A.7 ANCHORE
DIMENSION: (TRIA: 0.5M x 0.5M) x 0.15M
VOLUME: 0.01875 cu. M
CEMENT: 0.01875 x 9.0= 0.169 BAGS
GRAVEL: 0.01875 x 1.0= 0.019 cu. M
SAND: 0.01875 x 0.5= 0.009 cu. M
TOTAL: 39 POST
CEMENT: 6.58125 BAGS
GRAVEL: 0.73125 cu. M
SAND: 0.365625 cu. M
B REINFORCEMENT
B.1 FOOTING
12 PCS- 1.5M 16MM
= 4 PCS- 16MM 6M LONG
TOTAL: 39 POST
16MM 6M LONG= 156 PCS
B.7 ANCHORE
LONGITUDINAL BARS:
2 PCS-16MM 1M LONG
= 6PCS PER 1-16MM 6M LONG
= 0.3333 PCS-16MM 6M LONG
TRANSVERSE BARS:
6 PCS- 10MM 0.30M LONG
= 20PCS PER 1-10MM 6M LONG
= 0.3PCS-10MM 6M LONG
TOTAL: 38 SPAN
16MM 6M LONG= 13 PCS
10MM 6M LONG= 12 PCS
SUMMARY OF ESTIMATION:
NO. ITEM QUANTITY UNIT PRICE
1 CEMENT 1319.79625 BAGS 225
2 GRAVEL 88.88625 CU. M 250
3 SAND 87.568125 CU. M 300
4 16MM 6M LONG 785 PCS 210
5 12MM 6M LONG 38 PCS 150
6 10MM 6M LONG 1020 PCS 119
7 TIE WIRE No. 16 700 KGS 50
8 MARINE PLYWOOD 1.2M x 2.4m 16 PCS 120
9 2"x3" GOOD LUMBER 25 PCS 135
10 2"x2" GOOD LUMBER 15 PCS 130
11 CHB 6992 PCS 15
PER POST
PER POST
PER POST
PER POST
PER POST
PER POST
PER POST
PER POST
PER POST
PER SPAN
PER SPAN
PER SPAN
PER SPAN
PER SPAN
PER SPAN
PER POST
PER POST
PER POST
PER POST
PER POST
PER POST
PER SPAN
PER SPAN
PER SPAN
PER SPAN
PER SPAN
PER SPAN
COST
PHP 296,954.16
PHP 22,221.56
PHP 26,270.44
PHP 164,850.00
PHP 5,700.00
PHP 121,380.00
PHP 35,000.00
PHP 1,920.00
PHP 3,375.00
PHP 1,950.00
PHP 104,880.00
PHP 784,501.16