ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHUPURO - VISTA AL

JU

Estudio definitivo
TRAMO I: CHUPURO - VISTA ALEGRE

METRADOS DE TRANSPORTE DE

MATERIAL A ELIMINAR
UBICACIN OBRAS DE ARTE Y DRENAJE
ALCANTAR. Y MUROS
VIA PRINCIPAL MEJORAMI
M3 ENTO M3
ENCAUZ.
INICIO FINAL LONG. C.G.
M3 M3

00+000 01+000 1000 0.50 0.00


01+000 02+000 1000 1.50 0.00
02+000 03+000 1000 2.50 9.53

03+000 04+000 1000 3.50 18,539.29

04+000 05+000 1000 4.50 20,954.35

05+000 06+000 1000 5.50 11,320.64

06+000 07+000 1000 6.50 7,127.23

07+000 08+000 1000 7.50 2,508.83

08+000 09+000 1000 8.50 5,755.83

09+000 10+000 1000 9.50 2,693.00

10+000 11+000 1000 10.50 12,172.79

11+000 12+000 1000 11.50 11,396.83

12+000 13+000 1000 12.50 9,164.29

13+000 14+000 1000 13.50 10,084.27

14+000 15+000 1000 14.50 13,787.46

15+000 16+000 1000 15.50 6,021.36

16+000 17+000 1000 16.50 4,562.40

17+000 18+000 1000 17.50 6,153.72

18+000 19+000 1000 18.50 8,183.34

19+000 20+000 1000 19.50 5,422.41

20+000 21+000 1000 20.50 2,333.70

21+000 22+000 1000 21.50 3,633.75


22+000 23+000 1000 22.50 4,511.00

23+000 24+000 1000 23.50 997.90


24+000 25+000 1000 24.50 6,764.90
25+000 26+000 1000 25.50 4,760.69

26+000 27+000 1000 26.50 2,832.37

27+000 28+000 1000 27.50 8,387.30

28+000 29+000 1000 28.50 12,412.67

29+000 30+000 1000 29.50 2,383.65

30+000 31+000 1000 30.50 8,211.27

31+000 32+000 1000 31.50 10,016.98

32+000 33+000 1000 32.50 10,396.44

33+000 34+000 1000 33.50 7,547.96

34+000 35+039 1039 34.52 231.60

241,279.67 0.00 0.00 0.00

VOLUMEN TRANSPORTE DE
A MATERIAL EXCEDENTE
BOTADERO
ELIMINAR
(m3) D <= 1 KM D > 1 KM
BOTADERO 07+640 78,597.81 75,532.02 146,071.00
BOTADERO 16+820 84,570.78 84,570.78 317,024.80
BOTADERO 20+800 21,758.71 21,758.71 69,020.60
BOTADERO 21+860 17,687.48 17,687.48 33,632.10
BOTADERO 23+530 3,033.81 3,033.81 5,915.90
BOTADERO 27+700 57,590.74 43,477.46 78,412.10
BOTADERO 34+260 50,424.25 50,345.82 96,008.10
TOTAL 313,663.57 296,406.07 746,084.60
A CHUPURO - VISTA ALEGRE - CHICCHE - CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HUANCAYO - DE
JUNN - PRIMERA ETAPA

ANSPORTE DE MATERIAL EXCEDENTE DE CORTE A DME

NAR BOTADERO 07+

DE ARTE Y DRENAJE UBICACIN (KM)


SUB ZANJAS DE FACTOR TOTAL ACCESO (KM)
CORONACIO ESPONJ.
DRENAJE N DIST.
Libre Km Dist. Val %
M3 M3 30% TRANSP.

1.30 0.00 7.18 0.120 7.06 100%


1.30 0.00 6.18 0.120 6.06 100%
1.30 12.39 5.18 0.120 5.06 100%

1.30 24101.08 4.18 0.120 4.06 100%

1.30 27240.65 3.18 0.120 3.06 100%

1.30 14716.83 2.18 0.120 2.06 100%

1.30 9265.39 1.18 0.120 1.06 100%

1.30 3261.48 0.18 0.120 0.06 100%

1.30 7482.57 0.90 0.120 0.78 0%

1.30 3500.89 1.90 0.120 1.78 0%

1.30 15824.62 2.90 0.120 2.78 0%

1.30 14815.88 3.90 0.120 3.78 0%

1.30 11913.58 4.90 0.120 4.78 0%

1.30 13109.54 5.90 0.120 5.78 0%

1.30 17923.69 6.90 0.120 6.78 0%

1.30 7827.77 7.90 0.120 7.78 0%

1.30 5931.11 8.90 0.120 8.78 0%

1.30 7999.83 9.90 0.120 9.78 0%

1.30 10638.34 10.90 0.120 10.78 0%

1.30 7049.13 11.90 0.120 11.78 0%

1.30 3033.81 12.90 0.120 12.78 0%

1.30 4723.87 13.90 0.120 13.78 0%


1.30 5864.30 14.90 0.120 14.78 0%

1.30 1297.27 15.90 0.120 15.78 0%


1.30 8794.36 16.90 0.120 16.78 0%
1.30 6188.89 17.90 0.120 17.78 0%

1.30 3682.08 18.90 0.120 18.78 0%

1.30 10903.49 19.90 0.120 19.78 0%

1.30 16136.47 20.90 0.120 20.78 0%

1.30 3098.74 21.90 0.120 21.78 0%

1.30 10674.65 22.90 0.120 22.78 0%

1.30 13022.07 23.90 0.120 23.78 0%

1.30 13515.37 24.90 0.120 24.78 0%

1.30 9812.34 25.90 0.120 25.78 0%

1.30 301.07 26.92 0.120 26.80 0%

0.00 0.00 313,663.57

DISTANCIA
MEDIA

KM
2.82
4.75
4.17
2.90
2.95
2.12
2.90
3.32
UANCAYO - DEPARTAMENTO

GOBIERNO REGIONAL DE JUNIN

MET

TADERO 07+640

7.64
TRANSPORTE DE
0.040 MATERIAL
EXCEDENTE
MATERIAL
MOMENTO
M3-KM
ELIMINAR D <= 1 KM D > 1 KM

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
12.39 62.69 12.39 50.30

24101.08 97850.37 24101.08 73749.30

27240.65 83356.38 27240.65 56115.70

14716.83 30316.66 14716.83 15599.80

9265.39 9821.32 9265.39 555.90

3261.48 195.69 195.69 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

78,597.81 221,603.11 75,532.02 146,071.00


ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHU

Estudio definitivo
TRAMO I: CHUPURO - VISTA ALEGRE

METRADOS DE TRANSPORTE DE M

BOTADERO 16+820

UBICACIN (KM) 16.82 UB


TRANSPORTE DE
ACCESO (KM) 0.100 MATERIAL A
EXCEDENTE
MATERIAL DIST.
DIST. Dist. Val. MOMENTO
Libre Km % TRANSP
TRANSP. KM M3-KM
ELIMINAR D <= 1 KM D > 1 KM .

16.42 0.12 16.30 0% 0.00 0.00 0.00 0.00 20.30


15.42 0.12 15.30 0% 0.00 0.00 0.00 0.00 19.30
14.42 0.12 14.30 0% 0.00 0.00 0.00 0.00 18.30

13.42 0.12 13.30 0% 0.00 0.00 0.00 0.00 17.30

12.42 0.12 12.30 0% 0.00 0.00 0.00 0.00 16.30

11.42 0.12 11.30 0% 0.00 0.00 0.00 0.00 15.30

10.42 0.12 10.30 0% 0.00 0.00 0.00 0.00 14.30

9.42 0.12 9.30 0% 0.00 0.00 0.00 0.00 13.30

8.42 0.12 8.30 100% 7482.57 62105.35 7482.57 54622.80 12.30

7.42 0.12 7.30 100% 3500.89 25556.52 3500.89 22055.60 11.30

6.42 0.12 6.30 100% 15824.62 99695.11 15824.62 83870.50 10.30

5.42 0.12 5.30 100% 14815.88 78524.16 14815.88 63708.30 9.30

4.42 0.12 4.30 100% 11913.58 51228.38 11913.58 39314.80 8.30

3.42 0.12 3.30 100% 13109.54 43261.50 13109.54 30152.00 7.30

2.42 0.12 2.30 100% 17923.69 41224.49 17923.69 23300.80 6.30

1.42 0.12 1.30 0% 0.00 0.00 0.00 0.00 5.30

0.42 0.12 0.30 0% 0.00 0.00 0.00 0.00 4.30

0.78 0.12 0.66 0% 0.00 0.00 0.00 0.00 3.30

1.78 0.12 1.66 0% 0.00 0.00 0.00 0.00 2.30

2.78 0.12 2.66 0% 0.00 0.00 0.00 0.00 1.30

3.78 0.12 3.66 0% 0.00 0.00 0.00 0.00 0.30

4.78 0.12 4.66 0% 0.00 0.00 0.00 0.00 0.70


5.78 0.12 5.66 0% 0.00 0.00 0.00 0.00 1.70

6.78 0.12 6.66 0% 0.00 0.00 0.00 0.00 2.70


7.78 0.12 7.66 0% 0.00 0.00 0.00 0.00 3.70
8.78 0.12 8.66 0% 0.00 0.00 0.00 0.00 4.70

9.78 0.12 9.66 0% 0.00 0.00 0.00 0.00 5.70

10.78 0.12 10.66 0% 0.00 0.00 0.00 0.00 6.70

11.78 0.12 11.66 0% 0.00 0.00 0.00 0.00 7.70

12.78 0.12 12.66 0% 0.00 0.00 0.00 0.00 8.70

13.78 0.12 13.66 0% 0.00 0.00 0.00 0.00 9.70

14.78 0.12 14.66 0% 0.00 0.00 0.00 0.00 10.70

15.78 0.12 15.66 0% 0.00 0.00 0.00 0.00 11.70

16.78 0.12 16.66 0% 0.00 0.00 0.00 0.00 12.70

17.80 0.12 17.68 0% 0.00 0.00 0.00 0.00 13.72

84,570.78 401,595.51 84,570.78 317,024.80


A CARRETERA CHUPURO - VISTA ALEGRE - CHICCHE - CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HU
JUNN - PRIMERA ETAPA

PORTE DE MATERIAL EXCEDENTE DE CORTE A DME

BOTADERO 20+800

UBICACIN (KM) 20.80 UBICACIN (


TRANSPORTE DE
ACCESO (KM) 0.000 MATERIAL ACCESO (K
EXCEDENTE
MATERIAL
Libre Dist. Val MOMENTO DIST.
% Libre Km
Km Km M3-KM TRANSP.
ELIMINAR D <= 1 KM D > 1 KM

0.12 20.18 0% 0.00 0.00 0.00 0.00 21.42 0.12


0.12 19.18 0% 0.00 0.00 0.00 0.00 20.42 0.12
0.12 18.18 0% 0.00 0.00 0.00 0.00 19.42 0.12

0.12 17.18 0% 0.00 0.00 0.00 0.00 18.42 0.12

0.12 16.18 0% 0.00 0.00 0.00 0.00 17.42 0.12

0.12 15.18 0% 0.00 0.00 0.00 0.00 16.42 0.12

0.12 14.18 0% 0.00 0.00 0.00 0.00 15.42 0.12

0.12 13.18 0% 0.00 0.00 0.00 0.00 14.42 0.12

0.12 12.18 0% 0.00 0.00 0.00 0.00 13.42 0.12

0.12 11.18 0% 0.00 0.00 0.00 0.00 12.42 0.12

0.12 10.18 0% 0.00 0.00 0.00 0.00 11.42 0.12

0.12 9.18 0% 0.00 0.00 0.00 0.00 10.42 0.12

0.12 8.18 0% 0.00 0.00 0.00 0.00 9.42 0.12

0.12 7.18 0% 0.00 0.00 0.00 0.00 8.42 0.12

0.12 6.18 0% 0.00 0.00 0.00 0.00 7.42 0.12

0.12 5.18 100% 7827.77 40547.84 7827.77 32720.10 6.42 0.12

0.12 4.18 100% 5931.11 24792.05 5931.11 18860.90 5.42 0.12

0.12 3.18 100% 7999.83 25439.46 7999.83 17439.60 4.42 0.12

0.12 2.18 0% 0.00 0.00 0.00 0.00 3.42 0.12

0.12 1.18 0% 0.00 0.00 0.00 0.00 2.42 0.12

0.12 0.18 0% 0.00 0.00 0.00 0.00 1.42 0.12

0.12 0.58 0% 0.00 0.00 0.00 0.00 0.42 0.12


0.12 1.58 0% 0.00 0.00 0.00 0.00 0.70 0.12

0.12 2.58 0% 0.00 0.00 0.00 0.00 1.70 0.12


0.12 3.58 0% 0.00 0.00 0.00 0.00 2.70 0.12
0.12 4.58 0% 0.00 0.00 0.00 0.00 3.70 0.12

0.12 5.58 0% 0.00 0.00 0.00 0.00 4.70 0.12

0.12 6.58 0% 0.00 0.00 0.00 0.00 5.70 0.12

0.12 7.58 0% 0.00 0.00 0.00 0.00 6.70 0.12

0.12 8.58 0% 0.00 0.00 0.00 0.00 7.70 0.12

0.12 9.58 0% 0.00 0.00 0.00 0.00 8.70 0.12

0.12 10.58 0% 0.00 0.00 0.00 0.00 9.70 0.12

0.12 11.58 0% 0.00 0.00 0.00 0.00 10.70 0.12

0.12 12.58 0% 0.00 0.00 0.00 0.00 11.70 0.12

0.12 13.60 0% 0.00 0.00 0.00 0.00 12.72 0.12

21,758.71 90,779.35 21,758.71 69,020.60


PROVINCIA DE HUANCAYO - DEPARTAMENTO

GOBIERNO REGIONAL DE JUNIN

BOTADERO 21+860

UBICACIN (KM) 21.86


TRANSPORTE DE
ACCESO (KM) 0.060 MATERIAL
EXCEDENTE
MATERIAL
Dist. MOMENTO
%
Valor. Km M3-KM
ELIMINAR D <= 1 KM D > 1 KM

21.30 0% 0.00 0.00 0.00 0.00


20.30 0% 0.00 0.00 0.00 0.00
19.30 0% 0.00 0.00 0.00 0.00

18.30 0% 0.00 0.00 0.00 0.00

17.30 0% 0.00 0.00 0.00 0.00

16.30 0% 0.00 0.00 0.00 0.00

15.30 0% 0.00 0.00 0.00 0.00

14.30 0% 0.00 0.00 0.00 0.00

13.30 0% 0.00 0.00 0.00 0.00

12.30 0% 0.00 0.00 0.00 0.00

11.30 0% 0.00 0.00 0.00 0.00

10.30 0% 0.00 0.00 0.00 0.00

9.30 0% 0.00 0.00 0.00 0.00

8.30 0% 0.00 0.00 0.00 0.00

7.30 0% 0.00 0.00 0.00 0.00

6.30 0% 0.00 0.00 0.00 0.00

5.30 0% 0.00 0.00 0.00 0.00

4.30 0% 0.00 0.00 0.00 0.00

3.30 100% 10638.34 35106.53 10638.34 24468.20

2.30 100% 7049.13 16213.01 7049.13 9163.90

1.30 0% 0.00 0.00 0.00 0.00

0.30 0% 0.00 0.00 0.00 0.00


0.58 0% 0.00 0.00 0.00 0.00

1.58 0% 0.00 0.00 0.00 0.00


2.58 0% 0.00 0.00 0.00 0.00
3.58 0% 0.00 0.00 0.00 0.00

4.58 0% 0.00 0.00 0.00 0.00

5.58 0% 0.00 0.00 0.00 0.00

6.58 0% 0.00 0.00 0.00 0.00

7.58 0% 0.00 0.00 0.00 0.00

8.58 0% 0.00 0.00 0.00 0.00

9.58 0% 0.00 0.00 0.00 0.00

10.58 0% 0.00 0.00 0.00 0.00

11.58 0% 0.00 0.00 0.00 0.00

12.60 0% 0.00 0.00 0.00 0.00

17,687.48 51,319.53 17,687.48 33,632.10


ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHUPU

Estudio definitivo
TRAMO I: CHUPURO - VISTA ALEGRE

METRADOS DE TRANSPORTE DE

BOTADERO 23+530

UBICACIN (KM) 23.53 UBICAC


TRANSPORTE DE
ACCESO (KM) 0.040 MATERIAL ACCES
EXCEDENTE
MATERIAL
DIST. Dist. MOMENTO DIST.
Libre Km % Libre Km
TRANSP. Val .KM M3-KM TRANSP.
ELIMINAR D <= 1 KM D > 1 KM

23.07 0.12 22.95 0% 0.00 0.00 0.00 0.00 27.24 0.12


22.07 0.12 21.95 0% 0.00 0.00 0.00 0.00 26.24 0.12
21.07 0.12 20.95 0% 0.00 0.00 0.00 0.00 25.24 0.12

20.07 0.12 19.95 0% 0.00 0.00 0.00 0.00 24.24 0.12

19.07 0.12 18.95 0% 0.00 0.00 0.00 0.00 23.24 0.12

18.07 0.12 17.95 0% 0.00 0.00 0.00 0.00 22.24 0.12

17.07 0.12 16.95 0% 0.00 0.00 0.00 0.00 21.24 0.12

16.07 0.12 15.95 0% 0.00 0.00 0.00 0.00 20.24 0.12

15.07 0.12 14.95 0% 0.00 0.00 0.00 0.00 19.24 0.12

14.07 0.12 13.95 0% 0.00 0.00 0.00 0.00 18.24 0.12

13.07 0.12 12.95 0% 0.00 0.00 0.00 0.00 17.24 0.12

12.07 0.12 11.95 0% 0.00 0.00 0.00 0.00 16.24 0.12

11.07 0.12 10.95 0% 0.00 0.00 0.00 0.00 15.24 0.12

10.07 0.12 9.95 0% 0.00 0.00 0.00 0.00 14.24 0.12

9.07 0.12 8.95 0% 0.00 0.00 0.00 0.00 13.24 0.12

8.07 0.12 7.95 0% 0.00 0.00 0.00 0.00 12.24 0.12

7.07 0.12 6.95 0% 0.00 0.00 0.00 0.00 11.24 0.12

6.07 0.12 5.95 0% 0.00 0.00 0.00 0.00 10.24 0.12

5.07 0.12 4.95 0% 0.00 0.00 0.00 0.00 9.24 0.12

4.07 0.12 3.95 0% 0.00 0.00 0.00 0.00 8.24 0.12

3.07 0.12 2.95 100% 3033.81 8949.74 3033.81 5915.90 7.24 0.12

2.07 0.12 1.95 0% 0.00 0.00 0.00 0.00 6.24 0.12


1.07 0.12 0.95 0% 0.00 0.00 0.00 0.00 5.24 0.12

0.07 0.12 0.00 0% 0.00 0.00 0.00 0.00 4.24 0.12


1.01 0.12 0.89 0% 0.00 0.00 0.00 0.00 3.24 0.12
2.01 0.12 1.89 0% 0.00 0.00 0.00 0.00 2.24 0.12

3.01 0.12 2.89 0% 0.00 0.00 0.00 0.00 1.24 0.12

4.01 0.12 3.89 0% 0.00 0.00 0.00 0.00 0.24 0.12

5.01 0.12 4.89 0% 0.00 0.00 0.00 0.00 0.84 0.12

6.01 0.12 5.89 0% 0.00 0.00 0.00 0.00 1.84 0.12

7.01 0.12 6.89 0% 0.00 0.00 0.00 0.00 2.84 0.12

8.01 0.12 7.89 0% 0.00 0.00 0.00 0.00 3.84 0.12

9.01 0.12 8.89 0% 0.00 0.00 0.00 0.00 4.84 0.12

10.01 0.12 9.89 0% 0.00 0.00 0.00 0.00 5.84 0.12

11.03 0.12 10.91 0% 0.00 0.00 0.00 0.00 6.86 0.12

3,033.81 8,949.74 3,033.81 5,915.90


TERA CHUPURO - VISTA ALEGRE - CHICCHE - CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HUANCAYO
PRIMERA ETAPA

ORTE DE MATERIAL EXCEDENTE DE CORTE A DME

BOTADERO 27+700

UBICACIN (KM) 27.70 UBICACIN (KM)


TRANSPORTE DE
ACCESO (KM) 0.040 MATERIAL ACCESO (KM)
EXCEDENTE
MATERIAL
Dist. Val . MOMENTO DIST.
% Libre KM
Km M3-KM TRANSP.
ELIMINAR D <= 1 KM D > 1 KM

27.12 0% 0.00 0.00 0.00 0.00 34.36 0.12


26.12 0% 0.00 0.00 0.00 0.00 33.36 0.12
25.12 0% 0.00 0.00 0.00 0.00 32.36 0.12

24.12 0% 0.00 0.00 0.00 0.00 31.36 0.12

23.12 0% 0.00 0.00 0.00 0.00 30.36 0.12

22.12 0% 0.00 0.00 0.00 0.00 29.36 0.12

21.12 0% 0.00 0.00 0.00 0.00 28.36 0.12

20.12 0% 0.00 0.00 0.00 0.00 27.36 0.12

19.12 0% 0.00 0.00 0.00 0.00 26.36 0.12

18.12 0% 0.00 0.00 0.00 0.00 25.36 0.12

17.12 0% 0.00 0.00 0.00 0.00 24.36 0.12

16.12 0% 0.00 0.00 0.00 0.00 23.36 0.12

15.12 0% 0.00 0.00 0.00 0.00 22.36 0.12

14.12 0% 0.00 0.00 0.00 0.00 21.36 0.12

13.12 0% 0.00 0.00 0.00 0.00 20.36 0.12

12.12 0% 0.00 0.00 0.00 0.00 19.36 0.12

11.12 0% 0.00 0.00 0.00 0.00 18.36 0.12

10.12 0% 0.00 0.00 0.00 0.00 17.36 0.12

9.12 0% 0.00 0.00 0.00 0.00 16.36 0.12

8.12 0% 0.00 0.00 0.00 0.00 15.36 0.12

7.12 0% 0.00 0.00 0.00 0.00 14.36 0.12

6.12 100% 4723.87 28910.08 4723.87 24186.20 13.36 0.12


5.12 100% 5864.30 30025.22 5864.30 24160.90 12.36 0.12

4.12 100% 1297.27 5344.77 1297.27 4047.50 11.36 0.12


3.12 100% 8794.36 27438.41 8794.36 18644.10 10.36 0.12
2.12 100% 6188.89 13120.45 6188.89 6931.60 9.36 0.12

1.12 100% 3682.08 4123.93 3682.08 441.80 8.36 0.12

0.12 100% 10903.49 1308.42 1308.42 0.00 7.36 0.12

0.72 100% 16136.47 11618.26 11618.26 0.00 6.36 0.12

1.72 0% 0.00 0.00 0.00 0.00 5.36 0.12

2.72 0% 0.00 0.00 0.00 0.00 4.36 0.12

3.72 0% 0.00 0.00 0.00 0.00 3.36 0.12

4.72 0% 0.00 0.00 0.00 0.00 2.36 0.12

5.72 0% 0.00 0.00 0.00 0.00 1.36 0.12

6.74 0% 0.00 0.00 0.00 0.00 0.86 0.12

57,590.74 121,889.53 43,477.46 78,412.10


CIA DE HUANCAYO - DEPARTAMENTO JUNN -

GOBIERNO REGIONAL DE JUNIN

BOTADERO 34+260

UBICACIN (KM) 34.26


TRANSPORTE DE
ACCESO (KM) 0.600 MATERIAL
EXCEDENTE
MATERIAL
MOMENTO
DIST. VAL .KM %
M3-KM
ELIMINAR D <= 1 KM D > 1 KM

34.24 0% 0.00 0.00 0.00 0.00


33.24 0% 0.00 0.00 0.00 0.00
32.24 0% 0.00 0.00 0.00 0.00

31.24 0% 0.00 0.00 0.00 0.00

30.24 0% 0.00 0.00 0.00 0.00

29.24 0% 0.00 0.00 0.00 0.00

28.24 0% 0.00 0.00 0.00 0.00

27.24 0% 0.00 0.00 0.00 0.00

26.24 0% 0.00 0.00 0.00 0.00

25.24 0% 0.00 0.00 0.00 0.00

24.24 0% 0.00 0.00 0.00 0.00

23.24 0% 0.00 0.00 0.00 0.00

22.24 0% 0.00 0.00 0.00 0.00

21.24 0% 0.00 0.00 0.00 0.00

20.24 0% 0.00 0.00 0.00 0.00

19.24 0% 0.00 0.00 0.00 0.00

18.24 0% 0.00 0.00 0.00 0.00

17.24 0% 0.00 0.00 0.00 0.00

16.24 0% 0.00 0.00 0.00 0.00

15.24 0% 0.00 0.00 0.00 0.00

14.24 0% 0.00 0.00 0.00 0.00

13.24 0% 0.00 0.00 0.00 0.00


12.24 0% 0.00 0.00 0.00 0.00

11.24 0% 0.00 0.00 0.00 0.00


10.24 0% 0.00 0.00 0.00 0.00
9.24 0% 0.00 0.00 0.00 0.00

8.24 0% 0.00 0.00 0.00 0.00

7.24 0% 0.00 0.00 0.00 0.00

6.24 0% 0.00 0.00 0.00 0.00

5.24 100% 3098.74 16237.39 3098.74 13138.70

4.24 100% 10674.65 45260.52 10674.65 34585.90

3.24 100% 13022.07 42191.52 13022.07 29169.40

2.24 100% 13515.37 30274.43 13515.37 16759.10

1.24 100% 9812.34 12167.30 9812.34 2355.00

0.74 100% 301.07 222.64 222.64 0.00

50,424.25 146,353.81 50,345.82 96,008.10


ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHUPURO - VISTA AL
JU

Estudio definitivo
TRAMO I: CHUPURO - VISTA ALEGRE

METRADOS DE TRANSPORTE DE

MATERIAL A ELIMINAR
UBICACIN OBRAS DE ARTE Y DRENAJE
ALCANTAR. Y MUROS
VIA PRINCIPAL MEJORAMI
M3 ENTO M3
ENCAUZ.
INICIO FINAL LONG. C.G.
M3 M3

00+000 01+000 1000 0.50 0.00


01+000 02+000 1000 1.50 0.00
02+000 03+000 1000 2.50 9.53

03+000 04+000 1000 3.50 18,539.29

04+000 05+000 1000 4.50 20,954.35

05+000 06+000 1000 5.50 11,320.64

06+000 07+000 1000 6.50 7,127.23

07+000 08+000 1000 7.50 2,508.83

08+000 09+000 1000 8.50 5,755.83

09+000 10+000 1000 9.50 2,693.00

10+000 11+000 1000 10.50 12,172.79

11+000 12+000 1000 11.50 11,396.83

12+000 13+000 1000 12.50 9,164.29

13+000 14+000 1000 13.50 10,084.27

14+000 15+000 1000 14.50 13,787.46

15+000 16+000 1000 15.50 6,021.36

16+000 17+000 1000 16.50 4,562.40

17+000 18+000 1000 17.50 6,153.72

18+000 19+000 1000 18.50 8,183.34

19+000 20+000 1000 19.50 5,422.41

20+000 21+000 1000 20.50 2,333.70

21+000 22+000 1000 21.50 3,633.75


22+000 23+000 1000 22.50 4,511.00

23+000 24+000 1000 23.50 997.90


24+000 25+000 1000 24.50 6,764.90
25+000 26+000 1000 25.50 4,760.69

26+000 27+000 1000 26.50 2,832.37

27+000 28+000 1000 27.50 8,387.30

28+000 29+000 1000 28.50 12,412.67

29+000 30+000 1000 29.50 2,383.65

30+000 31+000 1000 30.50 8,211.27

31+000 32+000 1000 31.50 10,016.98

32+000 33+000 1000 32.50 10,396.44

33+000 34+000 1000 33.50 7,547.96

34+000 35+039 1039 34.52 231.60

241,279.67 0.00 0.00 0.00

VOLUMEN TRANSPORTE DE
A MATERIAL EXCEDENTE
BOTADERO
ELIMINAR
(m3) D <= 1 KM D > 1 KM
BOTADERO 07+640 87,830.83 83,118.87 147,436.30
BOTADERO 16+820 93,096.56 87,584.81 253,722.50
BOTADERO 20+800 24,721.20 22,233.48 22,541.80
BOTADERO 21+860 7,656.02 3,117.81 0.00
BOTADERO 23+530 19,212.68 16,801.42 5,508.10
BOTADERO 27+700 30,722.04 16,608.76 441.80
BOTADERO 34+260 50,424.25 50,345.82 96,008.10
TOTAL 313,663.57 279,810.96 525,658.60
A CHUPURO - VISTA ALEGRE - CHICCHE - CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HUANCAYO - DE
JUNN - PRIMERA ETAPA

ANSPORTE DE MATERIAL EXCEDENTE DE CORTE A DME

NAR BOTADERO 07+

DE ARTE Y DRENAJE UBICACIN (KM)


SUB ZANJAS DE FACTOR TOTAL ACCESO (KM)
CORONACIO ESPONJ.
DRENAJE N DIST.
Libre Km Dist. Val %
M3 M3 30% TRANSP.

1.30 0.00 7.18 0.120 7.06 100%


1.30 0.00 6.18 0.120 6.06 100%
1.30 12.39 5.18 0.120 5.06 100%

1.30 24101.08 4.18 0.120 4.06 100%

1.30 27240.65 3.18 0.120 3.06 100%

1.30 14716.83 2.18 0.120 2.06 100%

1.30 9265.39 1.18 0.120 1.06 100%

1.30 3261.48 0.18 0.120 0.06 100%

1.30 7482.57 0.90 0.120 0.78 100%

1.30 3500.89 1.90 0.120 1.78 50%

1.30 15824.62 2.90 0.120 2.78 0%

1.30 14815.88 3.90 0.120 3.78 0%

1.30 11913.58 4.90 0.120 4.78 0%

1.30 13109.54 5.90 0.120 5.78 0%

1.30 17923.69 6.90 0.120 6.78 0%

1.30 7827.77 7.90 0.120 7.78 0%

1.30 5931.11 8.90 0.120 8.78 0%

1.30 7999.83 9.90 0.120 9.78 0%

1.30 10638.34 10.90 0.120 10.78 0%

1.30 7049.13 11.90 0.120 11.78 0%

1.30 3033.81 12.90 0.120 12.78 0%

1.30 4723.87 13.90 0.120 13.78 0%


1.30 5864.30 14.90 0.120 14.78 0%

1.30 1297.27 15.90 0.120 15.78 0%


1.30 8794.36 16.90 0.120 16.78 0%
1.30 6188.89 17.90 0.120 17.78 0%

1.30 3682.08 18.90 0.120 18.78 0%

1.30 10903.49 19.90 0.120 19.78 0%

1.30 16136.47 20.90 0.120 20.78 0%

1.30 3098.74 21.90 0.120 21.78 0%

1.30 10674.65 22.90 0.120 22.78 0%

1.30 13022.07 23.90 0.120 23.78 0%

1.30 13515.37 24.90 0.120 24.78 0%

1.30 9812.34 25.90 0.120 25.78 0%

1.30 301.07 26.92 0.120 26.80 0%

0.00 0.00 313,663.57

DISTANCIA
MEDIA

KM
2.62
3.67
1.81
0.41
1.16
0.55
2.90
2.57
UANCAYO - DEPARTAMENTO

GOBIERNO REGIONAL DE JUNIN

MET

TADERO 07+640

7.64
TRANSPORTE DE
0.040 MATERIAL
EXCEDENTE
MATERIAL
MOMENTO
M3-KM
ELIMINAR D <= 1 KM D > 1 KM

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
12.39 62.69 12.39 50.30

24101.08 97850.37 24101.08 73749.30

27240.65 83356.38 27240.65 56115.70

14716.83 30316.66 14716.83 15599.80

9265.39 9821.32 9265.39 555.90

3261.48 195.69 195.69 0.00

7482.57 5836.41 5836.41 0.00

1750.45 3115.80 1750.45 1365.30

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

87,830.83 230,555.31 83,118.87 147,436.30


ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHU

Estudio definitivo
TRAMO I: CHUPURO - VISTA ALEGRE

METRADOS DE TRANSPORTE DE M

BOTADERO 16+820

UBICACIN (KM) 16.82 UB


TRANSPORTE DE
ACCESO (KM) 0.100 MATERIAL A
EXCEDENTE
MATERIAL DIST.
DIST. Dist. Val. MOMENTO
Libre Km % TRANSP
TRANSP. KM M3-KM
ELIMINAR D <= 1 KM D > 1 KM .

16.42 0.12 16.30 0% 0.00 0.00 0.00 0.00 20.30


15.42 0.12 15.30 0% 0.00 0.00 0.00 0.00 19.30
14.42 0.12 14.30 0% 0.00 0.00 0.00 0.00 18.30

13.42 0.12 13.30 0% 0.00 0.00 0.00 0.00 17.30

12.42 0.12 12.30 0% 0.00 0.00 0.00 0.00 16.30

11.42 0.12 11.30 0% 0.00 0.00 0.00 0.00 15.30

10.42 0.12 10.30 0% 0.00 0.00 0.00 0.00 14.30

9.42 0.12 9.30 0% 0.00 0.00 0.00 0.00 13.30

8.42 0.12 8.30 0% 0.00 0.00 0.00 0.00 12.30

7.42 0.12 7.30 50% 1750.45 12778.26 1750.45 11027.80 11.30

6.42 0.12 6.30 100% 15824.62 99695.11 15824.62 83870.50 10.30

5.42 0.12 5.30 100% 14815.88 78524.16 14815.88 63708.30 9.30

4.42 0.12 4.30 100% 11913.58 51228.38 11913.58 39314.80 8.30

3.42 0.12 3.30 100% 13109.54 43261.50 13109.54 30152.00 7.30

2.42 0.12 2.30 100% 17923.69 41224.49 17923.69 23300.80 6.30

1.42 0.12 1.30 100% 7827.77 10176.10 7827.77 2348.30 5.30

0.42 0.12 0.30 100% 5931.11 1779.33 1779.33 0.00 4.30

0.78 0.12 0.66 50% 3999.91 2639.94 2639.94 0.00 3.30

1.78 0.12 1.66 0% 0.00 0.00 0.00 0.00 2.30

2.78 0.12 2.66 0% 0.00 0.00 0.00 0.00 1.30

3.78 0.12 3.66 0% 0.00 0.00 0.00 0.00 0.30

4.78 0.12 4.66 0% 0.00 0.00 0.00 0.00 0.70


5.78 0.12 5.66 0% 0.00 0.00 0.00 0.00 1.70

6.78 0.12 6.66 0% 0.00 0.00 0.00 0.00 2.70


7.78 0.12 7.66 0% 0.00 0.00 0.00 0.00 3.70
8.78 0.12 8.66 0% 0.00 0.00 0.00 0.00 4.70

9.78 0.12 9.66 0% 0.00 0.00 0.00 0.00 5.70

10.78 0.12 10.66 0% 0.00 0.00 0.00 0.00 6.70

11.78 0.12 11.66 0% 0.00 0.00 0.00 0.00 7.70

12.78 0.12 12.66 0% 0.00 0.00 0.00 0.00 8.70

13.78 0.12 13.66 0% 0.00 0.00 0.00 0.00 9.70

14.78 0.12 14.66 0% 0.00 0.00 0.00 0.00 10.70

15.78 0.12 15.66 0% 0.00 0.00 0.00 0.00 11.70

16.78 0.12 16.66 0% 0.00 0.00 0.00 0.00 12.70

17.80 0.12 17.68 0% 0.00 0.00 0.00 0.00 13.72

93,096.56 341,307.27 87,584.81 253,722.50


A CARRETERA CHUPURO - VISTA ALEGRE - CHICCHE - CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HU
JUNN - PRIMERA ETAPA

PORTE DE MATERIAL EXCEDENTE DE CORTE A DME

BOTADERO 20+800

UBICACIN (KM) 20.80 UBICACIN (


TRANSPORTE DE
ACCESO (KM) 0.000 MATERIAL ACCESO (K
EXCEDENTE
MATERIAL
Libre Dist. Val MOMENTO DIST.
% Libre Km
Km Km M3-KM TRANSP.
ELIMINAR D <= 1 KM D > 1 KM

0.12 20.18 0% 0.00 0.00 0.00 0.00 21.42 0.12


0.12 19.18 0% 0.00 0.00 0.00 0.00 20.42 0.12
0.12 18.18 0% 0.00 0.00 0.00 0.00 19.42 0.12

0.12 17.18 0% 0.00 0.00 0.00 0.00 18.42 0.12

0.12 16.18 0% 0.00 0.00 0.00 0.00 17.42 0.12

0.12 15.18 0% 0.00 0.00 0.00 0.00 16.42 0.12

0.12 14.18 0% 0.00 0.00 0.00 0.00 15.42 0.12

0.12 13.18 0% 0.00 0.00 0.00 0.00 14.42 0.12

0.12 12.18 0% 0.00 0.00 0.00 0.00 13.42 0.12

0.12 11.18 0% 0.00 0.00 0.00 0.00 12.42 0.12

0.12 10.18 0% 0.00 0.00 0.00 0.00 11.42 0.12

0.12 9.18 0% 0.00 0.00 0.00 0.00 10.42 0.12

0.12 8.18 0% 0.00 0.00 0.00 0.00 9.42 0.12

0.12 7.18 0% 0.00 0.00 0.00 0.00 8.42 0.12

0.12 6.18 0% 0.00 0.00 0.00 0.00 7.42 0.12

0.12 5.18 0% 0.00 0.00 0.00 0.00 6.42 0.12

0.12 4.18 0% 0.00 0.00 0.00 0.00 5.42 0.12

0.12 3.18 50% 3999.91 12719.73 3999.91 8719.80 4.42 0.12

0.12 2.18 100% 10638.34 23191.59 10638.34 12553.20 3.42 0.12

0.12 1.18 100% 7049.13 8317.98 7049.13 1268.80 2.42 0.12

0.12 0.18 100% 3033.81 546.09 546.09 0.00 1.42 0.12

0.12 0.58 0% 0.00 0.00 0.00 0.00 0.42 0.12


0.12 1.58 0% 0.00 0.00 0.00 0.00 0.70 0.12

0.12 2.58 0% 0.00 0.00 0.00 0.00 1.70 0.12


0.12 3.58 0% 0.00 0.00 0.00 0.00 2.70 0.12
0.12 4.58 0% 0.00 0.00 0.00 0.00 3.70 0.12

0.12 5.58 0% 0.00 0.00 0.00 0.00 4.70 0.12

0.12 6.58 0% 0.00 0.00 0.00 0.00 5.70 0.12

0.12 7.58 0% 0.00 0.00 0.00 0.00 6.70 0.12

0.12 8.58 0% 0.00 0.00 0.00 0.00 7.70 0.12

0.12 9.58 0% 0.00 0.00 0.00 0.00 8.70 0.12

0.12 10.58 0% 0.00 0.00 0.00 0.00 9.70 0.12

0.12 11.58 0% 0.00 0.00 0.00 0.00 10.70 0.12

0.12 12.58 0% 0.00 0.00 0.00 0.00 11.70 0.12

0.12 13.60 0% 0.00 0.00 0.00 0.00 12.72 0.12

24,721.20 44,775.38 22,233.48 22,541.80


PROVINCIA DE HUANCAYO - DEPARTAMENTO

GOBIERNO REGIONAL DE JUNIN

BOTADERO 21+860

UBICACIN (KM) 21.86


TRANSPORTE DE
ACCESO (KM) 0.060 MATERIAL
EXCEDENTE
MATERIAL
Dist. MOMENTO
%
Valor. Km M3-KM
ELIMINAR D <= 1 KM D > 1 KM

21.30 0% 0.00 0.00 0.00 0.00


20.30 0% 0.00 0.00 0.00 0.00
19.30 0% 0.00 0.00 0.00 0.00

18.30 0% 0.00 0.00 0.00 0.00

17.30 0% 0.00 0.00 0.00 0.00

16.30 0% 0.00 0.00 0.00 0.00

15.30 0% 0.00 0.00 0.00 0.00

14.30 0% 0.00 0.00 0.00 0.00

13.30 0% 0.00 0.00 0.00 0.00

12.30 0% 0.00 0.00 0.00 0.00

11.30 0% 0.00 0.00 0.00 0.00

10.30 0% 0.00 0.00 0.00 0.00

9.30 0% 0.00 0.00 0.00 0.00

8.30 0% 0.00 0.00 0.00 0.00

7.30 0% 0.00 0.00 0.00 0.00

6.30 0% 0.00 0.00 0.00 0.00

5.30 0% 0.00 0.00 0.00 0.00

4.30 0% 0.00 0.00 0.00 0.00

3.30 0% 0.00 0.00 0.00 0.00

2.30 0% 0.00 0.00 0.00 0.00

1.30 0% 0.00 0.00 0.00 0.00

0.30 100% 4723.87 1417.16 1417.16 0.00


0.58 50% 2932.15 1700.65 1700.65 0.00

1.58 0% 0.00 0.00 0.00 0.00


2.58 0% 0.00 0.00 0.00 0.00
3.58 0% 0.00 0.00 0.00 0.00

4.58 0% 0.00 0.00 0.00 0.00

5.58 0% 0.00 0.00 0.00 0.00

6.58 0% 0.00 0.00 0.00 0.00

7.58 0% 0.00 0.00 0.00 0.00

8.58 0% 0.00 0.00 0.00 0.00

9.58 0% 0.00 0.00 0.00 0.00

10.58 0% 0.00 0.00 0.00 0.00

11.58 0% 0.00 0.00 0.00 0.00

12.60 0% 0.00 0.00 0.00 0.00

7,656.02 3,117.81 3,117.81 0.00


ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHUPU

Estudio definitivo
TRAMO I: CHUPURO - VISTA ALEGRE

METRADOS DE TRANSPORTE DE

BOTADERO 23+530

UBICACIN (KM) 23.53 UBICAC


TRANSPORTE DE
ACCESO (KM) 0.040 MATERIAL ACCES
EXCEDENTE
MATERIAL
DIST. Dist. MOMENTO DIST.
Libre Km % Libre Km
TRANSP. Val .KM M3-KM TRANSP.
ELIMINAR D <= 1 KM D > 1 KM

23.07 0.12 22.95 0% 0.00 0.00 0.00 0.00 27.24 0.12


22.07 0.12 21.95 0% 0.00 0.00 0.00 0.00 26.24 0.12
21.07 0.12 20.95 0% 0.00 0.00 0.00 0.00 25.24 0.12

20.07 0.12 19.95 0% 0.00 0.00 0.00 0.00 24.24 0.12

19.07 0.12 18.95 0% 0.00 0.00 0.00 0.00 23.24 0.12

18.07 0.12 17.95 0% 0.00 0.00 0.00 0.00 22.24 0.12

17.07 0.12 16.95 0% 0.00 0.00 0.00 0.00 21.24 0.12

16.07 0.12 15.95 0% 0.00 0.00 0.00 0.00 20.24 0.12

15.07 0.12 14.95 0% 0.00 0.00 0.00 0.00 19.24 0.12

14.07 0.12 13.95 0% 0.00 0.00 0.00 0.00 18.24 0.12

13.07 0.12 12.95 0% 0.00 0.00 0.00 0.00 17.24 0.12

12.07 0.12 11.95 0% 0.00 0.00 0.00 0.00 16.24 0.12

11.07 0.12 10.95 0% 0.00 0.00 0.00 0.00 15.24 0.12

10.07 0.12 9.95 0% 0.00 0.00 0.00 0.00 14.24 0.12

9.07 0.12 8.95 0% 0.00 0.00 0.00 0.00 13.24 0.12

8.07 0.12 7.95 0% 0.00 0.00 0.00 0.00 12.24 0.12

7.07 0.12 6.95 0% 0.00 0.00 0.00 0.00 11.24 0.12

6.07 0.12 5.95 0% 0.00 0.00 0.00 0.00 10.24 0.12

5.07 0.12 4.95 0% 0.00 0.00 0.00 0.00 9.24 0.12

4.07 0.12 3.95 0% 0.00 0.00 0.00 0.00 8.24 0.12

3.07 0.12 2.95 0% 0.00 0.00 0.00 0.00 7.24 0.12

2.07 0.12 1.95 0% 0.00 0.00 0.00 0.00 6.24 0.12


1.07 0.12 0.95 50% 2932.15 2785.54 2785.54 0.00 5.24 0.12

0.07 0.12 0.00 100% 1297.27 0.00 0.00 0.00 4.24 0.12
1.01 0.12 0.89 100% 8794.36 7826.98 7826.98 0.00 3.24 0.12
2.01 0.12 1.89 100% 6188.89 11697.00 6188.89 5508.10 2.24 0.12

3.01 0.12 2.89 0% 0.00 0.00 0.00 0.00 1.24 0.12

4.01 0.12 3.89 0% 0.00 0.00 0.00 0.00 0.24 0.12

5.01 0.12 4.89 0% 0.00 0.00 0.00 0.00 0.84 0.12

6.01 0.12 5.89 0% 0.00 0.00 0.00 0.00 1.84 0.12

7.01 0.12 6.89 0% 0.00 0.00 0.00 0.00 2.84 0.12

8.01 0.12 7.89 0% 0.00 0.00 0.00 0.00 3.84 0.12

9.01 0.12 8.89 0% 0.00 0.00 0.00 0.00 4.84 0.12

10.01 0.12 9.89 0% 0.00 0.00 0.00 0.00 5.84 0.12

11.03 0.12 10.91 0% 0.00 0.00 0.00 0.00 6.86 0.12

19,212.68 22,309.53 16,801.42 5,508.10


TERA CHUPURO - VISTA ALEGRE - CHICCHE - CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HUANCAYO
PRIMERA ETAPA

ORTE DE MATERIAL EXCEDENTE DE CORTE A DME

BOTADERO 27+700

UBICACIN (KM) 27.70 UBICACIN (KM)


TRANSPORTE DE
ACCESO (KM) 0.040 MATERIAL ACCESO (KM)
EXCEDENTE
MATERIAL
Dist. Val . MOMENTO DIST.
% Libre KM
Km M3-KM TRANSP.
ELIMINAR D <= 1 KM D > 1 KM

27.12 0% 0.00 0.00 0.00 0.00 34.36 0.12


26.12 0% 0.00 0.00 0.00 0.00 33.36 0.12
25.12 0% 0.00 0.00 0.00 0.00 32.36 0.12

24.12 0% 0.00 0.00 0.00 0.00 31.36 0.12

23.12 0% 0.00 0.00 0.00 0.00 30.36 0.12

22.12 0% 0.00 0.00 0.00 0.00 29.36 0.12

21.12 0% 0.00 0.00 0.00 0.00 28.36 0.12

20.12 0% 0.00 0.00 0.00 0.00 27.36 0.12

19.12 0% 0.00 0.00 0.00 0.00 26.36 0.12

18.12 0% 0.00 0.00 0.00 0.00 25.36 0.12

17.12 0% 0.00 0.00 0.00 0.00 24.36 0.12

16.12 0% 0.00 0.00 0.00 0.00 23.36 0.12

15.12 0% 0.00 0.00 0.00 0.00 22.36 0.12

14.12 0% 0.00 0.00 0.00 0.00 21.36 0.12

13.12 0% 0.00 0.00 0.00 0.00 20.36 0.12

12.12 0% 0.00 0.00 0.00 0.00 19.36 0.12

11.12 0% 0.00 0.00 0.00 0.00 18.36 0.12

10.12 0% 0.00 0.00 0.00 0.00 17.36 0.12

9.12 0% 0.00 0.00 0.00 0.00 16.36 0.12

8.12 0% 0.00 0.00 0.00 0.00 15.36 0.12

7.12 0% 0.00 0.00 0.00 0.00 14.36 0.12

6.12 0% 0.00 0.00 0.00 0.00 13.36 0.12


5.12 0% 0.00 0.00 0.00 0.00 12.36 0.12

4.12 0% 0.00 0.00 0.00 0.00 11.36 0.12


3.12 0% 0.00 0.00 0.00 0.00 10.36 0.12
2.12 0% 0.00 0.00 0.00 0.00 9.36 0.12

1.12 100% 3682.08 4123.93 3682.08 441.80 8.36 0.12

0.12 100% 10903.49 1308.42 1308.42 0.00 7.36 0.12

0.72 100% 16136.47 11618.26 11618.26 0.00 6.36 0.12

1.72 0% 0.00 0.00 0.00 0.00 5.36 0.12

2.72 0% 0.00 0.00 0.00 0.00 4.36 0.12

3.72 0% 0.00 0.00 0.00 0.00 3.36 0.12

4.72 0% 0.00 0.00 0.00 0.00 2.36 0.12

5.72 0% 0.00 0.00 0.00 0.00 1.36 0.12

6.74 0% 0.00 0.00 0.00 0.00 0.86 0.12

30,722.04 17,050.61 16,608.76 441.80


CIA DE HUANCAYO - DEPARTAMENTO JUNN -

GOBIERNO REGIONAL DE JUNIN

BOTADERO 34+260

UBICACIN (KM) 34.26


TRANSPORTE DE
ACCESO (KM) 0.600 MATERIAL
EXCEDENTE
MATERIAL
MOMENTO
DIST. VAL .KM %
M3-KM
ELIMINAR D <= 1 KM D > 1 KM

34.24 0% 0.00 0.00 0.00 0.00


33.24 0% 0.00 0.00 0.00 0.00
32.24 0% 0.00 0.00 0.00 0.00

31.24 0% 0.00 0.00 0.00 0.00

30.24 0% 0.00 0.00 0.00 0.00

29.24 0% 0.00 0.00 0.00 0.00

28.24 0% 0.00 0.00 0.00 0.00

27.24 0% 0.00 0.00 0.00 0.00

26.24 0% 0.00 0.00 0.00 0.00

25.24 0% 0.00 0.00 0.00 0.00

24.24 0% 0.00 0.00 0.00 0.00

23.24 0% 0.00 0.00 0.00 0.00

22.24 0% 0.00 0.00 0.00 0.00

21.24 0% 0.00 0.00 0.00 0.00

20.24 0% 0.00 0.00 0.00 0.00

19.24 0% 0.00 0.00 0.00 0.00

18.24 0% 0.00 0.00 0.00 0.00

17.24 0% 0.00 0.00 0.00 0.00

16.24 0% 0.00 0.00 0.00 0.00

15.24 0% 0.00 0.00 0.00 0.00

14.24 0% 0.00 0.00 0.00 0.00

13.24 0% 0.00 0.00 0.00 0.00


12.24 0% 0.00 0.00 0.00 0.00

11.24 0% 0.00 0.00 0.00 0.00


10.24 0% 0.00 0.00 0.00 0.00
9.24 0% 0.00 0.00 0.00 0.00

8.24 0% 0.00 0.00 0.00 0.00

7.24 0% 0.00 0.00 0.00 0.00

6.24 0% 0.00 0.00 0.00 0.00

5.24 100% 3098.74 16237.39 3098.74 13138.70

4.24 100% 10674.65 45260.52 10674.65 34585.90

3.24 100% 13022.07 42191.52 13022.07 29169.40

2.24 100% 13515.37 30274.43 13515.37 16759.10

1.24 100% 9812.34 12167.30 9812.34 2355.00

0.74 100% 301.07 222.64 222.64 0.00

50,424.25 146,353.81 50,345.82 96,008.10


"ESTUDIO DEFINITIVO DE INGENIERA DE LA CARRETERA CHUPURO - VISTA ALEGRE - CHICCHE -
CHONGOS ALTO - HUASICANCHA, PROVINCIA DE HUANCAYO - DEPARTAMENTO JUNN"

RESUMEN DE PLANILLA DE METRADOS DE EXPLANACIONES

TRAMO CORTE EN CORTE EN


CORTE EN SUB TOTAL
INICIO TRMINO MATERIAL ROCA SUELTA
ROCA FIJA (m3) (m3)
RELLENO (m3)
Km. Km. SUELTO (m3) (m3)
00+000 01+000 0.000 0.000 0.000 0.000 0.000
01+000 02+000 0.000 0.000 0.000 0.000 0.000
02+000 03+000 9.530 0.000 0.000 9.530 0.000
03+000 04+000 5,906.290 9,607.398 3,025.602 18,539.290 0.000
04+000 05+000 15,831.952 5,122.393 0.000 20,954.345 0.000
05+000 06+000 4,250.866 2,722.773 4,346.997 11,320.635 0.000
06+000 07+000 5,836.122 1,123.804 167.300 7,127.225 0.000
07+000 08+000 1,783.102 642.976 82.752 2,508.830 0.000
08+000 09+000 2,096.217 3,146.585 513.024 5,755.825 0.000
09+000 10+000 1,804.658 719.824 168.514 2,692.995 0.000
10+000 11+000 7,096.545 4,532.729 543.512 12,172.785 0.000
11+000 12+000 4,005.216 3,531.732 3,859.882 11,396.830 0.000
12+000 13+000 5,744.985 2,316.185 1,103.120 9,164.290 0.000
13+000 14+000 8,208.043 1,609.667 266.556 10,084.265 0.000
14+000 15+000 7,168.541 5,154.607 1,464.307 13,787.455 0.000
15+000 16+000 3,844.104 1,984.125 193.132 6,021.360 0.000
16+000 17+000 1,746.623 2,422.517 393.256 4,562.395 0.000
17+000 18+000 1,846.115 3,692.229 615.372 6,153.715 0.000
18+000 19+000 5,764.770 1,675.538 743.032 8,183.340 0.000
19+000 20+000 4,484.610 805.947 131.853 5,422.410 0.000
20+000 21+000 2,100.330 233.370 0.000 2,333.700 0.000
21+000 22+000 3,270.371 363.375 0.000 3,633.745 0.000
22+000 23+000 4,059.900 451.100 0.000 4,511.000 0.000
23+000 24+000 468.474 529.429 0.000 997.903 0.000
24+000 25+000 6,088.406 676.490 0.000 6,764.895 0.000
25+000 26+000 3,678.737 867.656 214.293 4,760.685 0.000
26+000 27+000 2,832.370 0.000 0.000 2,832.370 0.000
27+000 28+000 4,674.441 2,917.247 795.613 8,387.300 0.000
28+000 29+000 7,060.740 4,587.369 764.562 12,412.670 0.000
29+000 30+000 970.904 1,217.012 195.730 2,383.645 0.000
30+000 31+000 7,390.143 821.127 0.000 8,211.270 0.000
31+000 32+000 8,410.778 1,606.202 0.000 10,016.980 0.000
32+000 33+000 8,317.152 2,079.288 0.000 10,396.440 0.000
33+000 34+000 6,448.820 1,099.135 0.000 7,547.955 0.000
34+000 35+040 231.595 0.000 0.000 231.595 0.000
TOTAL 153,431.443 68,259.825 19,588.405 241,279.673 0.000