1. General arrangement of evaporator
2. Typical design data
Operation Testing
ASME Sect. VIII, Div.1 Rmt/3,5 bzw. Rt0,2/1,5 Rmp/3,5 bzw. Rp0,2/1.5
1 RT exposure
ASME VIII,
No NDT every 15 m welding 100% RN and LN
Sect. 1
seam
6.2 NDT and Joint efficency acc. to Chinese Regulations
2004 or 2009
2004 2009
100% welded joints within opening 100% welded joints covered by other
area parts
100% welded joints covered by 20% butt joint in nozzles with diameter
reinforcements, saddles or pads greater than 250mm
20% butt joint in welded head or tube
plate
20% butt joint in nozzles with
diameter greater than 250mm
2004 2009
full class III pressure vessel Cat. III pressure vessel if P>1,6 MPa
t = 30 mm (35 mm)*
AD2000 Merkblatt B1
Joint efficency 0,85
t = 1,9 mm (2,4 mm)*
Joint efficency 1,0
t = 1,6 mm (2,0 mm)*
AD2000 Merkblatt B6
t = 10,31 mm
8. Summary
The demands from the Chinese regulations affect both, ASME and
AD-2000:
Design calculation (Safety factor, joint efficency)
Manufacturing and Testing (extend of NDT)
The main differences of the 2004 and 2009 Edition of the Chinese
Regulations are:
Different Safety factors
Higher allowable stresses
Lower extend of NDT
Contact
Thomas Weber
Mooswiesstr. 1
94541 Grattersdorf