Exploring Oracle Primavera P6 Professional 18, 3rd Edition
By Sham Tickoo
()
About this ebook
Exploring Oracle Primavera P6 Professional 18 textbook explains the concepts and principles of project management through practical examples, tutorials, and exercises. This enables the users to harness the power of managing projects with Oracle Primavera P6 for their specific use. In this textbook, the author emphasizes on planning, managing and controlling the projects, assigning resources and roles to a project, and producing schedule and resources reports and graphics. This textbook is specially meant for professionals and students in engineering, project management and allied fields in the building industry.
Some of the Salient Features of this textbook are as follows:
Detailed explanation of Oracle Primavera concepts.
Real-world projects given as tutorials.
Tips and Notes throughout the textbook.
264 pages of illustrated text.
Self-Evaluation Tests, Review Questions, and Exercises at the end of the chapters.
Free Teaching and Learning Resources:
CADCIM Technologies provides the following free teaching and learning resources with this textbook:
All data files used in tutorials, exercises (For Faculty only), and illustrations
Customizable PowerPoint Presentations of all chapter (For Faculty only)
Instructor Guide with solution to all review questions and exercises (For Faculty only)
Sham Tickoo
Prof. Sham Tickoo is professor of Manufacturing Engineering at Purdue University Northwest, USA where he has taught design, drafting, CAD and other engineering courses for over nineteen years. Before joining Purdue University, Prof. Tickoo has worked as a machinist, quality control engineer, design engineer, engineering consultant, and software developer. He has received a US patent for his invention Self Adjusting Cargo Organizer for Vehicles. Professor Tickoo also leads the team of authors at CADCIM Technologies to develop world-class teaching and learning resources for Computer Aided Design and Manufacturing (CAD/CAM) and related technologies.
Read more from Sham Tickoo
AutoCAD MEP 2016 for Designers Rating: 0 out of 5 stars0 ratingsExploring Bentley STAAD.Pro CONNECT Edition, 3rd Edition Rating: 5 out of 5 stars5/5CATIA V5-6R2014 for Designers Rating: 3 out of 5 stars3/5Exploring Autodesk Revit 2018 for Architecture, 14th Edition Rating: 5 out of 5 stars5/5AutoCAD Plant 3D 2015 for Designers Rating: 5 out of 5 stars5/5Exploring Bentley STAAD.Pro V8i Rating: 4 out of 5 stars4/5Exploring Autodesk Revit 2018 for MEP, 5th Edition Rating: 1 out of 5 stars1/5Exploring AutoCAD Civil 3D 2017 , 7th Edition Rating: 5 out of 5 stars5/5Introduction to C++ Programming Rating: 3 out of 5 stars3/5Autodesk Inventor 2016 for Designers Rating: 5 out of 5 stars5/5SOLIDWORKS Simulation 2018: A Tutorial Approach Rating: 0 out of 5 stars0 ratingsExploring Autodesk Revit 2018 for Structure, 8th Edition Rating: 5 out of 5 stars5/5Autodesk Revit Architecture 2016 for Architects and Designers Rating: 5 out of 5 stars5/5Adobe Premiere Pro CC: A Tutorial Approach Rating: 5 out of 5 stars5/5Exploring Bentley STAAD.Pro V8i (SELECTseries 6) Rating: 0 out of 5 stars0 ratingsAutodesk Maya 2018: A Comprehensive Guide, 10th Edition Rating: 0 out of 5 stars0 ratingsAutoCAD Electrical 2017 for Electrical Control Designers, 8th Edition Rating: 3 out of 5 stars3/5SOLIDWORKS Simulation 2016: A Tutorial Approach Rating: 5 out of 5 stars5/5Exploring Autodesk Revit Structure 2016 Rating: 5 out of 5 stars5/5Introduction to Java Programming, 2nd Edition Rating: 5 out of 5 stars5/5Solid Edge ST9 for Designers, 14th Edition Rating: 0 out of 5 stars0 ratingsAutoCAD Electrical 2016 for Electrical Control Designers Rating: 0 out of 5 stars0 ratingsIntroducing PHP 7/MySQL Rating: 0 out of 5 stars0 ratingsPixologic ZBrush 4R7: A Comprehensive Guide Rating: 0 out of 5 stars0 ratingsPTC Creo Parametric 3.0 for Designers Rating: 5 out of 5 stars5/5Exploring Autodesk Revit MEP 2016 Rating: 4 out of 5 stars4/5Autodesk 3ds Max 2016: A Comprehensive Guide Rating: 0 out of 5 stars0 ratingsExploring AutoCAD Civil 3D 2016 Rating: 5 out of 5 stars5/5NX Nastran 9.0 for Designers Rating: 5 out of 5 stars5/5Exploring Autodesk Revit 2017 for Architecture, 13th Edition Rating: 5 out of 5 stars5/5
Related to Exploring Oracle Primavera P6 Professional 18, 3rd Edition
Related ebooks
Repetitive Project Scheduling: Theory and Methods Rating: 0 out of 5 stars0 ratingsPMI-SP Success Blueprint: Q&A with Explanations Rating: 0 out of 5 stars0 ratingsProject Controls A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsProject controller A Complete Guide Rating: 0 out of 5 stars0 ratingsProject Control: Integrating Cost and Schedule in Construction Rating: 0 out of 5 stars0 ratingsThe Government Manager's Guide to Earned Value Management Rating: 0 out of 5 stars0 ratingsManaging Enterprise Projects: Using Project Online and Microsoft Project Server 2019 Rating: 0 out of 5 stars0 ratingsHow to Track Schedules, Costs and Earned Value with Microsoft Project Rating: 0 out of 5 stars0 ratingsIntegrated Project Planning and Construction Based on Results Rating: 0 out of 5 stars0 ratingsProject Control Third Edition Rating: 0 out of 5 stars0 ratingsGuide to Good Practice in the Management of Time in Complex Projects Rating: 0 out of 5 stars0 ratingsPMI-RMP Success Blueprint :Q&A with Explanations Rating: 0 out of 5 stars0 ratingsProject Control Stages A Complete Guide - 2019 Edition Rating: 0 out of 5 stars0 ratingsOracle Primavera P6 Version 8: Project and Portfolio Management Rating: 4 out of 5 stars4/5The Certified Scheduling Professional Rating: 5 out of 5 stars5/5Cloud Computing : Beginners And Intermediate User Guide Rating: 0 out of 5 stars0 ratingsTotal Cost Management A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsCritical path Complete Self-Assessment Guide Rating: 0 out of 5 stars0 ratingsImprovement and Efforts to Minimize Project Delays Rating: 0 out of 5 stars0 ratingsProject Control Methods and Best Practices: Achieving Project Success Rating: 0 out of 5 stars0 ratingsCost Control Systems A Complete Guide - 2020 Edition Rating: 0 out of 5 stars0 ratingsConstruction Scheduling with Primavera P6 Rating: 3 out of 5 stars3/5Practical Earned Value Analysis: 25 Project Indicators from 5 Measurements Rating: 0 out of 5 stars0 ratingsOffice 365 in Business Rating: 0 out of 5 stars0 ratingsEarned Schedule Plus Rating: 0 out of 5 stars0 ratingsThe Project Manager's Pocket Survival Guide Rating: 5 out of 5 stars5/5Managing a project with Microsoft Project 2010 Rating: 2 out of 5 stars2/5Project Management Office Complete Self-Assessment Guide Rating: 0 out of 5 stars0 ratingsMultisensor Instrumentation 6σ Design: Defined Accuracy Computer-Integrated Measurement Systems Rating: 0 out of 5 stars0 ratingsProject Management Techniques A Complete Guide Rating: 0 out of 5 stars0 ratings
Technology & Engineering For You
The Big Book of Maker Skills: Tools & Techniques for Building Great Tech Projects Rating: 4 out of 5 stars4/5The Big Book of Hacks: 264 Amazing DIY Tech Projects Rating: 4 out of 5 stars4/5The Art of War Rating: 4 out of 5 stars4/5Ultralearning: Master Hard Skills, Outsmart the Competition, and Accelerate Your Career Rating: 4 out of 5 stars4/5How to Write Effective Emails at Work Rating: 4 out of 5 stars4/5Elon Musk: Tesla, SpaceX, and the Quest for a Fantastic Future Rating: 4 out of 5 stars4/580/20 Principle: The Secret to Working Less and Making More Rating: 5 out of 5 stars5/5The 48 Laws of Power in Practice: The 3 Most Powerful Laws & The 4 Indispensable Power Principles Rating: 5 out of 5 stars5/5My Inventions: The Autobiography of Nikola Tesla Rating: 4 out of 5 stars4/5Smart Phone Dumb Phone: Free Yourself from Digital Addiction Rating: 0 out of 5 stars0 ratingsThe ChatGPT Millionaire Handbook: Make Money Online With the Power of AI Technology Rating: 0 out of 5 stars0 ratingsThe CIA Lockpicking Manual Rating: 5 out of 5 stars5/5Logic Pro X For Dummies Rating: 0 out of 5 stars0 ratingsBroken Money: Why Our Financial System is Failing Us and How We Can Make it Better Rating: 5 out of 5 stars5/5The Art of War Rating: 4 out of 5 stars4/5The Fast Track to Your Technician Class Ham Radio License: For Exams July 1, 2022 - June 30, 2026 Rating: 5 out of 5 stars5/5No Nonsense Technician Class License Study Guide: for Tests Given Between July 2018 and June 2022 Rating: 5 out of 5 stars5/5A History of the American People Rating: 4 out of 5 stars4/5Understanding Media: The Extensions of Man Rating: 4 out of 5 stars4/5Artificial Intelligence: A Guide for Thinking Humans Rating: 4 out of 5 stars4/5The Systems Thinker: Essential Thinking Skills For Solving Problems, Managing Chaos, Rating: 4 out of 5 stars4/5Summary of Nicolas Cole's The Art and Business of Online Writing Rating: 4 out of 5 stars4/5Longitude: The True Story of a Lone Genius Who Solved the Greatest Scientific Problem of His Time Rating: 4 out of 5 stars4/5Ghost Rider: Travels on the Healing Road Rating: 4 out of 5 stars4/5The Invisible Rainbow: A History of Electricity and Life Rating: 4 out of 5 stars4/5Stop Asking Questions: How to Lead High-Impact Interviews and Learn Anything from Anyone Rating: 5 out of 5 stars5/5
Reviews for Exploring Oracle Primavera P6 Professional 18, 3rd Edition
0 ratings0 reviews