Anda di halaman 1dari 12

Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 1

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard

3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 24 25

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total

Number of Branches: 2 0 0 22 0 0 24

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 0 0 1

System Frequency: 50.00

Unit System: English

Project Filename: Bida Faris PU3 R0

Output Filename: H:\Relay Setting Calclation\A-11184\Bida Faris PU\Bida Faris PU\Untitled.SQ2S


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 2

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Global 0

Cable Resistance: Yes Global 0


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 3

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BIDA FARIS 11KV Load 11.000 11.500 1 90.79 30.00


AIS-PU-3
BIDA FARIS 33 kV-PU1 Load 33.000 33.000 1 98.48 -0.22
BIDA FARIS 33KV -PU2 Load 33.000 33.000 1 98.48 -0.20

BIDA FARIS 33KV Load 33.000 33.000 1 98.48 -0.20


GIS-PU-3
Bus1 Load 33.000 33.000 1 100.00 0.00
Bus7 Load 33.000 33.000 1 100.00 0.00
Bus8 Load 33.000 33.000 1 100.00 0.00
Bus9 Load 33.000 33.000 1 100.00 0.00
Bus14 Load 33.000 33.000 1 100.00 0.00
Bus16 Load 11.000 11.500 1 100.00 30.00
Bus18 Load 33.000 33.000 1 100.00 0.00
Bus19 Load 33.000 33.000 1 100.00 0.00
Bus25 Load 33.000 33.000 1 100.00 0.00
Bus26 Load 33.000 33.000 1 100.00 0.00
Bus28 Load 33.000 33.000 1 100.00 0.00
Bus35 Load 11.000 11.500 1 100.00 30.00
Bus36 Load 11.000 11.500 1 100.00 30.00
Bus37 Load 11.000 11.500 1 100.00 30.00
Bus38 Load 11.000 11.500 1 100.00 30.00
Bus39 Load 0.415 0.434 1 100.00 60.00
Bus40 Load 11.000 11.500 1 91.02 30.00
Bus41 Load 11.000 11.500 1 100.00 30.00
Bus42 Load 11.000 11.500 1 100.00 30.00
LVAC PANEL Load 0.415 0.434 1 100.00 60.00

NEW RAMAH GRID-33KV SWNG 33.000 33.000 1 100.00 0.00


BUS

25 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP.
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 4

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Line/Cable Input Data

ohms or siemens per 1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (C) R1 X1 Y1 R0 X0 Y0

0.415KV LVAC INC 1.0MCUN3 35 39.4 0.0 1 0 0.1473565 0.024384 0.0000309 0.464173 0.0599846
CABLE1
11KV AUX TRF CABLE1 11MCUS3 95 39.4 0.0 1 0 0.0546254 0.0310896 0.000032 0.1720701 0.0764804

11KV TRF INC CABLE 11MCUS1 500 39.4 0.0 2 0 0.0112335 0.030419 0.0000593 0.0353854 0.0748315

33KV CABLE C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE- C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE-C1 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV CABLE1 FROM H37 33MCUS3 240 164.0 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV-CABLE- C1 33MCUS3 240 10170.6 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

33KV-TRF INC CABLE 33MCUS3 240 42.7 0.0 1 0 0.021674 0.0323088 0.0000227 0.0903082 0.0201168

Cable4 11MCUS3 240 984.3 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

Cable5 11MCUS3 240 984.3 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

O/G OHL FEEDER -2 11MCUS3 240 22965.9 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

O/G OHL FEEDER -4 11MCUS3 240 22965.9 0.0 1 0 0.0215859 0.027432 0.0000456 0.0679954 0.0674827

33KV -OHL1 182. 27887.1 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL1 182. 16732.3 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33KV-OHL1 182. 28051.2 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL3 210 16076.1 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL5 210 11154.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

33kV-OHL7 210 11154.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

O/G OHL FEEDER -1 182. 22965.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

O/G OHL FEEDER -3 182. 22965.9 0.0 1 0 0.0761086 0.1176528 0.0000009 0.1655064 0.4456176 0.0000009

Line / Cable resistances are listed at the specified temperatures.


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 5

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T2 15.000 33.000 11.500 14.13 10.00 0 0 0 0 0 14.13 Dyn -30.00

T4 0.050 11.000 0.415 3.90 10.00 0 0 0 0 0 3.90 Dyn -30.00

2-Winding Transformer Grounding Input Data

Grounding
Transformer Rating Conn. Primary Secondary

ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm

T2 15.000 33.000 11.500 D/Y Solid

T4 0.050 11.000 0.415 D/Y Solid


Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 6

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

T2 2W XFMR Bus14 Bus16 9.03 90.33 90.78

T4 2W XFMR Bus40 Bus39 692.21 6922.14 6956.67

0.415KV LVAC INC CABLE1 Cable Bus39 LVAC PANEL 308.20 51.00 312.39 0.0000002

11KV AUX TRF CABLE1 Cable BIDA FARIS 11KV AIS-PU-3 Bus40 0.16 0.09 0.19 0.0001665

11KV TRF INC CABLE Cable Bus16 BIDA FARIS 11KV AIS-PU-3 0.02 0.05 0.05 0.0006173

33KV CABLE C1 Cable Bus18 BIDA FARIS 33KV -PU2 0.03 0.05 0.06 0.0040565

33KV CABLE C1 Cable NEW RAMAH GRID-33KV Bus25 0.03 0.05 0.06 0.0040565
BUS
33KV CABLE- C1 Cable Bus19 BIDA FARIS 33 kV-PU1 0.03 0.05 0.06 0.0040565

33KV CABLE-C1 Cable NEW RAMAH GRID-33KV Bus26 0.03 0.05 0.06 0.0040565
BUS
33KV CABLE1 FROM H37 Cable NEW RAMAH GRID-33KV Bus28 0.03 0.05 0.06 0.0040565
BUS
33KV-CABLE- C1 Cable Bus7 BIDA FARIS 33KV GIS-PU-3 2.02 3.02 3.63 0.2515045

33KV-TRF INC CABLE Cable BIDA FARIS 33KV GIS-PU-3 Bus14 0.01 0.01 0.02 0.0010547

Cable4 Cable BIDA FARIS 11KV AIS-PU-3 Bus36 1.61 2.04 2.60 0.0059314

Cable5 Cable BIDA FARIS 11KV AIS-PU-3 Bus42 1.61 2.04 2.60 0.0059314

O/G OHL FEEDER -2 Cable BIDA FARIS 11KV AIS-PU-3 Bus37 37.48 47.64 60.62 0.1383996

O/G OHL FEEDER -4 Cable BIDA FARIS 11KV AIS-PU-3 Bus38 37.48 47.64 60.62 0.1383996

33KV -OHL1 Line Bus26 Bus9 19.49 30.13 35.88 0.0277695

33kV-OHL1 Line Bus28 Bus1 11.69 18.08 21.53 0.0166617

33KV-OHL1 Line Bus25 Bus8 19.60 30.31 36.09 0.0279329

33kV-OHL3 Line Bus1 Bus7 11.24 17.37 20.69 0.0160083

33kV-OHL5 Line Bus8 Bus19 7.80 12.05 14.35 0.0111078

33kV-OHL7 Line Bus9 Bus18 7.80 12.05 14.35 0.0111078

O/G OHL FEEDER -1 Line Bus36 Bus35 132.17 204.31 243.33 0.0027773

O/G OHL FEEDER -3 Line Bus42 Bus41 132.17 204.31 243.33 0.0027773
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 7

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Power Grid Input Data

% Impedance
Rating 100 MVA Base
Grounding
Power Grid ID Connected Bus ID MVASC kV R X" R/X" Type

NEW RAMAH GRID-MAX NEW RAMAH GRID-33KV 1257.469 33.000 0.79130 7.91302 0.10 Wye - Solid
FAULT BUS
Total Connected Power Grids ( = 1 ): 1257.469 MVA
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 8

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

SHORT- CIRCUIT REPORT

Fault at bus : Bus35

Nominal kV = 11.000 Voltage c Factor = 1.00 (Minimum If)

Line-To-Ground Fault

Contribution % Voltage at From Bus Current at From Bus (kA)

From Bus To Bus Va Vb Vc Ia Ib Ic Sequence Current (kA)


ID ID Mag. Ang. Mag. Ang. Mag. Ang. Mag. Ang. Mag. Ang. Mag. Ang. I1 I2 I0

Bus35 Total 0.00 0.0 122.67 -132.0 116.00 135.0 0.855 -67.7 0.000 0.0 0.000 0.0 0.285 0.285 0.285

Bus36 Bus35 77.48 -2.7 98.91 -118.5 98.40 118.7 0.855 -67.7 0.000 0.0 0.000 0.0 0.285 0.285 0.285

BIDA FARIS 11KV AIS-PU-3Bus36 78.18 -2.9 98.90 -118.4 98.18 118.6 0.855 -67.7 0.000 0.0 0.000 0.0 0.285 0.285 0.285

Bus40 BIDA FARIS 11KV AIS-PU-3 78.18 -2.9 98.90 -118.4 98.18 118.6 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus16 BIDA FARIS 11KV AIS-PU-3 78.19 -2.9 98.90 -118.4 98.18 118.6 0.855 -67.7 0.000 0.0 0.000 0.0 0.285 0.285 0.285

Bus42 BIDA FARIS 11KV AIS-PU-3 78.18 -2.9 98.90 -118.4 98.18 118.6 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus37 BIDA FARIS 11KV AIS-PU-3 78.18 -2.9 98.90 -118.4 98.18 118.6 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus38 BIDA FARIS 11KV AIS-PU-3 78.18 -2.9 98.90 -118.4 98.18 118.6 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus39 Bus40 86.71 33.6 100.00 -90.0 89.01 144.2 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus14 Bus16 90.87 -31.3 91.52 -148.0 95.65 90.0 0.855 -67.7 0.000 0.0 0.000 0.0 0.285 0.285 0.285

Bus41 Bus42 78.18 -2.9 98.90 -118.4 98.18 118.6 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

LVAC PANEL Bus39 86.71 33.6 100.00 -90.0 89.01 144.2 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

BIDA FARIS 33KV GIS-PU-3Bus14 90.88 -31.3 91.52 -148.0 95.65 90.0 0.172 -67.7 0.172 112.3 0.000 112.3 0.099 0.099 0.000

Bus7 BIDA FARIS 33KV GIS-PU-391.21 -31.2 91.78 -148.2 95.65 90.0 0.172 -67.7 0.172 112.3 0.000 112.3 0.099 0.099 0.000

Bus1 Bus7 93.12 -30.8 93.29 -149.0 95.65 90.0 0.172 -67.7 0.172 112.3 0.000 112.3 0.099 0.099 0.000

Bus28 Bus1 95.11 -30.3 94.89 -149.9 95.65 90.0 0.172 -67.7 0.172 112.3 0.000 112.3 0.099 0.099 0.000

NEW RAMAH GRID-33KV BUS


Bus28 95.12 -30.3 94.89 -149.9 95.65 90.0 0.172 -67.7 0.172 112.3 0.000 112.3 0.099 0.099 0.000

Bus25 NEW RAMAH GRID-33KV BUS


95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus26 NEW RAMAH GRID-33KV BUS


95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

NEW RAMAH GRID-MAX FAULT


NEW RAMAH GRID-33KV BUS
95.65 -30.0 95.65 -150.0 95.65 90.0 0.172 -67.7 0.172 112.3 0.000 112.3 0.099 0.099 0.000

Bus8 Bus25 95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus9 Bus26 95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus19 Bus8 95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

Bus18 Bus9 95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 9

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

(Cont.)

Fault at bus : Bus35

Nominal kV = 11.000 Voltage c Factor = 1.00 (Minimum If)

Line-To-Ground Fault

Contribution % Voltage at From Bus Current at From Bus (kA)

From Bus To Bus Va Vb Vc Ia Ib Ic Sequence Current (kA)


ID ID Mag. Ang. Mag. Ang. Mag. Ang. Mag. Ang. Mag. Ang. Mag. Ang. I1 I2 I0

BIDA FARIS 33 kV-PU1 Bus19 95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

BIDA FARIS 33KV -PU2 Bus18 95.12 -30.3 94.89 -149.9 95.65 90.0 0.000 0.0 0.000 0.0 0.000 0.0 0.000 0.000 0.000

# Indicates fault current contribution is from three-winding transformers


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 10

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

Bus35 11.000 1.256 2.210 1.256 0.855 1.506 0.855 0.855 1.088 1.914 1.088 1.088 1.166 2.052 1.166 1.166

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 11

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)

ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus35 11.000 2.22985 4.53835 5.05656 2.22985 4.53835 5.05656 3.99138 11.52948 12.20082 0.00000 0.00000 0.00000
Project: REINFORCEMENT OF 33KV NETWORK ETAP Page: 12

Location: ALAIN - WEST AREA 16.0.0C Date: 28-12-2016

Contract: A11184 SN: FREQELCTRO

Engineer: ENGINEER 1 Revision: Base


Study Case: 3P-F
Filename: Bida Faris PU3 R0 Config.: GRID H31 MAX

Sequence-of-Operation Event Summary Report

Symmetrical 3-Phase Fault between Bus35 and O/G OHL FEEDER -1. Adjacent to Bus35.

Time (ms) ID If (kA) T1 (ms) T2 (ms) Condition


948 BIDA FARIS PU3K01(OC& EF) 1.256 948 Phase - OC1 - 51

988 BIDA FARIS PU3 K01 CB 40.0 Tripped by BIDA FARIS PU3K01(OC& EF) Phase - OC1 - 51

5234 BIDA FARIS PU3K03(OC& EF) 1.256 5234 Phase - OC1 - 51

5274 BIDA FARIS PU3 K03 CB 40.0 Tripped by BIDA FARIS PU3K03(OC& EF) Phase - OC1 - 51

5303 BIDA FARIS PU3H03 (OC-EF) 0.438 5303 Phase - OC1 - 51

5353 BIDA FARIS PU3 H03-CB 50.0 Tripped by BIDA FARIS PU3H03 (OC-EF) Phase - OC1 - 51