Anda di halaman 1dari 3

Muhammad Noman

engr.muhammadnoman@gmail.com
+92 346 8482210 PEC Membership: Regd: ELECT/40886
Current Address: House # 178, Ataturk Block, New Garden Town, LAHORE.
Skype ID: engr.muhammadnoman CNIC#: 17301 7442225 7
Date of birth: 22nd March, 1991 Marital Status: Single
Passport #: AG9202251 (Validity: 21 August 2018 )

PERSONAL SUMMARY
Competent electrical engineer with a comprehensive knowledge of detailed designing, testing and commissioning of
electrical power systems & components to required specifications, focusing on safety, reliability, quality and
sustainability. Presently I am working with a consulting firm on their 4 Hydropower projects titled as REDSIP
(Renewable Energy Development Sector Investment Program) with net worth of $92 Million US Dollar, funded by Asian
Development Bank.
ACADEMIC QUALIFICATION
Qualification Institute Passed In Marks
Bachelors in Electrical Power University Of Engineering Sept 2013 81.00 %
Engineering And Technology Peshawar (3.24/4 CGPA)
Pre Engineering / A Level Islamia College University July 2009 81.64 %
Peshawar (898/1100)
Matriculation / O Level Islamia Collegiate School July 2007 87.11 %
Peshawar (784/900)

TECHNICAL EXPERTISE
1). Power Plants; 2). Power Transmission & Distribution; 3). Substation; 4). High Voltage Engineering.
5). Power System Control & Protection 6). Power System Analysis

PROFESSIONAL EXPERIENCE 3 Years & 3 Months

Designation Organization Time Period Experience Project Name

Punjab Hydropower Oct 2013 Present


Jr. Power Engineer 3 Years REDSIP, Punjab
Consultants
Internship July 2013 Sep 2013 Warsak Hydropower
WAPDA 3 Months
(Trainee Engineer) Station

Jr. Power Engineer Oct 2013 Present


Punjab Hydropower Consultants
Details of my job responsibilities are given as follows;
Preparation of Test Reports for Employer pertaining to the E & M tests carried out at site.
Surveillance of compliance to quality standards & specifications.

Page 1 of 3
Design Review and testing of Spillway and Tailrace Draft tube gates.
Detailed study and monitoring of Electrical & Mechanical parameters during 72 Hour Full Load run test.
Analyzing transient behavior of power plant during Load Rejection Test.
Testing & commissioning of 6.3 kV, 2 numbers of hydro generators with rated capacity of 1.41 MW each;
1. Start up and trial operation tests
2. Short Circuit Characteristic test
3. No load Characteristic Test
Grounding test of power plant using earthing test set UNI-T UT 521.
11 kV, 6.3 kV & 0.4 kV cable tests;
1. Megger Test
2. High voltage A.C Test
3. High Voltage D.C Test
Factory acceptance tests of distribution transformers at PEL (Pak Elektron Ltd.) facility.
1. Measurement for Break down voltage of Transformer Mineral Oil using Dielectric Tester (BAUR DTA 100 C)
2. Separate source voltage withstands test / power frequency test.
3. Induced over voltage withstand test.
4. Measurement of short circuit impedance and load losses.
5. Measurement of winding resistance.
6. Measurement of no load losses & current
7. Measurement of voltage ratio and check of phase displacement
Design review and approval of interconnection study report including load flow studies, transient stability analysis
and short circuit levels during single phase, phase to phase and 3 phase faults.
Performed voltage drop, ampicity and technical losses calculations for Transmission lines.
Transmission Lines Route survey and visits to interconnected grid stations for data collection.
Design & construction of single circuit & double circuit 11 kV overhead transmission line as per WAPDA specs.
Design review and approval of Plan & Profile Diagrams for double circuit & triple circuit overhead transmission lines.
Design of 11 kV Incoming interconnected panels at Grid End as per WAPDA specifications devised in P-44.
Design and selection of surge arrestors for protection of transmission lines against lightning stokes.
Detailed design review of setting calculations for Overcurrent protection (IDMT, Definite & Instantaneous) for
Step-Up Main Transformers and Transmission lines Feeder relay PCS 9611.
Design calculations and settings of Earth Fault protection for Transmission lines.
Testing and commissioning of power house bridge crane as per FEM standards
Powerhouse building and Spillway AC lighting design as well design of emergency lighting on DC system.
Performed detailed grounding mesh calculations for powerhouse as per IEEE Std 80- 2000.
Performed short circuit calculations as per IEC 60909.
Detailed study and approval of design drawings, specifications and technical documents.
Performed UPS & battery sizing design & calculations in accordance with IEEE 485-1997.
Detailed design calculations for 230 V & 400 V distribution system as well as cable sizing as per IEC 60364.
Detailed design calculations for generator protection as per IEEE C37.101
Design of structural lightning protection as per BS EN 62305.
Design analysis for liquid immersed and dry type transformers as per IEC-76, IEC-600726.
Design review of 0.4 kV, 6.3 kV and 11 kV switchgear panels.
Performed electrical design calculations for the distribution transformers and standby diesel generators

Page 2 of 3
Performed design review of power transformer installation drawings & lightning protection.
Performed selection and sizing of lightning arresters as per IEC & IEEE standards.
Conducted site visits to determine and validate field dimensions.
Processing of Commercial Invoices of equipment imported from abroad. Check and verify the consignments arrived at
site from abroad.
Detailed design review of internal & external lighting schemes.
Verification of interim payment certificates (IPCs) of the contractors.
Meetings and frequent letter correspondence with Client and Contractor to settle down the issues regarding design
services and installation of equipment at site

Internship (Trainee Engineer) July 2013 Sep 2013


Electrical system of WARSAK Power Station.
Protection scheme and detailed study of 132 KV switch yard of Powerhouse.
Detailed study and operation of Electrical equipment and related accessories installed in the powerhouse.
Relays, their types and operation, Rectifiers for D.C supply to protection equipment, Bus bar and feeders.

COMPUTER PROFICIENCY
MS office, AutoCAD, ORCAD 10.5, PSPICE, C, C++, MATLAB (Simulink),Proteus.

LANGUAGES
English, Urdu, Pashto
REFERENCES
Shall be provided on request.

Page 3 of 3

Anda mungkin juga menyukai