No Uraian Pekerjaan Analisa Volume Satuan H. Satuan


1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 Unit 250,000.00
2 Papan Nama Proyek Ls 1.00 Unit 350,000.00
3 Sewa Direksi keet Ls 1.00 Unit 1,750,000.00
4 Penyediaan Air Kerja Ls 1.00 Unit 200,000.00
5 Pembongkaran Ls 1.00 Unit 75,000.00
6 Pelaporan, Dokumentasi Ls 1.00 Unit 1,850,000.00

II PEK. TANAH
1 Pek. Bowplank Ls 1.00 Unit 350,000.00
2 Galian Tanah 6.1 184.00 M3 14,880.00

III PEK. BETON


1 Pas. Pondasi Beton Cor 1Sp : 3 Ps : 5 Kr 5.1 44.70 M3 537,360.00

IV PEK. PEMBESIAN
1 Besi. L 6.60.60 Ls 804.00 Buah 142,000.00
2 Pek. Kawat Duri Ls 20,869.68 M' 1,400.00
3 Pek. Pintu Pagar Pipa Galvanis 2 " Ls 4.00 Unit 1,150,000.00
4 Pek . Cat Besi 6.2 384.96 M2 13,670.00

V PEK. GAPURA
1 Pek. Galian Tanah 6.1 0.92 M3 14,880.00
2 Pek. Kolom Beton 6.38 1.82 M3 2,472,880.00
3 Pek. Pelasteran 6.11 24.50 M2 74,235.00
1 Pek. Pengecatan Gapura 6.14 24.50 M2 8,591.00

VII PEKERJAAN AKHIR


1 Pek. Pembersihan Akhir Ls 1.00 Unit 206,650.00
REKAPITULASI
RECANA ANGGARAN BIAYA ( R A B )
( ESTIMATE ENGINEER )
Kegiatan : Pengembangan SAPRAS Kelembagaan Pembibitan Peternaka
Pekerjaan : Pembangunana Pagar Keliling
Lokasi : Desa Air Bening Kecamatn Bermani Ulu Raya
Kabupaten Rejang Lebong
Tahun Anggaran : 2008

No. URAIAN PEKERJAAN


1 2 3

I PEKERJAAN PERSIAPAN Rp..

II PEK. TANAH Rp..

III PEK. BETON Rp..

IV PEK. PEMBESIAN Rp..

V PEK. GAPURA Rp..

VII PEKERJAAN AKHIR Rp..

Jumlah Rp..
PPn 10 % Rp..
Jumlah Total Rp..
Dibulatkan Rp..
Terbilang : ( Dua Ratus Sepuluh Juta Tujuh Ratus Lima Puluh Ribu Rupiah )

Curup , Maret 2008


Diketahui : Dibuat ,
Pengelola Teknis Konsultan Perencana
Kimpraswil Kab . Rejang Lebong CV . Joint Engineering Consu

T U K I J A N , ST IRWANSYAH , ST .MM

Mengetahui / Menyetujui : Mengetahui :


Kepala Kantor Peternakan Dan Perikanan Pejabat Peleksana Teknis Kegiatan
Kabupaten Rejang Lebong (PPTK)

Ir . AFNISARDI , MM Ir . MUDARLIS
NIP . 450 006 336 NIP. 080 124 022

Mengetahui / Menyetujui :
Kuasa Pengguna Anggaran
Ir . ROSIHAN , Y.T , MSi
NIP. 080 066 788
RENCANA ANGGARAN BIAY
(RAB)
Kegiatan : Pengembangan SAPRAS Kelembagaan Pembibitan Peter
Pekerjaan : Pembagunan Jalan Lapen
Lokasi : Desa Air Bening Kecamatn Bermani Ulu Raya
Kabupaten Rejang Lebong
Tahun Anggaran : 2008

RAB SEMULA
No Uraian Pekerjaan Analisa Volume Satuan H. Satuan
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 Unit 350,000.00
2 Sewa Direksi keet Ls 1.00 Unit 2,250,000.00
3 Penyediaan Air Kerja Ls 1.00 Unit 150,000.00
4 Papan Nama Proyek Ls 1.00 Unit 350,000.00
5 Pelaporan, Dokumentasi Ls 1.00 Unit 2,250,000.00
Jumlah Rp.
II PEK . LAPISAN PENETERASI ( LAPEN)
1 Galian Tanah K.224 241.00 M3 34,580.00
2 Mobilisasi Alat Ls 1.00 Unit 3,800,000.00
3 LPA - Lapisan Penetrasi ( Lapen ) K . 618 860.00 M2 74,904.02
4 LPB - TELFORD K . 516 172.00 M3 242,375.00
5 Pasangan batu Kali 1 : 4 K.810 - - -
6 Galian Tanah K.224
Jumlah Rp .
III PEKERJAAN DRAINASE
1 Saluran Air SLR 530.00 M1 93,391.32
Jumlah Rp .
IV PEK . DINDING PENAHAN TANAH
1 Pek. Galian Tanah K.224 107.00 M3 34,580.00
2 Pasangan Batu K.810 123.50 M3 516,400.00
Jumlah Rp .
V PEK. PLAT DUEKER ( 2 UNIT )
1 Pek. Galian Tanah K.224 9.50 M3 34,580.00
2 Pasangan Batu K.810 5.90 M3 516,400.00
3 Pek.Rabat Beton K.720 0.68 M3 721,513.83
4 Pek. Beton Bertulang K.710+K715+ 1.34 M3 1,533,556.33
K.720+K.725
Jumlah Rp .
VI SARANA PENDUKUNG KEGIATAN
1 Pek. Gelian Tanah K.224 1.65 M3 34,580.00
2 Pesangan Pondasi Batu Kali 1 : 4 K.810 3.11 M3 516,400.00
3 Lantai Beton K.720 0.33 M3 721,513.83
4 Pek. Pipa 3/4" + Asesoris + Upah Ls 750.00 M' 10,200.00
5 Kran Ls 4.00 Bh 22,000.00

VII PEK. AKHIR


1 Pek. Pembersihan Akhir Ls 1.00 Unit 461,530.00
Jumlah Rp .

Jumlah = I + II + III + IV + V + VI + VII


PPN 10 %
Jumlah Total Rp .
Dibulatkan

Mengetahui Tim Peneliti Kontrak Pegelola Teknis


Pejabat Pelaksana Teknis Kegiatan Ketua

Ir. MURDALIS Drs. DARMAWI TUKIJAN ,ST


Nip. 080 124 022 Nip. 080 052 883 NIP.450003896
REKAPITULASI
RENCANA ANGGARAN BIAYA
(RAB)
Kegiatan : Pengembangan SAPRAS Kelembagaan Pembibitan Peter
Pekerjaan : Pembagunan Jalan Lapen
Lokasi : Desa Air Bening Kecamatn Bermani Ulu Raya
Kabupaten Rejang Lebong
Tahun Anggaran : 2008

No. URAIAN PEKERJAAN


1 2 3

I PEKERJAAN PERSIAPAN Rp..

II PEK . LAPISAN PENETERASI ( LAPEN) Rp..

III PEKERJAAN DRAINASE Rp..

IV PEK . DINDING PENAHAN TANAH Rp..

V PEK. PLAT DUEKER ( 2 UNIT ) Rp..

IV SARANA PENDUKUNG KEGIATAN Rp..

VII PEK. AKHIR Rp..

Jumlah Total Rp..


PPN 10 % Rp..
Jumlah Total Rp..
Dibulatkan Rp..
Terbilang : ( Dua Ratus Delapan Puluh Dua Juta Dua Ratus Empat Puluh Tujuh Ribu Rupiah )

Curup , 27 Mei 2008


CV . PADANG ARAFAH

OKTOVANDES
Kuasa Direktur
NA ANGGARAN BIAYA
(RAB)

embagaan Pembibitan Peternakan

Jumlah
7

250,000.00
350,000.00
1,750,000.00
200,000.00
75,000.00
1,850,000.00
4,475,000.00

350,000.00
2,737,920.00
3,087,920.00

24,019,992.00
24,019,992.00

114,168,000.00
29,217,552.00
4,600,000.00
5,262,403.20
153,247,955.20

13,659.84
4,510,533.12
1,818,757.50
210,479.50
6,553,429.96

206,650.00
206,650.00
EKAPITULASI
embagaan Pembibitan Peternakan

JUMLAH
4

4,475,000.00

3,087,920.00

24,019,992.00

153,247,955.20

6,553,429.96

206,650.00

191,590,947.16
19,159,094.72
210,750,041.88
210,750,000.00

Curup , Maret 2008

Konsultan Perencana
CV . Joint Engineering Consultant

IRWANSYAH , ST .MM

bat Peleksana Teknis Kegiatan

engetahui / Menyetujui :
asa Pengguna Anggaran
ROSIHAN , Y.T , MSi
NIP. 080 066 788
A ANGGARAN BIAYA
(RAB)
elembagaan Pembibitan Peternakan

n Bermani Ulu Raya

R A B PERUBAHAN
Volume Satuan H. Satuan Jumlah
7

350,000.00 1.00 Unit 350,000.00 350,000.00


2,250,000.00 1.00 Unit 2,250,000.00 2,250,000.00
150,000.00 1.00 Unit 150,000.00 150,000.00
350,000.00 1.00 Unit 350,000.00 350,000.00
2,250,000.00 1.00 Unit 2,250,000.00 2,250,000.00
5,350,000.00 5,350,000.00

8,333,780.00 139.00 M3 34,580.00 4,806,620.00


3,800,000.00 1.00 Unit 3,800,000.00 3,800,000.00
64,417,457.20 594.00 M2 74,904.02 44,492,987.88
41,688,500.00 119.00 M3 242,375.00 28,842,625.00
- 57.00 M3 516,400.00 29,434,800.00
198.46 M3 34,580.00 6,862,746.80
118,239,737.20 118,239,779.68

49,497,399.60 530.00 M1 93,391.32 49,497,399.60


49,497,399.60 49,497,399.60

3,700,060.00 107.00 M3 34,580.00 3,700,060.00


63,775,400.00 123.50 M3 516,400.00 63,775,400.00
67,475,460.00 67,475,460.00
328,510.00 9.50 M3 34,580.00 328,510.00
3,046,760.00 5.90 M3 516,400.00 3,046,760.00
490,629.40 0.68 M3 721,513.83 490,629.40
2,054,965.48 1.34 M3 1,533,556.33 2,054,965.48

5,920,864.89 5,920,864.89

57,057.00 1.65 M3 34,580.00 57,057.00


1,606,520.40 3.11 M3 516,400.00 1,606,520.40
241,616.94 0.33 M3 721,513.83 241,616.94
7,650,000.00 750.00 M' 10,200.00 7,650,000.00
88,000.00 4.00 Bh 22,000.00 88,000.00
9,643,194.34 9,643,194.34

461,530.00 1.00 Unit 461,530.00 461,530.00


461,530.00 461,530.00

256,588,186.03 256,588,228.51
25,658,818.60 25,658,822.85
282,247,004.63 282,247,051.36
282,247,000.00 282,247,000.00

Curup, 7 Oktober 2008


Diperiksa oleh Dibuat oleh :
Konsultan Kontraktor Pelaksana
CV. JOINT ENGINEERING Const CV. PADANG ARAFAH

IRWANSYAH, ST, MM OKTOVANDES


Kuasa Direktur
EKAPITULASI

elembagaan Pembibitan Peternakan

n Bermani Ulu Raya

JUMLAH
4

5,350,000.00

118,239,779.68

49,497,399.60

67,475,460.00

5,920,864.89

9,643,194.34

282,247,051.36

538,373,749.87
53,837,374.99
592,211,124.86
282,247,000.00
Puluh Tujuh Ribu Rupiah )

Curup , 27 Mei 2008


CV . PADANG ARAFAH
ANALISA BIAYA PEKERJAAN
LAPIS PERKERASAN MAKADAM 5 CM ( LAPEN )
( MENGGUNAKAN BURUH )
Propinsi : Bengkulu Kecamatan Dipersiapkan Oleh
Kabupaten : Rejang Lebong CURUP
URAIAN : ANGGAPAN / ASUMSI
1 Seprotkan aspal Tack coat 0,8 ltr / m2 1. Menggunakan Tenaga Buruh
2 Hamparkan Agregat Pokok 3-5 cm 25 m3 2. Harga Material ( Agregat Pokok, Agregat Pengunci, agregat Penutup, dan
3 Hamparkan Split 2-3 cm 45 m3&Padatkan Aspal ) adalah Harga Dilokasi Proyek
4 Semprotkan Aspal ( 2,5 kg/m2 ) 3. Volume Aspal Cair Untuk Tack Coat 0,8 ltr/m2
5 Hamparkan Agregat Pengunci Split 1-2 cm 4. Tebal Lapisan Penetrasi 5 cm
90 m2/m3 dan Padatkan 5. Agregat Dikirin Sampai Lokasi Pekerjaan Oleh Leveransir
6 Semprotkan Aspal 1,5 kg/m2 & Gilas
7 Taburkan Pasir Rata - rata 400 m2/m3

JUMLAH TOTAL VOL UPAH


PEKERJAAN HARI KODE
ORANG ( Orang/Hari ) ( Rp/Orang/Hari )

P
E Mandor 2.00 3.00 L.061 6.00 47,000.00
K Operator Terlatih 2.00 3.00 L.081 6.00 100,000.00
E Sopir 1.00 3.00 L.091 3.00 75,000.00
R Buruh Tak Terlatih 66.00 3.00 L.101 198.00 33,000.00
J Buruh Terlatih 2.00 3.00 L.106 6.00 37,000.00
A

JUMLAH
MATERIAL SAT. KODE HARGA
MATERIAL
M
A Batu Pecah 3-5 cm 56.00 M3 M.023 285,000.00
T Batu Pecah 2-3 cm 31.11 M3 M.024 335,000.00
E Batu Pecah 1-2 cm 15.55 M3 M.025 285,000.00
R Pasir Beton 3.50 M3 M.041 147,500.00
I Aspal 6270.00 Kg M.061 9,000.00
A Minyak Bakar 450.00 Lt M.065 3,500.00
L Alat Bantu 8.16 Set M.170 65,000.00

JUMLAH HARI JAM HARGA


PERALATAN KODE
ALAT KERJA KERJA ( Jam / Hari )
P
E
R
A Mesin Gilas 3 Roda 8-10 T 1.00 3.00 E.080 15.00 128,324.06
L Sprayer Aspal 200Ltr 1.00 3.00 E.153 15.00 52,016.83
A Dump Truck 3,5 T/ 44 Hp 1.00 3.00 E.211 15.00 126,468.29
T
A
N

Volume : 1400 Satuan M2 Harga Satuan 73,093.87

ANALISA BIAYA PEKERJAAN


KONSTRUKSI LAPIS PONDASI BAWAH (LPB)-TELFORD
( MENGGUNAKAN BURUH )
Propinsi : Bengkulu Kecamatan Dipersiapkan Oleh
Kabupaten : Rejang Lebong CURUP
URAIAN : ANGGAPAN / ASUMSI
1 Material Disiapkan dilokasi Pekerjaan 1. Menggunakan Tenaga Manusia 400 M2 / hari
2 Hamparkan pasir setebal 5 cm 2. Material-material dikirim ketempat Pekerjaan Oleh Leveransir
3 Batu pecah berukuran besar 3. Batu sudah dipecah
( 10 - 15 ) cm Disusun berdiri 4. Tanah dasar sudah disiapkan
4 Batu pecah yang lebih kecil mengisi rongga 5. Dipadatkan sampai tebal 20 cm
diatasnya shg rata kemudian dipadatkan /
digilas dengan mesin Gilas

JUMLAH TOTAL VOL UPAH


PEKERJAAN HARI KODE
ORANG ( Orang/Hari ) ( Rp/Orang/Hari )

P
E Mandor 3.00 1.00 L.061 3.00 47,000.00
K Operator Terlatih 1.00 1.00 L.081 1.00 100,000.00
E Buruh Tak Terlatih 99.00 1.00 L.101 99.00 33,000.00
R
J
A

JUMLAH
MATERIAL SAT. KODE HARGA
MATERIAL SAT. KODE HARGA
MATERIAL
M
A Batu belah 15 / 20 50.00 M3 M.020 150,000.00
T Batu Pecah 5 -7 cm 20.00 M3 M.022 235,000.00
E Pasir Urug 30.00 M3 M.040 65,000.00
R Alat bantu 4.00 M3 M.170 65,000.00
I
A
L

JUMLAH HARI JAM HARGA


PERALATAN KODE
ALAT KERJA KERJA ( Jam / Hari )
P
E
R
A Mesin Gilas 3 Roda 8-10 T 1.00 1.00 E.080 5.00 128,324.06
L
A
T
A
N

Volume : 80 Satuan M2 Harga Satuan 231,995.25


AAN KODE
CM ( LAPEN ) K.618
H)
Tanggal :

gat Pengunci, agregat Penutup, dan

aan Oleh Leveransir

BIAYA SUB TOTAL


( Rp ) ( Rp )

282,000.00
600,000.00
225,000.00
6,534,000.00
222,000.00

7,863,000.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

15,960,000.00
10,421,850.00
4,431,750.00
516,250.00
56,430,000.00
1,575,000.00
530,400.00
89,865,250.00
BIAYA SUB TOTAL
( Rp ) ( Rp )
1,924,860.90
780,252.45
1,897,024.35

4,602,137.70
Total ( Rp ) 102,330,387.70
Per M2

AAN KODE
(LPB)-TELFORD K.516
H)
Tanggal :

kerjaan Oleh Leveransir

BIAYA SUB TOTAL


( Rp ) ( Rp )

141,000.00
100,000.00
3,267,000.00

3,508,000.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

7,500,000.00
4,700,000.00
1,950,000.00
260,000.00

14,410,000.00
BIAYA SUB TOTAL
( Rp ) ( Rp )

641,620.30

641,620.30
Total ( Rp ) 18,559,620.30