Malaysia
JENGKA 3 PALM OIL MILL
Felda
2014
Report prepared by: Mahaswaran Maliyapan (Lead Assessor)
Certification decision by: Simon Selvaraj (Certifier)
Certifying Office
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa,
Off Jalan Sg Bertih, Teluk Gadong, 41100 Klang, Selangor, Malaysia
rspo@controlunion.com
Tel: +603-3377 1600 / 1700
CUC is accredited by the Dutch Council of Accreditation (RVA) on the European quality standard EN
45011 for the inspection and certification of CUC Organic program (according to the EU regulation
2092/91) and GLOBALGAP program. When requested a copy of the accreditation certificate can be
obtained from CUC.
Control Union (Malaysia) Sdn Bhd is a registered affiliate member of RSPO and is a private limited
company owned by the Control Union World Group based in Malaysia. Control Union (Malaysia)
Sdn Bhd is authorized to conduct and issue certification on behalf of RSPO and Control Union
Certifications.
RSPO Membership Number 8-0025-06-000-00
RSPO Approval Date 12/01/2006
Affiliate Membership http://www.rspo.org/en/member/339
Table of Contents
4.4 ISSUES THAT WERE RAISED DURING THE STAKEHOLDER CONSULTATION, IF ANY......................................... 47
PART 5: RSPO SUPPLY CHAIN CERTIFICATION ................................................................................... 47
5.1 POM INCLUDED IN THE SCOPE OF THE AUDIT ..................................................................................... 47
5.2 CONFIRMATION OF THE COMPANYS SUMMARY OF ANNUAL CERTIFIED VOLUME OF RSPO CERTIFIED PALM
OIL AND PALM KERNEL OVER A SPECIFIED PERIOD ..................................................................................... 48
5.3 SUMMARY REPORT INCLUDING A BRIEF DESCRIPTION OF THE SCOPE OF CERTIFICATION ............................. 48
5.4 MONTHLY RECORDS OF CERTIFIED AND UNCERTIFIED FFB RECEIVED SINCE THE LAST AUDIT ........................ 48
5.5 MONTHLY RECORDS OF CERTIFIED CPO AND PK PRODUCED SINCE THE LAST AUDIT ................................... 48
5.6 RECORDS OF CERTIFIED CPO & PK SOLD UNDER GREEN PALM TO BUYERS SINCE THE LAST AUDIT, IF ANY ...... 49
5.7 RECORDS OF CERTIFIED CPO & PK SOLD UNDER UTZ ETRACE TO BUYERS SINCE THE LAST AUDIT, IF ANY ...... 49
5.8 NON-CONFORMITIES IDENTIFIED DURING THIS AUDIT ............................................................................ 49
5.9 DESCRIPTION OF THE ORGANIZATIONAL MANAGEMENT SYSTEMS .......................................................... 50
5.10 FINAL CERTIFICATION DECISION BY CONTROL UNION FOR THE RSPO SCCS AUDIT OF THE POM ........... 50
PART 6: CERTIFIED ORGANISATIONS ACKNOWLEDGEMENT OF INTERNAL RESPONSIBILITY ........... 51
6.1 DATE OF NEXT ASA ........................................................................................................................ 51
6.2 DATE FOR CLOSURE OF NON-CONFORMITIES ...................................................................................... 51
6.3 SIGNING BY THE CLIENT ................................................................................................................... 51
6.4 SIGNING BY THE LEAD AUDITOR ........................................................................................................ 51
6.5 SIGNING BY THE CERTIFIER ............................................................................................................... 51
1.7.2 Statistics of the Supply Base and Estimated Tonnes of FFB produced per year
Estimated Cycle
OPP Oil Palm Plantation Planting Years
FFB/Year (MT) (Years)
OPP1 Felda Jengka 2 40,770 1971 25
OPP2 Felda Jengka 3 41,090 1973 25
OPP3 Felda Jengka 4 31,190 1973 25
OPP4 Felda Jengka 5 30,870 1973 25
OPP 5 Felda Jengka 6 41,400 1973 25
OPP 6 Felda Jengka 7 38,330 1976 25
OPP 7 Felda Ulu Jempol 49,820 1973 25
OPP 8 Felda Bukit Tajau 9,160 1971* 25
Total 282,630 - -
*Felda Bukit Tajau is an integrated crop based plantation; refer to 1.7.1 OPP 18 [rubber and palm]. Therefore, the estimated
FFB/year is much lower comparing to the others.
1.7.5 Calculation of the Number of Production Units (N) to Sample for the Mill
N = 0.8Y, where Y is the number of units, with the result always to be rounded up to the next whole
integer. Where only a sample of the supply base is assessed, units not previously assessed, or assessed earlier in
the certification program, are to be preferred over those more recently assessed
For the Mill, how many units make up the production base?
Owned estates (Y) N = 0.8Y Smallholders (Z) N = 0.8Z
8 3 1191 27
Explanation as to the selection of estates sampled
As per above and random selection of the plantation and small holders are made for compliance assessment.
2.3.2 Is the time bound The company presented a table showing how the certification Yes
plan challenging? audits are planned to fit into the period ending and it is
Age of considered to be challenging plan (see time bound plan below)
plantations.
Location.
Mill
development.
Infrastructure.
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 7 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
Compliance
with applicable
law.
2.3.3 Have there been Some units already been certified, please refer to below time Yes
any changes since bound plan
the last audit? Are
they justified?
2.3.4 If there have been Changes been made in the time bound plan for certified and Yes
changes, what those units in the progress of audit process
circumstances have
occurred?
2.3.5 Have there been No comment received Yes
any stakeholder
comments?
2.3.6 Have there been Yes. Will adhere to new planting procedure once finalise Yes
any newly acquired
subsidiaries?
2.3.7 Have there been No currently being a year advance Yes
any isolated lapses
in implementation
of the plan?
2.3.8 Has there been any Not observed Yes
systematic failure
to proceed with the
implementation of
the plan?
2.3.9 General statement Felda is following the time bound plan accordingly. Yes
as to progress made
since the last audit?
RSPO criterion
7.3.
2.4.3 Any new plantings No new planting up to this period of assessment. However, as Yes
st
since January 1 explained in partial findings at table 2.5, Felda will adhere to
2010 must comply new planting procedure when necessary.
with the RSPO New
Plantings
Procedure.
2.4.4 Any Land conflicts None noted. No stakeholder comments or complaints received. Yes
are being resolved
through a mutually
agreed process,
e.g. RSPO
Grievance
procedure or
Dispute Settlement
Facility, in
accordance with
RSPO criteria 6.4,
7.5 and 7.6.
2.4.5 Any Labor disputes None noted. No stakeholder comments or complaints received. Yes
are being resolved
through a mutually
agreed process, in
accordance with
RSPO criterion 6.3.
2.4.6 Any Legal non- None noted. No stakeholder comments or complaints received. Yes
compliance is being
resolved in
accordance with
the legal
requirements, with
reference to RSPO
criteria 2.1 and 2.2.
TIME BOUND PLAN FORECAST FOR RSPO CERTIFICATION OF ALL PALM OIL MILLS & SUPPLY BASES
Targeted RSPO Current Certification
Supply Bases (estates,
s/n Palm Oil Mill Country Certification Status as per this
plantations, associations)
Year Audit
Felda Kota Gelanggi 1
Felda Kota Gelanggi 2
1 Kota Gelanggi 1 Malaysia Felda Kota Gelanggi 3 2010 Certified
Felda Kota Gelanggi 4
Felda Kota Gelanggi 5/6
Felda Lepar Utara 3
Felda Lepar Utara 7
2 L. Utara 6 Malaysia Felda Lepar Utara 8 2010 Certified
Felda Lepar Utara 9
Felda Lepar Utara 11
FTP Jengka 13
FTP Jenderak Selatan
FTP Jenderak Utara
F Jengka 1 Certified 14.01.2013
3 Jengka 21 Malaysia 2010
FTP Sg. Tekam Utara BSI
F Jengka 24/25
FTP Jengka 12
FAS PPPTR/UKA
FTP Jengka 2
FTP Jengka 3
FTP Jengka 5
FTP Ulu Jempol Certified 13.12.2012
4 Jengka 3 Malaysia 2010
FTP Jengka 4 CUC
FTP Jengka 6
FTP Jengka 7
F Bukit Tajau
F Sg. Tekam
FTP Jengka 8
Certified 13.12.2012
5 Jengka 8 Malaysia FTP Jengka 9 2010
CUC
FTP Jengka 10
FTP Jengka 11
F Lepar Utara 2
FAS Lepar Utara 10
F Lepar Utara 1 Certified 12.09.2012
6 L. Utara 4 Malaysia 2010
F Lepar Utara 4 BSI
FP Lepar Utara 5
FP Lepar Utara14
FTP Jengka 18
FTP Jengka 19
FTP Jengka 21
FTP Jengka 22
FTP Jengka 23
FTP Sg. Nerek Certified 16.01.2013
7 Jengka 18 Malaysia 2010
F Jengka 20 BSI
F Kg. Awah
FTP Jengka 14
FTP Jengka 15
FTP Jengka 16
FTP Jengka 17
FTP Padang Piol Certified 13.12.2012
8 Padang Piol Malaysia 2010
FTP Sg. Retang CUC
FTP Sg. Mas,
FTP Sening
Certified under TUV
9 Adela Malaysia FTP Adela 2011
FGV Kledang 02
F Tunggal
FTP Sg Mas
FTP Papan Timur
FTP Aping Barat Certified under TUV
10 Lok Heng Malaysia 2011
F Lok Heng Barat
F Lok Heng Selatan
F Lok Heng Timur
F Pasak
F Semencu
F Air Tawar 1
Certified 25.07.2012
11 Semenchu Malaysia F Air Tawar 3 2011
SGS
F Air Tawar 4
F Air Tawar 5
F Air Tawar 2
F Aping Timur
FTP Bukit Wa Ha Certified on
12 Waha Malaysia 2011
FTP Simpang Wa Ha 21.05.2012 Agrovet
FTP Bukit Easter
FP Terapai 3
FTP Kepayang
Certified 7.01.2013
13 B. Kepayang Malaysia FTP Mayam 2011
Sirim
FTP Kumai
FTP Purun
FTP Bukit Mendi
FTP Bukit Puchong
14 Bukit Mendi Malaysia 2011 5.10.2012 Moody
F Mengkuang
F Sg Kemahal
FP Mengkarak 1
FP Mengkarak 2
15 Kemasul Malaysia 2011 Certified
FTP Kemasul
F Chemomoi
FP Bera Selatan 1
FP Bera Selatan 4
FTP Sebertak
16 Tementi Malaysia 2011 Certified
FTP Rentam
FTP Tementi
F Ulu Penggeli
FAS Ulu Belitong
FTP Pasir Raja
Certified on
20 Bukit Besar Malaysia FTP Bukit Besar 2012
28.03.2014
FTP Bukit Ramun
FTP Kahang Barat
21 Kahang Malaysia FTP Kahang Timur 2012 Certified 13 Jun 2014
FTP Ulu Dengar
FTP Taib Andak
FTP Bukit Batu Certified on
22 Kulai Malaysia 2012
FTP Ulu Tebrau 14.04.2014
FAS Bkt Besar/Taib Andak
FP Inas Selatan
F Inas Utara
Certified on
FTP Sg. Sibol
24 Penggeli Malaysia 2012 14.04.2014
FTP Sg. Sayong
FTP Penggeli Timur
FTP Linggiu
FP Sahabat 9/15
FP Sahabat 16
25 Baiduri Ayu Malaysia FP Sahabat 55 2013 Certified on 2014
F Sahabat 1
F Sahabat 2
FP Sahabat 11
FP Sahabat 12
FP Sahabat 13
FP Sahabat 17
26 Embara Budi Malaysia 2013 Certified on 2014
FP Sahabat 56
F Sahabat 3
F Sahabat 4
F Sahabat 5
FP Sahabat 42
FP Sahabat 43
27 Kembara Sakti Malaysia FP Sahabat 53 2013 Certified on 2014
FP Sahabat 54
FP Sahabat 35
FP Sahabat 10
FP Sahabat 39
28 L. Kemudi Malaysia FP Sahabat 44 2013 Certified on 2014
FP Sahabat 38
FP Sahabat 45
FP Bukit Sagu 4
FP Bukit Sagu 6
FP Bukit Sagu 7
29 Bukit Sagu Malaysia FP Bukit Sagu 8 2013 Certified on 2014
F Bukit Sagu 2
F Bukit Sagu 1
F Bukit Sagu 3
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 12 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
F Lepar Hilir 1
F Lepar Hilir 2
F Lepar Hilir 3
30 Lepar Hilir Malaysia F Lepar Hilir 4 2013 Certified on 2014
FP Lepar Hilir 5
FP Lepar Hilir 6
FP Lepar Hilir 8
FTP Seberang Tayor
FTP Neram 1
FTP Neram 2
31 Neram Malaysia 2013 2015
FP NERAM 03
FP CERUL 03
FTP Bukit Kuantan
FTP Panching Utara
32 Pancing Malaysia FTP Panching Selatan 2013 2015
FTP Panching Timur
FP Sahabat 7
FP Sahabat 46
33 M. Puspita Malaysia FP Sahabat 48 2014 Certified on 2014
FAS Sahabat 6,9,57
FAS Sahabat 17
FP Sahabat 50
34 N. Permata Malaysia FP Sahabat 51 2014 Certified on 2014
FP Sahabat 52
F Tersang 1
F Tersang 2
F Tersang 3
35 Tersang Malaysia F Tersang 4 2014 2017
F Sg.Koyan 1
F Sg.Koyan 2
F Sg.Koyan 3
FP Besout 6,
FP Besout 7
FTP Besout 1
36 Besout Malaysia FTP Besout 2 2014 Certified on 2014
FTP Besout 3
FTP Besout 4
FTP Besout 5
FTP Gedangsa
F Sg Tenggi
37 Sg Tengi Malaysia 2014 Certified on 2014
FTP Soeharto
FTP Sg. Tengi Selatan
FTP Trolak Selatan
Pending
FTP Sg. Klah
38 Trolak Malaysia Certification Certified on 2014
FTP Trolak Utara
decision 2014
FTP Trolak Timur
FP Bera Selatan 5
FTP Keratong 1
FTP Keratong 2 Pending
39 Keratong 2 Malaysia F Keratong 7 Certification 2015
F Keratong 8 decision 2014
F Keratong 9
FP Keratong 11
40 Keratong 3 Malaysia FTP Keratong 3 2014 Audited
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 13 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
FTP Keratong 4
FTP Keratong 5
FTP Keratong 6
FP Tembangau 6
F Keratong 10
FP Bera Selatan 7
41 Keratong 09 Malaysia FP Keratong Timur 2014 Audited
FP MERCHONG 01
FAS Merchong
F Selancar 4
F Selancar 5
F Selancar 3
F Pemanis 2
42 Selancar 2A Malaysia 2015 Audited
F Medoi
F Pemanis 1
FTP Redong
FTP Selancar 1
FP Selancar 6
43 Selancar 2B Malaysia FP Selancar 8 2015 Audited
FP Selancar 9
FTP Pasoh 1
FTP Pasoh 2
44 Pasoh Malaysia FTP Pasoh 3 2015 Audited
FTP Pasoh 4
FP Bera Selatan 3
FP Tembangau 8
FP Serting 5
FP Serting Hilir 8
FP Serting Hilir 9
FP Palong 21
45 Serting Malaysia 2015 Audited
F raja alias 1
F raja alias 2
F raja alias 3
F raja alias 4
FAS Serting Hilir
FAS Tembangau 9
FP Tembangau 3
FP Tembangau 5
FP Tembangau 6
FP Tembangau 7
FP Tembangau 8
FP Tembangau 9
F Sg Lui
F Lui Timur
46 Serting Hilir Malaysia FTP Lui Muda 2015 2015
FTP Tembangau 1
FTP Tembangau 2
F Serting Hilir 2
F Serting Hilir 3
F Serting Hilir 4
F Serting Hilir 5
F Serting Hilir 6
F Serting Hilir 7
F Selancar 2
FP Krau 2
47 Krau Malaysia 2015 Audited
FP Krau 4
FTP Kg Sertik
FTP Lakum
FTP Bukit Damar
48 Mempaga Malaysia 2015 Audited
FTP Mempaga 1
FTP Lurah Bilut
FTP Mempaga 2
FP Maokil 6
FP Maokil 7
F Maokil 1
49 Maokil Malaysia F Maokil 2 2015 Audited
F Maokil 3
F Maokil 4
F Chemplak
FP Selendang 3
FP Selendang 4
50 Selendang Malaysia F Selendang 2 2015 Audited
FP Berabong
FTP Selendang 1
FP Tenggaroh 9
FP Tenggaroh 11
FP Tenggaroh 13
F Tenggaroh 2
F Tenggaroh 4
51 Tenggaroh Malaysia F Tenggaroh 5 2015 Audited
F Tenggaroh 7
F Tenggaroh Timur 1
F Tenggaroh Selatan 1
F Tenggaroh 1
FAS T. TIMOR
FP Tenggaroh Timur 2
FP Tenggaroh 12
52 T. Timor Malaysia 2015 Audited
F Tenggaroh 3
F Tenggaroh 6
FP Setiu 1
F Chalok
F Chalok Barat
F Tersat
53 Chalok Malaysia 2016 Audited
F Tenang Besut
F Mengkawang
FTP Belara
FTP Selasih
FTP Jerangau Barat
54 J. Barat Malaysia F Cerul 1 2016 Audited
F Cerul 2
FP Rantau Abang 1
FP Chador 1
55 J. Baru Malaysia 2016 Audited
FTP Jerangau
FTP Bukit Bading
FP Semaring
FTP Kerteh 1
56 Kertih Malaysia 2016 Audited
FTP Kerteh 2
F Kerteh 3
F Kerteh 4
F Kerteh 5
FTP Kerteh 6
FAS Kerteh
FP Sahabat 20
FP Sahabat 21
57 F. Harapan Malaysia 2013 Certified on 2013
FP Sahabat 25
FP Sahabat 22
FP Sahabat 23
FP Sahabat 24
FP Sahabat 26
FP Sahabat 31
58 H. Badai Malaysia FP Sahabat 32 2016 Certified on 2014
FP Sahabat 28
FP Sahabat 33
FP Sahabat 34
FAS Tambisan
FP Sahabat 27
FP Sahabat 28
Mill closed down.
FP Sahabat 33
59 J. Bistari Malaysia 2016 Supply base goes to
FP Sahabat 34
Hamparan Badai
FP Sahabat 36
FP Sahabat 37
FP Kalabakan Tengah
60 Kalabakan Malaysia FP Kalabakan Utara 2016 Certified on 2014
FP Kalabakan Selatan
FP Umas 5
FP Umas 6
61 Umas Malaysia F Umas 1 2016 Certified on 2014
F Umas 2/3
F Umas 4
FP Sampadi 1
FP Sampadi 3
62 Sampadi Malaysia FP Sampadi 4 2017 2017
FP Sampadi 5
FP Sampadi 6
FP Aring 2
FP Aring 3
FP Aring 4
FP Aring 5
63 Aring A Malaysia 2017 2017
FP Aring 6
FP Aring 8
FP Aring 10
F Aring 1
FP Aring 8
64 Aring B Malaysia FP Aring 10 2017 Mill closed down
FP Aring 11
FP Ciku 4
FP Ciku 8
FP Ciku 5
65 Ciku Malaysia F Ciku 6 2017 2017
F Ciku 1
F Ciku 2
F Ciku 3
F Perasa
F Ciku 7
FP Kechau 2
FP Kechau 3
FP Kechau 7
FP Telang 1
66 Kechau A Malaysia 2017 2015
FP Chegar Perah 2
FP Kechau 11
FAS Telang
F Kechau 1
FP Kechau 6
67 Kechau B Malaysia FP Kechau 8 2017 2015
FP Kechau 10
FP Kemahang 4
FTP Kemahang 1
68 Kemahang Malaysia 2017 2017
F Kemahang 3
FTP Kemahang 2
FTP Cini 1
69 Cini 2 Malaysia 2017 2017
FTP Cini 2
FP Terapai 1
FTP Cini 3
FTP Cini 4
FTP Chini 5
70 Cini 3 Malaysia 2017 2017
FTP Chini Timur 2
F Chini Timur 3
F Chini Timur 1
FP CINI TIMUR 04
71 Air Tawar Malaysia TBD 2017 2017
Pontian
72 Malaysia TBD 2017 2017
Plantation
PT Citra Niaga Recently completed
73 Indonesia TBD TBD
Perkasa the NPP in 2013
Fluent in main local Selvanathan Grapragasem Fluent in both English and Bahasa Malaysia
languages and English. Muhd. Jamalul Arif Fluent in both English and Bahasa Malaysia
Shafiq Fluent in both English and Bahasa Malaysia
Atiqah [Trainee Auditor] Fluent in Bahasa and English
Field working Selvanathan Grapragasem SA 8000 advanced auditor, QMS, EMS & OHSAS
experience in the palm Lead Auditor, Working experience in oil palm
oil sector, or a plantation.
demonstrable Muhd. Jamalul Arif Involved in RSPO auditing since November 2010.
equivalent. Auditing experience in GMP and Globalgap.
Shafiq Diploma in Plantation with more than 5 years
working in various palm oil plantations.
Atiqah [Trainee Auditor] Graduated on geo-science.
Good agricultural Selvanathan Grapragasem SA 8000 advanced auditor, QMS, EMS & OHSAS
practices (GAP), Lead Auditor, Working experience in oil palm
integrated pest plantation.
management (IPM), Muhd. Jamalul Arif Involved in RSPO auditing since November 2010.
pesticide and fertilizer Auditing experience in GMP and Globalgap.
use. Shafiq Diploma in Plantation with more than 5 years
working in various palm oil plantations.
Atiqah [Trainee Auditor] Attended In-house GAP trainings.
Health and Safety Selvanathan Grapragasem SA 8000 advanced auditor, QMS, EMS & OHSAS
auditing on the farm Lead Auditor, Working experience in oil palm
and in processing plantation.
facilities. (For example Muhd. Jamalul Arif Involved in RSPO auditing since November 2010.
OHSAS 18001 or Auditing experience in GMP and Globalgap.
occupational. Health Shafiq Diploma in Plantation with more than 5 years
and safety assurance
working in various palm oil plantations.
system).
Atiqah [Trainee Auditor] Attended ISO 9001 awareness trainings.
Workers welfare issues Selvanathan Grapragasem SA 8000 advanced auditor, QMS, EMS & OHSAS
and social auditing Lead Auditor, Working experience in oil palm
experience. (For plantation.
example with SA8000 or Muhd. Jamalul Arif Involved in RSPO auditing since November 2010.
related social or ethical Auditing experience in GMP and Global gap.
accountability codes). Shafiq Diploma in Plantation with more than 5 years
working in various palm oil plantations.
Atiqah [Trainee Auditor] Nil
Environmental and Selvanathan Grapragasem SA 8000 advanced auditor, QMS, EMS & OHSAS
ecological auditing. (For Lead Auditor, Working experience in oil palm
example experience plantation.
with organic agriculture, Muhd. Jamalul Arif Involved in RSPO auditing since November 2010.
ISO 14001 or Auditing experience in GMP and Global gap.
environmental Shafiq Diploma in Plantation with more than 5 years
management systems).
working in various palm oil plantations.
Atiqah [Trainee Auditor] Nil
The Palm Oil Mill audit verification included the following activities:
Mill and workshop inspections. Documentation review & worker interviews.
Mill. SOPs. Safe working environment. Gen sets. Walk ways. Signs. EFB. POME treatment. Emissions.
Mass balance. Diesel tanks. PPE. Fire extinguishers. First aiders and boxes. Fuel and water usage.
OSH. Training. Management structure. First aiders.
Full document review. Completion of the checklist. Review and documentation of evidence. All aspects
of RSPO P&Cs applicable.
Worker interviews. OSH. Sexual, religious, racial harassment. Pay and contracts.
Compliance against the RSPO SCCS certification scheme.
Verification:
Verification of implementation was done through field observations, workshop and chemical store inspections,
worker and community interviews and mill inspections as summarized above.
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 20 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
Mill inspection
06/09/2014 Selva Workshops
[Sat] Atiqah Stores
POM application
Document review
Jengka 3
POM
Mill operations
Shafiq Worker interviews
Jamal Housing
Medical
Schools
Local communities
Environmental
Field operations.
Mahas Worker interviews
Selva Chemical stores
Atiqah Workshops
Jengka 2
Shafiq Housing
Estate
Jamal Medical
Schools
Local communities
08/09/2014 Environmental
[Mon]
Field operations.
Mahas Worker interviews
Selva Chemical stores
Atiqah Workshops
Jengka 4
Shafiq Housing
Estate
Jamal Medical
Schools
Local communities
Environmental
Field operations.
Worker interviews
Mahas
Selva Chemical stores
09/09/2014 Jengka 7 Atiqah Workshops
[Tue] Estate Shafiq Housing
Jamal Medical
Schools
Local communities
Environmental
End of assessment
v. Spraying
vi. Pest and Diseases
Leaf and soil analysis report available for year 2014 with ref:
CS/FTPSB/06/3/01/5087 (03)-Jengka 7 in 28/10/2013. Sighted of records
individual blocks with result by agronomist in the report. Company has
applied empty fruit bunch in the field. To replace potassium. Moisture
retention as supplement from inorganic fertilizer. Application of the EFB for
Lot FELDA/FTP area in 2014 is in progress.
ASA 2 4.3 In Jengka 7 Estate, there are 4 type of Soil in the estate area as follow:
i. Gajah Mati
ii. Segamat
iii. Durian and Lancang
The soil map is available. SOP for terracing no. MOSL 12.0 is covering
terracing activities and maintaining slopes area. Company has applied empty
fruit bunch in the field. To replace potassium. Moisture retention as
supplement from inorganic fertilizer. Application of the EFB for Lot FELDA/FTP
area in 2014 is in progress. Company has applied empty fruit bunch in the
field. To replace potassium. Moisture retention as supplement from inorganic
fertilizer. Application of the EFB for Lot FELDA/FTP area in 2014 is in progress.
Latest training for Sprayers on 20 August 2013 at Dewan Kenanga Felda
Jengka 7. Road maintenance programme is done based on survey and input
from stakeholders for improvement. Last road maintenance carried out from
August 2014. The main activities include grading and compacting. Soil Report
was done on year 2014 with ref: CS/FTPSB/06/3/01/5087 (03)-Jengka 7 in
28/10/2013. Sent to Felda Agricultural Services Sdn. Bhd.
ASA 2 4.4 There is no river across the estate. Monitoring of the rainfall data. Sighted the
recent 8 months records:
Month Days mm
Jan14 9 41.00
Feb14 0 0.00
Mar14 5 19.00
Apr14 5 48.00
May14 6 26.00
Jun14 7 46.00
July14 5 35.00
Aug 14 7 80.00
The record use for estate operation and data is important when process of replanting.
Water that used for line site use is from Jabatan Bekalan Air [JBA- Pahang].
Seen the water management plan includes the
i. To contact JBA- Pahang if there is water cut
ii. Inform at the Perhimpunan Pagi and Mosque
iii. Preparation with tanks at all block at housing quarters.
JBA- Pahang will dispatch water to the tanks prepared by mill administration
to ensure water is adequate for workers and families.
ASA 2 4.5 In Jengka 7 Estate, seen the implementation of IPM is based on the Manual
Ladang Sawit Lestari- Pre Mature Area- MLSL (Ed 2 ) Sec 3 (11.0) integrated
pest management date on 01/06/2012.That contain information regarding on
the implementation of IPM. Including Spraying, Trunk injection Rat baiting.
There is IPM plan available. A little / rare rat attacks. Last done at FTP area
09/07/2014-18/08/2014. However the barn owl box in progress to complete.
The Tunera Sibulata (150 points) was completed planting in 26/02/2014.
- Sources of pollutions
- Mitigation measures
- Target
- Person Responsible
- Status
Biogas production (Nm3) in progress to set up. Target to complete is January
2015. The plan is not including gaseous emissions and effluent in the mill in
EIA. Mill effluent final discharge are drain to river with the specification of
BOD limits at <100 ppm approved by DOE as to avoid water contamination of
surface and ground water. Approval letter from DOE date 01/7/2014
30/6/2015 with license No 004370 located as evidence.
Principle 6: Responsible Consideration of Employees and of Individuals and Communities by Growers and
Millers
Criterion by The mill and estate have conducted the social impact assessment. The
Audit relevant policies are in place and are fully implemented across the board.
Communication and consultation as well complaints and grievances
Summary
procedure are well communicated and adhered to. There are evidences of
workers not been discriminated against in any way and all are being paid their
fair wages.
ASA 2 6.1 In the mill seen a memo dated 13.8.2014 for SIA survey. 26 out of 50 surveys
were replied. Survey were done with youth [2], staff [16], office [4],
businessman [1], and local employee [3]. A document for SIA Report [sample]
is available. Last SIA conducted in 1.9.2014.
The survey were analyzed and found:
(+) Good infrastructure;
(+) Side income available
(+) Local amnesties proper-school, clinic etc.
Management Programme / Plan sighted. Ex: Awareness programme for
reduce drug abuse. Participant taken from Stakeholder list: Stakeholder listed
dated 10.10.2013, that workers [87]; gov [17], FFB supplier [57], supplier [22],
internal security [4], Village head [4]. Survey conducted for 26 out 50 [total
stakeholder 187 personnel].
Assessment has been done with the participation of affected parties. In
Jengka 7, the last SIA conducted in 10.1.2013. Settlers are 398. Survey
conducted for 97 randomly. Given to stakeholder & non-settlers [youth,
teachers, workers FTP, government, neighbours, shop-owner etc.]. For 2013;
the survey form has been distributed to employee and settlers. Describes the
issue on:
Local amnesties
Support business
Social and Religious
Social amenities
ASA 2 6.2 Procedure ML-1A/L2-PR3 (0) dated Mar 2012 on Consultation, Participation &
Communication evident for the purpose of open and transparent methods for
communication and consultation between growers and/or mills, local
communities and other affected or interested parties. SOP for Consultation
and communication is divided into internal and external communication.
There is a flowchart available for the communication that to handle in order
to resolve it.
For internally, communication can be made through morning row call and
notice board in the mill area. Workers also can make communication from
workers union meeting. For external stakeholders, communication can be
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 33 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
made in any medium such as through media, suggestion box and complaint
logbook and from HQ in KL.
In the mill, personnel available; Mr Nor Fadli b. Toha; letter of appointment
dated 10.5.2014 with the roles and responsibilities for these issues. In Felda
Jengka 7, the personnel available; Mr. Fahzan Shahmi; appointed dated
22.1.2014. In Felda Jengka 2, appointed person is Mohd Zairi on 26.2.2011.
Sighted the stakeholder list in mill dated 10.10.2013, that workers [87]; gov
[17], FFB supplier [57], supplier [22], internal security [4], Village head [4].
ASA 2 6.3 To comply with SOP Manual Lestari 1A (ML-1A/L2-PR4 (0) dates on March
2012 each complaint will be taken action within 7 days and issue resolved in
14 days from the complaint date. System was found to be open for any
affected parties by implementation of SIA form and stakeholders meeting by
the management. Documentation sighted for dispute and resolve stated in
procedure ML-1A/L2-PR4 (0) dated Mar 2012. The procedure including the
flow chart how the disputes is refer to and to give responses in timely
manner. The scheme has Visit Manager activities.
In the mill, only DOE & DOSH visit recorded as part of legal compliance. 4
complain registered for since 2014. Last complain registered on 21.7.2014 for
house repair. Repaired dated 23.7.2014.
In Felda Jengka 2, the scheme has Visit Manager activities. Sighted about 40
visits to settlers done in a month August 2014 and recorded. 7complaints
registered for Jan Aug 2014. Last issue registered on 15.8.2014 on pruning
job not satisfactory by Siti Aminah [settlers]; the managements has
monitored the pruning and do fertilizing job dated completed 5.9.2014.
In Jengka 4 Estate, a complaint book is available at the office where it is open
to all the stakeholders to lodge any complaint. Moreover, complaint box is
also available at the public area such as mosque. The time taken to resolve
any complaints is within two weeks as stated in the SOP. Ex: 12/2//14,
complaint by Mr Ismail regarding the harvesting work done by FTP. The
complaint being attended by manager on 13/2/14.
ASA 2 6.4 No negotiations concerning compensation for loss of legal or customary rights
is as per this assessment period [this land where the Mill stand s belong
Government [given to the management.]. ML-1A/L2-PR12 (0) Mac 2012 for a
procedure for identifying legal and customary rights and a procedure for
identifying people entitled to compensation.
History and documents of the development of Complex Felda Jengka 3 under
FGVP do not show any evidence that there was a loss of legal or customary
rights which would have led to a necessary, consequent compensation or that
any compensational claims would be open and/or evident.
ASA 2 6.5 No foreigner in the mill employments. Syarat-syarat perkhidmatan Felda
handbook sighted for the employment terms and conditions. Workers
understood contract, terms & condition evident. Minimum pay of RM 900/=
as per the government regulation for monthly paid worker sighted and
verified.
In the mill, sampled and interviewed Mustapha Kamaluddin Press [Local];
Bukhari Ismail Boiler man [Local]. Pay wages & slip evident; employee
understood the salary itinerary. Contract verified; local staffs have their
contract signed. No foreigner in the mill employments.
In Felda Jengka 7, seen 211 from 398 settler run by themselves. [Settlers do
their own work]. Some have workers to help them. Sampled and interviewed
Musa Latif [Block B1 Peringkat 001]; sampled for July 2014; gross payment
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 34 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
Topographic information for the existing estate sighted along with latest GPS
Survey.
ASA 2 7.3 There is a primary forest [Hutan Simpanan Pia] sighted within this estate
perimeter. As this is a larger Felda Scheme area in Malaysia, therefore all
the estates are eventually neighbors to the others. HCV 2 and 6 areas
identified. As there is no new planting applicable, therefore formal HCV
assessment not evidence.
ASA 2 7.4 Agronomist annual report on "Oil Palm Manuring Recommendations
2014/15 sighted with estate's geographical condition. No peat land and due
to no hilly and sloping areas, therefore terracing not applicable.
The annual agronomist report will be used as guideline for existing estate
mature palm management and for replanting.
ASA 2 7.5 As there is no new planting applicable, therefore formal HCV, EIA and SIA
assessment not evidence.
ASA 2 7.6 Neither new planting nor extension of existing one documented and seen
during this audit. Replanting program in place for period of 2018 - 2021. As
there is no new planting applicable, therefore formal HCV, EIA and SIA
assessment not evidence.
No negotiations concerning compensation for loss of legal or customary
rights are as per this assessment period. Based on the land title, it leases for
99 years, therefore no compensation issues involved. Since the RSPO
certification date, there isn't any issues raised by stakeholders during
stakeholder meetings.
ASA 2 7.7 Felda has a zero burning Policy and SOP-09 that seen effectively documented
and communicated among all the interested parties. The upcoming replanting
schedule to be in 2018-2021. During field visit not observed any open burning
in the operating units. Apart from the policy, Guidelines for the
implementation of the ASEAN policy on zero burning used for reference.
ASA 2 7.8 Neither new planting nor extension of existing one documented and seen
during this audit.
Principle 8: Commitment to Continuous Improvement in Key Areas of Activity
Criterion by Sighted continuous monitoring, review of activities and development are
Audit implemented along with action plans that allow demonstrable continual
Summary improvement in key operations such as in minimizing use of certain
pesticides, environmental impacts, maximizing recycling and minimizing
waste or by-products generation, pollution prevention plans.
ASA 2 8.1 In mill, the environmental impacts improvement plan is available in year 2014
QOHSE Objectives. The plan include to reduce 0.6 lit/MT diesel usage and to
reduce 0.5% of MRE/BTS emission. There are plan to maximize recycling such
as paper, plastic bottle and metal scrap. Sighted letter to all workers dated
6/1/2014 to maximize recycling. Recycle bin has been placed in the mill and
housing area. Pollution prevention plan is available as the environmental
impacts improvement plan. Memo dated 13.8.2014 for SIA survey. 26 out of
50 surveys were replied. Survey were done with youth [2], staff [16], office
[4], businessman [1], and local employee [3]. A document for SIA Report
[sample] is available. Last SIA conducted in 1.9.2014. The survey were
analysed and found. In estates, programs to reduce chemical usage are
sighted. Management plan has been established to reduce chemical used.eg:
introduction of Barn owl. Details of expenditure were in Budget 2013/2014
for amenities & welfare.
4.3 Non-conformity Raised During this Audit and Any from the Previous Year, if applicable
This section gives an over view of new or revised non-conformities raised during this audit and of action taken
to close out non-conformities raised during the previous audits, if applicable
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 37 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
If a minor-non-conformity raised at the last audit, is not closed out, then this will be raised to Major
status and the company given 60 days to close this out.
The NC number is comprised of 2 parts to include the year in which the NC was raised as well as a
sequential number.
Date: 05/09/2014
Proposed corrective action / improvement action by company.
Date:
4.3.2 Non-Conformity Identified during the last ASA, not applicable for MA
Non-Conformities identified in previous audit. [11 Minor NCs]. The Lead Auditor has verified the effectiveness
of the replied corrective action and found satisfactory.
NC number: 2013-NC-05
Client name: Felda POM Jengka 3
Date raised: 05/09/2013
Major or Minor: Minor
Raised by: Simon
Aspect of standard: - 6
A specific grievance mechanism is established.
Evidence of non-conformity:
A grievance mechanism procedure evident. The committee fails specifically address concerns of women on
matters such as; training on womens rights, counseling for women affected by violence. Nor the activities of
the committee documented.
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Notifications and Training has been provided for " Gender Committee ".
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Policy has been communicated to the workers and the freedom of such policy. Policy is now displayed at the
notice board.
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Policy has been communicated to the workers and the freedom of such policy. Policy is now displayed at the
notice board.
Date: 06/09/2014
RSPOPC-SUM-REPORT.F01 MAY 2014 Page 40 of 54
Control Union (Malaysia) Sdn. Bhd.
150-A, 1st Floor, Persiaran Raja Muda Musa, Off Jalan Sg Bertih, Teluk Gadong, 41100, Klang, Selangor. Malaysia.
Tel: +603-3377 1600 / 1700
RSPO Principles & Criteria
Annual Surveillance Assessment Report
Report Number CU826788
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
To prepare a visitor logbook to record , including feedback from the complainant after the action taken.
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Prepare Home Farm Budget Formulation and Administration for 2014 and 2015.
Prepare Summary Revenue Estimates for 2014 and 2015.
Date: 06/09/2014
There is no documented evidence of Notification of New Amended Legal and Other Requirements form
FPI/L4/QOHSE-2.2 used for revisions made on 20/11/2012. This is against the requirement spelled in
procedure FPI/L2/QOHSE-2.0 dated on 02/01/08.
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Assessment for the year 2013 has been made . Notification of new legislation will be announced where
necessary.
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
HCV assessment carried out and updated. Interviews carried out with internal & external stakeholders.
Date: 06/09/2014
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Workers housing are now renovated and proper facilities are prepared.
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Provide Water Analysis Report Tube well. Provide Sample Analysis Report River Water Entry and Exit
Date: 06/09/2014
Auditors signature:
Date: 05/09/2013
Proposed corrective action / improvement action by company.
Medical report has been updated and all direct employees already do medical check.
Date: 06/09/2014
Evidence of non-conformity:
Scheme managers should ensure that appropriate systems are in place for their smallholders to comply with
legal, SIA and EIA.
Lead Assessor signature:
Date: 09/09/2014
Evidence of non-conformity:
SIA conducted randomly. At some times, the survey percentage doesn't suit the probability of the overall
participant which includes governmental, youth, old people, supplier, and other interested parties.
Lead Assessor signature:
Date: 09/09/2014
4.4 Issues that were raised during the Stakeholder Consultation, if any
Stakeholders were either informed by the client or by Control Union via the RSPO website.
For Main Assessments, a 30 day Stakeholder consultation announcement is published on the RSPO website
prior to the audit. The same announcement is circulated by the client prior to the audit
For subsequent Annual Assessments, it is based on stakeholders reading the approved public summary
reports available on the RSPO website, the clients procedures in receiving on-going feedback or if feedback
was sent directly to Control Union prior to an audit or thorough RSPO complaints procedures.
During each assessment, the audit team will review the companys implemented procedures in receiving
feedback and will execute field visits and interviews. Not limited to the following questions, any feedback
received is reviewed and summarized in this summary report for either Part 2 Partial Certification or Part 4
Assessment Findings above or noted below, if applicable:
1. Do you have any remarks on the RSPO standard?
2. What is your relation with the applicant?
3. Are there any plantation or mill management practices that affect you?
4. Do you consider any management is in conflict with the RSPO principles and criteria?
5. Do you have any suggestions for management?
6. Are you aware of any HCV in the plantations or in adjacent land?
7. Are you aware of any endangered or rare species?
8. Are there any adverse (or positive) effects on local communities?
9. Additional comments?
11. Do you have any comments about the assessment team and would you like to meet with them?
12. Do you have any comments for the clients management of any other plantations?
Subject raised Company response and Audit team findings
proposed action to be taken
refer to PART 2 and PART 4 refer to PART 2 and PART 4 refer to PART 2 and PART 4
5.2 Confirmation Of The Companys Summary Of Annual Certified Volume Of RSPO Certified Palm Oil And
Palm Kernel Over A Specified Period
Product
CPO (MT) PK (MT) Specified 12 month period
CU Code
POM 1 60,766 15,952 Forecasted volumes between Sept 2014 to Aug 2015.
5.4 Monthly Records of Certified and Uncertified FFB Received Since the Last Audit
This is an Annual Surveillance Assessment, the figures used are since the last audit.
No MONTH-YEAR Certified Supply Bases (MT) Uncertified Supply Bases (MT), if any Total (MT)
1 Sep-13 32127.72 899.43 33027.15
2 Oct-13 32223.70 440.14 32663.84
3 Nov-13 29230.04 449.91 29679.95
4 Dec-13 25343.89 352.14 25696.03
5 Jan-14 22491.02 - 22491.02
6 Feb-14 16489.06 - 16489.06
7 Mar-14 19212.71 - 19212.71
8 Apr-14 20938.71 - 20938.71
9 May-14 22794.42 - 22794.42
10 Jun-14 19554.60 - 19554.60
11 Jul-14 21122.41 - 21122.41
12 Aug-14 27348.43 - 27348.43
TOTAL 288876.71 2141.62 291018.33
Note: From January 2014, this mill is upgraded from MB to SG.
5.5 Monthly Records of Certified CPO and PK Produced Since the Last Audit
st
If this is the 1 Main Assessment, the figures used are from the last 12 months.
If this is an Annual Surveillance Assessment, the figures used are since the last audit.
No MONTH-YEAR Certified CPO (MT) Certified PK Total (MT)
1 Sep-13 6718.33 1832.72 8551.05
2 Oct-13 6730.05 1837.77 8567.82
3 Nov-13 6163.85 1631.12 7794.97
4 Dec-13 5254.17 1472.10 6726.27
5 Jan-14 4578.58 1348.08 5926.66
6 Feb-14 3452.17 972.35 4424.52
7 Mar-14 3644.95 1044.15 4689.1
8 Apr-14 4258.05 1220.84 5478.89
9 May-14 5275.76 1369.22 6644.98
10 Jun-14 4136.91 919.98 5056.89
11 Jul-14 4628.08 1083.39 5711.47
12 Aug-14 5715.84 1677.5 7393.34
TOTAL 60556.74 16409.22 76965.96
Note: From Sept 2013 to Dec 2013, sales involves MB model.
5.6 Records of Certified CPO & PK Sold under Green Palm to Buyers since the Last Audit, if Any
If this is the 1st Main Assessment, the figures used are from the last 12 months.
If this is an Annual Surveillance Assessment, the figures used are since the last audit.
The transactions were sighted form the clients registered Green Palm Account.
Certified CPO Certified PK
No Buyers Name Green Palm Trading No
(MT) Sold (MT) Sold
1 5479/4128/7374 600 -
2 5495/4122/7406 1400 -
3 5692/4332/7843 1500 -
4 6299/4618/8519 2050 -
5 6271/4619/8521 500 -
6 6325/4617/8538 450 -
7 6331/4663/8608 2000 -
8 5118/4665/8611 2000 -
9 6564/4817/8878 3000 -
10 6511/4838/8902 500 -
11 6608/4836/8912 2000 -
12 6630/4873/8953 5000 -
13 6743/4961/9115 3000 -
24,000 -
5.7 Records of Certified CPO & PK Sold under UTZ eTrace to Buyers since the Last Audit, if Any
If this is the 1st Main Assessment, the figures used are from the last 12 months.
If this is an Annual Surveillance Assessment, the figures used are since the last audit.
The transactions were sighted form the clients registered UTZ eTrace Account.
Certified CPO Certified PK
No Buyers Name UTZ eTrace Trading No
(MT) Sold (MT) Sold
1 Cargill Palm Products Sdn. Bhd. TR-f7a6dab7-fa8a 1525.81 -
2 Cargill Palm Products Sdn. Bhd. TR-e8f90af2-a23b 2282.27 -
3 Cargill Palm Products Sdn. Bhd. TR-ccff470b-ba61 479.03 -
4 Cargill Palm Products Sdn. Bhd. TR-e704ca8c-e0b8 491.20 -
5 Felda Iffco Oil Products Sdn. Bhd. TR-0a35d1da-fb89 283.05 -
6 Cargill Palm Products Sdn. Bhd. TR-6c7827c3-71cb 460.77 -
7 Cargill Palm Products Sdn. Bhd. TR-afecb431-d028 35.26 -
8 Cargill Palm Products Sdn. Bhd. TR-285e3d5f-7577 520.00 -
9 Cargill Palm Products Sdn. Bhd. TR-2afb76a6-824d 82.16 -
10 Cargill Palm Products Sdn. Bhd. TR-c7729eff-1683 500.00 -
11 Cargill Palm Products Sdn. Bhd. TR-3e8b157b-a83e 550.00 -
12 Cargill Palm Products Sdn. Bhd. TR-c5b2f2bc-bf86 750.00 -
13 Cargill Palm Products Sdn. Bhd. TR-c49632c8-6be3 750.00 -
Total 8,709.55
be considered as a major) and the integrity of the RSPO Supply Chain Certification is at risk. A maximum of
one month is to be given to the certified client to satisfactorily address the non-conformance. The
certification body shall assess the effectiveness of the corrective and/or or preventive actions taken. Should
the nonconformance not be addressed within the one-month maximum timeframe, a suspension or
withdrawal of the certificate and a full re-audit may be necessary.
4. If no non-conformances are observed at an audit or when the corrective action plan has satisfactorily
addressed raised non-conformance(s), the client shall be recommended for (re-) certification.
Non-were raised during this audit.
NC Number: NA
Date:
Reference to standard:
Standard requirement:
Evidence of non-compliance:
5.10Final Certification decision by Control Union for the RSPO SCCS Audit of the POM
Recommendations made: Yes
Summary of non- None Found
compliances:
Certification status of client: The POM included in the scope of this audit demonstrated full compliance with
the RSPO SCCS. With effect from the certification date given in the RSPOPC
certificate, this POM mentioned in the scope of this report is considered to be
certified in accordance with the RSPO SCCS.
Acknowledged by:
Name: Norazam Abdul Hameed
Position: General Manager
PART 7: APPENDICIES