Abe, T. and Starr. P, (2003), 'Teaching the writing and role of specifications via a
structured teardown process' , Design Studies, vol.24,No.6, pp. 475-489.
Adiano,C. and Roth, A.V.(I994) 'Beyond the House of Quality: Dynamic QFD',
Benchmarking for Quality Management and Technology, VoU, No.1,
pp.25-37.
Aluned, S., Hassan, M.HJ and Taha, Z, (2005), 'TPM can go beyond maintenance:
except from a case implementation', Journal of Quality in Maintenance
Engineering, VoUl, Nol, pp.19-42.
Akao,Y and Mazur,G.H.,(2003), 'The leading edge in QFD: past, present and
future', International Journal of Quality and Reliability Management, Vol.
20,No.I, pp.20-35.
Balthazard, P.A. and Gargeya,V.B, (1995) 'Reinforcing QFD with group support
systems- Computer-supported collaboration for quality in design',
International Journal of Quality and Reliability Management, Vol.
12,No.6, pp.43-62.
Bamber, C.J, Sharp, J.M and Hides,M.T, (1999) 'Factors affecting successful
implementation of total productive maintenance: A UK manufacturing case
study perspective', Journal of Quality in Maintenance Engineering, Vol.5,
N03, pp.162-181.
Ben-Daya, M. and Duffuaa, S.O., (1995), 'Maintenance and quality: the missing
link', Journal of Quality in Maintenance Engineering, VoU], No.I, pp.
20-26.
Bendell,T., Penson, R., and Carr,s.,(l995) "The quality gurus- their approaches
described and considered", Managing Service Quality, Vol.5 No.6, pp 44-
48.
Blanchard, B.S., (1997) 'An enhanced approach for implementing total productive
maintenance in the manufacturing environment', Journal of Quality in
Maintenance Engineering, Vol.3, No 2, pp.69-80.
Chan, A. H.S. Kwok, W.Y. and Duffy ,V. G. (2004) 'Using AHP for determining
priority in a safety management system', Industrial Management & Data
Systems Vol. 104 No 5 pp. 43().....445.
Chan, F. T.S. and Abhary, K. (1996) "Design and evaluation of automated cellular
manufacturing systems with simulation modeling and AHP approach: a
case study", Integrated Manufacturing Systems, Vo!.7/6, pp. 39-52.
Chan, L.K. and Wu, M.L (2002), "Quality function deployment: A literature
review", European Journal ofOperational research Vo1.l43, pp.463-497.
Chein,T. and ZU,C 2003 'Using the QFD concept to resolve customer satisfaction
strategy decision', International Journal of Quality and Reliability
Management, Vo1.20,No.3, pp.345-359.
Chin, K-S.,Pun, K-F., Leung,W.M. and Lau,H. (2001) 'A quality function
deployment approach for improving technical library and information
services: a case study', Library Management, Vo1.22, No.4/5. pp 195-204.
Chin,K Chiu,S and Tummala V.M. R (1999) " An evaluation of success factors
using the AHP to implement ISO 14001-based EMS" International Journal
of QuaIity &Reliability Management, Vol. 16 No. 4, pp. 341-361.
Chin, K.-S. Pun, K.-F., Xu Y,. and Chan J.S.F, (2002) , "An AHP based study of
critical factors for TQM implementation in Shanghai manufacturing
industries" Technovation Vol. 22, pp.707-715.
Cheng,W.L.E and Li,H (2001), "An approach to determine measure for business
performance", Measuring business excellence, VoI.5,No.3,pp-30-36.
Cheung.A, lp, W.H.and Lu,D, (2005) "Methodology and theory: Expert system for
aircraft maintenance services industry", Journal of Quality in
MaintenanceEngineering,Vol. 11 No. 4, pp. 348-358.
Chiang,C and Lai,C, (2002) "A study on the comprehensive indicator of indoor
environment assessment for occupants' health in Taiwan", Building and
Environment Vol.37 pp.387-392.
Chein, T.K. and Su, C, T (2003), "Using the QFD concept to resolve customer
satisfaction strategy decisions", International Journal of quality and
reliability management. Vo1.20, No.3, pp.345-359.
Choi,H,R., Kim, H,S, Park,B,J., Park,Y,J, and Whinston,A.B (2004), "An agent for
selecting optimal order set in EC marketplace", Decision Support Systems
Vol.36 pp.371- 383.
Cua, K.O., Mc Kone, K.E. and Schroeder, R.G. (2001), "Relationship between
TQM, ]JT, and TPM, and manufacturing performance", Journal of
operations management 19,675-694.
Dale, B.G., Elkjaer, MB.F., vander Weil, A. and Williams, A.R.T. (2000), "Fad,
fashion and fit: An examination of quality circles, business process
reengineering and statistical process control". International Journal of
production economics: Vol. 73, pp, 137-152.
Dijkstra,L and van der Bij,H (2002) 'Quality function deployment in health care:
Methods for meeting customer requirements in redesign and renewal'.
Duarte ,D. (2004), 'A perfonnace overview about fire risk management in the
Brazilian hydroelectric generating plants and transmission network',
Journal ofLoss Prevention in the Process Industries, voU7, pp. 65-75.
Gelfand,J. 2005 'American society for engineering education, 2005 meeting annual
report', Library hi tech news, No.7,pp.3-5.
Hansion,J. and KJefsjo,B.,(2003), "A core value model for implementing Total
Quality Management in small organizations". The TQM Magazine,Vo l. 5,
No. 2,2003,pp-7l-81.
Hansson,J and Backlund,F (2003), "Management commitment :increasing the odds
for successful implementation of TQM,TPM and RCM. International
Journal ofQuality and Reliability management, Vo1.20, No.9, pp.993-1008.
Hoque, Z (2003), 'Total quality management and the balanced scorecard approach:
a critical analysis of their potential relationships and directions for
research', Critical Perspectives on Accounting, Vol. 14, pp.553-566.
Hum, S-H. and Sim,H-H., (1996), " time based competition: literature review and
implications for modeling", International Journal of OPerations
management. Vo1.l6, No.1, pp.75-90.
Huang, A.H and Windsor, l.C, (1998), "An empirical assessment of a multimedia
executive support system", lnfonnation Management, Vol.33, pp-25 1-262.
Hunt, R.A and Xavior, F.B, (2003), "The leading edge in strategic QFD"
International Journal oj Quality and Reliability management. Vo1.20, No.1,
pp.56-73.
Hwamg, H,B and Teo,C. (2001), "Translating customers' voices into operations
requirements: A QFD application in higher education", International
Journal of Quality and Reliability Management, Vol. 18 No. 2, , pp. 195-
225.
Irani, Z., Beskese, A and Love, P.E.D.(2004), 'Total quality management and
corporate culture: constructs of organisational excellence', Technovation,
Vol.24 , 643-650.
Ireland, F. and Dale, RO. (2001) 'A study of total productive maintenance
implementation', Journal of Quality in Maintenance Engineering. Vo1.7,
No.3, pp.183-192.
Jackson,J,( 2001) "Prioritising customers and other stakeholders using the AHP",
European Journal of Marketing, Vol. 35 No. 7/8, ,pp. 858-871.
Juran, J.M and Oryna, F.M., (1997), Quality Planning and Analysis, Tata Me
Graw-Hill Edition, New Delhi, India, Fourth reprint.
Kruger, v., (2001) "Main schools of TQM: "the big five"', TQM Magazine,
VoU3 No. 3,2001, pp. 146-155.
Lewis, W.G. Pun K.F. and Lalla, T.R.M. (2005 )"An AHP-based study of TQM
benefits inISO 9001 certified SMEs in Trinidad and Tobago" The TQM
Magazine, Vol. 17 No. 6, pp. 558-572.
Logothetis,N. (1997) Managing for 'total quality, Prentice Hall of India Private
Limited, India.
Lokamy III A. and Khurana, A.,(1995) "Quality function deployment: total quality
management for new product design" International Journal of Quality and
Reliability Management, Vo1.12,No6,pp73-84.
Lu, M-H. and Kuei, C-H.(l998), 'Strategic marketing planning quality function
deployment approach' International Journal of Quality and Reliability
Management. Vo1.12 No.6, pp.85-96.
Malina, M.A and Selto, F.H. 2004 'Choice and change of measures in performance
measurement models', Management Accounting Research, Vol. 15 pp.
441-469.
management at the classroom level, The TQM Magazine, Vol. 17 No. 2,pp.
121-136.
Masui,K, Sakao,T., Kobayashi;M., and Inaba,A.,(2003), "Applying Quality
Function Deployment to environmentally conscious design." International
Journal ofquality and reliability management. Vol. 20.Nol,pp 90-106.
Mc Kone, K.E., Schroeder, R.G. and Cua, K.O. (1999), "Total productive
maintenance: a contextual view", Journal of operations management
Vo1.l9, pp, 123-144.
Me Kone,K.E., Schroeder, R.G. and Cua, K.O. (2001), "The impact of total
productive maintenance practices on manufacturing performance", Journal
ofOperations Management Vol.19,pp.39-58.
Muller, M.H and Fairlie-Clarke, A.C. (2001) "Using the AHP to determine the
correlation of product issues to profit", European Journal of Marketing,
Vol. 35 No. 7/8, , pp. 843-857.
NCB Expertise-Log dispersion Technique used for analyzing down time of mining
equipment. NCB News letter June 2004.
Negri, L. and Galli, M.(l997) 'Quality policies and value creation strategies in
Italian manufacturing industry', Technovation, Vol.I7,No.6, pp.321-328.
Nwabueze,U.,(200Ia), "How the mighty have fallen: the naked truth about TQM",
Managerial Auditing Journal, Vol.l6 No.9, pp.504-513.
Olhager, J. and West, B. M. (2002) 'The house of flexibility: using the QFD
approach to deploy manufacturing flexibility', International Journal of
Operations and Production Management, Vol. 22, No.l, pp.50-79.
Ollero, A., Morel, G., Bernus, P., Nof, S.Y., Sasiadek, J., Boverie, S., Erbe, H.
and Goodall. R. (2002) 'Milestone report of the manufacturing and
instrumentation coordinating committee: From mems to enterprise
systems', Annual Reviews in Control, Vo1.26, pp.151-162.
Pun, K.F., Chin, K.S. and Lau.H, (2000) 'A QFD/hoshin approach for service
quality development : a case study', Managing Service Quality, VoU 0,
No.3, pp. 156-169.
Pun, K.F. and Hui, 1.K. (2001) "An analytical hierarchy process assessment of the
ISO 14001 environmental management system" Integrated Manufacturing
Systems, Vo1.12, No,S, pp. 333-345.
Rho, B-H., Paark, K., and Yu, Y-N. (2001), "An international comparison of the
effect of manufacuring strategy - implementation gap on business
performance", International Journal of Production Economics Vol. 70, pp
89-77.
Rho, B-H., Park, K. and Yu, Y-M. (2001) 'An international comparison of the
effect of manufacturing strategy - implementation gap on business
performance', International Journal ofProduction Economics, Vol. 70, pp.
89-77.
Rho, B-H., Park, K., and Yu, Y-M. (2001), "An international comparison of the
effect of manufacturing strategy - implementation gap on business
performance", International Journal ofproduction economics, Vol. 70, pp.
89-77.
Rainer R.K and Watson, H.J, (1995), "Why does it take for succesful executive
information system", Decision Support systems, voU4. pp. 147-156.
Ramanathan, R,(2001), "A note on the use of Analytic Hierarchy Process for
environmental assessment", Journal of Environmental Management
Vol.63,pp 27-35.
Rangone, A (1996) "An analytical hierarchy process framework for comparing the
overall performance of manufacturing departments" International Journal of
Operations& Production Management, Vol. 16, No. 8, pp. 104-119.
Tan, K.C. and Pawitra, T.A (2001), 'Integrating SERQUAL and Kano'S model in
to QFD for service excellence development', Managing Service Quality,
Vol. 11 No. 6, ppA18-430.
Troutt, M.D and Tadisina,S.K (1992), "The analytic hierarchy process as a model
base for a merit salary recommendation system" Mathl. Comput. Modelling
Vol. 16, No. 5, pp. 99-105.
van der Wall, R.W.E and Lynn,D. (2002) 'Total productive maintenance in a south
African pulp and paper company: a case study', The TQM Magazine,
Vol.l4, No.6, pp.359-366.
Veltz.P, (2001) 'City and university in the knowledge age', European Journal of
Engineering Education, Vol. 26, No. 1, pp.53- 62.
WatsonHJ and Rainer,R.K, Jr, (1991), 'A manager's guide to executive support
system', Businesshorizons", March April, pp 44-50.
Yang,J and Lee,H, (1997) 'An AHP decision model for facility location selection'
,Facilities Vo1.l5 . No, 9/10' pp. 241-254.
Zairi, M. and Youssef, M .A. (1995) 'Quality function deployment - A main pillar
for successful total quality management and product development' ,
International Journal of Quality and Reliability Management, Vol. 12 No.
6, pp. 9-23.
Zairi,M (1992) Total quality management for engineers, Adithya books private
limited, New Delhi, India.