Anda di halaman 1dari 64

SITES FORES

N
Rgion Dpartement S/Prfecture Village Sites for
ordre

NOUKPOUDOU LBS
1 NAWA BUYO BUYO F1 (SE5)
(Site3: F1-SE5)

NOUKPOUDOU LBS
2 NAWA BUYO BUYO F2 (SE2)
(Site1: F2-SE2)

NOUKPOUDOU LBS
3 NAWA BUYO BUYO F1 (SE4)
(Site2: F1-SE4)

4 NAWA BUYO BUYO Assamouakro F1 (SE2)


5 NAWA BUYO BUYO Gbily F1 (SE4)

6 NAWA BUYO BUYO Malawakro (Site1) F1 (SE2)

7 NAWA BUYO BUYO N'Zi Kouassikro F1 (SE1)


8 NAWA BUYO BUYO N'Zi Kouassikro F2 (SE2)
Kouadio N'Gokro (F1-
9 NAWA BUYO BUYO F1 (SE2)
SE1)
Malawakro
10 NAWA BUYO BUYO
(Site2/cole)
F1 (SE3)

11 NAWA BUYO BUYO Malawakro (Site1)/F2 F2 (A)

12 NAWA BUYO BUYO N'Zi Kouassikro F3 (SEA)


13 NAWA BUYO BUYO Malawakro (Site2) / F2 F2 (SEA)
Raphalkro
14 NAWA BUYO BUYO F1(SE1)
(Site1/cole)
15 NAWA BUYO BUYO Raphalkro (Site2) F1(SE4)

16 NAWA BUYO BUYO Raphalkro (Site3) F1(SE7)

17 NAWA BUYO BUYO Korahinou F1 (SE2)

18 NAWA BUYO BUYO Kodaya (V5) (Site1) F1(SE1)

19 NAWA BUYO BUYO Kodaya (V5) (Site2) F2(SE4)

Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
N
Type Altitude/mer
Indentificatio Latitude Longitude
d'ouvrage (m)
n forage

HV BUY - 001 0654'40,0"w 0623'36,0"N 230

HV BUY - 002 0654'18,4"w 0623'32,0"N 232

HV BUY - 003 0654'30,3"w 0623'26,0"N 235

HV BUY - 004 0655'08,6"w 0621'04,3"N 242


HVA BUY - 005 0657'37,7"w 0613'41,4"N 177

HV - 0658'49,5"w 0618'00,4"N 230

HV - 0656'34,2"w 0620'52,0"N 231


HV - 0656'33,2"w 0620'53,2"N 231

HV BUY - 006 0656'10,2"w 0621'08,8"N 239

HV - 0658'34,3"w 0618'16,2"N 231

HV BUY - 007 0065848.6W 061755,7N 220

HV BUY - 008 065632,3w 0620'51,5"N 230

HV BUY - 009 0065831,0w 061816,3N 229

HV BUY - 010 0657'43,6"w 0618'23,0"N 228

HV BUY - 011 0657'34,5"w 0618'36,3"N 218

HV BUY - 012 0657'34,5"w 0618'36,3"N 221

HVA BUY - 013 0707'11,5"w 0628'37,6"N 241

HV BUY - 014 0658'16,9"w 0559'37,0"N 211

HV BUY - 015 0658'33,1"w 0559'46,5"N 231


Priode travaux Altration PVC Pleins
Socle Prfdr Totale

(m) (m)
Dbut Fin
(m) (m)

11/17/2015 11/19/2015 22.07 31.79 53.86 36.84

11/19/2015 11/20/2015 27 51.4 78.40 52.80

11/21/2015 11/25/2015 31.6 46.72 78.32 64.22

11/26/2015 11/27/2015 36 18.07 0.00 39.97


11/28/2015 11/29/2015 10.49 53.3 63.79 35.09

12/1/2015 1/2/2015 35 58.2 93.20 -


12/3/2015 12/5/2015 4.85 93.38 98.23 -
12/5/2015 1/19/2016 7.3 82.7 90.00 -
1/23/2016 1/24/2016 30 25.22 55.22 41.12
1/27/2016 1/28/2016 25 70 95.00 -
1/28/2016 1/29/2016 33 20.96 53.96 39.86
2/23/2016 2/24/2016 12.69 37.2 49.89 32.87
2/26/2016 2/27/2016 19.07 29.87 48.94 31.92

2/28/2016 2/29/2016 34.19 24.56 58.75 47.57

2/29/2016 3/1/2016 39.2 19.68 58.88 50.62

3/2/2016 3/3/2016 35 28.32 63.32 46.28


3/3/2016 3/9/2016 20 40 60.00 42.98
3/23/2016 3/30/2016 34.47 19.59 54.06 39.96

4/2/2016 4/3/2016 29 24.8 51.14 42.88


485.93 775.76 644.98
Longueur Arrives d'eau
Dbit dv. (Profond
Totale
PVC Crpins hors sol (m)/Dbit (m3/h))
quipe-ment
(m) (m)
(m3/h) AE 1
(m)

17.52 54.36 0.5 1 25/0,5

26.1 78.9 0.5 0.6 48/0,56

14.6 78.82 0.5 0.7

14.6 54.57 54.57 1.8 42/2


29.2 64.29 0.5 6 27/5,7
- - - - -
- - - - -
- - - - -

14.6 55.72 0.5 4 38/3,5


- - - - -

14.6 54.46 0.5 4 39/4


17.52 50.39 0.5 1.2 16/0,4
17.52 49.44 0.5 0.4 28/0,6
11.68 59.25 0.5 3.6 45/2,9
8.76 59.38 0.5 2 48/7
17.52 63.8 0.48 1.5 45/1,7
17.52 60.5 0.5 10
14.6 54.56 0.5 3 39/2

8.76 51.64 0.5 0.6 44/0,9


245.1
ves d'eau
(Profondeur DISTANCE
(m)/Dbit (m3/h)) Pompage
Date ppge d'essai
(oui=1)
(Km)
AE 2 AE 3

SITES FORES

37,56/,72 0 1

0 1

0 1

- - 4 1
14 3/6/2016 1
- - 8 -
- - 8
- - - - -

48/4 1 2/26/2016 1

- - 9 - -

- - 8 2/28/2016 1
37/1 - 7 2/26/2016 1

40/0,7 - 7 2/28/2016 1

- - 2 3/2/2016 1

55/6 - 0 3/3/2016 1

- - 0 3/4/2016 1
175 3/19/2016 1
48,5/2,7 75

- - 0
318 13
ND
ND
Q PALIER1 PALIER1 Q PALIER2 Q PALIER3
PALIER2
NS
(m)
(m3/h) (m3/h) (m3/h)
(m)
(m)

- - - - - -

- - - - - -

- - - - - -

- - - - - -
ND POMPAGE LONGUE DUREE
ND
PALIER3
REMONTEE

(m)
(m) DATE NS (m) Q (m3/h)

- -

- - - - -

- -

- -
MARGELLES
ONGUE DUREE Analyses d'eau (oui=1)
CONSTRUITES (oui=1)

ND Remonte
ND (m) Date Nombre Date
(m)

12/1/2015 1

12/1/2015 1

11/25/2015 1

12/3/2015 1
3/11/2015 1

-
3/2/2015 1

- - - - -

3/4/2015 1
3/2/2015 1
3/4/2015 1

3/8/2015 1

3/8/2015 1

3/8/2015 1

12
MARGELLES CLTURES CONSTRUITES POMPES INSTALLEES
ONSTRUITES (oui=1) (oui=1) (oui=1)

Nombre Date Nombre Date Nombre

- - - - -

4 0 0
SITES FORES

N
Rgion Dpartement S/Prfecture Village
ordre

1 NAWA GUEYO DABOUYO BAKADOU


2 NAWA GUEYO DABOUYO BAKADOU
3 NAWA GUEYO DABOUYO BALEKO
4 NAWA GUEYO Dabouyo Zohourahio
5 NAWA GUEYO Dabouyo Dabouyo
6 NAWA GUEYO Guyo Kossoyo
7 NAWA GUEYO Guyo Brtihio
8 NAWA GUEYO Guyo Ziwayo
9 NAWA GUEYO Guyo Bodouyo-Bloc
10 NAWA GUEYO Guyo Tagbayo
Tagbouayo-
11 NAWA GUEYO Guyo Dioulabougou
12 NAWA GUEYO DABOUYO BAKADOU
13 NAWA GUEYO DABOUYO BAKADOU
14 NAWA GUEYO DABOUYO BAKADOU
15 NAWA GUEYO DABOUYO BAKADOU

Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
N
Type
Sites for Indentification Latitude Longitude
d'ouvrage
forage

F1 (SE3) HV - 0601'18,1"w 0524'53,6"N


F2 (SE2) HV - 0601'15,7"w 0524'53,8"N
F1 (SE1) HV DYO - 001 0601'31,6"w 0525'36,9"N
F1 (SE1) HV DYO - 002 0602'24,4"w 0528'20,7"N
F1 (SE1) HVA DYO - 003 0601'47,5"w 0533'12,7"N
F2 (SE2) HV GYO - 001 0603'19,8"w 0540'23,6"N
F1 (SE2) HV GYO - 002 0605'48,3"w 0542'54,7"N
F1 (SE2) HV GYO - 003 0609'00,9"w 0541'46,6"N
F1 (SE2) HV GYO - 004 0610'14,5"w 0541'40,5"N
F1 (SE2) HVA GYO - 005 0613'30,6"w 0541'48,2"N

F1 (SE2) HV GYO - 006 0611'35,2"w 0541'38,6"N

F3 (A) HV - 0601'12,6"w 0524'58,8"N


F4 (B) HV - 0601'10,6"w 0525'01,5"N
F5 (C) HV - 0601'11,6"w 0525'09,3"N
(REHAB) HV GYO - 010 0601'14,2"w 0524'57,2"N
Priode travaux
Altration Socle
Altitude/mer
(m)
(m) (m)
Dbut Fin

145 11/4/2015 11/5/2015 7.25 67.65


141 11/5/2015 11/6/2015 5.3 94.85
163 11/10/2015 11/12/2015 14.87 45.23
177 11/12/2015 11/17/2015 33 27
153 11/17/2015 11/18/2015 8.15 51.95
172 11/19/2015 11/21/2015 25.15 60
191 11/23/2015 11/24/2015 30 49.85
172 11/24/2015 11/25/2015 21.75 47.85
164 11/26/2015 11/27/2015 29.3 55.7
141 11/28/2015 11/29/2015 13.9 50.95

159 11/29/2015 11/30/2015 27.4 57.3


140 12/12/2015 12/12/2015 5.35 99.35
138 12/12/2015 12/13/2015 1.75 98.25
142 12/13/2015 12/14/2015 3.1 96.75
143 12/17/2015 12/17/2015 - -
226.27 902.68
Longueur
PVC Pleins
PVC Pleins PVC Totale
Prfdr Totale 200
Crpins quipe-ment
(m)
(m) (m)
(m)
(m)

74.9 - - - -
100.15 - - - -
60.1 48.6 12 - 60.6
60 48.5 12 - 60.5
60.1 42.6 18 - 60.6
85.15 55.65 30 - 85.65
79.85 62.35 18 - 80.35
69.6 52.1 18 - 70.1
85 61.5 24 - 85.5
64.85 35.35 30 - 65.35
84.7 55.2 30 - 85.2
104.7 - - - -
100 - - - -
99.85 - - - -
- - - -
461.85 192
Arrives d'eau
Gravier Dbit dv. (Profond
hors sol (m)/Dbit (m3/h))
(m)
(m3/h)
H V AE 1

SITES F
- - - - -
- - - - -
26 260 0.5 7.2 40/0,3
29 290 0.5 3 43/9
29 290 0.5 35 40/7
59 590 0.5 1 35/0,7
41 410 0.5 1.2 47/0,3
26 260 0.5 24 45/15
35 350 0.5 36 58/2
47 470 0.5 45 24,0/09
56 560 0.5 1.3 38/1,2
- - - - -
- - - - -
- - - - -
ves d'eau
(Profondeur DISTANCE
(m)/Dbit (m3/h)) Pompage
d'essai Date ppge
(oui=1)
(Km)
AE 2 AE 3

SITES FORES POSITIFS


- - 0 - -
- - 0 - -
48/6 - 3 1 12/3/2015
- 7 1 12/3/2015
46/12 52/30 10 1 12/13/2015
46/0,8 76/0,9 16 1 12/4/2015
52/0,9 57/1,5 8 1 12/1/2015
48/16 62/18 15 1 12/2/2015
63/34 75/36 2 1 12/2/2015
50/37 56/42 3 1 12/16/2015
73/1,8 - 3 1 12/2/2015
- - 36 - -
- - - - -
- - - - -
1 12/17/2015
103 10
ND ND
Q PALIER1 Q PALIER2 Q PALIER3
PALIER1 PALIER2
NS
(m)
(m3/h) (m3/h) (m3/h)
(m) (m)

- - - - - -
- - - - - -
13.51 2.4 24.85 4.73 32.7 6
7.41 1 15.41 2 21.6 3
-0.12 4 0.37 8 0.81 12
14 1 31.33 1 31.9 1
9.35 0.5 23.3 1.2 35.88 1.2
10 3 12.4 4 13.48 6
11.31 3 14.82 4 16.95 6
4.7 4 6.09 8 6.93 12
15.71 1 27.5 1.3 52.25 1.3
- - - - - -
- - - - - -
- - - - - -
ND ND POMPAGE
Q PALIER4 ND
PALIER3 PALIER4
REMONTEE

(m3/h) (m)
(m) (m)
DATE

- - - - -
- - - - -
39.39 - - 20.36 -
28.12 - - 9.6 -
1.1 - - 0.33 12/14/2015
32.35 - - 15.22 -
37.37 - - 22.32 -
14.78 - - 12.59 -
19.22 - - 15.3 -
8.04 - - 5.94 12/16/2015
56.42 - - 28.14 -
- - - - -
- - - - -
- - - - -
- - - -
POMPAGE LONGUE DUREE Analyses d'eau (oui=1

ND Remonte
NS (m) Q (m3/h) ND (m) Date
(m)

- - - - -
- - - - -
- - - - 12/18/2015
- - - - 12/18/2015
0.08 12 2.1 1.13 12/29/2015
- - - - 12/18/2015
- - - - 12/18/2015
- - - - 12/18/2015
- - - - 12/18/2015
4.7 12 9.83 4,,92 12/29/2015
- - - - 12/18/2015
- - - -
- - - -
- - - -
- - - - 12/29/2015
MARGELLES CLTURES
yses d'eau (oui=1)
CONSTRUITES (oui=1) CONSTRUITES (oui=1)

Nombre Date Nombre Date Nombre

- - - - -
- - - - -
1 2/5/2016 1 2/24/2016 1
1 2/4/2016 1 2/24/2016 1
1 - - - -
1 1/31/2016 1 2/3/2016 1
1 2/8/2016 1 2/19/2016 1
1 2/1/2016 1 2/19/2016 1
1 2/9/2016 1 2/23/2016 1
1 - - - -
1 2/10/2016 1 2/20/2016 1
- - -
- - -
- - -
1 2/6/2016 1 2/24/2016 1
10 8 8
POMPES INSTALLEES
(oui=1)

Date Nombre

- -
- -
2/15/2016 1
2/15/2016 1
- -
2/20/2016 1
2/19/2016 1
2/16/2016 1
2/19/2016 1
- -
2/19/2016 1
-
-
-
2/15/2016 1
8
SITES FORES

N
Rgion Dpartement S/Prfecture Village
ordre

1 NAWA MEAGUI OUPOYO GBLETIA


2 NAWA MEAGUI MEAGUI GNITITOUAGUI
3 NAWA MEAGUI MEAGUI Touagui 1
4 NAWA MEAGUI MEAGUI Touagui 1
5 NAWA MEAGUI MEAGUI GNITITOUAGUI
6 NAWA MEAGUI MEAGUI Pogreagui
7 NAWA MEAGUI Opouyo Walbo
8 NAWA MEAGUI Opouyo Walbo-cole
9 NAWA MEAGUI Opouyo Walbo
10 NAWA MEAGUI Opouyo Djibagui (Site3)
11 NAWA MEAGUI Opouyo Djibagui (Site4)/F1
12 NAWA MEAGUI Opouyo Djibagui (Site1)
13 NAWA MEAGUI Opouyo Djibagui (Site2)
14 NAWA MEAGUI Opouyo Djibagui (Site3)
15 NAWA MEAGUI Opouyo Djibagui (Site1)
16 NAWA MEAGUI Opouyo Djibagui (Site2)
17 NAWA MEAGUI Opouyo Walbo
Tano Brahimakro
18 NAWA MEAGUI Opouyo
(Site2/centre) / F1
19 NAWA MEAGUI MEAGUI Bagui (Site1)/F1

20 NAWA MEAGUI MEAGUI Bagui (Site2-cole) / F2

21 NAWA MEAGUI MEAGUI Bagui (Site3) / F3

22 NAWA MEAGUI MEAGUI Bagui (Site4) / F4


23 NAWA MEAGUI MEAGUI Bagui (Site3) / F5

Tano Brahimakro
24 NAWA MEAGUI Opouyo
(Site1/Mossikro) / F2

Tano Brahimakro
25 NAWA MEAGUI Opouyo
(Site1/Mossikro) / F3

26 NAWA MEAGUI Opouyo Djibagui (Site2) / F8

Tano Brahimakro
27 NAWA MEAGUI Opouyo (Site1/Sieloukouassikro) /
F4
Tano Brahimakro
28 NAWA MEAGUI Opouyo
(Site1/Mossikro) / F5

29 NAWA MEAGUI Opouyo Djibagui (Site2) / F9

Tano Brahimakro
30 NAWA MEAGUI Opouyo
(Site1/Mossikro) / F5

Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Type N Indentification
Sites for Latitude Longitude
d'ouvrage forage

F1 (SE1) HVA OPY - 001 0637'46,4"w 0537'53,1"N


F1 (SE3) HVA - 0631'54,1"w 0519'12,9"N
F1 (SE2) HVA - 0634'21,7"w 0530'57,8"N
F2 (SE4) HVA MEG - 001 0634'26,3"w 0530'40,2"N
F2 (SE2) HVA MEG - 002 0631'11,9"w 0519'17,6"N
F1 (SE2) HV MEG - 003 0640'39,4"w 0526'42,3"N
F1 (SE2) HV - 0650'03,5"w 0534'42,4"N
F1 (SE3) HV OPY - 002 0650'08,7"w 0535'11,8"N
F2 (SE1) HV - 0650'01,5"w 0534'46,1"N
F1 (SE5) HV - 0652'17,4"w 0536'53,0"N
F1 (SE6) HV OPY - 003 0652'22,9"w 0536'50,4"N
F1 (SE1) HV - 0652'41,6"w 0536'38,2"N
F1 (SE3) HV - 0652'37,9"w 0536'53,4"N
F2 (SE4) HV OPY - 004 0652'09,4"w 0536'53,1"N
F2 (A1) HV OPY - 005 0652'47,9"w 0536'34,5"N
F2 (A2) HV - 0652'43,8"w 0536'55,1"N
F2 (A) HV OPY - 006 0650'01,2"w 0534'55,4"N

F1 (SE3) / F1 HV OPY - 007 0647'27,8"w 0543'36,6"N

F1(A1) / F1 HV MEG - 004 625'8.5W 525'33.2N

F1(A2) / F2 HV MEG - 005 625'04.4"W 052526,0N

F1GM1) / F3 HV - 624'54.63"W 525'20.64"N

F1(A4) / F4 HV MEG - 006 062537,2W 052526,7N


F2(B) / F5 HV MEG - 007 062454,7W 052519,6N

F1(A1) / F2 HV - 647'12.34"W 543'20.46"N

F1(A1) / F3 HV - 647'6.96"W 543'17.68"N

F2 (SE C) / F8 HV - 652'43.69"W 536'55.86"N

F1 (A) / F4 HV OPY - 008 646'49.1"W 541'45.3"N


F3(SE-A) / F5 HV -

F3(SE-A) HV OPY - 009 652'36,5"W 536'48,6"N

F3(SE-D) HV OPY - 010 647'11.32"W 543'15.48"N


Priode travaux
Altration
Altitude/mer Socle
(m) (m)
(m)
Dbut Fin

112 11/7/2015 11/9/2015 11.25 47.58


135 11/10/2015 11/12/2015 34.05 69.83
98 11/13/2015 11/14/2015 27.8 66.98
100 11/16/2015 11/17/2015 23.4 48.78
130 11/18/2015 11/22/2015 17.05 49.63
171 11/22/2015 11/24/2015 21.26 41.87
220 11/25/2015 11/26/2015 19.88 65.85
211 11/26/2015 11/28/2015 20.3 79.13
219 11/30/2015 12/1/2015 22.95 71.73
12/2/2015 12/3/2015 32.15 67.03
200 12/4/2015 12/5/2015 35.01 28.17
- 12/7/2015 12/8/2015 39.75 50.56
- 12/9/2015 12/10/2015 33.55 65.63
194 12/11/2015 12/12/2015 18.9 39.88
195 12/14/2015 12/15/2015 30.5 32.83
- 12/16/2015 12/17/2015 28.6 57.13
211 12/18/2015 12/19/2015 9.65 44.68

211 1/5/2016 1/8/2016 32.15 58.03

93 1/9/2016 1/11/2016 31.15 36.53


96 1/11/2016 1/12/2016 28.15 39.48
1/13/2016 1/14/2016 30.85 59.23
94 1/14/2016 1/16/2016 25.55 55.73
79 1/16/2016 1/19/2016 33.75 51.98

1/19/2016 1/21/2016 27.65 62.63

1/21/2016 1/22/2016 20.45 60.78

- 1/25/2016 1/26/2016 28.2 62.03

187 1/27/2016 1/28/2016 15.05 48.23


2/4/2016 2/5/2016 21.63 59.57

204 2/6/2016 2/10/2016 41.45 19.15

203 2/12/2016 2/13/2016 19.65 65.95


Longueur
PVC Pleins
Prfdr Totale PVC Pleins PVC Totale
200
quipe Crpins quipe-ment

(m) (m) (m)


(m)
(m)

58.83 41.6 11.75 17.73 59.33


103.88 - - - -
94.78 - - - -
72.18 60.86 23.9 11.82 72.68
66.68 49.45 17.31 17.73 67.18
63.13 40.9 - 17.73 58.63
85.73 - - - -
99.43 91.11 - 8.82 99.93
94.68 32.56 - 11.82 44.38
99.18 - - - -
63.18 48.95 - 14.73 63.68
90.31 - - - -
99.18 - - - -
58.78 41.48 - 17.74 59.22
63.33 46.1 - 17.73 63.83
85.73 - - - -
54.33 43.01 - 11.82 54.83

90.18 78.95 - 11.73 90.68

67.68 53.62 - 14.56 68.18


67.63 56.49 - 11.64 68.13

90.08 - - - -
81.28 58.5 - 23.28 81.78
85.73 68.77 - 17.46 86.23

90.28 - - - -

81.23 - - - -

90.23 - - - -

63.28 46.32 - 17.46 63.78


81.2 - - - -

60.6 49.46 - 11.64 61.1

85.6 65.73 - 20.37 86.1


Arrives d'eau
Gravier Dbit dv. (Profondeu
hors sol (m)/Dbit (m3/h))
(m)
H V (m3/h) AE 1 AE 2

SITES F
40.83 245 0.5 7.2 15/6,5 -
- - - - 49/0,5 69/1,9
- - - - 48/0,5 63/0,7
27.54 165 0.5 12 51/12 -
37.76 227 0.5 6 34/2,7 47/6,2
42.66 256 -4.5 5 22/4,8 31/5,4
- - - - - -
17.03 103 0.5 3 89/3 -
20.04 120 - 0.45 82/0,6 86/1,5
- - - - - -
28.01 200 0.5 1 38/1,2 -
- - - - - -
- - - - - -
40.88 276 0.44 0.6 22/0,6 -
32.83 197 0.5 5 35/2,16 43/5,4
- - - - - -
25.94 156 0.5 15 35/15 -

22.85 131.1 0.5 1.3 75/0,8 83/1,3


36.53 219 0.5 14 35/0,35 56/1,35

17.75 106.5 0.5 2.5 55/2,5 -

- - - - - -
43.92 263.52 0.5 0.7 56/0,4 63/0,77
40.22 241.32 0.5 2

- - - - - -

- - - - - -

- - - - - -

48.23 289.38 0.5 0.6


- - - - - -

21.55 0.5 3 48 3.086

67.99 0.5 0.6 45/0,26 63/0,44


(Profondeur DISTANCE
bit (m3/h)) Pompage
NS
d'essai Date ppge
(m)
(oui=1)
(Km)
AE 3

SITES FORES
- 0 1 12/12/2015 2.13
93/2,1 41 - - -
66/0,8 27 - - -
- 0 1 12/16/2015 6.97
- 27 1 12/19/2015 1.5
- 29 1 12/21/2015 11.35
- 38 - - -
- 0 1 1/4/2016 13.5
- 0 1 - -
- 9.2 - - -
- 0 1 1/4/2016 11
- 0 - - -
- 0 - - -
- 0 1 1/5/2016 8.14
- 0 1 1/6/2016 3.85
- 0 - - -
- 9 1 1/5/2016 15.19

- 23 1 1/9/2016 12.85
64/13,5 77 1 1/13/2016 7.45
- 0 1 1/15/2016
- - - - -
1 1/18/2016 19.46
0 1 1/20/2016

- - - - -

- - - - -

- 23 - - -

- 20 1 2/1/2016
- - - - -

- 24 1 2/11/2016 17.57

81/0,51 24 1 2/15/2016

18
ND
ND ND
Q PALIER1 PALIER1 Q PALIER2 Q PALIER3
PALIER2 PALIER3

(m3/h) (m3/h) (m3/h)


(m) (m)
(m)

1.88 3.07 3.75 4.75 5.63 6.92


- - - - - -
- - - - - -
3 9.97 6 15.82 9 22.52
1.5 5.9 3 11.38 4.5 23.79
1.25 13.16 2.5 15.25 3.75 20.46
- - - - - -
0.76 17.69 1.5 22.02 2.15 29.03
- - - - - -
- - - - - -
0.3 23.96 0.6 30.64 1 43.8
- - - - - -
- - - - - -
0.25 19.9 0.5 22.95 0.7 30.09
1.25 11.94 2.5 20.54 3.75 27.9
- - - - - -
3.45 17.98 7 22.39 9.85 27.15

0.33 21.77 0.65 30.68 1.5 42.73


4 14.22 8 21.31 12.31 29.15

- - - - - -
0.63 29.19 1.25 36.67 1.88 45.12

- - - - - -

- - - - - -

- - - - - -
- - - - - -

0.75 21.83 1.5 26.6 4 33.38


ND POMPAGE LONGUE DUR
Q PALIER4 ND
PALIER4
REMONTEE

(m3/h) (m)
(m) DATE NS (m)

7.51 7.92 2.82 14-15/12/15 2.15


- - - - -
- - - - -
12 28.82 12.38 17-18/12/2015 7.1
6 30.47 2.41 20-21/12/2015 1.78
- - 11.39 - -
- - - - -
- - 17.31 - -
- - - - -
- - - - -
- - 11.42 - -
- - - - -
- - - - -
- - 8.85 - -
- - 6.1 - -
- - - - -
- - 17.68 - -

- - 16.85 - -

- - 13.19 - -

- - - - -
- - 21.84

- - - - -

- - - - -

- - - - -
- - - - -

18.21
POMPAGE LONGUE DUREE Analyses d'eau

ND Remonte
Q (m3/h) ND (m) Date (oui=1)
(m)

7.2 9.55 3.33 12/18/2015 1


- - - - -
- - - - -
10 34.47 8.06 12/20/2015 1
6 27.57 1.94 12/23/2015 1
- - - 12/23/2015 1
- - - - -
- - - 1/7/2016 1
- - - - -
- - - - -
- - - 1/9/2016 1
- - - -
- - - -
- - - 1/7/2016 1
- - - 1/9/2016 1
- - - -
- - - 1/7/2016 1

- - - 1/12/2016 1

- - - 1/16/2016 1

1/18/2016 1

- - - -
1/21/2016 1
1/22/2016 1

- - - -

- - - -

- - - -

2/4/2016 1
- - - - -

2/14/2016 1

2/15/2016 1

17
MARGELLES CONSTRUITES CLTURES CONSTRUITES
(oui=1) (oui=1)

Date Nombre Date Nombre

- - - -
- - - -
- - - -
- - - -
- - - -
1/21/2016 1 1/26/2016 1
- - - -
1/19/2016 1 1/23/2016 1
- - - -
- - - -
1/21/2016 1 1/27/2016 1
- - - -
- - - -
1/22/2016 1 1/29/2016 1
1/23/2016 1 1/30/2016 1
- -
1/20/2016 1 1/23/2016 1

2/26/2016 1 3/9/2016 1

3/1/2016 1 3/18/2016 1
3/2/2016 1 3/19/2016 1

- -
3/3/2016 1 3/17/2016 1
3/4/2016 1 3/19/2016 1

- - - -

- - - -

- - - -

2/28/2016 1 3/12/2016 1
- - - -

2/25/2016 1 3/4/2016 1

3/1/2016 1 3/9/2016 1

14 14
POMPES (oui=1)

Date Nombre

- -
- -
- -
- -
- -
2/20/2016 1
- -
2/21/2016 1
- -
- -
2/21/2016 1
- -
- -
2/21/2016 1
2/21/2016 1

2/21/2016 1

3/20/2016 1

3/19/2016 1
3/19/2016 1

3/19/2016 1
3/19/2016 1

- -

- -

- -

3/21/2016 1
- -

3/20/2016 1

3/21/2016 1

14
SITES FORES

N
Rgion Dpartement S/Prfecture Village Sites for
ordre

1 NAWA SOUBRE GRAND-ZATRY PETIGOA1 F1 (SE2)


2 NAWA SOUBRE SOUBRE KONEDOUGOU F2 (SE2)
3 NAWA SOUBRE SOUBRE KONEDOUGOU F1 (SE4)
4 NAWA SOUBRE Grand-Zattry Zakuoua F1 (SE2)
5 NAWA SOUBRE Grand-Zattry Gbazoa F1 (SE1)
6 NAWA SOUBRE Grand-Zattry Gbazoa F1 (SE4)
7 NAWA SOUBRE Grand-Zattry Bagolieoua F1 (SE1)
8 NAWA SOUBRE Grand-Zattry Bagolieoua F1 (SE3)
9 NAWA SOUBRE Soubr Obrouayo F1 (SE1)
10 NAWA SOUBRE Soubr Obrouayo F2 (SE2)

Grbouo 2 Autoch.
11 NAWA SOUBRE Okrouyo F1 (SE3)
(site1)

Grbouo 2 Allogne
12 NAWA SOUBRE Okrouyo F1 (SE6)
(site2)
Tollakro cole
13 NAWA SOUBRE Okrouyo (Site2)/F1
F2 (SE5)

Tollakro centre
14 NAWA SOUBRE Okrouyo (Site1)/F2
F1 (SE2)

15 NAWA SOUBRE Okrouyo Juleskro (Site1) F1 (A1)

16 NAWA SOUBRE Okrouyo Juleskro (Site2) F1 (SE8)

17 NAWA SOUBRE Okrouyo Juleskro (Site3) F1 (B)

Tollakro centre
18 NAWA SOUBRE Okrouyo (Site1)/F3
F2 (A)

Tollakro centre
19 NAWA SOUBRE Okrouyo (Site1)/F4
F3 (B)

20 NAWA SOUBRE Okrouyo Tayo (Site 1 ) F1(SE2)

21 NAWA SOUBRE Liliyo Nnfroua (Site1) F1 (SE4)

22 NAWA SOUBRE Liliyo Koziayo 1 F1 (SE3)

Tollakro centre
23 NAWA SOUBRE Okrouyo (Site1)/F5
F4 (A3)
Kouadio Kouamkro
24 NAWA SOUBRE Liliyo F1 (SE3)
(site 1)

Kouadio Kouamkro
25 NAWA SOUBRE Liliyo F1 (SE5)
(site 2)

Tollakro centre
26 NAWA SOUBRE Okrouyo (Site1)/F6
F4 (A3)

Tollakro centre
27 NAWA SOUBRE Okrouyo (Site1)/F7
F4 (SEB)

Nov-15
Dec-15
Jan-16
Feb-16
Mar-16
Type N Indentification Altitude/mer
Latitude Longitude
d'ouvrage forage (m)

HVA GZY - 001 0642'49,2"w 0606'33,6"N


HV SBR - 001 0639'54,0"w 0602'31,9"N
HV SBR - 002 0639'44,9"w 0602'19,1"N
HVA GZY - 002 0630'29,6"w 0615'22,2"N
HV GZY - 003 0637'06,8"w 0613'47,6"N
HV GZY - 004 0637'15,3"w 0613'56,6"N
HV GZY - 005 0631'50,5"w 0610'07,7"N
HV GZY - 006 0632'02,5"w 0610'13,6"n
HVA - 0638'53,3"w 0553'52,3"N
HVA SBR - 003 0638'54,4"w 0553'27,4"N

HV OKR - 001 0620'57,1"w 0534'29,3"N

HV OKR - 002 0620'54,1"w 0534'35,0"N

HV OKR - 003 0622'08,6"w 0537'25,6"N

HV - 0622'16,4"w 0537'39,0"N

HV OKR - 004 0539'10,1"w 0623'43,2"N

HV OKR - 005 0539'26,2"w 0623'52,0"N

HV OKR - 006 0539'14,5"w 0623'40,8"N

HV - 0622'18,3"w 0537'31,4"N 115

HV - 0537'33,8"w 0622'07,1"N 122

HV OKR - 007 0620'10,1"w 0540'39,6"N

HV LYO - 001 0626'23,7"w 0546'52,0"N 141

HV LYO - 002 0620'28,4"w 0556'02,9"N 177

HV -
HV LYO - 003 0627'26,7"w 0604'46,2"N 225

HV LYO - 004 0627'28,1"w 0604'49,0"N 226

HV - 0622'11.5"W 0537'26.3"N 115

HV OKR - 008 0622'14.0"W 0537'47.8"N 106


Priode travaux PVC Pleins
Altration Socle Prfdr Totale

(m) (m) (m)


Dbut Fin
(m)

11/6/2015 11/11/2015 70.88 47.12 118.00 103.96


11/11/2015 11/13/2015 59.15 22.85 82.00 70.83
11/13/2015 11/16/2015 42.4 39.6 82.00 77.03
11/17/2015 11/19/2015 27.65 36.35 64.00 47.31
11/19/2015 11/21/2015 42.15 12.85 55.00 43.97
11/21/2015 11/23/2015 38 17 55.00 43.78
11/24/2015 11/26/2015 27.65 22.85 50.50 39.27
11/26/2015 11/28/2015 25.35 29.65 55.00 41.44
11/29/2015 12/1/2015 5.45 94.55 100 -
12/2/2015 12/3/2015 20.45 39.05 59.50 42.27

12/5/2015 12/7/2015 25.25 43.55 68.80 57.48

12/7/2015 12/9/2015 20.65 34.65 55.30 38.07

12/9/2015 12/11/2015 25.15 48.15 73.30 64.98

12/11/2015 12/14/2015 20.95 79.35 100.30 -

12/14/2015 12/16/2015 14.45 63.35 77.80 63.57


12/16/2015 12/17/2015 9.65 41.15 50.80 33.84

12/18/2015 12/21/2015 17.85 41.95 59.80 39.93

1/4/2016 1/6/2016 10.85 98.45 109.30 -

1/7/2016 1/9/2016 28.55 71.75 100.30 88.98

1/11/2016 1/12/2016 16.85 47.45 64.30 41.25

1/13/2016 1/14/2016 13.2 33.1 46.30 35.07

1/16/2016 1/18/2016 6.02 62.78 68.80 46.02

1/20/2016 1/21/2016 12.35 87.65 100.00 -


1/23/2016 1/25/2016 24.42 30.88 55.30 32.52

1/26/2016 1/27/2016 27.95 35.55 63.50 43.63

1/28/2016 2/1/2016 30.3 60.2 90.50 -

2/2/2016 2/3/2016 15.62 47.78 63.40 46.44

679.19 1289.61 1141.64


Longueur
PVC Pleins GRAVIER
PVC Totale
200 hors sol
Crpins quipe-ment
(m)
(m)
(m) H V
(m)

14.64 71.38 118.6 0.6 41.58 249.48


11.82 59.65 82.65 0.65 23.73 168.78
5.91 0 82.94 0.94 14.12 84.72
17.73 0 65.04 1.04 37.67 265.62
11.82 0 55.79 0.79 17.82 380.27
11.82 0 55.6 0.6 19.94 285
11.73 0 51 0.5 25.76 314.61
14.55 25.85 55.99 0.99 32.19 332.84
- - - - - -
17.73 - 60 0.5 25.85 155.1

11.82 - 69.3 0.5 19.94 119.64

17.73 - 55.8 0.5 25.85 155.1

8.82 - 73.8 0.5 15.32 91.92

- - - - - -

14.73 - 78.3 0.5 21.13 126.78


17.46 - 51.3 0.5 38.31 229.86

20.37 18.35 60.3 0.5 21.13 252.72

- - - - - -

11.82 - 100.8 0.5 17.82 106.92

23.55 - 64.8 0.5 47.49

11.73 - 46.8 0.5 33.1

23.28 6.52 69.3 0.5 52.56 315.27

- - - - - -
23.28 - 55.8 0.5 31.5 207.6

20.37 - 64 0.5 37.2 277.32

- - - - - -

17.46 - 63.9 0.5 37.49 -

340.17
Arrives d'eau
Dbit dv. (Profondeur DISTANCE
(m)/Dbit (m3/h)) Pompage
d'essai
(oui=1)
(Km)
(m3/h) AE 1 AE 2 AE 3

SITES FORES
11 84/3,08 110/6,6 116/10,8 0 1
1.0864/0,36 80/1,08 - 10 1
8.676/8,64 - - 0 1
731/3,92 56/6,85 - 50 1
344/1,36 52/2,8 - 23 1
3.542/1,7 47,5/2,5 - 0 1
8.531/7,2 - - 13 1
326,5/0,65 50/1 53/3 0 1
- 22-Jan 48/1,4 67/2,7 40 -
14 40/10 44/14 - 0 1

3.1 53/1,3 57/1,6 - 71 1

4.5 35/3,3 44/3,9 - 0 1

3 67/3,6 - - 7 1

- - - - 0 -

2.1 66/0,75 - - 5 1
0.7 32/0,9 - - 0 1

0.75 23/0,85 - - 0 1

- - - - 5 -

0.5 49/300 97/1,1 - 0 1

0.83 36/0,654 - - 35 1

1.8 32/1,97 - - 20 1

0.9 35,5/0,4 56/0,54 - 24 1

- - - - - -
8.6 (-)/3 37/4,2 47/6,1 108 1

34 32/0,8 46/1,4 50/27 0 1

- - - - 108 -

16 - - - 0 1

519 22
ND ND
Q PALIER1 Q PALIER2
PALIER1 PALIER2
NS
Date ppge
(m)
(m3/h) (m3/h)
(m) (m)

11/30/2015 4.8 2.75 8.04 5.5 1.93


12/3/2015 14.4 0.25 22.76 0.5 35.77
12/3/2015 14.8 2.15 24.65 4.3 32.25
12/4/2015 3 1.75 6.42 3.5 11.86
12/8/2015 7.3 0.75 18.31 1.5 26.05
12/8/2015 8.15 0.875 14.18 1.75 24.28
12/7/2015 12.9 2.125 17.31 4.25 20.9
12/7/2015
- - - - - -
12/9/2016 6.52 3.5 11.09 7 15.16

12/17/2015

12/17/2015 10.2 1.13 12.7 2.56 16.1

12/18/2015 21.24 0.75 35.18 1.5 47.14

- - - - - -

12/19/2015 6.58 0.523 8.07 1 10.1


12/19/2015 8.27 0.56 13.3 - -

12/21/2015 10.68 0.7 18.41 - -

1/11/2016

1/13/2016

1/15/2016

1/27/2016

- - - - - -
1/28/2016

1/29/2016

- - - - - -

2/4/2016 8.17 4.5 13.69 9 18.65


Q
ND ND P
Q PALIER3 PALIER4 ND
PALIER3 PALIER4
REMONTEE

(m3/h) (m)
(m) (m) DATE
(m3/h)

8.25 22.89 11.02 33 7.96 01-02/12/2015


0.7 51.47 - - 19.97 -
6.45 44.04 - - 20.74 -
5.25 20.79 7.058 30.77 4.31 05-06/12/2015
2.25 32.82 - - 8.06 -
2.45 29.88 - - 10.04 -
6 26.38 - - 16.3 -

- - - - - -
10.5 20.83 14 27.1 7.66 10-11/12/2015

3.18 20.4 - - 12.98 -

58.49 - - 34.77 -

- - - - - -

1.51 14.8 - - 8.49 -


- - - - 8.3 -

- - - - 9.72 -

- - - - - -
- - - - - -

18 23.81 - - 16.35 -
POMPAGE LONGUE DUREE Analyses d'eau

ND Remonte
NS (m) Q (m3/h) ND (m) Date
(m)

5.02 8 28.66 7.31 12/6/2015


- - - - 12/6/2015
- - - - 12/6/2015
3.07 7 28.55 4.21 12/9/2015
- - - - 12/10/2015
- - - - 12/10/2015
- - - - 12/9/2015
12/9/2015
- - - -
7.18 10 29.95 11.97 12/14/2015

12/20/2016

- - - - 12/20/2016

- - - - 12/21/2016

- - - -

- - - - 12/22/2016
- - - - 12/22/2016

- - - - 12/23/2016

1/16/2016

1/18/2016

1/31/2016

- - - - -
1/31/2016

1/31/2016

- - - -

- - - - 2/7/2016
MARGELLES CONSTRUITES CLTURES CONSTRUITES
nalyses d'eau
(oui=1) (oui=1)

(oui=1) Date Nombre Date Nombre

1 - - - -
1 1/26/2016 1 2/7/2016 1
1 1/27/2016 1 2/10/2016 1
1 - - - -
1 1/30/2016 1 2/17/2016 1
1 1/31/2016 1 2/18/2016 1
1 1/29/2016 1 2/13/2016 1
1 1/30/2016 1 2/14/2016 1
- - -
1 -

1 1/29/2016 1 2/15/2016 1

1 1/30/2016 1 2/11/2016 1

1 1/27/2016 1 2/8/2016 1

- - -

1 1/23/2016 1 1/29/2016 1
1 1/23/2016 1 2/1/2016 1

1 1/26/2016 1 2/5/2016 1

1 3/2/2016 1 3/24/2016 1

1 2/25/2016 1 3/16/2016 1

1 2/25/2016 1 3/24/2016 1

- - - - -
1 2/25/2016 1

1 2/27/2016 1

- - -

1 3/4/2016 1 3/19/2016 1

21 18 16
POMPES INSTALLEES
(oui=1)

Date Nombre

- -
2/20/2016 1
2/20/2016 1
- -
2/18/2016 1
2/18/2016 1
2/18/2016 1
2/18/2016 1
- -
- -

2/22/2016 1

2/22/2016 1

2/21/2016 1

- -

2/21/2016 1
2/21/2016 1

2/21/2016 1

3/22/2016 1

3/18/2016 1

3/22/2016 1

- -
3/22/2016 1

3/22/2016 1

3/18/2016 1

18
LOT 1

Activits Novembre Dcembre Janvier Fvrier Cumul Fvrier

1. FORATION
1.1 Positif 5 0 2 3 10
1.2 Ngatif 0 2 2 0 4
2. Pompages 4 0 0 4 8
3. Analyses 1 3 0 0 4
4. Margelles 0 0 0 0 0
LOT 2
1. FORATION
1.1 Positif 9 1 0 0 10
1.2 Ngatif 2 3 0 0 5
2. Pompages 0 10 0 0 10
3. Analyses 0 10 0 0 10
4. Margelles 0 0 1 7 8
5. Cltures 0 0 0 8 8
6. Pompes 0 0 0 8 8
LOT3
1. FORATION
1.1 Positif 5 4 6 2 17
1.2 Ngatif 3 5 4 1 13
2. Pompages 0 4 11 3 18
3. Analyses 0 4 10 3 17
4. Margelles 0 0 6 3 9
5. Cltures 0 0 6 0 6
6. Pompes 0 0 0 6 6
LOT4
1. FORATION
1.1 Positif 8 7 5 1 21
1.2 Ngatif 0 2 3 1 6
2. Pompages 1 14 6 1 22
3. Analyses 0 15 5 1 21
4. Margelles 0 0 9 4 13
5. Cltures 0 0 2 10 12
6. Pompes 0 0 0 12 12
Mars

3
0
4
8
4