RFQ

165788
RFQ Name Project
16-5788 West High School Modernization and Auditorium Building

RFQ Prepared Date Territory Manager


01/12/2016 Quentin Wilmot

Details
Project Details RFQ Details

Project Territory Manager Quentin Wilmot RFQ Prepared Date 01/12/2016


West High School Modernization
and Auditorium Building
Firm Bid Date 20/12/2016 14:00
Project Number
16-5788
Customer/Contractor All Bidders Alternate Bid Date
Project Type
004 Educational
Contact Name Bid Time
Street Address 1
20401 Victor St.
Contact Number
Street Address 2
Street Address 3
Technical Contact Project Style Remodel
State
CA
Technical Contact Number Structural Stamp Required PE
City
Torrance
Seismic Deisgn Criteria USA - D
Zip Code
90503
Industry Seismic

FTP Site Login Information

Scope
Service Choose Service and Check all that apply

https://gripple1.crm4.dynamics.com/_forms/print/print.aspx?allsubgridspages=false&formid=768c17e168934ba1b3c153143ff323d8&id=%7b7053A38F15B8E61180EAC4346BAD506C%7d&objectType=10034&title=RFQ%3a%20165788 1/5
12/6/2016 RFQ:165788

Seismic Seismic VI VI
Industrial Please see: INDUSTRIAL Installation Design Details Section below

Fire Pro Pipe Yes Fire Pro Pipe No

Plumbing Pipe Yes Plumbing Pipe No

Plumbing Equipment No Plumbing Equipment No

NG/LPG/MG/LG Piping Yes NG/LPG/MG/LG Piping No

NG/LPG/MG/LG Equipment No NG/LPG/MG/LG Equipment No

HVAC Ductwork Yes HVAC Ductwork No

HVAC Dry Side Equipment Yes HVAC Dry Side Equipment No

HVAC / Mech Pipe Yes HVAC / Mech Pipe No

HVAC Wet Side Equipment Yes HVAC Wet Side Equipment No

Electrical Conduit / Busduct Yes Electrical Conduit / Busduct No

Electrical Systems / Cable Tray Yes Electrical Systems / Cable Tray No

Electrical Equipment Yes Electrical Equipment No

Lighting Fixtures No Lighting Fixtures No

BIM No BIM No

Clash Detection No Clash Detection No

Specs Received Select all that apply and give section number
Specs Received Select all that apply and give section number Section Number

https://gripple1.crm4.dynamics.com/_forms/print/print.aspx?allsubgridspages=false&formid=768c17e168934ba1b3c153143ff323d8&id=%7b7053A38F15B8E61180EAC4346BAD506C%7d&objectType=10034&title=RFQ%3a%20165788 2/5
12/6/2016 RFQ:165788

Seismic N/A Section Number

VI N/A Section Number

Electrical Conduit & Cable Tray Support Received Section Number 260548

HVAC Ductwork & Piping Support Received Section Number 230548

Structural Drawings N/A Section Number

Plans Received Check all that apply


Fire Received HVAC / Mechanical Piping Received

Plumbing Received Electric Received

NG / LPG / MG / LG Received Process N/A

HVAC Ductwork Received Other:

Building & Equipment Criteria: Check most appropriate


Occupancy Category III - (Assembly, Schools that are not shelters, etc;)

Site Class D

Distribution Importance Factor

HVAC Importance Factor 1.0

Plumbing Importance Factor 1.0

Gas / Medical Gas Importance Factor 1.5

Conduit / Tray Importance Factor 1.0

Other Importance Factor 1.0

https://gripple1.crm4.dynamics.com/_forms/print/print.aspx?allsubgridspages=false&formid=768c17e168934ba1b3c153143ff323d8&id=%7b7053A38F15B8E61180EAC4346BAD506C%7d&objectType=10034&title=RFQ%3a%20165788 3/5
12/6/2016 RFQ:165788

Equipment Importance Factor

Essential / Hazardous / Flamable Equipment List

Misc. Notes

Misc. Notes

INDUSTRIAL Installation Design Details

1. Services Select all that apply


HVAC HVAC Pipework Pipework

Round Duct No Mechanical Piping No

Oval Duct No Plumbing Domestic No

Rectangular Duct No Plumbing Drain Lines No

Dry Side Equipment No Medical Gas Piping No

Coordinated Brackets Separate Brackets

Electrical Electrical Other Other

Individual Lighting Units No Acoustic Baffles No

Track Lighting No Other

https://gripple1.crm4.dynamics.com/_forms/print/print.aspx?allsubgridspages=false&formid=768c17e168934ba1b3c153143ff323d8&id=%7b7053A38F15B8E61180EAC4346BAD506C%7d&objectType=10034&title=RFQ%3a%20165788 4/5
12/6/2016 RFQ:165788

Recessed Lighting No

Cable Tray No

Conduit / Busduct No

Notes specific area to quote,...

2. Is Catenary Required?
If yes, submit framing drawings and elevation views. Give details on preferred Catenary direction i.e. spanning over purlins or spanning over steels, accessories...

3. Products Give full details of preferred products and accessories for all services to be supported.
HVAC Pipework

Round: teardrop/cradle? Oval: cradle, strut+MTZ? Rectangular: DT2, strut+MTZ? Equipment: HF, TZ, MTZ Single pipes: GC2, MTZ for clevis hanger? Racks: PB or LPB? Hanger for PB: rod, MTZ?

Electrical Other

Lighting: if Angel, YFit or V Bracket? YFit end fixing? tray: strut+MTZ/TZ.? Conduit: PB+MTZ/rod.? Other

4. End Fixings Soffit type and preferred end fixings for all services
Details: without indication 3/8" stud or loop will be quoted as default

5. Drop Lengths Drop lengths for all services in all areas of the building.
Details: without indication or detailed elevation view length of cable won't be indicated xxFT

6. Comments Any other comments. Accessories Required? NonStandard Bracket Spacing? Special Circumstances?