NO.

Uraian

A. Upah Tenaga Kerja

1 Mandor
2 Tukang gali tanah
3 Kepala tukang batu
4 Tukang Batu
5 Laden tukang batu
6 Kepala tukang kayu
7 Tukang kayu
8 Laden Tukang Kayu
9 Kepala Tukang Besi
10 Tukang besi
11 Laden Tukang Besi
12 Kepala tukang cat
13 Tukang cat
14 Laden tukang cat
15 Penjaga malam
16 Buruh tak terlatih
17 Buruh lapangan agak terlatih
18 Buruh Lapangan terlatih
19 Tukang listrik
20 Tukang las
21 Tukang tebas
22 Tukang anyam

B. Bahan Bangunan

1 besi 8
2 besi 6
3 besi 4
4 besi 10
4 semen
5 Pasir Pasang
6 Pasir Urug
7 koral
papan bekisting
kayu bekisting
Atap Zimculome Collor ( sakura elang ) 2 susun
Atap Zimculome Collor ( Mega Roof ) 3 susun
Bak mandi Fibre 50 x 50 Segi empat kecil
Balok kayu Meranti Ukuran 5x10x400 cm
Balok kayu Meranti Ukuran 6x12x400 cm
Balok kayu Meranti Ukuran 8 x12 x 400 cm
Bataco
keramik dinding wc
keramik lantai wc
closed jongkok INA
keramik lantai 40 x40
pipa 1/2"
pipa 3/4"
pipa 3"
flor drain
keran air
papan kayu 2/20 (kayu kuat I Benuas/ulin)
cat dasar
cat dinding
cat kayu platon
Minyak cat
engsel pintu
engsel jendela
grendel pintu
tarikan jendela
hak angin
kunci tanam jendela
kunci tanam pintu
bindrat
plamir
Satuan Harga Dasar

OH Rp 98,300.00
OH Rp 68,000.00
OH Rp 90,700.00
OH Rp 83,100.00
OH Rp 68,000.00
OH Rp 90,700.00
OH Rp 83,100.00
OH Rp 68,000.00
OH Rp 90,700.00
OH Rp 83,100.00
OH Rp 68,000.00
OH Rp 90,700.00
OH Rp 83,100.00
OH Rp 68,000.00
OH Rp 68,000.00
OH Rp 68,000.00
OH Rp 68,000.00
OH Rp 68,000.00
OH Rp 75,000.00
OH Rp 98,300.00
OH Rp 98,300.00
OH Rp 75,500.00

Btg = 11 m' Rp 32,000.00


Btg = 11 m' Rp 16,000.00
Btg = 11 m' Rp 7,500.00
Btg = 11 m' Rp 52,500.00
zak Rp 58,000.00
rit Rp 270,000.00
rit Rp 170,000.00 42500
rit Rp 1,150,000.00 Rp 287,500.00
m3 Rp 1,200,000.00
btg Rp 3,000.00
Lbr Rp 28,000.00
Lbr Rp 31,300.00
Bh Rp 120,000.00
M3
M3
M3 Rp 2,500,000.00
Bh Rp 2,000.00
doz Rp 49,000.00
doz Rp 49,000.00
Bh Rp 120,000.00
doz Rp 51,000.00
btg
btg
btg
Bh Rp 15,000.00
Bh Rp 10,000.00
m3 Rp 2,500,000.00
klg
klg
klg
klg
ps
ps
Bh
Bh
ps
Bh
Bh
kg Rp 16,000.00
kg
DAFTAR AN

ANALISA URAIAN

1. PEKERJAAN PENDAHULUAN

SNI 01.1.1 1 M1 Pembersihan perataan lahan


0.100 Oh
0.050 Oh

SNI 01.1.2 1 M2 Pembuatan Direksi Keet


1.700 Btg
0.210 M
0.300 Kg
10.500 Kg
0.030 M3
0.050 M3
1.500 lbr
2.000 Oh
1.000 Oh
0.200 Oh
0.050 Oh

SNI 01.2.1 1 M1 Pengukuran dan pasang bouwplank


0.005 Oh
0.010 Oh
0.100 Oh
0.100 Oh
0.012 M3
0.007 M3
0.020 Kg

SNI 01 3.2 1 M2 Pembuatan gudang semen dan alat-alat los (kerja)


0.050 Oh
0.200 Oh
2.000 Oh
1.000 Oh
1.700 Btg
0.210 M3
0.300 Kg
10.500 Kg
0.030 M3
0.050 M3
1.500 Lbr

2. PEKERJAAN TANAH

SNI 02.6.1 1 M3 Galian tanah biasa sedalam 1 m


0.025 Oh
0.750 Oh

SNI 02.6.2 1 M3 Galian tanah biasa sedalam 2 m


0.045 Oh
0.900 Oh

SNI 02.6.9 1 M3 urugan tanah kembali


0.015 Oh
0.300 Oh
0.400 M3

SNI 02.6.10 1 M3 Pemadatan tanah (per 20 cm)


0.050 Oh
0.500 Oh

SNI 02.6.11 1 M3 Urugan pasir bawah pondasi


0.010 Oh
0.300 Oh
1.200 M3

SNI 02.6.11 1 M3 Urugan pasir bawah lantai


0.010 Oh
0.300 Oh
1.200 M3

3. PEKERJAAN PONDASI
SNI 03.6.1 1 M3 Pasang pondasi batu belah adukan 1 Pc : 3 Ps
0.075 Oh
0.075 Oh
0.750 Oh
1.500 Oh
1.200 M3
20.200 Kg
0.485 M3
SNI 03.6.9 1 M3 Pasang pondasi batu kosong ( aanstamping )
0.039 Oh
0.039 Oh
0.390 Oh
0.780 Oh
1.200 M3
0.432 M3

4. PEKERJAAN PEMBETONAN
SNI 07. 6. 5 1 M Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr
0.0800 Oh
0.0250 Oh
0.2500 Oh
1.6500 Oh
23.200 Kg
0.5200 M3
0.7800 M3

SNI 07. 6. 1 1 M Membuat Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


0.0800 Oh
0.0250 Oh
0.2500 Oh
1.6500 Oh
23.2000 Kg
0.5200 M3
0.7800 M3

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir 8mm
0.0003 Oh
0.0007 Oh
0.0070 Oh
0.0070 Oh
1.0500 Kg
0.0150 Kg

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir 10mm
0.0003 Oh
0.0007 Oh
0.0070 Oh
0.0070 Oh
1.0500 Kg
0.0150 Kg
SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir 12 mm
0.0003 Oh
0.0007 Oh
0.0070 Oh
0.0070 Oh
1.0500 Kg
0.0150 Kg

SNI. 07. 6. 25 1 kg Pembesian dengan besi polos atau besi ulir 16mm
0.0003 Oh
0.0007 Oh
0.0070 Oh
0.0070 Oh
1.0500 Kg
0.0150 Kg

SNI 09.6.20 1 M2 Pasang bekisting untuk pondasi


0.026 Oh
0.026 Oh
0.260 Oh
0.520 Oh
0.040 M3
0.300 Kg
0.100 Ltr

SNI 09.6.20 1 M2 Pasang bekisting untuk Sloof


0.026 Oh
0.026 Oh
0.260 Oh
0.520 Oh
0.045 M3
0.300 Kg
0.100 Ltr

SNI 09.6.22 1 M2 Pasang bekisting untuk kolom


0.033 Oh
0.033 Oh
0.330 Oh
0.660 Oh
0.040 M3
0.400 Kg
0.200 Ltr
0.015 M3
0.350 Lbr
2.000 Btg

SNI 09.6.23 1 M2 Pasang bekisting untuk balok


0.033 Oh
0.033 Oh
0.330 Oh
0.660 Oh
0.040 M3
0.400 Kg
0.200 Ltr
0.018 M3
0.350 Lbr
2.000 Btg

SNI 09.6.24 1 M2 Pasang bekisting untuk lantai


0.033 Oh
0.033 Oh
0.330 Oh
0.660 Oh
0.040 M3
0.400 Kg
0.200 Ltr
0.015 M3
0.350 Lbr
6.000 Btg

SNI 09.6.26 1 M2 Pasang bekisting untuk tangga


0.033 Oh
0.033 Oh
0.330 Oh
0.660 Oh
0.030 M3
0.400 Kg
0.150 Ltr
0.015 M3
0.350 Lbr
2.000 Btg

5. PEKERJAAN LANTAI
SNI 10.2.3 1 M2 Pasang lantai keramik 20 x 20 cm
0.035 Oh
0.035 Oh
0.350 Oh
0.700 Oh
26.500 Bh
10.000 Kg
0.045 M3
1.500 Kg

SNI 10.2.3 1 M2 Pasang lantai keramik 40 x 40 cm


0.035 Oh
0.035 Oh
0.350 Oh
0.700 Oh
26.500 Bh
10.000 Kg
0.045 M3
1.500 Kg

SNI 10.2.3 1 M2 Pasang lantai keramik 10 x 40 cm


0.035 Oh
0.035 Oh
0.350 Oh
0.700 Oh
2.650 Bh
10.000 Kg
0.045 M3
1.500 Kg

SNI 10.19.4 1 M2 Pasang lantai keramik 15 x 20 cm


0.035 Oh
0.035 Oh
0.350 Oh
0.700 Oh
26.500 Bh
10.400 Kg
0.045 M3
1.620 Kg

6. PEKERJAAN KUSEN PINTU,JENDELA DAN VENTILASI


SNI 07.1.2 1 M3 Pasang kusen pintu dan jendela kayu kelas kuat II (kayu lanan/meranti)
0.300 Oh
2.100 Oh
21.000 Oh
7.000 Oh
1.200 M3
1.250 Kg
1.000 Kg

SNI 12.2.1 1 Bh Pasang engsel pintu


0.001 Oh
0.015 Oh
0.150 Oh
0.015 Oh
1.000 Bh

SNI 12.2.1 1 Bh Pasang kunci tanam


0.003 Oh
0.060 Oh
0.600 Oh
0.060 Oh
1.000 Bh

SNI 12.11.2 1 M2 Pasang kaca polos/bening tebal3 mm


0.001 Oh
0.015 Oh
0.150 Oh
0.015 Oh
1.100 M2

SNI 12.2.2 1 Bh Pasang engsel jendela


0.001 Oh
0.010 Oh
0.100 Oh
0.010 Oh
1.000 Bh

SNI 12.4.1 1 Bh Pasang kait angin


0.001 Oh
0.015 Oh
0.150 Oh
0.015 Oh
1.000 Bh
SNI 12.6.1 1 Bh Pasang kunci selot
0.001 Oh
0.020 Oh
0.200 Oh
0.020 Oh
1.000 Bh

SNI 12.7.1 1 Bh Pasang pegangan pintu


0.003 Oh
0.050 Oh
0.500 Oh
0.050 Oh
1.000 Bh

SNI 11.6.7 1 M2 Pasang Pintu Panel Kayu


0.05 Oh
0.25 Oh
2.5 Oh
1 Oh
0.04 Bh

SNI 12.7.1a 1 Bh Pasang pegangan jendela


0.003 Oh
0.050 Oh
0.500 Oh
0.050 Oh
1.000 Bh

7. PEKERJAAN DINDING DAN PLESTERAN


SNI 04. 6. 10 1 M2 Pasangan Bata Merah Tebal 1/2 Bata 1 Pc : 3 Ps
0.0150 Oh
0.0100 Oh
0.1000 Oh
0.3000 Oh
15.0000 Bh
11.5000 Kg
0.0430 M3

SNI 06.6.3 1 M Plesteran camp 1 Pc : 3 Ps tebal 15 mm


0.015 Oh
0.015 Oh
0.150 Oh
0.300 Oh
7.776 Kg
0.023 M3

SNI 06.5 1 M Plesteran camp 1 Pc : 5 Ps tebal 15 mm


0.015 Oh
0.015 Oh
0.150 Oh
0.300 Oh
7.776 Kg
0.038 M3

8. PEKERJAAN PLAFOND
SNI 08.17.4 1 M Pasang rangka langit-lamgit 60 x 60 cm kayu kelas kuat II (kayu lanan/m
0.011 Oh
0.035 Oh
0.350 Oh
0.210 Oh
0.017 M3
0.115 Kg

SNI 08.1.4 1 M Pasang langit-langit nusaboard


0.005 Oh
0.010 Oh
0.100 Oh
0.100 Oh
0.050 Kg
0.347 Lbr

9. PEKERJAAN PENGECATAN
SNI 13.8.1 1 M2 Pengecatan bidang kayu baru: 1 lapis plamir, 1 lapis cat dasar dan 2 lapi
0.003 Oh
0.006 Oh
0.009 Oh
0.070 Oh
0.200 Kg
0.150 Kg
0.170 Kg
0.260 Kg

SNI 13.10.2 1 M2 Pengecatan tembok baru: 1 lapis cat dasar dan 2 lapis cat penutup
0.003 Oh
0.004 Oh
0.043 Oh
0.028 Oh
0.130 Kg
0.230 Kg

10. PEKERJAAN KUDA-KUDA DAN ATAP


SNI 06.12.2 1 M3 Pasang konstruksi kuda-kuda kayu kelas kuat II (kayu lanan/meranti)
0.2000 OH
1.2000 OH
12.0000 OH
4.0000 OH
1.1000 OH
15.0000 M'
0.8000 Kg

SNI 6.6.31 1 M Rangka atap Kasau 5/7 dan Reng 3/4


0.0050 OH
0.0100 OH
0.1000 OH
0.1000 OH
0.0088 M3
0.0600 Kg

SNI 08.6.32 1 M Pasang Atap Genteng Metal merk Mulitroof


0.0010 OH
0.0100 OH
0.1000 OH
0.2000 OH
1.6700 M2

SNI 6.6.53 1 M Listplank 3x30 cm Papan meranti


0.0050 OH
0.0100 OH
0.1000 OH
0.1000 OH
0.0088 M3
0.0600 Kg

11. PEKERJAAN KAMAR MANDI


SNI 11.2.1 Pasang 1 buah kloset jongkok berwarna Merk INA
0.160 Oh
1.500 Oh
1.500 Oh
1.000 Oh
1.000 Bh
6.000 Kg
0.010 M3

SNI 10.17.1 Pasang 1 buah kran air diameter 3/4" atau 1/2"
0.005 Oh
0.010 Oh
0.100 Oh
0.010 Oh
1.000 Bh
0.500 Bh

SNI 6.27 Pasang 1 m pipa pvc tipe AW diameter 3/4"


0.002 Oh
0.010 Oh
0.100 Oh
0.010 Oh
1.200 Bh
0.500 Bh

SNI 11.6.1 Pasang 1 buah bak mandi fiber glass, volume 0,30 m3 (50 x 50) cm
0.110 Oh
0.540 Oh
2.700 Oh
1.800 Oh
1.000 Bh
0.180

SNI 10.19.4a 1 M2 Pasang dinding keramik 20 x 20 cm


0.045 Oh
0.045 Oh
0.450 Oh
0.900 Oh
26.500 Bh
9.300 Kg
0.018 M3
1.940 Kg

12. PEKERJAAN SEPTICTANK DAN RESAPAN


SNI 10. 6.42 Menggali galian 1 buah septictank
0.9000 Mandor
0.9000 Kepala Tukang Batu
4.5000 Tukang Batu
3.0000 Laden Tukang Batu
0.4000 Tukang gali

SNI 10. 6.42 Menggali galian 1 buah Resapan


0.9000 Mandor
0.9000 Kepala Tukang Batu
4.5000 Tukang Batu
3.0000 Laden Tukang Batu
0.4000 Tukang gali
1.0000 Ijuk /kg
0.9990 Kerikil/m3
1.0000 Tanah urug

SNI 07. 6. 1 1 M Membuat Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


0.0800 Oh
0.0250 Oh
0.2500 Oh
1.6500 Oh
23.2000 Kg
0.5200 M3
0.7800 M3

SNI 07. 6. 5 1 M Membuat Beton Bertulang 1 Pc : 2 Ps : 3 Kr


0.0800 Oh
0.0250 Oh
0.2500 Oh
1.6500 Oh
23.200 Kg
0.5200 M3
0.7800 M3

sloof per m3
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

URAIAN HARGA SATUAN HARGA UPAH

han perataan lahan


Tukang Tebas @ Rp. 75,500.00 Rp.
Mandor @ Rp. 98,300.00 Rp.
Rp.

an Direksi Keet
Kayu dolken/galam 10-12 cm,4 @ Rp. 13,800.00 Rp.
Kayu Klas III @ Rp. 1,600,000.00 Rp.
Paku Biasa @ Rp. 13,000.00 Rp.
Semen Portland @ Rp. 1,500.00 Rp.
Pasir Beton @ Rp. 67,500.00 Rp.
Koral Beton @ Rp. 325,000.00 Rp.
Seng Gelombang bljs 20 cm @ Rp. 39,300.00 Rp.
Tukang Kayu @ Rp. 83,100.00 Rp.
Pembantu Tukang Kayu @ Rp. 68,000.00 Rp.
Kepala Tukang Kayu @ Rp. 90,700.00 Rp.
Mandor @ Rp. 98,300.00 Rp.
Rp.
uran dan pasang bouwplank
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Balok kayu kelas kuat III @ Rp. 1,500,000.00
Papan bouwplank @ Rp. 1,860,000.00
Paku kayu @ Rp. 13,000.00
Rp.

an gudang semen dan alat-alat los (kerja)


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 6,800.00 Rp.
Kayu dolken dia. 8-10/400 cm @ Rp. 13,800.00
Papan kayu kelas II @ Rp. 1,860,000.00
Paku kayu @ Rp. 13,000.00
Semen PC @ Rp. 1,500.00
Pasir beton @ Rp. 67,500.00
Koral beton @ Rp. 325,000.00
Seng Gelombang bljs 20 cm @ Rp. 39,300.00
Rp.

anah biasa sedalam 1 m


Mandor @ Rp. 98,300.00 Rp.
Tukang gali tanah @ Rp. 68,000.00 Rp.
Rp.
anah biasa sedalam 2 m
Mandor @ Rp. 98,300.00 Rp.
Tukang gali tanah @ Rp. 68,000.00 Rp.
Rp.

anah kembali
Mandor @ Rp. 98,300.00 Rp.
Tukang gali tanah @ Rp. 68,000.00 Rp.
Pasir urug @ Rp. 42,500.00
Rp.

an tanah (per 20 cm)


Mandor @ Rp. 98,300.00 Rp.
Tukang gali tanah @ Rp. 68,000.00 Rp.
Rp.
pasir bawah pondasi
Mandor @ Rp. 98,300.00 Rp.
Tukang gali tanah @ Rp. 68,000.00 Rp.
Pasir urug @ Rp. 42,500.00
Rp.

pasir bawah lantai


Mandor @ Rp. 98,300.00 Rp.
Tukang gali tanah @ Rp. 68,000.00 Rp.
Pasir urug @ Rp. 42,500.00
Rp.

ondasi batu belah adukan 1 Pc : 3 Ps


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Batu belah 15/20 cm @ Rp. 212,500.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Rp.
ondasi batu kosong ( aanstamping )
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Batu belah 15/20 cm @ Rp. 212,500.00
Pasir urug @ Rp. 42,500.00
Rp.

t Beton Bertulang 1 Pc : 2 Ps : 3 Kr
Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Batu @ Rp. 90,700.00 Rp.
Tukang Batu @ Rp. 83,100.00 Rp.
Laden Tukang Batu @ Rp. 68,000.00 Rp.
Semen Portland / Kg @ Rp. 1,500.00
Pasir Beton @ Rp. 67,500.00
Koral Beton @ Rp. 287,500.00
Rp.

t Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Batu @ Rp. 90,700.00 Rp.
Tukang Batu @ Rp. 83,100.00 Rp.
Laden Tukang Batu @ Rp. 68,000.00 Rp.
Semen Portland / Kg @ Rp. 1,500.00
Pasir Beton @ Rp. 67,500.00
Koral Beton @ Rp. 287,500.00
Rp.
n dengan besi polos atau besi ulir 8mm
Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Besi @ Rp. 90,700.00 Rp.
Tukang Besi @ Rp. 83,100.00 Rp.
Laden Tukang Besi @ Rp. 68,000.00 Rp.
Besi beton @ Rp. 6,500.00
Kawat Beton @ Rp. 16,000.00
Rp.

n dengan besi polos atau besi ulir 10mm


Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Besi @ Rp. 90,700.00 Rp.
Tukang Besi @ Rp. 83,100.00 Rp.
Laden Tukang Besi @ Rp. 68,000.00 Rp.
Besi beton @ Rp. 6,500.00
Kawat Beton @ Rp. 16,000.00
Rp.
n dengan besi polos atau besi ulir 12 mm
Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Besi @ Rp. 90,700.00 Rp.
Tukang Besi @ Rp. 83,100.00 Rp.
Laden Tukang Besi @ Rp. 68,000.00 Rp.
Besi beton @ Rp. 6,500.00
Kawat Beton @ Rp. 16,000.00
Rp.
n dengan besi polos atau besi ulir 16mm
Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Besi @ Rp. 90,700.00 Rp.
Tukang Besi @ Rp. 83,100.00 Rp.
Laden Tukang Besi @ Rp. 68,000.00 Rp.
Besi beton @ Rp. 6,500.00
Kawat Beton @ Rp. 16,000.00
Rp.

ekisting untuk pondasi


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kayu papan bekisting @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Minyak bekisting (olie) @ Rp. 0.00
Rp.

ekisting untuk Sloof


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kayu papan bekisting @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Minyak bekisting (olie) @ Rp. 0.00
Rp.

ekisting untuk kolom


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kayu papan bekisting @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Minyak bekisting (olie) @ Rp. 0.00
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Plywood tebal 9mm @ Rp. 146,900.00
Kayu dolken/galam dia. 8-10 cm pjg 4 m @ Rp. 13,800.00
Rp.

ekisting untuk balok


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kayu papan bekisting @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Minyak bekisting (olie) @ Rp. 0.00
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Plywood tebal 9mm @ Rp. 146,900.00
Kayu dolken/galam dia. 8-10 cm pjg 4 m @ Rp. 13,800.00
Rp.

ekisting untuk lantai


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kayu papan bekisting @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Minyak bekisting (olie) @ Rp. 0.00
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Plywood tebal 9mm @ Rp. 146,900.00
Kayu dolken/galam dia. 8-10 cm pjg 4 m @ Rp. 13,800.00
Rp.

ekisting untuk tangga


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kayu terentang (papan bekisting) @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Minyak bekisting (olie) @ Rp. 0.00
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Plywood tebal 9mm @ Rp. 146,900.00
Kayu dolken/galam dia. 8-10 cm pjg 4 m @ Rp. 13,800.00

Rp.

AN LANTAI
antai keramik 20 x 20 cm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
keramik 20 x 20 cm @ Rp. 12,500.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Semen warna @ Rp. 12,500.00
Rp.

antai keramik 40 x 40 cm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
keramik 20 x 20 cm @ Rp. 12,500.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Semen warna @ Rp. 12,500.00
Rp.

antai keramik 10 x 40 cm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
keramik 10 x 40 cm @ Rp. 12,500.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Semen warna @ Rp. 12,500.00
Rp.

antai keramik 15 x 20 cm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
keramik 15 x 20 cm @ Rp. 2,350.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Semen warna @ Rp. 12,500.00
Rp.

AN KUSEN PINTU,JENDELA DAN VENTILASI


usen pintu dan jendela kayu kelas kuat II (kayu lanan/meranti)
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Lem kayu @ Rp. 30,000.00
Rp.

Mandor @ Rp. 98,300.00 Rp.


Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Engsel lokal "4" @ Rp. 16,900.00
Rp.

unci tanam
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kunci tanam merk ISEO @ Rp. 140,600.00
Rp.

aca polos/bening tebal3 mm


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kaca polos/bening tebal 3 mm @ Rp. 90,600.00
Rp.

ngsel jendela
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Engsel jendela "3" @ Rp. 11,300.00
Rp.

Mandor @ Rp. 98,300.00 Rp.


Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kait angin @ Rp. 16,600.00
Rp.
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Kunci selot @ Rp. 13,300.00
Rp.

egangan pintu
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Pegangan pintu @ Rp. 43,800.00
Rp.

Pintu Panel Kayu


Mandor 98,300.00 Rp.
Kepala Tukang Kayu 90,700.00 Rp.
Tukang Kayu 90,700.00 Rp.
Laden Tukang Kayu 68,000.00 Rp.
Kayu Ulin, Balok 502,500.00
Rp.

egangan jendela
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 90,700.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Pegangan jendela @ Rp. 9,000.00
Rp.

AN DINDING DAN PLESTERAN


n Bata Merah Tebal 1/2 Bata 1 Pc : 3 Ps
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
batako @ Rp. 1,600.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Rp.

n camp 1 Pc : 3 Ps tebal 15 mm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Rp.

n camp 1 Pc : 5 Ps tebal 15 mm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Rp.

AN PLAFOND
angka langit-lamgit 60 x 60 cm kayu kelas kuat II (kayu lanan/meranti)
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Paku kayu @ Rp. 13,000.00
Rp.

angit-langit nusaboard
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Pembantu tukang kayu @ Rp. 68,000.00 Rp.
Paku nusaboard @ Rp. 21,400.00
nusaboard @ Rp. 51,000.00
Rp.

AN PENGECATAN
an bidang kayu baru: 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang cat @ Rp. 90,700.00 Rp.
Tukang cat @ Rp. 90,700.00 Rp.
Pembantu tukang cat @ Rp. 68,000.00 Rp.
Cat meni @ Rp. 30,000.00
Plamir (dempul kayu) biasa @ Rp. 26,700.00
Cat dasar @ Rp. 27,600.00
Cat penutup merk TKS @ Rp. 26,400.00
Rp.

an tembok baru: 1 lapis cat dasar dan 2 lapis cat penutup


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang cat @ Rp. 90,700.00 Rp.
Tukang cat @ Rp. 90,700.00 Rp.
Pembantu tukang cat @ Rp. 68,000.00 Rp.
Cat dasar @ Rp. 27,600.00
Cat penutup merk vinilex @ Rp. 16,300.00
Rp.

AAN KUDA-KUDA DAN ATAP


onstruksi kuda-kuda kayu kelas kuat II (kayu lanan/meranti)
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang kayu @ Rp. 90,700.00 Rp.
Tukang kayu @ Rp. 83,100.00 Rp.
Laden tukang kayu @ Rp. 68,000.00 Rp.
Balok kayu kelas kuat II @ Rp. 1,200,000.00
Besi strip @ Rp. 20,400.00
Paku kayu @ Rp. 13,000.00
Rp.

atap Kasau 5/7 dan Reng 3/4


Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Kayu @ Rp. 90,700.00 Rp.
Tukang Kayu @ Rp. 83,100.00 Rp.
Laden Tukang Kayu @ Rp. 68,000.00 Rp.
Balok Kayu Meranti @ Rp. 2989100
Paku Ulin @ Rp. 21900
Rp.

Atap Genteng Metal merk Mulitroof


Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Kayu @ Rp. 90,700.00 Rp.
Tukang Kayu @ Rp. 83,100.00 Rp.
Laden Tukang Kayu @ Rp. 68,000.00 Rp.
Genteng Metal @ Rp. 28,000.00
Rp.

3x30 cm Papan meranti


Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Kayu @ Rp. 90,700.00 Rp.
Tukang Kayu @ Rp. 83,100.00 Rp.
Laden Tukang Kayu @ Rp. 68,000.00 Rp.
PapanMeranti @ Rp.
Paku Ulin @ Rp. 21900
Rp.

AAN KAMAR MANDI


kloset jongkok berwarna Merk INA
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Kloset jongkok berwarna merk INA @ Rp. 139,600.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Rp.

kran air diameter 3/4" atau 1/2"


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Krain air @ Rp. 20,200.00
Seal tape @ Rp. 2,000.00
Rp.

pa pvc tipe AW diameter 3/4"


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Pipa PVC @ Rp. 20,200.00
Seal tape @ Rp. 2,000.00
Rp.

bak mandi fiber glass, volume 0,30 m3 (50 x 50) cm


Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Bak Fiber @ Rp. 197,500.00
Perlengkapan 18% dari harga bak @ Rp. 35,550.00
Rp.

inding keramik 20 x 20 cm
Mandor @ Rp. 98,300.00 Rp.
Kepala tukang batu @ Rp. 90,700.00 Rp.
Tukang batu @ Rp. 83,100.00 Rp.
Pembantu tukang batu @ Rp. 68,000.00 Rp.
Ubin keramik 20 x 20 cm @ Rp. 2,400.00
Semen PC @ Rp. 1,500.00
Pasir pasang @ Rp. 67,500.00
Semen warna @ Rp. 12,500.00
Rp.

AN SEPTICTANK DAN RESAPAN


an 1 buah septictank
@ Rp. 98,300.00 Rp.
epala Tukang Batu @ Rp. 90,700.00 Rp.
@ Rp. 83,100.00 Rp.
aden Tukang Batu @ Rp. 68,000.00 Rp.
@ Rp. 68,000.00 Rp.
Rp.

an 1 buah Resapan
@ Rp. 98,300.00 Rp.
epala Tukang Batu @ Rp. 90,700.00 Rp.
@ Rp. 83,100.00 Rp.
aden Tukang Batu @ Rp. 68,000.00 Rp.
@ Rp. 68,000.00 Rp.
@ Rp. 62,100.00 Rp.
@ Rp. 287,500.00 Rp.
@ Rp. 42,500.00 Rp.
Rp.

t Cor Beton Tumbuk / Spesi 1 Pc : 2 Ps : 3 Kr


Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Batu @ Rp. 90,700.00 Rp.
Tukang Batu @ Rp. 83,100.00 Rp.
Laden Tukang Batu @ Rp. 68,000.00 Rp.
Semen Portland / Kg @ Rp. 1,500.00
Pasir Beton @ Rp. 67,500.00
Koral Beton @ Rp. 287,500.00
Rp.
t Beton Bertulang 1 Pc : 2 Ps : 3 Kr
Mandor @ Rp. 98,300.00 Rp.
Kepala Tukang Batu @ Rp. 90,700.00 Rp.
Tukang Batu @ Rp. 83,100.00 Rp.
Laden Tukang Batu @ Rp. 68,000.00 Rp.
Semen Portland / Kg @ Rp. 1,500.00
Pasir Beton @ Rp. 67,500.00
Koral Beton @ Rp. 287,500.00
Rp.
RJAAN

HARGA UPAH HARGA BAHAN JUMLAH

7,550.00
4,915.00
12,465.00 Rp. - Rp. 12,465.00

Rp. 23,460.00
Rp. 336,000.00
Rp. 3,900.00
Rp. 15,750.00
Rp. 2,025.00
Rp. 16,250.00
Rp. 58,950.00
166,200.00 Rp.
68,000.00 Rp.
18,140.00 Rp.
4,915.00 Rp.
257,255.00 Rp. 456,335.00 Rp. 713,590.00

491.50
907.00
8,310.00
6,800.00
Rp. 18,000.00
Rp. 13,020.00
Rp. 260.00
16,508.50 Rp. 31,280.00 Rp. 47,788.50

4,915.00
18,140.00
166,200.00
6,800.00
Rp. 23,460.00
Rp. 390,600.00
Rp. 3,900.00
Rp. 15,750.00
Rp. 2,025.00
Rp. 16,250.00
Rp. 58,950.00
196,055.00 Rp. 510,935.00 Rp. 706,990.00

2,457.50
51,000.00
53,457.50 Rp. - Rp. 53,457.50

4,423.50
61,200.00
65,623.50 Rp. - Rp. 65,623.50

1,474.50
20,400.00
Rp. 17,000.00
21,874.50 Rp. 17,000.00 Rp. 38,874.50

4,915.00
34,000.00
38,915.00 Rp. - Rp. 38,915.00

983.00
20,400.00
Rp. 51,000.00
21,383.00 Rp. 51,000.00 Rp. 72,383.00

983.00
20,400.00
Rp. 51,000.00
21,383.00 Rp. 51,000.00 Rp. 72,383.00

7,372.50
6,802.50
62,325.00
102,000.00
Rp. 255,000.00
Rp. 30,300.00
Rp. 32,737.50
178,500.00 Rp. 318,037.50 Rp. 496,537.50
3,833.70
3,537.30
32,409.00
53,040.00
Rp. 255,000.00
Rp. 18,360.00
92,820.00 Rp. 273,360.00 Rp. 366,180.00

7,864.00
2,267.50
20,775.00
112,200.00
Rp. 34,800.00
Rp. 35,100.00
Rp. 224,250.00
143,106.50 Rp. 294,150.00 Rp. 437,256.50

7,864.00
2,267.50
20,775.00
112,200.00
Rp. 34,800.00
Rp. 35,100.00
Rp. 224,250.00
143,106.50 Rp. 69,900.00 Rp. 213,006.50

29.49
63.49
581.70
476.00
Rp. 6,825.00
Rp. 240.00
1,150.68 Rp. 7,065.00 Rp. 8,215.68

29.49
63.49
581.70
476.00
Rp. 6,825.00
Rp. 240.00
1,150.68 Rp. 7,065.00 Rp. 8,215.68
29.49
63.49
581.70
476.00
Rp. 6,825.00
Rp. 240.00
1,150.68 Rp. 7,065.00 Rp. 8,215.68

29.49
63.49
581.70
476.00
Rp. 6,825.00
Rp. 240.00
1,150.68 Rp. 7,065.00 Rp. 8,215.68

2,555.80
2,358.20
21,606.00
35,360.00
Rp. 48,000.00
Rp. 3,900.00
Rp. 0.00
61,880.00 Rp. 51,900.00 Rp. 113,780.00

2,555.80
2,358.20
21,606.00
35,360.00
Rp. 54,000.00
Rp. 3,900.00
Rp. 0.00
61,880.00 Rp. 57,900.00 Rp. 119,780.00

3,243.90
2,993.10
27,423.00
44,880.00
Rp. 48,000.00
Rp. 5,200.00
Rp. 0.00
Rp. 18,000.00
Rp. 51,415.00
Rp. 27,600.00
78,540.00 Rp. 150,215.00 Rp. 228,755.00

3,243.90
2,993.10
27,423.00
44,880.00
Rp. 48,000.00
Rp. 5,200.00
Rp. 0.00
Rp. 21,600.00
Rp. 51,415.00
Rp. 27,600.00
78,540.00 Rp. 153,815.00 Rp. 232,355.00

3,243.90
2,993.10
27,423.00
44,880.00
Rp. 48,000.00
Rp. 5,200.00
Rp. 0.00
Rp. 18,000.00
Rp. 51,415.00
Rp. 82,800.00
78,540.00 Rp. 205,415.00 Rp. 283,955.00

3,243.90
2,993.10
27,423.00
44,880.00
Rp. 36,000.00
Rp. 5,200.00
Rp. 0.00
Rp. 18,000.00
Rp. 51,415.00
Rp. 27,600.00
Rp. 0.00
78,540.00 Rp. 138,215.00 Rp. 216,755.00
3,440.50
3,174.50
29,085.00
47,600.00
Rp. 331,250.00
Rp. 15,000.00
Rp. 3,037.50
Rp. 18,750.00
83,300.00 Rp. 368,037.50 Rp. 451,337.50

3,440.50
3,174.50
29,085.00
47,600.00
Rp. 331,250.00
Rp. 15,000.00
Rp. 3,037.50
Rp. 18,750.00
83,300.00 Rp. 368,037.50 Rp. 451,337.50

3,440.50
3,174.50
29,085.00
47,600.00
Rp. 33,125.00
Rp. 15,000.00
Rp. 3,037.50
Rp. 18,750.00
83,300.00 Rp. 69,912.50 Rp. 153,212.50

3,440.50
3,174.50
29,085.00
47,600.00
Rp. 62,275.00
Rp. 15,600.00
Rp. 3,037.50
Rp. 20,250.00
83,300.00 Rp. 101,162.50 Rp. 184,462.50

29,490.00
190,470.00
1,745,100.00
476,000.00
Rp. 1,440,000.00
Rp. 16,250.00
Rp. 30,000.00
2,441,060.00 Rp. 1,486,250.00 Rp. 3,927,310.00

73.73
1,360.50
13,605.00
1,020.00
Rp. 16,900.00
16,059.23 Rp. 16,900.00 Rp. 32,959.23

294.90
5,442.00
54,420.00
4,080.00
Rp. 140,600.00
64,236.90 Rp. 140,600.00 Rp. 204,836.90

73.73
1,360.50
13,605.00
1,020.00
Rp. 99,660.00
16,059.23 Rp. 99,660.00 Rp. 115,719.23

49.15
907.00
9,070.00
680.00
Rp. 11,300.00
10,706.15 Rp. 11,300.00 Rp. 22,006.15

73.73
1,360.50
13,605.00
1,020.00
Rp. 16,600.00
16,059.23 Rp. 16,600.00 Rp. 32,659.23
98.30
1,814.00
18,140.00
1,360.00
13,300.00 Rp. 13,300.00
34,712.30 Rp. 13,300.00 Rp. 48,012.30

245.75
4,535.00
45,350.00
3,400.00
Rp. 43,800.00
53,530.75 Rp. 43,800.00 Rp. 97,330.75

4,915.00
22,675.00
226,750.00
68,000.00
Rp. 20,100.00
322,340.00 Rp. 20,100.00 Rp. 342,440.00

245.75
4,535.00
45,350.00
3,400.00
Rp. 9,000.00
53,530.75 Rp. 9,000.00 Rp. 62,530.75

1,474.50
907.00
8,310.00
20,400.00
Rp. 24,000.00
Rp. 17,250.00
Rp. 2,902.50
31,091.50 Rp. 44,152.50 Rp. 75,244.00

1,474.50
1,360.50
12,465.00
20,400.00
Rp. 11,664.00
Rp. 1,552.50
35,700.00 Rp. 13,216.50 Rp. 48,916.50

1,474.50
1,360.50
12,465.00
20,400.00
Rp. 11,664.00
Rp. 2,565.00
35,700.00 Rp. 14,229.00 Rp. 49,929.00

1,081.30
3,174.50
29,085.00
14,280.00
Rp. 20,400.00
Rp. 1,495.00
100,448.00 Rp. 21,895.00 Rp. 122,343.00

491.50
907.00
8,310.00
6,800.00
Rp. 22,000.00
Rp. 51,000.00
16,508.50 Rp. 73,000.00 Rp. 89,508.50

245.75
544.20
816.30
4,760.00
Rp. 6,000.00
Rp. 4,005.00
Rp. 4,692.00
Rp. 6,864.00
6,366.25 Rp. 21,561.00 Rp. 27,927.25

327.34
390.01
3,900.10
1,904.00
3,588.00 Rp. 3,588.00
Rp. 3,749.00
10,109.45 Rp. 7,337.00 Rp. 17,446.45

19,660.00
108,840.00
997,200.00
272,000.00
Rp. 1,320,000.00
Rp. 306,000.00
Rp. 10,400.00
1,397,700.00 Rp. 1,636,400.00 Rp. 3,034,100.00

491.50
907.00
8,310.00
6,800.00
Rp. 26,304.08
Rp. 1,314.00
16,508.50 Rp. 27,618.08 Rp. 44,126.58

98.30
907.00
8,310.00
13,600.00
Rp. 46,760.00
22,915.30 Rp. 46,760.00 Rp. 69,675.30

491.50
907.00
8,310.00
6,800.00
Rp. 0.00
Rp. 1,314.00
16,508.50 Rp. 1,314.00 Rp. 17,822.50

15,728.00
136,050.00
124,650.00
68,000.00
Rp. 139,600.00
Rp. 9,000.00
Rp. 675.00
344,428.00 Rp. 149,275.00 Rp. 493,703.00

491.50
907.00
8,310.00
680.00
Rp. 20,200.00
Rp. 1,000.00
10,388.50 Rp. 21,200.00 Rp. 31,588.50

491.50
907.00
8,310.00
680.00
Rp. 24,240.00
Rp. 1,000.00
10,388.50 Rp. 25,240.00 Rp. 35,628.50

10,813.00
48,978.00
224,370.00
122,400.00
197,500.00 Rp. 197,500.00
Rp. 6,399.00
604,061.00 Rp. 203,899.00 Rp. 807,960.00

4,423.50
4,081.50
37,395.00
61,200.00
Rp. 63,600.00
Rp. 13,950.00
Rp. 1,215.00
Rp. 24,250.00
107,100.00 Rp. 103,015.00 Rp. 210,115.00
88,470.00
81,630.00
373,950.00
204,000.00
27,200.00
775,250.00 Rp. Rp. 775,250.00

88,470.00
81,630.00
373,950.00
204,000.00
27,200.00
62,100.00
287,212.50
42,500.00
775,250.00 Rp. 391,812.50 Rp. 1,167,062.50

7,864.00
2,267.50
20,775.00
112,200.00
Rp. 34,800.00
Rp. 35,100.00
224,250.00
143,106.50 Rp. 294,150.00 Rp. 437,256.50

7,864.00
2,267.50
20,775.00
112,200.00
Rp. 34,800.00
Rp. 35,100.00
Rp. 224,250.00
143,106.50 Rp. 294,150.00 Rp. 437,256.50

Rp 3,897,147.31
Rp 70,148.65
$ 206,900,100.00
$ 180,000,000.00
$ 1,800,000.00
$ 21,600,000.00
$ 158,400,000.00
$ 38,400,000.00
$ 54,000,000.00
u 206,137.18
b 353,115.00
0.0076666667
0.0383333333
RENCANA AN
PROGRAM
KEGIATAN
TAHUN ANGGARAN

No.

1
I

II
1

III
1

2
3

IV
1
2

V
1

VI

VII
1

2
2

3
4

10
12
20
21
22

23
24
25

26
RENCANA ANGGARAN BIAYA

GIATAN
HUN ANGGARAN

Uraian Pekerjaan Volume

2 4
PEKERJAAN PENDAHULUAN
Pembuatan Papan Nama Proyek 1.00
Pengukuran dan pemasangan bowplank 40.60
Pembersihan lokasi 1.00

PEKERJAAN TANAH DAN PONDASI


Penimbunan/peninggian & pemadatan tanah di lokasi
a. Mengurug sirtu padat untuk perbaikan tanah 142
Pondasi beton footplat 80 x 80 x 100 cm (100 kg + bekisting)
a. Menggali tanah biasa sedalam 1m 12
b. Mengurug tanah kembali 11.08
c. Lantai kerja beton tumbuk 1pc:3ps:5kr 1.2
d. Bekisting untuk pondasi 5.76
e. Beton bertulang 100kg besi 1pc : 2ps : 4kr 0.92
Pek. Slof 15 x 20 cm (100kg + bekisting)
a. Bekisting untuk sloof 16.27
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr 1.22
Pek. Kolom 15 x 15 x 345 cm (100 + bekisting)
a. bekisting untuk kolom 10.35
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr 0.78
Pek. Ringbalk 15 x 20 cm (100kg + bekisting)
a. Bekisting untuk balok 21.97
b. Beton brtulang 100 kg besi 1 pc : 2ps : 4kr 1.65
c. Plesteran 1pc : 5ps, tebal 15mm 16.48
d. Acian 16.48

PEKERJAAN DINDING PINTU DAN JENDELA


Pek. Dinding dan gewel
a. Pas. Bataco 1pc : 5ps 119.49
b. Plesteran 1pc : 5ps tebal 15mm 238.97
c. Acian 238.97
Pek. Kusen, pintu dan jendela
a. Membuat dan memasang kusen pintu dan jendela, 0.06
kayu kelas kuat I
b. Membuat & memasang daun pintu panil, kayu kelas kuat I 5.21
Pintu PVC + kusen PVC (pintu WC) 1
d. Pintu harmonika tebal 1mm + asesoris lengkap terpasang 17.18
e. Pasang pagar BRC jadi T = 1m 9.4
Pek. Engsel, kunci dan kaca
a. Pasang engsel pintu 2
b. pasang kunci tanam standar 1
c. Pasang kunci tanam kamar mandi 1
d. Pasang 1 buah kaca bening 5mm 3

PEKERJAAN LANTAI, KERAMIK & HALAMAN DEPAN


Pek. Urugan bawah lantai & pemadatan/perataan 18
Pek. Lantai ruang & keramik WC
A. Pek. Lantai ruang
a. Beton tumbuk 1pc : 3ps : 5kr 7.2
b. Memasang keramik lantai ukuran 40x40 cm 57
c. Memasang plin keramik 10x40cm 34.34
B. Pek. Keramik WC
a. Memasang lantai keramik ukuran 20x20 cm 2.64
b. Memasang keramik lantai ukuran 25x20 cm 5.46
Pek. Perkerasan/ cor halaman depan t = 10cm
a. beton tumbuk 1pc : 3ps : 6kr 5.43
b. Plesteran 1pc:5ps tebal 15mm 45.29

PEKERJAAN ATAP DAN LISTRIK


Pekerjaan rangka penutup atap
a. Pek. Rangka atap baja ringan zinc alum + atap metal 119.23
zincalum 2 susun lengkap terpasangn (termasuk nok dan
Jurai)
b. Lisplang uk. (3x30) kayu kelas I (kayu benuas) 44.1
Pekerjaan listrik
a. Instalasi titik lampu bang.beton 5
b. Lampu TL bambu 40 watt 2
c. Lampu SL 20 watt untuk gudang peralatan & lampu luar 3
d. Instalasi stop kontak bang beton 3

PEKERJAAN SANITASI
a. Septictank dan rembesan 2 m3 1
b. Memasang closed Jongkok porselen 1
c. memasang bak mandi fiberglass 1
d. Memasang floor drain 1
e. Memasang kran 3/4" atau 1/2" 1
f. Memasang pipa PVC tipe AW 3/4 20
g. Memasang pipa penyalur air limbah jenis pipa tanah 3" 3

PEKERJAAN PENGECATAN
Pek. Pengecatan dinding, kolom & balok beton
a. Pengecatan Tembok Dinding ( 1 plamir, 1 lapis cat dasar 266.86
2 lapis cat penutup)
Pek. Pengecatan seluruh kusen, pintu & lisplank
a. Pengecatan kilap kayu/besi ( 1 lapis cat dasar, 3 lapis cat 46.77
kilap penutup)

Galian Tanah Biasa 1.00


Urugan Tanah Kembali 1.00
Urugan Pasir 1.00
Pasang Pondasi Batu Belah 1.00
Pasangan Batu Kosong 0.00

PEKERJAAN PEMBETONAN

b. Sloof 15/20
Membuat Beton Bertulang 1.00
Pembesian dengan besi 8 mm 1.00
Pembesian dengan besi 6 mm 1.00
Pasang Bekisting untuk Sloof 1.00
c. Kolom
Membuat Beton Bertulang 1.00
Pembesian dengan besi 8 mm 1.00
Pembesian dengan besi 6 mm 1.00
Pasang Bekisting untuk Kolom 1.00
d. Balok
Membuat Beton Bertulang 1.00
Pembesian dengan besi 6 mm 1.00
Pembesian dengan besi 4 mm 1.00
Pasang Bekisting untuk Balok 1.00
e. Plat teras
Membuat Beton Bertulang 1.00
Pembesian dengan besi 8 mm 1.00
Pembesian dengan besi 6 1.00
Pasang Bekisting untuk teras 1.00

PEKERJAAN LANTAI
Pasang Lantai Keramik 30x30 1.00
Pasang Lantai Keramik 15x20 1.00
cor lantai 1.00
Urugan Pasir 1.00
spesi lantai 1.00
tanah urugan 1.00

PEKERJAAN KUSEN PINTU,JENDELA DAN VENTILASI


Pasang Kusen Pintu dan Jendela Kayu Meranti 1.00
Pasang Pintu Panel Kayu 1.00
Pasang 1 Buah Engsel Pintu 1.00
Pasang 1 Buah Kunci 1.00
Pasang kaca, tebal 3 mm 1.00
Pasang 1 Buah Engsel Jendela 1.00

PEKERJAAN DINDING DAN PLESTERAN


Pasangan batako 1.00
Plesteran 1 Pc : 3 Ps tebal 15 cm 1.00

PEKERJAAN PLAFOND
Langit-langit ( 60 x 120 cm ), tebal 4 mm 1.00
Pasang rangka Langit-langit ( 60 x 120 cm ), kayu lanan 1.00

PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu Baru 1 lapis plamir, 1.00
Pengecatan Bidang Tembok Baru 1 lapis plamir, 1.00

PEKERJAAN KUDA-KUDA DAN ATAP


Pasang Konstruksi Atap Kayu Meranti 1.00
Pasang Atap Genteng Metal 1.00

PEKERJAAN KAMAR MANDI


Memasang 1 Buah Kloset Jongkok Berwarna INA 1.00
Memasang 1 Buah Kran 1.00
Memasang 1 Buah Bak mandi 1.00
PEKERJAAN INSTALASI LISTRIK DAN AIR
Paku Kayu 1.00
Pipa Saluran Air Kotor 4 1.00
Pipa Saluran Air Kotor 2 1.00
Pompa Air 1.00

PEKERJAAN SEPTICTANK DAN RESAPAN


Menggali galian 1 buah septictank 1.0
Membuat Cor Beton Tumbuk / Spesi 1.0
Membuat Beton Bertulang 1.0

PEKERJAAN CARPORT
Cor beton tumbuk 1.00
TOTAL KESELURUHAN
NGGARAN BIAYA

Harga Harga Jumlah


Sat. Satuan Bahan Satuan Upah Total Harga
(Rp) (Rp) (Rp)
5 6 7

bh Rp - Rp 200,000.00
m Rp 16,508.50 Rp 31,280.00 Rp 1,940,213.10
lok Rp - Rp 300,000.00
SUB TOTAL I Rp 2,440,213.10

m3 Rp 21,383.00 Rp 51,000.00 Rp 10,278,386.00

m3 Rp 53,457.50 Rp - Rp 641,490.00
m3 Rp 21,383.00 Rp 51,000.00 Rp 802,003.64
m3 Rp 143,106.50 Rp 294,150.00 Rp 524,707.80
m2 Rp 61,880.00 Rp 51,900.00 Rp 655,372.80
m3 Rp 206,137.18 Rp 353,115.00 Rp 514,512.01

m2 Rp 61,880.00 Rp 57,900.00 Rp 1,948,820.60


m3 Rp 206,137.18 Rp 353,115.00 Rp 682,287.66

m2 Rp 78,540.00 Rp 150,215.00 Rp 2,367,614.25


m3 Rp 206,137.18 Rp 353,115.00 Rp 436,216.70

m2 Rp 78,540.00 Rp 153,815.00 Rp 5,104,839.35


m3 Rp 206,137.18 Rp 353,115.00 Rp 922,766.10
m2 Rp 35,700.00 Rp 13,216.50 Rp 806,143.92
m2 Rp -
SUB TOTAL II Rp 25,685,160.82

m2 Rp 31,091.50 Rp 44,152.50 Rp 8,990,905.56


m2 Rp 35,700.00 Rp 13,216.50 Rp 11,689,576.01
m2 Rp 35,700.00 Rp 13,216.50 Rp 11,689,576.01

m3 Rp - Rp 382,050.00 Rp 382,050.00

m2 Rp - Rp - Rp 2,000,000.00
set Rp - Rp 270,000.00 Rp 270,000.00
m2 Rp - Rp 750,000.00 Rp 12,885,000.00
m Rp 31,091.50 Rp 44,152.50 Rp 707,293.60

bh Rp 16,059.23 Rp 16,900.00 Rp 65,918.45


bh Rp 64,236.90 Rp 140,600.00 Rp 204,836.90
bh Rp 64,236.90 Rp 140,600.00 Rp 204,836.90
bh Rp 16,059.23 Rp 99,660.00 Rp 347,157.68
SUB TOTAL III Rp 49,437,151.10

m3 Rp 21,383.00 Rp 51,000.00 Rp 1,302,894.00

m3 Rp 143,106.50 Rp 69,900.00 Rp 1,533,646.80


m2 Rp 83,300.00 Rp 368,037.50 Rp 25,726,237.50
m Rp 83,300.00 Rp 69,912.50 Rp 5,261,317.25

m2 Rp 83,300.00 Rp 368,037.50 Rp 1,191,531.00


m2 Rp 83,300.00 Rp 101,162.50 Rp 1,007,165.25

m3 Rp 143,106.50 Rp 69,900.00 Rp 1,156,625.30


m2 Rp 35,700.00 Rp 13,216.50 Rp 2,215,428.29
SUB TOTAL IV Rp 39,394,845.38

m2 Rp - Rp 170,000.00 Rp 20,269,100.00

m Rp 16,508.50 Rp 1,314.00 Rp 785,972.25

ttk Rp 15,000.00 Rp 15,000.00 Rp 150,000.00


bh Rp 15,000.00 Rp 35,000.00 Rp 100,000.00
bh Rp 15,000.00 Rp 25,000.00 Rp 120,000.00
bh Rp 200,000.00 Rp 600,000.00
SUB TOTAL V Rp 22,025,072.25

bh Rp 775,250.00 Rp 391,812.50 Rp 1,167,062.50


unit Rp 344,428.00 Rp 149,275.00 Rp 493,703.00
unit Rp 604,061.00 Rp 203,899.00 Rp 807,960.00
unit Rp 15,000.00 Rp 15,000.00 Rp 30,000.00
unit Rp 10,388.50 Rp 21,200.00 Rp 31,588.50
m Rp 10,388.50 Rp 25,240.00 Rp 712,570.00
m Rp 10,388.50 Rp 25,240.00 Rp 106,885.50
SUB TOTAL VI Rp 3,349,769.50

m2 Rp 6,366.25 Rp 21,561.00 Rp 7,452,665.94

m2 Rp 10,109.45 Rp 7,337.00 Rp 815,970.42


SUB TOTAL I Rp 8,268,636.35
Jumlah Biaya Pekerjaan Rp 147,251,079.00
PPN 10% Rp 14,725,107.90
Jumlah Total Rp 161,976,186.90
Jumlah Total Pembulatan Rp 162,000,000.00

M3 Rp 53,457.50 Rp 53,457.50
M3 Rp 17,000.00 Rp 38,874.50 Rp 55,874.50
M3 Rp 51,000.00 Rp 21,383.00 Rp 72,383.00
M3 Rp 178,500.00 Rp 496,537.50 Rp 675,037.50
M3 Rp - Rp -
SUB TOTAL II Rp 856,752.50

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00
M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00

M3 Rp 143,106.50 Rp 294,150.00 Rp 437,256.50


kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
kg Rp 1,150.68 Rp 7,065.00 Rp 8,215.68
M2 Rp 61,880.00 Rp 57,900.00 Rp 119,780.00
SUB TOTAL III Rp 2,293,871.44

M2 Rp 83,300.00 Rp 368,037.50 Rp 451,337.50


M2 Rp 83,300.00 Rp 101,162.50 Rp 184,462.50
M3 Rp 143,106.50 Rp 69,900.00 Rp 213,006.50
M3 Rp 21,383.00 Rp 51,000.00 Rp 72,383.00
M3 Rp 21,383.00 Rp 51,000.00 Rp 72,383.00
M3 Rp 21,383.00 Rp 51,000.00 Rp 72,383.00
SUB TOTAL IV Rp 1,065,955.50

M Rp 2,441,060.00 Rp 1,486,250.00 Rp 3,927,310.00


M2 Rp 322,340.00 Rp 20,100.00 Rp 342,440.00
Buah Rp 16,059.23 Rp 16,900.00 Rp 32,959.23
Buah Rp 64,236.90 Rp 140,600.00 Rp 204,836.90
M2 Rp 16,059.23 Rp 99,660.00 Rp 115,719.23
Buah Rp 10,706.15 Rp 11,300.00 Rp 22,006.15
Rp -
SUB TOTAL V Rp 4,645,271.50

M2 Rp 31,091.50 Rp 44,152.50 Rp 75,244.00


M2 Rp 35,700.00 Rp 13,216.50 Rp 13,216.50
SUB TOTAL VI Rp 88,460.50

M2 Rp 16,508.50 Rp 73,000.00 Rp 89,508.50


M2 Rp 100,448.00 Rp 21,895.00 Rp 122,343.00
SUB TOTAL VII Rp 211,851.50

M2 Rp 6,366.25 Rp 21,561.00 Rp 27,927.25


M2 Rp 10,109.45 Rp 7,337.00 Rp 17,446.45
SUB TOTAL VIII Rp 45,373.70

M2 Err:509 Err:509 Rp 69,675.30


M2 Rp 22,915.30 Rp 46,760.00 Rp 46,760.00
SUB TOTAL IX Rp 116,435.30

Buah Rp 344,428.00 Rp 149,275.00 Rp 493,703.00


Buah Rp 10,388.50 Rp 21,200.00 Rp 31,588.50
Buah Rp 604,061.00 Rp 203,899.00 Rp 807,960.00
SUB TOTAL X Rp 1,333,251.50

Kg Rp - Rp -
Buah Rp - Rp -
Buah Rp - Rp -
Buah Rp - Rp -
SUB TOTAL XI Rp -

M3 Rp - Rp -
M3 Rp - Rp -
M3 Rp - Rp -
SUB TOTAL XII Rp -

M3 Rp - Rp -
Rp 13,097,436.54
35.8455
573,467.86
573,467.86

72,383.00

211,851.50

133,834.20