Daily Report

Project Name: Hlaine Tet Hotel


Project Code: 6YG 03900 Report Date : 12.1.2017 Thu No. of Day 197 Report No. DPR-197
Proj Start Date 22.6.2016 Contract Period Calendar Day AM PM Fine
Weather
Estimate Completion Date Remain Period Calendar Day 6~8 8~10 10 ~12 12 ~1 1~3 3 ~5 Rain
Work Force
Office
Trades PM PE SSE Site Engr QA/QC QS Admin Safety Security Site Store EP Surveyor Geotech Workers Mason Carpenter Smith Welder
Staff
Today 1 1 2 1 1 2 2 1 19 7 7 11

Trades Total

Today 55

Machine & Equipments onsite


Description previous Today Cum. Remarks Description previous Today Cum. Remarks Description previous Today Cum. Remarks
Drilling Machine
Mobile Crane(Ton70)

Pile Machine

Generator (165KV, 220 KV) 1 2

Material Delivery On Site


Quantity Quantity Quantity
Description Unit Description Unit Description Unit Remarks
Today Total Today Total Today Total

QC - Test Sampling
Item Remarks

Test
Sample
Taken

LTI Free Day UA,UC Near Miss FAI MTC LTA


Daily TBT Conducted
HSE
By Safety Officer
49 - - - - -

Works Carried out Details


Trades Of Work Location Remark

1 4th tr's beam weldding work and 6th and 7th floor decking sheet installation work G/L 1 to 4, G/L A to D

2 Ground beam formwork removing work G/L 1 to 4, G/L A to C

3 Rebar production work for ground tank base slab and rebar carrying work for decking sheet slab

4 Sand filling work for ground floor slab G/L 1 to 4, G/L A to C

Special Event

Site
Visitors on
Purpose Instructio
site
n

Project Manager Project Engineer Prepare By: Site Engineer

Name Name Nyo Aung Name Zaw Myo Oo

Signature Signature Signature

FO-OP-01 REV-00