Anda di halaman 1dari 167

1.

DATA BANGUNAN
Proyek : Rumah Tinggal T-45 KARISMA RESIDENCE
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2,016.00
No. Deskripsi panjang lebar
1.00 Luas tanah 8.00 12.00 96.00
2.00 Keliling 40.00
3.00 Luas bangunan 45.85
4.00 Keliling Dinding 29.95
5.00 Ketinggian Bangunan dari jalan 0.10
6.00 Target Pengerjaan 2.00
7.00 Luas Carport/Perkerasan 13.17
8.00 Pondasi Batu Batu Belah

Luas Bangunan
Lantai 1 panjang (m) lebar (m) koefisien
1 Teras 2.15 2.00 0.50
2 Ruang Tamu 2.75 2.50 1.00
3 Ruang keluarga 3.00 2.50 1.00
4 Ruang Tidur 1 2.50 2.75 1.00
5 Ruang Tidur 2 2.75 2.75 1.00
6 R01 1.50 1.25 1.00
7 Wc 1.50 1.50 1.00
8 Ruang Makan 3.00 2.67 1.00
Dapur 1.00 2.75 1.00

Luas Total bangunan


m2
m'
m2
m'
m'
Bulan
m2
bh

luas
2.15 m
6.88 m
7.50 m
6.88 m
7.56 m
1.88 m
2.25 m
8.01 m
2.75 m

45.85 m
2. WBS
Proyek
Lokasi
Tahun

NO.

I.
1
2
3
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
III
1
2
3
4
5
6
IV
1
2
3
4
5
6
V
1
2
3
4
5
VI
1
2
3
VII
1
2
3
4
5
6
VIII
1
IX
1
2
3
4
5
X
1
2
3
4
5
XI
1
XII
1
2
3
4
XIII
1
2. WBS
Rumah Tinggal T-45 KARISMA RESIDENCE
Jl. Politeknik no xx Bandung
2016

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN


Pekerjaan pengukuran dan pasangan bouw plank
Pekerjaan galian tanah untuk pondasi batu kali
Urugan tanah untuk peninggian lantai
PEKERJAAN PONDASI DAN BETON
Membuat Pondasi Bangunan Batu belah 1 Pc : 5 Psr
Pas. Pondasi batu kosong/ Anstamping
Membuat Sloof 10/15 Beton Bertulang
Membuat bekisting sloof 2 kali pemakaian
Membuat Sloof Beton Bertulang ( Bongkar Bekisting )
Membuat Kolom praktis 10/10 Beton Bertulang ( 203 KG Besi + Bekisting )
Membuat bekisting kolom praktis 2 kali pemakaian
Membuat Kolom Beton Bertulang ( Bongkar Bekisting )
Membuat Ring Balok Atas Dinding Bata
Membuat bekisting ring balk 2 kali pemakaian
Membuat Ring Balok Beton Bertulang Atas Dinding Bata ( Bongkar Bekisting )
Membuat Plat topi Beton Bertulang 6 cm
Membuat bekisting plat topi 2 kali pemakaian
Membuat Plat dak topi Beton Bertulang 6 cm ( Bongkar Bekisting )
Membuat Meja dapur plat Beton Bertulang 6 cm (tulangan sisa)
Membuat bekisting dapur 2 kali pemakaian
Membuat Meja dapur plat Beton Bertulang 6 cm (Bongkar Bakesting)
Membuat plat Duicker carport t= 12 cm
Pekerjaan Pembesian
Membuat rabat beton carport + acian roll
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan dinding bata merah 1 : 5 Bangunan
Plesteran 1 : 5 Bangunan
Acian Bangunan
Pasangan dinding bata merah 1 : 5 Batas Taman Standar t=40 cm
Plesteran 1 : 5 Batas taman
Acian Batas taman
PEKERJAAN LANTAI DAN DINDING
Pasangan lantai keramik motif ruangan dalam 30 cm x 30 cm
Pasangan lantai keramik motif 30 cm x 30 cm untuk teras depan
Pasangan lantai keramik motif 30 cm x 30 cm untuk teras belakang
Pasangan lantai keramik motif 20 cm x 20 cm u/ (KM/WC)
Pasangan dinding keramik motif 20 cm x 20 cm u/ KM (WC)
Pasangan dinding keramik polos 20 cm x 20 cm u/ meja dapur
PEKERJAAN ATAP
Pasangan LIST Plank kayu kamper banjar 3/20
Pasangan atap genteng beton
Pasangan nok bubung genteng beton
Kuda Kuda baja ringan
Talang datar
PEKERJAAN PLAFOND
Pasangan rangka plafond 60x60
Langit - langit plafond gypsum
list gypsum
PEKERJAAN KUSEN, PINTU DAN JENDELA
Pasangan kusen kayu borneo super
daun pintu panel kayu borneo super
daun jendela kayu borneo super
pasang engsel pintu
pasang engsel jendela
pasang kunci kamar
PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA
Pasangan kaca polos 5 mm
PEKERJAAN SANITAIR
Pasangan kloset duduk
Pasangan double kran air 1/2" + Shower
pasangan kran air
pasangan washtafel
Pasangan kitchen zink meja dapur
PASANGAN INSTALASI AIR
Pasangan pipa PVC diameter 1/2 inci u/ air PDAM 10000
Pasangan pipa PVC diameter 2 inci u/ air kotor 6000
Pasangan pipa PVC diameter 3 inci u/ air hujan dari belakang 4000
Pasangan pipa PVC diameter 2 inci u/ air hujan dari dak beton 4000
Pekerjaan septic tank dan rembesan
PEKERJAAN INSTALSI LISTRIK
Pasangan kabel listrik
PEKERJAAN PENGECATAN
Pengecatan kesen, Dengan Cat Kayu
Pengecatan pintu dan jendela dengan cat kayu
Pengecatan plafond 3x dengan cat Tembok Vinilex
penegcatan tembok 3x dengan cat tembok Vinilex
PEKERJAAN LAIN-LAIN
Pemberesan lahan setelah selesai pekerjaan
VOL. SAT.

48.00 m
m
m

m
m
m
m2
m2
ttk
m2
m2
m'
m2
m2
m'
m2
m2
m'
m2
m2
m'
kg
m'

m'
m'
m'
m'
m'
m'

m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

M
M
m1

m3
m2
m2
bh
bh
bh

m'

1.00 Bh
1.00 Bh
1.00 Bh
1.00 Bh
1.00 Unit

m'
m'
m'
m'
Unit

Unit

m'
m'
m'
m'
RINGKASAN HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
WILAYAH BANDUNG th 2016

NO.

A
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

B
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

C
1.
2.
3.
4.
5.
6.
7.

D
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

E
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

F
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.

G
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

H
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
37.
38.
39.

I
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.

J
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.

K
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.

L
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44
45
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.

M
1.
2.
3.
4.
5.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.

N
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

O
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
33.
34.

P
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.

Q
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.

R
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22
23
24
25
26
27
28.
29.
30.
31.
32.
33
34.
35.
36.
37.
38.
39.
40.
41.
42.

S
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

T
1.
2.
3.
4.
5.
6.
7.
8.

U
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.

V
1.
2.
3.
4.
5.
6.
7.
8.
9.
10
11
12
13
14
15.
RINGKASAN HARGA SATUAN PEKERJAAN (UNIT PRICE)
BANGUNAN GEDUNG, PERUMAHAN DAN PRASARANA
WILAYAH BANDUNG th 2016

URAIAN

PEKERJAAN PENDAHULUAN
Pagar sementara dari seng gelombang tinggi 2 meter tiap 1 m'
Pagar sementara dari kawat duri tinggi 1,8 meter tiap 1 m'
Pagar perimeter dari kawat duri tinggi 1,5 meter tiap 1 m'
Pagar perimeter dari kawat duri tinggi 70 cm tiap 1 m'
Pembuatan kantor sementara, dengan lantai plesteran tiap 1 m
Pembuatan kantor sementara dengan lantai plesteran + meja & bangku kayu tiap 1 m
Pembuatan gudang semen dan peralatan tiap 1 m
Pembuatan jalan sementara tebal 20 cm tiap 1 m
Pembuatan jalan sementara tebal 25 cm tiap 1 m
Pekerjaan Pengukuran dan Pasang bouwplank kayu Albasia tiap 1 m'

Pasang bouwplank kayu terentang tiap 1 m'


Pasang bouwplank kayu meranti tiap 1 m'
Membersihkan puing-puing tiap 1 m2

PEKERJAAN TANAH
Pembersihan lapangan dan perataan tiap 1 m
Pekerjaan stripping setinggi 1 meter (pembersihan lahan skala besar) tiap 1 m
Galian tanah biasa sedalam 1 meter tiap 1 m
Galian tanah biasa sedalam 2 meter tiap 1 m
Galian tanah biasa sedalam 3 meter tiap 1 m
Galian tanah keras sedalam 1 meter tiap 1 m
Galian tanah cadas sedalam 1 meter tiap 1 m
Galian tanah lumpur sedalam 1 meter tiap 1 m
Pembuangan tanah sejauh 150 m tiap 1 m
Urugan tanah kembali tiap 1 m
Urugan tanah mendatangkan tiap 1 m
Mengangkut tanah sejauh 30 m tiap 1 m
Menghampar tanah dengan menghampar tiap 1 m
Pemadatan tanah (tenaga manusia) tiap 1 m
Pemadatan tanah (tenaga manusia) tebal 20 cm tiap 1 m
Pemadatan tanah dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m
Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 6 lintasan / tebal 20cm tiap 1 m
Pemadatan tanah dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m
Pemadatan tanah tebal 20 cm dengan tamper/hand compactor 10 lintasan / tebal 20cm tiap 1 m
Pemadatan tanah dengan Vibrating Roller tiap 1 m
Pemadatan tanah tebal 20 cm dengan Vibrating Roller tiap 1 m
Urugan sirtu tiap 1 m
Urugan pasir urug tiap 1 m
Urugan tanah merah tiap 1 m
Urugan pasir pasang tiap 1 m
Pemancangan tiang/cerucuk dolken kecil dalam 2 m' tiap 1 titik
Pemancangan tiang/cerucuk dolken besar dalam 2 m' tiap 1 titik
Pemasangan lapisan ijuk tiap 1 m2

PEKERJAAN PASANGAN BATU KALI/BELAH


Pasang pondasi/pasangan batu kali/belah 1 Pc : 2 Ps tiap 1 m
Pasang pondasi/pasangan batu kali/belah 1 Pc : 3 Ps tiap 1 m
Pasang pondasi/pasangan batu kali/belah 1 Pc : 4 Ps tiap 1 m
Pasang pondasi/pasangan batu kali/belah 1 Pc : 5 Ps tiap 1 m
Pasang pondasi batu kosong (aanstamping) tiap 1 m
Pasang pondasi siklop 40% batu kali tiap 1 m
Pasang pondasi sumuran diameter 100 cm tiap 1 m

PEKERJAAN DINDING
Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps tiap 1m
Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps tiap 1m
Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps tiap 1m
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps tiap 1m
Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps tiap 1m
Pasangan bata merah 1 Pc : 2 Ps tiap 1m (dibagi tebal bata 11 cm)
Pasangan bata merah 1 Pc : 4 Ps tiap 1m (dibagi tebal bata 11 cm)
Pasangan dinding batako tiap 1m
Pasangan dinding bata ringan t = 7,5 cm dengan perekat mortar tiap 1m
Pasangan dinding bata ringan t = 10 cm dengan perekat mortar tiap 1m
Pasangan rollag bata merah 1 Pc : 5 Ps , tiap 1 m' (1 lapis bata)
Pasangan rollag bata merah 1 Pc : 4 Ps , tiap 1 m' (2 lapis bata)
Pasangan dinding hollowblock HB 20 tiap 1m, spesi 1:4
Pasangan dinding hollowblock HB 15 tiap 1m, spesi 1:4
Pasangan dinding hollowblock HB 10 tiap 1m, spesi 1:4
Pasangan dinding Roster bata merah 12 x 24 x 10 tiap 1m, spesi 1:3
Pasangan dinding Roster beton 20 x 20 x 7 tiap 1m
Pasangan dinding Glass block 20 x 20 x 10 tiap 1m

PEKERJAAN PLESTERAN
Plesteran 1 Pc : 2 Ps tebal 15 mm tiap 1m
Plesteran 1 Pc : 3 Ps tebal 15 mm tiap 1m
Plesteran 1 Pc : 4 Ps tebal 15 mm tiap 1m
Plesteran texture/ Skrit tiap 1 m2
Plesteran 1 Pc : 2 Ps tebal 20 mm tiap 1m
Plesteran 1 Pc : 3 Ps tebal 20 mm tiap 1m
Plesteran 1 Pc : 4 Ps tebal 20 mm tiap 1m
Plesteran 1 Pc : 2 Ps tebal 25 mm tiap 1m
Plesteran 1 Pc : 3 Ps tebal 25 mm tiap 1m
Plesteran 1 Pc : 4 Ps tebal 25 mm tiap 1m
Plesteran dinding dengan mortar tiap 1m
Plesteran Berapen 1 Pc : 3 Ps tebal 15 mm tiap 1m
Plesteran Berapen 1 Pc : 5 Ps tebal 15 mm tiap 1m
Plesteran Skoning (benangan/ tali air) 1 Pc : 2 Ps lebar 10 cm / tiap 1m'
Plesteran Ciprat 1 Pc : 2 Ps tiap 1m
Plesteran Siar 1 Pc : 2 Ps untuk pasangan batu kali tiap 1m
Acian 1 m2
Acian dengan mortar tiap 1m

PEKERJAAN KUSEN DAN DAUN PINTU/JENDELA KAYU


Pasang kusen pintu dan jendela Kayu Jati tiap 1m
Pasang kusen pintu dan jendela Kayu Kamper Samarinda Oven tiap 1m
Pasang kusen pintu dan jendela Kayu Kamper Medan/Kruing tiap 1m
Pasang kusen pintu dan jendela Kayu Meranti Palembang tiap 1m
Pasang kusen pintu dan jendela Kayu Borneo tiap 1m
Pasang pintu panel Kayu Jati tiap 1m
Pasang pintu panel Kayu Kamper Samarinda Oven tiap 1m
Pasang pintu panel Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu panel Kayu Borneo tiap 1m
Pasang pintu panel Kayu Meranti Sampit tiap 1m
Pasang pintu dan jendela kaca Kayu Jati tiap 1m
Pasang pintu dan jendela kaca Kayu Kamper Samarinda Oven tiap 1m
Pasang pintu dan jendela kaca Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu dan jendela kaca Kayu Meranti Sampit tiap 1m
Pasang pintu dan jendela kaca Kayu Borneo tiap 1m
Pasang pintu dan jendela jalusi Kayu Jati tiap 1m
Pasang pintu dan jendela jalusi Kayu Kamper Samarinda Oven tiap 1m
Pasang pintu dan jendela jalusi Kayu Kamper Singkil tiap 1m
Pasang pintu dan jendela jalusi Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu dan jendela jalusi Kayu Meranti Sampit tiap 1m
Pasang pintu dan jendela jalusi Kayu Borneo tiap 1m
Pasang jalusi mati Kayu Jati tiap 1m
Pasang jalusi mati Kayu Kamper Samarinda oven tiap 1m
Pasang jalusi mati Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu teakwood rangkap, rangka Kayu Kamper Samarinda oven tiap 1m
Pasang pintu teakwood rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu teakwood rangkap, rangka Kayu Meranti Palembang tiap 1m
Pasang pintu triplek rangkap, rangka Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu triplek rangkap, rangka Kayu Meranti Palembang tiap 1m
Pasang pintu teakwood dan formika, rangka Kayu Kamper Samarinda oven tiap 1m
Pasang pintu teakwood dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu teakwood dan formika, rangka Kayu Meranti Palembang tiap 1m
Pasang pintu triplek dan formika, rangka Kayu Kamper Medan/Kruing tiap 1m
Pasang pintu triplek dan formika, rangka Kayu Meranti Palembang tiap 1m
Pasang pintu triplek dan double formika, rangka Kayu Meranti Palembang tiap 1m
Pasang kawat harmonika tiap 1 m
Pasang kawat nyamuk tiap 1 m
Pasang kawat kasa tiap 1 m

PEKERJAAN KONSTRUKSI ATAP KAYU


Pasang konstruksi kuda-kuda Kayu Borneo tiap 1m
Pasang konstruksi kuda-kuda Kayu Kamper Medan/Kruing tiap 1m
Pasang konstruksi kuda-kuda expose Kayu Samarinda tiap 1m
Pasang Konstruksi Gording Kayu Kamper Medan/Kruing tiap 1m
Pasang kaso + reng genteng kodok Kayu Kamper Medan/Kruing tiap 1m
Pasang kaso + reng genteng kodok Kayu Meranti Jambi tiap 1m
Pasang kaso + reng genteng keramik Kayu Kamper Medan/Kruing tiap 1m
Pasang kaso + reng genteng keramik Kayu Meranti Jambi tiap 1m
Pasang kaso + reng genteng beton Kayu Kamper Medan/Kruing tiap 1m
Pasang kaso + reng genteng beton Kayu Meranti Jambi tiap 1m
Pasang kaso + reng atap sirap kayu kamper tiap 1m
Pasang lisplank (3 x 20) cm Kayu Kamper Samarinda tiap 1m'
Pasang lisplank (3 x 20) cm Kayu Kamper Medan/Kruing tiap 1m'
Pasang lisplank (3 x 20) cm Kayu Meranti Palembang tiap 1m'
Pasang lisplank (3 x 30) cm Kayu Kamper Samarinda tiap 1m'
Pasang lisplank (3 x 30) cm Kayu Kamper Medan/Kruing tiap 1m'
Pasang lisplank (3 x 30) cm Kayu Meranti Palembang tiap 1m'
Pasang lisplank 2 x (2 x 20) cm Kayu Kamper Samarinda tiap 1m'
Pasang lisplank 2 x (2 x 20) cm Kayu Kamper Medan/Kruing tiap 1m'
Pasang lisplank 2 x (2 x 20) cm Kayu Meranti Palembang tiap 1m'
Membuat listplank asbes plat ram kayu tiap 1 m2
Pasang kaso hollow 40x40 + reng baja ringan tiap 1m

PEKERJAAN KONSTRUKSI LANGIT-LANGIT/PLAFON DAN PENUTUP


Pasang rangka plafon (1,00 x 1,00) m Kayu Kamper Samarinda tiap 1m
Pasang rangka plafon (1,00 x 1,00) m Kayu Kamper Medan/Kruing tiap 1m
Pasang rangka plafon (1,00 x 1,00) m Kayu Meranti Palembang tiap 1m
Pasang rangka plafon (50 x 100) cm Kayu Kamper Samarinda tiap 1m
Pasang rangka plafon (50 x 100) cm Kayu Kamper Medan/Kruing tiap 1m
Pasang rangka plafon (50 x 100) cm Kayu Meranti Palembang tiap 1m
Pasang rangka plafon (60 x 120) cm Kayu Kamper Samarinda tiap 1m
Pasang rangka plafon (60 x 120) cm Kayu Kamper Medan/Kruing tiap 1m
Pasang rangka plafon (60 x 120) cm Kayu Meranti Palembang tiap 1m
Pasang rangka plafon (60 x 60) cm Kayu Kamper Samarinda tiap 1m
Pasang rangka plafon (60 x 60) cm Kayu Kamper Medan/Kruing tiap 1m
Pasang rangka plafon (60 x 60) cm Kayu Meranti Palembang tiap 1m
Pasang rangka plafon (30 x 60) cm Kayu Kamper Samarinda tiap 1m
Pasang rangka plafon (30 x 60) cm Kayu Kamper Medan/Kruing tiap 1m
Pasang rangka plafon (30 x 60) cm Kayu Meranti Palembang tiap 1m
List Plafon kayu profil tiap 1m'
List plafon bahan Kayu Kamper Samarinda papan 1x5 cm tiap 1 m'
List plafon bahan triplek 0,3x5 cm tiap 1 m'
Pasang list profil cornice gypsum lebar sampai 5 cm tiap 1 m'
Pasang list profil cornice gypsum lebar sampai 5-10 cm tiap 1 m'
Pasang list profil cornice gypsum lebar lebih dari 10 cm tiap 1 m'
Pasang list profil cornice wall aluminium tiap 1 m'
Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm tiap 1m
Penutup plafon akustik (60 x 120) cm tiap 1m
Penutup plafon teakwood (60 x 120) cm tebal 3 mm tiap 1m
Penutup plafon gypsum board 9 mm tiap 1m
Penutup plafon GRC-board 4 mm tiap 1m
Penutup plafon Calsiboard 4 mm tiap 1m
Penutup plafon triplek 4 mm tiap 1m
Penutup plafon triplek 6 mm tiap 1m
Penutup plafon asbes (1,00 x 1,00) m tebal 2,7 mm lengkap rangka Kamper Medan/Kruing tiap 1m
Penutup plafon triplek 4 mm (60 x 120) cm lengkap rangka Kamper Medan/Kruing tiap 1m
Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tiap (6mx6m) = 36 m
Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.3 mm / tiap 1 m
Penutup plafon Gypsumboard 9 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
Penutup plafon Calsiboard 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m
Penutup plafon Akustik ukuran 60x120 cm + rangka alumunium / tiap 1 m
Plafond Papan (Lambriziring) 10 cm, tebal 1 cm + Rangka Kayu Borneo Super tiap 1 m2
Perapihan langit-langit beton exposed

PEKERJAAN KONSTRUKSI DINDING KAYU DAN PENUTUP


Pasang rangka dinding pemisah Kayu Kamper Medan/Kruing tiap 1m
Pasang rangka dinding pemisah Kayu Meranti Palembang tiap 1m
Pasang dinding pemisah teakwood rangkap rangka Kayu Kamper Medan/Kruing tiap 1m
Pasang dinding pemisah teakwood rangkap rangka Kayu Meranti Palembang tiap 1m
Pasang teakwood tebal 3 mm untuk dinding tiap 1m
Pasang triplek tebal 4 mm untuk dinding tiap 1m
Pasang triplek tebal 6 mm untuk dinding tiap 1m
Pasang gypsum tebal 12 mm untuk dinding tiap 1m
Dinding partisi gypsum 12 mm lkp rk metal Studs 2 muka tiap 1 m
Dinding partisi gypsum 12 mm lkp rk hollow tiap 1 m
Dinding partisi double GRC-board 6 mm rk Kamper Medan/Kruing tiap 1 m
Dinding partisi double GRC-board 6 mm rk hollow tiap 1 m

PEKERJAAN BETON
Beton Non Struktur 1Pc : 3Ps : 5Kr - untuk rabatan/ beton tumbuk tiap 1m
Lantai Kerja Beton 1Pc : 3Ps : 5Kr - untuk beton tumbuk tebal 5 cm
Beton K-125 (1Pc : 3Ps : 4Kr) tiap 1m
Beton K-175 (1Pc : 2,5Ps : 3,5Kr) tiap 1m
Beton Struktur K-225 (1Pc : 2Ps : 3Kr) tiap 1m
Beton Struktur K-250 (1Pc : 1,65Ps : 3Kr) tiap 1m
Beton Struktur K-275 (1Pc : 1,5Ps : 3Kr) tiap 1m
Beton Struktur K-350 (1Pc : 1,5Ps : 2,75Kr) tiap 1m
Beton Struktur K-400 (1Pc : 1,5Ps : 2,5Kr) tiap 1m
Beton Cyclope 1pc:3ps:5kr tiap 1m
Pembesian dengan besi polos tiap 1 kg
Pembesian dengan besi ulir tiap 1 kg
Pasang bekisting untuk pondasi 1 m
Pasang bekisting untuk sloof 1 m
Pasang bekisting untuk sloof 1 m dengan bahan tripleks 9 mm
Pasang bekisting untuk kolom 1 m
Pasang bekisting untuk balok 1 m
Pasang bekisting untuk pelat lantai 1 m
Pasang bekisting untuk dinding 1 m
Pasang bekisting untuk tangga 1 m
Membokar cetakan bekesting tiap 1m
Stutwerk untuk 1 m, tinggi 3 - 4 m (memakai dolken)
Stutwerk untuk 1 m, tinggi 3 - 4 m (memakai scafolding)
Membuat pondasi beton bertulang (150 kg besi + bekisting) tiap 1m
Membuat sloof beton bertulang (200 kg besi + bekisting) tiap 1m
Membuat kolom beton bertulang (300 kg besi + bekisting) tiap 1m
Membuat balok beton bertulang (200 kg besi + bekisting) tiap 1m
Membuat balok beton bertulang (150 kg besi + bekisting) tiap 1m
Membuat dinding beton bertulang (150 kg besi + bekisting) tiap 1m
Membuat tangga beton bertulang (200 kg besi + bekisting) tiap 1m
Membuat 1 unit pelat pondasi beton bertulang (100 x 100 x 30) cm
Membuat sloof beton bertulang (15 x 20) cm tiap 1 m'
Membuat sloof beton bertulang (15 x 30) cm tiap 1 m'
Membuat sloof beton bertulang (20 x 40) cm tiap 1 m'
Membuat kolom penguat/praktis beton bertulang (11 x 11) cm tiap 1m'
Membuat kolom beton bertulang (11 x 20) cm tiap 1 m'
Membuat kolom beton bertulang (11 x 30) cm tiap 1 m'
Membuat kolom beton bertulang (30 x 30) cm tiap 1 m'
Membuat ring balok beton bertulang (10 x 15) cm tiap 1m'
Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m
Membuat pelat atap beton bertulang tebal 10 cm tiap 1 m
Membuat pelat meja beton bertulang tebal 8 cm tiap 1 m
Plat Duiker Pintu Masuk, lebar saluran 0,5 m tiap 1 m' (Tebal plat 10 cm)
Plat Duiker Pintu Masuk, lebar saluran 0,75 m tiap 1 m' (Tebal plat 12,5 cm)
Plat Duiker Pintu Masuk, lebar saluran 1 m tiap 1 m' (Tebal plat 15 cm)

PEKERJAAN PENUTUP ATAP


Pasang atap genteng plentong natural tiap 1m
Pasang atap genteng plentong besar/super tiap 1m
Pasang atap genteng kodok tiap 1m
Pasang atap genteng keramik Kanmuri natural tiap 1m
Pasang atap genteng keramik M Class tiap 1m
Pasang atap genteng beton Monier standar tiap 1m
Pasang atap genteng metal tiap 1m
Pasang atap asbes gelombang 2,5 x 0,92 m x 5 mm tiap 1m
Pasang atap asbes gelombang 2,25 x 0,92 m x 5 mm tiap 1m
Pasang atap asbes gelombang 2,00 x 0,92 m x 5 mm tiap 1m
Pasang atap asbes gelombang 1,80 x 0,92 m x 5 mm tiap 1m
Pasang atap seng gelombang BJLS 25 (0,25 mm) tiap 1m
Pasang atap spandek tiap 1m
Pasang lisplang spandek tiap 1 m
Pasang atap Fibreglass ukuran 180 X 90 cm tiap 1 m2
Pasang alumunium foil tiap 1m
Pasang glasswool tiap 1m
Pasang Nok genteng plentong tiap 1m'
Pasang Nok genteng plentong besar tiap 1m'
Pasang Nok genteng keramik Kanmuri tiap 1m'
Pasang Nok genteng keramik M Class tiap 1m'
Pasang Nok genteng beton tiap 1m'
Pasang nok genteng metal tiap 1m'
Pasang nok tepi tiap 1 m'
Pasang nok/bubung stel gelombang 0,92 m tiap 1m'
Pasang nok paten 0,92 m tiap 1m'
Pasang nok stel rata 0,92 m tiap 1m'
Pasang atap nok seng tiap 1m'
Pasang nok asbes tiap 1m'
Pasang nok spandek standar tiap 1m'
Pasang Flashing tiap 1m'
Pasang atap policarbonat tiap 1 m2

PEKERJAAN SANITASI
Memasang 1 buah kloset duduk/monoblok (sederhana)
Memasang 1 buah kloset duduk/monoblok setara INA (sedang)
Memasang 1 buah kloset duduk/monoblok (tidak sederhana)
Memasang 1 buah kloset jongkok sederhana
Memasang 1 buah kloset jongkok sedang
Memasang 1 buah kloset jongkok tdk sederhana
Memasang 1 buah urinoir
Memasang 1 buah penyekat urinoir
Memasang 1 buah wastafel
Memasang 1 buah bak mandi fibreglass volume 0,3 m
Memasang 1 buah bak mandi batu bata volume 0,3 m
Memasang 1 buah bak mandi batu bata volume 0,3 m (60x60x80 cm)
Memasang pipa galvanis dia 1/2" tiap m'
Memasang pipa galvanis dia 3/4" tiap m'
Memasang pipa galvanis dia 1" tiap m'
Memasang pipa galvanis dia 1 " tiap m'
Memasang pipa galvanis dia 1 " tiap m'
Memasang pipa galvanis dia 2" tiap m'
Memasang pipa galvanis dia 2 " tiap m'
Memasang pipa galvanis dia 3" tiap m'
Memasang pipa galvanis dia 4" tiap m'
Memasang pipa PVC tipe AW dia 1/2" tiap m'
Memasang pipa PVC tipe AW dia 3/4" tiap m'
Memasang pipa PVC tipe AW dia 1" tiap m'
Memasang pipa PVC tipe AW dia 1 " tiap m'
Memasang pipa PVC tipe D dia 1 " tiap m'
Memasang pipa PVC tipe AW dia 1 " tiap m'
Memasang pipa PVC tipe D dia 1 " tiap m'
Memasang pipa PVC tipe AW dia 2" tiap m'
Memasang pipa PVC tipe D dia 2" tiap m'
Memasang pipa PVC tipe AW dia 2 " tiap m'
Memasang pipa PVC tipe D dia 2 " tiap m'
Memasang pipa PVC tipe AW dia 3" cm tiap m'
Memasang pipa PVC tipe D dia 3" cm tiap m'
Memasang pipa PVC tipe AW dia 4" tiap m'
Memasang pipa PVC tipe D dia 4" tiap m'
Memasang pipa PVC tipe AW dia 6" tiap m'
Memasang pipa PVC tipe D dia 6" tiap m'
Memasang 1 buah bak cuci piring stainless steel
Memasang 1 buah kran dia 3/4" atau 1/2" sederhana
Memasang 1 buah kran dia 3/4" atau 1/2" stainless
Memasang 1 buah kran leher angsa stainless
Memasang 1 buah kran bebek stainless
Memasang 1 buah hand shower
Memasang Jet Shower
Memasang 1 buah tempat sabun
Memasang 1 buah gantungan baju
Memasang 1 floor drain sederhana
Memasang 1 floor drain stainless
Memasang Roof drain
Memasang 1 clean out dia. 100 mm
Memasang 1 clean out dia. 50 mm
Membuat 1 unit sumur air tanah bor manual dalam 12 m' + pompa air listrik
Membuat 1 unit tanki septik sederhana kapasitas 1,2 m dalam 1,2 m
Membuat 1 unit tanki septik kapasitas 1,7x0,85 m dalam 1,3 m (vol. 1,88 m u/ 5 pemakai)
Membuat tanki septik kapasitas tiap 1 m
Membuat 1 unit resapan 0,8 m (digali 1 m) dalam 1 m (digali 1,9 m) kap. 0,5 m
Memasang 1 unit septictank Biotec kap. 1 m
Memasang 1 unit septictank Biotec kap. 2 m

PEKERJAAN BESI DAN ALUMINIUM


Pasang Besi Profil tiap kg
Pasang Rangka Atap Baja tiap kg
Kuda-kuda baja dengan WF / kg
Kuda-kuda baja dengan siku / kg
Gording baja CNP / Kg
Pengelasan Las Listrik setiap 1 cm
Pasang pintu besi plat baja tebal 2 mm rangkap, rangka baja siku / tiap m
Pasang rangka jendela besi Scuare Tube (25x5) cm / tiap m
pasang grill besi tiap m'
Pasang pintu lipat tiap m (Folding Door)
Pasang rolling door tiap m
Pasang kusen pintu aluminium tiap m'
Pasang kusen jendela aluminium tiap m'
Memasang 1 m pintu/jendela/BV kaca, rangka allumunium
Pasang terali besi tiap m
Pasang jendela nako dan teralis tiap m
Pasang talang datar, seng BJLS 28 (0,28 mm) tiap 1 m'
Pasang talang miring, seng BJLS 28 (0,28 mm) tiap 1 m'
Pasang talang 1/2 lingkaran D-15 cm, seng BJLS 30 / tiap 1 m'
Pasang baut 16
Pasang baut 12
Pasang Angkur 19
Pasang grill besi Hollow finish cat tiap m2

PEKERJAAN KUNCI DAN KACA


Pasang 1 buah kunci tanam antik
Pasang 1 buah kunci tanam sederhana
Pasang 1 buah kunci tanam biasa
Pasang 1 buah kunci tanam KM
Pasang 1 buah kunci silinder Pintu Aluminium
Pasang 1 buah kunci lemari
Pasang kunci gembok tiap 1 buah
Pasang 1 buah engsel pintu biasa/sederhana
Pasang 1 buah engsel pintu kuningan/stainless
Pasang 1 buah engsel jendela kuningan/stainless
Pasang 1 buah engsel angin
Pasang floor hinges
Pasang pull handle
Pasang 1 buah spring knip
Pasang 1 buah kait angin
Pasang 1 buah door closer
Pasang 1 buah kunci selot
Pasang 1 buah grendel
Pasang 1 buah window casement
Pasang 1 buah rambuncis
Pasang 1 buah pegangan pintu/door holder
Pasang 1 buah door stop
Pasang 1 buah rel pintu dorong
Pasang kaca es tebal 3 mm tiap 1 m
Pasang kaca tebal 5 mm tiap 1 m
Pasang kaca es tebal 5 mm tiap 1 m
Pasang kaca rayben tebal 5 mm tiap 1 m
Pasang kaca tebal 8 mm tiap 1 m
Pasang kaca tebal 10 mm tiap 1 m
Pasang kaca rayben tebal 8 mm tiap 1 m
Pasang kaca rayben tebal 10 mm tiap 1 m
Pasang kaca rayben tebal 12 mm tiap 1 m
Pasang Kaca Tempered polos 12 mm tiap 1 m2
Pasang Kaca Tempered polos 10 mm tiap 1 m2
Pasang Kaca Tempered polos 8 mm tiap 1 m2
Pasang kaca cermin tebal 5 mm tiap 1m
Pasang kaca patri tebal 5 mm tiap 1 m

PEKERJAAN PENUTUP LANTAI DAN DINDING


Pasang lantai Granito ukuran 40 x 40 cm tiap 1m
Pasang lantai keramik ukuran 40 x 40 cm Roman tiap 1m
Pasang lantai keramik ukuran 40 x 40 cm KW 2 tiap 1m
Pasang lantai Granito ukuran 30 x 30 cm tiap 1m
Pasang lantai keramik ukuran 60 x 60 cm Indogress tiap 1m
Pasang lantai keramik ukuran 30 x 30 cm Roman tiap 1m
Pasang lantai keramik ukuran 30 x 30 cm KW 2 tiap 1m
Pasang lantai keramik ukuran 20 x 20 cm Roman tiap 1m
Pasang lantai keramik ukuran 20 x 20 cm KW 2 tiap 1m
Pasang lantai keramik ukuran 10 x 20 cm Roman tiap 1 m
Pasang lantai keramik ukuran 10 x 20 cm KW 2 tiap 1 m
Pasang lantai marmer tiap 1m (100x100) cm
Pasang lantai parquet jati tiap 1m
Pasang lantai vinyl karet kl 1 tiap 1m
Pasang Floor Hardener tiap 1m
Pasang dinding marmer tiap 1m
Pasang dinding keramik 20 x 20 cm Roman tiap 1m
Pasang dinding keramik 20 x 20 cm KW 2 tiap 1m
Pasang dinding keramik 20 x 25 cm Roman tiap 1m
Pasang dinding keramik 20 x 25 cm KW 2 tiap 1m
Pasang dinding batu paras tiap m2
Pasang dinding batu tempel palimanan tiap 1m
Pasang plint ubin marmer ukuran 10 x 60 cm tiap 1m'
Pasang plint ubin marmer ukuran 10 x 40 cm tiap 1m'
Pasang plint ubin marmer ukuran 10 x 30 cm tiap 1m'
Pasang plint granito tile ukuran 10 x 40 cm / tiap 1m'
Pasang plint granito tile ukuran 10 x 30 cm / tiap 1m'
Pasang plint keramik ukuran 10 x 40 cm Roman tiap 1m'
Pasang plint keramik ukuran 10 x 30 cm Roman tiap 1m'
Pasang plint keramik ukuran 10 x 20 cm Roman tiap 1m'
Pasang plint keramik ukuran 10 x 60 cm tiap 1 m'
Pasang plint keramik (list) ukuran 5 x 20 cm Roman tiap 1m'
Pasang plint keramik (list) ukuran 5 x 20 cm KW 2 tiap 1m'
Pasang keramik stepnosing 5/30 tiap 1 m'
Pasang plint vinyil 1m
Pasang plint kayu 2 x 10 cm tiap 1m'

PEKERJAAN PENGECATAN
Mengikis/mengerok permukaan tembok lama tiap 1 m
Mendempul dan menggosok kayu 1 m
Pengecatan dengan cat KW 2 bidang kayu lama 1 m
Pengecatan dengan cat Mowilex bidang kayu lama 1 m
Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 2 lps penutup KW 2
Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 2 lps penutup Mowilex
Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 3 lps penutup KW 2
Pengecatan bidang kayu baru dg plamir 1 m + 1 lps dsr + 3 lps penutup Mowilex
Pelaburan bidang kayu dgn politur 1 m
Pengecatan bidang kayu dengan politur Ultran tiap 1 m
Pengecatan bidang kayu dengan melamik Impra tiap 1 m
Pengecatan kusen kayu dengan melamik Impra tiap 1 m'
Pelaburan bidang kayu dgn residu dan ter 1 m
Pelaburan bidang kayu dgn vernis 1 m
Pengecatan tembok baru dg plamir 1 m + 1 lps dsr + 2 lps penutup KW 2
Pengecatan tembok baru dg plamir 1 m + 1 lps dsr + 2 lps Catylac
Pengecatan tembok baru dg wall sealer 1 m + 1 lps dsr + 2 lps Dulux/ICI
Pengecatan tembok baru dg wall sealer 1 m + 1 lps dsr + 2 lps Dulux/ICI Weathershield
Pengecatan bidang tembok lama 1 m dg 1 lps dsr + 2 lps penutup KW 2
Pengecatan bidang tembok lama 1 m dg 1 lps dsr + 2 lps penutup Catylac
Pengecatan bidang tembok lama 1 m dg 1 lps dsr + 2 lps penutup Dulux/ICI
Memasang wallpaper
Mengecat genteng 1 m
Pengecatan permukaan baja 1 m dgn meni besi
Pengecatan permukaan baja 1 m dgn meni besi & perancah
Pengecatan permukaan baja tiap 1 m dengan zinchromate
Pengecatan permukaan baja tiap 1 m dengan Cat KW 2
Pengecatan permukaan baja tiap 1 m dengan Cat Mowilex
Pekerjaan cat duko 3x tiap 1 m
Pengecatan waterproofing (coating) tiap 1 m
Pengecatan permukaan kayu 1 m dgn meni
Grouting
Cat anti lumut (silicosal) tiap m2
Cat list plafond tiap m'
Cat besi Glotex tiap m2

PEKERJAAN BONGKARAN
Bongkar beton bertulang tiap 1m
Bongkar dinding tembok bata merah tiap 1m
Bongkar dinding bata tiap 1m
Bongkar pelat beton bertulang tiap 1m
Bongkar batu kali tebal < 50 cm tiap 1 m
Bongkar batu kali tebal > 50 cm tiap 1 m
Bongkar lantai tiap 1 m
Bongkar paving block tiap 1 m
Bongkar plesteran tiap 1 m
Bongkar atap genteng tiap 1 m
Bongkar karpusan atap genteng tiap 1 m'
Bongkar atap seng/asbes tiap 1 m
Bongkar kaso dan reng kayu (kayu akan dipakai lagi) tiap 1 m
Bongkar kaso dan reng kayu (kayu tidak akan dipakai lagi) tiap 1 m
Bongkar balok kuda-kuda & loteng (kayu akan dipakai lagi) tiap 1 m
Bongkar balok kuda-kuda & loteng (kayu tidak akan dipakai lagi) tiap 1 m
Bongkar rangka plafon tiap 1 m
Bongkar penutup plafon tiap 1 m

PEKERJAAN INSTALASI LISTRIK


Pasang instalasi lampu dg NYM 3x2,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Pasang instalasi lampu dg NYM 2x2,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Pasang instalasi lampu dg NYM 2x1,5 mm tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Pasang instalasi lampu untuk gedung pertemuan & gudang tiap 1 titik (tidak termasuk fitting, sakelar & lampu)
Pasang kabel NYA 70 mm tiap 1 m
Pasang kabel feeder NYY 4x4 mm tiap 1 m
Pasang instalasi AC dg NYY 4x4 mm tiap 1 titik
Pasang instalasi AC dg NYY 4x10 mm tiap 1 titik
Pasang instalasi AC dg NYY 3x2,5 mm tiap 1 titik
Pasang instalasi stop kontak tiap 1 titik (tidak termasuk stop kontak)
Pasang instalasi stop kontak lebih dari 500 watt tiap 1 titik (tidak termasuk stop kontak)
Pasang instalasi listrik + outlet AC tiap 1 titik (tidak termasuk AC)
Pasang instalasi + tiang antena TV tiap 1 titik (tidak termasuk socket & antena)
Pasang instalasi penangkal petir
Pasang instalasi telepon tiap 1 titik (tidak termasuk outlet, pesawat telepon & sambungan Telkom)
Pasang instalasi telepon paralel/extension line tiap 1 titik (tidak termasuk outlet, pesawat telepon)
Pasang Panel Pembagi Daya 1300 VA / 6 A (3 grup @ 6 A) tiap 1 unit
Pasang Panel Pembagi Daya 2200 VA / 10 A (3 grup @ 10 A) tiap 1 unit
Pasang pentanahan (grounding) tiap 1 titik
Pasang pentanahan (grounding) panel tiap 1 titik
Pasang 1 buah lampu SL
Pasang 1 buah lampu down light PLC 18 watt
Pasang 1 buah lampu roset 18 watt
Pasang 1 buah lampu KDK 400 watt
Pasang 1 buah lampuTKI 2x36 W mirror reflektor
Pasang 1 buah lampuTKI 2x36 W mirror reflektor + battery nicad
Pasang 1 buah lampu PLC 18 W + battery nicad
Pasang 1 buah lampu TL 1x18 RM
Pasang 1 buah lampu TL 2x18 RM
Pasang 1 buah lampu TL 2x36 RM
Pasang 1 buah lampu TL 1x18 Balk
Pasang 1 buah lampu TL 2x18 Balk
Pasang 1 buah lampu TL 1x36 Balk
Pasang 1 buah lampu TL 2x36 Balk
Pasang 1 buah lampu baret
Pasang 1 buah lampu pijar
Pasang 1 buah lampu Taman
Pasang 1 buah saklar tunggal
Pasang 1 buah saklar ganda
Pasang 1 buah stop kontak
Pasang 1 buah Exhaust Fan
Pasang 1 buah out let TV

PEKERJAAN PRASARANA LINGKUNGAN - DRAINASE


Memasang pipa beton, dia 15-20 cm tiap m'
Memasang pipa beton, dia 30 cm tiap m'
Memasang pipa beton, dia 40 cm tiap m'
Memasang pipa beton, dia 50 cm tiap m'
Memasang pipa beton, dia 60 cm tiap m'
Memasang pipa beton, dia 80 cm tiap m'
Memasang pipa beton, dia 100 cm tiap m'
Memasang 1 buah bak kontrol pas.batu bata 30 x 30 cm tinggi 35 cm
Memasang 1 buah bak kontrol pas.batu bata 45 x 45 cm tinggi 50 cm
Memasang 1 buah bak kontrol pas.batu bata 60 x 60 cm tinggi 65 cm
Membuat saluran air buis beton 20 cm dinding bata dalam 15-25 cm tiap 1 m'
Membuat saluran air buis beton 30 cm dinding bata dalam 30-45 cm tiap 1 m'
Membuat saluran air dari batu kali lebar bawah 30 cm tinggi 60 cm tiap 1 m'
Membuat saluran air dari batu kali lebar bawah 60 cm tinggi 80 cm tiap 1 m'
Membuat saluran air dari batu kali lebar bawah 80 cm tinggi 100 cm tiap 1 m'
Membuat saluran air dari batu kali lebar bawah 100 cm tinggi 120 cm tiap 1 m'
Memasang pipa beton type RJ ex Boral, dia 80 cm panj. 2440 mm tiap buah
Memasang pipa beton type RJ ex Boral, dia 100 cm panj. 2440 mm tiap buah
Memasang pipa beton type RJ ex Boral, dia 120 cm panj. 2440 mm tiap buah
Memasang pipa beton type RJ ex Boral, dia 150 cm panj. 2440 mm tiap buah
Memasang Saluran beton U Ditch ex Boral, uk. 60 x 80 cm tiap m'
Memasang Saluran beton U Ditch ex Boral, uk. 60 x 60 cm tiap m'

PEKERJAAN PRASARANA LINGKUNGAN - PAGAR


Pasang pagar beton pracetak tinggi 1,6 m tiap 1 m'
Pasang pagar beton pracetak tinggi 2 m tiap 1 m'
Membuat pagar dinding tinggi 2 m bata merah + plesteran + cat tembok tiap 1 m'
Membuat pagar dinding tinggi 3 m bata merah + plesteran + cat tembok tiap 1 m'
Membuat pagar dinding tinggi 2 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'
Membuat pagar dinding tinggi 1,5 m bata hollow ekspos + kolom/ringbalk diplester & dicat tiap 1 m'
Membuat pagar BRC 1,2 m tinggi jadi 1,5 m (pondasi batu kali + sloof 15/20 + bata 30 cm + plester + cat) tiap 1 m'
Membuat pagar BRC 0,9 m tinggi jadi 1,2 m (pondasi batu kali + sloof 15/20 + bata 30 cm + plester + cat) tiap 1 m'

PEKERJAAN PRASARANA LINGKUNGAN - JALAN, LAPANGAN PARKIR, LAPANGAN UPACARA/APEL


Galian dengan excavator (skala besar) tiap 1m
Galian dengan tenaga manusia tiap 1m
Urugan tanah merah dipadatkan alat berat tiap 1m
Penyiapan badan jalan / tanah dasar (Subgrade) tiap 1m
Urugan sirtu (agregat kelas C) dipadatkan tiap 1m
Lapis Pondasi Bawah (LPB / Subbase Course) Kelas C Sirtu tebal 10 cm tiap 1m
Lapis Pondasi Jalan Tanpa Penutup Aspal jenis Waterbound Macadam tiap 1m
Lapis Pondasi Atas (LPA / Base Course) Agregat Kelas A tiap 1m
Lapis Resap Ikat (Prime Coat) tiap 1 Liter
Lapis Perekat (Tack Coat) tiap 1 Liter
Aspal untuk Pelaburan tiap 1 Liter
Lapisan Penetrasi (LAPEN) / Lapisan Permukaan (Surface Course) Macadam tebal 5 cm tiap 1m
Lapisan Tipis Aspal Beton (LATASTON / HRS-Hot Rolled Sheet) tebal 3 cm tiap 1m
Lapisan Permukaan Aspal Beton (LASTON / AC-Asphalt Concrete) tebal 5 cm tiap 1m
Pembuatan jalan aspal biasa (Sirtu t=10 cm, Agregat Kelas A t=20 cm, Permukaan Macadam t=5 cm) tiap m
Pembuatan jalan aspal biasa lebar 3 m' tiap 1 m'
Pembuatan jalan aspal biasa lebar 4 m' tiap 1 m'
Pembuatan jalan aspal biasa lebar 5 m' tiap 1 m'
Pembuatan jalan aspal biasa lebar 6 m' tiap 1 m'
Pembuatan jalan aspal biasa lebar 8 m' tiap 1 m'
Pembuatan jalan aspal beton t=3 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LATASTON HRS-WC = 3 cm) tiap m
Pembuatan jalan aspal beton t=3 cm lebar 3 m' tiap 1 m'
Pembuatan jalan aspal beton t=3 cm lebar 4 m' tiap 1 m'
Pembuatan jalan aspal beton t=3 cm lebar 5 m' tiap 1 m'
Pembuatan jalan aspal beton t=3 cm lebar 6 m' tiap 1 m'
Pembuatan jalan aspal beton t=3 cm lebar 8 m' tiap 1 m'
Pembuatan jalan aspal beton t=5 cm (Sirtu = 10 cm, Agregat Kelas A t=20 cm, LASTON AC-WC = 5 cm) tiap m
Pembuatan jalan aspal beton t=5 cm lebar 3 m' tiap 1 m'
Pembuatan jalan aspal beton t=5 cm lebar 4 m' tiap 1 m'
Pembuatan jalan aspal beton t=5 cm lebar 5 m' tiap 1 m'
Pembuatan jalan aspal beton t=5 cm lebar 6 m' tiap 1 m'
Pembuatan jalan aspal beton t=5 cm lebar 8 m' tiap 1 m'
Pekerjaan paving parkir kendaraan (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 20 cm + urugan pasir 5 cm tiap m
Pekerjaan paving jalan setapak (warna abu T-16 uk. 8x10,5x21) + urugan sirtu 10 cm + urugan pasir 5 cm tiap m
Pekerjaan kanstin tiap 1 m'
Pasang grassblock tebal 10 cm tiap 1 1m
Gebalan rumput tiap 1m

PEKERJAAN ANALISA TAMBAHAN


Foto Dokumentasi
Listrik Kerja (Sewa Genset)
Listrik Kerja dengan penyambungan daya sementara utk 5 bln
Memasang 1 buah pompa sumur listrik
Air Kerja dalam unit
Pemasangan AC 2 1/2 PK Split
Pemasangan AC 1 PK Split tiap unit
Pemasangan AC Cassete 4 PK tiap unit
Pemasangan AC satnding 10 PK tiap unit
Beton Ready Mix K.350 / m3
Beton Ready Mix K.300 / m3
Beton Ready Mix K.275 / m3
Beton Ready Mix K.250 / m3
Beton Ready Mix K.225 / m3
Pekerjaan tanah dan perataan tiap m3
HSP (Rp)

463,030.00
101,320.00
118,140.00
145,920.00
1,404,300.00
684,410.00
1,282,460.00
127,340.00
149,780.00
53,460.00
77,670.00
92,930.00
14,550.00

13,480.00
4,260.00
57,690.00
71,090.00
84,740.00
76,750.00
116,620.00
92,920.00
43,760.00
19,220.00
104,670.00
25,250.00
19,430.00
42,600.00
8,520.00
16,124.00
3,229.00
26,873.00
5,375.00
2,332.00
491.00
224,070.00
187,080.00
104,670.00
245,550.00
25,130.00
24,960.00
70,680.00

866,390.00
781,140.00
730,030.00
694,600.00
373,470.00
1,845,530.00
747,710.00

250,750.00
228,130.00
120,870.00
110,790.00
108,470.00
1,110,820.00
1,019,320.00
95,020.00
108,140.00
139,280.00
25,410.00
58,800.00
193,980.00
202,100.00
152,740.00
221,070.00
291,040.00
641,680.00

50,010.00
46,950.00
44,870.00
237,970.00
66,220.00
62,140.00
59,300.00
69,290.00
67,830.00
65,030.00
69,120.00
33,430.00
31,570.00
15,260.00
37,570.00
49,660.00
26,980.00
Err:512

29,985,540.00
15,416,060.00
9,842,320.00
7,304,080.00
7,438,330.00
1,411,370.00
836,450.00
613,290.00
537,390.00
537,050.00
913,980.00
569,020.00
435,130.00
389,380.00
389,580.00
2,094,050.00
1,174,170.00
979,740.00
817,120.00
695,140.00
695,670.00
1,826,770.00
964,390.00
629,650.00
751,230.00
611,750.00
548,230.00
503,150.00
439,630.00
943,820.00
804,350.00
740,820.00
695,750.00
632,220.00
782,010.00
68,840.00
59,160.00
69,340.00

6,454,440.00
8,658,090.00
15,830,850.00
7,998,640.00
135,900.00
85,320.00
135,900.00
85,320.00
148,530.00
92,900.00
1,705,070.00
111,780.00
74,950.00
56,650.00
158,140.00
101,870.00
73,920.00
120,010.00
75,000.00
52,640.00
410,360.00
92,720.00

174,900.00
113,380.00
88,000.00
214,920.00
135,980.00
103,400.00
188,030.00
121,390.00
93,890.00
234,960.00
151,410.00
116,930.00
309,260.00
191,360.00
142,710.00
36,260.00
22,970.00
18,530.00
Err:512
35,700.00
38,180.00
25,200.00
32,540.00
173,690.00
82,510.00
46,260.00
43,540.00
55,010.00
41,840.00
48,290.00
146,700.00
161,210.00
Err:512
Err:512
186,140.00
183,410.00
194,880.00
287,150.00
360,540.00
52,550.00

233,850.00
174,620.00
430,710.00
371,490.00
81,260.00
37,820.00
44,700.00
54,860.00
Err:512
330,150.00
335,420.00
Err:512

806,610.00
117,830.00
812,930.00
897,670.00
997,680.00
1,039,100.00
1,080,530.00
1,118,160.00
1,154,370.00
1,017,360.00
15,430.00
16,060.00
205,530.00
222,140.00
211,830.00
367,010.00
395,040.00
502,410.00
492,850.00
352,730.00
291,120.00
2,401,460.00
1,398,520.00
4,257,350.00
5,275,780.00
9,203,460.00
7,082,700.00
6,549,460.00
6,172,380.00
6,339,380.00
950,180.00
136,850.00
203,310.00
466,920.00
88,130.00
105,000.00
177,240.00
758,630.00
106,240.00
781,710.00
704,400.00
233,800.00
1,136,420.00
703,310.00
1,013,780.00

54,660.00
42,070.00
62,160.00
145,270.00
184,570.00
113,430.00
238,660.00
76,790.00
80,020.00
75,540.00
82,970.00
61,090.00
266,030.00
201,450.00
70,490.00
40,770.00
51,900.00
84,900.00
94,000.00
152,750.00
172,400.00
105,830.00
81,830.00
89,690.00
172,140.00
91,620.00
83,340.00
34,090.00
59,140.00
110,740.00
86,430.00
298,440.00

1,096,910.00
2,488,480.00
2,883,010.00
425,040.00
565,090.00
691,540.00
3,401,440.00
1,469,570.00
1,958,980.00
982,770.00
1,755,150.00
771,140.00
51,410.00
62,590.00
53,380.00
58,700.00
72,210.00
85,500.00
106,740.00
120,030.00
153,360.00
14,790.00
17,020.00
20,140.00
23,500.00
20,990.00
26,820.00
20,580.00
33,310.00
27,480.00
38,530.00
26,740.00
63,720.00
46,190.00
92,880.00
58,130.00
234,430.00
117,140.00
357,180.00
57,690.00
223,690.00
505,690.00
367,690.00
391,690.00
106,690.00
78,620.00
42,620.00
53,620.00
381,620.00
146,620.00
116,120.00
83,620.00
9,133,870.00
1,699,340.00
3,056,130.00
1,629,110.00
300,350.00
3,265,020.00
7,270,880.00

27,800.00
27,280.00
30,690.00
30,210.00
Err:512
3,870.00
849,990.00
124,110.00
328,900.00
592,050.00
567,730.00
176,060.00
139,760.00
Err:512
480,480.00
208,020.00
214,720.00
204,350.00
76,460.00
15,140.00
15,140.00
83,790.00
371,700.00

463,360.00
156,330.00
236,880.00
219,740.00
205,290.00
114,550.00
100,150.00
33,360.00
40,410.00
50,790.00
43,720.00
2,106,600.00
1,894,920.00
153,890.00
34,440.00
372,600.00
56,720.00
57,370.00
104,090.00
51,190.00
272,400.00
73,760.00
851,760.00
129,500.00
121,800.00
155,740.00
133,630.00
303,140.00
333,940.00
486,840.00
692,540.00
789,950.00
778,950.00
670,050.00
561,150.00
256,390.00
1,467,490.00

381,560.00
204,540.00
136,920.00
325,150.00
288,890.00
245,950.00
204,240.00
245,460.00
214,220.00
173,920.00
165,970.00
548,790.00
422,310.00
130,330.00
Err:512
578,400.00
251,010.00
219,770.00
239,370.00
210,510.00
315,370.00
257,520.00
140,060.00
173,400.00
191,610.00
54,150.00
47,240.00
28,450.00
29,940.00
32,160.00
71,750.00
24,030.00
21,910.00
73,490.00
44,140.00
102,490.00

11,220.00
9,580.00
37,000.00
39,270.00
51,590.00
54,500.00
58,480.00
62,030.00
31,100.00
73,040.00
120,490.00
61,900.00
8,980.00
35,790.00
17,830.00
17,070.00
30,870.00
39,840.00
13,940.00
13,300.00
21,890.00
18,450.00
19,930.00
28,030.00
54,200.00
24,220.00
42,200.00
45,110.00
208,510.00
50,150.00
35,290.00
220,950.00
54,020.00
18,180.00
44,490.00

526,580.00
52,640.00
5,760.00
63,190.00
118,480.00
236,970.00
4,260.00
4,260.00
3,940.00
2,690.00
4,040.00
5,930.00
10,460.00
7,890.00
621,400.00
410,850.00
7,890.00
3,080.00

365,950.00
354,950.00
308,950.00
422,510.00
90,330.00
42,730.00
352,500.00
715,500.00
205,500.00
365,050.00
696,340.00
464,850.00
448,950.00
4,394,330.00
360,150.00
239,030.00
1,818,320.00
1,818,320.00
130,970.00
740,550.00
73,020.00
126,550.00
183,110.00
592,160.00
391,170.00
977,980.00
732,550.00
259,520.00
299,920.00
384,760.00
136,300.00
158,520.00
184,780.00
222,150.00
226,180.00
21,510.00
1,163,060.00
60,140.00
65,190.00
65,190.00
572,210.00
82,360.00

117,090.00
407,870.00
452,530.00
578,480.00
634,030.00
795,660.00
877,770.00
426,870.00
462,370.00
710,120.00
156,190.00
235,280.00
409,410.00
602,360.00
871,700.00
1,130,610.00
1,882,390.00
2,810,190.00
3,826,890.00
5,533,890.00
1,412,620.00
1,210,640.00

295,430.00
466,770.00
1,049,810.00
1,333,930.00
979,530.00
745,000.00
711,370.00
637,040.00

101,320.00
98,900.00
107,380.00
5,030.00
232,820.00
24,080.00
317,300.00
328,790.00
13,630.00
15,750.00
15,910.00
97,090.00
102,830.00
160,280.00
191,970.00
575,910.00
767,880.00
959,850.00
1,151,820.00
1,535,760.00
208,630.00
625,890.00
834,520.00
1,043,150.00
1,251,780.00
1,669,040.00
266,080.00
798,240.00
1,064,320.00
1,330,400.00
1,596,480.00
2,128,640.00
238,600.00
209,450.00
102,660.00
226,200.00
32,710.00

127,000.00
2,352,830.00
6,138,290.00
7,836,660.00
9,993,270.00
8,557,120.00
3,640,440.00
25,958,410.00
64,460,620.00
1,590,130.00
1,563,680.00
1,518,830.00
1,499,280.00
1,434,880.00
196,570.00
3. DATA PERHITUNGAN QUANTITY
Proyek :
Lokasi :
Tahun :

NO.

I
1
2
3
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
III
1
2
3
4
5
6
IV
1
2
3
4
5
6
V
1
2
3
4
5
VI
1
2
3
VII
1
2
3
4
5
6
VIII
1
IX
1
2
3
4
5
X
1
2
3
4
5
XI
1
XII
1
2
3
4
XIII
1
DATA PERHITUNGAN QUANTITY
Rumah Tinggal T-45 KARISMA RESIDENCE
Jl. Politeknik no xx Bandung
2016

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN
Pekerjaan pengukuran dan pasangan bouwplank
Pekerjaan galian tanah untuk pondasi batu kali
Urugan tanah untuk peninggian lantai
PEKERJAAN PONDASI DAN BETON
Membuat Pondasi Bangunan Batu belah 1 Pc : 5 Psr
Pas. Pondasi batu kosong/ Anstamping
Membuat Sloof 10/15 Beton Bertulang
Membuat bekisting sloof 2 kali pemakaian
Membuat Sloof Beton Bertulang ( Bongkar Bekisting )
Membuat Kolom praktis 10/10 Beton Bertulang ( 203 KG Besi + Bekisting )
Membuat bekisting kolom praktis 2 kali pemakaian
Membuat Kolom Beton Bertulang ( Bongkar Bekisting )
Membuat Ring Balok Atas Dinding Bata
Membuat bekisting ring balk 2 kali pemakaian
Membuat Ring Balok Beton Bertulang Atas Dinding Bata ( Bongkar Bekisting )
Membuat Plat topi Beton Bertulang 6 cm
Membuat bekisting plat topi 2 kali pemakaian
Membuat Plat dak topi Beton Bertulang 6 cm ( Bongkar Bekisting )
Membuat Meja dapur plat Beton Bertulang 6 cm (tulangan sisa)
Membuat bekisting dapur 2 kali pemakaian
Membuat Meja dapur plat Beton Bertulang 6 cm (Bongkar Bakesting)
Membuat plat Duicker carport t= 12 cm
Pekerjaan Pembesian
Membuat rabat beton carport + acian roll
PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan dinding bata merah 1 : 5 Bangunan
Plesteran 1 : 5 Bangunan
Acian Bangunan
Pasangan dinding bata merah 1 : 5 Batas Taman Standar t=40 cm
Plesteran 1 : 5 Batas taman
Acian Batas taman
PEKERJAAN LANTAI DAN DINDING
Pasangan lantai keramik motif ruangan dalam 30 cm x 30 cm
Pasangan lantai keramik motif 30 cm x 30 cm untuk teras depan
Pasangan lantai keramik motif 30 cm x 30 cm untuk teras belakang
Pasangan lantai keramik motif 20 cm x 20 cm u/ (KM/WC)
Pasangan dinding keramik motif 20 cm x 20 cm u/ KM (WC)
Pasangan dinding keramik polos 20 cm x 20 cm u/ meja dapur
PEKERJAAN ATAP
Pasangan LIST Plank kayu kamper banjar 3/20
Pasangan atap genteng beton
Pasangan nok bubung genteng beton
Kuda Kuda baja ringan
Talang datar
PEKERJAAN PLAFOND
Pasangan rangka plafond 60x60
Langit - langit plafond gypsum
list gypsum
PEKERJAAN KUSEN, PINTU DAN JENDELA
Pasangan kusen kayu borneo super
daun pintu panel kayu borneo super
daun jendela kayu borneo super
pasang engsel pintu
pasang engsel jendela
pasang kunci kamar
PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA
Pasangan kaca polos 5 mm
PEKERJAAN SANITAIR
Pasangan kloset duduk
Pasangan double kran air 1/2" + Shower
pasangan kran air
pasangan washtafel
Pasangan kitchen zink meja dapur
PASANGAN INSTALASI AIR
Pasangan pipa PVC diameter 1/2 inci u/ air PDAM 10000
Pasangan pipa PVC diameter 2 inci u/ air kotor 6000
Pasangan pipa PVC diameter 3 inci u/ air hujan dari belakang 4000
Pasangan pipa PVC diameter 2 inci u/ air hujan dari dak beton 4000
Pekerjaan septic tank dan rembesan
PEKERJAAN INSTALSI LISTRIK
Pasangan kabel listrik
PEKERJAAN PENGECATAN
Pengecatan kesen, Dengan Cat Kayu
Pengecatan pintu dan jendela dengan cat kayu
Pengecatan plafond 3x dengan cat Tembok Vinilex
penegcatan tembok 3x dengan cat tembok Vinilex
PEKERJAAN LAIN-LAIN
Pemberesan lahan setelah selesai pekerjaan
QTY. SAT. DATA HITUNGAN

l p t
48.00 m 8.00 12.00 96 m
- m 4 6
- m

- m
- m
- m
- m2
- m2
- ttk
- m2
- m2
- m'
- m2
- m2
- m'
- m2
- m2
- m'
- m2
- m2
- m'
- kg
- m'

- m'
- m'
- m'
- m'
- m'
- m'

- m'
- m'
- m'
- m'
- m'
- m'

- m'
- m'
- m'
- m'
- m'

- M
- M
- m1

- m3
- m2
- m2
- bh
- bh
- bh

- m'

1.00 Bh
1.00 Bh
1.00 Bh
1.00 Bh
1.00 Unit

- m'
- m'
- m'
- m'
- Unit

- Unit

- m'
- m'
- m'
- m'

1.00
PERHITUNGAN KUSEN
KETERANGAN
No Uraian Pekerjaan Dim
A Pekerjaan Kusen

PU 0.06 0.15 1
P1 0.06 0.15 4

B Pekerjaan Pondasi Beton


Ph ph tot Panjang melamik
0.05

0.5 0.5 2 0.7 1.4 0.4 0 -


0.9 3.6 2 2 4 0 0 -
Luas Kel Vol Volume TL TK Tmelamik

0.35 2.3 0.021 2 2 0.7 4.6 3.8


1.80 7.6 0.068 1 1 1.8 7.6 0
KUSEN PINTU/JENDELA
TV Hrg Sat Jenis Jumlah Luas

0.04 PU - Jbr - PU 0.045 0.1


0.07 P1 - Jbr - P1 - 0
JENDELA
Panjang Luas Kel Vol Vlm TV TL TK

0 0 - 0 0.000 0 0 Jendela - -
1.15 0.65 0.75 3.6 0.000 3 3 Jendela 2.24 10.80
PINTU / JENDELA
Hrg/m3 Hrg/bh Jumlah

PU - - -
P1 - - -
PERLENGKAPAN PINTU / JENDELA
Vol Engsel

PU 0 0 16" PU
P1 1 3 16" P1
KACA KACA BV KACA MATI
Tinggi Lebar Luas T
0.04 0.03

0.65 0.1 0.55 0.5 0 0.50 0.55


0 0 0 0 0 - - 0
KACA MATI KACA JENDELA/PINTU
L Luas Tinggi Lebar Vlm
0.1 0.1

- PU 0 0 0 0 0.00 0
0 - P1 1.15 1.15 0.65 0.65 0.75 3
TOTAL KACA
Luas Vol Luas

- 2 1.10 5mm PU
2.24 1 2.24 5mm P1
3. Rekapitulasi
Proyek : Rumah Tinggal T-45 KARISMA RESIDENCE
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016

I PEKERJAAN PERSIAPAN Err:509 Rp.


II PEKERJAAN GALIAN DAN URUGAN Err:509 Rp.
III PEKERJAAN PONDASI Err:509 Rp.
IV PEKERJAAN BETON Err:509 Rp.
V PEKERJAAN DINDING Err:509 Rp.
VI PEKERJAAN KUSEN, PINTU DAN JENDELA Err:509 Rp.
VII PEKERJAAN ATAP Err:509 Rp.
VIII PEKERJAAN PLAFOND Err:509 Rp.
IX PEKERJAAN KERAMIK LANTAI & DINDING Err:509 Rp.
X PEK PENGECATAN Err:509 Rp.
XI PERLENGKAPAN SANITER Err:509 Rp.
XII PEKERJAAN MEKANIKAL & PLAMBING Err:509 Rp.
a INSTALASI AIR BERSIH Err:509 Rp.
b INSTALASI AIR KOTOR, BEKAS, HUJAN & VENT Err:509 Rp.
XIII PEKERJAAN INSTALASI LISTRIK Err:509 Rp.
XIV PEKERJAAN LAIN-LAIN Err:509 Rp.
Sub Jumlah Rp.
Keuntungan dan Jasa 10% Rp.
Sub Jumlah Rp.
PPN 10 % Rp.
Jumlah Rp.
Pembulatan Rp.
Nilai Penawaran Rp.
terbilang: Empat puluh satu juta dua ratus empat ribu seratus tiga puluh rupiah

Harga Bangunan per m2 Rp.


Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
ga puluh rupiah

Err:509
5. RENCANA ANGGARAN BIAYA
Proyek : Rumah Tinggal T-45 KARISMA RESIDENCE
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016

HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)


NO. URAIAN PEKERJAAN QTY. SAT.
Bahan Upah Bahan
I PEKERJAAN PERSIAPAN
1 Pembersihan lapangan dan perataan Err:509 m 14,550.00 Err:509
2 Pembuatan gudang semen dan peralatan - m 998,050 284,419.30 -
3 dst
II PEKERJAAN GALIAN DAN URUGAN
1
2
3
III PEKERJAAN PONDASI
IV PEKERJAAN BETON
V PEKERJAAN DINDING
VI PEKERJAAN KUSEN, PINTU DAN JENDELA
VII PEKERJAAN ATAP
VIII PEKERJAAN PLAFOND
IX PEKERJAAN KERAMIK LANTAI & DINDING
X PEK PENGECATAN
XI PERLENGKAPAN SANITER
XII PEKERJAAN MEKANIKAL & PLAMBING
a INSTALASI AIR BERSIH
b INSTALASI AIR KOTOR, BEKAS, HUJAN & VENT
XIII PEKERJAAN INSTALASI LISTRIK
XIV PEKERJAAN LAIN-LAIN
MLAH HARGA (Rp.) TOTAL HARGA (Rp.)
KETERANGAN
Upah Bahan + Upah
Err:509
Err:509 Err:509
- -
5. ANALISA HARGA SATUAN
Proyek : Rumah Tinggal type xxxx
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016

KUANTI
NO. URAIAN SAT
TAS
1 2 3 4

A PEKERJAAN PENDAHULUAN
1. Pembersihan lapangan dan perataan tiap m2
- Pekerja Oh 0.200

2. Pembuatan gudang semen dan peralatan tiap 1 m


Harga
Kayu dolken 8-10/400 cm
- Kayu dolken 8-10/400 cm btg 1.700
- Kayu Meranti Palembang kaso m 0.210
- Paku biasa 2"-5" kg 0.300
- Semen portland kg 10.500
- Pasir beton m 0.030
- Batu pecah/split 2/3 m 0.050
- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 1.500

Upah tenaga:
- Tukang kayu Oh 2.000
- Pekerja Oh 1.000
- Kepala tukang Oh 0.200
- Mandor Oh 0.050
HARGA SAT.
SUB TOTAL (Rp) HSP (Rp)
DASAR (Rp)
5 6 7

72,780 14,556.00
Jumlah Upah Tenaga 14,556.00
Dibulatkan 14,550.00

29,900 50,830.00
3,981,000 836,010.00
15,400 4,620.00
1,477 15,508.50
236,575 7,097.25
236,675 11,833.75
48,100 72,150.00
Jumlah Harga Bahan 998,049.50

91,927 183,854.00
72,780 72,780.00
107,872 21,574.40
124,218 6,210.90
Jumlah Upah Tenaga 284,419.30
Jumlah Total 1,282,468.80
Dibulatkan 1,282,460.00
6. DAFTAR HARGA BAHAN BANGUNAN
Proyek : Rumah Tinggal type xxxx
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016

RATA-RATA HARGA
NO. URAIAN SAT DASAR 2016

1 2 3 4
I. URAIAN BAHAN

A PASIR, BATU DAN SEMEN

1. Pasir pasang m 205,200.00

2. Pasir beton m 236,575.00

3. Pasir urug m 136,675.00

B BAHAN KAYU

C KAYU LAPIS DAN LEMBARAN

Kayu dolken 8-10/400 cm btg 29,900


Kayu Meranti Palembang kaso m 3,981,000
Paku biasa 2"-5" kg 15,400
Semen portland kg 1,477
Pasir beton m 236,575
Batu pecah/split 2/3 m 236,675
Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 48,100

Tukang kayu Oh 91,927


Pekerja Oh 72,780
Kepala tukang Oh 107,872
Mandor Oh 124,218
HARGA SAT. DATA SURVEI
JURNAL HRG JURNAL HRG DATA SURVEI DATA SURVEI
MINIMAL MAKSIMAL
KAB. BANDUNG pergub
2 3
KET.
2015 jabar 2016

5 6 7 8 9 10 11

161,600 195,300 203,500.00 181,200.00 249,600.00 240,000.00


DATA SURVEI
DATA SURVEI DATA SURVEI
KOEFISIEN pergub
2 3
jabar 2016

0.80 226,514.00 312,000.00 300,000.00


a. TIME SCHEDULE
Proyek :Rumah Tinggal T-45 KARISMA RESIDENCE
Lokasi :Jl. Politeknik no xx Bandung
Tahun : 2016

bulan ke 1 bulan ke 2
No. Item Pekerjaan bobot(%)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II PEKERJAAN GALIAN DAN URUGAN Err:509 Err:509 Err:509
III PEKERJAAN PONDASI Err:509 Err:509 Err:509
IV PEKERJAAN BETON Err:509 Err:509 Err:509 Err:509
V PEKERJAAN DINDING Err:509 Err:509 Err:509
VI PEKERJAAN KUSEN, PINTU DAN JENDELA Err:509 Err:509
VII PEKERJAAN ATAP Err:509
VIII PEKERJAAN PLAFOND Err:509
IX PEKERJAAN KERAMIK LANTAI & DINDING Err:509
X PEK PENGECATAN Err:509
XI PERLENGKAPAN SANITER Err:509
XII PEKERJAAN MEKANIKAL & PLAMBING Err:509
a INSTALASI AIR BERSIH Err:509 Err:509
b INSTALASI AIR KOTOR, BEKAS, HUJAN & VENT Err:509
XIII PEKERJAAN INSTALASI LISTRIK Err:509
XIV PEKERJAAN LAIN-LAIN Err:509
% Rencana Prestasi Mingguan Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
% Kumulatif Rencana Prestasi Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
% Realisasi Prestasi Mingguan
% Kululatif Realisasi Prestasi Mingguan
% Deviasi
bulan ke 2 bulan ke 3
7 8 9 10 11 12 Keterangan
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509


Err:509
Err:509 Err:509
Err:509 Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Bandung, Juni 2016


PT Ogah Rugi
CONTOH WBS
Proyek : Rumah Tinggal 4 lantai
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016
NO. URAIAN PEKERJAAN QTY.

I PEKERJAAN PERSIAPAN

1 Pekerjaan persiapan lahan ( lokasi pekerjaan )


2 Pekerjaan pengukuran dan pasangan bouwplank
3 Pekerjaan bedeng & gudang bahan
4 Mobilisai/Demobilisasi,buang brangkal/sampah 1.00
5 Pagar sementara keliling
6 Pengadaan air kerja
7 Persiapan listrik kerja (tdk termasuk penyambungan ke PLN)
8 Keamanan
9 Biaya iuran perbaikan lingkungan (IPL)

II PEKERJAAN GALIAN DAN URUGAN

1 Pemboran pondasi stuzpal t = 10m' d 30 cm


2 Galian tanah + Buang untuk pondasi poer /file cap
3 Galian tanah + Urug kembali untuk pondasi lajur & tangga
4 Galian tanah untuk pondasi penahan tanah
5 Galian tanah Garasi t = 1.1m
6 Galian tanah Carport Depan t = 1.6m
7 Galian tanah Carport Samping t = 0.5m
8 Galian tanah septik tank 6m3
9 Galian tanah reservoir air 3m3
10 Urugan pasir bwh fondasi t 10 cm
11 Peninggian elevasi tanah
12 Urugan pasir di bawah lantai t= 5 cm

III PEKERJAAN PONDASI

1 Pekerjaan pondasi struzpal d 30 cm t = 5 m'


2 Pekerjaan pondasi poer/file cap
3 Pekerjaan Pondasi batu kali 1: 5
4 Pekerjaan Pondasi tangga beton
5 Lantai kerja di bwh pondasi poer/file cap t = 5cm

IV PEKERJAAN BETON
A Lantai 1
1 Sloof 1;2;3
2 Kolom praktis 1:2:3
3 kolom konstruksi 1:2:3
4 Ring Balok 1:2:3
5 Balok konstruksi 1:2:3
6 Beton utk reservoir air bawah
7 Meja beton & dapur
8 Lantai beton penutup septik tank
9 Pluran lantai t 5 cm
10 Carport Depan (Gravel)
11 Carport Jalan (Gravel)
12 Gravel Belakang
13 Garasi+Teras Samping

B Lantai 2
1 Kolom praktis 1:2:3
2 Kolom kontruksi 1:2:3
3 Ring Balok 1:2:3
4 Balok konstruksi 1:2:3 30/40
5 Beton topi teras depan/konsol kanopi
6 Lantai beton bertulang 1;2:3
7 Tangga beton 1:2:3
8 Meja beton kamar mandi

C Lantai 3
1 Lantai beton bertulang 1;2:3

V PEKERJAAN WATERPROOFING

1 Water Proofing Dak (asphal membrane ex Fosroc / setara)


- Atap Lantai 2
- Atap Lantai 4
- Screed waterproofing atap ( semen psr + kawat ayam)
2 Water Proofing Balkon (coating system cement based ex Sika / setara)
Lantai 2
- Balkon depan
- Balkon samping
Lantai 3
- Balkon depan
- Balkon rg tidur 1 dan 2
- Balkon rg tidur 3
3 Waterpoofing toilet (coating system cement based ex Sika / setara)
Lantai 2
- Toilet rg tidur utama
Lantai 3
- Toilet rg tidur 1
- Toilet rg tidur 2 dan 3
Lantai 4
- Toilet

VI PEKERJAAN DINDING

A Dinding
1 Pasangan dinding Bata Merah
2 Plesteran dinding dalam (adukan 1:5) 10.00
3 Plesteran dinding luar ( Plesteran)
4 Acian Dalam (Fleakseal Acian)
5 Acian luar 10.00
6 Kamprot Halus
7 Openingan kusen pintu alumunium
8 Tali air, skonengan, pada plint lantai dan kusen 644.14
9 Perancah kerja dari bambu
10 Pekerjaan finishing janggutan bawah balkon, railling tangga
Lantai 2
- Balkon depan
- Atas pintu garasi
- Tangga dalam
Lantai 3
- Balkon depan
- Teras ruang tidur 1 dan 2
- Teras ruang tidur 3
- Tangga dalam
Lantai 4
- Balkon depan
- Atas teras ruang tidur 1 dan 2
- Atas teras ruang tidur 3
- Tangga dalam

VII PEKERJAAN ATAP

1 Kuda-kuda Rangka Kayu ex Pryda


2 Lisplang Fibercement ex Pryda
3 Alumunium foil Single side ex Pryda
4 Kaso expose Bengkirai ex Pryda
5 Genteng Beton Cisangkan (Victory Abu-Abu)
Nok Atas
Nok Penangkal Petir
Nok Samping Ujung
Nok Samping
6 Genteng Kaca
7 Talang Baja
8 Adukan + Water proof pemasangan nok genteng

VIII PEKERJAAN PLAFOND

1 Rangka Plafon Gysum 9 mm (rangka besi hollow 0.35mm) 540.00


2 Perapihan Pinggir 530.00
3 Drop Ceiling 116.00
4 Corner Beat 116.00
5 Tali air

IX PEKERJAAN KERAMIK LANTAI & DINDING

A R.Utama
Lantai2
1 Ruang Keluarga Lt1 (uk. Keramik 60 x 60 cm) 78.00

Lantai3
2 Ruang Keluarga Lt2 53.00
Lantai4
3 Meditation Room 14.00
4 Koridor 12.00

B R.Tidur
Lantai2
1 Kamar Tidur Utama Lt1 36.00
Lantai3
2 Kamar Tidur Anak 1 24.00
3 Kamar Tidur Anak 2 19.00
4 Kamar Tidur Anak 3 20.00

C Kamar Mandi
Lantai2
1 K.Mandi Utama 10.00
krmk dinding 30.00
Lantai3
2 K.Mandi Anak 9.00
krmk dinding anak 30.00
3 K.Mandi Anak 3 10.00
krmk dinding anak 30.00
Lantai 4
4 K.Mandi 5.00
krmk dinding 21.00
Lantai1
5 WC Pemb 3.00
krmk dinding WC pembt 18.00

D R.Servis (Keramik 20x20)

1 Garasi 88.00
2 Gudang 8.00
3 Dapur Kotor 10.00
4 Meja Beton Pantry/Dapur 6.00
5 Foyer Tangga 18.00
6 Keramik Tangga
- Tangga Lt 1 ke Lt 2 24.00
- Tangga Lt 2 ke Lt 3 24.00
- Tangga Lt 3 ke Lt 4 24.00
7 R.Pemb 12.00
8 Laundry 22.00
9 R.Pompa 24.00
10 Plin keramik 400.00
11 Tanggulan di bawah railling tangga / balkon
Lantai 2
- Balkon depan 8.50
- Teras samping 5.00
- Tangga dalam 10.50
Lantai 3
- Balkon depan 8.50
- Teras ruang tidur 1 dan 2 6.50
- Teras ruang tidur 3 8.00
- Tangga dalam 10.50
Lantai 4
- Tangga dalam 10.50

E R.Luar
Lantai2
1 Teras Lt1 16.00
2 Teras & Tangga Entrance Lt1 30.00
3 Balkon 9.00
Lantai3
4 Balkon 25.00
Lantai1
5 Carport (batu andesit 43.00
6 Carport Jalan 15.00
7 Reservoir 3 m3 (Keramik 20x20)
8 Perbaikan Kanstin 34.00
D Adukan Keramik
1 Adukan Keramik 1,322.00

X PEKERJAAN BATU ALAM

A Pekerjaan Batu Tampak Depan S2

1 Tampak Depan S1 95.00


2 Pagar Depan S2 95.00

B Adukan Pasangan Batu


1 Adukan Pasangan Batu 190.00

XI PEKERJAAN KUSEN, PINTU DAN JENDELA

A PINTU BESI
1 Pintu besi D1 (1 unit)
- Kusen besi 11.20
- Daun pintu besi 12.71
- Jalusi besi 2.48
Accessories
- Rel pintu ex Wina 14.00
- Roda pintu 12.00
- Engsel 24.00
- Selot atas - bawah 2.00
- Kunci 1.00
- Kunci otomatis 1.00

B PINTU KAYU
1 Pintu kayu D2 (3 unit)
- Kusen pintu kayu 5/15 . -
- Daun pintu double teakwood - variasi jalusi uk 82 x 214 cm 3.00
Accessories
- Handle + body ex .. 3.00
- Engsel stainless 4" ex . 4.50
- Door stoper 3.00
Upah pasang kusen -
Upah pasang daun pintu 3.00
2 Pintu kayu D5 (1 unit)
- Kusen pintu kayu 5/15 . -
- Daun pintu double teakwood - variasi kaca uk 82 x 226 cm 1.00
Accessories
- Handle + body ex .. 3.00
- Engsel stainless 4" ex . 4.50
- Kaca polos 5 mm -
- Door stoper 1.00
Upah pasang kusen 1.40
Upah pasang daun pintu 1.00
3 Pintu kayu D6 (1 unit)
- Kusen pintu kayu 5/15 . 0.06
- Daun pintu kaca uk 140 x 226 cm 2.00
Accessories
- Handle + body ex .. 1.00
- Rel pintu ex 6.00
- Kaca polos 8 mm 0.36
- Tralis besi 4.88
- Selot atas + bawah 1.00
Upah pasang kusen 2.30
Upah pasang daun pintu 2.00
4 Pintu kayu D8 (4 unit)
- Kusen pintu kayu 5/15 . -
- Daun pintu double teakwood uk 82 x 226 cm 4.00
Accessories
- Handle + body ex .. 4.00
- Engsel stainless 4" ex . 6.00
- Door stoper 4.00
Upah pasang kusen 10.35
Upah pasang daun pintu 4.00
5 Pintu kayu D8a (1 unit)
- Kusen pintu kayu 5/15 . 0.23
- Daun pintu double teakwood uk 82 x 211 cm 1.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 1.50
- Door stoper 1.00
Upah pasang kusen 8.28
Upah pasang daun pintu 1.00
6 Pintu kayu D9 (2 unit)
- Kusen pintu kayu 5/15 . 0.05
- Daun pintu double teakwood + variasi kaca uk 80 x 228 cm 2.00
Accessories
- Handle + body ex .. 2.00
- Rel pintu ex 3.60
- Box kayu penutup rel 3.60
- Kaca polos 5 mm -
Upah pasang kusen 1.94
Upah pasang daun pintu 2.00
Upah pembuatan box penutup rel 3.60
7 Pintu kayu D10 (1 unit)
- Kusen pintu kayu 5/15 . 0.11
- Daun pintu kaca uk 72 x 226 cm 1.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 1.50
- Kaca polos 5 mm 0.31
- Door stoper 1.00
Upah pasang kusen 3.91
Upah pasang daun pintu 1.00
8 Pintu kayu D11 (2 unit)
- Kusen pintu kayu 5/15 . 0.06
- Daun pintu double teakwood + variasi kaca uk 72 x 226 cm 2.00
Accessories
- Handle + body ex .. 2.00
- Engsel stainless 4" ex . 3.00
- Kaca polos 5 mm 1.34
- Door stoper 2.00
Upah pasang kusen 1.84
Upah pasang daun pintu 2.00
9 Pintu jendela kayu WD1 (1 unit)
- Kusen pintu kayu 5/15 . -
- Daun pintu double teakwood + variasi kaca uk 82 x 214 cm 1.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 1.50
- Kaca polos 5 mm -
- Door stoper 1.00
Upah pasang kusen -
Upah pasang daun pintu 1.00
10 Jendela kayu W1 (2 unit)
- Kusen pintu kayu 5/15 . -
Accessories
- Kaca es 5 mm -
Upah pasang kusen -

C PINTU ALUMUNIUM
1 Pintu alumunium D4 (1 unit)
- Kusen alumunium 3" ex YKK coklat 17.20
- Daun pintu alumunium variasi jalusi uk. 67 x 196 cm 1.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 1.50
- Door stoper 1.00
- Silikon 34.40
2 Pintu alumunium D7 (1 unit)
- Kusen alumunium 3" ex YKK coklat 7.98
- Daun pintu kaca rangka alum. uk 152.5 x 226 cm 3.00
Accessories
- Handle + body ex .. 1.00
- Rel pintu ex 13.50
- Kaca polos 8 mm 5.62
- Selot atas + bawah 2.00
- Silikon 15.20
- Karet kaca 23.00
3 Pintu alumunium D12 (1 unit)
- Kusen alumunium 3" ex YKK coklat 11.76
- Daun pintu alumunium variasi jalusi uk. 72 x 186 cm 1.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 1.50
- Door stoper 1.00
- Silikon 23.52
4 Pintu jendela alumunium WD2 (3 unit)
- Kusen alumunium 3" ex YKK coklat 36.16
- Daun pintu kaca rangka alum. uk. 72 x 225 cm 3.00
- Daun jendela kaca rangka alum. uk. 72 x 132 cm 6.00
Accessories
- Handle + body ex .. 3.00
- Engsel stainless 4" ex . 4.50
- Engsel casement 16" ex .. 6.00
- Rambuncis 6.00
- Kaca polos 5 mm 4.76
- Door stoper 3.00
- Silikon 51.60
- Karet kaca 130.80
5 Pintu jendela alumunium WD3 (1 unit)
- Kusen alumunium 3" ex YKK coklat 44.10
- Daun pintu kaca rangka alum. uk. 92 x 225 cm 1.00
- Daun jendela kaca rangka alum. uk. 92 x 132 cm 1.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 1.50
- Engsel casement 16" ex .. 1.00
- Rambuncis 1.00
- Kaca polos 5 mm 11.97
- Door stoper 1.00
- Silikon 16.40
- Karet kaca 32.80
6 Pintu jendela alumunium WD4 (1 unit)
- Kusen alumunium 3" ex YKK coklat 11.08
- Daun pintu kaca rangka alum. uk. 72 x 225 cm 4.00
- Daun jendela kaca rangka alum. uk. 72 x 132 cm 3.00
Accessories
- Handle + body ex .. 2.00
- Engsel stainless 4" ex . 6.00
- Selot tanam atas + bawah 2.00
- Engsel casement 16" ex .. 3.00
- Rambuncis 3.00
- Kaca polos 5 mm 3.79
- Door stoper 4.00
- Silikon 23.00
- Karet kaca 50.20
7 Pintu jendela alumunium WD5 (2 unit)
- Kusen alumunium 3" ex YKK coklat 23.63
- Daun pintu kaca rangka alum. uk. 62 x 215 cm 2.00
- Daun jendela kaca rangka alum. uk. 62 x 132 cm 2.00
Accessories
- Handle + body ex .. 2.00
- Engsel stainless 4" ex . 3.00
- Engsel casement 16" ex .. 2.00
- Rambuncis 2.00
- Kaca es 5 mm 9.89
- Door stoper 4.00
- Silikon 14.80
- Karet kaca 40.10
8 Pintu jendela alumunium WD6 (1 unit)
- Kusen alumunium 3" ex YKK coklat 25.50
- Daun pintu kaca rangka alum. uk. 92.5 x 200 cm 2.00
- Daun jendela kaca rangka alum. uk. 87.5 x 122 cm 2.00
Accessories
- Handle + body ex .. 1.00
- Engsel stainless 4" ex . 3.00
- Selot tanam atas + bawah 1.00
- Engsel casement 16" ex .. 2.00
- Rambuncis 2.00
- Kaca polos 5 mm 6.87
- Door stoper 4.00
- Silikon 19.20
- Karet kaca 54.80
9 Jendela alumunium W2 (1 unit)
- Kusen alumunium 3" ex YKK coklat 5.88
- Daun jendela kaca rangka alum. uk. 70 x 115 cm 3.00
Accessories
- Engsel casement 16" ex .. 3.00
- Rambuncis 3.00
- Kaca polos 5 mm 0.97
- Silikon 12.80
- Karet kaca 22.40
10 Jendela alumunium W3 (3 unit)
- Kusen alumunium 3" ex YKK coklat 8.80
- Daun jendela kaca rangka alum. uk. 65 x 100 cm 3.00
Accessories
- Engsel casement 16" ex .. 3.00
- Rambuncis 3.00
- Kaca polos 5 mm 1.73
- Silikon 25.20
- Karet kaca 33.60
11 Jendela alumunium W4 (1 unit)
- Kusen alumunium 3" ex YKK coklat 15.44
- Daun jendela kaca rangka alum. uk. 65 x 135 cm 1.00
Accessories
- Engsel casement 16" ex .. 1.00
- Rambuncis 1.00
- Kaca polos 5 mm 2.07
- Silikon 8.40
- Karet kaca 8.40
12 Jendela alumunium W5 (1 unit)
- Kusen alumunium 3" ex YKK coklat 4.41
- Daun jendela kaca rangka alum. uk. 65 x 135 cm 3.00
Accessories
- Engsel casement 16" ex .. 3.00
- Rambuncis 3.00
- Kaca polos 5 mm 0.69
- Silikon 17.20
- Karet kaca 43.60
13 Jendela alumunium W6 (1 unit)
- Kusen alumunium 3" ex YKK coklat 15.20
Accessories
- Jalusi alumunium 0.70
- Silikon 9.80
14 Jendela alumunium W7 (1 unit)
- Kusen alumunium 3" ex YKK coklat 4.90
- Daun jendela kaca rangka alum. uk. 65 x 115 cm 4.00
Accessories
- Engsel casement 16" ex .. 4.00
- Rambuncis 4.00
- Kaca polos 5 mm -
- Silikon 19.40
- Karet kaca 55.20
D Kusen Pintu PVC
1 Pintu PVC D3 (2 unit) + accessories lengkap uk daun 72 x 226 cm 2.00

XII PERLENGKAPAN SANITER

A Lantai 1
1 Kamar Mandi Bawah
Closet Jongkok 1.00
Shower 1.00
Kran 1.00
2 Kran Taman/Garasi/R.cuci 4.00
3 Floor Drain dia. 2" 1.00

B Lantai 2
1 Kamar Mandi Utama
Closet/Monoblok 1.00
Shower Spray 1.00
Wastafel 1.00
Shower Mixer 1.00
Urinoir 1.00
2 Dapur Bersih
Kitchen Zink 1.00
Kran Kitchen Zink 1.00
3 Floor Drain dia. 2" (K.Mandi) 2.00
4 Floor Drain dia. 2" (Teras) 4.00

C Lantai 3
1 Kamar Mandi Anak 1
Closet/Monoblok 1.00
Shower Spray 1.00
Wastafel 1.00
Shower Mixer 1.00
2 Kamar Mandi Anak 2
Closet/Monoblok 1.00
Shower Spray 1.00
Wastafel 1.00
Shower Mixer 1.00
Urinoir 1.00
Floor Drain dia. 2" (K.Mandi) 4.00
Floor Drain dia. 2" (Teras) 6.00

D Lantai 4 (Dak Atas)


1 Floor Drain dia. 2" 1.00
E Lantai Atap
1 Roof drain 3" (Stainless) 6.00

XIII PEKERJAAN MEKANIKAL & PLAMBING

A PEKERJAAN INSTALASI AIR BERSIH & AIR PANAS

1 POMPA, WATER HEATER & PRESURE TANK

1 Pompa Transfer (dr. R.Pompa ke Reservoir Atas) 1.00


2 Pompa Distribusi (dr. Reservoir Bawah 1 ke Reservoir Bawah 2) 1.00
3 Pompa Distribusi (dr. Reservoir Atas ke Instalasi) 1.00
4 Solar Water Heater kap. 300 Ltr 1.00
5 Presure Tank Kap. 300 Ltr 1.00
6 Filter 1.00
Sub Total

2 ROOF TANK/TORN (TANGKI PENAMPUNG AIR ATAS)

1 Toren Stainless 2000L 1.00


Sub Total

3 GROUND TANK (TANGKI PENAMPUNG AIR BAWAH)

1 Toren Fiber 1000L


2 Toren Fiber 3000L
Sub Total

4 VALVE & ACCESSORIES

1 Pipa Header Dia. 100 mm, Galvanize 1.00


2 Dudukan Pipa Header, besi siku 1.00
3 Gate Valve Dia. 32 mm (Pompa, Header, Torn & Pressure) 10.00
4 Gate Valve Dia. 25 mm (Pompa/Filter) 4.00
5 Gate Valve Dia. 20 mm (Torn) 4.00
6 Gate Valve Dia. 15 mm (Solar Water Heater) 2.00
7 Check Valve Dia. 32 mm 3.00
8 Check Valve Dia. 25 mm 2.00
9 Water Mur Dia. 32 mm 13.00
10 Water Mur Dia. 25 mm 4.00
11 Water Mur Dia. 20 mm 4.00
12 Accessories & Material bantu (Lem, Support, Klem, Gantungan, dll) 1.00
Sub Total
5 INSTALASI AIR BERSIH

1 Instalasi dari Meter PDAM ke Reservoir bawah 1


Pipa dia. 1" 8.00
2 Instalasi dari Reservoir bawah 1 ke Reservoir Bawah 2
Pipa dia. 1" 10.00
3 Instalasi dari Reservoir bawah 2 ke R. Pompa
Pipa dia. 1 1/4" 12.00
4 Instalasi dari Pompa Transfer Lt. 1 ke Tanki Atas Lt. Dak Atap
Pipa dia. 1 1/2" 4.00
Pipa dia. 1 1/4" 4.00
5 Instalasi Lt. 4 (Dak Atap)
Pipa dia. 1 1/4" 48.00
Pipa dia. 1" 4.00
Pipa dia. 3/4" 4.00
Pipa dia. 1/2" 10.00
6 Instalasi Lt. 3
Pipa dia. 1 1/2" 4.00
Pipa dia. 1 1/4" 12.00
Pipa dia. 1" 20.00
Pipa dia. 3/4" 8.00
Pipa dia. 1/2" 20.00
7 Instalasi Lantai 2
Pipa dia. 1 1/2" 4.00
Pipa dia. 1 1/4" 12.00
Pipa dia. 1" 4.00
Pipa dia. 3/4" 12.00
Pipa dia. 1/2" 50.00
8 Instalasi Lantai 1
Pipa dia. 1 1/4" 4.00
Pipa dia. 1" 6.00
Pipa dia. 3/4" 10.00
Pipa dia. 1/2" 53.00
9 Fitting - fitting 1.00
10 Accessories & Material bantu (Lem, Support, Klem, Gantungan, dll) 1.00
Sub Total

6 WIRING KABEL KONTROL


1 NYMHY 3x1.5 dgn pipa conduit (Ega/Clipsal) 1.00
Sub Total

7 INSTALASI AIR PANAS


Pipa ATP TORO, PP-R PN-20

1 Instalasi Lantai 4 (Dak Atap)


Pipa dia. 3/4" 16.00
Pipa dia. 1/2" 2.00
2 Instalasi Lantai 3
Pipa dia. 3/4" 28.00
Pipa dia. 1/2" 16.00
3 Instalasi Lantai 2
Pipa dia. 3/4" 4.00
Pipa dia. 1/2" 17.00
4 Instalasi Lantai 1
Pipa dia. 3/4" -
Pipa dia. 1/2" -
5 Fitting - fitting 1.00
6 Accessories & Material bantu (Heater, Support, Klem, Gantungan, dll) 1.00
Sub Total

8 INSTALASI PIPA GAS


1 Pipa Blacksteel
Sub Total

TOTAL A

B. INSTALASI AIR KOTOR, BEKAS, HUJAN & VENT

Peralatan Utama
1 BIOTECH
2 Bak Kontrol
3 Resapan
Sub Total

Lantai 1
Instalasi Pemipaan dg pipa PVC Wavin Aw lengkap dgn
fitting, support dan material bantunya
1 Pipa PVC dia. 6" 10.00
2 Pipa PVC dia. 4" 54.00
3 Pipa PVC dia. 3" 32.00
4 Pipa PVC dia. 2" 2.00
5 Fitting - fitting 1.00
6 Accessories & Material bantu (Lem, Support, Klem, Gantungan, dll) 1.00
Sub Total

Lantai 2
Instalasi Pemipaan dg pipa PVC Wavin Aw lengkap dgn
fitting, support dan material bantunya
1 Pipa PVC dia. 4" 12.00
2 Pipa PVC dia. 3" 38.00
3 Pipa PVC dia. 2" 10.00
4 Pipa PVC dia. 4" (vent) 4.00
5 Pipa PVC dia. 3" (vent) 4.00
6 Fitting - fitting 1.00
7 Accessories & Material bantu (Lem, Support, Klem, Gantungan, dll) 1.00
Sub Total

Lantai 3
Instalasi Pemipaan dg pipa PVC Wavin Aw lengkap dgn
fitting, support dan material bantunya
1 Pipa PVC dia. 4" 15.00
2 Pipa PVC dia. 3" 45.00
3 Pipa PVC dia. 2" 4.00
4 Pipa PVC dia. 4" (vent) 4.00
5 Pipa PVC dia. 3" (vent) 4.00
6 Fitting - fitting 1.00
7 Accessories & Material bantu (Lem, Support, Klem, Gantungan, dll) 1.00
Sub Total

Lantai 4 (Dak Atas)


Instalasi Pemipaan dg pipa PVC Wavin Aw lengkap dgn
fitting, support dan material bantunya
1 Pipa PVC dia. 4" -
2 Pipa PVC dia. 3" 25.00
3 Pipa PVC dia. 2" 4.00
4 Pipa PVC dia. 4" (vent) 4.00
5 Pipa PVC dia. 3" (vent) 4.00
6 Roof Drain dia. 4" 8.00
7 Fitting - fitting 1.00
8 Accessories & Material bantu (Lem, Support, Klem, Gantungan, dll) 1.00
Sub Total

TOTAL B

C. TESTING & COMMISSIONING 1.00

XIV PEKERJAAN INSTALASI LISTRIK

1. PANEL

1.1 PP/LP-U (POWER/LIGHTING PANEL UTAMA LT. 1)


1 Panel Box Wall Mounted Type, IP 669, Epoxy Powder/Cat 1.00
Bakar, Plate Steel 2mm, Dimensi 600x500x200 mm)
2 MCCB 3P 25A 6kA, ke Kwh 1.00
3 MCCB 3P 20A 6kA, ke PP/LP - LT.1, LT.2, LT.3, LT.4 & Genset 5.00
4 MCB 16A, 1P 240/415V 4,5kA 2.00
5 MCB 10A, 1P 240/415V 4,5kA 5.00
6 MCB 6A, 1P 240/415V 4,5kA 5.00
7 Selector Switch 2.00
8 Indicator Lamp+fuse 3.00
9 Accessories (Busbar Cu 15x2, Shunt Cable, 1.00
Terminasi, Labeling/grouping etc.)
Sub Total

1.2 PP/LP-2 (POWER/LIGHTING PANEL LT. 2)


1 Panel Box Wall Mounted Type, IP 669, Epoxy Powder/Cat 1.00
Bakar, Plate Steel 2mm, Dimensi 500x400x200 mm)
2 MCCB 3P 20A 6kA 1.00
3 MCB 16A, 1P 240/415V 4,5kA 4.00
4 MCB 10A, 1P 240/415V 4,5kA 7.00
5 MCB 6A, 1P 240/415V 4,5kA 7.00
6 Contactor 1.00
7 TIMER SWITCH 24 HOURS QUARTZ 1.00
8 Accessories (Busbar Cu 20x2, Shunt Cable, 1.00
Terminasi, Labeling/grouping etc.)

Sub Total

1.3 PP/LP-3 (POWER/LIGHTING PANEL LT. 3 & LT.4)


1 Panel Box Wall Mounted Type, IP 669, Epoxy Powder/Cat 1.00
Bakar, Plate Steel 2mm, Dimensi 500x400x200 mm)
2 MCCB 3P 20A 6kA 1.00
3 MCB 16A, 1P 240/415V 4,5kA 4.00
4 MCB 10A, 1P 240/415V 4,5kA 8.00
5 MCB 6A, 1P 240/415V 4,5kA 8.00
6 Accessories (Busbar Cu 20x2, Shunt Cable, 1.00
Terminasi, Labeling/grouping etc.)

Sub Total

TOTAL 1

2. KABEL DAYA
Pengadaan & pemasangan Kabel Daya Tegangan Rendah
Stand. IEC-SPLN-SlI, (NYY, NYM,NYMHY Cable Control)
1 Dari Panel Induk ke Kwh Meter PLN
Kabel NYFGBY 4 x 10 mm
2 Dari Meter PLN ke Lt. 1 (Panel Utama & Lt.1) 25.00
Kabel NYY 4 x 10 + BC 16 mm
3 Dari Lt. 1 (Panel Utama) ke Panel Lt. 2 8.00
Kabel NYY 4 x 10 + BC 16 mm
4 Dari Lt. 1 (Panel Utama) ke Panel Lt. 3 17.00
Kabel NYY 4 x 10 + BC 16 mm
5 Dari Lt. 1 (Panel Utama) ke Box Power Otomatis Gerbang -
Kabel NYY 4 x 2,5 mm

TOTAL 2

3. INSTALASI PENERANGAN & DAYA INTERIOR

3.1 DARI PP/LP-1 (Power/Lighting Panel Lt. 1)


1 Lampu Neon -
2 Lampu Downlight 16.00
3 Lampu Step Tangga 4.00
4 Lampu Dinding 1.00
5 Lampu TL Indirect 24.00
6 Instalasi Titik Lampu 29.00
7 Saklar Tunggal 5.00
8 Saklar Tunggal Remote -
9 Saklar Tunggal Timer -
10 Saklar Dobel 1.00
11 Saklar Dobel Timer -
12 Saklar Tunggal Hotel -
13 Saklar Dobel Hotel 1.00
14 Instalasi Saklar Hotel 1.00
15 Stop Kontak 7.00
16 Stop Kontak Lantai -
17 Instalasi Stop Kontak 7.00
18 Instalasi Power AC -
19 Saklar Bell 1.00
20 Bell Dinding 1.00
21 Instalasi Bell Dinding 1.00
Sub Total

3.2 DARI PP/LP-2 (Power/Lighting Panel Lt. 2)


1 Lampu Neon 3.00
2 Lampu Downlight 30.00
3 Lampu Step Tangga 6.00
4 Lampu Dinding 1.00
5 Lampu TL Indirect 32.00
6 Instalasi Titik Lampu 46.00
7 Saklar Tunggal 2.00
8 Saklar Tunggal Remote 9.00
9 Saklar Tunggal Timer 4.00
10 Saklar Dobel 4.00
11 Saklar Dobel Timer -
12 Saklar Tunggal Hotel -
13 Saklar Dobel Hotel 2.00
14 Instalasi Saklar Hotel 2.00
15 Stop Kontak 13.00
16 Stop Kontak Lantai -
17 Instalasi Stop Kontak 13.00
18 Instalasi Power AC 3.00
Sub Total

3.3 DARI PP/LP-2 (Power/Lighting Panel Lt. 3 & Lt. 4)


1 Lampu Neon 2.00
2 Lampu Downlight 40.00
3 Lampu Step Tangga 6.00
4 Lampu Dinding 1.00
5 Lampu TL Indirect 40.00
6 Instalasi Titik Lampu 57.00
7 Saklar Tunggal 4.00
8 Saklar Tunggal Remote
9 Saklar Tunggal Timer
10 Saklar Dobel 10.00
11 Saklar Dobel Timer
12 Saklar Tunggal Hotel
13 Saklar Dobel Hotel 3.00
14 Instalasi Saklar Hotel 3.00
15 Stop Kontak 27.00
16 Stop Kontak Lantai -
17 Instalasi Stop Kontak 27.00
18 Instalasi Power AC 4.00
Sub Total

TOTAL 3

4. INSTALASI PENERANGAN EXTERIOR

4.1 DARI PP/LP-2 (Power/Lighting Panel Lt. 2)


1 Lampu Taman 3.00
2 Instalasi Titik Lampu Taman 3.00
TOTAL 4

5. INSTALASI PENANGKAL PETIR

1 Air Terminal dia.20mm 3.00


2 Support tiang galv. dia.20 mm x 1,5 m 3.00
3 BC 35 mm, dgn pipa conduit (Ega/Clipsal) 45.00
4 Bak Kontrol 1.00
5 Grounding/Tahanan Pentanahan Max. 2 Ohm, Erection & Instalasi 1.00
6 Acessories & material bantu 1.00
(Cat, Resin, Duradus, tap konektor, spid bawah, klem besi, dll)
TOTAL 5

6. GROUNDING ELEKTRIKAL SYSTEM

1 Grounding Elektrikal System dengan pipa galvanize & 1.00


BC 16 mm
TOTAL 6

7. GROUNDING ELEKTRONIK SYSTEM

1 Grounding Elektronik System dengan pipa galvanize & 1.00


BC 16 mm
TOTAL 7

8. TESTING & COMMISSIONING 1.00


TOTAL 8

XV PEKERJAAN ELEKTRONIK
1. TELEPON

1.1 EQUIPMENT
- Digital Super Hibrid Cap. 12 port, 1 PTT/12 Ext (PABX)

1.2 INSTALASI TELEPON

Wirring :
Dari Terminal Box TELKOM ke Box Panel Telepon 1.00
Supreme 2x4x0,6 mm
Box Panel Telepon/Data + LSA 1.00
Outlet dan Instalasi Telepon :
Lantai 1
- Outlet Telepon 1.00
- Instalasi Telepon 1.00
Lantai 2
- Outlet Telepon 2.00
- Instalasi Telepon 2.00
Lantai 3 & 4
- Outlet Telepon 5.00
- Instalasi Telepon 5.00
TOTAL 1
2. INTERNET

2.1 EQUIPMENT

2.2 INSTALASI INTERNET


TOTAL 2

3. INSTALASI TV

3.1 EQUIPMENT & INSTALASI

EQUIPMENT
- Booster Amplifier
- Splizer 6 Way 2.00
- Box Panel TV 1.00

INSTALASI KABEL MATV


- Dari Antena UHF & VHF ke Box Splitzer 1.00
Coaxial 5C-2V dgn pipa conduit
- Dari Antena Parabola/Indovision ke Box Splitzer 1.00
Coaxial 5C-2V dgn pipa conduit
- Dari Antena TV Kabel ke Box Splitzer 1.00
Coaxial 7C-2V dgn pipa conduit
INSTALASI TV
- Lantai 1
- TV Outlet 1.00
- Instalasi Antena TV Lokal & Parabola/Indovision/TV Kabel 1.00
Coaxial Cable C5 2V (Belden RG-6)
- Lantai 2
- TV Outlet 2.00
- Instalasi Antena TV Lokal & Parabola/Indovision/TV Kabel 2.00
Coaxial Cable C5 2V (Belden RG-6)
- Lantai 3
- TV Outlet 1.00
- Instalasi Antena TV Lokal & Parabola/Indovision/TV Kabel 1.00
Coaxial Cable C5 2V (Belden RG-6)
TOTAL 3

4. INSTALASI AUDIO

4.1 EQUIPMENT
4.2 INSTALASI AUDIO
TOTAL 4
5. INSTALASI ALARM

5.1 EQUIPMENT
5.2 INSTALASI ALARM
TOTAL 5

6. TESTING & COMMISSIONING 1.00


TOTAL 6

XVI PEK PENGECATAN

1 Pekerjaan cat dinding dalam + Alkali -


2 Pekerjaan cat dinding luar + Alkali -
3 Pekerjaan cat plafon gypsum 540.00
4 Pekerjaan cat duco pintu besi garasi
- Kusen
- Daun pintu
5 Pekerjaan melamik kusen dan daun pintu
- melamik kusen kayu tanpa archicraft -
- melamik daun pintu kayu -
6 Pekerjaan coating batu alam -
7 Waterproofing dinding samping dan belakang -

XVII PEKERJAAN BESI

1 Railing Tangga Dalam 25.00


2 Railing Tangga Teras Luar 15.00
3 Railing Balkon Luar 35.00
4 Pintu Pagar 12.00
5 Tutup bak torn bawah besi 1.00
6 Grill besi 5.80
Adukan 1.00

XVIII PEKERJAAN LAIN-LAIN

1 Pembersihan akhir 1.00

JUMLAH TOTAL
HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
SAT.
Bahan Upah Bahan Upah

m2
m1
m2
ls
m'
ls
bln
bln
bln

m'
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
m2
m2
m2

m3
m3
m3
m3
m3
m3
m3
m3

m3

m2
m2
m2

m2
m2

m2
m2
m2

m2
m2
m2

m2

m2
m2
m2
m2
m2
m2
m'
m'
m'

m'
m'
m'

m'
m'
m'
m'

m'
m'
m'
m'

m2
ls
ls
ls
m2
bh
bh
bh
bh
bh
m1
m1

m2
m'
m'
m'
m'

m2

m2

m2
m2

m2

m2
m2
m2

m2
m2

m2
m2
m2
m2

m2
m2
m2
m2

m2
m2
m2
m2
m2

m'
m'
m'
m2
m2
m2
m'

m'
m'
m'

m'
m'
m'
m'

m'

m2
m2
m2

m2

m2
m2
m2
m'
m2

m3
m3

m2

m'
m2
m2

m'
bh
bh
set
bh
bh

m3
lbr

bh
psg
bh
m2
lbr

m3
lbr

bh
psg
m2
bh
m2
lbr

m3
lbr

bh
m'
m2
m2
set
m2
lbr

m3
lbr

bh
psg
bh
m2
lbr

m3
lbr

bh
psg
bh
m2
lbr

m3
lbr

bh
m'
m'
m2
m2
lbr
m'
m3
lbr

bh
psg
m2
bh
m2
lbr

m3
lbr

bh
psg
m2
bh
m2
lbr

m3
lbr

bh
psg
m2
bh
m2
lbr

m3

m2
m2

m'
lbr

bh
psg
bh
m2
m'
lbr

bh
m'
m2
set
m'
m'

m'
lbr

bh
psg
bh
m'

m'
lbr
lbr

bh
psg
psg
bh
m2
bh
m'
m'

m'
lbr
lbr

bh
psg
psg
bh
m2
bh
m'
m'
m'
lbr
lbr

bh
psg
set
psg
bh
m2
bh
m'
m'

m'
lbr
lbr

bh
psg
psg
bh
m2
bh
m'
m'

m'
lbr
lbr

bh
psg
set
psg
bh
m2
bh
m'
m'

m'
lbr

psg
bh
m2
m'
m'

m'
lbr

psg
bh
m2
m'
m'

m'
lbr

psg
bh
m2
m'
m'

m'
lbr

psg
bh
m2
m'
m'

m'

m2
m'

m'
lbr

psg
bh
m2
m'
m'
unit

set
set
set
bh
bh

set
set
set
set
set

set
set
bh
bh

set
set
set
set

set
set
set
set
set
bh
bh

bh
bh

Unit
Unit
Unit
Unit
Unit
Unit

Unit

Unit
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
ls
m'

m'

m'

m'
m'

m'
m'
m'
m'

m'
m'
m'
m'
m'

m'
m'
m'
m'
m'

m'
m'
m'
m'
ls
ls

ls
m'
m'

m'
m'

m'
m'

m'
m'
ls
ls

m'
m'
m'
m'
lot
lot

m'
m'
m'
m'
m'
lot
lot

m'
m'
m'
m'
m'
lot
lot

m'
m'
m'
m'
m'
bh
lot
lot

ls

unit

bh
bh
bh
bh
bh
bh
bh
ls

unit

bh
bh
bh
bh
bh
bh
ls

unit

bh
bh
bh
bh
ls

m
m

bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
ttk
ttk
bh
bh
ttk

bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
ttk
ttk

bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
ttk
ttk

bh
ttk

bh
bh
m
ls
ttk
ls

lot

lot

LS

unit

ls

bh

bh
ttk

bh
ttk

bh
ttk
bh
bh
bh

ls

ls

ls

bh
ttk

bh
ttk

bh
ttk
LS

m2
m2
m2

m'
m2

m'
m2
m2
m2

m'
m'
m'
m2
bh
m2
ls

ls
TOTAL HARGA (Rp.)
KETERANGAN
Bahan + Upah
c. CARA MENGHITUNG LUAS DINDING
Proyek : Rumah Tinggal 4 lantai
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016

Dinding Pintu
KD AS Panjang Tinggi Lebar Luas
Type
m m m m/m
LANTAI 1

PBR 10 H - 1 11.80 4.60 29.61 D2B


BV/6
W/6C
PBR 10 H 1 - 2 13.98 4.60 59.79 TOI

89.41

BS Benangan Sudut = 44.02 m'


OP Opening Pintu & Jendela = 44.02 m'
BP12 Balok Praktis/ Latai uk. 12 x 12 = 0.16 m
KP12 Kolom Praktis uk. 12 x 12 cm = m
PBR 10 Pasangan Bata ringan t. 10 cm = 64.74 m
Pintu Dan Jendela Opening Balok
Jumlah Tinggi Lebar Luas latei
unit m m m m' m'
NO

1
1.00 2.15 1.80 3.87 6.10 2.00
1.00 1.58 3.13 4.94 9.41 3.33
1.00 3.63 3.13 11.34 13.51 3.33
3.00 2.15 0.70 4.52 15.00 2.70

9.51 8.75 24.67 44.02 11.35


ITEM TYPE TINGGI
PINTU
D2B Pintu Allumunium type D2B Uk. 2x900x2150 2.15
TOI Pintu Allumunium type TOI Uk. 700 x 2150 2.15
BV/6 Jendela Allmunium Type BV/6 1.58
W/6C Jendela Allmunium Type W/6C 3.63
LEBAR JUMLAH
VOLUME LT-1 LT-2
1.80 3.87 1.00 -
0.70 1.51 3.00 -
3.13 4.94 1.00 -
3.13 11.34 1.00 -
d. CARA MENGHITUNG PEKERJAAN BETON
Proyek : Rumah Tinggal 4 lantai
Lokasi : Jl. Politeknik no xx Bandung
Tahun : 2016
NO URAIAN PEKERJAAN SATUAN

1 PONDASI BORED PILE TYPE XX


- Bored Pile 60 cm m1
- Besi D 19 kg
- Besi spiral 10 kg
- Cor Beton K-250 m3
- Cut off Pile titik
- Buangan Lumpur m3
2 PILE CAP TYPE P-1 1,20x1,20x0,80 - 4 unit
- Besi D 19 kg
- Besi D 16 kg
- Besi D 13 tulangan samping kg
- Begisting Batako m2
- Cor Beton K-300 m3
3 SLOOF TB3 30/50
- Besi D 19 kg
- Besi D 13 kg
- Besi 10 kg
- Begisting Batako m2
- Cor Beton K-300 m3
VOLUME

276.00
6,727.11 2.22 D 19
2,048.99 0.62 10
53.41
21.00
53.41

469.83 2.22 D 19
242.31 1.58 D 16
39.94
15.36
4.61

691.40 2.22 D 19
80.92 1.04 D 13
268.13 0.62 10
38.85
5.83

Anda mungkin juga menyukai