Anda di halaman 1dari 147

DAFTAR HARGA SATUAN BAHAN DAN UPAH

BULAN DESEMBER 2013 UTK JANUARI 2014


A. Harga Satuan Bahan

SATUA
NO NAMA BARANG
N
1 2 3
FINISHING
1 Amplas lbr
2 Cat besi kg
3 Cat dasar kg
4 Cat emco kg
5 Cat menie besi kg
6 Cat menie kayu kg
7 Cat tembok Decolith kg
8 Cat tembok Dulux kg
9 Cat tembok Emco kg
10 Cat tembok Paragon kg
11 Cat tembok Toyopaint kg
12 Cat tembok Vinilex kg
13 Cat tembok Vinippaint kg
14 Dempul ltr
15 Kuas bh
16 Mild zak
17 Minyak cat ltr
18 Plamir kayu kg
19 Plamir tembok kg
20 Politur ultra ltr
21 Politur vernis ltr
22 Thiner A Bonanza ltr
23 Thiner B Spesial ltr

PENUTUP ATAP
24 Alang-alang panjang 2,4 meter lbr
25 Alluminium foil m2
26 Asbes Bubungan lbr
27 Asbes Gelombang 1,80 m x 0,80 m x 5 mm lbr
28 Asbes Gelombang 2,4 m x 1,05 m x 4 mm lbr
29 Asbes Rata 2 m x 1 m x 4 mm lbr
30 Atap metal Toratora 1 x 4 Extra m2
31 Atap metal Toratora 1 x 4 Premium m2
32 Atap metal Toratora 2 x 4 Extra m2
33 Atap metal Toratora 2 x 4 Premium m2
34 Atap metal Toratora 3 x 4 Extra m2
35 Atap metal Toratora 3 x 4 Premium m2
36 Atap metal Toratora 4 x 4 Extra m2

Harga Barang dan Upah Hal. 1


SATUA
NO NAMA BARANG
N
1 2 3
37 Atap metal Toratora 4 x 4 Premium m2
38 Bentala paras bh
39 Bentala tanah liat bh
40 Besi profil WF P.6m kg
41 Besi profil WF P.12m kg
42 Bubungan Biasa bj
43 Bubungan Karang Pilang (glazur) isi 3,5/m bj
44 Bubungan Karang Pilang isi 3,5/m bj
45 Bubungan Ngalayur isi 3,5/m bj
46 Bubungan Plentong bj
47 Bubungan Utama isi 3,5/m bj
48 Genteng Kanmuri (glazur) isi 14/m2 bj
49 Genteng Kodok Karang Pilang (Bambe) isi 20/m2 bj
50 Genteng Kodok Karang Pilang (Bisma) isi 20/m2 bj
51 Genteng Kodok Karang Pilang (Good Year) isi 20/m2 bj
52 Genteng Morando Abadi isi 18/m2 bj
53 Genteng Morando Jatiwangi isi 18/m2 bj
54 Genteng Morando Ngalayur isi 20/m2 bj
55 Genteng Plentong bj
56 Genteng plentong dicat bj
57 Genteng Plentong Jatiwangi isi 24/m2 bj
58 Ijuk kg
59 Ikut celedu paras bh
60 Ikut celedu tanah liat bh
61 Murda paras bh
62 Murda tanah liat bh
63 Seng BJLS 0,20 gelombang lbr
64 Seng BJLS 0,25 gelombang lbr
65 Seng BJLS 0,28 gelombang lbr
66 Seng BJLS 0,32 gelombang lbr
67 Seng Plat 3" x 6" BJLS 28 lbr
68 Sirap Jati bh
69 Tali Ijuk kg
70 Tali pengikat alang-alang ikat

PENGGANTUNG
71 Engsel kupu-kupu ps
72 Engsel nylon ps
73 Espagnoleth set
74 Grendel biasa bh
75 Grendel hararo bh
76 Kaca 3 mm bening m2
77 Kaca 5 mm bening m2
78 Kaca 6 mm bening m2

Harga Barang dan Upah Hal. 2


SATUA
NO NAMA BARANG
N
1 2 3
79 Kaca 8 mm bening m2
80 Kaca 10 mm bening m2
81 Kaca 12 mm bening m2
82 Kaca Es/Kapur 3 mm m2
83 Kaca Es/Kapur 5 mm m2
84 Kaca nako daun
85 Kaca nako teralis bening m2
86 Kaca ryben 3 mm m2
87 Kaca ryben 5 mm m2
88 Kait angin biasa bh
89 Kunci pintu TOP bh
90 Kunci pintu Union bh
91 Kunci pintu Vanesa bh
92 Kunci pintu Yale bh
93 Kunci pintu YURI bh
94 Kunci slot bh
95 Kunci tanam 2 slag bh

KAYU DAN PLAFOND


96 Bambu besar Ukuran 4 m btg
97 Bambu sedang Ukuran 4 m btg
98 Bambu kecil Ukuran 4 m btg
99 Celling teak (0,62 x 2,40) m2 lbr
100 Eternit lbr
101 Formika lbr
102 Gedeg kulit kelas I m2
103 Gypsum Old lbr
104 Hard board MDF lbr
105 Kalsiboard 4,5 mm lbr
106 Kayu bekesting balok m3
107 Kayu bingkirai balok m3
108 Kayu bingkirai papan m3
109 Kayu dolken (pekerjaan sementara) btg
110 Kayu jati m3
111 Kayu jati papan m3
112 Kayu kamper balok m3
113 Kayu kamper usuk/reng m3
114 Kayu kamper papan m3
115 Kayu kruing balok m3
116 Kayu kruing usuk/reng m3
117 Kayu kruing papan m3
118 Kayu meranti balok m3
119 Kayu meranti usuk/reng m3
120 Kayu meranti papan m3

Harga Barang dan Upah Hal. 3


SATUA
NO NAMA BARANG
N
1 2 3
121 Kayu merbau balok m3
122 Kayu merbau papan m3
123 Kayu profil usuk m1
124 Kayu seseh balok m3
125 Kayu seseh dolken m3
126 Lem Aibond kg
127 Lem Kayu ltr
128 List Gypsum standar m'
129 Minyak bekisting ltr
130 Multiplek 12 mm lbr
131 Multiplek 18 mm lbr
132 Multiplek 6 mm lbr
133 Multiplek 9 mm lbr
134 Plywood 12 mm lbr
135 Plywood 3 mm lbr
136 Plywood 4 mm lbr
137 Plywood 6 mm lbr
138 Plywood 9 mm lbr
139 Plywood aluminium lbr
140 Teak wood (0,9x2,20) m2 lbr
141 Teak wood (1,20x2,40) m2 lbr

KERAMIK
IKAD
142 Ikad (Keramik) Kw. I 10 x 20 cm m2
143 Ikad (Keramik) Kw. I 20 x 20 cm m2
144 Ikad (Keramik) Kw. I 20 x 30 cm m2
145 Ikad (Keramik) Kw. I 30 x 30 cm m2
146 Ikad (Keramik) Kw. I 40 x 40 cm m2
147 Ikad (Keramik) Kw. II 10 x 20 cm m2
148 Ikad (Keramik) Kw. II 20 x 20 cm m2
149 Ikad (Keramik) Kw. II 20 x 30 cm m2
150 Ikad (Keramik) Kw. II 30 x 30 cm m2
151 Ikad (Keramik) Kw. II 40 x 40 cm m2

INESA
152 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P) m2
153 Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
154 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P) m2
155 Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP) m2
156 Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R) m2
157 Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P) m2

Harga Barang dan Upah Hal. 4


SATUA
NO NAMA BARANG
N
1 2 3
158 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P) m2
159 Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP) m2
160 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P) m2
161 Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP) m2
162 Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P) m2

ESSENZA
163 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P) m2
164 Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP) m2
165 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P m2
166 Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, m2
167 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P m2
168 Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, m2
169 Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P m2
170 Keramik Kelas I Domus m2
171 Keramik Kelas I Granity Imperiali m2
172 Keramik Kelas I Lavagna m2
173 Keramik Kelas I Mountain Peak m2

ROMAN
174 Keramik 20 x 20 tekstur kasar m2
175 Keramik 25 x 33 kelas I m2
176 Keramik 25 x 45 motif halus kelas I m2
177 Keramik 30 x 30 standard m2
178 Keramik 30 x 30 kelas I T. 1cm m2
179 Keramik 20 x 60 kelas I T. 1cm m2
180 Keramik 20 x 40 kelas I Motif standard m2
181 Keramik 30 x 60 kelas I Motif Dasar Muda m2
182 Keramik 40 x 40 kelas I krem m2
183 Keramik 40 x 40 kelas I white m2
184 Keramik 50 x 50 kelas I warna muda m2

PLATINUM
185 Keramik 25 x 33 kelas I m2
186 Keramik 25 x 40 kelas II m2
187 Keramik 30 x 60 kelas II bulgari m2
188 Keramik 40 x 40 kelas I brown m2

GRANIT
189 Granit star white L.60 m2
190 Granit BGYD red L.60 m2
191 Granit crystal pink L. 60 m2

Harga Barang dan Upah Hal. 5


SATUA
NO NAMA BARANG
N
1 2 3
192 Granit mongol black L. 60 m2
193 Granit gold black L. 60 m2

GRANITO
194 Granito Castello Tera 60 x 60 m2
195 Granito Monalisa TD6602 60 x 60 m2
196 Granito Monalisa TD6602 80 x 80 m2
197 Granito Niro FR660IY 60 x 60 m2
198 Granito Essenza Grey 60 x 60 m2
199 Granito Indogress Cristallo 80 x 80 m2

MARMER
200 Marmer cream BA 60 x 60 m2
201 Marmer cream BA 40 x 40 m2
202 Marmer cream BA 30 x 30 m2

MOZAIK
203 Mozaik keramik zehn crystal glass 30 x 30 biji
204 Mozaik batu alam 30 x 30 biji

ASIA
205 Keramik 20 x 30 kelas I warna muda m2
206 Keramik 30 x 30 kelas I warna muda m2
207 Keramik 30 x 30 kelas I warna tua m2
208 Keramik 40 x 40 kelas I warna muda m2
209 Keramik 10 x 20 kelas II m2
210 Keramik 20 x 20 kelas II m2
211 Keramik 20 x 30 kelas II m2
212 Keramik 30 x 30 kelas II m2
213 Keramik 40 x 40 kelas II m2

MULIA
214 Keramik 10 x 20 cm kelas I m2
215 Keramik 20 x 20 cm kelas I m2
216 Keramik 20 x 30 cm kelas I m2
217 Keramik 30 x 30 cm kelas I m2
218 Keramik 40 x 40 cm kelas I m2
219 Keramik 10 x 20 cm kelas II m2
220 Keramik 20 x 20 cm kelas II m2
221 Keramik 20 x 30 cm kelas II m2
222 Keramik 30 x 30 cm kelas II m2
223 Keramik 40 x 40 cm kelas II m2

Harga Barang dan Upah Hal. 6


SATUA
NO NAMA BARANG
N
1 2 3

SANITAIR
224 Bak mandi fibre glass 70x70x66 cm bh
225 Bak mandi keramik 50x50 bh
226 Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange " bh
227 Floor drain plastik bh
228 Floor drain stainless bh
229 Kloset duduk INA Komplit bh
230 Kloset duduk Amerika Standar bh
231 Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP C bh
232 Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COM bh
233 Kloset duduk " TOTO Type AVANTE CW 823 J bh
234 Kloset duduk " TOTO Type CW 660J bh
235 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT bh
236 Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WAR bh
237 Kloset duduk " TOTO Type CW 660J WARNA COMPLIT bh
238 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
239 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
240 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
241 Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT bh
242 Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
243 Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
244 Kloset jongkok " TOTO Type CE 6 COMPLIT bh
245 Kloset jongkok " TOTO Type CE 7 COMPLIT bh
246 Kloset porselin jongkok Kia (standar) bh
247 Kloset porselin jongkok Ina (standar) bh
248 Kran biasa bh
249 Kran SunEi bh
250 Kran TOTO T 205 LCSC bh
251 Kran TOTO T 205 MC bh
252 Kran TOTO T 23 B13 bh
253 Kran TOTO T 23 B13V7N bh
254 Kran TOTO T 26 - 13 bh
255 Kran TOTO TX 109 LH bh
256 Penyekat Urinoir " TOTO " Type A 100 " bh
257 Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory ) bh
258 Soap holder " TOTO " Type S 6 N " bh
259 Seal tape bh
260 Urinoir " TOTO U 57 M bh
261 Urinoir " TOTO U 57 M BODI bh
262 Urinoir " TOTO UW 447 JT 1 " bh
263 Urinoir " TOTO UW 447 JT 1 BODI bh
264 Urinoir " TOTO UW 447 JT 1,M " bh

Harga Barang dan Upah Hal. 7


SATUA
NO NAMA BARANG
N
1 2 3
265 Urinoir " TOTO UW 447 JT 1,M "BODI bh
266 Wastagel KIA Standard bh
267 Wastagel KIA Warna bh
268 Wastafel Komplit " TOTO Tx " Type L 521V1A " bh
269 Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 bh
267 Wastafel Toto komplit LW631JW/F segi 4 bh
268 Wastafel Toto LW352JW/F bulat bh
269 Wastafel Toto komplit LW645+T6JV5 kotak bh
270 Wastafel Toto LW248JR bh
271 Shower TOTO Tx 401SBZ bh
272 Shower TOTO Tx 471SOBR bh
273 Shower TOTO Tx 471SKBR bh
274 Shower TOTO Tx 449SMBR bh
275 Kloset American Standart komplit bh
276 Kloset American Famous bh
277 Kloset Toto komplit bh
278 Elite cuci piring E-176 bh
279 Elite cuci piring dobel E-118 bh

PAKU
280 Paku 10 cm kg
281 Paku kalsiboard kg
282 Paku list SQ kg
283 Paku pancing 60 x 230 kg
284 Paku reng/usuk SQ kg
285 Paku seng kg
286 Paku seng import bj
287 Paku skrup 1/2" kg
288 Paku skrup 2" kg
289 Paku skrup 3.5" kg
290 Paku sumbat 1/2" kg

PASIR, BATU, KERIKIL, BATA DAN PARAS


291 Bata gosok ex Tulikup bj
292 Bata Merah 5 x 11 x 22 cm bj
293 Batako kelas I bj
294 Batu kali /batu bulat 15/20 cm m3
295 Batu karang m3
296 Batu lahar Singaraja m3
297 Batu pecah 5-7 cm (manual) m3
298 Batu pipih Singaraja m3
299 Bata riyan ( abble ) bj
300 Roster Keramik bh

Harga Barang dan Upah Hal. 8


SATUA
NO NAMA BARANG
N
1 2 3
301 Koral Beton m3
302 Limestone m3
303 Paras Batik bh
304 Paras Buahan bh
305 Paras Karang Bukit bh
306 Paras Kerobokan Tebal 5 bh
307 Paras Malem bh
308 Paras Putih Bukit bh
309 Paras Silakarang tebal bh
310 Paras Silakarang tipis bh
311 Paras untuk pondasi bh
312 Batu alam RTM hijau 10 x 20 halus m2
313 Batu alam RTM hijau 20 x 20 halus m2
314 Batu alam RTS hijau 10 x 20 kasar m2
315 Batu pilah Jember 30 x 30 m2
316 Batu pilah Jember 20 x 30 m2
317 Batu pilah Jember 40 x 40 m2
318 Batu pilah Singaraja 30 x 30 m2
319 Batu pilah Singaraja 20 x 20 m2
320 Batu hitam Jember 5 x 20 halus m2
321 Batu hitam Jember 20 x 40 halus m2
322 Batu hitam Jember 15 x 30 halus m2
323 Batu hitam Singaraja 15 x 30 halus m2
324 Batu hitam Singaraja 20 x 40 halus m2
325 Batu AND 60 x 60 abu m2
326 Batu AND 50 x 50 hitam m2
327 Batu AND 40 x 40 hitam bkr m2
328 Batu AND 30 x 60 hitam bkr m2
329 Batu AND 40 x 60 hitam kilap m2
330 Batu AND 30 x 40 abu SS m2
331 Batu marmer kuning 10 x 20 m2
332 Batu marmer kuning PB1 10 x 20 m2
333 Batu marmer kuning PB2 10 x 20 m2
334 Batu marmer kuning 15 x 30 m2
335 Batu kuning serat 30 x 30 m2
336 Batu kuning serat 20 x 30 m2
337 Batu palimanan cirebon 20 x 30 m2
338 Batu palimanan cirebon 20 x 40 m2
339 Batu paras Jogja 60 x 60 m2
340 Batu candi hitam 60 x 60 m2
341 Batu candi hitam 20 x 20 m2
342 Batu candi hitam 30 x 30 m2
345 Batu candi hitam 40 x 40 T.5cm m2

Harga Barang dan Upah Hal. 9


SATUA
NO NAMA BARANG
N
1 2 3
346 Batu candi hitam 20 x 30 m2
347 Batu Bali green gelombang 20 x 40 m2
348 Batu Bali green kombinasi 20 x 40 m2
349 Batu serayu 20 x 60 m2
350 Pasir beton m3
351 Pasir pasang m3
352 Pasir urug m3
353 Sirtu m3
354 Tanah urug m3

PIPA
355 Pipa Galvanis 1/2" m1
356 Pipa Galvanis 3/4" m1
357 Pipa Galvanis 1 1/4" m1
358 Pipa Galvanis 1 1/2" m1
359 Pipa Galvanis 1" m1
360 Pipa Galvanis 1,5 BSA m1
361 Pipa Galvanis 2" m1
362 Pipa Galvanis 3" m1
363 Pipa Maspion AW 1 ljr
364 Pipa Maspion AW 1/2 ljr
365 Pipa Maspion AW 10 ljr
366 Pipa Maspion AW 1-1/2 ljr
367 Pipa Maspion AW 1-1/4 ljr
368 Pipa Maspion AW 12 ljr
369 Pipa Maspion AW 14 ljr
370 Pipa Maspion AW 16 ljr
371 Pipa Maspion AW 2 ljr
372 Pipa Maspion AW 2-1/2 ljr
373 Pipa Maspion AW 3 ljr
374 Pipa Maspion AW 3/4 ljr
375 Pipa Maspion AW 4 ljr
376 Pipa Maspion AW 5 ljr
377 Pipa Maspion AW 6 ljr
378 Pipa Maspion AW 8 ljr
379 Pipa Maspion C 1 ljr
380 Pipa Maspion C 1-1/2 ljr
381 Pipa Maspion C 1-1/4 ljr
382 Pipa Maspion C 2 ljr
383 Pipa Maspion C 2-1/2 ljr
384 Pipa Maspion C 3 ljr
389 Pipa Maspion C 3/4 ljr
390 Pipa Maspion C 4 ljr

Harga Barang dan Upah Hal. 10


SATUA
NO NAMA BARANG
N
1 2 3
391 Pipa Maspion C 5/8 ljr
392 Pipa Maspion D 10 ljr
393 Pipa Maspion D 1-1/2 ljr
394 Pipa Maspion D 1-1/4 ljr
395 Pipa Maspion D 12 ljr
396 Pipa Maspion D 14 ljr
397 Pipa Maspion D 16 ljr
398 Pipa Maspion D 2 ljr
399 Pipa Maspion D 2-1/2 ljr
400 Pipa Maspion D 3 ljr
401 Pipa Maspion D 4 ljr
402 Pipa Maspion D 5 ljr
403 Pipa Maspion D 6 ljr
404 Pipa Maspion D 8 ljr

KRAN AIR
405 TOTO T.30AR13V7N bh
406 TOTO T.60N bh
407 TOTO TX-116 LI bh
408 TOTO TX-116 LEBR bh
409 TOTO TX 101 LB bh

HANDEL PINTU
410 Gradino Handel Luar HP.6106 bh
411 Gradino Handel Luar HP.99.01 bh
412 Solid HRE 99.14 bh
413 ELT handle pintu dobel P99.62 set
414 ELT handle pintu dobel PR 511.05 set
415 ELT bulat PHB 308SS bh

SEMEN & AIR CAMPURAN BETON


416 Semen Bosowa 50 kg zak
416 Semen Gresik 40 kg zak
417 Semen Gresik 50 kg zak
418 Semen Tiga Roga 40 kg zak
419 Semen Tonasa 40 kg zak
420 Semen warna/semen grouting kg
421 Air Campuran Beton ltr

BESI BETON DAN PAGAR


422 Besi beton kg
423 Kawat berduri roll
424 Kawat beton RRT kg

Harga Barang dan Upah Hal. 11


SATUA
NO NAMA BARANG
N
1 2 3
424 Pagar BRC asli T.120 diameter 6mm m'
425 Pagar BRC asli T.150 diameter 6mm m'
426 Pagar BRC asli T.175 diameter 7mm m'
427 Pagar BRC asli T.190 diameter 7mm m'
428 Pagar BRC asli T.90 diameter 6mm m'
429 Pagar HotDip Galvanized T.120 diameter 6mm m'
430 Pagar HotDip Galvanized T.150 diameter 7mm m'
431 Pagar HotDip Galvanized T.175 diameter 7mm m'
432 Pagar HotDip Galvanized T.190 diameter 7mm m'
433 Pagar HotDip Galvanized T.90 diameter 6mm m'
434 Tiang BRC asli T. 120 diameter 1 1/2" bh
435 Tiang BRC asli T. 150 diameter 2" bh
436 Tiang BRC asli T. 175 diameter 2" bh
437 Tiang BRC asli T. 190 diameter 2" bh
438 Tiang BRC asli T. 90 diameter 1 1/2" bh
439 Tiang HotDip Galvanized T. 120 diameter 1 1/2" bh
440 Tiang HotDip Galvanized T. 150 diameter 2" bh
441 Tiang HotDip Galvanized T. 175 diameter 2" bh
442 Tiang HotDip Galvanized T. 190 diameter 2" bh
443 Tiang HotDip Galvanized T. 90 diameter 1 1/2" bh

BAHAN LISTRIK
444 Saklar (Broco) bh
445 Stop Kontak bh
446 Fitting bh
447 Steker bh
448 Coaxial cable 5C - 75 ohm commscof m1
449 Kabel NYM 3 x 2.5 mm ex. Supreme m1
450 Kabel NYM 4 mm m1
403 Kabel telephone m1
451 Lampu pijar 10 Watt (Philip) bh
452 Lampu pijar 15 Watt (Philip) bh
453 Lampu pijar 25 Watt (Philip) bh
454 Lampu TL 10 Watt (10 Watt) bh
455 Lampu TL 20 Watt (10 Watt) bh
456 Lampu TL 25 Watt (10 Watt) bh
457 Pipa clipsal 20 mm bt
458 Pipa flexible clipsal 20 mm m1
459 Sock clipsal 20 mm bj
460 Tee dos clipsal 20 mm bh
461 Klem clipsal 20 mm bj
462 Inbow dos plastik clipsal E 157 P bj

Harga Barang dan Upah Hal. 12


SATUA
NO NAMA BARANG
N
1 2 3
BUIS BETON
463 Buis beton 10 x 75 bh
464 Buis beton 15 x 75 bh
465 Buis beton 20 x 75 bh
466 Buis beton 25 x 75 bh
467 Buis beton 30 x 75 bh
468 Buis beton 50 x 75 bh

PAVING
469 Paving 10 x 20 cm tebal 6 cm K225 m2
470 Paving 10 x 20 cm tebal 6 cm K350 m2
471 Paving 10 x 20 cm tebal 8 cm K225 m2
472 Paving 10 x 20 cm tebal 8 cm K350 m2
473 Paving 10 x 20 cm tebal 8 cm K425 m2
474 Paving 20 x 20 cm tebal 6 cm K225 m2
475 Paving 20 x 20 cm tebal 6 cm K350 m2
476 Paving 20 x 20 cm tebal 8 cm K225 m2
477 Paving 20 x 20 cm tebal 8 cm K350 m2
478 Paving 20 x 20 cm tebal 8 cm K425 m2
479 Paving 20 x 20 cm tebal 10 cm K225 m2
480 Paving 20 x 20 cm tebal 10 cm K350 m2
481 Paving 20 x 20 cm tebal 10 cm K425 m2
482 Paving Tiga Berlian tebal 6 cm K225 m2
483 Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225) m1
484 Kanstein Jumbo (P:50,L:15,T:30 cm K225) m1
485 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) m1
486 Grass Block 36 X 54 cm tebal 9 cm K 225 m2
487 Koral Sikat (10 Kg) zak

LAIN-LAIN
488 Wall papper 29 x 29 lembar
489 Wall papper 70 x 100 lembar
490 Wall papper 50 x 70 lembar
491 Wall papper 30 x 60 lembar
492 Glass block bj
493 Dugul batu hitam 50 x 50 x 200 tempel unit
494 Dugul batu hitam 60 x 70 x 250 tempel unit
495 Dugul batu hitam 70 x 70 x 250 tempel unit
496 Padmasari batu hitam 50 x 50 x 200 tempel unit
497 Padmasari batu hitam 65 x 75 x 255 tempel unit
498 Padmasari batu hitam 70 x 70 x 250 tempel unit
499 Dugul batu hitam 50 x 50 x 200 masive unit
500 Dugul batu hitam 60 x 70 x 250 masive unit

Harga Barang dan Upah Hal. 13


SATUA
NO NAMA BARANG
N
1 2 3
501 Dugul batu hitam 70 x 70 x 300 masive unit
502 Padmasari batu hitam 50 x 50 x 200 masive unit
503 Padmasari batu hitam 65 x 75 x 255 masive unit
504 Padmasari batu hitam 70 x 70 x 250 masive unit

Mangupura, 16Desember 2013


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M


Pembina Tk.I
NIP. 196110101994032001

Harga Barang dan Upah Hal. 14


N UPAH
RI 2014

HARGA SATUAN

4,100.00
70,500.00
43,600.00
55,000.00
30,000.00
30,000.00
33,000.00
38,800.00
38,000.00
10,000.00
18,500.00
30,000.00
17,000.00
29,000.00
16,800.00
15,000.00
26,000.00
42,000.00
12,000.00
47,000.00
59,000.00
22,000.00
20,000.00

12,500.00
29,000.00
24,000.00
29,000.00
36,000.00
50,000.00
84,000.00
125,000.00
74,000.00
108,500.00
72,000.00
105,000.00
70,000.00

Harga Barang dan Upah Hal. 15


HARGA SATUAN

4
105,000.00
68,000.00
52,000.00
9,500.00
10,066.00
4,400.00
7,200.00
7,200.00
8,800.00
8,800.00
4,400.00
11,000.00
4,290.00
4,180.00
4,180.00
3,190.00
3,190.00
3,080.00
1,540.00
1,980.00
1,350.00
2,750.00
68,200.00
53,900.00
82,500.00
67,100.00
47,850.00
46,200.00
46,750.00
51,700.00
51,150.00
9,350.00
37,400.00
10,450.00

53,900.00
29,700.00
110,000.00
17,050.00
24,200.00
106,700.00
112,200.00
183,700.00

Harga Barang dan Upah Hal. 16


HARGA SATUAN

4
233,200.00
335,500.00
412,500.00
95,700.00
128,700.00
16,500.00
128,700.00
134,200.00
139,700.00
24,200.00
66,000.00
79,200.00
119,900.00
126,500.00
145,200.00
110,000.00
115,500.00

15,000.00
11,000.00
8,000.00
77,000.00
51,700.00
88,000.00
22,000.00
69,850.00
117,700.00
79,200.00
2,500,000.00
13,200,000.00
14,850,000.00
99,000.00
22,000,000.00 0.016 1 62.5 9500 593750
30,000,000.00
7,500,000.00 5750000 6500000 6125000
6,000,000.00
8,500,000.00
5,500,000.00
6,600,000.00
6,600,000.00
2,750,000.00
1,700,000.00
2,500,000.00

Harga Barang dan Upah Hal. 17


HARGA SATUAN

4
13,500,000.00
13,300,000.00
24,500.00
2,491,225.00
3,025,000.00
36,300.00
13,750.00
18,700.00
16,500.00
148,500.00
220,000.00
68,200.00 79000
108,570.00 104200
139,700.00
50,000.00
60,000.00
73,700.00
116,050.00
82,500.00
61,600.00
68,200.00

51,500.00
42,000.00
52,000.00
42,500.00
48,000.00
38,000.00
40,000.00
47,000.00
40,000.00
52,000.00

191,000.00
154,000.00
180,000.00
143,000.00
165,000.00
209,000.00

Harga Barang dan Upah Hal. 18


HARGA SATUAN

4
209,000.00
160,000.00
197,000.00
149,000.00
248,500.00

210,000.00
189,500.00
150,700.00
107,800.00
222,900.00
194,900.00
273,500.00
286,500.00
262,500.00
249,900.00
337,000.00

57,750.00
70,500.00
88,750.00
72,500.00
95,000.00
114,900.00
76,900.00
175,900.00
76,100.00
76,100.00
92,900.00

61,500.00
40,000.00
40,900.00
57,500.00

315,000.00
425,000.00
320,000.00

Harga Barang dan Upah Hal. 19


HARGA SATUAN

4
825,000.00
825,000.00

271,700.00
244,000.00
242,000.00
244,000.00
258,000.00
247,000.00

335,000.00
260,000.00
215,000.00

41,000.00
21,500.00

55,500.00
39,000.00
45,000.00
52,000.00
45,000.00
35,000.00
37,000.00
37,000.00
40,000.00

41,000.00
40,000.00
56,000.00
43,000.00
48,000.00
38,500.00
40,000.00
53,500.00
36,500.00
46,000.00

Harga Barang dan Upah Hal. 20


HARGA SATUAN

230,000.00
170,000.00
200,000.00
15,000.00
45,000.00
1,300,000.00
955,000.00
1,500,000.00
5,610,000.00
5,600,000.00
610,000.00
1,365,000.00
1,491,000.00
670,000.00
2,800,000.00
2,200,000.00
1,800,000.00
2,800,000.00
2,200,000.00
1,800,000.00
355,000.00
165,000.00
145,000.00
135,000.00
18,000.00
110,500.00
220,500.00
165,000.00
140,000.00
142,000.00
187,000.00
410,000.00
835,000.00
235,000.00
48,000.00
2,600.00
1,052,000.00
849,000.00
-
-
-

Harga Barang dan Upah Hal. 21


HARGA SATUAN

4
-
185,000.00
235,000.00
1,135,000.00
735,000.00
1,021,000.00
746,000.00
1,535,000.00
382,000.00
1,185,000.00
2,100,000.00
2,900,000.00
3,787,000.00
4,446,000.00
1,325,000.00
5,040,000.00
686,000.00
1,284,500.00

15,400.00
26,400.00
18,700.00
22,000.00
14,300.00
23,100.00
49,500.00
19,800.00
19,800.00
29,150.00
16,500.00

128571
1,980.00
1,300.00 800000 7 114286
2,350.00
197,000.00 138000
145,000.00 47500 6 7916.667
190,000.00
195,000.00 150000
155,000.00
2,500.00
50,000.00

Harga Barang dan Upah Hal. 22


HARGA SATUAN

4
192,000.00
85,000.00
17,000.00
10,000.00
8,500.00
9,500.00
13,000.00
4,000.00
14,500.00
12,000.00
12,500.00
75,000.00
90,000.00
70,000.00
55,000.00
55,000.00
65,000.00
65,000.00
60,000.00
55,000.00
55,000.00
55,000.00
60,000.00
65,000.00
190,000.00
190,000.00
140,000.00
140,000.00
160,000.00
100,000.00
75,000.00
90,000.00
70,000.00
100,000.00
70,000.00
70,000.00
80,000.00
80,000.00
120,000.00
75,000.00
70,000.00
75,000.00
185,000.00

Harga Barang dan Upah Hal. 23


HARGA SATUAN

4
75,000.00
105,000.00
100,000.00
90,000.00
155,000.00
160,000.00
140,000.00
130,000.00
80,000.00

27,125.00
35,000.00
70,625.00
81,125.00
38,000.00
58,000.00
77,500.00
175,000.00
35,000.00
22,000.00
112,000.00
64,000.00
48,000.00
1,550,000.00
1,900,000.00
2,400,000.00
89,000.00
122,000.00
173,000.00
29,000.00
250,000.00
373,000.00
494,000.00
768,000.00
14,700.00
19,500.00
16,500.00
35,000.00
45,000.00
50,000.00
10,000.00
63,000.00

Harga Barang dan Upah Hal. 24


HARGA SATUAN

4
5,500.00
784,000.00
35,000.00
30,000.00
1,270,000.00
1,650,000.00
1,877,568.00
45,000.00
65,000.00
95,000.00
130,000.00
209,000.00
254,000.00
449,000.00

247,500.00
854,000.00
2,580,000.00
2,230,000.00
712,000.00

135,000.00
230,000.00
182,000.00
196,000.00
446,000.00
220,000.00

60,000.00
52,000.00
61,000.00
50,000.00
49,500.00
12,500.00
75.00

8,909.00
93,500.00
17,600.00

Harga Barang dan Upah Hal. 25


HARGA SATUAN

4
187,000.00
195,800.00
276,100.00
294,800.00
150,700.00
154,000.00
210,100.00
225,500.00
242,000.00
132,200.00
183,700.00
236,500.00
269,500.00
275,000.00
154,000.00
161,700.00
189,200.00
209,000.00
220,000.00
139,700.00

15,000.00
17,600.00
6,600.00
33,000.00
6,600.00
13,200.00
6,600.00
4,400.00
6,600.00
7,700.00
8,800.00
30,250.00
38,500.00 7700
37,400.00
13,200.00
11,550.00
2,200.00
7,700.00
825.00
11,000.00

Harga Barang dan Upah Hal. 26


HARGA SATUAN

34,100.00
42,900.00
4,400.00
47,300.00
59,400.00
82,500.00

58,000.00
68,000.00
68,000.00
78,000.00
88,000.00
58,000.00
68,000.00
68,000.00
78,000.00
88,000.00
78,000.00
88,000.00
98,000.00 58000
58,000.00
58,000.00
66,000.00
69,000.00
73,000.00
45,000.00

23,100.00
84,000.00
103,950.00
36,750.00
35,000.00
3,990,000.00
4,305,000.00
4,515,000.00
3,990,000.00
4,305,000.00
4,515,000.00
4,500,000.00
5,800,000.00

Harga Barang dan Upah Hal. 27


HARGA SATUAN

4
6,200,000.00
4,500,000.00
5,700,000.00
6,000,000.00

upura, 16Desember 2013


epala Dinas Cipta Karya
Kabupaten Badung

Putu Dessy Dharmayanty, M.T


Pembina Tk.I
P. 196110101994032001

Harga Barang dan Upah Hal. 28


DAFTAR HARGA SATUAN UPAH
BULAN DESEMBER TAHUN 2013 UTK JANUARI 2014
HARGA
NO NAMA BARANG SPESIFIKASI SATUAN
(Rp.)
1 2 3 4 5

1 Mandor Hari 81,000.00


2 Kepala Tukang Hari 75,000.00
3 Tukang Politur Hari 68,000.00
4 Tukang Batu Hari 75,000.00
5 Tukang kayu Hari 75,000.00
6 Tukang Besi Hari 75,000.00
7 Tukang cat Hari 68,000.00
8 Tukang gali Hari 68,000.00
9 Tukang Listrik Hari 68,000.00
10 Tukang Pipa/ Tukang Ledeng Hari 62,500.00
11 Tukang Aspal Hari 75,000.00
12 Tukang masak Aspal Hari 55,000.00
13 Pekerja Hari 55,000.00
14 Tukang Ukir Hari 75,000.00
15 Operator Hari 75,000.00
16 Pembantu Operator Hari 68,000.00
17 Mekanik Hari 75,000.00
18 Pembantu Mekanik Hari 55,000.00
19 Pasang Atap Alang-Alang Hari 70,000.00
20 Pasang Bata Gosok Dua Muka M2 350,000.00
21 Pasang Bata Gosok Satu Muka M2 200,000.00
22 Pasang Batu Paras Diukir M2 375,000.00
23 Pasang Patu Paras Siap Diukir M2 300,000.00
24 Tukang Bongkar Begesting Hari 55,000.00

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).

Mangupura, 16 Desember 2013


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001
DAFTAR ANALISA PEKERJAAN

HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2
METER
1.2500 btg Bambu Sedang 11,000.00
2.5000 kg Semen Portland 1,220.00
1.2000 lbr Seng gelombang 3" - 5" 47,850.00
0.0050 m3 Pasir Beton 155,000.00
0.0090 m3 Koral beton 192,000.00
0.0720 m3 Kayu Meranti Usuk 5/7 1,700,000.00
0.0600 kg Paku biasa 2" - 5" 14,300.00
0.4500 kg Meni Besi 30,000.00
0.2000 oh Tukang Kayu 75,000.00 15,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0200 oh Mandor 81,000.00 1,620.00
Total : 40,120.00

2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7 1,700,000.00
0.0200 kg Paku Biasa 2" - 5" 14,300.00
0.0070 m3 Kayu Papan Meranti 3/20 2,500,000.00
0.1000 oh Tukang Kayu 75,000.00 7,500.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 14,155.00

3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI


PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m 99,000.00
0.1800 m3 Kayu Meranti 2,750,000.00
0.8500 kg Paku Biasa 2" - 5" 14,300.00
1.1000 kg Besi Strip 10,066.00
35.0000 kg Semen Portland 1,220.00
0.1500 m3 Pasir Pasang 160,000.00
0.1000 m3 Pasir Beton 155,000.00
0.1500 m3 Koral Beton 192,000.00
30.0000 bh Bata Merah 1,300.00
0.2500 lbr Seng Plat 51,150.00
2.0000 bh Jendela Nako 16,500.00
0.0800 m2 Kaca Polos 112,200.00
0.1500 bh Kunci Tanam 115,500.00
0.0600 lbr Plywood 4 mm 60,000.00
2.0000 oh Tukang Kayu 75,000.00 150,000.00
1.0000 oh Tukang Batu 75,000.00 75,000.00
2.0000 oh Pekerja 55,000.00 110,000.00
0.3000 oh Kepala Tukang 75,000.00 22,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 361,550.00

4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang 11,000.00
0.2100 m3 Kayu Meranti 2,750,000.00
0.3000 kg Paku Biasa 2" - 5" 14,300.00
10.5000 kg Semen Portland 1,220.00
0.0300 m3 Pasir Beton 155,000.00
0.0500 m3 Koral Beton 192,000.00
1.5000 lbr Seng gelombang BJLS 28 46,750.00
2.0000 oh Tukang Kayu 75,000.00 150,000.00
1.0000 oh Pekerja 55,000.00 55,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.2000 oh Kepala Tukang 75,000.00 15,000.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 224,050.00

5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU


3.0000 btg Bambu Sedang 11,000.00
0.2760 m3 Kayu Meranti 2,750,000.00
0.7000 kg Paku biasa 2" - 5" 14,300.00
1.5000 lbr Seng gelombang BJLS 28 46,750.00
1.5000 oh Tukang Kayu 75,000.00 112,500.00
1.0000 oh Pekerja 55,000.00 55,000.00
0.1500 oh Kepala Tukang 75,000.00 11,250.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 182,800.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja 55,000.00 5,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 9,550.00

7 1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang 11,000.00
0.1860 m3 Kayu Meranti 2,750,000.00
0.3000 kg Paku Biasa 2" - 5" 14,300.00
18.0000 kg Semen Portland 1,220.00
0.0300 m3 Pasir Beton 155,000.00
0.0500 m3 Koral Beton 192,000.00
1.5000 lbr Seng gelombang BJLS 28 46,750.00
1.3500 lbr Plywood 4 mm 60,000.00
2.0000 oh Tukang Kayu 75,000.00 150,000.00
1.0000 oh Pekerja 55,000.00 55,000.00
0.2000 oh Kepala Tukang 75,000.00 15,000.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 224,050.00

8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang 2,750,000.00
0.0800 kg Paku Biasa 2" - 5" 14,300.00
1.0000 btg Kaso 5/7 35,000.00
0.3000 oh Tukang kayu 75,000.00 22,500.00
0.0015 oh Mandor 81,000.00 121.50
Total : 22,621.50

9 1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu 8,000.00
0.2500 kg Tali Ijuk 37,400.00
0.0170 oh Tukang Kayu 75,000.00 1,275.00
0.0020 oh Pekerja 55,000.00 110.00
0.2500 oh Kepala Tukang 75,000.00 18,750.00
0.0130 oh Mandor 81,000.00 1,053.00
21,188.00

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20 197,000.00
0.0900 m3 Batu Pecah 5 - 7 195,000.00
0.0100 m3 Pasir Pasang 160,000.00
1.0000 oh Pekerja 55,000.00 55,000.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 59,050.00

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja 55,000.00 366,685.00
0.3330 oh Mandor 81,000.00 26,973.00
Total : 393,658.00

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja 55,000.00 366,685.00
0.0330 oh Mandor 81,000.00 2,673.00
Total : 369,358.00

II PEKERJAAN TANAH (SNI 2835 : 2008)

1 1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja 55,000.00 41,250.00
0.0250 oh Mandor 81,000.00 2,025.00
Total : 43,275.00
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.9000 oh Pekerja 55,000.00 49,500.00
0.0450 oh Mandor 81,000.00 3,645.00
Total : 53,145.00

3 1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja 55,000.00 57,750.00
0.0670 oh Mandor 81,000.00 5,427.00
Total : 63,177.00

4 1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja 55,000.00 55,000.00
0.0320 oh Mandor 81,000.00 2,592.00
Total : 57,592.00

5 1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja 55,000.00 82,500.00
0.0600 oh Mandor 81,000.00 4,860.00
Total : 87,360.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja 55,000.00 66,000.00
0.0450 oh Mandor 81,000.00 3,645.00
Total : 69,645.00

7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja 55,000.00 2,750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 3,155.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja 55,000.00 18,150.00
0.0100 oh Mandor 81,000.00 810.00
Total : 18,960.00

9 1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja 55,000.00 27,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 31,550.00

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 140,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.0100 oh Mandor 81,000.00 810.00
Total : 17,310.00

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk 2,750.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 9,465.00

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu 130,000.00
0.2500 oh Pekerja 55,000.00 13,750.00
0.0250 oh Mandor 81,000.00 2,025.00
Total : 15,775.00

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug 80,000.00
0.5000 oh Pekerja 55,000.00 27,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 31,550.00
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone 85,000.00
0.2500 oh Pekerja 55,000.00 13,750.00
0.0250 oh Mandor 81,000.00 2,025.00
Total : 15,775.00

III PEKERJAAN PONDASI (SNI 2836 : 2008)

1 1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 197,000.00
202.0000 kg Semen Portland 1,220.00
0.4850 m3 Pasir Pasang 160,000.00
1.5000 oh Pekerja 55,000.00 82,500.00
0.7500 oh Tukang Batu 75,000.00 56,250.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0750 oh Kepala Tukang 75,000.00 5,625.00
0.0750 oh Mandor 81,000.00 6,075.00
Total : 150,450.00

2 1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 197,000.00
163.0000 kg Semen Portland 1,220.00
0.5200 m3 Pasir Pasang 160,000.00
1.5000 oh Pekerja 55,000.00 82,500.00
0.7500 oh Tukang Batu 75,000.00 56,250.00
0.0750 oh Kepala Tukang 75,000.00 5,625.00
0.0750 oh Mandor 81,000.00 6,075.00
Total : 150,450.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 197,000.00
136.0000 kg Semen Portland 1,220.00
0.5440 m3 Pasir Pasang 160,000.00
1.5000 oh Pekerja 55,000.00 82,500.00
0.7500 oh Tukang Batu 75,000.00 56,250.00
0.0750 oh Kepala Tukang 75,000.00 5,625.00
0.0750 oh Mandor 81,000.00 6,075.00
Total : 150,450.00

4 1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 197,000.00
117.0000 kg Semen Portland 1,220.00
0.5610 m3 Pasir Pasang 160,000.00
1.5000 oh Pekerja 55,000.00 82,500.00
0.7500 oh Tukang Batu 75,000.00 56,250.00
0.0750 oh Kepala Tukang 75,000.00 5,625.00
0.0750 oh Mandor 81,000.00 6,075.00
Total : 150,450.00

5 1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20 197,000.00
91.0000 kg Semen Portland 1,220.00
0.5840 m3 Pasir Pasang 160,000.00
1.5000 oh Pekerja 55,000.00 82,500.00
0.7500 oh Tukang Batu 75,000.00 56,250.00
0.0750 oh Kepala Tukang 75,000.00 5,625.00
0.0750 oh Mandor 81,000.00 6,075.00
Total : 150,450.00

6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20 197,000.00
194.0000 kg Semen Portland 1,220.00
0.3120 m3 Pasir Beton 155,000.00
0.4680 m3 Koral Beton 192,000.00
126.0000 kg Besi Beton 8,909.00
1.8000 kg Kawat Beton 17,600.00
3.4000 oh Pekerja 55,000.00 187,000.00
0.8500 oh Tukang Batu 75,000.00 63,750.00
0.0850 oh Kepala Tukang 75,000.00 6,375.00
0.1700 oh Mandor 81,000.00 13,770.00
270,895.00

7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20 197,000.00
194.0000 kg Semen Portland 1,220.00
0.3120 m3 Pasir Beton 155,000.00
0.4680 m3 Koral Beton 192,000.00
2.4000 oh Pekerja 55,000.00 132,000.00
0.8000 oh Tukang Batu 75,000.00 60,000.00
0.0800 oh Kepala Tukang 75,000.00 6,000.00
0.1190 oh Mandor 81,000.00 9,639.00
Total : 207,639.00

8 1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20 197,000.00
0.4320 m3 Pasir Urug 140,000.00
0.7800 oh Pekerja 55,000.00 42,900.00
0.3900 oh Tukang Batu 75,000.00 29,250.00
0.0390 oh Kepala Tukang 75,000.00 2,925.00
0.0390 oh Mandor 81,000.00 3,159.00
Total : 78,234.00
SNI 03-2836-2002
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
9 1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang
0.0160 m3 Pasir Urug 140,000.00
0.0800 m3 Pasir Beton 155,000.00
0.1250 m3 Koral Beton 192,000.00
49.0000 kg Semen Portland 1,220.00
34.5000 kg Besi Beton 8,909.00
0.7000 kg Kawat beton 17,600.00
0.0270 m3 Kayu Bekesting 2,500,000.00
0.1200 kg Paku Reng SQ 14,300.00
0.2000 kg Plamir Tembok 12,000.00
0.0900 lt Minyak Bekisting 16,500.00
0.8000 oh Pekerja 55,000.00 44,000.00
0.5000 oh Tukang Batu 75,000.00 37,500.00
0.0500 oh Kepala Tukang 75,000.00 3,750.00
0.0400 oh Mandor 81,000.00 3,240.00
Total : 88,490.00
10 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang
0.0190 m3 Pasir Urug 140,000.00
0.0940 m3 Pasir Beton 155,000.00
0.1500 m3 Koral Beton 192,000.00
60.5000 kg Semen Portland 1,220.00
45.0000 kg Besi Beton 8,909.00
0.9000 kg Kawat beton 17,600.00
0.0320 m3 Kayu Bekesting 2,500,000.00
0.1200 kg Paku Reng SQ 14,300.00
0.2400 kg Plamir Tembok 12,000.00
0.0900 lt Minyak Bekisting 16,500.00
1.0000 oh Pekerja 55,000.00 55,000.00
0.6700 oh Tukang Batu 75,000.00 50,250.00
0.0670 oh Kepala Tukang 75,000.00 5,025.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 114,325.00
IV PEKERJAAN DINDING (SNI 6897 : 2008)
1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
43.5000 kg Semen Portland 1,220.00
0.0800 m3 Pasir Pasang 160,000.00
0.6000 oh Pekerja 55,000.00 33,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0300 oh Mandor 81,000.00 2,430.00

51,930.00

2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
32.9500 kg Semen Portland 1,220.00
0.0910 m3 Pasir Pasang 160,000.00
0.6000 oh Pekerja 55,000.00 33,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0300 oh Mandor 81,000.00 2,430.00
51,930.00

3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
26.5500 kg Semen Portland 1,220.00
0.0930 m3 Pasir Pasang 160,000.00
0.6000 oh Pekerja 55,000.00 33,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0300 oh Mandor 81,000.00 2,430.00
51,930.00

4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
22.2000 kg Semen Portland 1,220.00
0.1020 m3 Pasir Pasang 160,000.00
0.6000 oh Pekerja 55,000.00 33,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0300 oh Mandor 81,000.00 2,430.00
51,930.00

5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.5000 kg Semen Portland 1,220.00
0.1220 m3 Pasir Pasang 160,000.00
0.6000 oh Pekerja 55,000.00 33,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0300 oh Mandor 81,000.00 2,430.00
51,930.00

6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
18.9500 kg Semen Portland 1,220.00
0.0380 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
25,965.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
14.3700 kg Semen Portland 1,220.00
0.0400 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00

8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
11.5000 kg Semen Portland 1,220.00
0.0430 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
9.6800 kg Semen Portland 1,220.00
0.0450 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
8.3200 kg Semen Portland 1,220.00
0.0490 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm 1,300.00
6.5000 kg Semen Portland 1,220.00
0.0500 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) / BATAKO


12.5000 bh Batako 2,350.00
7.5000 kg Semen Portland 1,220.00
0.0270 m3 Pasir Pasang 160,000.00
1.9500 kg Besi Beton 8 mm 8,909.00
0.3200 oh Pekerja 55,000.00 17,600.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 27,065.00

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako 2,350.00
7.5000 kg Semen Portland 1,220.00
0.0270 m3 Pasir Pasang 160,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.3200 oh Pekerja 55,000.00 17,600.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 27,065.00

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik 50,000.00
11.0000 kg Semen Portland 1,220.00
0.0350 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I 22,000.00
0.0140 m3 Kayu kamper usuk/reng 6,000,000.00
0.0120 kg Paku Biasa 14,300.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0030 m3 List Kayu 2/4 6,000,000.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.0500 oh Tukang Kayu 75,000.00 3,750.00
0.0050 oh Kepala Tukang 75,000.00 375.00
0.0020 oh Mandor 81,000.00 162.00
Total : 9,787.00

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)

1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM


15.5040 kg Semen Portland 1,220.00
0.0160 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
10.2240 kg Semen Portland 1,220.00
0.0200 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM


7.7760 kg Semen Portland 1,220.00
0.0230 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM


6.2400 kg Semen Portland 1,220.00
0.0240 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM


5.1840 kg Semen Portland 1,220.00
0.0260 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM


4.4160 kg Semen Portland 1,220.00
0.0270 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM


3.4560 kg Semen Portland 1,220.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0290 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM


13.6320 kg Semen Portland 1,220.00
0.0270 m3 Pasir Pasang 160,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0220 oh Mandor 81,000.00 1,782.00
Total : 40,282.00

9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM


10.3680 kg Semen Portland 1,220.00
0.0310 m3 Pasir Pasang 160,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0220 oh Mandor 81,000.00 1,782.00
Total : 40,282.00

10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM


8.3200 kg Semen Portland 1,220.00
0.0320 m3 Pasir Pasang 160,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0220 oh Mandor 81,000.00 1,782.00
Total : 40,282.00
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
6.9120 kg Semen Portland 1,220.00
0.0350 m3 Pasir Pasang 160,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0220 oh Mandor 81,000.00 1,782.00
Total : 40,282.00

12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM


5.8880 kg Semen Portland 1,220.00
0.0360 m3 Pasir Pasang 160,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
0.2000 oh Tukang Batu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0220 oh Mandor 81,000.00 1,782.00
Total : 40,282.00

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland 1,220.00
0.0130 m3 Pasir Pasang 160,000.00
0.0800 oh Pekerja 55,000.00 4,400.00
0.4000 oh Tukang Batu 75,000.00 30,000.00
0.0400 oh Kepala Tukang 75,000.00 3,000.00
0.0040 oh Mandor 81,000.00 324.00
Total : 37,724.00

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland 1,220.00
0.0060 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1000 oh Tukang Batu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,965.00

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland 1,220.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0750 oh Tukang Batu 75,000.00 5,625.00
0.0080 oh Kepala Tukang 75,000.00 600.00
0.0080 oh Mandor 81,000.00 648.00
Total : 15,123.00

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE


(= 8 M')
1.6000 kg Semen Portland 1,220.00
0.0700 oh Pekerja 55,000.00 3,850.00
0.0350 oh Tukang Batu 75,000.00 2,625.00
0.0040 oh Kepala Tukang 75,000.00 300.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0040 oh Mandor 81,000.00 324.00
Total : 7,099.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland 1,220.00
0.0120 m3 Pasir Pasang 160,000.00
0.3000 oh Pekerja 55,000.00 16,500.00
0.1500 oh Tukang Batu 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 30,090.00

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 1,220.00
0.2000 oh Pekerja 55,000.00 11,000.00
0.1000 oh Tukang Labur/Cat 68,000.00 6,800.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0100 oh Mandor 81,000.00 810.00
Total : 8,360.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
VI PEKERJAAN KAYU (SNI 3434 : 2008)

1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper 7,500,000.00
1.2500 Kg Paku 10 Cm 15,400.00
1.0000 Kg Lem Kayu 13,750.00
7.0000 oh Pekerja 55,000.00 385,000.00
21.0000 oh Tukang Kayu 75,000.00 1,575,000.00
2.1000 oh Kepala Tukang 75,000.00 157,500.00
0.3500 oh Mandor 81,000.00 28,350.00
Total : 2,145,850.00

2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing 5,500,000.00
1.2500 Kg Paku 10 Cm 15,400.00
1.0000 Kg Lem Kayu 13,750.00
6.0000 oh Pekerja 55,000.00 330,000.00
18.0000 oh Tukang Kayu 75,000.00 1,350,000.00
1.8000 oh Kepala Tukang 75,000.00 135,000.00
0.3000 oh Mandor 81,000.00 24,300.00
Total : 1,839,300.00

3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper 8,500,000.00
0.0500 Kg Paku 5-7 Cm 15,400.00
0.3500 oh Pekerja 55,000.00 19,250.00
1.0500 oh Tukang Kayu 75,000.00 78,750.00
0.1050 oh Kepala Tukang 75,000.00 7,875.00
0.0180 oh Mandor 81,000.00 1,458.00
Total : 107,333.00

4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing 6,600,000.00
0.0500 Kg Paku 5-7 Cm 15,400.00
0.3500 oh Pekerja 55,000.00 19,250.00
1.0500 oh Tukang Kayu 75,000.00 78,750.00
0.1050 oh Kepala Tukang 75,000.00 7,875.00
0.0180 oh Mandor 81,000.00 1,458.00
Total : 107,333.00

5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper 8,500,000.00
0.5000 Kg Lem Kayu 13,750.00
1.0000 oh Pekerja 55,000.00 55,000.00
3.0000 oh Tukang Kayu 75,000.00 225,000.00
0.3000 oh Kepala Tukang 75,000.00 22,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 306,550.00

6 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA


KACA, KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper 8,500,000.00
1.0000 m2 Kaca Bening 3 mm 106,700.00
0.3000 Kg Lem Kayu 13,750.00
0.8000 oh Pekerja 55,000.00 44,000.00
2.4000 oh Tukang Kayu 75,000.00 180,000.00
0.2400 oh Kepala Tukang 75,000.00 18,000.00
0.0400 oh Mandor 81,000.00 3,240.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 245,240.00
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,
KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper 8,500,000.00
0.5000 Kg Lem Kayu 13,750.00
1.0000 oh Pekerja 55,000.00 55,000.00
3.0000 oh Tukang Kayu 75,000.00 225,000.00
0.3000 oh Kepala Tukang 75,000.00 22,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 306,550.00
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA
TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper 8,500,000.00
0.0300 Kg Paku 1-2,5 Cm 15,400.00
0.5000 Kg Lem Kayu 13,750.00
1.0000 Lbr Plywood 4 mm 60,000.00
1.0000 oh Pekerja 55,000.00 55,000.00
3.0000 oh Tukang Kayu 75,000.00 225,000.00
0.3000 oh Kepala Tukang 75,000.00 22,500.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 306,550.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper 8,500,000.00
0.0300 Kg Paku 1-2,5 Cm 15,400.00
0.5000 Kg Lem Kayu 13,750.00
1.0000 Lbr Plywood 4 mm 60,000.00
0.8000 oh Pekerja 55,000.00 44,000.00
2.4000 oh Tukang Kayu 75,000.00 180,000.00
0.2400 oh Kepala Tukang 75,000.00 18,000.00
0.0400 oh Mandor 81,000.00 3,240.00
Total : 245,240.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600 m3 Papan Kayu Kamper 8,500,000.00
0.1500 Kg Paku 1-2,5 Cm 15,400.00
0.6700 oh Pekerja 55,000.00 36,850.00
2.0000 oh Tukang Kayu 75,000.00 150,000.00
0.2000 oh Kepala Tukang 75,000.00 15,000.00
0.3350 oh Mandor 81,000.00 27,135.00
Total : 228,985.00

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper 8,500,000.00
0.0300 Kg Paku 1-2,5 Cm 15,400.00
0.5000 Kg Lem Kayu 13,750.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 61,600.00
0.8000 oh Pekerja 55,000.00 44,000.00
2.4000 oh Tukang Kayu 75,000.00 180,000.00
0.2400 oh Kepala Tukang 75,000.00 18,000.00
0.0400 oh Mandor 81,000.00 3,240.00
Total : 245,240.00

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper 8,500,000.00
0.0300 Kg Paku 1-2,5 Cm 15,400.00
0.8000 Kg Lem Kayu 13,750.00
1.0000 Lbr Teakwood 4 mm uk 90x220 cm 61,600.00
0.5000 Lbr Formika 88,000.00
0.8000 oh Pekerja 55,000.00 44,000.00
2.4000 oh Tukang Kayu 75,000.00 180,000.00
0.2400 oh Kepala Tukang 75,000.00 18,000.00
0.0400 oh Mandor 81,000.00 3,240.00
Total : 245,240.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000 m3 Balok Kayu Kamper 7,500,000.00
15.0000 Kg Besi Strip Tebal 5 cm 10,066.00
5.6000 Kg Paku 12 Cm 15,400.00
4.0000 oh Pekerja 55,000.00 220,000.00
12.0000 oh Tukang Kayu 75,000.00 900,000.00
1.2000 oh Kepala Tukang 75,000.00 90,000.00
0.2000 oh Mandor 81,000.00 16,200.00
Total : 1,226,200.00

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000 m3 Balok Kayu Kamper 7,500,000.00
15.0000 Kg Besi Strip Tebal 5 cm 10,066.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
5.6000 Kg Paku 12 Cm 15,400.00
6.7000 oh Pekerja 55,000.00 368,500.00
20.1000 oh Tukang Kayu 75,000.00 1,507,500.00
2.0100 oh Kepala Tukang 75,000.00 150,750.00
0.3350 oh Mandor 81,000.00 27,135.00
Total : 2,053,885.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

1.1000 m3 Balok Kayu Kamper 7,500,000.00


15.0000 Kg Besi Strip Tebal 5 cm 10,066.00
3.0000 Kg Paku 12 Cm 15,400.00
2.4000 oh Pekerja 55,000.00 132,000.00
7.2000 oh Tukang Kayu 75,000.00 540,000.00
0.7200 oh Kepala Tukang 75,000.00 54,000.00
0.1200 oh Mandor 81,000.00 9,720.00
Total : 735,720.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00
0.0036 m3 Reng ( 2 x 3 ) Cm 6,000,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 15,400.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.1000 oh Tukang Kayu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 14,155.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS


II
0.0140 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00
0.0072 m3 Reng ( 2 x 3 ) Cm 6,000,000.00
0.2500 Kg Paku 5 Cm dan 10 Cm 15,400.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.1000 oh Tukang Kayu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 14,155.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

0.1650 m3 Balok Kayu Kamper 7,500,000.00


0.2000 Kg Paku 5 Cm dan 10 Cm 15,400.00
0.1200 oh Pekerja 55,000.00 6,600.00
0.1200 oh Tukang Kayu 75,000.00 9,000.00
0.0120 oh Kepala Tukang 75,000.00 900.00
0.0060 oh Mandor 81,000.00 486.00
Total : 16,986.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00
0.2000 Kg Paku 7 Cm dan 10 Cm 15,400.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.3000 oh Tukang Kayu 75,000.00 22,500.00
0.0300 oh Kepala Tukang 75,000.00 2,250.00
0.0750 oh Mandor 81,000.00 6,075.00
Total : 39,075.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163 m3 Kaso-Kaso ( 5 x 7 ) Cm 1,700,000.00
0.2500 Kg Paku 7 Cm dan 10 Cm 15,400.00
0.2000 oh Pekerja 55,000.00 11,000.00
0.3000 oh Tukang Kayu 75,000.00 22,500.00
0.0300 oh Kepala Tukang 75,000.00 2,250.00
0.0100 oh Mandor 81,000.00 810.00
Total : 36,560.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

0.0108 m3 Papan Kayu Kamper 8,500,000.00


0.1000 Kg Paku 5 Cm dan 7 Cm 15,400.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.2000 oh Tukang Kayu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0050 oh Mandor 81,000.00 405.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 22,405.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

0.0110 m3 Papan Kayu Kamper 8,500,000.00


0.0500 Kg Paku 5 Cm dan 7 Cm 15,400.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.2000 oh Tukang Kayu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0050 oh Mandor 81,000.00 405.00
Total : 22,405.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280 m3 Balok Kayu Kamper 7,500,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 15,400.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.4500 oh Tukang Kayu 75,000.00 33,750.00
0.0450 oh Kepala Tukang 75,000.00 3,375.00
0.0080 oh Mandor 81,000.00 648.00
Total : 46,023.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 7,500,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 15,400.00
0.8600 Lbr Teakwood 4 mm uk 90x220 cm 61,600.00
0.5600 Kg Lem Kayu 13,750.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.4500 oh Tukang Kayu 75,000.00 33,750.00
0.0450 oh Kepala Tukang 75,000.00 3,375.00
0.0080 oh Mandor 81,000.00 648.00
Total : 46,023.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280 m3 Balok Kayu Kamper 7,500,000.00
0.1500 Kg Paku 5 Cm dan 7 Cm 15,400.00
0.8600 Lbr Plywood tebal 4 mm uk 120 x 240 cm 60,000.00
0.5600 Kg Lem Kayu 13,750.00
0.2000 oh Pekerja 55,000.00 11,000.00
0.6000 oh Tukang Kayu 75,000.00 45,000.00
0.0600 oh Kepala Tukang 75,000.00 4,500.00
0.0100 oh Mandor 81,000.00 810.00
Total : 61,310.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

0.0070 m3 Papan Kayu Kamper 8,500,000.00


0.1000 Kg Paku 5 Cm dan 10 Cm 15,400.00
0.1500 Kg Paku Skrup 10 cm 19,800.00
0.6000 oh Pekerja 55,000.00 33,000.00
1.8000 oh Tukang Kayu 75,000.00 135,000.00
0.1800 oh Kepala Tukang 75,000.00 13,500.00
0.0300 oh Mandor 81,000.00 2,430.00
Total : 183,930.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X


240) CM
0.4000 Lbr Plywood tebal 4 mm uk 120 x 240 cm 60,000.00
0.0500 Kg Paku 1 Cm dan 2.5 Cm 15,400.00
0.0250 oh Pekerja 55,000.00 1,375.00
0.0750 oh Tukang Kayu 75,000.00 5,625.00
0.0080 oh Kepala Tukang 75,000.00 600.00
0.0010 oh Mandor 81,000.00 81.00
Total : 7,681.00

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87
247.0000 kg Semen Portland 1,220.00
869.0000 kg Pasir Beton 100.71
999.0000 kg Koral Beton 92.59
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
120,198.00

2 MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
276.0000 kg Semen Portland 1,220.00
828.0000 kg Pasir Beton 100.71
1,012.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72
299.0000 kg Semen Portland 1,220.00
799.0000 kg Pasir Beton 100.71
1,017.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00

4 MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66
326.0000 kg Semen Portland 1,220.00
760.0000 kg Pasir Beton 100.71
1,029.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00

5 MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61
352.0000 kg Semen Portland 1,220.00
731.0000 kg Pasir Beton 100.71
1,031.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
6 MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58
371.0000 kg Semen Portland 1,220.00
698.0000 kg Pasir Beton 100.71
1,047.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
7 MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56
384.0000 kg Semen Portland 1,220.00
692.0000 kg Pasir Beton 100.71
1,039.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
8 MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53
406.0000 kg Semen Portland 1,220.00
684.0000 kg Pasir Beton 100.71
1,026.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
9 MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
413.0000 kg Semen Portland 1,220.00
681.0000 kg Pasir Beton 100.71
1,021.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
10 MEMBUAT 1 M BETON MUTU f' C
= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49
439.0000 kg Semen Portland 1,220.00
670.0000 kg Pasir Beton 100.71
1,006.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
11 MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48
448.0000 kg Semen Portland 1,220.00
667.0000 kg Pasir Beton 100.71
1,000.0000 kg Koral Beton 92.59
215.0000 lt Air 25.00
1.6500 oh Pekerja 55,000.00 90,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
0.0280 oh Kepala Tukang 75,000.00 2,100.00
0.0830 oh Mandor 81,000.00 6,723.00
Total : 120,198.00

12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR


10.5000 kg Besi Beton (Polos/ Ulir) 8,909.00
0.1500 kg Kawat Beton 17,600.00
0.0700 oh Pekerja 55,000.00 3,850.00
0.0700 oh Tukang Besi 75,000.00 5,250.00
0.0070 oh Kepala Tukang 75,000.00 525.00
0.0040 oh Mandor 81,000.00 324.00
Total : 9,949.00

13 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III 2,750,000.00
0.3000 kg Paku Biasa 5' - 10' 14,300.00
0.1000 ltr Minyak Bekisting 16,500.00
0.5200 oh Pekerja 55,000.00 28,600.00
0.2600 oh Tukang Kayu 75,000.00 19,500.00
0.0260 oh Kepala Tukang 75,000.00 1,950.00
0.0260 oh Mandor 81,000.00 2,106.00
Total : 52,156.00

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III 2,750,000.00
0.3000 kg Paku Biasa 5' - 10' 14,300.00
0.1000 ltr Minyak Bekisting 16,500.00
0.5200 oh Pekerja 55,000.00 28,600.00
0.2600 oh Tukang Kayu 75,000.00 19,500.00
0.0260 oh Kepala Tukang 75,000.00 1,950.00
0.0260 oh Mandor 81,000.00 2,106.00
Total : 52,156.00

15 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III 2,750,000.00
0.4000 kg Paku Biasa 5' - 12' 14,300.00
0.2000 ltr Minyak Bekisting 16,500.00
0.0150 m3 Kayu Usuk 4/6 6,600,000.00
0.3500 lbr Plywood 9 mm 116,050.00
2.0000 btg Dolken Kayu 8" - 10"/4 m 99,000.00
0.6600 oh Pekerja 55,000.00 36,300.00
0.3300 oh Tukang Kayu 75,000.00 24,750.00
0.0330 oh Kepala Tukang 75,000.00 2,475.00
0.0330 oh Mandor 81,000.00 2,673.00
Total : 66,198.00

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III 2,750,000.00
0.4000 kg Paku Biasa 5' - 12' 14,300.00
0.2000 ltr Minyak Bekisting 16,500.00
0.0180 m3 Kayu Usuk 4/6 6,600,000.00
0.3500 lbr Plywood 9 mm 116,050.00
2.0000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.6600 oh Pekerja 55,000.00 36,300.00
0.3300 oh Tukang Kayu 75,000.00 24,750.00
0.0330 oh Kepala Tukang 75,000.00 2,475.00
0.0330 oh Mandor 81,000.00 2,673.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
Total : 66,198.00

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III 2,750,000.00
0.4000 kg Paku Biasa 5' - 12' 14,300.00
0.2000 ltr Minyak Bekisting 16,500.00
0.0150 m3 Kayu Usuk 4/6 6,600,000.00
0.3500 lbr Plywood 9 mm 116,050.00
6.0000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.6600 oh Pekerja 55,000.00 36,300.00
0.3300 oh Tukang Kayu 75,000.00 24,750.00
0.0330 oh Kepala Tukang 75,000.00 2,475.00
0.0330 oh Mandor 81,000.00 2,673.00
Total : 66,198.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

18 1 M2 PASANG BEKISTING UNTUK DINDING


0.0300 M3 Kayu Kelas III 2,750,000.00
0.4000 Kg Paku Biasa 5' - 12' 14,300.00
0.2000 Ltr Minyak Bekisting 16,500.00
0.0200 M3 Kayu Usuk 4/6 6,600,000.00
0.3500 Lbr Plywood 9 mm 116,050.00
3.0000 Btng Dolken Kayu 8" - 10"/4m 99,000.00
4.0000 Bh Formite/penjaga jarak bekisting/spacer 2,000.00
0.6600 Oh Pekerja 55,000.00 36,300.00
0.3300 Oh Tukang Kayu 75,000.00 24,750.00
0.0330 Oh Kepala Tukang 75,000.00 2,475.00
0.0330 Oh Mandor 81,000.00 2,673.00
66,198.00

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III 2,750,000.00
0.4000 kg Paku Biasa 5' - 12' 14,300.00
0.1500 ltr Minyak Bekisting 16,500.00
0.0150 m3 Kayu Usuk 4/6 6,600,000.00
0.3500 lbr Plywood 9 mm 116,050.00
2.0000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.6600 oh Pekerja 55,000.00 36,300.00
0.3300 oh Tukang Kayu 75,000.00 24,750.00
0.0330 oh Kepala Tukang 75,000.00 2,475.00
0.0330 oh Mandor 81,000.00 2,673.00
Total : 66,198.00

20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan) 2,750,000.00
0.6000 kg Paku Biasa 5' - 12' 14,300.00
0.5000 btg Dolken Kayu 8" - 10"/4m 99,000.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0500 oh Tukang Kayu 75,000.00 3,750.00
0.0050 oh Kepala Tukang 75,000.00 375.00
0.0080 oh Mandor 81,000.00 648.00
Total : 13,023.00

21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III 2,750,000.00
1.5000 kg Paku Biasa 5' - 12' 14,300.00
0.4000 ltr Minyak Bekisting 16,500.00
157.0000 kg Besi Beton 8,909.00
2.2500 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
5.3000 oh Pekerja 55,000.00 291,500.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.3000 oh Tukang Kayu 75,000.00 97,500.00
1.0500 oh Tukang Besi 75,000.00 78,750.00
0.2620 oh Kepala Tukang 75,000.00 19,650.00
0.2650 oh Mandor 81,000.00 21,465.00
Total : 529,490.00

22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)


0.2700 m3 Kayu Kelas III 2,750,000.00
2.0000 kg Paku Biasa 5' - 12' 14,300.00
0.6000 ltr Minyak Bekisting 16,500.00
210.0000 kg Besi Beton 8,909.00
3.0000 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
5.6500 oh Pekerja 55,000.00 310,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.5600 oh Tukang Kayu 75,000.00 117,000.00
1.4000 oh Tukang Besi 75,000.00 105,000.00
0.3230 oh Kepala Tukang 75,000.00 24,225.00
0.2830 oh Mandor 81,000.00 22,923.00
Total : 600,523.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III 2,750,000.00
4.0000 kg Paku Biasa 5' - 12' 14,300.00
2.0000 ltr Minyak Bekisting 16,500.00
315.0000 kg Besi Beton 8,909.00
4.5000 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
0.1500 m3 Kayu Kelas II balok 5,500,000.00
3.5000 lbr Plywood 9 mm 116,050.00
20.0000 btg Dolken Kayu 8" /4 m 99,000.00
7.0500 oh Pekerja 55,000.00 387,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.6500 oh Tukang Kayu 75,000.00 123,750.00
2.1000 oh Tukang Besi 75,000.00 157,500.00
0.4030 oh Kepala Tukang 75,000.00 30,225.00
0.3530 oh Mandor 81,000.00 28,593.00
Total : 748,443.00

24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III 2,750,000.00
3.2000 kg Paku Biasa 5' - 12' 14,300.00
1.6000 ltr Minyak Bekisting 16,500.00
210.0000 kg Besi Beton 8,909.00
3.0000 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
0.1400 m3 Kayu Kelas II balok 5,500,000.00
2.8000 lbr Plywood 9 mm 116,050.00
16.0000 btg Dolken Kayu 8" /4 m 99,000.00
6.3500 oh Pekerja 55,000.00 349,250.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.6500 oh Tukang Kayu 75,000.00 123,750.00
1.4000 oh Tukang Besi 75,000.00 105,000.00
0.3330 oh Kepala Tukang 75,000.00 24,975.00
0.3180 oh Mandor 81,000.00 25,758.00
Total : 649,358.00
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III 2,750,000.00
3.2000 kg Paku Biasa 5' - 12' 14,300.00
1.6000 ltr Minyak Bekisting 16,500.00
157.5000 kg Besi Beton 8,909.00
2.2500 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
0.1200 m3 Kayu Kelas II balok 5,500,000.00
2.8000 lbr Plywood 9 mm 116,050.00
32.0000 btg Dolken Kayu 8" /4 m 99,000.00
5.3000 oh Pekerja 55,000.00 291,500.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.3000 oh Tukang Kayu 75,000.00 97,500.00
1.0500 oh Tukang Besi 75,000.00 78,750.00
0.2650 oh Kepala Tukang 75,000.00 19,875.00
0.2650 oh Mandor 81,000.00 21,465.00
529,715.00
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.2400 m3 Kayu Kelas III 2,750,000.00
3.2000 kg Paku Biasa 5' - 12' 14,300.00
1.6000 ltr Minyak Bekisting 16,500.00
157.0000 kg Besi Beton 8,909.00
2.2500 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
0.1600 m3 Kayu Kelas II balok 5,500,000.00
2.8000 lbr Plywood 9 mm 116,050.00
24.0000 btg Dolken Kayu 8" /4 m 99,000.00
5.3000 oh Pekerja 55,000.00 291,500.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.3000 oh Tukang Kayu 75,000.00 97,500.00
1.0500 oh Tukang Besi 75,000.00 78,750.00
0.2620 oh Kepala Tukang 75,000.00 19,650.00
0.2650 oh Mandor 81,000.00 21,465.00
529,490.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI +
BEKISTING)
0.2500 m3 Kayu Kelas III 2,750,000.00
3.0000 kg Paku Biasa 5' - 12' 14,300.00
1.2000 ltr Minyak Bekisting 16,500.00
210.0000 kg Besi Beton 8,909.00
3.0000 kg Kawat Beton 17,600.00
336.0000 kg Semen Portland 1,220.00
0.5400 m3 Pasir Beton 155,000.00
0.8100 m3 Koral Beton 192,000.00
0.1050 m3 Kayu Kelas II balok 5,500,000.00
2.5000 lbr Plywood 9 mm 116,050.00
14.0000 btg Dolken Kayu 8" /4 m 99,000.00
5.6500 oh Pekerja 55,000.00 310,750.00
0.2750 oh Tukang Batu 75,000.00 20,625.00
1.5600 oh Tukang Kayu 75,000.00 117,000.00
1.4000 oh Tukang Besi 75,000.00 105,000.00
0.3230 oh Kepala Tukang 75,000.00 24,225.00
0.2830 oh Mandor 81,000.00 22,923.00
600,523.00

28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III 2,750,000.00
0.0100 kg Paku Biasa 5' - 12' 14,300.00
3.0000 kg Besi Beton 8,909.00
0.0450 kg Kawat Beton 17,600.00
4.0000 kg Semen Portland 1,220.00
0.0060 m3 Pasir Beton 155,000.00
0.0090 m3 Koral Beton 192,000.00
0.1800 oh Pekerja 55,000.00 9,900.00
0.0200 oh Tukang Batu 75,000.00 1,500.00
0.0200 oh Tukang Kayu 75,000.00 1,500.00
0.0200 oh Tukang Besi 75,000.00 1,500.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0090 oh Mandor 81,000.00 729.00
Total : 15,579.00
29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Kelas III 2,750,000.00
0.0200 kg Paku Biasa 5' - 12' 14,300.00
3.6000 kg Besi Beton 8,909.00
0.0500 kg Kawat Beton 17,600.00
5.5000 kg Semen Portland 1,220.00
0.0090 m3 Pasir Beton 155,000.00
0.0150 m3 Koral Beton 192,000.00
0.2970 oh Pekerja 55,000.00 16,335.00
0.0330 oh Tukang Batu 75,000.00 2,475.00
0.0330 oh Tukang Kayu 75,000.00 2,475.00
0.0330 oh Tukang Besi 75,000.00 2,475.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 25,725.00

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG
25.0000 bh Genteng Plentong 1,540.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0600 oh Tukang Kayu 75,000.00 4,500.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0080 oh Mandor 81,000.00 648.00
Total : 13,848.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
25.0000 bh Genteng Plentong Dicat 1,980.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0600 oh Tukang Kayu 75,000.00 4,500.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0080 oh Mandor 81,000.00 648.00
Total : 13,848.00

3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong 8,800.00
8.0000 kg Semen Portland 1,220.00
0.0320 m3 Pasir Pasang 160,000.00
0.4000 oh Pekerja 55,000.00 22,000.00
0.2000 oh Tukang Kayu 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0020 oh Mandor 81,000.00 162.00
Total : 38,662.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm 29,000.00
0.1200 kg Paku Pancing 60 x 230 22,000.00
0.1400 oh Pekerja 55,000.00 7,700.00
0.0700 oh Tukang Kayu 75,000.00 5,250.00
0.0070 oh Kepala Tukang Kayu 75,000.00 525.00
0.0070 oh Mandor 81,000.00 567.00
Total : 14,042.00

5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M


2.4000 lbr Bubungan Stel Gelombang 24,000.00
6.0000 kg Paku Skrup 3,5" 29,150.00
0.0840 oh Pekerja 55,000.00 4,620.00
0.1250 oh Tukang Kayu 75,000.00 9,375.00
0.0130 oh Kepala Tukang 75,000.00 975.00
0.0040 oh Mandor 81,000.00 324.00
Total : 15,294.00
6 1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap 9,350.00
0.2000 kg Paku Biasa 1/2" - 1" 15,400.00
0.1660 oh Pekerja 55,000.00 9,130.00
0.2500 oh Tukang Kayu 75,000.00 18,750.00
0.0250 oh Kepala Tukang 75,000.00 1,875.00
0.0080 oh Mandor 81,000.00 648.00
Total : 30,403.00

7 1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28 51,150.00
0.0600 kg Paku biasa 1/2" - 1" 15,400.00
0.0500 kg Paku biasa 2" - 5" 14,300.00
0.0040 m3 Kayu papan 3 cm 8,500,000.00
0.1250 oh Pekerja 55,000.00 6,875.00
0.2500 oh Tukang kayu 75,000.00 18,750.00
0.0250 oh Kepala Tukang 75,000.00 1,875.00
0.0080 oh Mandor 81,000.00 648.00
Total : 28,148.00

8 1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang 12,500.00
0.5000 glg Tali pengikat 10,450.00
0.2000 oh Pekerja 55,000.00 11,000.00
0.0100 oh Mandor 81,000.00 810.00
Total : 11,810.00

9 1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28 46,750.00
0.0200 kg Paku Biasa 1/2" - 1" 15,400.00
0.1200 oh Pekerja 55,000.00 6,600.00
0.0600 oh Tukang Kayu 75,000.00 4,500.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0060 oh Mandor 81,000.00 486.00
Total : 12,036.00

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil 29,000.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0500 oh Tukang Kayu 75,000.00 3,750.00
0.0050 oh Kepala Tukang 75,000.00 375.00
0.0080 oh Mandor 81,000.00 648.00
Total : 13,023.00

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28 51,150.00
0.0400 kg Paku biasa 1/2" - 1" 15,400.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1500 oh Pekerja 55,000.00 8,250.00
0.0700 oh Tukang Kayu 75,000.00 5,250.00
0.0080 oh Kepala Tukang 75,000.00 600.00
0.0060 oh Mandor 81,000.00 486.00
Total : 14,586.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5
MM DAN 6 MM
1.1000 lbr Asbes semen 51,700.00
0.0100 kg Paku Biasa 1/2" - 1" 15,400.00
0.0300 oh Pekerja 55,000.00 1,650.00
0.0700 oh Tukang Kayu 75,000.00 5,250.00
0.0070 oh Kepala Tukang 75,000.00 525.00
0.0040 oh Mandor 81,000.00 324.00
Total : 7,749.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS 60,000.00
0.0300 kg Paku Biasa 1/2" - 1" 15,400.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.1000 oh Tukang Kayu 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 14,155.00

3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan 8,500,000.00
0.0100 kg Paku Biasa 1/2" - 1" 15,400.00
0.8000 oh Pekerja 55,000.00 44,000.00
0.8000 oh Tukang Kayu 75,000.00 60,000.00
0.0800 oh Kepala Tukang 75,000.00 6,000.00
0.0400 oh Mandor 81,000.00 3,240.00
Total : 113,240.00

4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil 24,500.00
0.1000 kg Paku list SQ 15,840.00
0.0500 oh Pekerja 55,000.00 2,750.00
0.0500 oh Tukang Kayu 75,000.00 3,750.00
0.0050 oh Kepala Tukang 75,000.00 375.00
0.0030 oh Mandor 81,000.00 243.00
Total : 7,118.00

5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm 8,500,000.00
0.0600 kg Paku Biasa 2" - 5" 15,840.00
1.1000 lbr Asbes 51,700.00
0.1800 oh Pekerja 55,000.00 9,900.00
0.3200 oh Tukang Kayu 75,000.00 24,000.00
0.0320 oh Kepala Tukang 75,000.00 2,400.00
0.0090 oh Mandor 81,000.00 729.00
Total : 37,029.00

6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup 19,800.00
0.3640 lbr Gypsum Board (120x240x9) 69,850.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.0500 oh Tukang Kayu 75,000.00 3,750.00
0.0050 oh Kepala Tukang 75,000.00 375.00
0.0050 oh Mandor 81,000.00 405.00
Total : 10,030.00

7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM


0.1100 kg Paku Sekrup 19,800.00
0.3640 lbr Kalsiboard 4.5 mm 79,200.00
0.1000 oh Pekerja 55,000.00 5,500.00
0.0500 oh Tukang Kayu 75,000.00 3,750.00
0.0050 oh Kepala Tukang 75,000.00 375.00
0.0050 oh Mandor 81,000.00 405.00
Total : 10,030.00

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
1.0000 bh Kloset duduk/ monoblok 1,365,000.00
6% x harga kloset Perlengkapan
3.3000 oh Pekerja 55,000.00 181,500.00
1.1000 oh Tukang batu 75,000.00 82,500.00
0.0010 oh Kepala Tukang 75,000.00 75.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.1600 oh Mandor 81,000.00 12,960.00
Total : 277,035.00

2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen 135,000.00
6.0000 kg Semen Portland 1,220.00
0.0100 m3 Pasir Pasang 160,000.00
1.0000 oh Pekerja 55,000.00 55,000.00
1.5000 oh Tukang batu 75,000.00 112,500.00
1.5000 oh Kepala Tukang 75,000.00 112,500.00
0.1600 oh Mandor 81,000.00 12,960.00
Total : 292,960.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

3 MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir 1,052,000.00
6% x harga Urin Perlengkapan
6.0000 kg Semen Portland 1,220.00
0.0100 m3 Pasir Pasang 160,000.00
1.0000 oh Pekerja 55,000.00 55,000.00
1.0000 oh Tukang batu 75,000.00 75,000.00
0.1000 oh Kepala Tukang 75,000.00 7,500.00
0.1000 oh Mandor 81,000.00 8,100.00
Total : 145,600.00

4 MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel 185,000.00
12% x harga wast Perlengkapan
6.0000 kg Semen Portland 1,220.00
0.0100 m3 Pasir Pasang 160,000.00
1.2000 oh Pekerja 55,000.00 66,000.00
1.4500 oh Tukang batu 75,000.00 108,750.00
0.1500 oh Kepala Tukang 75,000.00 11,250.00
0.1000 oh Mandor 81,000.00 8,100.00
Total : 194,100.00

5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass 230,000.00
18% x harga wast Perlengkapan
1.8000 oh Pekerja 55,000.00 99,000.00
2.7000 oh Tukang batu 75,000.00 202,500.00
0.5400 oh Kepala Tukang 75,000.00 40,500.00
0.1100 oh Mandor 81,000.00 8,910.00
Total : 350,910.00

6 MEMASANG 1 M1 PIPA GALVANIS 0,5" - 1 "


1.2000 m1 Pipa galvanis 38,000.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 55,000.00 2,970.00
0.0900 oh Tukang Pipa 62,500.00 5,625.00
0.0090 oh Kepala Tukang 75,000.00 675.00
0.0270 oh Mandor 81,000.00 2,187.00
Total : 11,457.00

7 MEMASANG 1 M1 PIPA GALVANIS 1,5" - 3"


1.2000 M' Pipa galvanis 175,000.00
35% x harga pipa Perlengkapan
0.1080 Oh Pekerja 55,000.00 5,940.00
0.1800 Oh Tukang Pipa 62,500.00 11,250.00
0.0180 Oh Kepala Tukang 75,000.00 1,350.00
0.0054 Oh Mandor 81,000.00 437.40
Total : 18,977.40

8 MEMASANG 1 M1 PIPA PVC TYPE AW 0,5" - 1,5"


1.2000 m1 Pipa PVC 16,000.00
35% x harga pipa Perlengkapan
0.0360 oh Pekerja 55,000.00 1,980.00
0.0600 oh Tukang Pipa 62,500.00 3,750.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0018 oh Mandor 81,000.00 145.80
Total : 6,325.80

9 MEMASANG 1 M1 PIPA PVC TYPE AW 2"


1.2000 m1 Pipa PVC 22,250.00
35% x harga pipa Perlengkapan
0.0540 oh Pekerja 55,000.00 2,970.00
0.0900 oh Tukang Pipa 62,500.00 5,625.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0090 oh Kepala Tukang 75,000.00 675.00
0.0027 oh Mandor 81,000.00 218.70
Total : 9,488.70

10 MEMASANG 1 M1 PIPA PVC TYPE AW 3" - 4"


1.2000 m1 Pipa PVC 62,500.00
35% x harga pipa Perlengkapan
0.0810 oh Pekerja 55,000.00 4,455.00
0.1350 oh Tukang Pipa 62,500.00 8,437.50
0.0135 oh Kepala Tukang 75,000.00 1,012.50
0.0041 oh Mandor 81,000.00 332.10
Total : 14,237.10
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

11 MEMASANG 1 BUAH KRAN 0,75" ATAU 0,5"


1.0000 bh Kran air 18,000.00
0.0250 bh Seal tape 2,600.00
0.0100 oh Pekerja 55,000.00 550.00
0.1000 oh Tukang Pipa 62,500.00 6,250.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 7,955.00

XI PEKERJAAN BESI DAN ALUMINIUM (SNI


7393:2008)
1 1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF 9,500.00
0.0060 oh Pekerja 55,000.00 330.00
0.0600 oh Tukang besi 75,000.00 4,500.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0003 oh Mandor 81,000.00 24.30
Total : 5,304.30

2 1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako 128,700.00
10.0000 bh Paku biasa 1 cm - 2,5 cm 19,800.00
7.0000 m' Besi strip 10,066.00
0.2000 oh Pekerja 55,000.00 11,000.00
0.2000 oh Tukang besi 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0010 oh Mandor 81,000.00 81.00
Total : 27,581.00

3 1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat 51,150.00
0.0150 kg Paku biasa 0,5" - 1" 19,800.00
0.0190 m3 Kayu papan kelas II/III 8,500,000.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.4000 oh Tukang besi 75,000.00 30,000.00
0.0250 oh Kepala Tukang 75,000.00 1,875.00
0.0013 oh Mandor 81,000.00 105.30
Total : 40,230.30

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa 115,500.00
0.0100 oh Pekerja 55,000.00 550.00
0.5000 oh Tukang besi 75,000.00 37,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.0050 oh Mandor 81,000.00 405.00
Total : 39,205.00

2 1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu 29,700.00
0.0150 oh Pekerja 55,000.00 825.00
0.1500 oh Tukang besi 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0008 oh Mandor 81,000.00 64.80
Total : 13,264.80

3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela 53,900.00
0.0100 oh Pekerja 55,000.00 550.00
0.1000 oh Tukang besi 75,000.00 7,500.00
0.0100 oh Kepala Tukang 75,000.00 750.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0005 oh Mandor 81,000.00 40.50
Total : 8,840.50

4 1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin 24,200.00
0.0150 oh Pekerja 55,000.00 825.00
0.1500 oh Tukang besi 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0008 oh Mandor 81,000.00 64.80
Total : 13,264.80

5 1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot 110,000.00
0.0200 oh Pekerja 55,000.00 1,100.00
0.2000 oh Tukang besi 75,000.00 15,000.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0010 oh Mandor 81,000.00 81.00
Total : 17,681.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

6 1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca 112,200.00
0.0150 oh Pekerja 55,000.00 825.00
0.1500 oh Tukang besi 75,000.00 11,250.00
0.0150 oh Kepala Tukang 75,000.00 1,125.00
0.0008 oh Mandor 81,000.00 64.80
Total : 13,264.80

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI


7395:2008)

1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ex: Mulia


11.8700 bh Keramik 30 x 30 cm 3,909.09
10.0000 kg Semen Portland 1,220.00
0.0450 m3 Pasir Pasang 160,000.00
1.5000 kg Semen warna/semen grouting 12,500.00
0.7000 oh Pekerja 55,000.00 38,500.00
0.3500 oh Tukang batu 75,000.00 26,250.00
0.0350 oh Kepala Tukang 75,000.00 2,625.00
0.0350 oh Mandor 81,000.00 2,835.00
Total : 70,210.00

2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ex: Mulia


26.5000 bh Keramik 20 x 20 cm 1,600.00
10.4000 kg Semen Portland 1,220.00
0.0450 m3 Pasir Pasang 160,000.00
1.6200 kg Semen warna/semen grouting 12,500.00
0.7000 oh Pekerja 55,000.00 38,500.00
0.3500 oh Tukang batu 75,000.00 26,250.00
0.0350 oh Kepala Tukang 75,000.00 2,625.00
0.0350 oh Mandor 81,000.00 2,835.00
Total : 70,210.00

3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm 3,909.09
1.1400 kg Semen Portland 1,220.00
0.0030 m3 Pasir Pasang 160,000.00
0.1000 kg Semen warna/semen grouting 12,500.00
0.0900 oh Pekerja 55,000.00 4,950.00
0.0900 oh Tukang batu 75,000.00 6,750.00
0.0090 oh Kepala Tukang 75,000.00 675.00
0.0050 oh Mandor 81,000.00 405.00
Total : 12,780.00

4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM ex : Mulia


26.5000 bh Keramik 20 x 20 cm 1,600.00
9.3000 kg Semen Portland 1,220.00
0.0180 m3 Pasir Pasang 160,000.00
1.9400 kg Semen warna/semen grouting 12,500.00
0.9000 oh Pekerja 55,000.00 49,500.00
0.4500 oh Tukang batu 75,000.00 33,750.00
0.0450 oh Kepala Tukang 75,000.00 3,375.00
0.0450 oh Mandor 81,000.00 3,645.00
Total : 90,270.00

5 1 M2 PASANG BATU ALAM 30 X 30 CM


11.8700 bh Batu alam 30 x 30 cm 6,318.44
10.0000 kg Semen Portland 176.00
0.0450 m3 Pasir Pasang 81,000.00
1.5000 kg Semen warna/semen grouting 37,400.00
0.7000 oh Pekerja 1,220.00 854.00
0.3500 oh Tukang batu 45,000.00 15,750.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0350 oh Kepala Tukang 12,500.00 437.50
0.0350 oh Mandor 68,000.00 2,380.00
Total : 19,421.50

6 1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II 8,500,000.00
0.0500 kg Paku sekrup 3,5' 29,150.00
0.1200 oh Pekerja 55,000.00 6,600.00
0.1200 oh Tukang kayu 75,000.00 9,000.00
0.0120 oh Kepala Tukang 75,000.00 900.00
0.0060 oh Mandor 81,000.00 486.00
Total : 16,986.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni 30,000.00
0.1500 kg Dempul 29,000.00
0.1700 kg Cat dasar 43,600.00
0.2600 kg Cat Penutup 2x 55,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
0.0700 oh Pekerja 55,000.00 3,850.00
0.0090 oh Tukang cat 68,000.00 612.00
0.0060 oh Kepala Tukang 75,000.00 450.00
0.0025 oh Mandor 81,000.00 202.50
Total : 5,114.50

2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis 59,000.00
0.0500 kg Dempul 29,000.00
0.1000 lbr Amplas 4,100.00
0.0100 bh Kuas 16,800.00
0.1600 oh Pekerja 55,000.00 8,800.00
0.1600 oh Tukang cat 68,000.00 10,880.00
0.0160 oh Kepala Tukang 75,000.00 1,200.00
0.0025 oh Mandor 81,000.00 202.50
Total : 21,082.50
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir 12,000.00
0.1000 kg Cat dasar 43,600.00
0.2600 kg Cat Penutup 2x 30,000.00
0.0200 oh Pekerja 55,000.00 1,100.00
0.0630 oh Tukang cat 68,000.00 4,284.00
0.0063 oh Kepala Tukang 75,000.00 472.50
0.0025 oh Mandor 81,000.00 202.50
Total : 6,059.00

4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar 43,600.00
0.1800 kg Cat Penutup 2x 30,000.00
0.0280 oh Pekerja 55,000.00 1,540.00
0.0420 oh Tukang cat 68,000.00 2,856.00
0.0042 oh Kepala Tukang 75,000.00 315.00
0.0025 oh Mandor 81,000.00 202.50
Total : 4,913.50

5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


0.1000 kg Meni besi 30,000.00
0.0100 lbr Kuas 16,800.00
0.0200 oh Pekerja 55,000.00 1,100.00
0.2000 oh Tukang cat 68,000.00 13,600.00
0.0200 oh Kepala Tukang 75,000.00 1,500.00
0.0100 oh Mandor 81,000.00 810.00
Total : 17,010.00

6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi 70,500.00
0.0060 oh Pekerja 55,000.00 330.00
0.0600 oh Tukang cat 68,000.00 4,080.00
0.0120 oh Kepala Tukang 75,000.00 900.00
0.0060 oh Mandor 81,000.00 486.00
Total : 5,796.00

7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220 ltr Politur 47,000.00
2.0000 lbr Amplas 4,100.00
0.0600 oh Pekerja 55,000.00 3,300.00
0.0600 oh Tukang cat 68,000.00 4,080.00
0.0160 oh Kepala Tukang 75,000.00 1,200.00
0.0025 oh Mandor 81,000.00 202.50

Total : 8,782.50
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
XV PEKERJAAN TETEMPELAN STYLE BALI

1 1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok 1,980.00
8.4000 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 350,000.00 350,000.00
Total : 350,000.00

2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan 10,000.00
8.4000 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 200,000.00 200,000.00
Total : 200,000.00

3 1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan 1,980.00
4.2000 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 200,000.00 200,000.00
Total : 200,000.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

4 1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras 12,500.00
4.2000 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 200,000.00 200,000.00
Total : 200,000.00

5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,500.00
5.2500 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 200,000.00 200,000.00
Total : 200,000.00

6 1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.2000 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 355,000.00 355,000.00
Total : 355,000.00

7 1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras 12,500.00
4.2000 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 355,000.00 355,000.00
Total : 355,000.00

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok 1,980.00
4.4917 bh Batu paras 12,500.00
5.2500 kg Semen 50 Kg 1,240.00
Upah Kerja ( Lumpsum) 280,000.00 280,000.00
Total : 280,000.00

XVI PEKERJAAN LANDSCAPE

1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 6 cm K225 58,000.00
0.2500 oh Tukang Batu 75,000.00 18,750.00
0.0250 oh Kepala Tukang 75,000.00 1,875.00
0.5000 oh Pekerja 55,000.00 27,500.00
0.0250 oh Mandor 81,000.00 2,025.00
Total : 50,150.00
2 Paving 10 x 20 cm tebal 6 cm K350 68,000.00 50,150.00
4 Paving 10 x 20 cm tebal 8 cm K225 68,000.00 50,150.00
5 Paving 10 x 20 cm tebal 8 cm K350 78,000.00 50,150.00
5 Paving 10 x 20 cm tebal 8 cm K425 88,000.00 50,150.00
7 Paving 20 x 20 cm tebal 6 cm K225 58,000.00 50,150.00
8 Paving 20 x 20 cm tebal 6 cm K350 68,000.00 50,150.00
10 Paving 20 x 20 cm tebal 8 cm K225 68,000.00 50,150.00
11 Paving 20 x 20 cm tebal 8 cm K350 78,000.00 50,150.00
12 Paving 20 x 20 cm tebal 8 cm K425 88,000.00 50,150.00
14 Paving 20 x 20 cm tebal 10 cm K225 78,000.00 50,150.00
15 Paving 20 x 20 cm tebal 10 cm K350 88,000.00 50,150.00
16 Paving 20 x 20 cm tebal 10 cm K425 98,000.00 50,150.00
18 Paving Tiga Berlian tebal 6 cm K225 58,000.00 50,150.00

19 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block 73,000.00
0.0690 m3 Pasir Urug 140,000.00
0.5000 oh Tukang Batu 75,000.00 37,500.00
0.0500 oh Kepala Tukang 75,000.00 3,750.00
1.0000 oh Pekerja 55,000.00 55,000.00
0.0500 oh Mandor 81,000.00 4,050.00
Total : 100,300.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

20 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat 45,000.00
9.2800 zak Semen 1,240.00
0.2000 m3 Pasir pasang 160,000.00
0.2500 oh Tukang Batu 75,000.00 18,750.00
0.0100 oh Kepala Tukang 75,000.00 750.00
0.6250 oh Pekerja 55,000.00 34,375.00
0.0310 oh Mandor 81,000.00 2,511.00
Total : 56,386.00
21 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225 58,000.00
0.4500 zak Semen 50 Kg 1,240.00
0.0023 m3 Pasir Pasang 160,000.00
0.3500 oh Tukang Batu 75,000.00 26,250.00
0.0350 oh Kepala Tukang 75,000.00 2,625.00
0.9500 oh Pekerja 55,000.00 52,250.00
0.0950 oh Mandor 81,000.00 7,695.00
Total : 88,820.00
22 Kanstein Jumbo (P:50,L:15,T:30 cm K225) 66,000.00 88,820.00
23 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225) 69,000.00 88,820.00
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4

24 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat 70,500.00
0.0710 kg Thiner 20,000.00
0.0300 oh Tukang Cat 68,000.00 2,040.00
0.0030 oh Kep. Tukang 75,000.00 225.00
0.1500 oh Pekerja 55,000.00 8,250.00
0.0150 oh Mandor 81,000.00 1,215.00
Total : 11,730.00

XVII PEKERJAAN ELEKTRIKAL

1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 13,200.00
3.0000 bt Pipa Clipsal 20 mm hitam 13,200.00
2.0000 bh Tee dos clipsal 20 mm hitam 7,700.00
15.0000 bj Klem clipsal 20 mm hitam 825.00
3.0000 bj Sock clipsal 20 mm hitam 2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P 11,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

2 1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme 13,200.00
3.0000 bt Pipa Clipsal 20 mm hitam 13,200.00
1.0000 bh Tee dos clipsal 20 mm hitam 7,700.00
15.0000 bj Klem clipsal 20 mm hitam 825.00
4.0000 bj Sock clipsal 20 mm hitam 2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P 11,000.00
1.0000 m1 Pipa flexible clipsal 20 mm hitam 11,550.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

3 1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone 4,400.00
8.0000 bt Pipa Clipsal 20 mm putih 13,200.00
1.0000 bh Tee dos clipsal 20 mm putih 7,700.00
25.0000 bj Klem clipsal 20 mm putih 825.00
5.0000 bj Sock clipsal 20 mm putih 2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P 11,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

4 1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof 6,600.00
6.0000 bt Pipa Clipsal 20 mm putih 13,200.00
2.0000 bh Tee dos clipsal 20 mm putih 7,700.00
20.0000 bj Klem clipsal 20 mm putih 825.00
6.0000 bj Sock clipsal 20 mm putih 2,200.00
1.0000 bj Inbow dos plastik clipsal E 157 P 11,000.00
1.0000 ttk Biaya pasang 25,000.00 25,000.00
Total : 25,000.00

Mangupura, 16 Des
Kepala Dinas Cip
Kabupaten B

Ir. Ni Luh Putu Dessy D


Pembina T
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 2 3 4
NIP. 1961101019
AN

HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

13,750.00
3,050.00
57,420.00
775.00
1,728.00
122,400.00
858.00
13,500.00

213,481.00 253,601.00

20,400.00
286.00
17,500.00

38,186.00 52,341.00

123,750.00
495,000.00
12,155.00
11,072.60
42,700.00
24,000.00
15,500.00
28,800.00
39,000.00
12,787.50
33,000.00
8,976.00
17,325.00
3,600.00

867,666.10 1,229,216.10

18,700.00
577,500.00
4,290.00
12,810.00
4,650.00
9,600.00
70,125.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

697,675.00 921,725.00

33,000.00
759,000.00
10,010.00
70,125.00

872,135.00 1,054,935.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

9,550.00

13,750.00
511,500.00
4,290.00
21,960.00
4,650.00
9,600.00
70,125.00
81,000.00

716,875.00 940,925.00

99,000.00
1,144.00
35,000.00

135,144.00 157,765.50

8,000.00
9,350.00

17,350.00 38,538.00

29,550.00
17,550.00
1,600.00

48,700.00 107,750.00

393,658.00

369,358.00

43,275.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

53,145.00

63,177.00

57,592.00

87,360.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

69,645.00

3,155.00

18,960.00

31,550.00

168,000.00

168,000.00 185,310.00

16,500.00

16,500.00 25,965.00

156,000.00

156,000.00 171,775.00

96,000.00

96,000.00 127,550.00

102,000.00

102,000.00 117,775.00

236,400.00
246,440.00
77,600.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

560,440.00 710,890.00

236,400.00
198,860.00
83,200.00

518,460.00 668,910.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

236,400.00
165,920.00
87,040.00

489,360.00 639,810.00

236,400.00
142,740.00
89,760.00

468,900.00 619,350.00

236,400.00
111,020.00
93,440.00

440,860.00 591,310.00

94,560.00
236,680.00
48,360.00
89,856.00
1,122,534.00
31,680.00

1,623,670.00 1,894,565.00

88,650.00
236,680.00
48,360.00
89,856.00

463,546.00 671,185.00

236,400.00
60,480.00

296,880.00 375,114.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

2,240.00
12,400.00
24,000.00
59,780.00
307,360.50
12,320.00
67,500.00
1,716.00
2,400.00
1,485.00

491,201.50 579,691.50

2,660.00
14,570.00
28,800.00
73,810.00
400,905.00
15,840.00
80,000.00
1,716.00
2,880.00
1,485.00

622,666.00 736,991.00

182,000.00
53,070.00
12,800.00

247,870.00 299,800.00

182,000.00
40,199.00
14,560.00

236,759.00 288,689.00

182,000.00
32,391.00
14,880.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

229,271.00 281,201.00

182,000.00
27,084.00
16,320.00

225,404.00 277,334.00

182,000.00
22,570.00
19,520.00

224,090.00 276,020.00

91,000.00
23,119.00
6,080.00

120,199.00 146,164.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

91,000.00
17,531.40
6,400.00

114,931.40 140,896.40

91,000.00
14,030.00
6,880.00

111,910.00 137,875.00

91,000.00
11,809.60
7,200.00

110,009.60 135,974.60

91,000.00
10,150.40
7,840.00

108,990.40 134,955.40

91,000.00
7,930.00
8,000.00

106,930.00 132,895.00

29,375.00
9,150.00
4,320.00
17,372.55

60,217.55 87,282.55

29,375.00
9,150.00
4,320.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

42,845.00 69,910.00

1,500,000.00
13,420.00
5,600.00

1,519,020.00 1,544,985.00

33,000.00
84,000.00
171.60
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
18,000.00

135,171.60 144,958.60

18,914.88
2,560.00

21,474.88 51,564.88

12,473.28
3,200.00

15,673.28 45,763.28

9,486.72
3,680.00

13,166.72 43,256.72

7,612.80
3,840.00

11,452.80 41,542.80

6,324.48
4,160.00

10,484.48 40,574.48

5,387.52
4,320.00

9,707.52 39,797.52

4,216.32
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
4,640.00

8,856.32 38,946.32

16,631.04
4,320.00

20,951.04 61,233.04

12,648.96
4,960.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

17,608.96 57,890.96

10,150.40
5,120.00

15,270.40 55,552.40

8,432.64
5,600.00

14,032.64 54,314.64

7,183.36
5,760.00

12,943.36 53,225.36

610.00
2,080.00

2,690.00 40,414.00

5,270.40
960.00

6,230.40 32,195.40

3,791.76

3,791.76 18,914.76

1,952.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,952.00 9,051.00

7,734.80
1,920.00

9,654.80 39,744.80

3,965.00

3,965.00 12,325.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

8,250,000.00
19,250.00
13,750.00

8,283,000.00 10,428,850.00

6,600,000.00
19,250.00
13,750.00

6,633,000.00 8,472,300.00

340,000.00
770.00

340,770.00 448,103.00

264,000.00
770.00

264,770.00 372,103.00

340,000.00
6,875.00

346,875.00 653,425.00

204,000.00
106,700.00
4,125.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
314,825.00 560,065.00

544,000.00
6,875.00

550,875.00 857,425.00

212,500.00
462.00
6,875.00
60,000.00

279,837.00 586,387.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

217,600.00
462.00
6,875.00
60,000.00

284,937.00 530,177.00

510,000.00
2,310.00

512,310.00 741,295.00

217,600.00
462.00
6,875.00
61,600.00

286,537.00 531,777.00

212,500.00
462.00
11,000.00
61,600.00
44,000.00

329,562.00 574,802.00

8,250,000.00
150,990.00
86,240.00

8,487,230.00 9,713,430.00

9,000,000.00
150,990.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
86,240.00

9,237,230.00 11,291,115.00

8,250,000.00
150,990.00
46,200.00

8,447,190.00 9,182,910.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

23,800.00
21,600.00
3,850.00

49,250.00 63,405.00

23,800.00
43,200.00
3,850.00

70,850.00 85,005.00

1,237,500.00
3,080.00

1,240,580.00 1,257,566.00

26,180.00
3,080.00

29,260.00 68,335.00

27,710.00
3,850.00

31,560.00 68,120.00

91,800.00
1,540.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
93,340.00 115,745.00

93,500.00
770.00

94,270.00 116,675.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

210,000.00
2,310.00

212,310.00 258,333.00

210,000.00
2,310.00
52,976.00
7,700.00

272,986.00 319,009.00

210,000.00
2,310.00
51,600.00
7,700.00

271,610.00 332,920.00

59,500.00
1,540.00
2,970.00

64,010.00 247,940.00

24,000.00
770.00

24,770.00 32,451.00

301,340.00
87,516.99
92,497.41
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
5,375.00

486,729.40 606,927.40

336,720.00
83,387.88
93,701.08
5,375.00

519,183.96 639,381.96
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

364,780.00
80,467.29
94,164.03
5,375.00

544,786.32 664,984.32

397,720.00
76,539.60
95,275.11
5,375.00

574,909.71 695,107.71

429,440.00
73,619.01
95,460.29
5,375.00

603,894.30 724,092.30

452,620.00
70,295.58
96,941.73
5,375.00

625,232.31 745,430.31

468,480.00
69,691.32
96,201.01
5,375.00

639,747.33 759,945.33

495,320.00
68,885.64
94,997.34
5,375.00

664,577.98 784,775.98
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
503,860.00
68,583.51
94,534.39
5,375.00

672,352.90 792,550.90

535,580.00
67,475.70
93,145.54
5,375.00

701,576.24 821,774.24
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

546,560.00
67,173.57
92,590.00
5,375.00

711,698.57 831,896.57

93,544.50
2,640.00

96,184.50 106,133.50

110,000.00
4,290.00
1,650.00

115,940.00 168,096.00

110,000.00
4,290.00
1,650.00

115,940.00 168,096.00

110,000.00
5,720.00
3,300.00
99,000.00
40,617.50
198,000.00

456,637.50 522,835.50

110,000.00
5,720.00
3,300.00
118,800.00
40,617.50
198,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
476,437.50 542,635.50

110,000.00
5,720.00
3,300.00
99,000.00
40,617.50
594,000.00

852,637.50 918,835.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

82,500.00
5,720.00
3,300.00
132,000.00
40,617.50
297,000.00
8,000.00

569,137.50 635,335.50

82,500.00
5,720.00
2,475.00
99,000.00
40,617.50
198,000.00

428,312.50 494,510.50

72,600.00
8,580.00
49,500.00

130,680.00 143,703.00

550,000.00
21,450.00
6,600.00
1,398,713.00
39,600.00
409,920.00
83,700.00
155,520.00

2,665,503.00 3,194,993.00

742,500.00
28,600.00
9,900.00
1,870,890.00
52,800.00
409,920.00
83,700.00
155,520.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

3,353,830.00 3,954,353.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,100,000.00
57,200.00
33,000.00
2,806,335.00
79,200.00
409,920.00
83,700.00
155,520.00
825,000.00
406,175.00
1,980,000.00

7,936,050.00 8,684,493.00

880,000.00
45,760.00
26,400.00
1,870,890.00
52,800.00
409,920.00
83,700.00
155,520.00
770,000.00
324,940.00
1,584,000.00

6,203,930.00 6,853,288.00

880,000.00
45,760.00
26,400.00
1,403,167.50
39,600.00
409,920.00
83,700.00
155,520.00
660,000.00
324,940.00
3,168,000.00

7,197,007.50 7,726,722.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
660,000.00
45,760.00
26,400.00
1,398,713.00
39,600.00
409,920.00
83,700.00
155,520.00
880,000.00
324,940.00
2,376,000.00

6,400,553.00 6,930,043.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

687,500.00
42,900.00
19,800.00
1,870,890.00
52,800.00
409,920.00
83,700.00
155,520.00
577,500.00
290,125.00
1,386,000.00

5,576,655.00 6,177,178.00

5,500.00
143.00
26,727.00
792.00
4,880.00
930.00
1,728.00

40,700.00 56,279.00

8,250.00
286.00
32,072.40
880.00
6,710.00
1,395.00
2,880.00

52,473.40 78,198.40

38,500.00

38,500.00 52,348.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

49,500.00

49,500.00 63,348.00

44,000.00
9,760.00
5,120.00

58,880.00 97,542.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

21,750.00
2,640.00

24,390.00 38,432.00

57,600.00
174,900.00

232,500.00 247,794.00

561,000.00
3,080.00

564,080.00 594,483.00

20,460.00
924.00
715.00
34,000.00

56,099.00 84,247.00

81,250.00
5,225.00

86,475.00 98,285.00

32,725.00
308.00

33,033.00 45,069.00

30,450.00

30,450.00 43,473.00

15,345.00
616.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

15,961.00 30,547.00

56,870.00
154.00

57,024.00 64,773.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

22,500.00
462.00

22,962.00 37,117.00

127,500.00
154.00

127,654.00 240,894.00

25,725.00
1,584.00

27,309.00 34,427.00

102,000.00
950.40
56,870.00

159,820.40 196,849.40

2,178.00
25,425.40

27,603.40 37,633.40

2,178.00
28,828.80

31,006.80 41,036.80

1,365,000.00
81,900.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,446,900.00 1,723,935.00

135,000.00
7,320.00
1,600.00

143,920.00 436,880.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

1,052,000.00
63,120.00
7,320.00
1,600.00

1,124,040.00 1,269,640.00

185,000.00
22,200.00
7,320.00
1,600.00

216,120.00 410,220.00

230,000.00
41,400.00

271,400.00 622,310.00

45,600.00
13,300.00

58,900.00 70,357.00

210,000.00
61,250.00

271,250.00 290,227.40

19,200.00
5,600.00

24,800.00 31,125.80

26,700.00
7,787.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

34,487.50 43,976.20

75,000.00
21,875.00

96,875.00 111,112.10
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

18,000.00
65.00

18,065.00 26,020.00

10,925.00

10,925.00 16,229.30

141,570.00
198,000.00
70,462.00

410,032.00 437,613.00

53,707.50
297.00
161,500.00

215,504.50 255,734.80

115,500.00

115,500.00 154,705.00

29,700.00

29,700.00 42,964.80

53,900.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

53,900.00 62,740.50

24,200.00

24,200.00 37,464.80

110,000.00

110,000.00 127,681.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

123,420.00

123,420.00 136,684.80

46,400.91
12,200.00
7,200.00
18,750.00

84,550.91 154,760.91

42,400.00
12,688.00
7,200.00
20,250.00

82,538.00 152,748.00

13,017.27
1,390.80
480.00
1,250.00

16,138.07 28,918.07

42,400.00
11,346.00
2,880.00
24,250.00

80,876.00 171,146.00

74,999.88
1,760.00
3,645.00
56,100.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

136,504.88 155,926.38

25,500.00
1,457.50

26,957.50 43,943.50

6,000.00
4,350.00
7,412.00
14,300.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

32,062.00 37,176.50

8,850.00
1,450.00
410.00
168.00

10,878.00 31,960.50

1,200.00
4,360.00
7,800.00

13,360.00 19,419.00

5,232.00
5,400.00

10,632.00 15,545.50

3,000.00
168.00

3,168.00 20,178.00

21,150.00

21,150.00 26,946.00

24,534.00
8,200.00

32,734.00 41,516.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

217,800.00
10,416.00

228,216.00 578,216.00

137,500.00
10,416.00

147,916.00 347,916.00

108,900.00
5,208.00

114,108.00 314,108.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

229,166.67
5,208.00

234,374.67 434,374.67

108,900.00
56,145.83
6,510.00

171,555.83 371,555.83

108,900.00
5,208.00

114,108.00 469,108.00

229,166.67
5,208.00

234,374.67 589,374.67

108,900.00
56,145.83
6,510.00

171,555.83 451,555.83

58,000.00

58,000.00 108,150.00
68,000.00 118,150.00
68,000.00 118,150.00
78,000.00 128,150.00
88,000.00 138,150.00
58,000.00 108,150.00
68,000.00 118,150.00
68,000.00 118,150.00
78,000.00 128,150.00
88,000.00 138,150.00
78,000.00 128,150.00
88,000.00 138,150.00
98,000.00 148,150.00
58,000.00 108,150.00

73,000.00
9,660.00

82,660.00 182,960.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

54,000.00
11,507.20
32,000.00

97,507.20 153,893.20

58,000.00
558.00
368.00

58,926.00 147,746.00
109,507.20 198,327.20
112,507.20 201,327.20
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6

20,022.00
1,420.00

21,442.00 33,172.00

105,600.00
39,600.00
15,400.00
12,375.00
6,600.00
11,000.00

190,575.00 215,575.00

132,000.00
39,600.00
7,700.00
12,375.00
8,800.00
11,000.00
11,550.00
25,000.00
248,025.00 273,025.00

110,000.00
105,600.00
7,700.00
20,625.00
11,000.00
11,000.00

265,925.00 290,925.00

132,000.00
79,200.00
15,400.00
16,500.00
13,200.00
11,000.00

267,300.00 292,300.00

Mangupura, 16 Desember 2013


Kepala Dinas Cipta Karya
Kabupaten Badung

Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5 6
NIP. 196110101994032001
REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN
BULAN DESEMBER TAHUN 2013 UTK JANUARI 2014

NO URAIAN PEKERJAAN
1 2
I PEKERJAAN PERSIAPAN (SNI 03-2835-2002)
1 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER
2 1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK
3 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN
4 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
5 1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
6 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
7 1 M2 PEMBUATAN BEDENG BURUH
8 1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM
9 1 M2 PEMBUATAN STEGGER DARI BAMBU
10 1 M2 PEMBUATAN JALAN SEMENTARA
11 1 M3 BONGKARAN BETON BERTULANG
12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

II PEKERJAAN TANAH (SNI 2835 : 2008)


1 1 M3 GALIAN TANAH BIASA DALAM 1 METER
2 1 M3 GALIAN TANAH BIASA DALAM 2 METER
3 1 M3 GALIAN TANAH BIASA DALAM 3 METER
4 1 M3 GALIAN TANAH KERAS DALAM 1METER
5 1 M3 GALIAN TANAH CADAS DALAM 1 METER
6 1 M3 GALIAN TANAH LUMPUR DALAM 1 METER
7 1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER
8 1 M3 PEMBUANGAN TANAH SEJAUH 15 METER
9 1 M3 URUGAN KEMBALI
10 1 M3 PEMADATAN TANAH ( Per 20 Cm )
11 1 M3 URUGAN PASIR
12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM
13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan
14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN
15 1 M3 URUGAN LIMESTONE PADAT

III PEKERJAAN PONDASI (SNI 2836 : 2008)


1 1 M3 BATU KALI CAMP. 1 PC : 3 PS
2 1 M3 BATU KALI CAMP. 1 PC : 4 PS
3 1 M3 BATU KALI CAMP. 1 PC : 5 PS

Hal. 128
NO URAIAN PEKERJAAN
1 2
4 1 M3 BATU KALI CAMP. 1 PC : 6 PS
5 1 M3 BATU KALI CAMP. 1 PC : 8 PS
6 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
7 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M
8 1 M3 PASANGAN BATU KOSONG

IV PEKERJAAN DINDING (SNI 6897 : 2008)


1 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
2 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS
3 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS
4 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS
5 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS
6 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS
7 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS
8 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS
9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS
10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS
11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS
12 1 M2 PASAANGAN BATU ALAM 30 X 30 CAMP 1PC : 2PS
13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) / BATAKO
14 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI
15 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM
16 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

V PEKERJAAN PLESTERAN (SNI 2837 : 2008)


1 1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM
2 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM
3 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM
4 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM
5 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM
6 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM
7 1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM
8 1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM
9 1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM
10 1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM
11 1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM
12 1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM
13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM

Hal. 129
NO URAIAN PEKERJAAN
1 2
14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
15 1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')
17 1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
18 1 M2 PEKERJAAN ACIAN

VI PEKERJAAN KAYU (SNI 3434 : 2008)


1 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I
2 MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III
3 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II
4 MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III
5 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II
6 MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU DAN JENDELA KACA, KAYU KELAS I
7 MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
8 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
9 MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II
10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II
11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I
12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE,
KAYU KELAS II
13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS
I,II,III Bentang 6 M'
14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I
15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II
16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II
17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II
18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II
19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III
20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III
21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II
22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II
23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA
24 KAYU KELAS II
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA
25 KAYU KELAS II
26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I
27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

Hal. 130
NO URAIAN PEKERJAAN
1 2

VII PEKERJAAN BETON ( SNI 7394:2008)


1 MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87
2 MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
3 MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72
4 MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66
5 MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61
6 MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58
7 MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56
8 MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53
9 MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52
10 MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49
11 MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48
12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
13 1 M2 PASANG BEKISTING UNTUK PONDASI
14 1 M2 PASANG BEKISTING UNTUK SLOOF
15 1 M2 PASANG BEKISTING UNTUK KOLOM
16 1 M2 PASANG BEKISTING UNTUK BALOK
17 1 M2 PASANG BEKISTING UNTUK LANTAI
18 1 M2 PASANG BEKISTING UNTUK DINDING
19 1 M2 PASANG BEKISTING UNTUK TANGGA
20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON
21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)
22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)
23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)
24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)
27 1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)
28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)
29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)
30 1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI
31 1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M
32 1 M3 PASANGAN BATU KOSONG
33 1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang
34 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1 1 M2 PEKERJAAN ATAP GENTENG PLENTONG

Hal. 131
NO URAIAN PEKERJAAN
1 2
2 1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT
3 1 M1 PASANG BUBUNGAN GENTENG PLENTONG
4 1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM
5 1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
6 1 M2 PEKERJAAN ATAP SIRAP
7 1 M2 PEKERJAAN ATAP NOK SIRAP
8 1 M2 PASANG ATAP ALANG-ALANG 3 M1
9 1 M2 PEKERJAAN ATAP SENG GELOMBANG
10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL
11 1 M1 PASANG NOK SENG GELOMBANG

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


1 MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM
2 1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM
3 1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING
4 1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL
5 1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA
6 1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM
7 1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

X PEKERJAAN SANITASI ( SNI 2002 )


1 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK
2 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
3 MEMASANG 1 BUAH URINOIR
4 MEMASANG 1 BUAH WASHTAFEL KIA
5 MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3
6 MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
7 MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
8 MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
9 MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"
11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

XI PEKERJAAN BESI DAN ALUMINIUM (SNI 7393:2008)


1 1 KG PASANG RANGKA ATAP BAJA
2 1 M2 PASANG JENDELA NAKO
3 1 M1 PASANG TALANG DATAR, SENG BJLS 28

Hal. 132
NO URAIAN PEKERJAAN
1 2

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 1 BH PASANG KUNCI TANAM BIASA
2 1 PS PASANG ENGSEL PINTU
3 1 PS PASANG ENGSEL JENDELA KUPU-KUPU
4 1 BH PASANG KAIT ANGIN
5 1 BH PASANG KUNCI SLOT
6 1 M2 PASANG KACA, TEBAL 3 - 5 MM

XIII PEK. PENUTUP LANTAI DAN DINDING (SNI 7395:2008)


1 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM ex: Mulia
2 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ex: Mulia
3 1 M1 PASANG PLIN KERAMIK 10 X 30 CM
4 1 M2 PASANG DINDING KERAMIK 20 X 20 CM ex : Mulia
5 1 M1 PASANG PLIN KAYU 2 X 10 CM

XIV PEKERJAAN PENGECATAN (SNI 2002)


1 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
2 1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS
3 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
4 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
5 1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
6 1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI
7 1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

XV PEKERJAAN TETEMPELAN STYLE BALI


1 1 M2 PASANGAN BATA GOSOK 2 MUKA
2 1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA
3 1 M2 PASANGAN BATA GOSOK 1 MUKA
4 1 M2 PASANGAN PARAS 1 MUKA
5 1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA
6 1 M2 PASANGAN BATA GOSOK DIUKIR
7 1 M2 PASANGAN PARAS DIUKIR

Hal. 133
NO URAIAN PEKERJAAN
1 2

8 1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

XVI PEKERJAAN LANDSCAPE


1 1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225
2 Paving 10 x 20 cm tebal 6 cm K350
3 Paving 10 x 20 cm tebal 8 cm K225
4 Paving 10 x 20 cm tebal 8 cm K350
5 Paving 20 x 20 cm tebal 6 cm K225
6 Paving 20 x 20 cm tebal 6 cm K350
7 Paving 20 x 20 cm tebal 8 cm K225
8 Paving 20 x 20 cm tebal 8 cm K350
9 Paving 20 x 20 cm tebal 8 cm K425
10 Paving 20 x 20 cm tebal 10 cm K225
11 Paving 20 x 20 cm tebal 10 cm K350
12 Paving 20 x 20 cm tebal 10 cm K425
13 Paving Tiga Berlian tebal 6 cm K225
14 1 M2 PASANGAN GRASS BLOCK
15 1 M2 PASANGAN KORAL SIKAT
16 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
17 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
18 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
19 1 M2 PENGECATAN KANSTEIN

XVII PEKERJAAN ELEKTRIKAL


1 1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
2 1 TITIK INSTALASI AC
3 1 TITIK INSTALASI TELEPHONE
4 1 TITIK INSTALASI MATV

Mangupura, 16 Desember 2013


Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001

Hal. 134
KERJAAN
ARI 2014

HARGA
3

Rp. 253,601.00
Rp. 52,341.00
Rp. 1,229,216.10
Rp. 921,725.00
Rp. 1,054,935.00
Rp. 9,550.00
Rp. 940,925.00
Rp. 157,765.50
Rp. 38,538.00
Rp. 107,750.00
Rp. 393,658.00
Rp. 369,358.00

Rp. 43,275.00
Rp. 53,145.00
Rp. 63,177.00
Rp. 57,592.00
Rp. 87,360.00
Rp. 69,645.00
Rp. 3,155.00
Rp. 18,960.00
Rp. -
Rp. 31,550.00
Rp. 185,310.00
Rp. 25,965.00
Rp. 171,775.00
Rp. 127,550.00
Rp. 117,775.00

Rp. 710,890.00
Rp. 668,910.00
Rp. 639,810.00

Hal. 135
HARGA
3
Rp. 619,350.00
Rp. 591,310.00
Rp. 1,894,565.00
Rp. 671,185.00
Rp. 375,114.00

Rp. 299,800.00
Rp. 288,689.00
Rp. 281,201.00
Rp. 277,334.00
Rp. 276,020.00
Rp. 146,164.00
Rp. 140,896.40
Rp. 137,875.00
Rp. 135,974.60
Rp. 134,955.40
Rp. 132,895.00
Rp. 150,081.38
Rp. 87,282.55
Rp. 69,910.00
Rp. 1,544,985.00
Rp. 144,958.60

Rp. 51,564.88
Rp. 45,763.28
Rp. 43,256.72
Rp. 41,542.80
Rp. 40,574.48
Rp. 39,797.52
Rp. 38,946.32
Rp. 61,233.04
Rp. 57,890.96
Rp. 55,552.40
Rp. 54,314.64
Rp. 53,225.36
Rp. 40,414.00

Hal. 136
HARGA
3
Rp. 32,195.40
Rp. 18,914.76
Rp. 9,051.00
Rp. 39,744.80
Rp. 12,325.00

Rp. 10,428,850.00
Rp. 8,472,300.00
Rp. 448,103.00
Rp. 372,103.00
Rp. 653,425.00
Rp. 560,065.00
Rp. 857,425.00

Rp. 586,387.00

Rp. 530,177.00
Rp. 741,295.00
Rp. 531,777.00

Rp. 574,802.00

Rp. 9,713,430.00
Rp. 11,291,115.00
Rp. 9,182,910.00
Rp. 63,405.00
Rp. 85,005.00
Rp. 1,257,566.00
Rp. 68,335.00
Rp. 68,120.00
Rp. 115,745.00
Rp. 116,675.00
Rp. 258,333.00

Rp. 319,009.00

Rp. 332,920.00
Rp. 247,940.00
Rp. 32,451.00

Hal. 137
HARGA
3

Rp. 606,927.40
Rp. 639,381.96
Rp. 664,984.32
Rp. 695,107.71
Rp. 724,092.30
Rp. 745,430.31
Rp. 759,945.33
Rp. 784,775.98
Rp. 792,550.90
Rp. 821,774.24
Rp. 831,896.57
Rp. 106,133.50
Rp. 168,096.00
Rp. 168,096.00
Rp. 522,835.50
Rp. 542,635.50
Rp. 918,835.50
Rp. 635,335.50
Rp. 494,510.50
Rp. 143,703.00
Rp. 3,194,993.00
Rp. 3,954,353.00
Rp. 8,684,493.00
Rp. 6,853,288.00
Rp. 7,726,722.50
Rp. 6,930,043.00
Rp. 6,177,178.00
Rp. 56,279.00
Rp. 78,198.40
Rp. 1,894,565.00
Rp. 671,185.00
Rp. 375,114.00
Rp. 579,691.50
Rp. 736,991.00

Rp. 52,348.00

Hal. 138
HARGA
3
Rp. 63,348.00
Rp. 97,542.00
Rp. 38,432.00
Rp. 247,794.00
Rp. 594,483.00
Rp. 84,247.00
Rp. 98,285.00
Rp. 45,069.00
Rp. 43,473.00
Rp. 30,547.00

Rp. 64,773.00
Rp. 37,117.00
Rp. 240,894.00
Rp. 34,427.00
Rp. 196,849.40
Rp. 37,633.40
Rp. 41,036.80

Rp. 1,723,935.00
Rp. 436,880.00
Rp. 1,269,640.00
Rp. 410,220.00
Rp. 622,310.00
Rp. 70,357.00
Rp. 290,227.40
Rp. 31,125.80
Rp. 43,976.20
Rp. 111,112.10
Rp. 26,020.00

Rp. 16,229.30
Rp. 437,613.00
Rp. 255,734.80

Hal. 139
HARGA
3

Rp. 154,705.00
Rp. 42,964.80
Rp. 62,740.50
Rp. 37,464.80
Rp. 127,681.00
Rp. 136,684.80

Rp. 154,760.91
Rp. 152,748.00
Rp. 28,918.07
Rp. 171,146.00
Rp. 43,943.50

Rp. 37,176.50

Rp. 31,960.50
Rp. 19,419.00

Rp. 15,545.50
Rp. 20,178.00
Rp. 26,946.00
Rp. 41,516.50

Rp. 578,216.00
Rp. 347,916.00
Rp. 314,108.00
Rp. 434,374.67
Rp. 371,555.83
Rp. 469,108.00
Rp. 589,374.67

Hal. 140
HARGA
3

Rp. 451,555.83

Rp. 108,150.00
Rp. 118,150.00
Rp. 118,150.00
Rp. 128,150.00
Rp. 108,150.00
Rp. 118,150.00
Rp. 118,150.00
Rp. 128,150.00
Rp. 138,150.00
Rp. 128,150.00
Rp. 138,150.00
Rp. 148,150.00
Rp. 108,150.00
Rp. 182,960.00
Rp. 153,893.20
Rp. 147,746.00
Rp. 198,327.20
Rp. 201,327.20
Rp. 33,172.00

Rp. 215,575.00
Rp. 273,025.00
Rp. 290,925.00
Rp. 292,300.00

esember 2013
Cipta Karya
Badung

Dharmayanty, M.T
Tk. I
994032001

Hal. 141
DAFTAR HARGA SATUAN BAHAN TAMBAHAN
BULAN JULI TAHUN 2013
A. Harga Satuan Bahan

NO NAMA BARANG SATUAN


1 2 3

BATU
Batu Candi
1 20x20x2 m2
2 15x30x2 m2
3 20x30x2 m2
4 20x40x2 m2
5 30x30x2 m2
6 40x40x2 m2
7 30x60x2 m2
8 20x40x3 m2
9 30x30x3 m2
10 30x30x5 m2
11 40x40x5 m2

Palimanan putih
1 20x20x2 m2
2 20x30x2 m2
3 20x40x2 m2
4 20x40x3 m2
5 30x30x3 m2

Palimanan Serat Kuning


1 20x30 m2
2 20x40 m2
3 15x30 m2

Palimanan Cirebon
1 15x30x2 m2
2 20x30x2 m2
3 20x40x2 m2
4 30x30x2 m2

Alur Bali Green Lurus


1 20x30 m2
2 20x40 m2

Alur Bali Green Cukil


1 20x30 m2
2 20x40 m2
3 20x20 m2

Batu Bali Green


1 15x30 m2
2 20x30 m2
3 20x40 m2

Harga Barang dan Upah Hal. 142


NO NAMA BARANG SATUAN
1 2 3
4 40x40 m2

PARAS
Paras Kerobokan
1 20x40x3 Bj
2 20x40x5 Bj

Paras Kelating
1 20x40x3 Bj
2 20x40x5 Bj

Alur Andesit Lurus


1 20x40 m3
2 30x60 m3

Alur and cukil


1 20x40 m2
2 15x30 m2

Alur And Gelombang m2


Alur And Gelombang lurus m2

Random Singaraja m2
Random Cirebon m2
Random Jember m2

Harga Barang dan Upah Hal. 143


NO NAMA BARANG SATUAN
1 2 3

Harga Barang dan Upah Hal. 144


AMBAHAN

HARGA SATUAN
4

78,000.00
78,000.00
78,000.00
80,000.00
80,000.00
105,000.00
115,000.00
135,000.00
135,000.00
165,000.00
185,000.00

65,000.00
67,000.00
68,000.00
110,000.00
110,000.00

75,000.00
75,000.00
75,000.00

72,000.00
73,000.00
75,000.00
80,000.00

105,000.00
105,000.00

105,000.00
105,000.00
105,000.00

75,000.00
75,000.00
75,000.00

Harga Barang dan Upah Hal. 145


HARGA SATUAN
4
80,000.00

6,000.00
8,000.00

6,000.00
8,000.00

135,000.00
140,000.00

135,000.00
135,000.00

140,000.00
140,000.00

25,000.00
65,000.00
45,000.00

Harga Barang dan Upah Hal. 146


HARGA SATUAN
4

Harga Barang dan Upah Hal. 147