ESTRUCTURAS
FASE
ACTIVIDAD
PTO
S/
OBRAS PROVISIONALES
CASETA P/GUARDIANIA Y/O DEPOSITO DE MAT.
2,237.40
CERCO PROVISIONAL CON ARPILLERA Y ROLLIZOS DE EUCALIPT
2,118.00
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA
250.00
INSTALACION PROVISIONAL DE AGUA
250.00
CARTELDE OBRA
399.25
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO
3,715.46
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C"/RETR
19,250.18
ELIMINACION DE DESMONTE,PROV.DEL MOV.EN TERRENO NORMA
45,593.60
DEMOLICION DE ALBAILERIA
1,105.77
DEMOLICION DE VEREDAS
2,385.08
RELLENO CON MATERIAL PROPIO SELECCIONADO
22,283.37
RELLENO Y APISONADO CON MATERIAL SELECCIONADO
6,061.75
PERFILADO E=0.15 M
2,801.87
CONCRETO SIMPLE
SOLADO PARA LOSA DE FUNDACION MEZCAL 1:12
7,289.88
CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS
1,488.34
ENCOFRADO PARA CIMENTACIONES RENDIMIENTO=15 M2/DIA
1,083.31
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS
823.31
ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.60 MT
706.20
OBRAS DE CONCRETO ARMADO
VIGAS DE CIMENTACION Y PLATEA DE CIMENTACION
CONCRETO EN VIGAS PLATEA DE CIMENTACION F'C= 210 KG/CM2
129,716.94
ENCOFRADO Y DESENCOFRADO VIGA Y PLATEA DE CIMENTACIO
23,487.96
ACERO EN VIGA Y PLATEA DE CIMENTACION GRADO 60
202,280.65
TECNOPORT EN JUNTAS 2"
1,031.21
MUROS DE CONTENCION REFORZADO
CONCRETO EN MURO DE CONTENCION F'C= 210 KG/CM2
17,729.15
ENCOFRADO Y DESENCOFRADO EN MURO DE CONTENCION
13,872.59
ACERO EN MURO DE CONTENCION GRADO 60
15,940.71
TECNOPORT EN JUNTAS 2"
1,828.02
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
40,557.26
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUM
22,665.67
ACERO GRADO 60 EN COLUMNAS
211,499.10
COLUMNAS DE AMARRE
CONCRETO EN COLUMNAS DE AMARRE F'C=175 KG/CM2
2,403.37
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE AM
1,723.16
ACERO GRADO 60 EN COLUMNAS DE AMARRE
2,733.50
TECNOPORT EN JUNTAS 2" EN COLUMNAS
2,329.45
VIGAS
VIGAS PRINCIPALES Y SECUNDARIAS
CONCRETO EN VIGAS F'C=210 KG/CM2
68,086.57
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
43,107.32
ACERO GRADO 60 EN VIGAS
79,313.86
VIGAS DE AMARRE
CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2
1,616.56
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE AMARRE
1,342.67
ACERO GRADO 60 EN VIGAS DE AMARRE
1,811.71
VIGAS DE ESCALERA
CONCRETO EN VIGAS DE ESCALERA F'C=210 KG/CM2
473.21
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
347.53
ACERO GRADO 60 EN VIGAS
550.79
VIGAS CHATAS
CONCRETO EN VIGAS CHATAS F'C=210 KG/CM2
1,019.90
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
467.81
ACERO GRADO 60 EN VIGAS
1,942.63
VIGAS DE BORDE
CONCRETO EN VIGAS DE BORDE F'C=210 KG/CM2
1,404.94
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
1,821.96
ACERO GRADO 60 EN VIGAS
2,677.56
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
54,468.76
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADA
41,177.67
ACERO GRADO 60 EN LOSAS ALIGERADAS
28,059.78
BLOQUE HUECO/CONCRETO 20X15X30 CM PARA TECHO ALIGER
30,512.22
LOSAS MACISAS
CONCRETO EN LOSAS SOLIDAS F'C=210 KG/CM2 UNSAAC
4,394.60
ENCOFRADO Y DESENCOFRADO NORMAL DE LOSAS MACIZAS
2,379.15
ACERO GRADO 60 EN LOSAS MACIZAS
5,437.02
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
11,132.37
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
10,757.20
ACERO GRADO 60 EN ESCALERAS
21,797.57
PLACAS
CONCRETO EN MUROS TABIQUES Y PLACAS F'C= 210 KG/CM2
40,760.27
ENCOFRADO Y DESENCOFRADO MUROS TABIQUES Y PLACAS
27,476.64
ACERO GRADO 60 EN MUROS TABIQUES Y PLACAS
62,074.35
1,356,054.13
MUROS Y TABIQUES
MURO SOGA LADRILLO DE ARCILLA C/M 1:4 X 1.5CM.
2,829.69
MURO CABEZA LADRILLO DE ARCILLA C/M 1:5 X 1.5CM.
19,622.46
MURO SOGA LADRILLO DE ARCILLA C/M 1:4 X 1.5CM PARA MU
666.14
MUROS DE COSTILLA LADRILLO CORRIENTE
393.74
REVOQUES ENLUCIDOS Y CIELO RASOS
TARRAJEO DEL TIPO RAYADO O PRIMARIO EN INTERIORES C/MOR
747.72
TARRAJEO DEL TIPO RAYADO O PRIMARIO EN EXTERIORES
525.28
TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
8,139.27
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA
3,363.21
TARRAJEO DE SUPERF.VIGAS PERALTADAS-INDEPEND.(EN EXTER
4,388.92
TARRAJEO DE SUPERF. VIGAS PERALTADAS-INDEPEND.(EN INTE
10,637.63
TARRAJEO COLUMNAS EXTERIOR C/MORTERO 1:5 X 1.5CM.
1,776.65
TARRAJEO DE COLUMNAS INTERIORES INDEPENDIENTES
4,936.61
TARRAJEO DE PLACAS EN EXTERIORES C:M 1:5 E=2cm
2,912.46
TARRAJEO DE PLACAS INTERIORES C:M 1:5 E=2cm
10,992.74
1 SEMANA 2 SEMANA
2 MES
3 SEMANA
3 MES
3 SEMANA
4 MES
3 SEMANA
4 SEMANA 1 SEMANA
2 SEMANA
5 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
6 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
7 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
3 SEMANA
8 MES
4 SEMANA
1 SEMANA
2 SEMANA
L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D
2,237.40
2,118.00
250.00
250.00
399.25
3,715.46
19,250.18
45,593.60
1,105.77
2,385.08
22,283.37
6,061.75
2,801.87
7,289.88
1,488.34
1,083.31
823.31
706.20
129,716.94
23,487.96
101,140.33
101,140.33
1,031.21
17,729.15
13,872.59
15,940.71
1,828.02
27,038.17
13,519.09
15,110.45
7,555.22
140,999.40
70,499.70
600.84
1,802.53
430.79
1,292.37
683.37
2,050.12
776.48
1,552.96
34,043.28
34,043.28
21,553.66
21,553.66
39,656.93
39,656.93
808.28
808.28
671.34
671.34
905.85
905.85
473.21
347.53
550.79
509.95
509.95
233.90
233.90
971.32
971.32
1,404.94
1,821.96
2,677.56
27,234.38
27,234.38
20,588.84
20,588.84
14,029.89
14,029.89
15,256.11
15,256.11
2,197.30
2,197.30
1,189.57
1,189.57
2,718.51
2,718.51
11,132.37
10,757.20
21,797.57
20,380.14
20,380.14
13,738.32
13,738.32
31,037.18
31,037.18
1,414.84
1,414.84
9,811.23
9,811.23
333.07
333.07
196.87
196.87
373.86
373.86
262.64
262.64
4,069.63
4,069.63
1,681.61
1,681.61
2,194.46
2,194.46
5,318.81
5,318.81
888.32
888.32
2,468.30
2,468.30
1,456.23
1,456.23
5,496.37
5,496.37
3,618.55
762.78
2,178.94
860.03
1,809.28
ARQUITECTURA
STALACIONES SANITARIAS
PTO
S/
381.39
726.31
1,452.62
430.01
1 MES
ACTIVIDAD
1,809.28
381.39
1 SEMANA 2 SEMANA
3 SEMANA
2 MES
4 SEMANA 1 SEMANA 2 SEMANA
3 MES
3 SEMANA
4 MES
3 SEMANA
4 SEMANA 1 SEMANA
2 SEMANA
430.01
5 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
6 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
7 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
8 MES
3 SEMANA
4 SEMANA
1 SEMANA
2 SEMANA
L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D
VESTIDURA DE DERRAMES
4,699.33
BRUAS DE 1/2"
1,452.12
CIELORRASOS EN INTERIOR CON MEZCLA DE CEMENTO-ARENA
16,077.19
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM.
19,119.24
FALSO PISO 4" INCLUYE ENRROCADO
29,026.53
PISO DE TERRAZO CON ESTRIAS DE ALUMINIO
22,708.97
PISO CERAMICO 0.30X0.30 SERIE ORIGENES
1,693.40
PISO CERAMICO SUPERFORTE ALTO TRANSITO 0.30X0.30
16,457.70
VEREDAS DE CONCRETOFC=140 KG/CM2 E=10CM CON EMPEDR
892.31
SARDINELES FC=175 KG/CM2 DE 15*30 M
546.20
TAPAJUNTAS METALICO
421.17
CONTRAZOCALOS
CONTRAZOCALO DE TERRAZO E=1CM, H=0.15m
3,586.50
CONTRAZOCALO DE CERAMICO H=0.15m COLOR
4,231.47
ZOCALOS
ZOCALO DE CERAMICO 20X30 cm
2,329.44
LISTELOS DE 7.5 X 20 cm
1,247.01
CARPINTERIA DE MADERA
PUERTA DE MELAMINA CON BORDES DE MADERA CEDRO (1 HOJA
6,543.69
PUERTA DE MELAMINA CON BORDES DE MADERA CEDRO Y JAMBA
10,140.12
CLOSETS EMPOTRADOS CON MELAMINA DE18MM CORREDIZO
2,138.94
CLOSETS- ESTANTE EMPOTRADOS CON MELAMINA DE18MM CO
1,809.48
MAMPARA DE MELAMINA CON MARCOS DE CEDRO Y VIDRIOS 6M
5,147.48
BARANDA DE MADERA D=3" CON TUBO ELECTROSOLDADO 1 1/2"
1,588.22
PASAMANO DE MADERA D=3" CON TUBO ELECTROSOLDADO 1 1/2
1,002.80
SEPARADORES DE URINARIOS CON MELAMINA INC INSTALACION
124.08
TAPAJUNTAS DE MADERA CEDRO DE 10" X 1/2"
33.54
CARPINTERIA METALICA
SEPARADORES DE BAO CON MELAMINA CON FIERRO CUADRADO
2,091.68
PUERTAS EN SEPARADORES DE BAO CON MELAMINA
469.30
PUERTA METALICA DE INSPECCION A DUCTOS
195.84
PIZARRA ACRILICA
7,292.00
REJA METALICA DE PROTECCION VENTANAS ICL. PINT. ANTICOO
8,750.28
CERRAJERIA
BISAGRA CAPUCHINA BRONCEADA DE 3 1/2" X 3 1/2" UNSAAC
980.10
CERRADURA PARA PUERTAS DE VIDRIO O CRITAL
210.00
CERRADURA PTA.BAO TIPO PERILLAS UNSAAC
782.88
CERRADURA PARA PUERTA PRINCIPAL UNSAAC
167.22
CIERRAPUERTAS FRENO HIDRAULICO PUERTAS VIDRIO
2,730.00
PICAPORTES DE FIERRO REDONDO DE 4"
222.32
VIDRIOS, CRISTALES Y SIMILARES
VENTANA VIDRIO CRUDO COLOR GRISS 6mm CON PERFILES DE A
2,621.59
VENTANA VIDRIO CRUDO COLOR GRISS 8mm CON PERFILES DE A
597.19
PUERTA DE VIDRIO CRUDO COLOR BRONCE 10mm CON TUBO E
6,006.97
VIDRIOS 6mm
340.06
VITROVENT
1,913.98
VIDRIO CATEDRAL INCOLORO
47.02
ESPEJO BISELADO CORRIDO ICL. ARMASON DE MADERA Y SUJE
487.73
PINTURA
PINTURA LATEX EN MUROS INTERIORES UNSAAC
14,127.89
PINTURALATEX EN DERRAMES
939.00
PINTURA ESMALTE EN PIZARRAS COLOR VERDE
280.71
APARATOS Y ACCESORIOS SANITARIOS
283,623.51
INODORO BLANCO CON GRIFERIA Y ACCESORIOS UNSAAC
1,379.00
LAVATORIOS TIPO OVALIN BLANCO INC. MESA DE CONCRETO
1,400.00
LAVATORIOS TIPO MALIBU BLANCO C/P
70.00
URINARIOS DE LOZA DE PICO BLANCO UNSAAC
218.79
GRIFERIA DE URINARIOS UNSAAC
120.00
GRIFERIA DE LAVATORIOS UNSAAC
522.00
COLOCACION DE APARATOS SANITARIOS UNSAAC
619.68
GABINETE CONTRAINCENDIOS
1,100.29
RED DE CONEXION A TANQUE E INSTALACION PROVISIONAL AL EDIFICIO
SISTEMA DE ALIMENTACION
TUBERIA DE 3" PVC-SAP
864.05
TEE PVC-SAP 3" * 3/4"
19.92
CODO PVC SAP 3"
53.44
TUBERIA PVC SAP C-10 R 3/4"
622.69
CODO PVC-SAP3/4"
36.64
SISTEMAS DE CONDUCCIN AGUA POTABLE A T. ELEVADO Y CONTRAINCENDIO
TUBERIA DE AGUA PVC. DE 2"(50MM).INSTALACION.INC.PRUEBA H
108.70
CODO PVC SAP 2"
26.58
CODO PVC SAP 2"X45
13.65
SISTEMA DE CONTRAINCENDIO
TUBERIA FIERRO GALVANIZADO 2 " INSTAL.INC.PRUEBA HIDR.
1,236.38
CODO PVC SAP 2"
93.03
SISTEMA DE AGUA Y DESAGUE
SISTEMA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
1,897.50
SISTEMA DE DESAGUE Y VENTILACION
SALIDA DE DESAGE DE 2"
2,232.00
SALIDA DE DESAGE DE 4"
1,764.37
PROVISION E INSTALACION TUBERIA PVC-SAL D=4" + PRUEB.HID
344.03
PROVISION E INSTALACION TUBERIA PVC-SAL D=3" + PRUEB.HID
212.26
PROVISION E INSTALACION TUBERIA PVC-SAL D=2" + PRUEB.HID
86.13
REGISTRO DE BRONCE CROMADO DE 4"
49.71
REGISTRO DE BRONCE CROMADO DE 3"
81.80
REGISTRO DE BRONCE 2"
10.53
SUMIDERO DE BRONCE 2"
60.18
CODO PVC SAL 4"X45
65.46
CODO PVC SAL 3"X45
147.84
YEE DE P.V.C. SAL SP,RAMAL CON REDUCCION DE 4"-3"
40.32
YEE PVC SAL 4"
84.30
TEE PVC-SAL 3"* 2"
145.20
COLECTOR DE AGUAS SERVIDAS
TRAZO Y REPLANTEO
162.30
EXCAVACION DE TERRENO P/TUB COLECTOR AGUAS SERVIDAS (
4,939.19
783.22
1,566.44
1,174.83
1,174.83
726.06
726.06
8,038.60
8,038.60
19,119.24
29,026.53
11,354.49
11,354.49
1,693.40
16,457.70
892.31
546.20
421.17
3,586.50
4,231.47
1,164.72
1,164.72
623.51
623.51
6,543.69
10,140.12
2,138.94
1,809.48
5,147.48
1,588.22
1,002.80
124.08
33.54
2,091.68
469.30
195.84
7,292.00
8,750.28
980.10
210.00
782.88
167.22
2,730.00
222.32
2,621.59
597.19
6,006.97
340.06
1,913.98
47.02
487.73
14,127.89
939.00
280.71
1,379.00
1,400.00
70.00
218.79
120.00
522.00
619.68
1,100.29
864.05
19.92
53.44
622.69
36.64
108.70
26.58
13.65
1,236.38
93.03
1,897.50
1,116.00
882.19
1,116.00
882.19
172.01
172.01
106.13
106.13
43.07
43.07
49.71
81.80
10.53
60.18
65.46
147.84
40.32
84.30
145.20
162.30
4,939.19
INSTALACIONES SANITARIAS
2,358.03
7,091.48
127.73
46.20
98.22
56.82
38.88
2,358.03
7,091.48
127.73
46.20
98.22
56.82
38.88
1 MES
ACTIVIDAD
TUBERIA PVC SAL 6"
TUBERIA PVC SAL10"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 10"X20"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 18"X24"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 28"X28"
BUZON TIPO I TERR.NORMAL E.D. C/CARG.+VOLQ.HASTA 3.00M
SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO 3"- 4"
SISTEMA DEDESAGUE DE AGUAS PLUVIALES
TUBERIA PVC SAL3"
TUBERIA PVC SAL4"
ACCESORIOS DE FIJACION DE RECUBRIMIENTO DE MONTANTES
TARRAJEO DE RECUBRIMIENTO DE MONTANTES C:M 1:5 E=1.5cm
CODO PVC SAL 4"X45
CODO PVC SAL 3"X45
TEE PVC SAL 4"
TEE PVC-SAL 3"
SISTEMA COLECTOR DE AGUAS DE PLUVIALES
TRAZO Y REPLANTEO
EXCAVACION DE TERRENO P/TUB COLECTOR AGUAS SERVIDAS (
ELIMINACION DE EXCESO DE CORTE CON VOLQUETE, CARGUIO
RELLENO CON MATERIAL PROPIO SELECCIONADO
PERFILADO E=0.15 M
TUBERIA PVC SAL3"
TUBERIA PVC SAL4"
TUBERIA PVC SAL 6"
TUBERIA PVC SAL10"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 10"X20"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 12"X24"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 18"X24"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 24"X24"
CAJA DE REGISTRO DE DESAGUE C/TAPA C 28"X28"
BUZON TIPO I TERR.NORMAL E.D. C/CARG.+VOLQ.HASTA 2.00M
BUZON TIPO I TERR.NORMAL E.D. C/CARG.+VOLQ.HASTA 3.00M
SALIDA DE DESAGE DE 3"
INSTALACIONES ELECTRICAS
PTO
S/
1 SEMANA 2 SEMANA
3 SEMANA
2 MES
4 SEMANA 1 SEMANA 2 SEMANA
3 SEMANA
3 MES
4 SEMANA 1 SEMANA 2 SEMANA
4 MES
3 SEMANA
4 SEMANA 1 SEMANA
2 SEMANA
3 SEMANA
5 MES
4 SEMANA
1 SEMANA
2 SEMANA
3 SEMANA
6 MES
4 SEMANA
1 SEMANA
2 SEMANA
3 SEMANA
7 MES
4 SEMANA
1 SEMANA
2 SEMANA
3 SEMANA
8 MES
4 SEMANA
1 SEMANA
2 SEMANA
L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D L MM J V S D
1,342.05
3,691.74
172.32
144.01
526.94
4,881.72
522.99
1,342.05
3,691.74
172.32
144.01
526.94
4,881.72
522.99
56.82
38.88
557.16
1,924.91
10.91
24.64
15.17
10.42
56.82
38.88
###
1,924.91
10.91
24.64
15.17
10.42
239.17
3,974.06
1,459.35
5,705.79
231.54
44.60
378.43
1,369.51
5,856.89
258.48
121.20
144.01
579.39
263.47
1,030.20
1,220.43
149.40
239.17
3,974.06
1,459.35
5,705.79
231.54
44.60
378.43
1,369.51
5,856.89
258.48
121.20
144.01
579.39
263.47
1,030.20
1,220.43
149.40
67,591.92
INSTALACIONES ELECTRICAS
636.23
2,004.62
2,562.00
258.45
1,036.21
1,334.34
718.62
790.16
1,168.16
2,373.61
101.75
1,829.88
138.03
45.30
107.94
239.20
1,154.79
2,406.83
4,327.68
3,760.00
455.40
274.20
60.72
109.68
3,817.80
3,887.84
1,271.51
1,106.84
159.00
636.23
2,004.62
2,562.00
258.45
1,036.21
1,334.34
718.62
790.16
1,168.16
2,373.61
101.75
1,829.88
138.03
45.30
107.94
239.20
1,154.79
2,406.83
2,163.84
2,163.84
1,880.00
1,880.00
227.70
227.70
137.10
137.10
30.36
30.36
54.84
54.84
1,908.90
1,908.90
1,943.92
1,943.92
635.76
553.42
79.50
635.76
553.42
79.50
684.00
205.20
3,242.40
1,937.60
574.20
477.60
636.80
1,356.80
59.40
111.53
2,519.20
37.20
608.61
464.52
43.40
774.11
66.96
126.17
357.12
63.86
684.00
205.20
3,242.40
1,937.60
574.20
477.60
636.80
1,356.80
59.40
111.53
1,259.60
1,259.60
18.60
18.60
304.30
304.30
232.26
232.26
21.70
21.70
387.06
387.06
33.48
63.09
33.48
63.09
178.56
178.56
31.93
31.93
147.85
702.24
159.00
73.93
239.04
147.90
53,879.50
1,761,149.06
188,638.56
451,121.07
73.93
351.12
351.12
79.50
79.50
119.52
119.52
73.95
73.95
395,825.12
230,491.88
295,038.43
118,624.78
58,728.14
22,681.07
2,237.40
2,118.00
250.00
250.00
399.25
3,715.46
19,250.18
45,593.60
1,105.77
2,385.08
22,283.37
6,061.75
2,801.87
7,289.88
1,488.34
1,083.31
823.31
706.20
129,716.94
23,487.96
202,280.65
1,031.21
17,729.15
13,872.59
15,940.71
1,828.02
40,557.26
22,665.67
211,499.10
2,403.37
1,723.16
2,733.50
2,329.45
68,086.57
43,107.32
79,313.86
1,616.56
1,342.67
1,811.71
473.21
347.53
550.79
1,019.90
467.81
1,942.63
1,404.94
1,821.96
2,677.56
54,468.76
41,177.67
28,059.78
30,512.22
4,394.60
2,379.15
5,437.02
11,132.37
10,757.20
21,797.57
40,760.27
27,476.64
62,074.35
2,829.69
19,622.46
666.14
393.74
747.72
525.28
8,139.27
3,363.21
4,388.92
10,637.63
1,776.65
4,936.61
2,912.46
10,992.74
3,618.55
762.78
2,178.94
860.03
4,699.33
1,452.12
16,077.19
19,119.24
29,026.53
22,708.97
1,693.40
16,457.70
892.31
546.20
421.17
3,586.50
4,231.47
2,329.44
1,247.01
6,543.69
10,140.12
2,138.94
1,809.48
5,147.48
1,588.22
1,002.80
124.08
33.54
2,091.68
469.30
195.84
7,292.00
8,750.28
980.10
210.00
782.88
167.22
2,730.00
222.32
2,621.59
597.19
6,006.97
340.06
1,913.98
47.02
487.73
14,127.89
939.00
280.71
1,379.00
1,400.00
70.00
218.79
120.00
522.00
619.68
1,100.29
864.05
19.92
53.44
622.69
36.64
108.70
26.58
13.65
1,236.38
93.03
1,897.50
2,232.00
1,764.37
344.03
212.26
86.13
49.71
81.80
10.53
60.18
65.46
147.84
40.32
84.30
145.20
162.30
4,939.19
2,358.03
7,091.48
127.73
46.20
98.22
56.82
38.88
1,342.05
3,691.74
172.32
144.01
526.94
4,881.72
522.99
56.82
38.88
557.16
1,924.91
10.91
24.64
15.17
10.42
239.17
3,974.06
1,459.35
5,705.79
231.54
44.60
378.43
1,369.51
5,856.89
258.48
121.20
144.01
579.39
263.47
1,030.20
1,220.43
149.40
636.23
2,004.62
2,562.00
258.45
1,036.21
1,334.34
718.62
790.16
1,168.16
2,373.61
101.75
1,829.88
138.03
45.30
107.94
239.20
1,154.79
2,406.83
4,327.68
3,760.00
455.40
274.20
60.72
109.68
3,817.80
3,887.84
1,271.51
1,106.84
159.00
684.00
205.20
3,242.40
1,937.60
574.20
477.60
636.80
1,356.80
59.40
111.53
2,519.20
37.20
608.61
464.52
43.40
774.11
66.96
126.17
357.12
63.86
147.85
702.24
159.00
239.04
147.90
1,761,149.06
1,761,149.06
ARQUITECTURA
ESTRUCTURAS
FASE
ACTIVIDAD
OBRAS PROVISIONALES
CERCO PROVISIONAL CON ARPILLERA Y ROLLIZOS DE EUCA
INSTALACION PROVISIONAL DE AGUA
INSTALACION PROVISIONAL DE ENERGIA ELECTRICA
CARTELDE OBRA
ENCOFRADO Y DESENCOFRADO PARA PROTECCION DE DUC
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTI
OBRAS DE CONCRETO ARMADO
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS
ACERO GRADO 60 EN COLUMNAS
TECNOPORT EN JUNTAS 2" EN COLUMNAS
COLUMNAS DE AMARRE
CONCRETO EN COLUMNAS DE AMARRE F'C=175 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS DE
ACERO GRADO 60 EN COLUMNAS DE AMARRE
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS
ACERO GRADO 60 EN VIGAS
VIGAS DE AMARRE
CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE AM
ACERO GRADO 60 EN VIGAS DE AMARRE
PLACAS
CONCRETO EN PLACAS F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN PLACAS
ACERO GRADO 60 EN PLACAS
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGER
ACERO GRADO 60 EN LOSAS ALIGERADAS
BLOQUE HUECO/CONCRETO 15X20X30 CM PARA TECHO ALI
LOSAS SOLIDAS PLEGADAS
CONCRETO EN LOSAS SOLIDAS PLEGADAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS SOLIDA
ACERO GRADO 60 EN LOSAS SOLIDAS PLEGADAS
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS
ACERO GRADO 60 EN ESCALERAS
RAMPA
CONCRETO EN RAMPAS F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO EN RAMPAS
ACERO GRADO 60 EN RAMPAS
PARAPETOS
CONCRETO EN PARAPETO F'C= 210 KG/CM2
ENCOFRADO Y DESENCOFRADO ENPARAPETO
ACERO ENPARAPETO GRADO 60
MUROS Y TABIQUES DE ALBAILERIA
MURO DE BLOQUE HUECO DE CONCRETO e=15 cm, mezcla 1:5
MURO DE BLOQUE HUECO DE CONCRETO e=30 cm, mezcla 1:5
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO DEL TIPO RAYADO O PRIMARIO C/MORTERO 1:5
TARRAJEO FINO unsaac
TARRAJEO FROTACHADO CON CEMENTO-ARENA UNSAAC
TARRAJEO DE COLUMNAS C:M 1:5 E=2cm
TARRAJEO DE VIGAS PERALTADAS
TARRAJEO DE PLACAS INT. C:M 1:5 E=2cm
TARRAJEO DE ESCALERAS C:A 1:5
TARRAJEO DE PARAPETOS EN RAMPAS Y ESCALERASC:M 1:
VESTIDURA DE DERRAMES
BRUAS
TARRAJEO FINO EN CIELORRASOS CON MEZCLA DE CEMEN
TARRAJEO FROTACHADO EN CIELORRASOS CON MEZCLA D
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM.
PISO DE TERRAZO CON ESTRIAS DE ALUMINIO E= 2.50 cm
PISO DE PARQUET HUAYACAN 6 X 30 CM VETEADO
PISO CERAMICO 0.30X0.30
PISO CERAMICO VITRIFICADO ALTO TRANSITO ANTIDESLIZAN
REVESTIMIENTO DE GRADAS CON TERRAZO ICL. CANTONER
TAPAJUNTAS METALICO
CONTRAZOCALOS
CONTRAZOCALO DE TERRAZO C/PERFILES DE ALUMINIO
CONTRAZOCALO DE MADERA AGUANO DE 4" x 3/4" C/RODON DE 3/4"
CONTRAZOCALO DE MADERA AGUANO DE 6" x 3/4" C/RODON DE 3/4"
CONTRAZOCALO CERAMICO
ZOCALOS
ZOCALO DE CERAMICO DE 30x30cm.
LISTELO TIPO CINTILLO DE 0.015x0.30m.
CUBIERTAS
COBERTURA DE TEJAS SOBRE TIJERALES DE MADERA Y CORREAS
COBERTURA DE POLICARBONATO SOBRE ESTRUCT METALICA
MURO LADRILLO SOGA
TARRAJEO DE PARAPETOS DE TECHO
TARRAJEO CON IMPERMEABILIZANTE EN CANALES DE TECHO
CANALETA DE LATON
SUMIDERO DE BRONCE DE 6"
CARPINTERIA DE MADERA
PUERTA DE MELAMINA CON BORDES DE MADERA AGUANO e=45mm.
ASIENTOS DE MADERA SOBRE TUBO DE 2" Y PERFILES DE F
CARPINTERIA METALICA
PUERTA DE VIDRIO CRUDO 8mm CON BORDES DE TUBO DE
SEPARADORES METALICOS DE BAO e= 2.50MM
SEPARADORES DE URINARIOS METALICO e= 6MM INC INSTA
BARANDAS METALICAS DE TUBO 2" CON FIERRO LISO DE 5/
TUBO DECORATIVO DE FIERRO DE 4" PINTADO DE COLOR A
ANCLADO CON ANGULAR ESTRIADO DE 1 1/2" X 1 1/2" X 1/
PLATAFORMAS DE DESCANSO TIPO CANASTILLA
ESCALERA DE GATO METALICA
PIZARRA ACRILICA
CERRAJERIA
CERRADURA TIPO PERILLAS TIPO FORTE
CERRADURA DE POMO PARA PUERTAS DE VIDRIO O CRITAL
CERRADURA PARA PISO EN PUERTAS DE VIDRIO SIMILAR A
BISAGRA CAPUCHINA ALUMINIZADA DE 4" X 4" UNSAAC
CERROJO DE FIERRO REDONDO DE 5/8" X 0.60 M.
CERROJO DE FIERRO REDONDO DE 5/8" X 0.35 M.
PICAPORTES DE FIERRO REDONDO DE 4"
VIDRIOS, CRISTALES Y SIMILARES
VENTANA VIDRIO CRUDO TRASLUCIDO 8mm INCL ACCESORI
VENTANA VIDRIO PAVONADO 8mm INCL ACCESORIOS
VIDRIOS PAVONADO DE 8mm EN PUERTAS
Duracin
(das)
0.50
0.50
1.00
1.00
1.00
4.00
4.00
16.00
12.00
2.00
4.00
4.00
4.00
4.00
40.00
25.00
4.00
4.00
4.00
2.00
4.00
4.00
5.00
27.00
20.00
7.00
4.00
4.00
4.00
1.00
3.00
2.00
2.00
6.00
6.00
2.00
8.00
4.00
12.00
30.00
6.00
42.00
30.00
42.00
48.00
3.00
20.00
27.00
24.00
24.00
54.00
24.00
24.00
54.00
60.00
12.00
10.00
11.00
12.00
48.00
12.00
2.00
1.00
18.00
2.00
14.00
5.00
9.00
14.00
6.00
2.00
2.00
12.00
12.00
6.00
6.00
6.00
12.00
12.00
12.00
1.00
5.00
2.00
12.00
12.00
12.00
12.00
1.00
1.00
1.00
8.00
1.00
1.00
1 MES
LU MA MI JU VI
1
2
3
4
5
SA DO LU MA
6
7
8
9
MI
10
JU
11
VI
12
SA
13
DO
14
LU
15
MA
16
MI
17
2 MES
JU
18
VI
19
SA
20
DO
21
LU
22
MA
23
MI
24
JU
25
VI
26
SA
27
DO
28
LU
29
MA
30
MI JU
1
2
VI
3
SA DO LU MA
4
5
6
7
MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI
8
9 10 11 12 13 14 15 16 17 18 19 20 21 22
3 MES
JU
23
VI
24
SA
25
DO
26
LU
27
MA
28
MI
29
JU
30
VI
31
SA DO LU MA
1
2
3
4
MI JU VI
5
6
7
SA DO
8
9
LU
10
MA
11
MI
12
JU
13
VI
14
SA
15
DO
16
LU
17
MA
18
MI
19
JU
20
VI
21
SA
22
DO
23
LU
24
MA
25
MI
26
JU
27
VI
28
SA
29
DO
30
LU MA
1
2
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
XTERIORES
1.00
10.00
3.00
3.00
30.00
24.00
30.00
24.00
21.00
3.00
6.00
6.00
6.00
4.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
1.00
4.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
14.00
1.00
1.00
1.00
4.00
5.00
6.00
INSTALACIONES ELECTRICAS
LINEA DE ALIMENTACION
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
CABLE ELECTRICO TW AWG NO. 12
CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.
EXCAVACION
POZO-CONEXION A TIERRA EN SISTEMA C/EQ.BOMBEO,ALUMB,TOMACORR
TABLERO DE DISTRIBUCION CAJA METALICA CON PUERTA Y CERRADURA PARA 8TERMOMAGNETICOS TIPO ENGRAMPE
INTERRUPTOR TERMOMAGNETICO 2X20A
SISTEMA DE DISTRIBUCION
SALIDA DE TOMACORRIENTE TRIFASICO CON PUESTA TIERRA
SALIDA DE TECHO TW 4.0mmUNSAAC
CAJA DEPASO FG 200X200X30 MM. INC. TAPA
CAJA DE PASO CUADRADO
CAJA DE PASO CIRCULAR
LUMINARIAS
LAMPARA FLUORESCENTE DOBLE PARA EMPOTRAR DE 40W
LAMPARA FLUORESCENTE DOBLE CON REJILLA ADOSADA A CIELORASO
LAMPARA FLUORESCENTE CIRCULAR PARA DOSAR CON DIFUSOR
LAMPARA FLUORESCENTE DOBLE PARA ADOSAR 40W
LAMPARA HALOGENA FLOOD LIGTH DE 150 W O EQUIVALENTE
REFLEXTOR LAMPARA HALOGENA DE 75 W CIELO RASO
LAMPARA VAPOR DE SODIO DE 150W CON POSTE DE CA
INSTALACIONES ESPECIALES
INTERNET
SALIDA PARA RED INFORMATICA
CAJA DE PASO METALICA DE 100X100X50 MM. INC. TAPA INTERNET
TELECONFERENCIAS
SALIDA PARA TELECONFERENCIAS
CAJA DE PASO METALICA DE 100X100X50 MM. INC. TAPA TV-CABLE
ALARMA CONTRAINCENDIO
SALIDA PARA ALARMA CONTRAINCENDIO INC. SISTEMA
CAJA DE PASO CUADRADO
PARLANTES
SALIDA DE PARLANTES
CAJA DE PASO CUADRADO
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DURANTE UNSAAC
REUBICACION DE ESTRUCTURAS DE CONCRETO
ELIMINACION DE ARBOLES
REUBICACION DE POSTES DE LUZ
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA A MAQUINA
CORTE Y EXCAVACION MANUAL
DEMOLICION ESTRUCTURA DE CONCRETO
PICADO DE MURO DE CONCRETO (JARDINERA)
REMOSION DE PAVIMENTO- VEREDAS
PICADO DE PAVIMENTO PARA NUEVO VACIADO
RELLENO CON MATERIAL PROPIO SELECCIONADO
ELIMINACION DE DESMONTE,
COMPACTADO Y APISONADO CON MAT. SELECCIONADO
PERFILADO E=0.15 M
CONCRETO SIMPLE
MURO-SARDINEL FC=140 KG/CM2 DE 0.30*1.20 M
SARDINELES FC=175 KG/CM2 DE H= 15 E=30 M
SARDINELES FC=175 KG/CM2 DE 15*10 M
OBRAS EXTERIORE
4 MES
MI JU VI
3
4
5
5 MES
6 MES
SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3
4
5
6
7 8 9 10 11 12 13 14 15 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1
2
3
4 5 6
7
8
9 10 11 12 13 14 15
1 MES
FASE
ACTIVIDAD
TOTAL
LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI
1
OBRAS PROVISIONALES
CERCO PROVISIONAL CON ARPILLERA Y ROLLIZOS DE EUCALIPTO
0.50
0.50
1.00
CARTELDE OBRA
1.00
1.00
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO
4.00
4.00
16.00
12.00
2.00
COLUMNAS DE AMARRE
CONCRETO EN COLUMNAS DE AMARRE F'C=175 KG/CM2
4.00
4.00
4.00
ESTRUCTURAS
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2
4.00
40.00
25.00
VIGAS DE AMARRE
CONCRETO EN VIGAS DE AMARRE F'C=210 KG/CM2
4.00
4.00
4.00
PLACAS
CONCRETO EN PLACAS F'C= 210 KG/CM2
2.00
4.00
4.00
LOSAS ALIGERADAS
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2
5.00
27.00
20.00
2 MES
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1
9 10 11 12 13 14 15
ESTRUCTURAS
BLOQUE HUECO/CONCRETO 15X20X30 CM PARA TECHO ALIGERADO
7.00
4.00
4.00
4.00
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2
1.00
3.00
2.00
RAMPA
CONCRETO EN RAMPAS F'C=210 KG/CM2
2.00
6.00
6.00
PARAPETOS
CONCRETO EN PARAPETO F'C= 210 KG/CM2
2.00
8.00
4.00
12.00
30.00
6.00
42.00
30.00
42.00
48.00
3.00
20.00
27.00
VESTIDURA DE DERRAMES
24.00
BRUAS
24.00
54.00
24.00
PISOS Y PAVIMENTOS
CONTRAPISO DE 48 MM.
24.00
54.00
60.00
12.00
10.00
11.00
TAPAJUNTAS METALICO
12.00
CONTRAZOCALOS
CONTRAZOCALO DE TERRAZO C/PERFILES DE ALUMINIO
48.00
12.00
2.00
CONTRAZOCALO CERAMICO
1.00
ZOCALOS
ZOCALO DE CERAMICO DE 30x30cm.
18.00
2.00
ARQUITECTURA
CUBIERTAS
COBERTURA DE TEJAS SOBRE TIJERALES DE MADERA Y CORREAS
14.00
5.00
9.00
14.00
6.00
CANALETA DE LATON
2.00
2.00
CARPINTERIA DE MADERA
PUERTA DE MELAMINA CON BORDES DE MADERA AGUANO e=45mm.
12.00
12.00
CARPINTERIA METALICA
PUERTA DE VIDRIO CRUDO 8mm CON BORDES DE TUBO DE ACERO
6.00
6.00
6.00
BARANDAS METALICAS DE TUBO 2" CON FIERRO LISO DE 5/8" SEGUN DISEO
12.00
12.00
12.00
1.00
5.00
PIZARRA ACRILICA
2.00
CERRAJERIA
CERRADURA TIPO PERILLAS TIPO FORTE
12.00
12.00
12.00
A
BISAGRA CAPUCHINA ALUMINIZADA DE 4" X 4" UNSAAC
12.00
1.00
1.00
1.00
8.00
1.00
1.00
1.00
10.00
3.00
3.00
PINTURA
PINTURA LATEX EN MUROS INTERIORES UNSAAC
30.00
24.00
30.00
24.00
21.00
PINTURALATEX EN DERRAMES
3.00
6.00
6.00
6.00
4.00
1.00
1.00
1.00
GABINETE CONTRAINCENDIOS
1.00
1.00
2.00
2.00
TARIAS
2.00
2.00
2.00
INSTALACIONES SANITARIAS
2.00
2.00
1.00
4.00
1.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
14.00
1.00
1.00
1.00
4.00
5.00
6.00
EQUIPO
HIDRONEUMATICO DE 120 GLN DE 20-40 LB DE PRESION
ELECTROBOMBA DE 1.5 HP
INSTALACIONES ELECTRICAS
LINEA DE ALIMENTACION
TUBERIAS PVC SAP (ELECTRICAS) D=3/4"
CABLE ELECTRICO TW AWG NO. 12
CABLE ELECTRICO TW AWG-MCM NO. 14 -2.5 MM2.
EXCAVACION
POZO-CONEXION A TIERRA EN SISTEMA C/EQ.BOMBEO,ALUMB,TOMACORR
TABLERO DE DISTRIBUCION CAJA METALICA CON PUERTA Y CERRADURA PARA 8TERMOMAGNETICOS TIPO ENGRAMPE
INSTALACIONES ELECTRICAS
OBRAS PRELIMINARES
TRAZO Y REPLANTEO DURANTE UNSAAC
REUBICACION DE ESTRUCTURAS DE CONCRETO
2 MES
3 MES
4 MES
JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA DO LU MA MI JU VI SA
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1
5 MES
DO LU MA MI JU VI SA DO LU MA MI
4
9 10 11 12 13 14