Masonry Work Miscellaneous

STAGE 1 Excavation Charge against house tax

STAGE 2 Backfilling Charge against metro water

STAGE 3 Plinth beam Charge against drainage

STAGE 4 Basement brick work

STAGE 5 Filling over basement

STAGE 6 Plain cement concrete

STAGE 7 Column concrete

STAGE 8 Lintel tie ups

STAGE 9 Reinforced concrete slab

STAGE 10 Brick work

STAGE 11 Carpentry work

STAGE 12 Plastering

STAGE 13 Elevation work

STAGE 14 Plumbing

STAGE 15 Electrical

SATGE 16 Painting
1phase Rs5000
Before starting the construction

Charge for leveling Rs5000

Charge for boundary fixing Rs1500

Charge for bore or well

Charge for temporary hut 10x8 Rs6000

Charge for temporary current

Labour expences

Masonry work Rs250/100sq ft

Plumbing work

Electrical work

Carpenter work

Painting work
BEDROOM DOOR
Standard sizes SIZE PALAGAI
Main door (MD) 7x3.5
Bedroom door (D1) 7x3 2.506944 0.458333 Door frame
Balcony door (D2) 7x2.5
Toilet door (TD) 7x2.5

Windows (W1) 6x4 Panelled door


Windows (W2) 4.5x4
Windows (W3) 4x3
Windows (W4) 3x2.5

Ventilator (V1) 2x2


Ventilator (V2) 2x1.5 Accessories
Ventilator (V3) 1.5x1

Accessories
Hindges BRASS MAIN DOOR
Hindges SS
Hindges STEEL
Hall drop BRASS Door frame
Hall drop SS
Hall drop STEEL
Tower bolt BRASS
Tower bolt SS Panelled door
Tower bolt STEEL
Handle BRASS
Handle ALM
Handle STEEL
Door lock STD
Door lock BULLET Accessories
Hans SS
Ring SS

BALCONY DOOR

Door frame

Panelled door

Accessories
Window 6x4

Window frame

Window shutter

Glass

Window 4x3

Window frame

Window shutter

Glass

Window 4.5x4

Window frame

Window shutter

Glass

Window 3x2.5

Window frame

Window shutter

Glass

Ventilator 2x2

Ventilator frame

Glass

Ventilator 2x1.5
Ventilator frame

Glass
(D1)

L B D NOS QTY Remark


CARPENTRY
4 2.5 7 2 140 Nedukku
4 2.5 3.5 1 35 Kurukku
1.215278

5 1.5 7 2 105 Nedukku


8 1.5 3 1 36 Mael Kurukku
5 1.5 3 2 45 Maiya Kurukku
12 1 5.5 1 66 Palagai
1.291667

HINDGES 5" 3NOS


HALLDROP 2NOS
TOWER BOLT 2NOS
HANDLE 2NOS
LOCK 1NOS

(MD)

L B D NOS QTY Remark


5 3 7 2 210 Nedukku
5 3 4 2 120 Kurukku
2.291667

6 1.5 7 2 126 Nedukku


10 1.5 3.5 1 52.5 Mael Kurukku
6 1.5 3.5 2 63 Maiya Kurukku
15 1.5 5.5 2 247.5 Palagai
3.395833

HINDGES 5" 3NOS


HALLDROP 2NOS
TOWER BOLT 2NOS
HANDLE 2NOS
LOCK 1NOS

(D2)

L B D NOS QTY Remark


4 2.5 7 2 140 Nedukku
4 2.5 3 2 60 Kurukku
1.388889

5 1.5 7 2 105 Nedukku


8 1.5 2.5 1 30 Mael Kurukku
5 1.5 2.5 2 37.5 Maiya Kurukku
8 1 3 4 96 Palagai
1.864583

HINDGES 5" 3NOS


HALLDROP 2NOS
TOWER BOLT 2NOS
HANDLE 2NOS
LOCK 1NOS

4 2.5 6.5 2
4 2.5 4 5

3 1.5 4 8
3 1.5 1.5 8
24

4 2.5 3.5 2
4 2.5 4 3

3 1.5 4 4
3 1.5 1.5 4
12

4 2.5 5 2
4 2.5 4 4

3 1.5 4 6
3 1.5 1.5 6
18

4 2.5 3.5 2
4 2.5 2 3

3 1.5 2.5 4
3 1.5 1.5 4
8

4 2.5 2.5 2
4 2.5 2 2
6
4 2.5 2.5 2
4 2.5 1.5 2
4
CARPENTRY
Brick Calculator
enter b.w qty 83 m3 Conversion Chart
brick-inc m tk 0.002 m3
nos 41500 Feet to Meter
Meter to Feet

Mortor Calculator
brick-exc m tk 0.0015 m3
cement-bag 1.1064 0.7695 0.038417
sand-cft 48.737 0.2305

Concrete Calculator
enter conc qty 20 m3
constant 1.52 is456
full qty 30.4
cft m3
cement-bags 125.07 4.3428571 ratio 1:04:08
sand-cft 306.08 8.6857143
aggregate-cft 612.17 17.371429

Quantity
2.293359375 footing 0.25
0.99309375 pcc 0.333333
0.3375 column 0.833333
0.069444 FEET CUBE

637.5
9180 3.06
Conversion Chart Input Outputs
Feet cm m
Feet to Meter 1 30.48 0.3048
Meter to Feet 1 0.0328084 0.000328084

ID DESCRIPTION SUB CLASS RATE QUANTITY

CEMENT
COROMANDAL 305 50KG
L&T 305 50KG
PENNA 280 50KG
RAMCO 300 50KG

PRIYA 280 50KG


PENNA 280 50KG
SAGAR 280 50KG
BHARATHI 280 50KG

SAND
NICE 16000 4UNIT 40
ROUGH 11700 4UNIT 29.25

AGGREGATE
20MM 2800 1UNIT 28
40MM 2200 1UNIT 22

BRICK
2ND QTY 21000 3000NOS
3RD QTY 18500 3000NOS
BRICK BAT 3000 1UNIT

WATER
BORE WATER 850 6000LIT

QUARY DUST

RUBBISH

FILLING SAND
ELECTRICAL
PRICE LIST FORELECTRICAL ITEMS AS ON 11/2/2012
(SOURCE:DHANALEKSHUMI ELECRICALS)

S.NO DESCRIPTION OF GOODS SIZE RATE DISCOUNT


SQ MM (RS) 57%
POLY CAB
1 FR COIL 1 1040 592.8
2 FR COIL 1.5 1550 883.5
3 FR COIL 2.5 2500 1425
4 FR COIL 4 3690 2103.3
5 FR COIL 6 5480 3123.6
ANCHOR ROMA
6 6A ONE WAY SWITCH 34
7 6A SOCKET 65
8 16A SOCKET 107
9 16A SWITCH 79
10 6A TWO WAY SWITCH 57.35
11 6A BELL BUSH SWITCH 57.85
12 16A TWO WAY SWITCH 72.55
13 FAN REGULATOR-2M REGULATOR 233.75
14 12M PLATE 125
15 8M PLATE 102
16 6M PLATE 79.4
17 3M PLATE 49

Fan box
Celing rose
Breaker
Isolator
Regulator
Mainswitch
Regulator
DB box
Main board

Switch box

Earthing Earth plate


Copper wire
Charcoal
Salt
Main cable
AMOUNT VAT5% TOTAL

447.2 22.36 469.56


666.5 33.325 699.825
1075 53.75 1128.75
1586.7 79.335 1666.035
2356.4 117.82 2474.22
VAT 14.5%
4.93 38.93
9.425 74.425
15.515 122.515
11.455 90.455
8.31575 65.66575
8.38825 66.23825
10.51975 83.06975
33.89375 267.6438
18.125 143.125
14.79 116.79
11.513 90.913
7.105 56.105
PLUMBING
PLUMBING

DATA'S PROCURED FROM DRAWING


PRICE LIST FOR PLUMBING ITEMS AS ON 30/1/2012
(SOURCE:MADRAS PIPE CORPORATION)
S.NO DESCRIPTION OF GOODS SIZE RATE
DIA THICKNESS (RS) VAT5% TOTAL

1 RIGID PVC PIPE 25 15 26.5 1.325 27.825


2 RIGID PVC PIPE 32 15 41 2.05 43.05
3 RIGID PVC PIPE 50 15 75.25 3.7625 79.0125
4 RIGID PVC PIPE 50 6 35 1.75 36.75
5 RIGID PVC PIPE 75 6 80 4 84
6 RIGID PVC PIPE 110 4 115 5.75 120.75
7 RIGID PVC PIPE 110 6 159.5 7.975 167.475
8 PVC ELBOW 25 3.75 0.1875 3.9375
9 PVC ELBOW 32 5.75 0.2875 6.0375
10 PVC ELBOW 50 16.95 0.8475 17.7975
11 PVC ELBOW SWR 75 27.45 1.3725 28.8225
12 PVC ELBOW SWR 110 54 2.7 56.7
13 PVC ELBOW DOOR 110 69.25 3.4625 72.7125
14 PVC ELBOW 25 5.5 0.275 5.775
15 PVC ELBOW 32 8.25 0.4125 8.6625
16 PVC ELBOW 50 17 0.85 17.85
17 PVC ELBOW 75 39.6 1.98 41.58
18 PVC ELBOW SWR 75 45.25 2.2625 47.5125
19 PVC ELBOW DOOR 110 84.5 4.225 88.725
20 PVC COUPLING 32 3.7 0.185 3.885
21 PVC MTA 50 10.6 0.53 11.13
22 PVC END CAP 50 8 0.4 8.4
23 PVC REDUCER 110-75 46.8 2.34 49.14
24 PVC REDUCER BUSH 50-25 11.25 0.5625 11.8125
25 PVC REDUCER BUSH 75-50 21 1.05 22.05
26 PVC BEND 50/6 15 0.75 15.75
27 PVC Y 110 95.7 4.785 100.485
28 PVC DOOR 110 160.65 8.0325 168.6825
29 PVC COVEL 110 26.4 1.32 27.72
30 CPVC PIPE 3/4 52.15 2.6075 54.7575
31 CPVC ELBOW 3/4 13.3 0.665 13.965
32 CPVC ELBOW 3/4-1/2 40.25 2.0125 42.2625
33 CPVC SOLUTION 323 16.15 339.15
34 CPVC REDUCER 3/4-1/2 49.35 2.4675 51.8175
35 CPVC OFFSET 3/4 53.9 2.695 56.595
36 CPVC PLUG 1/2 4 0.2 4.2
37 PVC RIGID PIPE 3/15 6 80.5 4.025 84.525
0 0
SANITARY WARE 0 0
1 PARRYWARE INDIAN CLOSET 1225 61.25 1286.25
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0
0
0
INCH

1.00
1.28
2.00
2.00
3.00
4.40
4.40
1.00
1.28
2.00
3.00
4.40
4.40
1.00
1.28
2.00
3.00
3.00
4.40
1.28
2.00
2.00
TATA TISCON
SECTION
6
8
10
12
16
20
25
32
PRICE/PIECE
153
253
388
558
994
1553
2421
3968
DATA FROM DRAWING

Step 1 Dewatering cost


Step 2 Identify the size of pit
Step 3 Total labour anticipated 5
Step 4
COST OF LABOUR

COST FOR DIGGING A PIT EVERY FEET 3X3 500 Rs


COST FOR DIGGING A PIT EVERY FEET 4X4 700 Rs
COST FOR DIGGING A PIT EVERY FEET 5X5 850 Rs

DEWATERING EXPENCES 500 Rs/Hour