%
$101.37
45.36%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.117647
$60.14
26.91%
PEON
JOR
$298.08
0.117647
$35.07
15.69%
$95.21
42.60%
$2.86
1.28%
$2.86
1.28%
$24.05
10.76%
$24.05
10.76%
$95.21
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.020200
$223.49
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$24.72
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$23.72
$1.12
$273.05
Pgina: 14+0
21-Aug-2014
Concepto
Anlisis: 21101
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA EN COLUMNAS Y MUROS, ACABADO APARENTE CON TRIPLAY DE PINO DE 16 MM., INCL.
CIMBRADO, DESCIMBRADO, HABILITADO Y CHAFLANES U OCHAVOS.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.200000
$2.76
1.58%
M2
$101.25
0.200000
$20.25
11.59%
MADERA DE PINO 3 a.
PT
$6.23
4.500000
$28.04
16.04%
$51.05
29.21%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL CARPINTERO DE OBRA NEGRA
JOR
$582.29
0.136700
$79.60
45.54%
AYUDANTE
JOR
$298.06
0.136000
$40.54
23.19%
$120.14
68.73%
$3.60
2.06%
$3.60
2.06%
$120.14
0.030000
$174.79
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$19.33
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$18.55
$0.87
$213.54
Pgina: 15+0
21-Aug-2014
Concepto
Anlisis: 21110
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA PARA LOSAS, ACABADO APARENTE CON TRIPLAY DE PINO DE 16 MM., INCL. CIMBRADO,
DESCIMBRADO, CHAFLAN, GOTERO Y FRENTES (OCHAVOS).
MATERIALES
DIESEL
LT
$11.64
1.000000
$11.64
KG
$13.86
0.300000
$4.16
2.45%
M2
$101.25
0.200000
$20.25
11.94%
MADERA DE PINO 3 a.
PT
$6.23
3.250000
$20.25
11.94%
$56.30
33.19%
Subtotal: MATERIALES
6.86%
MANO DE OBRA
OFICIAL CARPINTERO DE OBRA NEGRA
JOR
$582.29
0.125000
$72.79
42.91%
AYUDANTE
JOR
$298.06
0.125000
$37.26
21.96%
$110.05
64.87%
$3.30
1.95%
$3.30
1.95%
$110.05
0.030000
$169.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$18.77
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$18.00
$0.85
$207.27
Pgina: 16+0
21-Aug-2014
Concepto
Anlisis: 21111
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA PARA LOSAS CON VOLADO POSTER. ESTRUC. U-2, U-2C ACABADO APARENTE CON TRIPLAY PINO
DE 16 MM., INCL. CIMBRADO, DESCIMBRADO, CHAFLAN, GOTERO Y FRENTES (OCHAVOS).
MATERIALES
DIESEL
LT
$11.64
1.000000
$11.64
5.61%
KG
$13.86
0.300000
$4.16
2.01%
M2
$101.25
0.200000
$20.25
9.76%
MADERA DE PINO 3 a.
PT
$6.23
3.250000
$20.25
9.76%
$56.30
27.14%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL CARPINTERO DE OBRA NEGRA
JOR
$582.29
0.166667
$97.05
46.79%
AYUDANTE
JOR
$298.06
0.166667
$49.68
23.95%
$146.73
70.74%
$4.40
2.12%
$4.40
2.12%
$146.73
0.030000
$207.43
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$22.94
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$22.01
$1.04
$253.42
Pgina: 17+0
21-Aug-2014
Concepto
Anlisis: 21115
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA APARENTE EN TRABES CON TRIPLAY DE PINO DE 16 MM., INCL. CIMBRADO, DESCIMBRADO Y
CHAFLANES U OCHAVOS Y FRENTES.
MATERIALES
DIESEL
LT
$11.64
1.000000
$11.64
KG
$13.86
0.300000
$4.16
2.36%
M2
$101.25
0.250000
$25.31
14.37%
MADERA DE PINO 3 a.
PT
$6.23
4.500000
$28.04
15.92%
$69.15
39.26%
Subtotal: MATERIALES
6.61%
MANO DE OBRA
OFICIAL CARPINTERO DE OBRA NEGRA
JOR
$582.29
0.118000
$68.71
39.01%
AYUDANTE
JOR
$298.06
0.118000
$35.17
19.97%
$103.88
58.97%
$3.12
1.77%
$3.12
1.77%
$103.88
0.030000
$176.15
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$19.48
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$18.69
$0.88
$215.20
Pgina: 18+0
21-Aug-2014
Concepto
Anlisis: 21120
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA PARA BARANDALES O FALDONES, APARENTE C/TRIPLAY DE PINO DE 16 MM. INC. CIMBRADO,
DESCIMBRADO, HABILITADO Y CHAFLANES U OCHAVOS.
MATERIALES
MADERA DE PINO 3 a.
PT
$6.23
6.345000
$39.53
26.39%
KG
$13.79
0.050000
$0.69
0.46%
ML
$2.40
2.500000
$6.00
4.01%
kg
$13.86
0.090000
$1.25
0.83%
M2
$101.25
0.112000
$11.34
7.57%
DIESEL
LT
$11.64
0.500000
$5.82
3.88%
$64.63
43.14%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL CARPINTERO DE OBRA NEGRA
JOR
$582.29
0.093933
$54.70
36.51%
AYUDANTE
JOR
$298.06
0.093933
$28.00
18.69%
$82.70
55.20%
$2.48
1.66%
$2.48
1.66%
$82.70
0.030000
$149.81
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$16.57
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$15.90
$0.75
$183.03
Pgina: 19+0
21-Aug-2014
Concepto
Anlisis: 21201
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO REFUERZO EN ESTRUCTURA CON ALAMBRON Fy=2530 KG/CM2., INCL. SUMINISTRO, HABILITADO
Y ARMADO, TRASLAPES, GANCHOS, SILLETA Y DESPERDICIO.
MATERIALES
ALAMBRON No.2 Fy=2530 KG/CM2
KG
$11.50
1.050000
Subtotal: MATERIALES
$12.08
62.49%
$12.08
62.49%
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.008000
$4.66
24.11%
AYUDANTE
JOR
$298.06
0.008000
$2.38
12.31%
$7.04
36.42%
$0.21
1.09%
$0.21
1.09%
$7.04
0.030000
$19.33
INDIRECTOS
10.6129%
$2.05
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.14
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.10
$23.62
Pgina: 20+0
21-Aug-2014
Concepto
Anlisis: 21203
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
$13.79
0.030000
$0.41
2.18%
KG
$11.50
1.050000
$12.08
64.08%
$12.49
66.26%
21.64%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.007000
$4.08
AYUDANTE
JOR
$298.06
0.007000
$2.09
11.09%
$6.17
32.73%
$0.19
1.01%
$0.19
1.01%
$6.17
0.030000
$18.85
INDIRECTOS
10.6129%
$2.00
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.09
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$23.03
Pgina: 21+0
21-Aug-2014
Concepto
Anlisis: 21204
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
$13.79
0.030000
$0.41
2.29%
KG
$11.50
1.050000
$12.08
67.37%
$12.49
69.66%
19.46%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.006000
$3.49
AYUDANTE
JOR
$298.06
0.006000
$1.79
9.98%
$5.28
29.45%
$0.16
0.89%
$0.16
0.89%
$5.28
0.030000
$17.93
INDIRECTOS
10.6129%
$1.90
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.98
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$21.90
Pgina: 22+0
21-Aug-2014
Concepto
Anlisis: 21205
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
$13.79
0.030000
$0.41
2.29%
KG
$11.50
1.050000
$12.08
67.37%
$12.49
69.66%
19.46%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.006000
$3.49
AYUDANTE
JOR
$298.06
0.006000
$1.79
9.98%
$5.28
29.45%
$0.16
0.89%
$0.16
0.89%
$5.28
0.030000
$17.93
INDIRECTOS
10.6129%
$1.90
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.98
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$21.90
Pgina: 23+0
21-Aug-2014
Concepto
Anlisis: 21206
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
$13.79
0.030000
$0.41
2.29%
KG
$11.50
1.050000
$12.08
67.37%
$12.49
69.66%
19.46%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.006000
$3.49
PEON
JOR
$298.08
0.006000
$1.79
9.98%
$5.28
29.45%
$0.16
0.89%
$0.16
0.89%
$5.28
0.030000
$17.93
INDIRECTOS
10.6129%
$1.90
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.98
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$21.90
Pgina: 24+0
21-Aug-2014
Concepto
Anlisis: 21301
Unidad
Costo
cantidad
Importe
Unidad: M3
CONCRETO F'c=250 KG/CM2 EN ESTRUCTURAS Y LOSAS CON T.M.A. 3/4", INCL. VIBRADO Y CURADO
EN LOSAS,INC. AFINE Y ACABADO PARA RECIBIR IMPERMEABILIZANTE.
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.300000
$153.35
8.90%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.060000
$30.67
1.78%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
$362.86
21.06%
$10.89
0.63%
$10.89
0.63%
2.03%
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$362.86
0.030000
M3
$34.94
1.000000
$34.94
M3
$42.42
1.000000
$42.42
2.46%
M3
$1,211.05
1.050000
$1,271.60
73.81%
Subtotal: BASICOS
$1,348.96
78.30%
Costo directo
$1,722.71
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$182.83
$0.00
$190.55
$8.61
$2,104.70
Pgina: 25+0
21-Aug-2014
Concepto
Anlisis: 31001
Unidad
Costo
cantidad
Importe
Unidad: ML
CADENA DE CONCRETO F'c=150 KG/CM2 DE 14x10CM ARM C/2 VAR #3 Y GRAPAS #2 @20CM.. INCLUYE
CIMBRA APARENTE.
MATERIALES
VARILLA No.3 Fy=4200KG/CM2
KG
$11.50
1.170000
$13.46
12.72%
KG
$11.50
0.869000
$9.99
9.44%
KG
$13.79
0.035000
$0.48
0.45%
$23.93
22.61%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.066600
$34.04
32.17%
PEON
JOR
$298.08
0.066600
$19.85
18.76%
$53.89
50.93%
$1.62
1.53%
$1.62
1.53%
$53.89
0.030000
M3
$1,048.64
0.014700
$15.42
14.57%
M2
$52.18
0.210000
$10.96
10.36%
$26.38
24.93%
Subtotal: BASICOS
Costo directo
$105.82
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$11.71
CARGOS ADICINALES
0.5%
$0.53
PRECIO UNITARIO
$11.23
$129.29
Pgina: 26+0
21-Aug-2014
Concepto
Anlisis: 31017
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$13.79
0.077000
$1.06
KG
$11.50
0.979600
$11.27
7.16%
KG
$11.50
2.339000
$26.90
17.08%
$39.23
24.91%
Subtotal: MATERIALES
0.67%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
32.47%
PEON
JOR
$298.08
0.100000
$29.81
18.93%
$80.93
51.40%
$2.43
1.54%
$2.43
1.54%
14.65%
$80.93
0.030000
M3
$1,048.64
0.022000
$23.07
M2
$39.33
0.300000
$11.80
7.49%
$34.87
22.15%
Subtotal: BASICOS
Costo directo
$157.46
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$17.42
CARGOS ADICINALES
0.5%
$0.79
PRECIO UNITARIO
$16.71
$192.38
Pgina: 27+0
21-Aug-2014
Concepto
Anlisis: 31019
Unidad
Costo
cantidad
Importe
Unidad: ML
CADENA O CASTILLO DE CONCRETO F C=150 KG/CM2 14 X 20 CMS ARM. C/4 VAR. #3 FY=4200
KG/CM2 EST. #2 @ 20 CM. INC. CIMBRA COMUN Y CRUCES DE VARILLA.
MATERIALES
VARILLA No.3 Fy=4200KG/CM2
KG
$11.50
2.340000
$26.91
16.11%
KG
$11.50
1.150000
$13.23
7.92%
KG
$13.79
0.040000
$0.55
0.33%
$40.69
24.36%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.095000
$28.32
16.95%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.095000
$48.56
29.07%
$76.88
46.02%
$2.31
1.38%
$2.31
1.38%
18.83%
$76.88
0.030000
M3
$1,048.64
0.030000
$31.46
M2
$39.33
0.400000
$15.73
9.42%
$47.19
28.25%
Subtotal: BASICOS
Costo directo
$167.07
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$18.48
CARGOS ADICINALES
0.5%
$0.84
PRECIO UNITARIO
$17.73
$204.12
Pgina: 28+0
21-Aug-2014
Concepto
Anlisis: 31040
Unidad
Costo
cantidad
Importe
Unidad: ML
CEJA DE CONCRETO F'c=150 KG/CM2 SECC. PROM. 28x12CM ARMADO CON VAR. #3 A.R. Y BASTON #2
A.C 30 CM DE 54CM LONG., INCL. CIMBRA APARENTE.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.012000
$0.17
0.09%
KG
$11.50
0.472500
$5.43
2.80%
KG
$11.50
0.585000
$6.73
3.47%
ML
$4.31
1.000000
Subtotal: MATERIALES
$4.31
2.22%
$16.64
8.57%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.143000
$73.10
37.65%
PEON
JOR
$298.08
0.143000
$42.63
21.96%
$115.73
59.61%
$3.47
1.79%
$3.47
1.79%
$115.73
0.030000
M3
$1,048.64
0.035700
$37.44
19.28%
M2
$52.18
0.400000
$20.87
10.75%
$58.31
30.03%
Subtotal: BASICOS
Costo directo
$194.15
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$21.48
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$20.60
$0.97
$237.20
Pgina: 29+0
21-Aug-2014
Concepto
Anlisis: 31105
Unidad
Costo
cantidad
Importe
Unidad: M2
MURO DE TABIQUE ROJO COMUN DE 11 A 14 CM DE ESPESOR, ASENTADO CON MORTERO CEM-ARENA 1:3
ACABADO COMUN.
MATERIALES
TABIQUE ROJO RECOCIDO 1a
PZA
$1.90
65.100000
Subtotal: MATERIALES
$123.69
48.57%
$123.69
48.57%
MANO DE OBRA
PEON
JOR
$298.08
0.100000
$29.81
11.71%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
20.07%
$80.93
31.78%
$2.43
0.95%
$2.43
0.95%
$47.62
18.70%
$47.62
18.70%
$80.93
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.040000
$254.67
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$28.17
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$27.03
$1.27
$311.14
Pgina: 30+0
21-Aug-2014
Concepto
Anlisis: 31212
Unidad
Costo
cantidad
Importe
Unidad: M2
FINO DE CONCRETO F'c=150 KG/CM2 DE 3CM DE ESPESOR SIN ARMAR, PARA ENTREPISO, ACABADO
ESCOBILLADO O RAYADO.
MATERIALES
CEMENTO GRIS NORMAL
TON
$1,980.00
0.002000
Subtotal: MATERIALES
$3.96
6.11%
$3.96
6.11%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
26.30%
AYUDANTE
JOR
$298.06
0.033333
$9.94
15.34%
$26.98
41.65%
$0.81
1.25%
$0.81
1.25%
$26.98
0.030000
$33.03
50.99%
Subtotal: BASICOS
M3
$1,048.64
0.031500
$33.03
50.99%
Costo directo
$64.78
INDIRECTOS
10.6129%
$6.88
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$7.17
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.32
$79.15
Pgina: 31+0
21-Aug-2014
Concepto
Anlisis: 31220
Unidad
Costo
cantidad
Importe
Unidad: M2
PISO CONCRETO F'c=150 KG/CM2, 10 CM ESPESOR, ACABADO PULIDO O RAYADO CON BROCHA DE PELO,
LOSAS DE 3.06x2M, JUNTAS FRIAS, ACAB. CON VOLTEA. INCL. CIMBRADO.
MATERIALES
CEMENTO GRIS NORMAL
TON
$1,980.00
0.001000
Subtotal: MATERIALES
$1.98
0.97%
$1.98
0.97%
MANO DE OBRA
PEON
JOR
$298.08
0.100000
$29.81
14.62%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
25.07%
$80.93
39.69%
$2.43
1.19%
$2.43
1.19%
$80.93
0.030000
M3
$1,048.64
0.105000
$110.11
54.00%
M2
$17.53
0.240000
$4.21
2.06%
M3
$42.42
0.100000
$4.24
2.08%
Subtotal: BASICOS
$118.56
58.15%
Costo directo
$203.90
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$22.55
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$21.64
$1.02
$249.11
Pgina: 32+0
21-Aug-2014
Concepto
Anlisis: 31250
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$13.79
0.057000
$0.79
KG
$11.50
1.470000
$16.91
8.55%
KG
$11.50
2.920000
$33.58
16.99%
$51.28
25.94%
Subtotal: MATERIALES
0.40%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.111000
$56.74
28.70%
PEON
JOR
$298.08
0.111000
$33.09
16.74%
$89.83
45.44%
$2.69
1.36%
$2.69
1.36%
$89.83
0.030000
M3
$1,048.64
0.031500
$33.03
16.71%
M2
$52.18
0.400000
$20.87
10.56%
$53.90
27.26%
Subtotal: BASICOS
Costo directo
$197.70
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$21.87
CARGOS ADICINALES
0.5%
$0.99
PRECIO UNITARIO
$20.98
$241.54
Pgina: 33+0
21-Aug-2014
Concepto
Anlisis: 31256
Unidad
Costo
cantidad
Importe
Unidad: ML
ML
$4.31
1.050000
Subtotal: MATERIALES
$4.53
6.72%
$4.53
6.72%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.066000
$33.74
50.05%
PEON
JOR
$298.08
0.066000
$19.67
29.18%
$53.41
79.23%
$1.60
2.37%
$1.60
2.37%
$7.87
11.67%
$7.87
11.67%
$53.41
0.030000
M2
$39.33
Subtotal: BASICOS
Costo directo
0.200000
$67.41
INDIRECTOS
10.6129%
$7.15
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$7.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.34
$82.36
Pgina: 34+0
21-Aug-2014
Concepto
Anlisis: 31258
Unidad
Costo
cantidad
Importe
Unidad: ML
PZA
$1.90
8.400000
Subtotal: MATERIALES
$15.96
34.99%
$15.96
34.99%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.025000
$12.78
28.02%
AYUDANTE
JOR
$298.06
0.025000
$7.45
16.33%
$20.23
44.35%
$0.61
1.34%
$0.61
1.34%
$8.81
19.32%
$8.81
19.32%
$20.23
0.030000
M3
$1,048.64
Subtotal: BASICOS
Costo directo
0.008400
$45.61
INDIRECTOS
10.6129%
$4.84
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$5.05
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.23
$55.73
Pgina: 35+0
21-Aug-2014
Concepto
Anlisis: 31260
Unidad
Costo
cantidad
Importe
Unidad: ML
ESCALON DE CONCRETO F'c=200 KG/CM2 DE 7 X 30 CM CON VARILLA DEL No.3 Y ESTRIBOS DEL
No.2 @ 15 CMS. COLADO EN EL LUGAR, INCLUYE CIMBRA APARENTE.
MATERIALES
VARILLA No.3 Fy=4200KG/CM2
KG
$11.50
2.342000
$26.93
22.39%
KG
$13.79
0.010000
$0.14
0.12%
KG
$11.50
1.029000
$11.83
9.83%
$38.90
32.34%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.052500
$26.84
22.31%
AYUDANTE
JOR
$298.06
0.052500
$15.65
13.01%
$42.49
35.32%
30.91%
M3
$1,126.85
0.033000
$37.19
M2
$52.18
0.033000
$1.72
1.43%
$38.91
32.34%
Subtotal: BASICOS
Costo directo
$120.30
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.31
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$12.77
$0.60
$146.98
Pgina: 36+0
21-Aug-2014
Concepto
Anlisis: 32001
Unidad
Costo
cantidad
Importe
Unidad: M2
APLANADO MUROS CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADO CON ESPONJA,
INCL. REMATES Y EMBOQUILLADO.
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.083333
$42.60
45.27%
PEON
JOR
$298.08
0.083333
$24.84
26.39%
$67.44
71.66%
$2.02
2.15%
$2.02
2.15%
$24.65
26.19%
$24.65
26.19%
$67.44
0.030000
M3
$947.96
Subtotal: BASICOS
Costo directo
0.026000
$94.11
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$10.41
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$9.99
$0.47
$114.98
Pgina: 37+0
21-Aug-2014
Concepto
Anlisis: 34003
Unidad
Costo
cantidad
Importe
Unidad: M2
PINTURA VINILICA LAVABLE PARA MUROS, COLUMNAS, TRABES Y PLAFONES TRABAJO TERMINADO,
INCL. PREPARACION DE LA SUPERFICIE, REBABEAR, PLASTE NECESARIO Y ZOCLOS.
MATERIALES
MATERIALES MENORES/PINT.
M2
$25.63
0.050000
$1.28
3.54%
RESANES Y REBABEADO/PINT.
M2
$20.32
0.050000
$1.02
2.82%
LT
$48.23
0.060000
$2.89
8.00%
LT
$68.88
0.200000
$13.78
38.13%
$18.97
52.49%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL PINTOR
JOR
$368.91
0.025000
$9.22
25.51%
AYUDANTE
JOR
$298.06
0.025000
$7.45
20.61%
$16.67
46.13%
$0.50
1.38%
$0.50
1.38%
$16.67
0.030000
$36.14
INDIRECTOS
10.6129%
$3.84
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$4.00
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.18
$44.16
Pgina: 38+0
21-Aug-2014
Concepto
Anlisis: 35005
Unidad
Costo
cantidad
Importe
Unidad: M2
M2
$99.85
1.100000
$109.84
SELLADOR ASFALTICO
LTR
$13.49
0.200000
$2.70
2.11%
$112.54
88.10%
6.89%
Subtotal: MATERIALES
85.99%
MANO DE OBRA
OFICIAL IMPERMEABILIZADOR
JOR
$440.03
0.020000
$8.80
AYUDANTE
JOR
$298.06
0.020000
$5.96
4.67%
$14.76
11.55%
$0.44
0.34%
$0.44
0.34%
$14.76
0.030000
$127.74
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$14.13
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$13.56
$0.64
$156.07
Pgina: 39+0
21-Aug-2014
Concepto
Anlisis: 37005
Unidad
Costo
cantidad
Importe
Unidad: M2
LIMPIEZA DE PISOS DE CONCRETO Y/O MOSAICO DE PASTA, CERAMICA, ETC. CON CEPILLO, AGUA Y
ACIDO CLORHIDRICO.
MATERIALES
ACIDO CLORHIDRICO=MURIATICO
LT
$12.00
0.025000
$0.30
4.17%
AGUA
M3
$50.00
0.015000
$0.75
10.43%
$1.05
14.60%
$5.96
82.89%
$5.96
82.89%
$0.18
2.50%
$0.18
2.50%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.020000
$5.96
0.030000
$7.19
INDIRECTOS
10.6129%
$0.76
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$0.80
CARGOS ADICINALES
0.5%
$0.04
PRECIO UNITARIO
$8.79
Pgina: 40+0
21-Aug-2014
Concepto
Anlisis: 37030
Unidad
Costo
cantidad
Importe
Unidad: M2
M3
$50.00
0.005000
$0.25
3.14%
JABON
KG
$5.25
0.005000
$0.03
0.38%
$0.28
3.52%
$7.45
93.71%
$7.45
93.71%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.025000
$0.22
2.77%
$7.45
0.030000
$0.22
2.77%
Costo directo
$7.95
INDIRECTOS
10.6129%
$0.84
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$0.88
CARGOS ADICINALES
0.5%
$0.04
PRECIO UNITARIO
$9.71
Pgina: 41+0
21-Aug-2014
Concepto
Anlisis: 38171
Unidad
Costo
cantidad
Importe
Unidad: ML
SEPARACION MURO-COLUMNA CON CANAL LAMINA No.18 DE 0.28 MTS. DE DESARROLLO, CELOTEX DE
3/4" X 15 CMS. DE ANCHO, FIJADA A COLUMNA. INC. PINTURA ESMALTE.
MATERIALES
LAMINA GALVANIZADA CAL. 18
TON
$16,809.60
0.002719
$45.71
45.11%
PZA
$890.00
0.050000
$44.50
43.92%
TAQUETE 3/4"
PZA.
$0.12
4.000000
$0.48
0.47%
TORNILLO
PZA
$0.10
4.000000
Subtotal: MATERIALES
$0.40
0.39%
$91.09
89.89%
$9.94
9.81%
$9.94
9.81%
$0.30
0.30%
$0.30
0.30%
MANO DE OBRA
PEON
JOR
$298.08
0.033333
$9.94
0.030000
$101.33
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$11.21
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$10.75
$0.51
$123.80
Pgina: 42+0
21-Aug-2014
Concepto
Anlisis: 41306
Unidad
Costo
cantidad
Importe
Unidad: PZA
M2
$1,623.00
2.500000
$4,057.50
95.68%
TAQUETE 3/4"
PZA.
$0.12
8.000000
$0.96
0.02%
TORNILLO
PZA
$0.10
8.000000
Subtotal: MATERIALES
$0.80
0.02%
$4,059.26
95.72%
MANO DE OBRA
AYUDANTE
JOR
$298.06
0.200000
$59.61
1.41%
OFICIAL HERRERO
JOR
$582.30
0.200000
$116.46
2.75%
$176.07
4.15%
$5.28
0.12%
$5.28
0.12%
$176.07
0.030000
$4,240.61
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$450.05
$0.00
$469.07
$21.20
$5,180.93
Pgina: 43+0
21-Aug-2014
Concepto
Anlisis: 41313
Unidad
Costo
cantidad
Importe
Unidad: M2
M2
$720.00
1.312500
Subtotal: MATERIALES
$945.00
95.42%
$945.00
95.42%
MANO DE OBRA
AYUDANTE
JOR
$298.06
0.050000
$14.90
1.50%
OFICIAL HERRERO
JOR
$582.30
0.050000
$29.12
2.94%
$44.02
4.44%
$1.32
0.13%
$1.32
0.13%
$44.02
0.030000
$990.34
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$105.10
$0.00
$109.54
$4.95
$1,209.93
Pgina: 44+0
21-Aug-2014
Concepto
Anlisis: 51002
Unidad
Costo
cantidad
Importe
Unidad: SAL
SALIDA DE CENTRO Y/O CONTACTO EN CAJA LAMINA CON TUBO DE Fo.Go. PARED DELGADA, Y
CONDUCTORES TW CAL. 10 Y 12 INCL. APAGADOR.
MATERIALES
COPLE Fo.Go. P.D. DE 25 MM.
PZA
$4.90
0.170100
$0.83
KG
$13.79
0.141750
$1.95
0.34%
ML
$19.68
4.507650
$88.71
15.39%
ML
$26.15
0.255150
$6.67
1.16%
ML
$39.37
0.510300
$20.09
3.48%
PZA
$19.83
0.510300
$10.12
1.76%
PZA
$19.83
0.056700
$1.12
0.19%
PZA
$3.53
1.984500
$7.01
1.22%
PZA
$4.69
0.056700
$0.27
0.05%
PZA
$5.34
0.226800
$1.21
0.21%
ML
$10.23
13.834800
$141.53
24.55%
ML
$11.34
2.891700
$32.79
5.69%
PZA
$2.60
1.502550
$3.91
0.68%
PZA
$2.45
0.085050
$0.21
0.04%
PZA
$2.36
0.708750
$1.67
0.29%
PZA
$3.79
0.028350
$0.11
0.02%
PZA
$10.34
0.113400
$1.17
0.20%
PZA
$18.97
0.340200
$6.45
1.12%
PZA
$27.25
0.453600
$12.36
2.14%
CINTA PLASTICA 20 M.
PZA
$12.85
0.170100
$2.19
0.38%
CHALUPA GALVANIZADA
PZA
$2.58
0.311850
$0.80
0.14%
PZA
$4.90
0.170100
$0.83
0.14%
$342.00
59.32%
$146.48
25.40%
Subtotal: MATERIALES
0.14%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.216327
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.220299
$81.27
14.10%
$227.75
39.50%
$6.83
1.18%
$6.83
1.18%
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$227.75
0.030000
$576.58
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$63.78
$61.19
Pgina: 45+0
21-Aug-2014
Concepto
CARGOS ADICINALES
Unidad
Costo
cantidad
0.5%
PRECIO UNITARIO
Importe
$2.88
$704.43
Pgina: 46+0
21-Aug-2014
Concepto
Anlisis: 51009
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$855.60
1.000000
CINTA PLASTICA 20 M.
PZA
$12.85
0.025000
Subtotal: MATERIALES
$855.60
86.37%
$0.32
0.03%
$855.92
86.41%
8.54%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.125000
$84.64
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.125000
$46.11
4.65%
$130.75
13.20%
$3.92
0.40%
$3.92
0.40%
$130.75
0.030000
$990.59
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$105.13
$0.00
$109.57
$4.95
$1,210.24
Pgina: 47+0
21-Aug-2014
Concepto
Anlisis: 51367
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA.
$5,600.00
1.000000
Subtotal: MATERIALES
$5,600.00
72.21%
$5,600.00
72.21%
$1,354.28
17.46%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
2.000000
AYUDANTE ESPECIALIZADO
JOR
$368.91
2.000000
$737.82
9.51%
$2,092.10
26.98%
$62.76
0.81%
$62.76
0.81%
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$2,092.10
0.030000
$7,754.86
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$823.02
$0.00
$857.79
$38.77
$9,474.44
Pgina: 48+0
21-Aug-2014
Concepto
Anlisis: 51378
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$85.69
1.000000
Subtotal: MATERIALES
$85.69
48.93%
$85.69
48.93%
MANO DE OBRA
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.083000
$30.62
17.49%
OFICIAL ELECTRICISTA
JOR
$677.14
0.083000
$56.20
32.09%
$86.82
49.58%
$2.60
1.48%
$2.60
1.48%
$86.82
0.030000
$175.11
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$19.37
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$18.58
$0.88
$213.94
Pgina: 49+0
21-Aug-2014
Concepto
Anlisis: 79000
Unidad
Costo
cantidad
Importe
Unidad: LOT
JOR
$298.06
0.500000
$149.03
3.63%
$149.03
3.63%
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$149.03
0.030000
$4.47
0.11%
CAMIONETA DE 3 TON
HR
$163.77
24.119915
$3,950.12
96.26%
$3,954.59
96.37%
Costo directo
$4,103.62
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$435.51
$0.00
$453.91
$20.52
$5,013.56
Pgina: 50+0
21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 51+0
21-Aug-2014
Concepto
Anlisis: 11080
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
1.000000
Subtotal: MATERIALES
$120.00
66.15%
$120.00
66.15%
$59.62
32.86%
$59.62
32.86%
$1.79
0.99%
$1.79
0.99%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
0.030000
$181.41
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$20.07
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$19.25
$0.91
$221.64
Pgina: 52+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 53+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 54+0
21-Aug-2014
Concepto
Anlisis: 11131
Unidad
Costo
cantidad
Importe
Unidad: M3
SUM. Y RELLENO DE MATERIAL INERTE COMPACTADO CON PISON Y AGUA EN CAPAS DE 20 CM. DE
ESPESOR, INCL. ACARREO DENTRO DE LA OBRA, MEDIR COMPACTO.
MATERIALES
AGUA
M3
$50.00
0.300000
$15.00
5.58%
MATERIAL INERTE
M3
$120.00
1.300000
$156.00
58.07%
$171.00
63.65%
$59.62
22.19%
$59.62
22.19%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
0.67%
2.000000
$36.24
13.49%
$38.03
14.16%
$268.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$29.72
CARGOS ADICINALES
0.5%
$1.34
PRECIO UNITARIO
$28.51
$328.22
Pgina: 55+0
21-Aug-2014
Concepto
Anlisis: 12076
Unidad
Costo
cantidad
Importe
Unidad: M2
MURETE DE ENRASE EN CIMENTACION DE BLOCK DE CONCRETO ASENTADO CON MORTERO CEM-ARENA 1:3
DE 15 CM. ESPESOR.
MATERIALES
TABICON DE CONCRETO PESADO 10X14X28
PZA
$3.10
32.700000
Subtotal: MATERIALES
$101.37
45.36%
$101.37
45.36%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.117647
$60.14
26.91%
PEON
JOR
$298.08
0.117647
$35.07
15.69%
$95.21
42.60%
$2.86
1.28%
$2.86
1.28%
$24.05
10.76%
$24.05
10.76%
$95.21
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.020200
$223.49
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$24.72
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$23.72
$1.12
$273.05
Pgina: 56+0
21-Aug-2014
Concepto
Anlisis: 21101
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA EN COLUMNAS Y MUROS, ACABADO APARENTE CON TRIPLAY DE PINO DE 16 MM., INCL.
CIMBRADO, DESCIMBRADO, HABILITADO Y CHAFLANES U OCHAVOS.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.200000
$2.76
1.58%
M2
$101.25
0.200000
$20.25
11.59%
MADERA DE PINO 3 a.
PT
$6.23
4.500000
$28.04
16.04%
$51.05
29.21%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL CARPINTERO DE OBRA NEGRA
JOR
$582.29
0.136700
$79.60
45.54%
AYUDANTE
JOR
$298.06
0.136000
$40.54
23.19%
$120.14
68.73%
$3.60
2.06%
$3.60
2.06%
$120.14
0.030000
$174.79
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$19.33
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$18.55
$0.87
$213.54
Pgina: 57+0
21-Aug-2014
Concepto
Anlisis: 21203
Unidad
Costo
cantidad
Importe
Unidad: KG
KG
$13.79
0.030000
$0.41
2.18%
KG
$11.50
1.050000
$12.08
64.08%
$12.49
66.26%
21.64%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.007000
$4.08
AYUDANTE
JOR
$298.06
0.007000
$2.09
11.09%
$6.17
32.73%
$0.19
1.01%
$0.19
1.01%
$6.17
0.030000
$18.85
INDIRECTOS
10.6129%
$2.00
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.09
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$23.03
Pgina: 58+0
21-Aug-2014
Concepto
Anlisis: 21302
Unidad
Costo
cantidad
Importe
Unidad: M3
CONCRETO F'C=200 KG/CM2 EN ESTRUCTURAS Y LOSAS CON T.M.A. 3/4", INCL. VIBRADO Y CURADO
EN LOSAS, AFINE Y ACABADO PARA RECIBIR IMPERMEABILIZANTE.
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.250000
$127.79
7.27%
PEON
JOR
$298.08
1.400000
$417.31
23.73%
$545.10
30.99%
$16.35
0.93%
$16.35
0.93%
$545.10
0.030000
M3
$1,126.85
1.050000
$1,183.19
67.27%
M3
$42.42
0.333333
$14.14
0.80%
Subtotal: BASICOS
$1,197.33
68.08%
Costo directo
$1,758.78
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
$194.54
CARGOS ADICINALES
0.5%
$8.79
PRECIO UNITARIO
$186.66
$0.00
$2,148.77
Pgina: 59+0
21-Aug-2014
Concepto
Anlisis: 31220
Unidad
Costo
cantidad
Importe
Unidad: M2
PISO CONCRETO F'c=150 KG/CM2, 10 CM ESPESOR, ACABADO PULIDO O RAYADO CON BROCHA DE PELO,
LOSAS DE 3.06x2M, JUNTAS FRIAS, ACAB. CON VOLTEA. INCL. CIMBRADO.
MATERIALES
CEMENTO GRIS NORMAL
TON
$1,980.00
0.001000
Subtotal: MATERIALES
$1.98
0.97%
$1.98
0.97%
MANO DE OBRA
PEON
JOR
$298.08
0.100000
$29.81
14.62%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
25.07%
$80.93
39.69%
$2.43
1.19%
$2.43
1.19%
$80.93
0.030000
M3
$1,048.64
0.105000
$110.11
54.00%
M2
$17.53
0.240000
$4.21
2.06%
M3
$42.42
0.100000
$4.24
2.08%
Subtotal: BASICOS
$118.56
58.15%
Costo directo
$203.90
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$22.55
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$21.64
$1.02
$249.11
Pgina: 60+0
21-Aug-2014
Concepto
Anlisis: 31250
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$13.79
0.057000
$0.79
KG
$11.50
1.470000
$16.91
8.55%
KG
$11.50
2.920000
$33.58
16.99%
$51.28
25.94%
Subtotal: MATERIALES
0.40%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.111000
$56.74
28.70%
PEON
JOR
$298.08
0.111000
$33.09
16.74%
$89.83
45.44%
$2.69
1.36%
$2.69
1.36%
$89.83
0.030000
M3
$1,048.64
0.031500
$33.03
16.71%
M2
$52.18
0.400000
$20.87
10.56%
$53.90
27.26%
Subtotal: BASICOS
Costo directo
$197.70
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$21.87
CARGOS ADICINALES
0.5%
$0.99
PRECIO UNITARIO
$20.98
$241.54
Pgina: 61+0
21-Aug-2014
Concepto
Anlisis: 31256
Unidad
Costo
cantidad
Importe
Unidad: ML
ML
$4.31
1.050000
Subtotal: MATERIALES
$4.53
6.72%
$4.53
6.72%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.066000
$33.74
50.05%
PEON
JOR
$298.08
0.066000
$19.67
29.18%
$53.41
79.23%
$1.60
2.37%
$1.60
2.37%
$7.87
11.67%
$7.87
11.67%
$53.41
0.030000
M2
$39.33
Subtotal: BASICOS
Costo directo
0.200000
$67.41
INDIRECTOS
10.6129%
$7.15
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$7.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.34
$82.36
Pgina: 62+0
21-Aug-2014
Concepto
Anlisis: 33082
Unidad
Costo
cantidad
Importe
Unidad: PZA
KG
$35.50
50.230000
$1,783.17
kg
$56.00
0.333333
$18.67
0.94%
$1,801.84
90.61%
Subtotal: MATERIALES
89.67%
MANO DE OBRA
OFICIAL HERRERO
JOR
$582.30
0.200000
$116.46
5.86%
AYUDANTE
JOR
$298.06
0.200000
$59.61
3.00%
$176.07
8.85%
PLANTA DE SOLDAR
H/M
$176.07
0.030000
$5.28
0.27%
$5.33
1.000000
$5.33
0.27%
$10.61
0.53%
$1,988.52
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$211.04
$0.00
$219.96
$9.94
$2,429.46
Pgina: 63+0
21-Aug-2014
Concepto
Anlisis: 34110
Unidad
Costo
cantidad
Importe
Unidad: PZA
PINTURA DE ASTABANDERA DE 3 TRAMOS DE 1.50, 1.40 Y 1.40 M., 88.9, 73 Y 60.3 MM. DE
DIAMETRO, 1.514 M2 TOTAL, INCL. SOPORTES CON CARRETILLA.
MATERIALES
PINTURA ESMALTE ALKIDAL
LT
$70.45
0.333333
$23.48
43.14%
THINNER
LTO
$11.23
0.500000
$5.62
10.33%
$29.10
53.46%
$24.59
45.18%
$24.59
45.18%
$0.74
1.36%
$0.74
1.36%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL PINTOR
JOR
$368.91
0.066667
$24.59
0.030000
$54.43
INDIRECTOS
10.6129%
$5.78
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$6.02
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.27
$66.50
Pgina: 64+0
21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 65+0
21-Aug-2014
Concepto
Anlisis: 11071
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
0.520000
Subtotal: MATERIALES
$62.40
52.78%
$62.40
52.78%
$54.20
45.84%
$54.20
45.84%
$1.63
1.38%
$1.63
1.38%
MANO DE OBRA
PEON
JOR
$298.08
0.181818
$54.20
0.030000
$118.23
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.08
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$12.55
$0.59
$144.45
Pgina: 66+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 67+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 68+0
21-Aug-2014
Concepto
Anlisis: 11131
Unidad
Costo
cantidad
Importe
Unidad: M3
SUM. Y RELLENO DE MATERIAL INERTE COMPACTADO CON PISON Y AGUA EN CAPAS DE 20 CM. DE
ESPESOR, INCL. ACARREO DENTRO DE LA OBRA, MEDIR COMPACTO.
MATERIALES
AGUA
M3
$50.00
0.300000
$15.00
5.58%
MATERIAL INERTE
M3
$120.00
1.300000
$156.00
58.07%
$171.00
63.65%
$59.62
22.19%
$59.62
22.19%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
0.67%
2.000000
$36.24
13.49%
$38.03
14.16%
$268.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$29.72
CARGOS ADICINALES
0.5%
$1.34
PRECIO UNITARIO
$28.51
$328.22
Pgina: 69+0
21-Aug-2014
Concepto
Anlisis: 12076
Unidad
Costo
cantidad
Importe
Unidad: M2
MURETE DE ENRASE EN CIMENTACION DE BLOCK DE CONCRETO ASENTADO CON MORTERO CEM-ARENA 1:3
DE 15 CM. ESPESOR.
MATERIALES
TABICON DE CONCRETO PESADO 10X14X28
PZA
$3.10
32.700000
Subtotal: MATERIALES
$101.37
45.36%
$101.37
45.36%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.117647
$60.14
26.91%
PEON
JOR
$298.08
0.117647
$35.07
15.69%
$95.21
42.60%
$2.86
1.28%
$2.86
1.28%
$24.05
10.76%
$24.05
10.76%
$95.21
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.020200
$223.49
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$24.72
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$23.72
$1.12
$273.05
Pgina: 70+0
21-Aug-2014
Concepto
Anlisis: 31220
Unidad
Costo
cantidad
Importe
Unidad: M2
PISO CONCRETO F'c=150 KG/CM2, 10 CM ESPESOR, ACABADO PULIDO O RAYADO CON BROCHA DE PELO,
LOSAS DE 3.06x2M, JUNTAS FRIAS, ACAB. CON VOLTEA. INCL. CIMBRADO.
MATERIALES
CEMENTO GRIS NORMAL
TON
$1,980.00
0.001000
Subtotal: MATERIALES
$1.98
0.97%
$1.98
0.97%
MANO DE OBRA
PEON
JOR
$298.08
0.100000
$29.81
14.62%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
25.07%
$80.93
39.69%
$2.43
1.19%
$2.43
1.19%
$80.93
0.030000
M3
$1,048.64
0.105000
$110.11
54.00%
M2
$17.53
0.240000
$4.21
2.06%
M3
$42.42
0.100000
$4.24
2.08%
Subtotal: BASICOS
$118.56
58.15%
Costo directo
$203.90
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$22.55
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$21.64
$1.02
$249.11
Pgina: 71+0
21-Aug-2014
Concepto
Anlisis: 31250
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$13.79
0.057000
$0.79
KG
$11.50
1.470000
$16.91
8.55%
KG
$11.50
2.920000
$33.58
16.99%
$51.28
25.94%
Subtotal: MATERIALES
0.40%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.111000
$56.74
28.70%
PEON
JOR
$298.08
0.111000
$33.09
16.74%
$89.83
45.44%
$2.69
1.36%
$2.69
1.36%
$89.83
0.030000
M3
$1,048.64
0.031500
$33.03
16.71%
M2
$52.18
0.400000
$20.87
10.56%
$53.90
27.26%
Subtotal: BASICOS
Costo directo
$197.70
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$21.87
CARGOS ADICINALES
0.5%
$0.99
PRECIO UNITARIO
$20.98
$241.54
Pgina: 72+0
21-Aug-2014
Concepto
Anlisis: 31256
Unidad
Costo
cantidad
Importe
Unidad: ML
ML
$4.31
1.050000
Subtotal: MATERIALES
$4.53
6.72%
$4.53
6.72%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.066000
$33.74
50.05%
PEON
JOR
$298.08
0.066000
$19.67
29.18%
$53.41
79.23%
$1.60
2.37%
$1.60
2.37%
$7.87
11.67%
$7.87
11.67%
$53.41
0.030000
M2
$39.33
Subtotal: BASICOS
Costo directo
0.200000
$67.41
INDIRECTOS
10.6129%
$7.15
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$7.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.34
$82.36
Pgina: 73+0
21-Aug-2014
Concepto
Anlisis: 37005
Unidad
Costo
cantidad
Importe
Unidad: M2
LIMPIEZA DE PISOS DE CONCRETO Y/O MOSAICO DE PASTA, CERAMICA, ETC. CON CEPILLO, AGUA Y
ACIDO CLORHIDRICO.
MATERIALES
ACIDO CLORHIDRICO=MURIATICO
LT
$12.00
0.025000
$0.30
4.17%
AGUA
M3
$50.00
0.015000
$0.75
10.43%
$1.05
14.60%
$5.96
82.89%
$5.96
82.89%
$0.18
2.50%
$0.18
2.50%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.020000
$5.96
0.030000
$7.19
INDIRECTOS
10.6129%
$0.76
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$0.80
CARGOS ADICINALES
0.5%
$0.04
PRECIO UNITARIO
$8.79
Pgina: 74+0
21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 75+0
21-Aug-2014
Concepto
Anlisis: 11071
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
0.520000
Subtotal: MATERIALES
$62.40
52.78%
$62.40
52.78%
$54.20
45.84%
$54.20
45.84%
$1.63
1.38%
$1.63
1.38%
MANO DE OBRA
PEON
JOR
$298.08
0.181818
$54.20
0.030000
$118.23
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.08
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$12.55
$0.59
$144.45
Pgina: 76+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 77+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 78+0
21-Aug-2014
Concepto
Anlisis: 11131
Unidad
Costo
cantidad
Importe
Unidad: M3
SUM. Y RELLENO DE MATERIAL INERTE COMPACTADO CON PISON Y AGUA EN CAPAS DE 20 CM. DE
ESPESOR, INCL. ACARREO DENTRO DE LA OBRA, MEDIR COMPACTO.
MATERIALES
AGUA
M3
$50.00
0.300000
$15.00
5.58%
MATERIAL INERTE
M3
$120.00
1.300000
$156.00
58.07%
$171.00
63.65%
$59.62
22.19%
$59.62
22.19%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
0.67%
2.000000
$36.24
13.49%
$38.03
14.16%
$268.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$29.72
CARGOS ADICINALES
0.5%
$1.34
PRECIO UNITARIO
$28.51
$328.22
Pgina: 79+0
21-Aug-2014
Concepto
Anlisis: 12076
Unidad
Costo
cantidad
Importe
Unidad: M2
MURETE DE ENRASE EN CIMENTACION DE BLOCK DE CONCRETO ASENTADO CON MORTERO CEM-ARENA 1:3
DE 15 CM. ESPESOR.
MATERIALES
TABICON DE CONCRETO PESADO 10X14X28
PZA
$3.10
32.700000
Subtotal: MATERIALES
$101.37
45.36%
$101.37
45.36%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.117647
$60.14
26.91%
PEON
JOR
$298.08
0.117647
$35.07
15.69%
$95.21
42.60%
$2.86
1.28%
$2.86
1.28%
$24.05
10.76%
$24.05
10.76%
$95.21
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.020200
$223.49
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$24.72
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$23.72
$1.12
$273.05
Pgina: 80+0
21-Aug-2014
Concepto
Anlisis: 31220
Unidad
Costo
cantidad
Importe
Unidad: M2
PISO CONCRETO F'c=150 KG/CM2, 10 CM ESPESOR, ACABADO PULIDO O RAYADO CON BROCHA DE PELO,
LOSAS DE 3.06x2M, JUNTAS FRIAS, ACAB. CON VOLTEA. INCL. CIMBRADO.
MATERIALES
CEMENTO GRIS NORMAL
TON
$1,980.00
0.001000
Subtotal: MATERIALES
$1.98
0.97%
$1.98
0.97%
MANO DE OBRA
PEON
JOR
$298.08
0.100000
$29.81
14.62%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
25.07%
$80.93
39.69%
$2.43
1.19%
$2.43
1.19%
$80.93
0.030000
M3
$1,048.64
0.105000
$110.11
54.00%
M2
$17.53
0.240000
$4.21
2.06%
M3
$42.42
0.100000
$4.24
2.08%
Subtotal: BASICOS
$118.56
58.15%
Costo directo
$203.90
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$22.55
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$21.64
$1.02
$249.11
Pgina: 81+0
21-Aug-2014
Concepto
Anlisis: 31250
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$13.79
0.057000
$0.79
KG
$11.50
1.470000
$16.91
8.55%
KG
$11.50
2.920000
$33.58
16.99%
$51.28
25.94%
Subtotal: MATERIALES
0.40%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.111000
$56.74
28.70%
PEON
JOR
$298.08
0.111000
$33.09
16.74%
$89.83
45.44%
$2.69
1.36%
$2.69
1.36%
$89.83
0.030000
M3
$1,048.64
0.031500
$33.03
16.71%
M2
$52.18
0.400000
$20.87
10.56%
$53.90
27.26%
Subtotal: BASICOS
Costo directo
$197.70
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$21.87
CARGOS ADICINALES
0.5%
$0.99
PRECIO UNITARIO
$20.98
$241.54
Pgina: 82+0
21-Aug-2014
Concepto
Anlisis: 31256
Unidad
Costo
cantidad
Importe
Unidad: ML
ML
$4.31
1.050000
Subtotal: MATERIALES
$4.53
6.72%
$4.53
6.72%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.066000
$33.74
50.05%
PEON
JOR
$298.08
0.066000
$19.67
29.18%
$53.41
79.23%
$1.60
2.37%
$1.60
2.37%
$7.87
11.67%
$7.87
11.67%
$53.41
0.030000
M2
$39.33
Subtotal: BASICOS
Costo directo
0.200000
$67.41
INDIRECTOS
10.6129%
$7.15
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$7.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.34
$82.36
Pgina: 83+0
21-Aug-2014
Concepto
Anlisis: 37005
Unidad
Costo
cantidad
Importe
Unidad: M2
LIMPIEZA DE PISOS DE CONCRETO Y/O MOSAICO DE PASTA, CERAMICA, ETC. CON CEPILLO, AGUA Y
ACIDO CLORHIDRICO.
MATERIALES
ACIDO CLORHIDRICO=MURIATICO
LT
$12.00
0.025000
$0.30
4.17%
AGUA
M3
$50.00
0.015000
$0.75
10.43%
$1.05
14.60%
$5.96
82.89%
$5.96
82.89%
$0.18
2.50%
$0.18
2.50%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.020000
$5.96
0.030000
$7.19
INDIRECTOS
10.6129%
$0.76
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$0.80
CARGOS ADICINALES
0.5%
$0.04
PRECIO UNITARIO
$8.79
Pgina: 84+0
21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 85+0
21-Aug-2014
Concepto
Anlisis: 11071
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
0.520000
Subtotal: MATERIALES
$62.40
52.78%
$62.40
52.78%
$54.20
45.84%
$54.20
45.84%
$1.63
1.38%
$1.63
1.38%
MANO DE OBRA
PEON
JOR
$298.08
0.181818
$54.20
0.030000
$118.23
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.08
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$12.55
$0.59
$144.45
Pgina: 86+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 87+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 88+0
21-Aug-2014
Concepto
Anlisis: 12010
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$511.17
0.300000
$153.35
8.90%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.060000
$30.67
1.78%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
$362.86
21.06%
$10.89
0.63%
$10.89
0.63%
$34.94
2.03%
$362.86
0.030000
M3
$34.94
1.000000
M3
$42.42
1.000000
$42.42
2.46%
M3
$1,211.05
1.050000
$1,271.60
73.81%
Subtotal: BASICOS
$1,348.96
78.30%
Costo directo
$1,722.71
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$182.83
$0.00
$190.55
$8.61
$2,104.70
Pgina: 89+0
21-Aug-2014
Concepto
Anlisis: 12021
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3a., ACABADO COMUN, INCL. CIMBRADO Y
DESCIMBRADO.
MATERIALES
MADERA DE PINO 3 a.
PT
$6.23
4.000000
$24.92
20.00%
KG
$13.79
0.200000
$2.76
2.22%
KG
$13.86
0.200000
$2.77
2.22%
DIESEL
LT
$11.64
1.000000
Subtotal: MATERIALES
$11.64
9.34%
$42.09
33.78%
MANO DE OBRA
AYUDANTE
JOR
$298.06
0.091000
$27.12
21.77%
JOR
$582.29
0.091000
$52.99
42.53%
$80.11
64.29%
$2.40
1.93%
$2.40
1.93%
$80.11
0.030000
$124.60
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.78
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$13.22
$0.62
$152.22
Pgina: 90+0
21-Aug-2014
Concepto
Anlisis: 12034
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON VARILLA #3 F'y=4200 KG/CM2, INCL. SUMINISTRO,
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIO.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.030000
$0.41
2.18%
KG
$11.50
1.050000
$12.08
64.08%
$12.49
66.26%
21.64%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.007000
$4.08
AYUDANTE
JOR
$298.06
0.007000
$2.09
11.09%
$6.17
32.73%
$0.19
1.01%
$0.19
1.01%
$6.17
0.030000
$18.85
INDIRECTOS
10.6129%
$2.00
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.09
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$23.03
Pgina: 91+0
21-Aug-2014
Concepto
Anlisis: 12080
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$3.10
60.420000
Subtotal: MATERIALES
$187.30
50.67%
$187.30
50.67%
MANO DE OBRA
PEON
JOR
$298.08
0.153800
$45.84
12.40%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.153800
$78.62
21.27%
$124.46
33.67%
$3.73
1.01%
$3.73
1.01%
$54.17
14.65%
$54.17
14.65%
$124.46
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.045500
$369.66
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$40.89
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$39.23
$1.85
$451.63
Pgina: 92+0
21-Aug-2014
Concepto
Anlisis: 31019
Unidad
Costo
cantidad
Importe
Unidad: ML
CADENA O CASTILLO DE CONCRETO F C=150 KG/CM2 14 X 20 CMS ARM. C/4 VAR. #3 FY=4200
KG/CM2 EST. #2 @ 20 CM. INC. CIMBRA COMUN Y CRUCES DE VARILLA.
MATERIALES
VARILLA No.3 Fy=4200KG/CM2
KG
$11.50
2.340000
$26.91
16.11%
KG
$11.50
1.150000
$13.23
7.92%
KG
$13.79
0.040000
$0.55
0.33%
$40.69
24.36%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.095000
$28.32
16.95%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.095000
$48.56
29.07%
$76.88
46.02%
$2.31
1.38%
$2.31
1.38%
18.83%
$76.88
0.030000
M3
$1,048.64
0.030000
$31.46
M2
$39.33
0.400000
$15.73
9.42%
$47.19
28.25%
Subtotal: BASICOS
Costo directo
$167.07
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$18.48
CARGOS ADICINALES
0.5%
$0.84
PRECIO UNITARIO
$17.73
$204.12
Pgina: 93+0
21-Aug-2014
Concepto
Anlisis: 31021
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$11.50
2.340000
$26.91
14.81%
KG
$11.50
1.150000
$13.23
7.28%
KG
$13.79
0.040000
$0.55
0.30%
$40.69
22.39%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.095000
$28.32
15.58%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.095000
$48.56
26.72%
$76.88
42.30%
$2.31
1.27%
$2.31
1.27%
25.39%
$76.88
0.030000
M3
$1,048.64
0.044000
$46.14
M2
$39.33
0.400000
$15.73
8.65%
$61.87
34.04%
Subtotal: BASICOS
Costo directo
$181.75
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$20.10
CARGOS ADICINALES
0.5%
$0.91
PRECIO UNITARIO
$19.29
$222.05
Pgina: 94+0
21-Aug-2014
Concepto
Anlisis: 31115
Unidad
Costo
cantidad
Importe
Unidad: M2
MURO DE TABIQUE ROJO COMUN DE 19 A 21 CM DE ESPESOR ASENTADO CON MORTERO CEM-ARENA 1:3
ACABADO COMUN PARA ESTRUCTURA REGIONAL , ZONA DE ALTA SISMICIDAD.
MATERIALES
TABIQUE ROJO RECOCIDO 1a
PZA
$1.90
96.600000
Subtotal: MATERIALES
$183.54
48.64%
$183.54
48.64%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.154000
$78.72
20.86%
PEON
JOR
$298.08
0.154000
$45.90
12.16%
$124.62
33.02%
$3.74
0.99%
$3.74
0.99%
$65.48
17.35%
$65.48
17.35%
$124.62
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.055000
$377.38
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$41.74
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$40.05
$1.89
$461.06
Pgina: 95+0
21-Aug-2014
Concepto
Anlisis: 32001
Unidad
Costo
cantidad
Importe
Unidad: M2
APLANADO MUROS CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADO CON ESPONJA,
INCL. REMATES Y EMBOQUILLADO.
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.083333
$42.60
45.27%
PEON
JOR
$298.08
0.083333
$24.84
26.39%
$67.44
71.66%
$2.02
2.15%
$2.02
2.15%
$24.65
26.19%
$24.65
26.19%
$67.44
0.030000
M3
$947.96
Subtotal: BASICOS
Costo directo
0.026000
$94.11
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$10.41
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$9.99
$0.47
$114.98
Pgina: 96+0
21-Aug-2014
Concepto
Anlisis: 34003
Unidad
Costo
cantidad
Importe
Unidad: M2
PINTURA VINILICA LAVABLE PARA MUROS, COLUMNAS, TRABES Y PLAFONES TRABAJO TERMINADO,
INCL. PREPARACION DE LA SUPERFICIE, REBABEAR, PLASTE NECESARIO Y ZOCLOS.
MATERIALES
MATERIALES MENORES/PINT.
M2
$25.63
0.050000
$1.28
3.54%
RESANES Y REBABEADO/PINT.
M2
$20.32
0.050000
$1.02
2.82%
LT
$48.23
0.060000
$2.89
8.00%
LT
$68.88
0.200000
$13.78
38.13%
$18.97
52.49%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL PINTOR
JOR
$368.91
0.025000
$9.22
25.51%
AYUDANTE
JOR
$298.06
0.025000
$7.45
20.61%
$16.67
46.13%
$0.50
1.38%
$0.50
1.38%
$16.67
0.030000
$36.14
INDIRECTOS
10.6129%
$3.84
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$4.00
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.18
$44.16
Pgina: 97+0
21-Aug-2014
Concepto
Anlisis: 31316
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$3.10
70.000000
KG
$11.50
6.015600
Subtotal: MATERIALES
$217.00
23.37%
$69.18
7.45%
$286.18
30.82%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.500000
$255.59
27.52%
PEON
JOR
$298.08
0.500000
$149.04
16.05%
$404.63
43.57%
$12.14
1.31%
$12.14
1.31%
$404.63
0.030000
M3
$1,190.50
0.057061
$67.93
7.31%
M3
$948.73
0.028000
$26.56
2.86%
M3
$947.96
0.071040
$67.34
7.25%
M3
$1,048.64
0.056700
$59.46
6.40%
M2
$17.53
0.252000
$4.42
0.48%
Subtotal: BASICOS
$225.71
24.30%
Costo directo
$928.66
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$98.56
$0.00
$102.72
$4.64
$1,134.58
Pgina: 98+0
21-Aug-2014
Concepto
Anlisis: 51405
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$1,288.62
1.000000
$1,288.62
PZA
$32.33
3.000000
$96.99
5.04%
$1,385.61
72.00%
17.59%
Subtotal: MATERIALES
66.96%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.500000
$338.57
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.500000
$184.46
9.59%
$523.03
27.18%
$15.69
0.82%
$15.69
0.82%
$523.03
0.030000
$1,924.33
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
$212.86
CARGOS ADICINALES
0.5%
$9.62
PRECIO UNITARIO
$204.23
$0.00
$2,351.04
Pgina: 99+0
21-Aug-2014
Concepto
Anlisis: 51408
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA.
$496.10
1.000000
Subtotal: MATERIALES
$496.10
82.16%
$496.10
82.16%
$67.71
11.21%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
10.000000
AYUDANTE ESPECIALIZADO
JOR
$368.91
10.000000
$36.89
6.11%
$104.60
17.32%
$3.14
0.52%
$3.14
0.52%
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$104.60
0.030000
$603.84
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$66.79
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$64.08
$3.02
$737.73
Pgina: 100+0
21-Aug-2014
Concepto
Anlisis: 51428
Unidad
Costo
cantidad
Importe
Unidad: ML
SUMINISTRO Y TENDIDO TUBO CONDUIT PVC TIPO PESADO 19 MM DIAM., INCL. CONEXIONES, TRAZO,
EXCAVACION Y RELLENO.
MATERIALES
TUBO CONDUIT PVC PESADO 19MM
ML
$21.58
1.000000
$21.58
PZA
$99.00
0.011111
$1.10
2.42%
$22.68
49.80%
Subtotal: MATERIALES
47.39%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.022761
$15.41
33.84%
AYUDANTE
JOR
$298.06
0.022761
$6.78
14.89%
$22.19
48.73%
$0.67
1.47%
$0.67
1.47%
$22.19
0.030000
$45.54
INDIRECTOS
10.6129%
$4.83
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$5.04
CARGOS ADICINALES
0.5%
$0.23
PRECIO UNITARIO
$55.64
Pgina: 101+0
21-Aug-2014
Concepto
Anlisis: 51429
Unidad
Costo
cantidad
Importe
Unidad: ML
SUMINISTRO Y TENDIDO TUBO CONDUIT PVC TIPO PESADO 25 MM DIAM., INCL. CONEXIONES, TRAZO,
EXCAVACION Y RELLENO.
MATERIALES
TUBO CONDUIT PVC PESADO 25 MM
ML
$8.21
1.050000
$8.62
16.43%
PZA
$12.83
0.327869
$4.21
8.03%
PZA
$99.00
0.006250
$0.62
1.18%
$13.45
25.64%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.040000
$11.92
22.72%
OFICIAL ELECTRICISTA
JOR
$677.14
0.040000
$27.09
51.64%
$39.01
74.36%
Costo directo
$52.46
INDIRECTOS
10.6129%
$5.57
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$5.80
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.26
$64.09
Pgina: 102+0
21-Aug-2014
Concepto
Anlisis: 51439
Unidad
Costo
cantidad
Importe
Unidad: ML
SUMINISTRO Y TENDIDO TUBO COND. GALV. PG 32 MM DIAM., INCL. CONEXION, TRAZO, EXCAVACION,
CAMA DE ARENA, RELLENO, COMPACTACION, UNIDAD DE OBRA TERMINADA.
MATERIALES
PEGAMENTO PVC AZUL
PZA
$99.00
0.011111
$1.10
1.48%
PZA.
$144.34
0.350000
$50.52
67.83%
$51.62
69.31%
20.69%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.022761
$15.41
AYUDANTE
JOR
$298.06
0.022761
$6.78
9.10%
$22.19
29.79%
$0.67
0.90%
$0.67
0.90%
$22.19
0.030000
$74.48
INDIRECTOS
10.6129%
$7.90
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$8.24
CARGOS ADICINALES
0.5%
$0.37
PRECIO UNITARIO
$90.99
Pgina: 103+0
21-Aug-2014
Concepto
Anlisis: 51460
Unidad
Costo
cantidad
Importe
Unidad: PZA
SUMINISTRO Y COLOCACION DE MUFA SECA PARA ACOMETIDA CON ENTRADA DE TUBO DE 32 MM.
MATERIALES
MUFA DE 32 MM
PZA
$12.93
1.000000
Subtotal: MATERIALES
$12.93
27.75%
$12.93
27.75%
$21.16
45.41%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
32.000000
AYUDANTE ESPECIALIZADO
JOR
$368.91
32.000000
$11.53
24.74%
$32.69
70.15%
$0.98
2.10%
$0.98
2.10%
EQUIPO Y HERRAMIENTA
HERRAMIENTA MENOR
$32.69
0.030000
$46.60
INDIRECTOS
10.6129%
$4.95
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$5.16
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.23
$56.94
Pgina: 104+0
21-Aug-2014
Concepto
Anlisis: 51469
Unidad
Costo
cantidad
Importe
Unidad: ML
ML
$16.79
1.030000
$17.29
CINTA PLASTICA 20 M.
PZA
$12.85
0.020000
$0.26
0.93%
$17.55
62.66%
Subtotal: MATERIALES
61.73%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.010000
$6.77
24.17%
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.010000
$3.69
13.17%
$10.46
37.34%
Costo directo
$28.01
INDIRECTOS
10.6129%
$2.97
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$3.10
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.14
$34.22
Pgina: 105+0
21-Aug-2014
Concepto
Anlisis: 51493
Unidad
Costo
cantidad
Importe
Unidad: ML
PZA
$12.85
0.025000
$0.32
1.01%
ML
$15.56
1.030000
$16.03
50.50%
$16.35
51.51%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.014286
$9.67
30.47%
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.014286
$5.27
16.60%
$14.94
47.07%
$0.45
1.42%
$0.45
1.42%
$14.94
0.030000
$31.74
INDIRECTOS
10.6129%
$3.37
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$3.51
CARGOS ADICINALES
0.5%
$0.16
PRECIO UNITARIO
$38.78
Pgina: 106+0
21-Aug-2014
Concepto
Anlisis: 51498
Unidad
Costo
cantidad
Importe
Unidad: PZA
PZA
$146.98
1.000000
$146.98
PZA
$6.12
1.000000
$6.12
3.26%
$153.10
81.45%
12.01%
Subtotal: MATERIALES
78.19%
MANO DE OBRA
OFICIAL ELECTRICISTA
JOR
$677.14
0.033333
$22.57
AYUDANTE ESPECIALIZADO
JOR
$368.91
0.033333
$12.30
6.54%
$34.87
18.55%
$187.97
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$20.79
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$19.95
$0.94
$229.65
Pgina: 107+0
21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 108+0
21-Aug-2014
Concepto
Anlisis: 11080
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
1.000000
Subtotal: MATERIALES
$120.00
66.15%
$120.00
66.15%
$59.62
32.86%
$59.62
32.86%
$1.79
0.99%
$1.79
0.99%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
0.030000
$181.41
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$20.07
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$19.25
$0.91
$221.64
Pgina: 109+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 110+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 111+0
21-Aug-2014
Concepto
Anlisis: 11131
Unidad
Costo
cantidad
Importe
Unidad: M3
SUM. Y RELLENO DE MATERIAL INERTE COMPACTADO CON PISON Y AGUA EN CAPAS DE 20 CM. DE
ESPESOR, INCL. ACARREO DENTRO DE LA OBRA, MEDIR COMPACTO.
MATERIALES
AGUA
M3
$50.00
0.300000
$15.00
5.58%
MATERIAL INERTE
M3
$120.00
1.300000
$156.00
58.07%
$171.00
63.65%
$59.62
22.19%
$59.62
22.19%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
0.67%
2.000000
$36.24
13.49%
$38.03
14.16%
$268.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$29.72
CARGOS ADICINALES
0.5%
$1.34
PRECIO UNITARIO
$28.51
$328.22
Pgina: 112+0
21-Aug-2014
Concepto
Anlisis: 12076
Unidad
Costo
cantidad
Importe
Unidad: M2
MURETE DE ENRASE EN CIMENTACION DE BLOCK DE CONCRETO ASENTADO CON MORTERO CEM-ARENA 1:3
DE 15 CM. ESPESOR.
MATERIALES
TABICON DE CONCRETO PESADO 10X14X28
PZA
$3.10
32.700000
Subtotal: MATERIALES
$101.37
45.36%
$101.37
45.36%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.117647
$60.14
26.91%
PEON
JOR
$298.08
0.117647
$35.07
15.69%
$95.21
42.60%
$2.86
1.28%
$2.86
1.28%
$24.05
10.76%
$24.05
10.76%
$95.21
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.020200
$223.49
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$24.72
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$23.72
$1.12
$273.05
Pgina: 113+0
21-Aug-2014
Concepto
Anlisis: 31220
Unidad
Costo
cantidad
Importe
Unidad: M2
PISO CONCRETO F'c=150 KG/CM2, 10 CM ESPESOR, ACABADO PULIDO O RAYADO CON BROCHA DE PELO,
LOSAS DE 3.06x2M, JUNTAS FRIAS, ACAB. CON VOLTEA. INCL. CIMBRADO.
MATERIALES
CEMENTO GRIS NORMAL
TON
$1,980.00
0.001000
Subtotal: MATERIALES
$1.98
0.97%
$1.98
0.97%
MANO DE OBRA
PEON
JOR
$298.08
0.100000
$29.81
14.62%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.100000
$51.12
25.07%
$80.93
39.69%
$2.43
1.19%
$2.43
1.19%
$80.93
0.030000
M3
$1,048.64
0.105000
$110.11
54.00%
M2
$17.53
0.240000
$4.21
2.06%
M3
$42.42
0.100000
$4.24
2.08%
Subtotal: BASICOS
$118.56
58.15%
Costo directo
$203.90
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$22.55
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$21.64
$1.02
$249.11
Pgina: 114+0
21-Aug-2014
Concepto
Anlisis: 31250
Unidad
Costo
cantidad
Importe
Unidad: ML
KG
$13.79
0.057000
$0.79
KG
$11.50
1.470000
$16.91
8.55%
KG
$11.50
2.920000
$33.58
16.99%
$51.28
25.94%
Subtotal: MATERIALES
0.40%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.111000
$56.74
28.70%
PEON
JOR
$298.08
0.111000
$33.09
16.74%
$89.83
45.44%
$2.69
1.36%
$2.69
1.36%
$89.83
0.030000
M3
$1,048.64
0.031500
$33.03
16.71%
M2
$52.18
0.400000
$20.87
10.56%
$53.90
27.26%
Subtotal: BASICOS
Costo directo
$197.70
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$21.87
CARGOS ADICINALES
0.5%
$0.99
PRECIO UNITARIO
$20.98
$241.54
Pgina: 115+0
21-Aug-2014
Concepto
Anlisis: 31256
Unidad
Costo
cantidad
Importe
Unidad: ML
ML
$4.31
1.050000
Subtotal: MATERIALES
$4.53
6.72%
$4.53
6.72%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.066000
$33.74
50.05%
PEON
JOR
$298.08
0.066000
$19.67
29.18%
$53.41
79.23%
$1.60
2.37%
$1.60
2.37%
$7.87
11.67%
$7.87
11.67%
$53.41
0.030000
M2
$39.33
Subtotal: BASICOS
Costo directo
0.200000
$67.41
INDIRECTOS
10.6129%
$7.15
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$7.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.34
$82.36
Pgina: 116+0
21-Aug-2014
Concepto
Anlisis: 37005
Unidad
Costo
cantidad
Importe
Unidad: M2
LIMPIEZA DE PISOS DE CONCRETO Y/O MOSAICO DE PASTA, CERAMICA, ETC. CON CEPILLO, AGUA Y
ACIDO CLORHIDRICO.
MATERIALES
ACIDO CLORHIDRICO=MURIATICO
LT
$12.00
0.025000
$0.30
4.17%
AGUA
M3
$50.00
0.015000
$0.75
10.43%
$1.05
14.60%
$5.96
82.89%
$5.96
82.89%
$0.18
2.50%
$0.18
2.50%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.020000
$5.96
0.030000
$7.19
INDIRECTOS
10.6129%
$0.76
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$0.80
CARGOS ADICINALES
0.5%
$0.04
PRECIO UNITARIO
$8.79
Pgina: 117+0
21-Aug-2014
Concepto
Anlisis: 11061
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.006000
$1.79
16.84%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.006000
$3.07
28.88%
$4.86
45.72%
$4.86
0.030000
$0.15
1.41%
NIVEL TRANSITO
HR
$11.24
0.500000
$5.62
52.87%
$5.77
54.28%
$10.63
INDIRECTOS
10.6129%
$1.13
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$1.18
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.05
$12.99
Pgina: 118+0
21-Aug-2014
Concepto
Anlisis: 11071
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$120.00
0.520000
Subtotal: MATERIALES
$62.40
52.78%
$62.40
52.78%
$54.20
45.84%
$54.20
45.84%
$1.63
1.38%
$1.63
1.38%
MANO DE OBRA
PEON
JOR
$298.08
0.181818
$54.20
0.030000
$118.23
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.08
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$12.55
$0.59
$144.45
Pgina: 119+0
21-Aug-2014
Concepto
Anlisis: 11101
Unidad
Costo
cantidad
Importe
Unidad: M2
JOR
$298.08
0.033333
$9.94
11.35%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.033333
$17.04
19.46%
$26.98
30.81%
$0.81
0.93%
$0.81
0.93%
$26.98
0.030000
$59.77
68.26%
Subtotal: BASICOS
M3
$948.73
0.063000
$59.77
68.26%
Costo directo
$87.56
INDIRECTOS
10.6129%
$9.29
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$9.69
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.44
$106.98
Pgina: 120+0
21-Aug-2014
Concepto
Anlisis: 11121
Unidad
Costo
cantidad
Importe
Unidad: M3
M3
$50.00
0.300000
Subtotal: MATERIALES
$15.00
13.32%
$15.00
13.32%
$59.62
52.92%
$59.62
52.92%
MANO DE OBRA
PEON
JOR
$298.08
0.200000
$59.62
BAILARINA DE 4.5 HP
HOR
$72.47
0.030000
$1.79
1.59%
2.000000
$36.24
32.17%
$38.03
33.76%
$112.65
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$12.46
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$11.96
$0.56
$137.63
Pgina: 121+0
21-Aug-2014
Concepto
Anlisis: 12010
Unidad
Costo
cantidad
Importe
Unidad: M3
JOR
$511.17
0.300000
$153.35
8.90%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.060000
$30.67
1.78%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
PEON
JOR
$298.08
0.300000
$89.42
5.19%
$362.86
21.06%
$10.89
0.63%
$10.89
0.63%
$34.94
2.03%
$362.86
0.030000
M3
$34.94
1.000000
M3
$42.42
1.000000
$42.42
2.46%
M3
$1,211.05
1.050000
$1,271.60
73.81%
Subtotal: BASICOS
$1,348.96
78.30%
Costo directo
$1,722.71
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
UTILIDAD
10%
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$182.83
$0.00
$190.55
$8.61
$2,104.70
Pgina: 122+0
21-Aug-2014
Concepto
Anlisis: 12021
Unidad
Costo
cantidad
Importe
Unidad: M2
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3a., ACABADO COMUN, INCL. CIMBRADO Y
DESCIMBRADO.
MATERIALES
MADERA DE PINO 3 a.
PT
$6.23
4.000000
$24.92
20.00%
KG
$13.79
0.200000
$2.76
2.22%
KG
$13.86
0.200000
$2.77
2.22%
DIESEL
LT
$11.64
1.000000
Subtotal: MATERIALES
$11.64
9.34%
$42.09
33.78%
MANO DE OBRA
AYUDANTE
JOR
$298.06
0.091000
$27.12
21.77%
JOR
$582.29
0.091000
$52.99
42.53%
$80.11
64.29%
$2.40
1.93%
$2.40
1.93%
$80.11
0.030000
$124.60
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$13.78
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$13.22
$0.62
$152.22
Pgina: 123+0
21-Aug-2014
Concepto
Anlisis: 12034
Unidad
Costo
cantidad
Importe
Unidad: KG
ACERO PARA REFUERZO EN CIMENTACION CON VARILLA #3 F'y=4200 KG/CM2, INCL. SUMINISTRO,
HABILITADO, ARMADO, TRASLAPES, SILLETAS, GANCHOS Y DESPERDICIO.
MATERIALES
ALAMBRE RECOCIDO No.18
KG
$13.79
0.030000
$0.41
2.18%
KG
$11.50
1.050000
$12.08
64.08%
$12.49
66.26%
21.64%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL FIERRERO
JOR
$582.29
0.007000
$4.08
AYUDANTE
JOR
$298.06
0.007000
$2.09
11.09%
$6.17
32.73%
$0.19
1.01%
$0.19
1.01%
$6.17
0.030000
$18.85
INDIRECTOS
10.6129%
$2.00
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$2.09
CARGOS ADICINALES
0.5%
$0.09
PRECIO UNITARIO
$23.03
Pgina: 124+0
21-Aug-2014
Concepto
Anlisis: 12080
Unidad
Costo
cantidad
Importe
Unidad: M2
PZA
$3.10
60.420000
Subtotal: MATERIALES
$187.30
50.67%
$187.30
50.67%
MANO DE OBRA
PEON
JOR
$298.08
0.153800
$45.84
12.40%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.153800
$78.62
21.27%
$124.46
33.67%
$3.73
1.01%
$3.73
1.01%
$54.17
14.65%
$54.17
14.65%
$124.46
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.045500
$369.66
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$40.89
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$39.23
$1.85
$451.63
Pgina: 125+0
21-Aug-2014
Concepto
Anlisis: 31019
Unidad
Costo
cantidad
Importe
Unidad: ML
CADENA O CASTILLO DE CONCRETO F C=150 KG/CM2 14 X 20 CMS ARM. C/4 VAR. #3 FY=4200
KG/CM2 EST. #2 @ 20 CM. INC. CIMBRA COMUN Y CRUCES DE VARILLA.
MATERIALES
VARILLA No.3 Fy=4200KG/CM2
KG
$11.50
2.340000
$26.91
16.11%
KG
$11.50
1.150000
$13.23
7.92%
KG
$13.79
0.040000
$0.55
0.33%
$40.69
24.36%
Subtotal: MATERIALES
MANO DE OBRA
PEON
JOR
$298.08
0.095000
$28.32
16.95%
OFICIAL DE ALBAILERIA
JOR
$511.17
0.095000
$48.56
29.07%
$76.88
46.02%
$2.31
1.38%
$2.31
1.38%
18.83%
$76.88
0.030000
M3
$1,048.64
0.030000
$31.46
M2
$39.33
0.400000
$15.73
9.42%
$47.19
28.25%
Subtotal: BASICOS
Costo directo
$167.07
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$18.48
CARGOS ADICINALES
0.5%
$0.84
PRECIO UNITARIO
$17.73
$204.12
Pgina: 126+0
21-Aug-2014
Concepto
Anlisis: 31115
Unidad
Costo
cantidad
Importe
Unidad: M2
MURO DE TABIQUE ROJO COMUN DE 19 A 21 CM DE ESPESOR ASENTADO CON MORTERO CEM-ARENA 1:3
ACABADO COMUN PARA ESTRUCTURA REGIONAL , ZONA DE ALTA SISMICIDAD.
MATERIALES
TABIQUE ROJO RECOCIDO 1a
PZA
$1.90
96.600000
Subtotal: MATERIALES
$183.54
48.64%
$183.54
48.64%
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.154000
$78.72
20.86%
PEON
JOR
$298.08
0.154000
$45.90
12.16%
$124.62
33.02%
$3.74
0.99%
$3.74
0.99%
$65.48
17.35%
$65.48
17.35%
$124.62
0.030000
M3
$1,190.50
Subtotal: BASICOS
Costo directo
0.055000
$377.38
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$41.74
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$40.05
$1.89
$461.06
Pgina: 127+0
21-Aug-2014
Concepto
Anlisis: 32001
Unidad
Costo
cantidad
Importe
Unidad: M2
APLANADO MUROS CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADO CON ESPONJA,
INCL. REMATES Y EMBOQUILLADO.
MANO DE OBRA
OFICIAL DE ALBAILERIA
JOR
$511.17
0.083333
$42.60
45.27%
PEON
JOR
$298.08
0.083333
$24.84
26.39%
$67.44
71.66%
$2.02
2.15%
$2.02
2.15%
$24.65
26.19%
$24.65
26.19%
$67.44
0.030000
M3
$947.96
Subtotal: BASICOS
Costo directo
0.026000
$94.11
INDIRECTOS
10.6129%
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$10.41
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$9.99
$0.47
$114.98
Pgina: 128+0
21-Aug-2014
Concepto
Anlisis: 34003
Unidad
Costo
cantidad
Importe
Unidad: M2
PINTURA VINILICA LAVABLE PARA MUROS, COLUMNAS, TRABES Y PLAFONES TRABAJO TERMINADO,
INCL. PREPARACION DE LA SUPERFICIE, REBABEAR, PLASTE NECESARIO Y ZOCLOS.
MATERIALES
MATERIALES MENORES/PINT.
M2
$25.63
0.050000
$1.28
3.54%
RESANES Y REBABEADO/PINT.
M2
$20.32
0.050000
$1.02
2.82%
LT
$48.23
0.060000
$2.89
8.00%
LT
$68.88
0.200000
$13.78
38.13%
$18.97
52.49%
Subtotal: MATERIALES
MANO DE OBRA
OFICIAL PINTOR
JOR
$368.91
0.025000
$9.22
25.51%
AYUDANTE
JOR
$298.06
0.025000
$7.45
20.61%
$16.67
46.13%
$0.50
1.38%
$0.50
1.38%
$16.67
0.030000
$36.14
INDIRECTOS
10.6129%
$3.84
FINANCIAMIENTO
0%
$0.00
UTILIDAD
10%
$4.00
CARGOS ADICINALES
0.5%
PRECIO UNITARIO
$0.18
$44.16